Search Results

Search found 18 results on 1 pages for 'yasser'.

Page 1/1 | 1 

  • How can I update Ubuntu if the update servers are blocked?

    - by Yasser Hussain
    I connect to the Internet through my college wifi and for some weird reason they have blocked all Ubuntu updates, so I cannot update Ubuntu through the common "Update Manager" way. So I was wondering if there was some other method to update Ubuntu, maybe manually download each package and then install them or download a DVD image which already has all the packages. I have Ubuntu 11.10 installed currently.

    Read the article

  • the "additional drivers" shows nothing

    - by Yasser al-Zainy
    I started using Ubuntu 32 bit last week. I love it but I recognized there was a problem with the cooling system. the fan doesn't stop and slightly loud all the time (that wasn't the case while running with windows 7). I told a friend who claimed that it should be a drivers problem. My machine is dell inspiron n5110 and the official site recommends win 7 64 bit only. there's no support for linux. (the page showing the machine drivers and system recommendation I tried to fix the problem using the "additional drivers", it opens but it shows nothing (no drivers to activate, just the help and the close buttons) is there a way to fix this?

    Read the article

  • Use new hosting which is already used buy a domain, for a new domain

    - by Yasser
    I am new to web hosting n stuffs, I am having a domain called www.yassershaikh.com from domainz.in, from where I had taken a LINUX hosting. I am running a wordpress blog there. Now I have taken a another domain from goDaddy called www.codera.org, now here I want to use Windows hosting, but that I am not planning to buy for atleast 6 months. So I was thinking if it's possible to use the hosting(LINUX) which I am using for my first site. Is this possible ? Please guide me on this please. (Also for now I am just redirecting it to one page on my blog.)

    Read the article

  • ip-up does not trigger when using built-in cisco vpn on mac osx lion

    - by Yasser Sobhdel
    I am using Cisco VPN client over lion and I want to make the ip-up and ip-down work. There is no sign of any action taken when I connect or disconnect this VPN connection. I really doubt whether the syntax has been changed or even this kind if connection is triggering the ip-up. Logically, it must be set over ppp but when using the following codes and instructions on them, there is no sign of any output in the log file: http://www.macfreek.nl/mindmaster/Modify_PPTP_Routing_Table http://www.aidanfindlater.com/use-vpn-for-specific-sites-on-mac-os-x Going for error, which there is no sign of it, using the following page: http://hints.macworld.com/article.php?story=20060616150640529 I couldn't find the /var/log/ppp/vpnd.log log file. Also the files are given full permission 0755 or a+x or even 777 using the following command: sudo chmod a+x /etc/ppp/ip-up Any clue on how to debug this would be appreciated. I am totally confused, netstat -rn -f inet doesn't show the routes. Even when the routes are added manually, closing the VPN connection does not run the ip-down and the routes must be deleted manually.

    Read the article

  • Excluding executables in winsxs folder

    - by Yasser Sobhdel
    I am facing a big problem since there are many msbuild.exe files in .Netframework and winsxs folders and I don't know if it is required to set all of them as trusted in the antivirus. The path changes server to server and hence it makes life harder! If it matters to you, I am using Kaspersky endpoint security 10. When defining trusted application, as far as I know, you must point exactly to the executable with hard-coded path. Thanks

