Search Results

Search found 10751 results on 431 pages for 'day cq'.

Page 109/431 | < Previous Page | 105 106 107 108 109 110 111 112 113 114 115 116  | Next Page >

  • Humanizing time

    - by keruilin
    I have a number of products that are perishable. Therefore, each product has an attribute called hours_expiration that tells how many hours the product can be used before it goes bad. For ex, apple expires in 168 hours; nut expires in 4320 hours. Given, the product's hours-to-expiration and the current time (Time.now or Date.now), how can I humanize the time-to-expiration in some of the following sample ways? Your item is set to expire in about: 6 months and 14 days 1 month and 13 days 1 month and 1 day 27 days 1 day 23 hours 1 hour 50 minutes 1 minute Looking for something robust and simple!

    Read the article

  • IP Micro-outages, telephone micro-outages, and CATV micro-outages

    - by Michael Graff
    This is a long and complicated question, mostly because it has been going on for 2.5 years without a solution in sight. It also is only one-third computer related, the other two-thirds are cable TV and cable-phone related. Background I have COX Communications for a cable provider, and we get Internet, digital cable TV, and digital phone service through them. The Internet is a SB5101 right now, and has been a DPC2100 and SB5120 in the past. Same results. The phone service is provided through a telephone interface mounted on the outside of the house (not classic VoIP) and the CATV is through a Scientific Atlanta receiver without DVR. I do have a TiVo connected to the CATV box. Symptoms The CATV shows "blocking" -- sometimes very very short duration where a few blocks appear on the screen. Sometimes it lasts long enough that the video "pauses" for 2-5 seconds, and rarely but not unseen the audio also fails. The CATV decoder box shows no correctable (FEC) or uncorrectable errors. That is, all BER counters are zero for the video stream. The Internet shows "micro-outages" where it appears that sent packets are not making it out, but I continue to receive packets from local modems. That is, pings stop coming back, but I continue to see modems broadcast for DHCP, and sometimes they ask more than once. The cable modem shows no errors during this time, but cable modems lie like you would not believe. It is actually possible to unplug the coax from the modem for 20 seconds and it reports NO ERRORS to the provider's tools. The phone service cuts out for 1-3 seconds, infrequently. When this happens, I hear NOTHING (not even comfort noise) and the remote side hears a "click" as if I were getting a call waiting message. However, there is no call incoming, other than the one I'm currently on of course. Things SEEM to happen more frequently when the temperature outside swings from cold to warm, so fall/spring seems worse than summer/winter. All micro-outages occur between once or twice a day (which I could ignore) to 10 times per hour. All SNR, signal levels, noise levels, etc. show very close to optimal when measured. COX's diagnosis This is a continual pain for me. Over the last 2.5 years, they have opened, "fixed" something, and closed the tickets. They close it without confirming that it is indeed better, and when I reopen they cannot do that, but instead they open a new ticket and send yet another low-level tech out to do the same signal tests and report that all is OK. I've finally gotten a line tech who has a clue and is motivated enough to pursue this with me. We have tried things like switching the local nodes over to UPS and generator power, but this does not trigger the noise. We have tried replacing all cabling, the tap outside my house, the modem, the CATV decoder -- all without resolution. Recently they have decided it is both my computer or switch, my TiVo, and my phone that are all broken and causing this issue. My debugging steps I spent the worse day of my TV-watching life yesterday and part of today. I watched live TV without the TiVo. I witnessed blocking, but it did "feel different." and was actually more severe. Some days it is better, some days it is worse, so perhaps this was just a very bad day. Today, I connected the TiVo to my DVD player, and ran two very long movies through it. I saw no blocking at all during nearly 6 hours of video. Suggestions? Does anyone have any suggestions on what to do next? I understand perhaps only the IP side can be addressed here, but it is one of the more limiting debugging options.

    Read the article

  • What would cause an .exe to vanish without a trace?

    - by Peter pete
    I have a few computers. One computer, at home, one day suddenly had its pgbouncer.exe vanish. The antivirus didn't have it in its virus chest [avast]. I couldn't find the bgbouncer anywhere. All the other pgbouncer files remained where they used to be, except the exe had vanished. I hadn't uninstalled it, nor had anyone else used the machine. I hadn't installed any new software since the previous time I had used it either. Just now, however, my TV computer was running out of disk space, which was weird because I had python setup to do transcoding and archiving. I logged in and voila! python.exe had vanished !! Once again, Avast.exe didn't have it in its virus chest, and dunno! I do this time, with the TV computer, know exactly the date that python vanished. Sat the 18th my python scripts ran fine. Sat the 19th python was gone. I'm going to do some hunting in the event log to see what happened that day. But if anyone has experienced vanishings before and has a clue what happened, I would like to know. FYI: Both computers (bgbouncer vanish and python vanish) were running Win7 with the RDP hack and both on SSDs and both with Avast. Both computers had all windows updates set to manual(to prevent random stuff changing!) and neither had recently had any windows updates manually applied. FYI2: Tv computer had since the beginning of October dropbox running all the time trying to download two files. Sadly, a temporary download of each of these two files by dropbox resulted in Avast freaking out and virus-chesting them, and then dropbox downloading them partially again, before being dropboxed. Now, these two files were binaries from a program I had personally written and were clean on other machines. Since the python vanishing I have deleted these two binaries from dropbox (using the website) and dropbox exe on the tv computer is now at peace. I don't think this should cause python.exe to vanish though :/ New edit: On the 18/10/2013, at 0742 my python script ended with an error: "file still in use" which was unexpected but I shrugged it off since sometimes media portal doesn't release the recording. But on second thoughts is weird since the show in use would have been finished recording the day before. On the 18/10/2013 at 0807 the windows event log complains that several drivers required for CutePDF, send to onenote 2010, send to onenote 2013, microsoft xps document writer aren't installed. I just checked now and indeed those printers have vanished! New update! I found my python.exe that had been removed. It was still in the C:\Python33\ directory except it had been renamed to a random string charater.tmp (ie, it was made into a temp file) with a creation date of 19/10/2013 at 0600:02 am. Now, the computer normally wakes at 6am to do transcoding. What could have moved my python file into a tmp file?

