Search Results

Search found 67705 results on 2709 pages for 'time management'.

Page 11/2709 | < Previous Page | 7 8 9 10 11 12 13 14 15 16 17 18  | Next Page >

  • Power Management - Sleep / Wake up Server when accessed

    - by KP65
    I have a headless HP Proliant Microserver with ubuntu installed. This machine has samba shares on it serving media and I usually rdp or ssh into it. Now my issue is I want the machine to go into sleep mode(so the state is saved from ram to the harddrive) and it will seem like it is turned off after an hour of idling. If there is any attempt to access the samba share through LAN I would like it to wake up. Now my motherboard supports this function, can anyone point me in the right direction for achieving this easily? Thanks

    Read the article

  • Game Asset Management

    - by user964123
    I am making my first small mobile game in C# XNA. Lets say I have 3 screens, the main menu, options and game screen. A single game session usually lasts for 1 min, so the user will alternate frequently between the main menu and game screen. Therefore, once I load the textures for either screen, I want to keep them in memory to avoid frequent reloading. Both screens share some assets like their background textures, but differ in others. The first solution I came up with is making 2 texture factory classes, MainScreenAssetFactory and GameScreenAssetFactory, each with their own content manager, and ill store them in a globally accessible point so that they persist after either screen is destroyed. There is also a OptionsScreenAssetFactory, but that I dont want to cache it since the options screen is rarely visited. A typical Factory would look something like this public class MainScreenAssetFactory { private readonly ContentManager contentManager; public MainScreenAssetFactory(IServiceProvider serviceProvider, string rootDirectory) { contentManager = new ContentManager(serviceProvider) { RootDirectory = rootDirectory }; } public Texture2D ListElementBackground { get { return return contentManager.Load<Texture2D>("UserTab"); } } public Texture2D ListElementBulletPoint { get { return return contentManager.Load<Texture2D>("TabIcon"); } } public Texture2D LoggedOutUser { get { return return contentManager.Load<Texture2D>("LoggedOutUser"); } } } Since both Main, Options and Game Screen share some common resources, instead of loading them more than once, I created another class CommonAssetTexFactory which holds the common stuff and stays in-memory during the app lifetime. For example, this class gets passed to the options screen when it is created. However, given my small game with its few assets, I am already finding this solution cumbersome and inflexible. Changing anything would require looking to see if its already in the common factory, and if not, modifying existing factories and so on. And this is just considering textures currently, i didnt add sound files yet. I cant imagine bigger games with thousands of resources using this approach. A better idea must exist. Would someone please enlighten me?

    Read the article

  • Which Project Management Software is adequate for Software & Non-Software Projects?

    - by cusack
    PMS = (Project Management Software) I used trac for software development some time ago. Right now I'm searching for a new more powerful (scheduling, gantt charts, ...) free solution (as in free beer ;-) and free to install on my server) for my current software project. Besides the current software project, abstract project management features like issue-tracking & scheduling would be great for coordinating a group of volunteers for real-life projects as well. I would want one solution for both purposes, so that I have the hassle of installation, getting used to the system and administration only once. So I tried redmine but the problem is it seems to be designed for software projects only. I can't suggest such a solution for the volunteer-group if tickets/issues would have to be of type bug, feature, ... I shortlisted the following six PMS from the wikipedia comparison http://en.wikipedia.org/wiki/List_of_project_management_software Project.net Project-Open Redmine Trac Endeavour Software Project Management eGroupWare I guess they are all more or less fine for software development but would you consider any of these to be good for the non-software project as well? Cliff Notes: I would want a start page situation like in trac. The start-page is a wiki presenting the project and not the PMS. But you can log into the PMS from there. Feature-wish list: wiki, Issue tracking, revision control, scheduling & gantt charts, forums (least important) (Btw: I'm very aware that I can't expect everything to be perfect ;-) 1.)Do you know a suitable solution for software and real-life projects or a highly customizable PMS where I can easily remove sth. like "browse source"(trac) and rename things like ticket/issue-types "bug", "feature"? 2.)Any experience good/bad with the above mentioned six PMS? I would personally guess that "Redmine" and "Endeavour Software Project Management" are too focused on software projects.