    Read the article

  • Unstable DNS with bind

    - by yasser abd
    we have a Centos machine called jupiter, on which I have installed bind9, On every other machine the DNS is set to be the IP address of jupiter (192.168.2.101), as you can see in the output of the following command in windows >ipconfig /all Windows IP Configuration Host Name . . . . . . . . . . . . : mypcs Primary Dns Suffix . . . . . . . : Node Type . . . . . . . . . . . . : Hybrid IP Routing Enabled. . . . . . . . : No WINS Proxy Enabled. . . . . . . . : No Ethernet adapter Local Area Connection: Connection-specific DNS Suffix . : Description . . . . . . . . . . . : Broadcom NetXtreme 57xx Gigabit Controller Physical Address. . . . . . . . . : 00-1A-A0-AC-E4-CC DHCP Enabled. . . . . . . . . . . : Yes Autoconfiguration Enabled . . . . : Yes Link-local IPv6 Address . . . . . : fe80::c16d:3ae4:5907:30c4%8(Preferred) IPv4 Address. . . . . . . . . . . : 192.168.2.98(Preferred) Subnet Mask . . . . . . . . . . . : 255.255.255.0 Lease Obtained. . . . . . . . . . : Thursday, September 20, 2012 10:26:11 AM Lease Expires . . . . . . . . . . : Sunday, September 23, 2012 10:26:10 AM Default Gateway . . . . . . . . . : 192.168.2.1 DHCP Server . . . . . . . . . . . : 192.168.2.1 DHCPv6 IAID . . . . . . . . . . . : 201333408 DHCPv6 Client DUID. . . . . . . . : 00-01-00-01-16-3A-50-01-00-1A-A0-AC-E4-CC DNS Servers . . . . . . . . . . . : 192.168.2.101 192.168.2.1 192.168.2.1 NetBIOS over Tcpip. . . . . . . . : Enabled All machines can always nslookup one of the domain (mydomain.com) that is set in the jupiter's DNS server, you can see that in the output of nslookup on the same windows machine: >nslookup mydomain.com Server: UnKnown Address: 192.168.2.101 Name: mydomain.com Address: 192.168.2.100 The problem is, sometimes mydomain.com can not be pinged, here is the output of the ping on the same windows machine >ping mydomain.com Ping request could not find host mydomain.com. Please check the name and try again. This looks very random, and happens once in a while, so the machine can lookup the DNS records but can't ping it, nor can browse the website that is hosted on mydomain.com, which should resolve to 192.168.2.100 On a linux machine that has the same DNS settings, the output of dig command for mydomain is as follows: $ dig mydomain.com ; <<>> DiG 9.8.2rc1-RedHat-9.8.2-0.10.rc1.el6_3.2 <<>> mydomain.com ;; global options: +cmd ;; Got answer: ;; ->>HEADER<<- opcode: QUERY, status: NOERROR, id: 36090 ;; flags: qr aa rd ra; QUERY: 1, ANSWER: 1, AUTHORITY: 1, ADDITIONAL: 1 ;; QUESTION SECTION: ;mydomain.com. IN A ;; ANSWER SECTION: mydomain.com. 86400 IN A 192.168.2.100 ;; AUTHORITY SECTION: mydomain.com. 86400 IN NS jupiter. ;; ADDITIONAL SECTION: jupiter. 86400 IN A 192.168.2.101 ;; Query time: 1 msec ;; SERVER: 192.168.2.101#53(192.168.2.101) ;; WHEN: Thu Sep 20 16:32:14 2012 ;; MSG SIZE rcvd: 83 We've never had the same problem on MACs, they always resolve mydomain.com Here is how I have defined mydomain.com on Bind9's configs on Jupiter, notice that the name of the machine on 192.168.2.100 is venus, so I have this file: /var/named/named.venus: $TTL 1D @ IN SOA jupiter. admin.ourcompany.com. ( 2003052800 ; serial 86400 ; refresh 300 ; retry 604800 ; expire 3600 ; minimum ) @ IN NS jupiter. @ IN A 192.168.2.100 * IN A 192.168.2.100 /var/named/zones/named.venus.zone zone "mydomain.com" IN {type master;file "/var/named/named.venus";allow-update {none;};}; One thing to note is that I haven't defined reverse DNS lookups, only the forward DNS lookups are defined in Bind9 configs, not sure if that's relevant or not. So my question is, why is this being so unstable? what could be the cause?

    Read the article

  • My NetGear router suddenly started showing limited access for all wifi connected laptops

    - by Yasser
    I have netgear n300 router which I had installed about 6 months back. Here is how the setup is, I have a local internet provider by the name of "Hathway" they have this modem which is in turn connected to the router and a wire from router is connected to my desktop. As shown in this pic below, except for the laptop I use a desktop rest all the connection is same So with this connection and the below configuration, every thing worked fine. The desktop would work also all my laptops and mobile devices would connect and be able to access the internet without any problem. Now suddenly since yesterday (with no changes made whatsoever to this config) all my laptops start showing the limited connection message and cannot connect to the internet. However the desktop which is connected can access the internet. Can someone please guide me on this.