    Read the article

  • Week in Geek: New Security Flaw Confirmed for Internet Explorer Edition

    - by Asian Angel
    This week we learned how to use a PC to stay entertained while traveling for the holidays, create quality photo prints with free software, share links between any browser and any smartphone, create perfect Christmas photos using How-To Geek’s 10 best how-to photo guides, and had fun decorating Firefox with a collection of Holiday 2010 Personas themes. Photo by Repoort. Random Geek Links Photo by Asian Angel. Critical 0-Day Flaw Affects All Internet Explorer Versions, Microsoft Warns Microsoft has confirmed a zero-day vulnerability affecting all supported versions of Internet Explorer, including IE8, IE7 and IE6. Note: Article contains link to Microsoft Security Advisory detailing two work-arounds until a security update is released. Hackers targeting human rights, indie media groups Hackers are increasingly hitting the Web sites of human rights and independent media groups in an attempt to silence them, says a new study released this week by Harvard University’s Berkman Center for Internet & Society. OpenBSD: audits give no indication of back doors So far, the analyses of OpenBSD’s crypto and IPSec code have not provided any indication that the system contains back doors for listening to encrypted VPN connections. But the developers have already found two bugs during their current audits. Sophos: Beware Facebook’s new facial-recognition feature Facebook’s new facial recognition software might result in undesirable photos of users being circulated online, warned a security expert, who urged users to keep abreast with the social network’s privacy settings to prevent the abovementioned scenario from becoming a reality. Microsoft withdraws flawed Outlook update Microsoft has withdrawn update KB2412171 for Outlook 2007, released last Patch Tuesday, after a number of user complaints. Skype: Millions still without service Skype was still working to right itself going into the holiday weekend from a major outage that began this past Wednesday. Mozilla improves sync setup and WebGL in Firefox 4 beta 8 Firefox 4.0 beta 8 brings better support for WebGL and introduces an improved setup process for Firefox Sync that simplifies the steps for configuring the synchronization service across multiple devices. Chrome OS the litmus test for cloud The success or failure of Google’s browser-oriented Chrome OS will be the litmus test to decide if the cloud is capable of addressing user needs for content and services, according to a new Ovum report released Monday. FCC Net neutrality rules reach mobile apps The Federal Communications Commission (FCC) finally released its long-expected regulations on Thursday and the related explanations total a whopping 194 pages. One new item that was not previously disclosed: mobile wireless providers can’t block “applications that compete with the provider’s” own voice or video telephony services. KDE and the Document Foundation join Open Invention Network The KDE e.V. and the Document Foundation (TDF) have both joined the Open Invention Network (OIN) as licensees, expanding the organization’s roster of supporters. Report: SEC looks into Hurd’s ousting from HP The scandal surrounding Mark Hurd’s departure from the world’s largest technology company in August has officially drawn attention from the U.S. Securities and Exchange Commission. Report: Google requests delay of new Google TVs Google TV is apparently encountering a bit of static that has resulted in a programming change. Geek Video of the Week This week we have a double dose of geeky video goodness for you with the original Mac vs PC video and the trailer for the sequel. Photo courtesy of Peacer. Mac vs PC Photo courtesy of Peacer. Mac vs PC 2 Trailer Random TinyHacker Links Awesome Tools To Extract Audio From Video Here’s a list of really useful, and free tools to rip audio from videos. Getting Your iPhone Out of Recovery Mode Is your iPhone stuck in recovery mode? This tutorial will help you get it out of that state. Google Shared Spaces Quickly create a shared space and collaborate with friends online. McAfee Internet Security 2011 – Upgrade not worthy of a version change McAfee has released their 2011 version of security products. And as this review details, the upgrades are minimal when compared to their 2010 products. For more information, check out the review. 200 Countries Plotted Hans Rosling’s famous lectures combine enormous quantities of public data with a sport’s commentator’s style to reveal the story of the world’s past, present and future development. Now he explores stats in a way he has never done before – using augmented reality animation. Super User Questions Enjoy looking through this week’s batch of popular questions and answers from Super User. How to restore windows 7 to a known working state every time it boots? Is there an easy way to mass-transfer all files between two computers? Coffee spilled inside computer, damaged hard drive Computer does not boot after ram upgrade Keyboard not detected when trying to install Ubuntu 10.10 How-To Geek Weekly Article Recap Have you had a super busy week while preparing for the holiday weekend? Then here is your chance to get caught up on your reading with our five hottest articles for the week. Ask How-To Geek: Rescuing an Infected PC, Installing Bloat-free iTunes, and Taming a Crazy Trackpad How to Use the Avira Rescue CD to Clean Your Infected PC Eight Geektacular Christmas Projects for Your Day Off VirtualBox 4.0 Rocks Extensions and a Simplified GUI Ask the Readers: How Many Monitors Do You Use with Your Computer? One Year Ago on How-To Geek Here are more great articles from one year ago for you to read and enjoy during the holiday break. Enjoy Distraction-Free Writing with WriteMonkey Shutter is a State of Art Screenshot Tool for Ubuntu Get Hex & RGB Color Codes the Easy Way Find User Scripts for Your Favorite Websites the Easy Way Access Your Unsorted Bookmarks the Easy Way (Firefox) The Geek Note That “wraps” things up for this week and we hope that everyone enjoys the rest of their holiday break! Found a great tip during the break? Then be sure to send it in to us at [email protected]. Photo by ArSiSa7. Latest Features How-To Geek ETC How to Use the Avira Rescue CD to Clean Your Infected PC The Complete List of iPad Tips, Tricks, and Tutorials Is Your Desktop Printer More Expensive Than Printing Services? 20 OS X Keyboard Shortcuts You Might Not Know HTG Explains: Which Linux File System Should You Choose? HTG Explains: Why Does Photo Paper Improve Print Quality? Simon’s Cat Explores the Christmas Tree! [Video] The Outdoor Lights Scene from National Lampoon’s Christmas Vacation [Video] The Famous Home Alone Pizza Delivery Scene [Classic Video] Chronicles of Narnia: The Voyage of the Dawn Treader Theme for Windows 7 Cardinal and Rabbit Sharing a Tree on a Cold Winter Morning Wallpaper An Alternate Star Wars Christmas Special [Video]

    Read the article

  • Sending mail with Gmail Account using System.Net.Mail in ASP.NET

    - by Jalpesh P. Vadgama
    Any web application is in complete without mail functionality you should have to write send mail functionality. Like if there is shopping cart application for example then when a order created on the shopping cart you need to send an email to administrator of website for Order notification and for customer you need to send an email of receipt of order. So any web application is not complete without sending email. This post is also all about sending email. In post I will explain that how we can send emails from our Gmail Account without purchasing any smtp server etc. There are some limitations for sending email from Gmail Account. Please note following things. Gmail will have fixed number of quota for sending emails per day. So you can not send more then that emails for the day. Your from email address always will be your account email address which you are using for sending email. You can not send an email to unlimited numbers of people. Gmail ant spamming policy will restrict this. Gmail provide both Popup and SMTP settings both should be active in your account where you testing. You can enable that via clicking on setting link in gmail account and go to Forwarding and POP/Imap. So if you are using mail functionality for limited emails then Gmail is Best option. But if you are sending thousand of email daily then it will not be Good Idea. Here is the code for sending mail from Gmail Account. using System.Net.Mail; namespace Experiement { public partial class WebForm1 : System.Web.UI.Page { protected void Page_Load(object sender,System.EventArgs e) { MailMessage mailMessage = new MailMessage(new MailAddress("[email protected]") ,new MailAddress("[email protected]")); mailMessage.Subject = "Sending mail through gmail account"; mailMessage.IsBodyHtml = true; mailMessage.Body = "<B>Sending mail thorugh gmail from asp.net</B>"; System.Net.NetworkCredential networkCredentials = new System.Net.NetworkCredential("[email protected]", "yourpassword"); SmtpClient smtpClient = new SmtpClient(); smtpClient.EnableSsl = true; smtpClient.UseDefaultCredentials = false; smtpClient.Credentials = networkCredentials; smtpClient.Host = "smtp.gmail.com"; smtpClient.Port = 587; smtpClient.Send(mailMessage); Response.Write("Mail Successfully sent"); } } } That’s run this application and you will get like below in your account. Technorati Tags: Gmail,System.NET.Mail,ASP.NET

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

  • How Linux is Built [Video]

    - by Asian Angel
    Many of the devices that we use each day such as computers, mobile phones, televisions, and more run on Linux, but how is Linux built? This wonderful video from The Linux Foundation shows just how it is done. How Linux is Built [via OMG! Ubuntu!] How To Customize Your Android Lock Screen with WidgetLocker The Best Free Portable Apps for Your Flash Drive Toolkit How to Own Your Own Website (Even If You Can’t Build One) Pt 3

    Read the article

  • New Cumulative Updates for SQL Server 2008 SP1 & R2!

