Search Results

Search found 27095 results on 1084 pages for 'project rome'.

Page 12/1084 | < Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >

  • Problems with WiX and Visual Studio web deployment project

    - by Valeriu
    Hello, I want to create an .MSI package from a web deployment project in Visual Studio 2008. Now we want to use continuous integration and we would need the .MSI package build in the nightly builds. Till now we used standard Visual Studio Web Setup project, but this is not compatible with the MSBuild. So we decided to use WiX. The problem is that I have not found any good tutorial/documentation about this. Is there a way to do a WiX installer package from a web deployment project? If yes, how? Also, I tried to use heat.exe to create the XML for the WiX project .wxs file, but it seems that heat.exe doesn't recognize the web deployment project format. Thank you for your responses. Regards, V.

    Read the article

  • Managing Static Library project as a module like Framework on iOS project in Xcode4.

    - by Eonil
    (Solution Note, I'll answer immediately) Many people including me trying to make a kind of Static Library framework for iOS to archive some kind of modularity. Framework is best way to do this, but it doesn't provided by Apple, and workarounds don't work well. https://github.com/kstenerud/iOS-Universal-Framework/tree/master/Fake%20Framework/Templates Fake framework cannot be referenced from linking tab in Build Phases. Real framework needs modification of system setting. And still not work smoothly on every parts. Problem is static library need header files, and it's impossible to reference header files on project at another location on different project without some script. And script breaks IDE's file management abstraction. How can I use static library project like a convenient module manner? (just dragging project into another project to complete embedding)

    Read the article

  • Creating a new project from a project skeleton using git

    - by asciitaxi
    In order to get a new django project up and running faster, I'd like to maintain a separate "project skeleton" on which I base all my new projects. It would be great if, as I improved the skeleton, I could bring those improvements into my active projects. How can I accomplish this with git? So, maybe in my remote git repository machine I would have 1 repo for each project and one for the skeleton? proj-A-repo proj-B-repo skeleton-repo If I want to create a new proj-C locally based on the skeleton, then push my local changes up to the remote server in a new repo called proj-C-repo, how might I do this? I've read through quite a bit of git documentation, but I'm confused about how to go about this. Do I need to clone the skeleton, or create an empty repo and then track a remote branch, or something else?

    Read the article

  • Eclipse, Android ndk, source files, and library project dependencies

    - by Android Noob
    In Microsoft Visual Studio 2010, it is possible to create a Solution with multiple projects and set dependencies between projects. I'm trying to figure out if the same thing can be done using Eclipse via the NDK. More specifically, I want to know if it is possible to create C source files in an ordinary Android project that can reference C header files in an Android library project. For example: Android library project: Sockets Ordinary Android project: Socket_Server Sockets contains all the C header/source files that are needed to do socket I/O. Socket_Server contains test code that makes calls to the functions that are defined in Sockets library project. This test code requires a header file that contains the function declaration of all API calls. I already set the library dependencies between the projects via: Properties > Android > Library > Add

    Read the article

  • MVVM Project and Item Templates

    - by Timmy Kokke
    Intro This is the first in a series of small articles about what is new in Silverlight 4 and Expression Blend 4. The series is build around a open source demo application SilverAmp which is available on http://SilverAmp.CodePlex.com.   MVVM Project and Item Templates Expression Blend has got a new project template to get started with a Model-View-ViewModel project  easily. The template provides you with a View and a ViewModel bound together. It also adds the ViewModel to the SampleData of your project. It is available for both Silverlight and Wpf. To get going, start a new project in Expression Blend and select Silverlight DataBound Application from the Silverlight project type. In this case I named the project DemoTest1. The solution now contains several folders: SampleData; which contains a data to show in Blend ViewModels; starts with one file, MainViewModel.cs Views; containing MainView.xaml with codebehind used for binding with the MainViewModel class. and your regular App.xaml and MainPage.xaml The MainViewModel class contains a sample property and a sample method. Both the property and the method are used in the MainView control. The MainView control is a regular UserControl and is placed in the MainPage. You can continue on building your applicaition by adding your own properties and methods to the ViewModel and adding controls to the View. Adding Views with ViewModels is very easy too. The guys at Microsoft where nice enough to add a new Item template too: a UserControl with ViewModel. If you add this new item to the root of your solution it will add the .xaml file to the views folder and a .cs file to the ViewModels folder. Conclusion The databound Application project type is a great to get your MVVM based project started. It also functions a great source of information about how to connect it all together.   Technorati Tags: Silverlight,Wpf,Expression Blend,MVVM