    Read the article

  • Database designing for a bug tracking system in SQL

    - by Yasser
    I am an ASP.NET developer and I really dont do such of database stuff. But for my open source project on Codeplex I am required to setup a database schema for the project. So reading from here and there I have managed to do the following. As being new to database schema designing, I wanted some one else who has a better idea on this topic to help me identify any issues with this design. Most of the relationships are self explanatory I think, but still I will jot each one down. The two keys between UserProfile and Issues are for relationships between UserId and IssueCreatedBy and IssueClosedBy Thanks

    Read the article

  • Oracle Unveils Oracle’s Primavera Inspire for SAP 8.0

    - by Sylvie MacKenzie, PMP
    “To successfully manage large capital projects and maintenance operations, organizations need clear visibility into materials, resources, schedule and financial information,” said Yasser Mahmud, vice president, Oracle’s Primavera Global Business Unit. “With the enhancements delivered in Oracle’s Primavera Inspire for SAP 8.0, partners and customers can benefit from an integrated solution that not only reduces risk, but also helps ensure that projects are completed on-time and within budget. This combination simplifies management and extends customers’ investments in existing SAP project management modules.” Read all about the new release at http://www.oracle.com/us/corporate/press/1666350?sc=OPR-TW

    Read the article

  • Software included in Adobe Partner Connection Solution Partner Program

    - by ymasood
    Hi, I'd like to know what software is available in the Adobe Partner Connection Solution Partner Program at the Bronze level. The linked page above states, 'Not for Resale (NFR) downloads for Adobe enterprise products — Limited Use licenses' however, what are the contents here? I've tried a lot but couldn't hit any page in Google that would help. Any help in this regard is much appreciated, thanks! Yasser

    Read the article

  • Oracle’s new release of Primavera P6 Enterprise Portfolio Management

    It is estimated that projects totaling more than $6 trillion in value have been managed with Primavera products. Companies turn to Oracle's Primavera project portfolio management solutions to help them make better portfolio management decisions, evaluate the risks and rewards associated with projects, and determine whether there are sufficient resources with the right skills to accomplish the work. Tune into this conversation with Yasser Mahmud, Director of Product Strategy, for the Oracle Primavera Global Business Unit, to learn how P6 revolutionized project management, the new features in the release of Oracle Primavera P6 version 7 and how this newest release helps project-intensive businesses manage their entire project portfolio lifecycle, including projects of all sizes.

    Read the article

  • Mouse settings/properties dialog box won't open in Windows 7

    - by ymasood
    Hi, I have a problem trying to open my computer's mouse settings by either going to the command prompt and typing, 'control mouse', 'main.cpl' (as researched online) or simply by trying to go to the Control Panel and clicking on 'Mouse' under Hardware and Sound section. I have also tried running cmd as Administrator and trying the above commands but that is of no help. Lastly, if I search for 'mouse' and click 'Mouse' from the Windows search bar, that doesn't work either. In the past I had bought and installed Microsoft Wireless Mobile Mouse 6000 software and have just now bought and installed HP's Wireless Comfort Mobile mouse. Any help in this regard is highly recommended. I won't be able to restore or reinstall my laptop since it's a heavy use machine. Thanks! Yasser

    Read the article

  • Oracle Brings Analytics to Project Management

    - by Sylvie MacKenzie, PMP
    Excerpt from PROFIT - ORACLE - by Alison Weiss  Nonprofit and for-profit organizations have many differences, but there is one way they are alike—managers struggle with huge amounts of data generated every day. Project data by itself has limited use—but any organization that can gain insight to make accurate predictions or to use resources more effectively can gain an operational advantage. Oracle’s Primavera P6 Analytics 2.0 business intelligence solution enables organizations using Oracle’s Primavera P6 Professional Project Management to do just that: identify critical issues and uncover trends in stores of project data. Primavera P6 Analytics provides management with the ability to look at not only how a single effort is progressing, but also how the entire organization is doing from a project perspective. The latest release includes new features that make it even easier to gather and analyze critical information. For example, the addition of geocoding gives Primavera P6 Analytics users the ability to track resources geographically on longitude and latitude and use a map to get an overall view of how projects, programs, and activities are deployed. “A nonprofit with relief projects in Vietnam, for example, can drill down to the project and get a world view and a regional view,” says Yasser Mahmud, vice president of product strategy and industry marketing in Oracle’s Primavera Global Business Unit. “Then they can drill down further to show statistics; key performance indicators; and how that program, portfolio, or project work is actually getting done.” The addition of new mobile capabilities to Primavera P6 Analytics puts deep-dive analysis into project managers’ hands with compatibility with major tablet operating systems. Now, nonprofits or for-profits working in remote locations can provide real-time visibility into projects to alert management if issues are occurring that need to be addressed immediately. “Primavera P6 Analytics generates information that can help organizations improve their utilization and trim down overall operating costs,” says Mahmud. “But more importantly, it gives organizations improved visibility.”