    Read the article

  • Is it normal for programmer to work on multiple projects simultaneously.

    - by gasan
    On a current job I have 2 projects to work on. First is very huge system and the second one is smaller but it also big (first project is being developed for 12 years, second for 4 years). At first I was working only on first project and was trying to get used to it. Then I was moved to second project and tried there, so my knowledge about first project became shady. Now I have to work on both projects at the same time. It's very hard for me because despite they both use java, they use different frameworks and the amount of code and business-logic to understand is very big so I really can't hold both that projects in my head. Is it normal and I should get used to it, although my expertise became very squashy, what won't happen if I would work only on a single project? Or should I raise a concern or maybe change employer?

    Read the article

  • How to balance programming projects between feasibility and usefulness

    - by tyjkenn
    I've become fairly competent as a programmer, but I would not say I am a master. I work independently, most as a hobby, although I have done some freelance PHP work. I tend to find myself dabbling in a lot of things: Java Android SDK, Arduino, game scripting, Lua, etc. I've reached the point where I want to start a real software project, but cannot think of a small enough project that allows me enough practice, while still being able to publish a decent piece of software in a reasonable amount of time, and build up a portfolio. More specifically, I was looking at Ubuntu development, in Python, using the Quickly toolset, which includes the PyGTK libraries. So the question is, what is the best way to come up with a small project that is still useful, as a starting point to a software development career?

    Read the article

  • Enabling Hyper-V Integrated Services Time Sync Services versus Internet Time Synchronization

    - by cpuguru
    Should I deselect the "Synchronize with an Internet Time Server" checkbox under the VM's "Date and Time - Internet Time Settings" tab if the "Time Synchronization Service" for a Hyper-V-based Virtual Machine is enabled? One of the Integration Services that Hyper-V provides is the Time Synchronization Service, which can be enabled/disabled by going to a VM's Settings-Integration Services setting in the Management section. I believe this is checked by default. When you install a Windows Server 2008 OS in a VM on the Hyper-V server, it comes with the "Synchronize with an Internet Time Server" option set, pointing to "time.windows.com". I'd think that if the parent Hyper-V server is set to one time server, and the child VM is pointing to a different time server, there would be a momentary blip if the two are not spot on with their times when the synchronization services run. So the question is, which time sync service should I use? I'm assuming not both. And what is the advantage of one over the other? Note: This question assumes that the machines are not joined to a domain. If they were, the machines would also try to update their time against the domain controller with the primary domain controller role too, right? Thanks!

    Read the article

  • Partner Blog Series: PwC Perspectives - "Is It Time for an Upgrade?"