    Read the article

  • Import SSIS Project in Denali CTP1

    For years Analysis Services has had the ability to take an existing database from a server and reverse engineer it into a BIDS project.  This is extremely useful when all you have is the running instance of the database and the project that created it has long since disappeared.  Reverse engineering has never been a feature of SSIS until now. Let me walk you through the simple steps. The first step is that you obviously have to have a project deployed to an SSIS Catalog.  I will do a video on this soon but in case you can’t wait then my good buddy Jamie Thomson has written it up here As you can see I have a project called imaginatively “Denali1” with one package “Package.dtsx” The next thing we need to do is fire up BIDS and choose the right project type (Integration Services Import Project) Now we just follow the wizard.  We make sure we specify on which server to find the Catalog and in which folder to look for the project. Next the setting are validated and we are greeted with the familiar review screen before the creation of our new project from the deployed project happens Hit Import and away we go The result is just what we wanted.

    Read the article

  • Project Jigsaw: Late for the train: The Q&A

    - by Mark Reinhold
    I recently proposed, to the Java community in general and to the SE 8 (JSR 337) Expert Group in particular, to defer Project Jigsaw from Java 8 to Java 9. I also proposed to aim explicitly for a regular two-year release cycle going forward. Herewith a summary of the key questions I’ve seen in reaction to these proposals, along with answers. Making the decision Q Has the Java SE 8 Expert Group decided whether to defer the addition of a module system and the modularization of the Platform to Java SE 9? A No, it has not yet decided. Q By when do you expect the EG to make this decision? A In the next month or so. Q How can I make sure my voice is heard? A The EG will consider all relevant input from the wider community. If you have a prominent blog, column, or other communication channel then there’s a good chance that we’ve already seen your opinion. If not, you’re welcome to send it to the Java SE 8 Comments List, which is the EG’s official feedback channel. Q What’s the overall tone of the feedback you’ve received? A The feedback has been about evenly divided as to whether Java 8 should be delayed for Jigsaw, Jigsaw should be deferred to Java 9, or some other, usually less-realistic, option should be taken. Project Jigsaw Q Why is Project Jigsaw taking so long? A Project Jigsaw started at Sun, way back in August 2008. Like many efforts during the final years of Sun, it was not well staffed. Jigsaw initially ran on a shoestring, with just a handful of mostly part-time engineers, so progress was slow. During the integration of Sun into Oracle all work on Jigsaw was halted for a time, but it was eventually resumed after a thorough consideration of the alternatives. Project Jigsaw was really only fully staffed about a year ago, around the time that Java 7 shipped. We’ve added a few more engineers to the team since then, but that can’t make up for the inadequate initial staffing and the time lost during the transition. Q So it’s really just a matter of staffing limitations and corporate-integration distractions? A Aside from these difficulties, the other main factor in the duration of the project is the sheer technical difficulty of modularizing the JDK. Q Why is modularizing the JDK so hard? A There are two main reasons. The first is that the JDK code base is deeply interconnected at both the API and the implementation levels, having been built over many years primarily in the style of a monolithic software system. We’ve spent considerable effort eliminating or at least simplifying as many API and implementation dependences as possible, so that both the Platform and its implementations can be presented as a coherent set of interdependent modules, but some particularly thorny cases remain. Q What’s the second reason? A We want to maintain as much compatibility with prior releases as possible, most especially for existing classpath-based applications but also, to the extent feasible, for applications composed of modules. Q Is modularizing the JDK even necessary? Can’t you just put it in one big module? A Modularizing the JDK, and more specifically modularizing the Java SE Platform, will enable standard yet flexible Java runtime configurations scaling from large servers down to small embedded devices. In the long term it will enable the convergence of Java SE with the higher-end Java ME Platforms. Q Is Project Jigsaw just about modularizing the JDK? A As originally conceived, Project Jigsaw was indeed focused primarily upon modularizing the JDK. The growing demand for a truly standard module system for the Java Platform, which could be used not just for the Platform itself but also for libraries and applications built on top of it, later motivated expanding the scope of the effort. Q As a developer, why should I care about Project Jigsaw? A The introduction of a modular Java Platform will, in the long term, fundamentally change the way that Java implementations, libraries, frameworks, tools, and applications are designed, built, and deployed. Q How much progress has Project Jigsaw made? A We’ve actually made a lot of progress. Much of the core functionality of the module system has been prototyped and works at both compile time and run time. We’ve extended the Java programming language with module declarations, worked out a structure for modular source trees and corresponding compiled-class trees, and implemented these features in javac. We’ve defined an efficient module-file format, extended the JVM to bootstrap a modular JRE, and designed and implemented a preliminary API. We’ve used the module system to make a good first cut at dividing the JDK and the Java SE API into a coherent set of modules. Among other things, we’re currently working to retrofit the java.util.ServiceLoader API to support modular services. Q I want to help! How can I get involved? A Check out the project page, read the draft requirements and design overview documents, download the latest prototype build, and play with it. You can tell us what you think, and follow the rest of our work in real time, on the jigsaw-dev list. The Java Platform