    Read the article

  • Five Ideas: Project Management

    - by Sylvie MacKenzie, PMP
     Except from Profit Magazine “For everyone to put on the project manager hat and standardize the way every single thing is done means that now the whole organization is on the same page as to what needs to occur from the time a hurricane hits Haiti and when a boat pulls in to unload supplies.” —Rich D’Addario, consulting project manager in the Primavera Global Business Unit at Oracle, on helping AmeriCares deliver aid to Haiti “Primavera P6 Analytics generates information that can help organizations improve their utilization and trim down overall operating costs. But more importantly, it gives organizations improved visibility.” —Yasser Mahmud, vice president of product strategy and industry marketing in Oracle’s Primavera Global Business Unit “Organizations are constantly looking for ways to improve the speed and precision of their decisions and work without creating environments and systems that limit their personnel through rigid structures and inflexible processes. The latest release of Primavera Portfolio Management meets this demand by further streamlining processes and supporting enhanced decision-making, helping drive better value from portfolios. In addition, the new UI clearly demonstrates Oracle's commitment to providing a seamlessly integrated enterprise project portfolio management product suite.” —Mike Sicilia, senior vice president, Oracle's Primavera “Make it a business project, not an IT project. All levels of functional management must have ownership, responsibility, and accountability for the success of the implementation.” —from Eaton Operations Services Manager Marcos Baccetto's 9 Project Management Tips “AEC firms must strategically pursue standardization opportunities in the project management area while preserving the spirit of entrepreneurism and flexibility at an individual project manager level. An enterprise technology platform doesn't only help with standardization of key project management processes across the enterprise; it also improves performance management, team collaboration and client specific reporting at an individual project level.” —Maneesh Chhabra is a director of Industry Strategy and Insight at Oracle

    Read the article

  • Silverlight Cream for April 18, 2010 -- #840

    - by Dave Campbell
    In this Issue: CrocusGirl, Giorgetti Alessandro(-2-), smartyP, Pete Brown, David Poll, David Anson, and Bill Reiss. Shoutouts: Yasser Makram has a post up discussing Human Centered ALM with Telerik TeamPulse and Team Foundation Server. I saw this demo'd at DevConnnections and it definitely deserves a look. Shawn Wildermuth posted his materials from DevConnections all on one post: Back from DevConnections with SourceCode Shawn Wildermuth also posted an Updated RIA Services + MVVM Example Laurent Bugnion announced a Small change in MVVM Light Toolkit templates for Blend 4 RC Laurent Bugnion also announced Crowdsourcing MVVM Light Toolkit support The Expression Blend and Design Blog announced Expression Blend 4 Release Candidate Available! Dan Wahlin posted Slides and Code from my Silverlight MVVM Talk at DevConnections From SilverlightCream.com: Windows Phone 7 Design Notes – Part#1: Metro Resources CrocusGirl has blogged about WP7 and the Metro design concept. She has a bunch of resources up and information about Metro and the design methodology. Stay tuned for Part 2. Silverlight, M-V-VM ... and IoC - part 1 Giorgetti Alessandro has part 1 of a multi-parter up on IoC and MVVM for LOB apps in Silverlight ... a pretty quick into to MVVM. Silverlight, M-V-VM … and IoC – part 2 Giorgetti Alessandro also posted part 2 of his series, and this one digs deeper into the code and discusses what goes into the view and the model. Using the Facebook Developer Toolkit With Windows Phone 7 smartyP has a post addressing using the Facebook Developer toolkit with WP7... it took some hacking, and he explains it, and provides it for download. Silverlight and WPF Tip: Fitting items in a ListBox Having trouble fitting items into a Listbox in Silverlight or WPF without getting horizontal scrollbars? Pete Brown has a solution for you in 4 steps. Making printing easier in Silverlight 4 David Poll has a great detailed post up about printing in SL4, taking it to building a higher-level API that allows printing of collections... all demos and source included. Detailed information about the Silverlight Toolkit's new stacked series support David Anson details the improvements to Data Visualization in the Toolkit release from last week. Space Rocks game step 9: the asteroid sprite Bill Reiss has his latest game episode up and this time he's putting asteroid sprites in play. No placement, movement, or collisions yet, but it's a beginning. And, he's updated all his code to Silverlight 4. Stay in the 'Light! Twitter SilverlightNews | Twitter WynApse | WynApse.com | Tagged Posts | SilverlightCream Join me @ SilverlightCream | Phoenix Silverlight User Group Technorati Tags: Silverlight    Silverlight 3    Silverlight 4    Windows Phone MIX10