    - by Tanu Sood
    Is your organization debating their next step with regard to Identity Management? While all the stakeholders are well aware that the one-size-fits-all doesn’t apply to identity management, just as true is the fact that no two identity management implementations are alike. Oracle’s recent release of Identity Governance Suite 11g Release 2 has innovative features such as a customizable user interface, shopping cart style request catalog and more. However, only a close look at the use cases can help you determine if and when an upgrade to the latest R2 release makes sense for your organization. This post will describe a few of the situations that PwC has helped our clients work through. “Should I be considering an upgrade?” If your organization has an existing identity management implementation, the questions below are a good start to assessing your current solution to see if you need to begin planning for an upgrade: Does the current solution scale and meet your projected identity management needs? Does the current solution have a customer-friendly user interface? Are you completely meeting your compliance objectives? Are you still using spreadsheets? Does the current solution have the features you need? Is your total cost of ownership in line with well-performing similar sized companies in your industry? Can your organization support your existing Identity solution? Is your current product based solution well positioned to support your organization's tactical and strategic direction? Existing Oracle IDM Customers: Several existing Oracle clients are looking to move to R2 in 2013. If your organization is on Sun Identity Manager (SIM) or Oracle Identity Manager (OIM) and if your current assessment suggests that you need to upgrade, you should strongly consider OIM 11gR2. Oracle provides upgrade paths to Oracle Identity Manager 11gR2 from SIM 7.x / 8.x as well as Oracle Identity Manager 10g / 11gR1. The following are some of the considerations for migration: Check the end of product support (for Sun or legacy OIM) schedule There are several new features available in R2 (including common Helpdesk scenarios, profiling of disconnected applications, increased scalability, custom connectors, browser-based UI configurations, portability of configurations during future upgrades, etc) Cost of ownership (for SIM customers)\ Customizations that need to be maintained during the upgrade Time/Cost to migrate now vs. waiting for next version If you are already on an older version of Oracle Identity Manager and actively maintaining your support contract with Oracle, you might be eligible for a free upgrade to OIM 11gR2. Check with your Oracle sales rep for more details. Existing IDM infrastructure in place: In the past year and half, we have seen a surge in IDM upgrades from non-Oracle infrastructure to Oracle. If your organization is looking to improve the end-user experience related to identity management functions, the shopping cart style access request model and browser based personalization features may come in handy. Additionally, organizations that have a large number of applications that include ecommerce, LDAP stores, databases, UNIX systems, mainframes as well as a high frequency of user identity changes and access requests will value the high scalability of the OIM reconciliation and provisioning engine. Furthermore, we have seen our clients like OIM's out of the box (OOB) support for multiple authoritative sources. For organizations looking to integrate applications that do not have an exposed API, the Generic Technology Connector framework supported by OIM will be helpful in quickly generating custom connector using OOB wizard. Similarly, organizations in need of not only flexible on-boarding of disconnected applications but also strict access management to these applications using approval flows will find the flexible disconnected application profiling feature an extremely useful tool that provides a high degree of time savings. Organizations looking to develop custom connectors for home grown or industry specific applications will likewise find that the Identity Connector Framework support in OIM allows them to build and test a custom connector independently before integrating it with OIM. Lastly, most of our clients considering an upgrade to OIM 11gR2 have also expressed interest in the browser based configuration feature that allows an administrator to quickly customize the user interface without adding any custom code. Better yet, code customizations, if any, made to the product are portable across the future upgrades which, is viewed as a big time and money saver by most of our clients. Below are some upgrade methodologies we adopt based on client priorities and the scale of implementation. For illustration purposes, we have assumed that the client is currently on Oracle Waveset (formerly Sun Identity Manager).   Integrated Deployment: The integrated deployment is typically where a client wants to split the implementation to where their current IDM is continuing to handle the front end workflows and OIM takes over the back office operations incrementally. Once all the back office operations are moved completely to OIM, the front end workflows are migrated to OIM. Parallel Deployment: This deployment is typically done where there can be a distinct line drawn between which functionality the platforms are supporting. For example the current IDM implementation is handling the password reset functionality while OIM takes over the access provisioning and RBAC functions. Cutover Deployment: A cutover deployment is typically recommended where a client has smaller less complex implementations and it makes sense to leverage the migration tools to move them over immediately. What does this mean for YOU? There are many variables to consider when making upgrade decisions. For most customers, there is no ‘easy’ button. Organizations looking to upgrade or considering a new vendor should start by doing a mapping of their requirements with product features. The recommended approach is to take stock of both the short term and long term objectives, understand product features, future roadmap, maturity and level of commitment from the R&D and build the implementation plan accordingly. As we said, in the beginning, there is no one-size-fits-all with Identity Management. So, arm yourself with the knowledge, engage in industry discussions, bring in business stakeholders and start building your implementation roadmap. In the next post we will discuss the best practices on R2 implementations. We will be covering the Do's and Don't's and share our thoughts on making implementations successful. Meet the Writers: Dharma Padala is a Director in the Advisory Security practice within PwC.  He has been implementing medium to large scale Identity Management solutions across multiple industries including utility, health care, entertainment, retail and financial sectors.   Dharma has 14 years of experience in delivering IT solutions out of which he has been implementing Identity Management solutions for the past 8 years. Scott MacDonald is a Director in the Advisory Security practice within PwC.  He has consulted for several clients across multiple industries including financial services, health care, automotive and retail.   Scott has 10 years of experience in delivering Identity Management solutions. John Misczak is a member of the Advisory Security practice within PwC.  He has experience implementing multiple Identity and Access Management solutions, specializing in Oracle Identity Manager and Business Process Engineering Language (BPEL). Praveen Krishna is a Manager in the Advisory Security practice within PwC.  Over the last decade Praveen has helped clients plan, architect and implement Oracle identity solutions across diverse industries.  His experience includes delivering security across diverse topics like network, infrastructure, application and data where he brings a holistic point of view to problem solving. Jenny (Xiao) Zhang is a member of the Advisory Security practice within PwC.  She has consulted across multiple industries including financial services, entertainment and retail. Jenny has three years of experience in delivering IT solutions out of which she has been implementing Identity Management solutions for the past one and a half years.