Module System JSR Q What’s the relationship between Project Jigsaw and the eventual Java Platform Module System JSR? A At a high level, Project Jigsaw has two phases. In the first phase we’re exploring an approach to modularity that’s markedly different from that of existing Java modularity solutions. We’ve assumed that we can change the Java programming language, the virtual machine, and the APIs. Doing so enables a design which can strongly enforce module boundaries in all program phases, from compilation to deployment to execution. That, in turn, leads to better usability, diagnosability, security, and performance. The ultimate goal of the first phase is produce a working prototype which can inform the work of the Module-System JSR EG. Q What will happen in the second phase of Project Jigsaw? A The second phase will produce the reference implementation of the specification created by the Module-System JSR EG. The EG might ultimately choose an entirely different approach than the one we’re exploring now. If and when that happens then Project Jigsaw will change course as necessary, but either way I think that the end result will be better for having been informed by our current work. Maven & OSGi Q Why not just use Maven? A Maven is a software project management and comprehension tool. As such it can be seen as a kind of build-time module system but, by its nature, it does nothing to support modularity at run time. Q Why not just adopt OSGi? A OSGi is a rich dynamic component system which includes not just a module system but also a life-cycle model and a dynamic service registry. The latter two facilities are useful to some kinds of sophisticated applications, but I don’t think they’re of wide enough interest to be standardized as part of the Java SE Platform. Q Okay, then why not just adopt the module layer of OSGi? A The OSGi module layer is not operative at compile time; it only addresses modularity during packaging, deployment, and execution. As it stands, moreover, it’s useful for library and application modules but, since it’s built strictly on top of the Java SE Platform, it can’t be used to modularize the Platform itself. Q If Maven addresses modularity at build time, and the OSGi module layer addresses modularity during deployment and at run time, then why not just use the two together, as many developers already do? A The combination of Maven and OSGi is certainly very useful in practice today. These systems have, however, been built on top of the existing Java platform; they have not been able to change the platform itself. This means, among other things, that module boundaries are weakly enforced, if at all, which makes it difficult to diagnose configuration errors and impossible to run untrusted code securely. The prototype Jigsaw module system, by contrast, aims to define a platform-level solution which extends both the language and the JVM in order to enforce module boundaries strongly and uniformly in all program phases. Q If the EG chooses an approach like the one currently being taken in the Jigsaw prototype, will Maven and OSGi be made obsolete? A No, not at all! No matter what approach is taken, to ensure wide adoption it’s essential that the standard Java Platform Module System interact well with Maven. Applications that depend upon the sophisticated features of OSGi will no doubt continue to use OSGi, so it’s critical that implementations of OSGi be able to run on top of the Java module system and, if suitably modified, support OSGi bundles that depend upon Java modules. Ideas for how to do that are currently being explored in Project Penrose. Java 8 & Java 9 Q Without Jigsaw, won’t Java 8 be a pretty boring release? A No, far from it! It’s still slated to include the widely-anticipated Project Lambda (JSR 335), work on which has been going very well, along with the new Date/Time API (JSR 310), Type Annotations (JSR 308), and a set of smaller features already in progress. Q Won’t deferring Jigsaw to Java 9 delay the eventual convergence of the higher-end Java ME Platforms with Java SE? A It will slow that transition, but it will not stop it. To allow progress toward that convergence to be made with Java 8 I’ve suggested to the Java SE 8 EG that we consider specifying a small number of Profiles which would allow compact configurations of the SE Platform to be built and deployed. Q If Jigsaw is deferred to Java 9, would the Oracle engineers currently working on it be reassigned to other Java 8 features and then return to working on Jigsaw again after Java 8 ships? A No, these engineers would continue to work primarily on Jigsaw from now until Java 9 ships. Q Why not drop Lambda and finish Jigsaw instead? A Even if the engineers currently working on Lambda could instantly switch over to Jigsaw and immediately become productive—which of course they can’t—there are less than nine months remaining in the Java 8 schedule for work on major features. That’s just not enough time for the broad review, testing, and feedback which such a fundamental change to the Java Platform requires. Q Why not ship the module system in Java 8, and then modularize the platform in Java 9? A If we deliver a module system in one release but don’t use it to modularize the JDK until some later release then we run a big risk of getting something fundamentally wrong. If that happens then we’d have to fix it in the later release, and fixing fundamental design flaws after the fact almost always leads to a poor end result. Q Why not ship Jigsaw in an 8.5 release, less than two years after 8? Or why not just ship a new release every year, rather than every other year? A Many more developers work on the JDK today than a couple of years ago, both because Oracle has dramatically increased its own investment and because other organizations and individuals have joined the OpenJDK Community. Collectively we don’t, however, have the bandwidth required to ship and then provide long-term support for a big JDK release more frequently than about every other year. Q What’s the feedback been on the two-year release-cycle proposal? A For just about every comment that we should release more frequently, so that new features are available sooner, there’s been another asking for an even slower release cycle so that large teams of enterprise developers who ship mission-critical applications have a chance to migrate at a comfortable pace.