    Read the article

  • Improving the Industry’s Best Cloud Project Portfolio Management (PPM) Solution – New Release of Instantis EnterpriseTrack

    - by Melissa Centurio Lopes
    Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} By Yasser Mahmud, Vice President of Product Strategy & Industry Marketing, Oracle Primavera We know that in today’s rapidly changing world, organizations and leaders must adapt to fierce competition, business climate change and customers consistently demanding more for less. And project portfolio management (PPM) initiatives are a key component to help organizations thrive and stand out among competitors. That’s why I’m excited to announce Instantis EnterpriseTrack 8.5. Since Oracle’s acquisition of Instantis late last year, we’ve been busy working to enhance the leading cloud PPM solution. Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Here’s what’s new: Perform more precise resource planning and management  Gain more precise capacity visibility for resource planning and project execution with resource calendars that capture vacation, LOA and part-time resource availability Ensure compliance and governance processes  with activity labor cost capitalization Improve project labor cost estimation, tracking and administration with variable resource rates Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Optimize Project Demand Management And Execution Enhance productivity and analysis with project request flexible staffing plan and simplified finance estimation Improve project status communication and execution with estimated time to complete (ETC) in timesheets and projects Achieve audit compliance and governance with field change history for key project and project request fields Enforce proper financial accounting processes with the new strict finance lock/close period option Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Improve Reporting and the User Experience Enhance user productivity and analysis with improved listing pages Improve program reporting with new program filters in listing pages and reports Run large data volume user defined Excel reports with MS Excel 2010 support Accelerate user productivity and satisfaction with an improved user interface for project issues, risks, and scope changes Enjoy faster system response and improved user experience with  optimized listing pages, resource planning, and application cache Deliver user self-service training on demand with UPK support And if that wasn’t enough, we’ve also made additional improvements to timesheets, field change history and finance lock/close period. Learn more about Instantis EnterpriseTrack 8.5.