    Read the article

  • Time not propagating to machines on Windows domain

    - by rbeier
    We have a two-domain Active Directory forest: ourcompany.com at the root, and prod.ourcompany.com for production servers. Time is propagating properly through the root domain, but servers in the child domain are unable to sync via NTP. So the time on these servers is starting to drift, since they're relying only on the hardware clock. WHen I type "net time" on one of the production servers, I get the following error: Could not locate a time-server. More help is available by typing NET HELPMSG 3912. When I type "w32tm /resync", i get the following: Sending resync command to local computer The computer did not resync because no time data was available. "w32tm /query /source" shows the following: Free-running System Clock We have three domain controllers in the prod.ourcompany.com subdomain (overkill, but the result of a migration - we haven't gotten rid of one of the old ones yet.) To complicate matters, the domain controllers are all virtualized, running on two different physical hosts. But the time on the domain controllers themselves is accurate - the servers that aren't DCs are the ones having problems. Two of the DCs are running Server 2003, including the PDC emulator. The third DC is running Server 2008. (I could move the PDC emulator role to the 2008 machine if that would help.) The non-DC servers are all running Server 2008. All other Active Directory functionality works fine in the production domain - we're only seeing problems with NTP. I can manually sync each machine to the time source (the PDC emulator) by doing the following: net time \\dc1.prod.ourcompany.com /set /y But this is just a one-off, and it doesn't cause automated time syncing to start working. I guess I could create a scheduled task which runs the above command periodically, but I'm hoping there's a better way. Does anyone have any ideas as to why this isn't working, and what we can do to fix it? Thanks for your help, Richard

    Read the article

  • Weird fluctuating time on a XEN linux guest

    - by Vin-G
    I have a weird problem with some servers here at work. We have a few XEN guests who's current time fluctuates. # date;date;date;date;date;date;date Thu Feb 25 16:00:40 PHT 2010 Thu Feb 25 16:00:48 PHT 2010 Thu Feb 25 16:00:40 PHT 2010 Thu Feb 25 16:00:48 PHT 2010 Thu Feb 25 16:00:40 PHT 2010 Thu Feb 25 16:00:48 PHT 2010 Thu Feb 25 16:00:40 PHT 2010 As seen above, the time fluctuates between 16:00:48 and 16:00:40, which is problematic for us since computing for time differences in some of our scripts becomes inaccurate (ex. what should be a few ms differences becomes some few second differences, and even sometimes, negative differences). The problematic servers are linux guests on a XEN host. The time fluctuates on the guest systems, but it is okay in the host itself. I've ruled out ntpd since this happens irregardless of whether ntpd is running or not on the guest systems. Guest is on full virtualisation. The time on both the host and the guest does match except that the time in the guest fluctuates at about a few seconds from the host's time, and the host time does not fluctuate. /proc/sys/xen/independent_wallclock is 0 in the host and does not exist in the guest. Ntpd service was stopped and disabled. Setting independent_wallclock to 1 in the host has no effect (that is, time still fluctuates in the guest). Though I was not able to restart the guest as it is a production server. Might be able to do that over the weekend. Any ideas on what to check and how to resolve this problem?

    Read the article

  • Expected time for an CakePHP MVC form/controller and db make up

    - by hephestos
    I would like to know, what is an average time for building a form in MVC pattern with for example CakePHP. I build 8 functions, two of them do custom queries, return json data, split them, expand them in a model in memory and delivers to the view. Those are three queries if you consider and an array to feed view for making some combo box. Why? all these, because I have data from json and I split them in order to make row of data like a table. Like that I changed a bit the edit.ctp but not a lot. And I created a javascript outside, with three functions. One collects data the other upon a change of a combo returnes the selected values, and does also some redirection flow. All this, in average how much time should it take ?