    Read the article

  • Tasks carried out for a Software Project

    - by Sara
    Hi, We were asked to propose a web based system for a shop, for an assignment. As i'm a newbee for project management stuff find it quite difficult to come with Tasks for our Gantt chart. Can someone pls suggest a sample gantt or main tasks followed in developing such system Thanks

    Read the article

  • Unable to use "Manage Content and Structure" after removing Project server form the SharePoint farm

    - by Brian
    We're no longer using Office Project Server, and I've removed it from the farm in which it was installed. However, now that it's been removed, I am unable to access the "Manage Content and Structure" link on some of our SharePoint sites. I get an error indicating that SharePoint Failed to find the XML file at location '12\Template\Features\PWSCommitments\feature.xml' Anyone have an idea how to fix this?

    Read the article

  • Cannot download Microsoft Project 2010 demo videos

    - by Nam Gi VU
    Hi everyone, I need to download the demo videos at my office so that I can view it later at home since I have slow internet connection there but it seems to be no way to download the videos at [the site][1], and other resources in this site. Using some of the firefox addons to download them is not possible. Do you have any tips for me? Please share. [1]: http://www.microsoft.com/showcase/en/US/search?phrase="project conference 2009"

    Read the article

  • Unregistering COM dll with a C# Setup Project

    - by lb
    Hi All. I've been stuck on this one for a while. I'll try explain in the simplest terms and at the best of my knowledge. I will honour any help. I've got a C# project which uses a VB6 compiled ActiveX DLL that I'm constantly updating. I compile the setup project, send it to the client and they run the setup. When building the updated setup project, I would increase the 'Version' of the setup project so it wouldn't bother with 'Another version is already installed'. What started happening after a few updates I began to notice the DLL would not be updated to the new version in the installer. The client computer had the original DLL both installed and registered. First symptom: method not found exceptions from the client C# code. This is not a shared DLL and only this application needs it. I've noticed that when uninstalling the application (through the usual procedure) the DLL is also not removed from the application folder although I would set this file's property 'Permanent' to false. The registration entries in the registry are mantained also. I do update in VS6.0 the version of the DLL (usually increase the build number) before building it. Then in VS2008, I remove it from the References, and add it again from the 'Browse tab', without re-registering it on my dev machine and adding it from the COM tab. I've thought of these options. Custom step in Setup project to regsvr32.exe /u 'hardcoded path of my dll' at uninstall (ugly) Somehow find out how the 'Isolate' property can work for me without registering Find out how to execute setup project 'Conditions' that would actually check the version of the library and to update the file accordingly at every install) Any help would be incredibly welcome.