    Read the article

  • Projected Results

    - by Sylvie MacKenzie, PMP
    Excerpt from PROFIT - ORACLE - by Monica Mehta Yasser Mahmud has seen a revolution in project management over the past decade. During that time, the former Primavera product strategist (who joined Oracle when his company was acquired in 2008) has not only observed a transformation in the way IT systems support corporate projects but the role project portfolio management (PPM) plays in the enterprise. “15 years ago project management was the domain of project management office (PMO),” Mahmud recalls of earlier days. “But over the course of the past decade, we've seen it transform into a mission critical enterprise discipline, that has made Primavera indispensable in the board room. Now, as a senior manager, a board member, or a C-level executive you have direct and complete visibility into what’s kind of going on in the organization—at a level of detail that you're going to consume that information.” Now serving as Oracle’s vice president of product strategy and industry marketing, Mahmud shares his thoughts on how Oracle’s Primavera solutions have evolved and how best-in-class project portfolio management systems can help businesses stay competitive. Profit: What do you feel are the market dynamics that are changing project management today? Mahmud: First, the data explosion. We're generating data at twice the rate at which we can actually store it. The same concept applies for project-intensive organizations. A lot of data is gathered, but what are we really doing with it? Are we turning data into insight? Are we using that insight and turning it into foresight with analytics tools? This is a key driver that will separate the very good companies—the very competitive companies—from those that are not as competitive. Another trend is centered on the explosion of mobile computing. By the year 2013, an estimated 35 percent of the world’s workforce is going to be mobile. That’s one billion people. So the question is not if you're going to go mobile, it’s how fast you are going to go mobile. What kind of impact does that have on how the workforce participates in projects? What worked ten to fifteen years ago is not going to work today. It requires a real rethink around the interfaces and how data is actually presented. Profit: What is the role of project management in this new landscape? Mahmud: We recently conducted a PPM study with the Economist Intelligence Unit centered to determine how important project management is considered within organizations. Our target was primarily CFOs, CIOs, and senior managers and we discovered that while 95 percent of participants believed it critical to their business, only six percent were confident that projects were delivered on time and on budget. That’s a huge gap. Most organizations are looking for efficiency, especially in these volatile financial times. But senior management can’t keep track of every project in a large organization. As a result, executives are attempting to inventory the work being conducted under their watch. What is often needed is a very high-level assessment conducted at the board level to say, “Here are the 50 initiatives that we have underway. How do they line up with our strategic drivers?” This line of questioning can provide early warning that work and strategy are out of alignment; finding the gap between what the business needs to do and the actual performance scorecard. That’s low-hanging fruit for any executive looking to increase efficiency and save money. But it can only be obtained through proper assessment of existing projects—and you need a project system of record to get that done. Over the next decade or so, project management is going to transform into holistic work management. Business leaders will want make sure key projects align with corporate strategy, but also the ability to drill down into daily activity and smaller projects to make sure they line up as well. Keeping employees from working on tasks—even for a few hours—that don’t line up with corporate goals will, in many ways, become a competitive differentiator. Profit: How do all of these market challenges and shifting trends impact Oracle’s Primavera solutions and meeting customers’ needs? Mahmud: For Primavera, it’s a transformation from being a project management application to a PPM system in the enterprise. Also making that system a mission-critical application by connecting to other key applications within the ecosystem, such as the enterprise resource planning (ERP), supply chain, and CRM systems. Analytics have also become a huge component. Business analytics have made Oracle’s Primavera applications pertinent in the boardroom. Now, as a senior manager, a board member, a CXO, CIO, or CEO, you have direct visibility into what’s going on in the organization at a level that you're able to consume that information. In addition, all of this information pairs up really well with your financials and other data. Certainly, when you're an Oracle shop, you have that visibility that you didn’t have before from a project execution perspective. Profit: What new strategies and tools are being implemented to create a more efficient workplace for users? Mahmud: We believe very strongly that just because you call something an enterprise project portfolio management system doesn’t make it so—you have to get people to want to participate in the system. This can’t be mandated down from the top. It simply doesn’t work that way. A truly adoptable solution is one that makes it super easy for all types users to participate, by providing them interfaces where they live. Keeping that in mind, a major area of development has been alternative user interfaces. This is increasingly resulting in the creation of lighter weight, targeted interfaces such as iOS applications, and smartphones interfaces such as for iPhone and Android platform. Profit: How does this translate into the development of Oracle’s Primavera solutions? Mahmud: Let me give you a few examples. We recently announced the launch of our Primavera P6 Team Member application, which is a native iOS application for the iPhone. This interface makes it easier for team members to do their jobs quickly and effectively. Similarly, we introduced the Primavera analytics application, which can be consumed via mobile devices, and when married with Oracle Spatial capabilities, users can get a geographical view of what’s going on and which projects are occurring in various locations around the world. Lastly, we introduced advanced email integration that allows project team members to status work via E-mail. This functionality leverages the fact that users are in E-mail system throughout the day and allows them to status their work without the need to launch the Primavera application. It comes back to a mantra: provide as many alternative user interfaces as possible, so you can give people the ability to work, to participate, to raise issues, to create projects, in the places where they live. Do it in such a way that it’s non-intrusive, do it in such a way that it’s easy and intuitive and they can get it done in a short amount of time. If you do that, workers can get back to doing what they're actually getting paid for.

    Read the article

1