    Read the article

  • Its Nomination Time: Oracle Fusion Middleware Innovation Awards 2012

    - by B Shashikumar
    Are you doing something unique and innovative with Oracle Fusion Middleware? Submit a nomination today for the Oracle Fusion Middleware Innovation Awards. Winners receive a free pass to Oracle OpenWorld 2012 in San Francisco (September 30 - October 4th) and will be honored during a special event at OpenWorld. The categories include: Oracle Exalogic Cloud Application Foundation Service Integration (SOA) and BPM WebCenter Identity Management Data Integration Application Development Framework and Fusion Development Business Analytics (BI, EPM, Exalytics)   Here's what you need to do:  CLICK HERE to submit your nomination today. The deadline to submit a nomination is 5pm Pacific on July 17, 2012. For additional details, go here.

    Read the article

  • Changing time or offsetting it in OpenVZ contained server

    - by Milad Naseri
    I am trying to run a VPS, a Debian box contained in an OpenVZ container. Obviously, I cannot use time --set or any such command, as the time must be set via the parent node. The owner of the parent node, however refuses to adjust the time (which is 30 minutes slower than the actual time). All the programs on my system, consequently, now recognized the false time and this throws a wrench in my syncing. Is there a way to possibly change the system time without interference from the container's administrator? Or perhaps, failing that, a way to make the programs "see" the time 30 minutes faster than what is reported by the container?

    Read the article

  • Time randomly changing itself, internet randomly dying

    - by Vee
    Operating System MS Windows 8 Enterprise 64-bit CPU Intel Core i7 2700K @ 3.50GHz 45 °C Sandy Bridge 32nm Technology RAM 8,00 GB Dual-Channel DDR3 @ 800MHz (8-8-8-24) Motherboard ASRock Z77 Extreme4-M (CPUSocket) 40 °C Graphics SMXL2270HD (1920x1080@60Hz) M2094D-PZ (1680x1050@60Hz) 896MB GeForce GTX 275 (CardExpert Technology) 57 °C Hard Drives 466GB FUJITSU MAXTOR STM3500320AS (SATA) 39 °C Optical Drives ASUS DRW-2014L1T Audio High Definition Audio Device Hello everyone, I installed Windows 8 RTM a few weeks ago. It's not my first time installing it, but it's the first time having two annoying problems: 1) Randomly, the system clock changes time all by itself - to fix it I have to open the time window and sync it with the internet. 2) Randomly, internet connection stops working - to fix I have to run troubleshooting. Windows will find a problem with IP on the "Ethernet" connection and fix it. 3) In rare occasions, my PC freezes and I need to restart it (a BSOD once happened, but after that only freezes) How can I permanently solve these problems? This is what I've already tried: Reset Virus scan Stop/reset the Windows Time service Disable/re-enable Windows Time automatic internet sync Change time from BIOS Change motherboard battery

    Read the article

  • Comprehensive solution for managing patches, event viewing, change management, inventory, etc

    - by Holocryptic
    I'm looking for a solution that incorporates most or all of the following: Patch Management, Server event viewing/tracking, AD change management, ticketing and internal/external kb, remote access - ability to shadow user sessions or create new ones, imaging, and inventory. Our environments contains Windows Servers and ESXi Hosts (We're not completely virtual, but we're moving that direction). Various Cisco and Linksys switches and firewalls. This is a tall order, and I don't know if it can be done on a reasonable budget. I've looked and found some questions on SF that deal with some of this: http://serverfault.com/questions/72015/active-directory-management-tools-for-medium-sized-forest-less-than-1000-users http://serverfault.com/questions/4021/are-there-any-tools-to-do-change-management-with-active-directory-group-policy http://serverfault.com/questions/21752/what-is-a-good-patch-update-management-server What I'm ideally looking for is a reasonably cheap solution that integrates the features into a central interface. We're a non-profit, so money is a limiting factor (the cheaper, the better; but we have a max of $15k). What we are trying to avoid is having to deal with multiple vendors, while maintaining scalability (we're creating more sites that we'll have to manage). Is this possible, or will we have to cobble together something to make it work for us?

    Read the article

  • Microsoft SQL Server Management Studio not working after installing .Net Framework 4

    - by smith watson
    Yesterday I installed .Net Framework 4 as it was required by Liquid XML Studio, but just after installing it, My SQL Server Management Studio stopped working. As soon as open the IDE I get package microsoft sql management studio package failed to load I tried pretty much all the solution posted on the internet but could not get it working, today when I removed the .Net Framework 4, SQL server management studio started working again. Then just to test, I installed the .Net Framework 4 back ... and I started getting the same problem in management studio. I want both on my machine ! how can i do it ? PS : OS is Windows 7

    Read the article

  • Windows 7 Computer Management Not Accessible

    - by David
    I am having issues trying to access Computer Management from the start menu. The following is a screenshot of exactly how I want to go to computer management. I know that there are other ways to get to computer management, but I would like to go the easier way through the start menu. I tried restarting the computer and I tried patching the computer. No error message comes up or anything. There is no response from the computer.

    Read the article

  • Windows CE 6.0 time setting in registry being overrided

    - by JaminSince83
    I have asked this question on stack overflow but its probably better suited here. So I have a Motorola MC3190 Mobile Barcode scanning device with Windows CE 6.0. Now I want to get the device to sync its date/time on boot up with our domain controller using a registry file that I have created. I have used this registry file below to get close to what I require. REG 1 REGEDIT4 [HKEY_LOCAL_MACHINE\Services\TIMESVC] "UserProcGroup"=dword:00000002 "Flags"=dword:00000010 "multicastperiod"=dword:36EE80 "threshold"=dword:5265C00 "recoveryrefresh"=dword:36EE80 "refresh"=dword:5265C00 "Context"=dword:0 "Autoupdate" = dword:1 "server" = "NAMEOFMYSERVER" "ServerRole" = dword:0 "Trustlocalclock" = dword:0 "Dll"="timesvc.dll" "Keep"=dword:1 "Prefix"="NTP" "Index"=dword:0 [HKEY_LOCAL_MACHINE\nls] "DefaultLCID" = dword:00000809 [HKEY_LOCAL_MACHINE\nls\overrides] "LCID" = dword:00000809 [HKEY_LOCAL_MACHINE\Time] @ = "UTC" "TimeZoneInformation"=hex:\ 00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,\ 00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00,00 [HKEY_LOCAL_MACHINE\Time Zones] @ = "UTC" [HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Clock] "AutoDST" = dword:00000000 Now it gets the correct date and shows the time zone correctly however the time is always 5 hours behind on Eastern Standard Time, which is really annoying. I have researched heavily into this and this question has been asked before here As you will see I have copied what it suggests but it doesnt work. Something is overiding the time which I dont understand enough about to resolve. I cannot find any other setting to get it to set the time correctly. Any help would be greatly appreciated.

    Read the article

  • Case Management API by Koen van Dijk

    - by JuergenKress
    Case Management is a new addition to Oracle BPM in release 11.1.1.1.7 (PS6). This new release contains the Case Management engine, see blog Léon at  http://leonsmiers.blogspot.nl/ for more details.  However, currently this release does not contain a case portal. The case management API's, just like the already existing Oracle BPM API's, help in developing a portal page with relative ease. This blog will use some real life examples from the EURent casemanagement application and portal application developed by Oracle. The Oracle BPM Case Management API is a Java Based API that enables developers to programmatically access the new Case Management functionalities. It is an elaborate API that can access all the functionalities of Oracle Case Management. I will describe two of those functionalities in this blog: retrieving case data as DOM (http://www.w3.org/DOM/) and attaching a document to a case. Libraries First of all when creating a Case Management project you will need to attach the following libraries: These contain all the classes that are in the Case Management API. Service client To do anything with the BPM CaseManagement API in general it is necessary to create a CaseManagementServiceClient Object. The Case Management service client is the central piece of the Case Management API. It can be used to retrieve two different types of services. The first is the case stream service and the case service. The case stream service contains functionality to upload and download documents to and from a case. The second one is the CaseService. This service contains all the other functionality acting upon a case including but not limited to: Read the complete article here. SOA & BPM Partner Community For regular information on Oracle SOA Suite become a member in the SOA & BPM Partner Community for registration please visit www.oracle.com/goto/emea/soa (OPN account required) If you need support with your account please contact the Oracle Partner Business Center. Blog Twitter LinkedIn Facebook Wiki Technorati Tags: ACM API,adaptive Case Management,BPM,SOA Community,Oracle SOA,Oracle BPM,Community,OPN,Jürgen Kress

