Difficulty racking Proliant G8's
Posted
by
Systemspoet
on Server Fault
See other posts from Server Fault
or by Systemspoet
Published on 2012-09-18T17:40:55Z
Indexed on
2012/09/18
21:41 UTC
Read the original article
Hit count: 256
We're an all Proliant shop with around 50 servers, mostly DL360s and DL380, from G5's through G7's. We just got our first two G8's in and went to rack them. We were stunned to find out that the new cable management arms protrude almost 1 inch deeper into the rack then previous iterations of the Proliant line.
Unfortunately that causes them to occupy the same space as the PDU's in our APC racks. In a non-densely populated section of rack that's no biggie, but in a densely populated section it's impossible to get the cable arm into place without dislodging another machine's power. Has anyone else run into this? Obviously racking machines without cable management arms is not an option. I supposed we could reconfigure our racks but that's a nightmare.
© Server Fault or respective owner