    - by AaronBertrand
    Well, this is the first time in a long time that I've blogged about cumulative updates for two different versions of SQL Server on the same day. Yesterday Microsoft released a cumulative update for SQL Server 2008 SP1 (bringing you to 10.0.2775), and a corresponding cumulative update for SQL Server 2008 R2 RTM (bringing you from 10.50.1600 to 10.50.1702). You can read more about these updates here: Cumulative Update #1 for SQL Server 2008 R2 RTM ( KB #981355 ) Cumulative Update #8 for SQL Server...(read more)

    Read the article

  • SQLAuthority News – MS Access Database is the Way to Go – April 1st Humor

    - by pinaldave
    First of all, today is April 1- April Fool’s Day, so I have written this post for some light entertainment. My friend has just sent me an email about why a person should go for Access Database. For a short background, I used to be an MS Access user once (I will not call myself MS Access DBA), and I must say I had a good time with Database at that time. As time passed by, I moved from MS Access to SQL Server. Well, as for my friend’s email, his reasons considering MS Access usage really made me laugh. MS Access may have a few points where it totally makes sense to use it. However, in the email that I received, there was not a single reason which was valid.  In fact, I thought it is an April 1st joke- just delivered a little earlier. Let us see some of the reasons from that email. Thanks to Mahesh Bhesania for sending this email to me. MS Access comes with lots of free stuff, e.g. MS Excel MS Access is the most preferred desktop database system MS Access can import data from MS Excel and SQL Server MS Access provides a real time database MS Access has a free IDE-to-VB Script MS Access fits well in your hard drive I actually think that the above points are either incorrect beliefs of some users, or someone just wrote them to give some laughter with such inaccurate data. And, for the same reason I decided to browse the Internet and do some research on MS Access database to verify my thoughts. While searching on this subject, I found the following two interesting statements from the site: Microsoft Access Database, Why Choose It? Other software manufacturers are more likely to provide interfaces to MS Access than any other desktop database system Microsoft Access consulting rates are typically lower for Access consultants compared to Oracle or SQL Server consultants The second one is may be the worst reason for you to switch to MS Access if you are already an SQL Server consultant. With this cartoon, have you ever felt like you were one of these chickens at some point in time? I guess that the moment might have just happened before the minute we say “I guess we were on the same page?” Does this mean we are IN the same table, or ON the same table?! (I accept bad joke!) It is All Fools’ Day after all, so just laugh! If you have something funny but non-offensive to share, just  leave your comment here. Reference: Pinal Dave (http://blog.SQLAuthority.com), Cartoon source unknown. Filed under: Software Development, SQL, SQL Authority, SQL Humor, SQL Query, SQL Server, SQL Tips and Tricks, SQLAuthority News, T SQL, Technology Tagged: MS ACCESS

    Read the article

  • What if Google’s ‘Project Glass’ Ran on Windows? [Funny Video]

    - by Asian Angel
    The tech sphere has been abuzz lately about Google’s new ‘Project Glass’, but what would happen if it ran on Windows? You can view the original ‘Project Glass’ video below… Windows Project Glass: One day too… [via Geeks are Sexy] How to Stress Test the Hard Drives in Your PC or Server How To Customize Your Android Lock Screen with WidgetLocker The Best Free Portable Apps for Your Flash Drive Toolkit

    Read the article

  • I&rsquo;m sorry RPGs, it&rsquo;s not you, it&rsquo;s me: The birth of my game idea

    - by George Clingerman
    One of the things I’ve had to give up in order to have some development time at night is gaming. It’s something I refused to admit for years but I’ve just had to face the facts. I’m no longer a gamer. I just don’t have hours and hours of free time to pour into gaming and when I do have hours and hours of free time I want to pour them into game development. That doesn’t mean I don’t game at all! I play games pretty much every day. It just means I’ve moved more into the casual game realm. It’s all I have time for when juggling priorities in my life. That means that games like Gears of War 2 sit shrink wrapped on my shelf and although I popped Dragon Age into my Xbox 360 one time, I barely made it through the opening sequence and haven’t had time to sit down and play again. Instead I’m playing short games like Jamestown, Atom Zombie Smasher, Fortix or if I have time to jump in and play a few rounds maybe some Monday Night Combat or Team Fortress 2. These are games I can instantly get into and play for just a short period of time and then walk away. Breath of Death VII saved my life: Back in the day (way, way back in the day) I used to be a pretty big RPG fan. Not big by a lot of RPG gamers' standards (most of the RPGs RPG fans about I’ve never heard of) but I used to LOVE to play them on the NES, SNES and Genesis and considered that my genre. Final Fantasy, Shining in the Darkness, Bard’s Tale, Faxanadu, Shadowrun, Ultima, Dragon Warrior, Chrono Trigger, Phantasy Star, Shining Force and well the list could go on but those are the ones I remember off the top of my head. I loved playing RPGs and they were my games of choice. After my first son was born (this was just about 12 years ago), I tried to continue playing RPGs and purchased games like Baldur’s Gate I & II, Neverwinter Nights, Fable, then a few of the Final Fantasy’s then Kingdom Hearts. I kept buying these games and then only playing for about fifteen minutes and never getting back to them. I still loved RPGs but they just no longer fit into my life (I still haven’t accepted that since I still purchased Dragon Age II for some reason and convinced myself I’d find the time). Adding three more sons to the mix (that’s 4 total) didn’t help much to finding more RPG time (except for Breath of Death VII and other XBLIG RPG titles, thanks guys!) All work and no RPG: A few months ago as I was sitting thinking about the lack of RPGs in my life and talking to my wife about why I wish RPGs were different and easier for a dad like me to get into. She seemed like she was listening, so I started listing all the things that made them impossible for me to play. Here’s a short list I came up with. They take 15 billion hours to complete I have a few minutes at a time I can grab to play them if I want to have time to code. At that rate it would take me 9 trillion years to beat just one RPG. There’s such long spans of times between when I can play them I forget what I was even doing so I have to spend most of the playtime I have just figuring that out and then my play time is over. Repeat. I’ll never finish one and since it takes so long to get to the fun part in an RPG, I’m never having fun. RPGs aren’t fun if you don’t have hours to play them at a time. As you can see based on my science and math, RPGs aren’t fun for me any more. From there my brain started toying around with ideas of RPGs that would work for me. They would have to be a short RPG, you know one you could beat in a single play session. A dad sized play session. I started thinking, wouldn’t it be awesome if there was a fifteen minute RPG? That got me laughing and I took that as a good sign that it sounded fun and so I thought about it a little more. I immediately discarded the idea of doing a real RPG. I’m sure a short RPG like that could be done but it wasn’t the vibe that I had in my head. No this was going to be something that just had the core essence of an RPG. In reality what I’d be making would be more of an arcade style game. One with high scores and lots of crazy action on the screen. And that’s when it hit me. It would be a speed run RPG. That’s the basics of the game I’m working on.   The Elevator Pitch: It’s a 2D top down RPG themed arcade game focused on speed. It sounds like an RPG, smells like an RPG but it’s merely emulating an RPG. The game is focused on fun and mayhem in RPG form with players leveling up in seconds instead of hours and rushing to finish quests as quickly as possible because they’ve only got fifteen minutes before EVIL overtakes the world. If the player takes longer than fifteen minutes, it’s game over man. One to four player co-operative play to really see just how fast players can level up and beat the game. Gamers will compete on leaderboards for bragging rights for fastest 1, 2, 3, and 4 player speed runs, lowest leveled characters to beat the game, highest leveled characters to beat the game and so on. Times will be tracked for everything from how long a player sat distributing stats, equipping items, talking to NPCs to running around the level. These stats will be shown at the end of each quest/level so the players can work on improving their speed run for that part of the game next time around. It’s the perfect RPG for those of us who only have fifteen minutes of game time! Where I’m at: I’m still at the prototyping stage attempting to but all the basic framework pieces in place that will at minimum give me one level to rush through. I’ve been working on this prototype for about a month now though so I’m going to have to step it up a bit or I’m not going to get finished in time (remember I’ve only got 85 days left!) Lots of the game code is in place (although pretty sloppy) but I still can’t play through that first quest/level just yet. That’s my goal to finish up by the end of next Sunday (3/25/2012). You can all hold me to that and cheer me on or heckle me throughout the week. Either way that should help me stay a bit more motivated and focused. In my head this feels like it’s going to be a fun game so I’m looking forward to seeing how it actually plays!