    Read the article

  • How to determine the size of a project (lines of code, function points, other)

    - by sixtyfootersdude
    How would you evaluate project size? Part A: Before you start a project. Part B: For a complete project. I am interested in comparing unrelated projects. Here are some options: 1) Lines of code. I know that this is not a good metric of productivity but is this a reasonable measure of project size? If I wanted to estimate how long it would take to recreate a project would this be a reasonable way to do it? How many lines of code should I estimate a day? 2) Function Points. Functions points are defined as the number of: inputs outputs inquires internal files external interfaces Anyone have a veiw point on whether this is a good measure? Is there a way to **actually do this? Does anyone have another solution? Hours taken seems like it could be a useful metric but not solely. If I ask you what is a "bigger program" and give you two programs how would you approach the question? I have seen several discussions of this on stackover flow but most discuss how to measure programmer productivity. I am more interested in project size.

    Read the article

  • Project management and bundling dependencies

    - by Joshua
    I've been looking for ways to learn about the right way to manage a software project, and I've stumbled upon the following blog post. I've learned some of the things mentioned the hard way, others make sense, and yet others are still unclear to me. To sum up, the author lists a bunch of features of a project and how much those features contribute to a project's 'suckiness' for a lack of a better term. You can find the full article here: http://spot.livejournal.com/308370.html In particular, I don't understand the author's stance on bundling dependencies with your project. These are: == Bundling == Your source only comes with other code projects that it depends on [ +20 points of FAIL ] Why is this a problem, (especially given the last point)? If your source code cannot be built without first building the bundled code bits [ +10 points of FAIL ] Doesn't this necessarily have to be the case for software built against 3rd party libs? Your code needs that other code to be compiled into its library before the linker can work? If you have modified those other bundled code bits [ +40 points of FAIL ] If this is necessary for your project, then it naturally follows that you've bundled said code with yours. If you want to customize a build of some lib,say WxWidgets, you'll have to edit that projects build scripts to bulid the library that you want. Subsequently, you'll have to publish those changes to people who wish to build your code, so why not use a high level make script with the params already written in, and distribute that? Furthermore, (especially in a windows env) if your code base is dependent on a particular version of a lib (that you also need to custom compile for your project) wouldn't it be easier to give the user the code yourself (because in this case, it is unlikely that the user will already have the correct version installed)? So how would you respond to these comments, and what points may I be failing to take into consideration? Would you agree or disagree with the author's take (or mine), and why?

    Read the article

  • How to model a system to help my team grasp the project's bigger picture? [closed]

    - by user1796528
    According to the software engineering point of view, I should model the system to make it easier for other people to understand well what they work on. To do so, I have used the Dia drawing program. But, after having used Dia for some time, I find that it falls short in helping me to correctly and efficiently model my project. How do you usually tackle this problem (modelling a project in the large) and what tools would you recommend for the job, and why?

    Read the article

  • Problem while Building a Setup Project for a windows Service?

    - by vijay shiyani
    Hi guys, I have created windows service project in vs2008. I have created simple serivce project and implemented simple serivce sucessfully. Unlike other application i cannot run service exe file, so I had to first installed service using ServiceInstaller in my service project. Now i am building setup project for my service (MSI). In that setup project I am trying to add the output from my service project to my setup project by follwing below step 1. Right Click **Setup roject** in solution explorer and then click add and then click project output. 2.Now it open up *project output group dialog box* but now problem is this dialog box is empty and not allowing me to select service project. Now i dont know how to add the service projet to my setup project any help would be appriciated. Thank you guys.

    Read the article

  • Project Server 2007 install issue - ProjectEventService won't start

    - by Brian Meinertz
    Trying to install PS2007 with SP1 on Server 2003. The install goes fine, but when running the SharePoint Configuration Wizard, it fails at stage 6 of 12 with the error: Failed to register SharePoint Services. An exception of type System.InvalidOperationException was thrown. Additional exception information: Cannot start service ProjectEventService on computer '.'. From the PSCDiagnostics log: Exception: System.InvalidOperationException: Cannot start service ProjectEventService on computer '.'. --- System.ComponentModel.Win32Exception: The service did not respond to the start or control request in a timely fashion. The ProjectEventService (Microsoft Office Project Server Event) won't even start manually using the Network Service account. Starting the service with a domain account works, but subsequently running the Config Wizard causes the service to be removed and re-provisioned to run using the Network Service account, which again fails. Presumably Network Service needs elevated permissions, but even adding it to the local Admin group makes no difference. Anyone come across this sort of issue before?