    Read the article

  • Oracle Leader in Transportation Management

    - by John Murphy
    Oracle Named a Leader in the Transportation Management Systems Market by Leading Analyst Firm Redwood Shores, Calif. – October 15, 2012 News Facts Gartner, Inc. has placed Oracle Transportation Management in the Leaders Quadrant of its 2012 report, “Magic Quadrant for Transportation Management Systems (TMS).” (1) Gartner Magic Quadrants position vendors within a particular market segment based on their completeness of vision and ability to execute on that vision. According to the report, “Multiple subcomponents make up a comprehensive TMS across planning (for example, load consolidation, routing, mode selection and carrier selection) and execution (for example, tendering loads to carriers, shipment track and trace, and freight audit and payment).” Built on modern, flexible, Internet based architecture, Oracle Transportation Management is a global transportation and logistics operations system that allows companies to minimize cost, optimize service levels, support sustainability initiatives, and create flexible business process automation within their transportation and logistics networks. With a share of 26% of worldwide software revenue for 2011, Oracle is also number one in TMS vendor share according to Gartner’s report, “Market Trends: A Golden Opportunity in the Transportation Management System Market, 2012 – 2016.” (2) Supporting Quote “Shippers and logistics service providers face increasingly complex challenges as they try to reduce costs, secure capacity and improve overall freight efficiency,” said Derek Gittoes, vice president, logistics product strategy, Oracle. “We believe our high standing in both Gartner reports is a reflection of Oracle’s commitment to addressing these challenges by delivering the industry’s broadest and deepest transportation management platform. With a flexible and modern platform, we are able to support customers with both basic transportation needs, as well as those with highly complex logistics requirements.” Supporting Resources Magic Quadrant for Transportation Management Systems Market Trends: A Golden Opportunity in the Transportation Management System Market, 2012 – 2016 Oracle Transportation Management (1) Gartner, Inc., “Magic Quadrant for Transportation Management Systems,” by C. Dwight Klappich, August 23, 2012 (2) Gartner, Inc., “Market Trends: A Golden Opportunity in the Transportation Management System Market, 2012 – 2016,” by Chad Eschinger and C. Dwight Klappich, September 24, 2012. About Oracle Applications Over 65,000 customers worldwide rely on Oracle's complete, open and integrated enterprise applications to achieve superior results. Oracle provides a secure path for customers to benefit from the latest technology advances that improve the customer software experience and drive better business performance. Oracle Applications Unlimited is Oracle's commitment to customer choice through continuous investment and innovation in current applications offerings. Oracle's next-generation Fusion Applications build upon that commitment, and are designed to work with and evolve Oracle's Applications Unlimited offerings. Oracle's lifetime support policy helps ensure customers will continue to have a choice in upgrade paths, based on their enterprise needs. For more information on the latest Oracle Applications releases go towww.oracle.com/applications About Oracle Oracle engineers hardware and software to work together in the cloud and in your data center. For more information about Oracle (NASDAQ:ORCL), visit www.oracle.com. Trademarks Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners. ###   Karen [email protected] Simon JonesBlanc & [email protected]

    Read the article

  • How to let screen time out on sign in screen

    - by Aren Cambre
    I have Ubuntu 13.10 set up on an older PC. If I am logged in as a user, then the screen timeout and power saving mode works as expected. However, if nobody is logged in, the screen never times out, and the monitor stays on all the time with the login screen. How can I adjust Ubuntu 13.10 so that the login screen also times out after a minute or so? I don't want the monitor's power saving mode to be disabled just because nobody is currently logged in.

    Read the article

  • How to deal with project managers who micromanage?

    - by entens
    Perhaps I'm just naive, but when I try to decipher the wall of tasks I'm targeted to do over the course of a week, I just can't help but think whoever builds the project schedule needs to get some remedial training on basic project management. For example, I am assigned 13 tasks today, the shortest lasting .13 days (default time metric in Microsoft Project), and the longest lasting .75 days. I can't help but think that it is blatant micromanagement scheduling projects in sub 10 minute intervals. The effects of management are becoming evident in slipped tasks, resource assignment exceeding capacity by a factor of two at some points in time, and spending more time clearing tasks and figuring out what comes next than actually doing work. How can I convince the project manager to create tasks with larger duration and to see the larger picture?

    Read the article

  • How to do the transition from project manager to product manager? [on hold]

    - by E. Topp
    I'm working as project manager / head of software for a small software company and was working on my own previously to this position. I want to however make the transition to product manager from my current position. You could ask about position differences, pitfalls of using project management processes and decision making as a product manager. What skill sets you need for the product manager job What are the position differences? What are the pitfalls of using project management processes and decision making as a product manager? What skill set is required for the product manager job? Is the transition easier for a project manager?

    Read the article

  • How can we unify business goals and technical goals?

    - by BAM
    Some background I work at a small startup: 4 devs, 1 designer, and 2 non-technical co-founders, one who provides funding, and the other who handles day-to-day management and sales. Our company produces mobile apps for target industries, and we've gotten a lot of lucky breaks lately. The outlook is good, and we're confident we can make this thing work. One reason is our product development team. Everyone on the team is passionate, driven, and has a great sense of what makes an awesome product. As a result, we've built some beautiful applications that we're all proud of. The other reason is the co-founders. Both have a brilliant business sense (one actually founded a multi-million dollar company already), and they have close ties in many of the industries we're trying to penetrate. Consequently, they've brought in some great business and continue to keep jobs in the pipeline. The problem The problem we can't seem to shake is how to bring these two awesome advantages together. On the business side, there is a huge pressure to deliver as fast as possible as much as possible, whereas on the development side there is pressure to take your time, come up with the right solution, and pay attention to all the details. Lately these two sides have been butting heads a lot. Developers are demanding quality while managers are demanding quantity. How can we handle this? Both sides are correct. We can't survive as a company if we build terrible applications, but we also can't survive if we don't sell enough. So how should we go about making compromises? Things we've done with little or no success: Work more (well, it did result in better quality and faster delivery, but the dev team has never been more stressed out before) Charge more (as a startup, we don't yet have the credibility to justify higher prices, so no one is willing to pay) Extend deadlines (if we charge the same, but take longer, we'll end up losing money) Things we've done with some success: Sacrifice pay to cut costs (everyone, from devs to management, is paid less than they could be making elsewhere. In return, however, we all have creative input and more flexibility and freedom, a typical startup trade off) Standardize project management (we recently started adhering to agile/scrum principles so we can base deadlines on actual velocity, not just arbitrary guesses) Hire more people (we used to have 2 developers and no designers, which really limited our bandwidth. However, as a startup we can only afford to hire a few extra people.) Is there anything we're missing or doing wrong? How is this handled at successful companies? Thanks in advance for any feedback :)

    Read the article

  • Correct way to textually report the remaining time on a long running process?

    - by Ryan
    So you have a long running process, perhaps with a progress bar, and you want a text estimate of the remaining time, eg: "5 minutes remaining" "30 seconds remaining" etc. If you don't actually want to report clock time (due to accuracy or resolution or update-rate issues) but want to stick to the text summary, what is the correct paradigm? Is "one minute" left displayed from 0 to 60 seconds? or from 1:00 to 1:59? Say there's 1:35 Left - is that "2 minutes remaining" or "1 minute remaining"? Do you just pare it down to "A few minutes left" when you're less than 3 minutes? What is the preferred (least user-frustrating) method?

    Read the article

< Previous Page | 7 8 9 10 11 12 13 14 15 16 17 18  | Next Page >