    Read the article

  • Google I/O 2010: Google TV Keynote - Introducing Google TV

    Google I/O 2010: Google TV Keynote - Introducing Google TV Due to licensing and permissions issues, we are unable to show the full Google TV demonstration from the Day 2 keynote at Google I/O. Until we are able to get these permissions, please check out these clips. For Google I/O session videos, presentations, developer interviews and more, go to: code.google.com/io From: GoogleDevelopers Views: 30 1 ratings Time: 06:55 More in Science & Technology

    Read the article

  • Friday Fun: Play 3D Rally Racing in Google Chrome

    - by Asian Angel
    Are you a racing fan in need of a short (or long) break from work? Then get ready to enjoy a mid-day speed boost with the 3D Rally Racing extension for Google Chrome. 3D Rally Racing in Action This is the opening screen for 3D Rally Racing. You can start game play, view current best times, and read through the instructions from here. The first thing that you should do is have a quick look at the instructions to help you get set up and started. Click on “Play” to start the process. Before you can go further you will need to choose a “User Name”. Once you have done that click “Select Track”… Note: The extension will retain your name for later use even if you close your browser. When you first start out you will only have access to two tracks…the others require reaching a certain score/level to unlock them. Once you select a track you will be taken to the next screen. After you have selected a track you will need to choose your car and car color. All that is left to do afterwards is click on “Go Race”. Note: You will be competing against three other vehicles in the race. Here is a look at the “Desert Race Track”… And a look at the “Snow Race Track”. This game moves quickly and it is easy to fall behind if you are not careful! You can have a lot of fun playing this game while you are waiting for the day to end. Conclusion If you love racing games and want a fun way to waste the rest of afternoon at work, then you should definitely give 3D Rally Racing a try. Links Download the 3d Rally Racing extension (Google Chrome Extensions) Similar Articles Productive Geek Tips Friday Fun: Uphill RushFriday Fun: Racing Fun with SuperTuxKart RacerHow to Make Google Chrome Your Default BrowserEnable Vista Black Style Theme for Google Chrome in XPIncrease Google Chrome’s Omnibox Popup Suggestion Count With an Undocumented Switch TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 PCmover Professional Enable Check Box Selection in Windows 7 OnlineOCR – Free OCR Service Betting on the Blind Side, a Vanity Fair article 30 Minimal Logo Designs that Say More with Less LEGO Digital Designer – Free Create a Personal Website Quickly using Flavors.me

    Read the article

  • Friday Fun: Play 3D Rally Racing in Google Chrome

    - by Asian Angel
    Are you a racing fan in need of a short (or long) break from work? Then get ready to enjoy a mid-day speed boost with the 3D Rally Racing extension for Google Chrome. 3D Rally Racing in Action This is the opening screen for 3D Rally Racing. You can start game play, view current best times, and read through the instructions from here. The first thing that you should do is have a quick look at the instructions to help you get set up and started. Click on “Play” to start the process. Before you can go further you will need to choose a “User Name”. Once you have done that click “Select Track”… Note: The extension will retain your name for later use even if you close your browser. When you first start out you will only have access to two tracks…the others require reaching a certain score/level to unlock them. Once you select a track you will be taken to the next screen. After you have selected a track you will need to choose your car and car color. All that is left to do afterwards is click on “Go Race”. Note: You will be competing against three other vehicles in the race. Here is a look at the “Desert Race Track”… And a look at the “Snow Race Track”. This game moves quickly and it is easy to fall behind if you are not careful! You can have a lot of fun playing this game while you are waiting for the day to end. Conclusion If you love racing games and want a fun way to waste the rest of afternoon at work, then you should definitely give 3D Rally Racing a try. Links Download the 3d Rally Racing extension (Google Chrome Extensions) Similar Articles Productive Geek Tips Friday Fun: Uphill RushFriday Fun: Racing Fun with SuperTuxKart RacerHow to Make Google Chrome Your Default BrowserEnable Vista Black Style Theme for Google Chrome in XPIncrease Google Chrome’s Omnibox Popup Suggestion Count With an Undocumented Switch TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 PCmover Professional Enable Check Box Selection in Windows 7 OnlineOCR – Free OCR Service Betting on the Blind Side, a Vanity Fair article 30 Minimal Logo Designs that Say More with Less LEGO Digital Designer – Free Create a Personal Website Quickly using Flavors.me

    Read the article

  • Google I/O 2010: Google TV Keynote - Android Apps On Google TV

    Google I/O 2010: Google TV Keynote - Android Apps On Google TV Due to licensing and permissions issues, we are unable to show the full Google TV demonstration from the Day 2 keynote at Google I/O. Until we are able to get these permissions, please check out these clips. For Google I/O session videos, presentations, developer interviews and more, go to: code.google.com/io From: GoogleDevelopers Views: 8 0 ratings Time: 03:18 More in Science & Technology

    Read the article

  • SQL SERVER – Quick Note of Database Mirroring

    - by pinaldave
    Just a day ago, I was invited at Round Table meeting at prestigious organization. They were planning to implement High Availability solution using Database Mirroring. During the meeting, I have made few notes of what was being discussed there. I just thought it would be interested for all of you know about it. Database Mirroring works [...]

    Read the article

  • Relational Database pioneer Chris Date is giving a seminar 13th/14th May Edinburgh on "SQL and Relat

    - by tonyrogerson
    One of the pioneers of the Relational Database, Chris Date is giving a 2 day seminar in Edinburgh (13th and 14th May 2010) based around his new book "SQL and Relational Theory - How to Write Accurate SQL Code" which if you don't already have I'd say is a must buy. When I first saw this and what he will cover I thought, oh yer - this is going to cost the earth, well it doesn't - its £750 for the two days and there are discounts available for multiple bookings, being a member...(read more)

    Read the article

  • Scrum in 5 Minutes

    - by Stephen.Walther
    The goal of this blog entry is to explain the basic concepts of Scrum in less than five minutes. You learn how Scrum can help a team of developers to successfully complete a complex software project. Product Backlog and the Product Owner Imagine that you are part of a team which needs to create a new website – for example, an e-commerce website. You have an overwhelming amount of work to do. You need to build (or possibly buy) a shopping cart, install an SSL certificate, create a product catalog, create a Facebook page, and at least a hundred other things that you have not thought of yet. According to Scrum, the first thing you should do is create a list. Place the highest priority items at the top of the list and the lower priority items lower in the list. For example, creating the shopping cart and buying the domain name might be high priority items and creating a Facebook page might be a lower priority item. In Scrum, this list is called the Product Backlog. How do you prioritize the items in the Product Backlog? Different stakeholders in the project might have different priorities. Gary, your division VP, thinks that it is crucial that the e-commerce site has a mobile app. Sally, your direct manager, thinks taking advantage of new HTML5 features is much more important. Multiple people are pulling you in different directions. According to Scrum, it is important that you always designate one person, and only one person, as the Product Owner. The Product Owner is the person who decides what items should be added to the Product Backlog and the priority of the items in the Product Backlog. The Product Owner could be the customer who is paying the bills, the project manager who is responsible for delivering the project, or a customer representative. The critical point is that the Product Owner must always be a single person and that single person has absolute authority over the Product Backlog. Sprints and the Sprint Backlog So now the developer team has a prioritized list of items and they can start work. The team starts implementing the first item in the Backlog — the shopping cart — and the team is making good progress. Unfortunately, however, half-way through the work of implementing the shopping cart, the Product Owner changes his mind. The Product Owner decides that it is much more important to create the product catalog before the shopping cart. With some frustration, the team switches their developmental efforts to focus on implementing the product catalog. However, part way through completing this work, once again the Product Owner changes his mind about the highest priority item. Getting work done when priorities are constantly shifting is frustrating for the developer team and it results in lower productivity. At the same time, however, the Product Owner needs to have absolute authority over the priority of the items which need to get done. Scrum solves this conflict with the concept of Sprints. In Scrum, a developer team works in Sprints. At the beginning of a Sprint the developers and the Product Owner agree on the items from the backlog which they will complete during the Sprint. This subset of items from the Product Backlog becomes the Sprint Backlog. During the Sprint, the Product Owner is not allowed to change the items in the Sprint Backlog. In other words, the Product Owner cannot shift priorities on the developer team during the Sprint. Different teams use Sprints of different lengths such as one month Sprints, two-week Sprints, and one week Sprints. For high-stress, time critical projects, teams typically choose shorter sprints such as one week sprints. For more mature projects, longer one month sprints might be more appropriate. A team can pick whatever Sprint length makes sense for them just as long as the team is consistent. You should pick a Sprint length and stick with it. Daily Scrum During a Sprint, the developer team needs to have meetings to coordinate their work on completing the items in the Sprint Backlog. For example, the team needs to discuss who is working on what and whether any blocking issues have been discovered. Developers hate meetings (well, sane developers hate meetings). Meetings take developers away from their work of actually implementing stuff as opposed to talking about implementing stuff. However, a developer team which never has meetings and never coordinates their work also has problems. For example, Fred might get stuck on a programming problem for days and never reach out for help even though Tom (who sits in the cubicle next to him) has already solved the very same problem. Or, both Ted and Fred might have started working on the same item from the Sprint Backlog at the same time. In Scrum, these conflicting needs – limiting meetings but enabling team coordination – are resolved with the idea of the Daily Scrum. The Daily Scrum is a meeting for coordinating the work of the developer team which happens once a day. To keep the meeting short, each developer answers only the following three questions: 1. What have you done since yesterday? 2. What do you plan to do today? 3. Any impediments in your way? During the Daily Scrum, developers are not allowed to talk about issues with their cat, do demos of their latest work, or tell heroic stories of programming problems overcome. The meeting must be kept short — typically about 15 minutes. Issues which come up during the Daily Scrum should be discussed in separate meetings which do not involve the whole developer team. Stories and Tasks Items in the Product or Sprint Backlog – such as building a shopping cart or creating a Facebook page – are often referred to as User Stories or Stories. The Stories are created by the Product Owner and should represent some business need. Unlike the Product Owner, the developer team needs to think about how a Story should be implemented. At the beginning of a Sprint, the developer team takes the Stories from the Sprint Backlog and breaks the stories into tasks. For example, the developer team might take the Create a Shopping Cart story and break it into the following tasks: · Enable users to add and remote items from shopping cart · Persist the shopping cart to database between visits · Redirect user to checkout page when Checkout button is clicked During the Daily Scrum, members of the developer team volunteer to complete the tasks required to implement the next Story in the Sprint Backlog. When a developer talks about what he did yesterday or plans to do tomorrow then the developer should be referring to a task. Stories are owned by the Product Owner and a story is all about business value. In contrast, the tasks are owned by the developer team and a task is all about implementation details. A story might take several days or weeks to complete. A task is something which a developer can complete in less than a day. Some teams get lazy about breaking stories into tasks. Neglecting to break stories into tasks can lead to “Never Ending Stories” If you don’t break a story into tasks, then you can’t know how much of a story has actually been completed because you don’t have a clear idea about the implementation steps required to complete the story. Scrumboard During the Daily Scrum, the developer team uses a Scrumboard to coordinate their work. A Scrumboard contains a list of the stories for the current Sprint, the tasks associated with each Story, and the state of each task. The developer team uses the Scrumboard so everyone on the team can see, at a glance, what everyone is working on. As a developer works on a task, the task moves from state to state and the state of the task is updated on the Scrumboard. Common task states are ToDo, In Progress, and Done. Some teams include additional task states such as Needs Review or Needs Testing. Some teams use a physical Scrumboard. In that case, you use index cards to represent the stories and the tasks and you tack the index cards onto a physical board. Using a physical Scrumboard has several disadvantages. A physical Scrumboard does not work well with a distributed team – for example, it is hard to share the same physical Scrumboard between Boston and Seattle. Also, generating reports from a physical Scrumboard is more difficult than generating reports from an online Scrumboard. Estimating Stories and Tasks Stakeholders in a project, the people investing in a project, need to have an idea of how a project is progressing and when the project will be completed. For example, if you are investing in creating an e-commerce site, you need to know when the site can be launched. It is not enough to just say that “the project will be done when it is done” because the stakeholders almost certainly have a limited budget to devote to the project. The people investing in the project cannot determine the business value of the project unless they can have an estimate of how long it will take to complete the project. Developers hate to give estimates. The reason that developers hate to give estimates is that the estimates are almost always completely made up. For example, you really don’t know how long it takes to build a shopping cart until you finish building a shopping cart, and at that point, the estimate is no longer useful. The problem is that writing code is much more like Finding a Cure for Cancer than Building a Brick Wall. Building a brick wall is very straightforward. After you learn how to add one brick to a wall, you understand everything that is involved in adding a brick to a wall. There is no additional research required and no surprises. If, on the other hand, I assembled a team of scientists and asked them to find a cure for cancer, and estimate exactly how long it will take, they would have no idea. The problem is that there are too many unknowns. I don’t know how to cure cancer, I need to do a lot of research here, so I cannot even begin to estimate how long it will take. So developers hate to provide estimates, but the Product Owner and other product stakeholders, have a legitimate need for estimates. Scrum resolves this conflict by using the idea of Story Points. Different teams use different units to represent Story Points. For example, some teams use shirt sizes such as Small, Medium, Large, and X-Large. Some teams prefer to use Coffee Cup sizes such as Tall, Short, and Grande. Finally, some teams like to use numbers from the Fibonacci series. These alternative units are converted into a Story Point value. Regardless of the type of unit which you use to represent Story Points, the goal is the same. Instead of attempting to estimate a Story in hours (which is doomed to failure), you use a much less fine-grained measure of work. A developer team is much more likely to be able to estimate that a Story is Small or X-Large than the exact number of hours required to complete the story. So you can think of Story Points as a compromise between the needs of the Product Owner and the developer team. When a Sprint starts, the developer team devotes more time to thinking about the Stories in a Sprint and the developer team breaks the Stories into Tasks. In Scrum, you estimate the work required to complete a Story by using Story Points and you estimate the work required to complete a task by using hours. The difference between Stories and Tasks is that you don’t create a task until you are just about ready to start working on a task. A task is something that you should be able to create within a day, so you have a much better chance of providing an accurate estimate of the work required to complete a task than a story. Burndown Charts In Scrum, you use Burndown charts to represent the remaining work on a project. You use Release Burndown charts to represent the overall remaining work for a project and you use Sprint Burndown charts to represent the overall remaining work for a particular Sprint. You create a Release Burndown chart by calculating the remaining number of uncompleted Story Points for the entire Product Backlog every day. The vertical axis represents Story Points and the horizontal axis represents time. A Sprint Burndown chart is similar to a Release Burndown chart, but it focuses on the remaining work for a particular Sprint. There are two different types of Sprint Burndown charts. You can either represent the remaining work in a Sprint with Story Points or with task hours (the following image, taken from Wikipedia, uses hours). When each Product Backlog Story is completed, the Release Burndown chart slopes down. When each Story or task is completed, the Sprint Burndown chart slopes down. Burndown charts typically do not always slope down over time. As new work is added to the Product Backlog, the Release Burndown chart slopes up. If new tasks are discovered during a Sprint, the Sprint Burndown chart will also slope up. The purpose of a Burndown chart is to give you a way to track team progress over time. If, halfway through a Sprint, the Sprint Burndown chart is still climbing a hill then you know that you are in trouble. Team Velocity Stakeholders in a project always want more work done faster. For example, the Product Owner for the e-commerce site wants the website to launch before tomorrow. Developers tend to be overly optimistic. Rarely do developers acknowledge the physical limitations of reality. So Project stakeholders and the developer team often collude to delude themselves about how much work can be done and how quickly. Too many software projects begin in a state of optimism and end in frustration as deadlines zoom by. In Scrum, this problem is overcome by calculating a number called the Team Velocity. The Team Velocity is a measure of the average number of Story Points which a team has completed in previous Sprints. Knowing the Team Velocity is important during the Sprint Planning meeting when the Product Owner and the developer team work together to determine the number of stories which can be completed in the next Sprint. If you know the Team Velocity then you can avoid committing to do more work than the team has been able to accomplish in the past, and your team is much more likely to complete all of the work required for the next Sprint. Scrum Master There are three roles in Scrum: the Product Owner, the developer team, and the Scrum Master. I’v e already discussed the Product Owner. The Product Owner is the one and only person who maintains the Product Backlog and prioritizes the stories. I’ve also described the role of the developer team. The members of the developer team do the work of implementing the stories by breaking the stories into tasks. The final role, which I have not discussed, is the role of the Scrum Master. The Scrum Master is responsible for ensuring that the team is following the Scrum process. For example, the Scrum Master is responsible for making sure that there is a Daily Scrum meeting and that everyone answers the standard three questions. The Scrum Master is also responsible for removing (non-technical) impediments which the team might encounter. For example, if the team cannot start work until everyone installs the latest version of Microsoft Visual Studio then the Scrum Master has the responsibility of working with management to get the latest version of Visual Studio as quickly as possible. The Scrum Master can be a member of the developer team. Furthermore, different people can take on the role of the Scrum Master over time. The Scrum Master, however, cannot be the same person as the Product Owner. Using SonicAgile SonicAgile (SonicAgile.com) is an online tool which you can use to manage your projects using Scrum. You can use the SonicAgile Product Backlog to create a prioritized list of stories. You can estimate the size of the Stories using different Story Point units such as Shirt Sizes and Coffee Cup sizes. You can use SonicAgile during the Sprint Planning meeting to select the Stories that you want to complete during a particular Sprint. You can configure Sprints to be any length of time. SonicAgile calculates Team Velocity automatically and displays a warning when you add too many stories to a Sprint. In other words, it warns you when it thinks you are overcommitting in a Sprint. SonicAgile also includes a Scrumboard which displays the list of Stories selected for a Sprint and the tasks associated with each story. You can drag tasks from one task state to another. Finally, SonicAgile enables you to generate Release Burndown and Sprint Burndown charts. You can use these charts to view the progress of your team. To learn more about SonicAgile, visit SonicAgile.com. Summary In this post, I described many of the basic concepts of Scrum. You learned how a Product Owner uses a Product Backlog to create a prioritized list of tasks. I explained why work is completed in Sprints so the developer team can be more productive. I also explained how a developer team uses the daily scrum to coordinate their work. You learned how the developer team uses a Scrumboard to see, at a glance, who is working on what and the state of each task. I also discussed Burndown charts. You learned how you can use both Release and Sprint Burndown charts to track team progress in completing a project. Finally, I described the crucial role of the Scrum Master – the person who is responsible for ensuring that the rules of Scrum are being followed. My goal was not to describe all of the concepts of Scrum. This post was intended to be an introductory overview. For a comprehensive explanation of Scrum, I recommend reading Ken Schwaber’s book Agile Project Management with Scrum: http://www.amazon.com/Agile-Project-Management-Microsoft-Professional/dp/073561993X/ref=la_B001H6ODMC_1_1?ie=UTF8&qid=1345224000&sr=1-1

    Read the article

  • Post-Purchase Social Media

    - by David Dorf
    When you make a particularly good purchase, the natural tendency is to share the experience with friends. You show them your cool new toy or garment, then explain how you discovered such a great deal, all the while implying you are the world's most savvy shopper. My wife does it with clothes, housewares, and books, and I do it with wiz-bang techie stuff. Post-purchase euphoria or Buyer's remorse are associated with most purchases beyond day-to-day needs. So now let's add social media to the mix. Haul videos are a YouTube phenomenon where a shopper describes their latest haul on video. Blair Fowler, aka juicystar07, is an excellent example. She and her older sister's haul videos have been viewed 75,000,000 times, at times causing particular items to sell out after being showcased. If you're not already on this bandwagon, checkout Blair's haul video from her trip to Forever21. There are a couple good articles on this trend from ABC's GMA, Slate, and NPR. Some retailers are already sending free products to these fashionistas in the hopes they'll be reviewed on camera. For those less willing to exert themselves, there's Blippy, a service that automatically tweets your purchases. Similar to Twitter, your purchases are tweeted so your friends can see what you've purchased and your network can make comments. In the example to the right, co-founder Philip Kaplan purchased a gift for his wife from the store Does Your Mother Know, proving the point that the need for privacy is overblown. Blippy has partnerships with selected merchants like Apple, Amazon, and Netflix and can also get purchases from the credit cards you've registered. When you register, you can configure whether to automatically tweet each purchase, or approve them first. No sense in broadcasting my need for Rogaine, right? This is a good thing for retailers, as it helps spread the word about purchases and gives other people ideas. Rick just bought an ooma from Amazon. What the heck is ooma? Oh, its like Vonage but no monthly bills. I'm there.

    Read the article

  • Thursday Community Keynote: "By the Community, For the Community"

    - by Janice J. Heiss
    Sharat Chander, JavaOne Community Chairperson, began Thursday's Community Keynote. As part of the morning’s theme of "By the Community, For the Community," Chander noted that 60% of the material at the 2012 JavaOne conference was presented by Java Community members. "So next year, when the call for papers starts, put-in your submissions," he urged.From there, Gary Frost, Principal Member of Technical Staff, AMD, expanded upon Sunday's Strategy Keynote exploration of Project Sumatra, an OpenJDK project targeted at bringing Java to heterogeneous computing platforms (which combine the CPU and the parallel processor of the GPU into a single piece of silicon). Sumatra entails enhancing the JVM to make maximum use of these advanced platforms. Within this development space, AMD created the Aparapi API, which converts Java bytecode into OpenCL for execution on such GPU devices. The Aparapi API was open sourced in September 2011.Whether it was zooming-in on a Mandelbrot set, "the game of life," or a swarm of 10,000 Dukes in a space-bound gravitational dance, Frost's demos, using an Aparapi/OpenCL implementation, produced stunningly faster display results. He indicated that the Java 9 timeframe is where they see Project Sumatra coming to ultimate fruition, employing the Lamdas of Java 8.Returning to the theme of the keynote, Donald Smith, Director, Java Product Management, Oracle, explored a mind map graphic demonstrating the importance of Community in terms of fostering innovation. "It's the sharing and mixing of culture, the diversity, and the rapid prototyping," he said. Within this topic, Smith, brought up a panel of representatives from Cloudera, Eclipse, Eucalyptus, Perrone Robotics, and Twitter--ideal manifestations of community and innovation in the world of Java.Marten Mickos, CEO, Eucalyptus Systems, explored his company's open source cloud software platform, written in Java, and used by gaming companies, technology companies, media companies, and more. Chris Aniszczyk, Operations Engineering,Twitter, noted the importance of the JVM in terms of their multiple-language development environment. Mike Olson, CEO, Cloudera, described his company's Apache Hadoop-based software, support, and training. Mike Milinkovich, Executive Director, Eclipse Foundation, noted that they have about 270 tools projects at Eclipse, with 267 of them written in Java. Milinkovich added that Eclipse will even be going into space in 2013, as part of the control software on various experiments aboard the International Space Station. Lastly, Paul Perrone, CEO, Perrone Robotics, detailed his company's robotics and automation software platform built 100% on Java, including Java SE and Java ME--"on rat, to cat, to elephant-sized systems." Milinkovic noted that communities are by nature so good at innovation because of their very openness--"The more open you make your innovation process, the more ideas are challenged, and the more developers are focused on justifying their choices all the way through the process."From there, Georges Saab, VP Development Java SE OpenJDK, continued the topic of innovation and helping the Java Community to "Make the Future Java." Martijn Verburg, representing the London Java Community (winner of a Duke's Choice Award 2012 for their activity in OpenJDK and JCP), soon joined Saab onstage. Verburg detailed the LJC's "Adopt a JSR" program--"to get day-to-day developers more involved in the innovation that's happening around them."  From its London launching pad, the innovative program has spread to Brazil, Morocco, Latvia, India, and more.Other active participants in the program joined Verburg onstage--Ben Evans, London Java Community; James Gough, Stackthread; Bruno Souza, SOUJava; Richard Warburton, jClarity; and Cecelia Borg, Oracle--OpenJDK Onboarding. Together, the group explored the goals and tasks inherent in the Adopt a JSR program--from organizing hack days (testing prototype implementations), to managing mailing lists and forums, to triaging issues, to evangelism—all with the goal of fostering greater community/developer involvement, but equally importantly, building better open standards. “Come join us, and make your ecosystem better!" urged Verburg.Paul Perrone returned to profile the latest in his company's robotics work around Java--including the AARDBOTS family of smaller robotic vehicles, running the Perrone MAX platform on top of the Java JVM. Perrone took his "Rumbles" four-wheeled robot out for a spin onstage--a roaming, ARM-based security-bot vehicle, complete with IR, ultrasonic, and "cliff" sensors (the latter, for the raised stage at JavaOne). As an ultimate window into the future of robotics, Perrone displayed a "head-set" controller--a sensor directed at the forehead to monitor brainwaves, for the someday-implementation of brain-to-robot control.Then, just when it seemed this might be the end of the day's futuristic offerings, a mystery voice from offstage pronounced "I've got some toys"--proving to be guest-visitor James Gosling, there to explore his cutting-edge work with Liquid Robotics. While most think of robots as something with wheels or arms or lasers, Gosling explained, the Liquid Robotics vehicle is an entirely new and innovative ocean-going 'bot. Looking like a floating surfboard, with an attached set of underwater wings, the autonomous devices roam the oceans using only the energy of ocean waves to propel them, and a single actuated rudder to steer. "We have to accomplish all guidance just by wiggling the rudder," Gosling said. The devices offer applications from self-installing weather buoy, to pollution monitoring station, to marine mammal monitoring device, to climate change data gathering, to even ocean life genomic sampling. The early versions of the vehicle used C code on very tiny industrial micro controllers, where they had to "count the bytes one at a time."  But the latest generation vehicles, which just hit the water a week or so ago, employ an ARM processor running Linux and the ARM version of JDK 7. Gosling explained that vehicle communication from remote locations is achieved via the Iridium satellite network. But because of the costs of this communication path, the data must be sent in very small bursts--using SBD short burst data. "It costs $1/kb, so that rules everything in the software design,” said Gosling. “If you were trying to stream a Netflix video over this, it would cost a million dollars a movie. …We don't have a 'big data' problem," he quipped. There are currently about 150 Liquid Robotics vehicles out traversing the oceans. Gosling demonstrated real time satellite tracking of several vehicles currently at sea, noting that Java is actually particularly good at AI applications--due to the language having garbage collection, which facilitates complex data structures. To close-out his time onstage, Gosling of course participated in the ceremonial Java tee-shirt toss out to the audience…In parting, Chander passed the JavaOne Community Chairperson baton to Stephen Chin, Java Technology Evangelist, Oracle. Onstage in full motorcycle gear, Chin noted that he'll soon be touring Europe by motorcycle, meeting Java Community Members and streaming live via UStream--the ultimate manifestation of community and technology!  He also reminded attendees of the upcoming JavaOne Latin America 2012, São Paulo, Brazil (December 4-6, 2012), and stated that the CFP (call for papers) at the conference has been extended for one more week. "Remember, December is summer in Brazil!" Chin said.

    Read the article

  • Free Online Performance Tuning Event

    - by Andrew Kelly
      On June 9th 2010 I will be showing several sessions related to performance tuning for SQL Server and they are the best kind because they are free :).  So mark your calendars. Here is the event info and URL: June 29, 2010 - 10:00 am - 3:00 pm Eastern SQL Server is the platform for business. In this day-long free virtual event, well-known SQL Server performance expert Andrew Kelly will provide you with the tools and knowledge you need to stay on top of three key areas related to peak performance...(read more)

    Read the article

  • Oracle Linux Training Calendar

    - by Antoinette O'Sullivan
    The Oracle Linux System Administrator Curriculum is designed to provide you with the knowledge and skills necessary to effectively administer an Oracle Linux environment. These classes will help you prepare to install, configure, and manage your enterprise Linux environment as well as prepare you for the Oracle Linux Certification. You can take these courses as a: Live-Virtual event: Following the instructor-led classes from your own desk - no travel required. There is an extensive list of events on the schedule to suit different timezones. See full list on http://oracle.com/education/linux. In-Class event: Travel to an education center to take these classes. Below is a sample of in-class events on the schedule: Unix and Linux Essentials: This 3-day class is for those new to the linux operating system. You learn to manage files & directories from the command line, perform remote connections, file transfers & more.  Location  Date  Delivery Language  Nairobi, Kenya  3 December 2012  English  Riyadh, Saudia Arabia  5 January 2013  English  Cape Town, South Africa  9 January 2013  English  Durban, South Africa  9 January 2013  English  Johannesburg, South Africa  9 January 2013  English  Woodmead, South Africa  15 July 2013  English  Denver, United States  23 January 2013  English  Columbia, United States  2 January 2013  English  East Lansing, United States  9 January 2013  English  Roseville, United States  1 April 2013  English  Morrisville, United States  11 February 2013  English  Jakarta, Indonesia  26 December 2012  English  Kuala Lumpur, Malaysia  29 January 2013  English  Auckland, New Zealand  12 December 2012  English  Makati City, Philippines  14 January 2013  English  Singapore  13 February 2013  English  North Sydney, Australia  4 February 2013  English  Brisbane, Australia  29 April 2013  English  Melbourne, Australia  29 January 2013  English Oracle Linux System Administration: This 5 day course covers a broad range of Oracle Linux system administration tasks, from installing the operating system to preparing the system for Oracle Database. The course also provides an extensive hands-on experience for key system administration tasks. You will gain comprehensive skills in installing, configuring, and managing an Oracle Linux system as well as insight into ULN, Ksplice and UEK.  Location  Date  Delivery Language  Brussels, Belgium  26 November 2012  English  Windhof, Luxembourg  17 December 2012  English  Utrecht, Netherlands  11 February 2013  Dutch  Warsaw, Poland  25 February 2013  Polish  Gabarone, Botswana  22 April 2013  English  Nairobi, Kenya  10 December 2012  English  Johannesburg, South Africa  11 March 2013  English  Belmont, CA, United States  11 February 2013  English  Irvine, CA, United States  25 March 2013  English  Roseville, MN, United States  26 November 2013  English  Irving, TX, United States  14 January 2013  English  Jakarta, Indonesia  3 December 2012  English  Singapore  26 November 2012  English  Canberra, Australia  21 January 2013  English  Sydney, Australia  21 January 2013  English  Melbourne, Australia  11 February 2013  English To test your Oracle Linux System Administration skills, take the Oracle Linux 6 Implementation Essentials Certification Exam. For more information on the Oracle Linux Curriculum or to express interest in additional events, go to http://oracle.com/education/linux.

    Read the article

  • TFS, G.I. Joe and Under-doing

    If I were to rank the most consistently irritating parts of my work day, using TFS would come in first by a wide margin. Even repeated network outages this week seem like a pleasant reprieve from this monolithic beast. This is not a reflexive anti-Microsoft feeling, that attitude just wouldnt work for a consultant who does .NET development. It is also not an utter dismissal of TFS as worthless; Ive seen people use it effectively on several projects. So why? Ill start with a laundry list of shortcomings. An out of the box UI for work items that is insultingly bad, a source control system that is confoundingly fragile when handling merges, folder renames and long file names, the arcane XML wizardry necessary to customize a template and a build system that adds an extra layer of oddness on top of msbuild. Im sure my legion of readers will soon point out to me how I can work around all these issues, how this is fixed in TFS 2010 or with this add-in, and how once you have everything set up, youre fine. And theyd be right, any one of these problems could be worked around. If not dirty laundry, what else? I thought about it for a while, and came to the conclusion that TFS is so irritating to me because it represents a vision of software development that I find unappealing. To expand upon this, lets start with some wisdom from those great PSAs at the end of the G.I. Joe cartoons of the 80s: Now you know, and knowing is half the battle. In software development, Id go further and say knowing is more than half the battle. Understanding the dimensions of the problem you are trying to solve, the needs of the users, the value that your software can provide are more than half the battle. Implementation of this understanding is not easy, but it is not even possible without this knowledge. Assuming we have a fixed amount of time and mental energy for any project, why does this spell trouble for TFS? If you think about what TFS is doing, its offering you a huge array of options to track the day to day implementation of your project. From tasks, to code churn, to test coverage. All valuable metrics, but only in exchange for valuable time to get it all working. In addition, when you have a shiny toy like TFS, the temptation is to feel obligated to use it. So the push from TFS is to encourage a project manager and team to focus on process and metrics around process. You can get great visibility, and graphs to show your project stakeholders, but none of that is important if you are not implementing the right product. Not just unimportant, these activities can be harmful as they drain your time and sap your creativity away from the rest of the project. To be more concrete, lets suppose your organization has invested the time to create a template for your projects and trained people in how to use it, so there is no longer a big investment of time for each project to get up and running. First, Id challenge if that template could be specific enough to be full featured and still applicable for any project. Second, the very existence of this template would be a indication to a project manager that the success of their project was somehow directly related to fitting management of that project into this format. Again, while the capabilities are wonderful, the mirage is there; just get everything into TFS and your project will run smoothly. Ill close the loop on this first topic by proposing a thought experiment. Think of the projects youve worked on. How many times have you been chagrined to discover youve implemented the wrong feature, misunderstood how a feature should work or just plain spent too much time on a screen that nobody uses? That sounds like a really worthwhile area to invest time in improving. How about going back to these projects and thinking about how many times you wished you had optimized the state change flow of your tasks or been embarrassed to not have a code churn report linked back to the latest changeset? With thanks to the Real American Heroes, Ill move on to a more current influence, that of the developers at 37signals, and their philosophy towards software development. This philosophy, fully detailed in the books Getting Real and Rework, is a vision of software that under does the competition. This is software that is deliberately limited in functionality in order to concentrate fully on making sure ever feature that is there is awesome and needed. Why is this relevant? Well, in one of those fun seeming paradoxes in life, constraints can be a spark for creativity. Think Twitter, the small screen of an iPhone, the limitations of HTML for applications, the low memory limits of older or embedded system. As long as there is some freedom within those constraints, amazing things emerge. For project management, some of the most respected people in the industry recommend using just index cards, pens and tape. They argue that with change the constant in software development, your process should be as limited (yet rigorous) as possible. Looking at TFS, this is not a system designed to under do anybody. It is a big jumble of components and options, with every feature you could think of. Predictably this means many basic functions are hard to use. For task management, many people just use an Excel spreadsheet linked up to TFS. Not a stirring endorsement of the tooling there. TFS as a whole would be far more appealing to me if there was less of it, but better. Id cut 50% of the features to make the other half really amaze and inspire me. And thats really the heart of the matter. TFS has great promise and I want to believe it can work better. But ultimately it focuses your attention on a lot of stuff that doesnt really matter and then clamps down your creativity in a mess of forms and dialogs obscuring what does.   --- Relevant Links --- All those great G.I. Joe PSAs are on YouTube, including lots of mashed up versions. A simple Google search will get you on the right track.Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

< Previous Page | 105 106 107 108 109 110 111 112 113 114 115 116  | Next Page >