    Read the article

  • Cannot Expand/Collapse tasks in Microsoft Project 2010

    - by Dean
    I opened an existing Microsoft Project file today and was unable to expand/collapse the subtasks use the cursor and the '+/-' signs beside the parent tasks. I am able to expand and collapse using the 'View-Outline' ribbon icon. However when I attempt to do this using the mouse on specific tasks, my cursor will not perform the task. My cursor is a 'white cross' when I need it to be an 'arrow'. I'm assuming this is something minor that I'm missing. Any assistance appreciated. Thanks

    Read the article

  • Project Server 2007 install issue - ProjectEventService won't start

    - by Brian Meinertz
    Trying to install PS2007 with SP1 on Server 2003. The install goes fine, but when running the SharePoint Configuration Wizard, it fails at stage 6 of 12 with the error: Failed to register SharePoint Services. An exception of type System.InvalidOperationException was thrown. Additional exception information: Cannot start service ProjectEventService on computer '.'. From the PSCDiagnostics log: Exception: System.InvalidOperationException: Cannot start service ProjectEventService on computer '.'. --- System.ComponentModel.Win32Exception: The service did not respond to the start or control request in a timely fashion. The ProjectEventService (Microsoft Office Project Server Event) won't even start manually using the Network Service account. Starting the service with a domain account works, but subsequently running the Config Wizard causes the service to be removed and re-provisioned to run using the Network Service account, which again fails. Presumably Network Service needs elevated permissions, but even adding it to the local Admin group makes no difference. Anyone come across this sort of issue before?

    Read the article

  • Cannot Expand/Collapse tasks in Microsoft Project 2010

    - by Dean
    I opened an existing Microsoft Project file today and was unable to expand/collapse the subtasks use the cursor and the '+/-' signs beside the parent tasks. I am able to expand and collapse using the 'View-Outline' ribbon icon. However when I attempt to do this using the mouse on specific tasks, my cursor will not perform the task. My cursor is a 'white cross' when I need it to be an 'arrow'. I'm assuming this is something minor that I'm missing. Any assistance appreciated. Thanks

    Read the article

  • MS project publishing to TFS web portal display

    - by denis bastarache
    So, when we initially created our MPP schedule, I made use of indends / subordinates to break down the project by the various stages of the lifecycle, which is fine... no issues there... But now that I'm trying to publish this over to TFS display, it'll only pick up the actual "action items / sub-tasks" seeing as I have resource allocation specified. So for example I have an "Analysis" phase with a few items underneath, and "System Requirements" phase with the same items, so when I publish these to TFS, it won't display the "Parent" distinction between items, so both "Tasks" instances are being published in TFS under the exact same name... So, if I can't do this Automatically, I'll likely have edit each tasks with "Analysis - Item 1", "Analysis - item 2", "SRD - Item 1", "SRD - item 2"... is there a way to do this automatically, or will have to go the manual route??

    Read the article

  • Is there a distributed project management software like Redmine?

    - by Tobias Kienzler
    I am quite familiar with and love using git, among other reasons due to its distributed nature. Now I'd like to set up some similarly distributed (FOSS) Project Management software with features similar to what Redmine offers, such as Issue & time tracking, milestones Gantt charts, calendar git integration, maybe some automatic linking of commits and issues Wiki (preferably with Mathjax support) Forum, news, notifications Multiple Projects However, I am looking for a solution that does not require a permanently accesible server, i.e. like in git, each user should have their own copy which can be easily synchronized with others. However it should be possible to not have a copy of every Project on every machine. Since trac uses multiple instances for multiple projects anyway, I was considering using that, but I neither know how well it adapts to simply giting the database itself (which would be be easiest way to handle the distribution due to git being used anyway), nor does it include all of Redmine's feature. So, can you recommend me a distributed project management software? If your suggestion is a software that usually runs on a server please include a description of the distribution method (e.g. whether simply putting the data in a git repository would do the trick), and if it's e.g. trac, please mention plugins required to include the features mentioned.

    Read the article

< Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >