Search Results

Search found 27095 results on 1084 pages for 'project rome'.

Page 14/1084 | < Previous Page | 10 11 12 13 14 15 16 17 18 19 20 21  | Next Page >

  • Looking for alternatives to the database project.

    - by Dave
    I've a fairly large database project which contains nine databases and one database with a fairly large schema. This project takes a large amount of time to build and I'm about to pull my hair out. We'd like to keep our database source controlled, but having a hard getting the other devs to use the project and build the database project before checking in just because it takes so long to build. It is seriously crippling our work so I'm look for alternatives. Maybe something can be done with Redgate's SQL Compare? I think maybe the only drawback here is that it doesn't validate syntax? Anyone's thoughts/suggestions would be most appreciated.

    Read the article

  • Installing a custom project template with Visual Studio Installer project

    - by ulu
    Hi! I've created a custom project template, and now I need to deploy it together with my product (i.e., it should be installed by the same msi I use for the main installation). I'm using a Visual Studio Installer project. One option is to use a custom action and manually copy a template file included in the installation. Another is to create a vsi file and use a custom action to install it after the main installation (how do I have it installed silently?) . Which one is better? Thanks a lot ulu

    Read the article

  • Create Orchard Module in a Separate Project

    - by Steve Michelotti
    The Orchard Project is a new OOS Microsoft project that is being developed up on CodePlex. From the Orchard home page on CodePlex, it states “Orchard project is focused on delivering a .NET-based CMS application that will allow users to rapidly create content-driven Websites, and an extensibility framework that will allow developers and customizers to provide additional functionality through modules and themes.” The Orchard Project site contains additional information including documentation and walkthroughs. The ability to create a composite solution based on a collection of modules is a compelling feature. In Orchard, these modules can just be created as simple MVC Areas or they can also be created inside of stand-alone web application projects.  The walkthrough for writing an Orchard module that is available on the Orchard site uses a simple Area that is created inside of the host application. It is based on the Orchard MIX presentation. This walkthrough does an effective job introducing various Orchard concepts such as hooking into the navigation system, theme/layout system, content types, and more.  However, creating an Orchard module in a separate project does not seem to be concisely documented anywhere. Orchard ships with several module OOTB that are in separate assemblies – but again, it’s not well documented how to get started building one from scratch. The following are the steps I took to successfully get an Orchard module in a separate project up and running. Step 1 – Download the OrchardIIS.zip file from the Orchard Release page. Unzip and open up the solution. Step 2 – Add your project to the solution. I named my project “Orchard.Widget” and used and “MVC 2 Empty Web Application” project type. Make sure you put the physical path inside the “Modules” sub-folder to the main project like this: At this point the solution should look like: Step 3 – Add assembly references to Orchard.dll and Orchard.Core.dll. Step 4 – Add a controller and view.  I’ll just create a Hello World controller and view. Notice I created the view as a partial view (*.ascx). Also add the [Themed] attribute to the top of the HomeController class just like the normal Orchard walk through shows it. Step 5 – Add Module.txt to the project root. The is a very important step. Orchard will not recognize your module without this text file present.  It can contain just the name of your module: name: Widget Step 6 – Add Routes.cs. Notice I’ve given an area name of “Orchard.Widget” on lines 26 and 33. 1: using System; 2: using System.Collections.Generic; 3: using System.Web.Mvc; 4: using System.Web.Routing; 5: using Orchard.Mvc.Routes; 6:   7: namespace Orchard.Widget 8: { 9: public class Routes : IRouteProvider 10: { 11: public void GetRoutes(ICollection<RouteDescriptor> routes) 12: { 13: foreach (var routeDescriptor in GetRoutes()) 14: { 15: routes.Add(routeDescriptor); 16: } 17: } 18:   19: public IEnumerable<RouteDescriptor> GetRoutes() 20: { 21: return new[] { 22: new RouteDescriptor { 23: Route = new Route( 24: "Widget/{controller}/{action}/{id}", 25: new RouteValueDictionary { 26: {"area", "Orchard.Widget"}, 27: {"controller", "Home"}, 28: {"action", "Index"}, 29: {"id", ""} 30: }, 31: new RouteValueDictionary(), 32: new RouteValueDictionary { 33: {"area", "Orchard.Widget"} 34: }, 35: new MvcRouteHandler()) 36: } 37: }; 38: } 39: } 40: } Step 7 – Add MainMenu.cs. This will make sure that an item appears in the main menu called “Widget” which points to the module. 1: using System; 2: using Orchard.UI.Navigation; 3:   4: namespace Orchard.Widget 5: { 6: public class MainMenu : INavigationProvider 7: { 8: public void GetNavigation(NavigationBuilder builder) 9: { 10: builder.Add(menu => menu.Add("Widget", item => item.Action("Index", "Home", new 11: { 12: area = "Orchard.Widget" 13: }))); 14: } 15:   16: public string MenuName 17: { 18: get { return "main"; } 19: } 20: } 21: } Step 8 – Clean up web.config. By default Visual Studio adds numerous sections to the web.config. The sections that can be removed are: appSettings, connectionStrings, authentication, membership, profile, and roleManager. Step 9 – Delete Global.asax. This project will ultimately be running from inside the Orchard host so this “sub-site” should not have its own Global.asax.   Now you’re ready the run the app.  When you first run it, the “Widget” menu item will appear in the main menu because of the MainMenu.cs file we added: We can then click the “Widget” link in the main menu to send us over to our view:   Packaging From start to finish, it’s a relatively painless experience but it could be better. For example, a Visual Studio project template that encapsulates aspects from this blog post would definitely make it a lot easier to get up and running with creating an Orchard module.  Another aspect I found interesting is that if you read the first paragraph of the walkthrough, it says, “You can also develop modules as separate projects, to be packaged and shared with other users of Orchard CMS (the packaging story is still to be defined, along with marketplaces for sharing modules).” In particular, I will be extremely curious to see how the “packaging story” evolves. The first thing that comes to mind for me is: what if we explored MvcContrib Portable Areas as a potential mechanism for this packaging? This would certainly make things easy since all artifacts (aspx, aspx, images, css, javascript) are all wrapped up into a single assembly. Granted, Orchard does have its own infrastructure for layouts and themes but it seems like integrating portable areas into this pipeline would not be a difficult undertaking. Maybe that’ll be the next research task. :)

    Read the article

  • Configure TFS portal afterwards

    Update #1 January 8th, 2010: There is an updated post on this topic for Beta 2: http://www.ewaldhofman.nl/post/2009/12/10/Configure-TFS-portal-afterwards-Beta-2.aspx Update #2 October 10th, 2010: In the new Team Foundation Server Power Tools September 2010, there is now a command to create a portal. tfpt addprojectportal   Add or move portal for an existing team project Usage: tfpt addprojectportal /collection:uri                              /teamproject:"project name"                              /processtemplate:"template name"                              [/webapplication:"webappname"]                              [/relativepath:"pathfromwebapp"]                              [/validate]                              [/verbose] /collection Required. URL of Team Project Collection. /teamproject Required. Specifies the name of the team project. /processtemplate Required. Specifies that name of the process template. /webapplication The name of the SharePoint Web Application. Must also specify relativepath. /relativepath The path for the site relative to the root URL for the SharePoint Web Application. Must also specify webapplication. /validate Specifies that the user inputs are to be validated. If specified, only validation will be done and no portal setting will be changed. /verbose Switches on the verbose mode. I created a new Team Project in TFS 2010 Beta 1 and choose not to configure SharePoint during the creation of the Team Project. Of course I found out fairly quickly that a portal for TFS is very useful, especially the Iteration and the Product backlog workbooks and the dashboard reports. This blog describes how you can configure the sharepoint portal afterwards. Update: September 9th, 2009 Adding the portal afterwards is much easier as described below. Here are the steps Step 1: Create a new temporary project (with a SharePoint site for it). Open the Team Explorer Right click in the Team Explorer the root node (i.e. the project collection) Select "New team project" from the menu Walk throught he wizard and make sure you check the option to create the portal (which is by default checked) Step 2: Disable the site for the new project Open the Team Explorer Select the team project you created in step 1 In the menu click on Team -> Show Project Portal. In the menu click on Team -> Team Project Settings -> Portal Settings... The following dialog pops up Uncheck the option "Enable team project portal" Confirm the dialog with OK Step 3: Enable the site for the original one. Point it to the newly created site. Open the Team Explorer Select the team project you want to add the portal to In the menu open Team -> Team Project Settings -> Portal Settings... The same dialog as in step 2 pops up Check the option "Enable team project portal" Click on the "Configure URL" button The following dialog pops up   In the dialog select in the combobox of the web application the TFS server Enter in the Relative site path the text "sites/[Project Collection Name]/[Team Project Name created in step 1]" Confirm the "Specify an existing SharePoint Site" with OK Check the "Reports and dashboards refer to data for this team project" option Confirm the dialog "Project Portal Settings" with OK Step 4: Delete the temporary project you created. In Beta 1, I have found no way to delete a team project. Maybe it will be available in TFS 2010 Beta 2. Original post Step 1: Create new portal site Go to the sharepoint site of your project collection (/sites//default.aspx">/sites//default.aspx">http://<servername>/sites/<project_collection_name>/default.aspx) Click on the Site Actions at the left side of the screen and choose the option Site Settings In the site settings, choose the Sites and workspaces option Create a new site Enter the values for the Title, the description, the site address. And choose for the TFS2010 Agile Dashboard as template. Create the site, by clicking on the Create button Step 2: Integrate portal site with team project Open Visual Studio Open the Team Explorer (View -> Team Explorer) Select in the Team Explorer tool window the Team Project for which you are create a new portal Open the Project Portal Settings (Team -> Team Project Settings -> Portal Setings...) Check the Enable team project portal checkbox Click on Configure URL... You will get a new dialog as below Enter the url to the TFS server in the web application combobox And specify the relative site path: sites/<project collection>/<site name> Confirm with OK Check in the Project Portal Settings dialog the checkbox "Reports and dashboards refer to data for this team project" Confirm the settings with OK (this takes a while...) When you now browse to the portal, you will see that the dashboards are now showing up with the data for the current team project. Step 3: Download process template To get a copy of the documents that are default in a team project, we need to have a fresh set of files that are not attached to a team project yet. You can do that with the following steps. Start the Process Template Manager (Team -> Team Project Collection Settings -> Process Template Manager...) Choose the Agile process template and click on download Choose a folder to download Step 4: Add Product and Iteration backlog Go to the Team Explorer in Visual Studio Make sure the team project is in the list of team projects, and expand the team project Right click the Documents node, and choose New Document Library Enter "Shared Documents", and click on Add Right click the Shared Documents node and choose Upload Document Go the the file location where you stored the process template from step 3 and then navigate to the subdirectory "Agile Process Template 5.0\MSF for Agile Software Development v5.0\Windows SharePoint Services\Shared Documents\Project Management" Select in the Open Dialog the files "Iteration Backlog" and "Product Backlog", and click Open Step 5: Bind Iteration backlog workbook to the team project Right click on the "Iteration Backlog" file and select Edit, and confirm any warning messages Place your cursor in cell A1 of the Iteration backlog worksheet Switch to the Team ribbon and click New List. Select your Team Project and click Connect From the New List dialog, select the Iteration Backlog query in the Workbook Queries folder. The final step is to add a set of document properties that allow the workbook to communicate with the TFS reporting warehouse. Before we create the properties we need to collect some information about your project. The first piece of information comes from the table created in the previous step.  As you collect these properties, copy them into notepad so they can be used in later steps. Property How to retrieve the value? [Table name] Switch to the Design ribbon and select the Table Name value in the Properties portion of the ribbon [Project GUID] In the Visual Studio Team Explorer, right click your Team Project and select Properties.  Select the URL value and copy the GUID (long value with lots of characters) at the end of the URL [Team Project name] In the Properties dialog, select the Name field and copy the value [TFS server name] In the Properties dialog, select the Server Name field and copy the value [UPDATE] I have found that this is not correct: you need to specify the instance of your SQL Server. The value is used to create a connection to the TFS cube. Switch back to the Iteration Backlog workbook. Click the Office button and select Prepare – Properties. Click the Document Properties – Server drop down and select Advanced Properties. Switch to the Custom tab and add the following properties using the values you collected above. Variable name Value [Table name]_ASServerName [TFS server name] [Table name]_ASDatabase tfs_warehouse [Table name]_TeamProjectName [Team Project name] [Table name]_TeamProjectId [Project GUID] Click OK to close the properties dialog. It is possible that the Estimated Work (Hours) is showing the #REF! value. To resolve that change the formula with: =SUMIFS([Table name][Original Estimate]; [Table name][Iteration Path];CurrentIteration&"*";[Table name][Area Path];AreaPath&"*";[Table name][Work Item Type]; "Task") For example =SUMIFS(VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Original Estimate]; VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Iteration Path];CurrentIteration&"*";VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Area Path];AreaPath&"*";VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Work Item Type]; "Task") Also the Total Remaining Work in the Individual Capacity table may contain #REF! values. To resolve that change the formula with: =SUMIFS([Table name][Remaining Work]; [Table name][Iteration Path];CurrentIteration&"*";[Table name][Area Path];AreaPath&"*";[Table name][Assigned To];[Team Member];[Table name][Work Item Type]; "Task") For example =SUMIFS(VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Remaining Work]; VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Iteration Path];CurrentIteration&"*";VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Area Path];AreaPath&"*";VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Assigned To];[Team Member];VSTS_ab392b55_6647_439a_bae4_8c66e908bc0d[Work Item Type]; "Task") Save and close the workbook. Step 6: Bind Product backlog workbook to the team project Repeat the steps for binding the Iteration backlog for thiw workbook too. In the worksheet Capacity, the formula of the Storypoints might be missing. You can resolve it with: =IF([Iteration]="";"";SUMIFS([Table name][Story Points];[Table name][Iteration Path];[Iteration]&"*")) Example =IF([Iteration]="";"";SUMIFS(VSTS_487f1e4c_db30_4302_b5e8_bd80195bc2ec[Story Points];VSTS_487f1e4c_db30_4302_b5e8_bd80195bc2ec[Iteration Path];[Iteration]&"*"))

    Read the article

  • Building in Change: Project Construction in Asset Intensive Industries

    - by Sylvie MacKenzie, PMP
    According to a recent survey by the Economist Intelligence Unit, sponsored by Oracle, only 51% of project owners rated themselves as effective at delivering their projects to scope, budget, and schedule when confronted with change. In addition only 43% rated themselves as effective at anticipating potential change. Even with the best processes and technology in place, change is often an unavoidable part of the construction process. How organizations respond to change can mean the difference between delays and cost overruns, and projects being completed on schedule and on budget. Implementing Enterprise Project Portfolio Management and using a solution to help manage and automate those process can help asset intensive organizations: Govern project and program compliance and regulatory requirements for project success Unite project teams and stakeholders through collaboration and strong feedback methods to speed project completion Reduce the risk of cost and schedule overruns and any resulting penalties to deliver on time and on budget Effectively manage change throughout the project life cycle Ensure sufficient capacity, utilization, and availability of people, skills, and other resources to meet commitments. The results of the recent EIU survey, sponsored by Oracle:"Building in Change: Project Construction in Asset-Intensive Industries", will be revealed in an upcoming webinar with Hart Energy / Oil & Gas Investor, featuring the Economist Intelligence Unit and Oracle on April 11th at 1pm CST. Click here for further information or visit http://www.oilandgasinvestor.com/

    Read the article

  • How to Handle Managing a Coding Project With 8 Friends?

    - by Raul
    I usually code by myself but currently I need to do a java web-based project with 8 of my friends. I would like to ask the following questions: 1) How to document the development properly? Like how to keep a daily log? Any software or format suggested? What things do you think are important to be included in the log? 2) How to code together? Is there any software/IDE that allows a team to code together? Something ike google docs? 3) How to do a proper backup for a team project? Any software or tips to share?

    Read the article

  • How do I Series: Connecting an Expression Blend Project to Team Foundation Server

    - by Enrique Lima
    I have heard of people wanting and needing to add projects created in Expression Blend to Team Foundation Server. Here is the recipe: 1) Create your project in Expression Blend … click OK 2) Select the option to open your recently created project in Visual Studio. Once that option is selected, your solution will open up in Visual Studio, close Expression Blend at this point. Now, I want to add this project to Source Control … Next, I connect to my TFS environment, and pick the location to save my project Once the project is added, I will get a status window of pending changes for my project, all that we are left to do is to check in those changes. Since we have checked in our project, we can now close Visual Studio, and we will proceed to open Expression Blend again. And select our project we will! We notice some differences from before, just by opening it What differences you say?!? Notice the lock to the right of the item name … And we also get this when we right click … And there we have it, it is a combination of tools to achieve this, but it is well worth it.

    Read the article

  • Project Gantt chart using ADF BC

    - by shantala.sankeshwar
    This article describes simple example of using Project Gantt chart using ADF Business components.Use Case DescriptionLet us create a simple Project Gantt chart using ADF Business components & try to get the selected tasks details. Implementation stepsA project Gantt chart is used for project management. The chart lists tasks vertically and shows the duration of each task as a bar on a horizontal time line.To create a basic project gantt chart,we first need to define  2 tables as below:1)task_table with taskid,task_type,start_date & end_date 2)subtask_table with subtaskid,subtask_type,start_date, end_date &  taskidNow we can create Business components for the above 2 tables .Then we will create new jspx page -projectGantt.jspx Drop TaskView1 as Gantt->Project: Select all required columns under tasks & subtasks tabs of 'create Project Gantt chart' dialog.We have created Project Gantt chart that lists tasks & its subtasks.Now if we need to get all task details selected by the user then define taskSelectionListener for the dvt:projectGantt in jspx source page: taskSelectionListener="#{test.taskSelectlistener}" public void taskListener(TaskSelectionEvent taskSelectionEvent) {// This codes gives all the tasks selected by user System.out.println("Selected task details +taskSelectionEvent.getTask());            }Run the above page & note that it shows all details of tasks nodes & expanding these tasks nodes shows its corresponding subtasks details.Now if user selects 2 tasks,we can see that it prints the complete task details for the selected tasks.

    Read the article

  • What's a good tool for Scrum Project Management in game development? [closed]

    - by BleakCabalist
    I'm looking for an efficient, easy-to-learn tool for Scrum project management not for proffesional use but to use it in my thesis concerning the use of Scrum in game development. Basically I want to visualize a production process of a hypothetical game. Some fragments of the production process should be really detailed to make my point, so basically user stories, tasks, burndown charts etc. are a must. I'm using Scrum, Kanban and some Lean practices for eliminating waste. I also want to use Extreme Programming practices in this production process including TDD and Continuous Integration. I have zero experience in proffesional project management so I need something that's fairly simple to use for a newb like me. Anyone can recommend a tool like that? For now I was thinking about TargetProcess and ScrumWorks. Thanks.

    Read the article

  • Project Management Tool for developers and sysadmins: shared or separate?

    - by David
    Should a team of system administrators who are on a software development project share a project management tool with the developers or use their own separate one? We use Trac and I see the benefit in sharing since inter-team tasks can be maintained by a single system where there may be cross-over or misfiled bugs (e.g. an apparent bug which turns out to be a server configuration issue or a development cycle which needs a server to be configured before it can start) However sharing could be difficult since many system administration tasks don't coincide with a single development milestone if at all. So should a system administration team use a separate PM Tool or share the same one with the developers? If they should share, then how?

    Read the article

  • Can we put percentage on amount of work of a certain role in project's lifecycle?

    - by deviDave
    The title may be confusing, but I will elaborate it here. I am trying to figure our how much time and effort each person spend during some project. I divided roles into: - junior developer (works mainly on UI and some light things) - senior developer (develops complex logic, database structures, etc.) - lead developer (leads the team, usually most experienced person) - negotiator/resolver (a person who directly talk to a client trying to either negotiate terms and timeframe or to clarify vagueness presented by a team leader) My AIM is to calculate percentage of role's involvement based on quality, not time (obviously a junior will spend most time in project, but with the least quality). In the end I would get a table which may look like this: Total: 100% ---------------- Junior: 10% Senior: 50% Lead: 30% Negotiator: 10% Can this be achieved? Has anyone found any source which may help me?

    Read the article

  • Should your client be able to view your project management board?

    - by bizso09
    We're making a bespoke software for our client and use Codebase for our project management. Is it a good idea to let our client view our project management board? The advantages that we thought of are that this would enhance the cooperation between the client and the dev team, following agile practices. He would essentially become part of our team. It would also reduce communication overhead and make sure we're on the same page. The client could track the progression of the system and make suggestions along the way on the user stories. In addition, he could submit bugs or feature requests. The disadvantages that we though of are that some aspects of the board might be too technical to the client. He would suggest changes to the user stories too often and he might view some content that we normally wouldn't want our client to see. For example, when we compromise on technology or functionality, the client might question that and insist on doing things one way or the other.

    Read the article

  • What is an effective way to organize tasks for a new project?

    - by Dulan
    Is there a practical solution to organizing the initial tasks for a new project? To elaborate, imagine the features/stories/goals are laid out for a project. How might one go about organizing those into sane tasks for the first few versions? The scenario I typically have in mind has the features listed as a high-level reference for what the end user-experience should involve. The tasks for constructing such features are then broken down into chunks (such as "create interface for X component"). Such a task is not necessarily "tied" to only that feature and may be useful when building subsequent features. Is breaking features down into small, code-able solutions valid? Or should they be slightly removed from any specific implementation? I do not expect that there is one "right" answer to this question, but I am looking for a fairly pragmatic and unobtrusive approach. As a note, I'm looking for solutions that are independent of any tools or "systems" used for managing the tasks themselves.

    Read the article

  • which Project hosting service (Like google code, github) you will prefer to use? And Why?

    - by MobileDev123
    I am using to study (and at some point of time copy the desired module of) the code from these two sites (Google Code and Github). There is sourceforge too, I have some code, say some library that I want to share with the community, and I am to decide the hosting site. And before I decide I want to have opinions from this community. Which is your favorite Project hosting site or service? And why? There is one point where github can win over google code (may be I am wrong here), Github can let you forge whole project with a zip or tar file, but to do the same in google code we have to upload the zip file explicitly and put it in downloads.... Thanks

    Read the article

  • What is the best agile project management technique for developing innovative software systems?

    - by user654019
    I am involved with the development of innovative software. The development is innovative since we don't know how to develop it and what algorithm should we use to implement and nobody else did it before. The process consists of several stages of studying books/papers, suggesting algorithms, writing prototypes and comparing the result with actual data. We hope that after some iteration, we converge to a valid software system. What is the best project management approach that we can use? Is there any project management software for these types of projects?

    Read the article

  • How can I convince a project manager that there is no way to solve all the compatibility issues?

    - by SAFAD
    I have been working on this project for more than a year now, and we are close to release, the project manager wants the product to be perfect and working in every single aspect. I like that and I love working under the perfection idea, but it seems he is delaying the launch too much because of compatibility issues, he wants the product to work in every single installation, every single configuration possible, and in most cases, the product just works without issues when it's on the hands of the client. UPDATE : yes the product doesn't work properly when there are conflicts, for example, other products that don't use guidelines nor standards to load libraries (causes double library load which leads to failure), cache is another example and so on..... but we warn the clients about the conflict before purchasing and help them fixing it after purchasing I've tried to explain it by giving some examples on major products, he understands the situation, but can not believe that it is near impossible (if it is not impossible) to do what he wants. Hope it is clarified enough for the community to answer.

    Read the article

  • c# - PubNub JSON serialization code works in example project but not in my project

    - by pilau
    I am making a Winamp plugin with the single function of sending the details of the song being played over HTTP to a webpage. It works like this: Winamp song event triggered - check for new song - publish to webpage using PubNub (C# API). So far I got to the stage where everything works exactly as it is supposed to, except for the PubNub code which doesn't serialize the object I'm passing for publishing into JSON. All I keep getting in the PubNub console is a mere {} - an empty JSON object. A little background on the project structure: I am using Sharpamp which is a custom library that enables making Winamp plugins with C#. I am also using the PubNub C# API. The gen_notifier_cs project is the C++ plugin wrapper created by Sharpamp. notifier_cs is where all my code resides. The two other projects are self explanatory I assume. I have referenced the PubNub API in notifier_cs, and also have referenced Sharpamp in both notifier_cs and PubNub API. So, the objects that need to get serialized are of a class Song as defined in Sharpamp: public class Song { public string Title { get; internal set; } public string Artist { get; internal set; } public string Album { get; internal set; } public string Year { get; internal set; } public bool HasMetadata { get; internal set; } public string Filename { get; internal set; } } So let's say if I have a song object with song data in it, I would go pubnub.publish("winamp_pipe", song); to publish it and PubNub will automatically serialize the data into JSON. But that's just not working in my solution. To test why it wasn't serializing, I copied that class to the example code file in the PubNub API. Visual Studio changed the class to this (notice the public Song() method): public class Song { public Song() { return; } public string Album { get; set; } public string Artist { get; set; } public string Filename { get; set; } public bool HasMetadata { get; set; } public string Title { get; set; } public string Year { get; set; } } On the same example file I initiated a default song object with some values: Song song = new Song(); song.Album = "albumname"; song.Artist = "artistname"; song.HasMetadata = true; song.Title = "songtitle"; song.Year = "2012"; And published it: pubnub.publish("winamp_pipe", song); and it worked! I got the JSON object in the PubNub channel! {"Album":"albumname","Artist":"artistname","Filename":null,"HasMetadata":true,"Title":"songtitle","Year":"2012"} So, I tried replacing the "new" Song class with the original one defined in Sharpamp. I tried adding another class definition in the notifier_cs project but that clashes with the one in Sharpamp which I have to rely on. I have been trying so many things as far as I could come up with. Needless to say none prevailed. Still, all I get is an empty JSON object. I have been pulling out my hair for the last day. I know this post is super long but I appreciate your input nonetheless. Thanks in advance.

    Read the article

  • SQL SERVER – Unable to DELETE Project in Data Quality Projects (DQS)

    - by pinaldave
    Here is the email which made me write this blog post. When I write a blog post I write keeping in mind that if the developer is not familiar with the concept he will attempt this on the development server. If due to any reason you attempt it on any other server than your personal server, developer should make sure to have complete confidence on his own expertise and understand the risk behind it.  Well, let us read the email which I received. I have modified it a bit to remove information related to organizational and individual. “I just read your blog post on Beginning DQS. I went ahead and followed every single screenshot and it worked fine. I was able to execute the DQS project successfully. However, the same blog post got me in trouble – a serious trouble. After first successful deployment I went ahead and created a few of my own knowledge base and projects. I played around a bit and then decided to get back to real work. Now we had deployed DQS on production server only, so experiment on production server. Now, when I got back to my work, I forgot to close all the windows. My manager found the window open and have seen my test projects. He has asked me to delete my experiments immediately and have said words which I cannot write to you. Here is the problem. I am not able to delete the project which I have created earlier. I am able to open it and play with it but the delete option is disabled and grayed out (see attached image). Now I believe there is nothing wrong with this project as it was just a test project. Would you please write to my manager that it is not harmful to leave that project there as it is? It is also not using any resources. I think he will believe you.” As I said this kind of email makes me uncomfortable. I do not want someone to execute anything on production server. I often write notes and disclaimer on my post when something is dangerous to execute on production server. However, if someone is not expert with SQL Server and attempts something new on production server, I think the major issue is here with the person (admin) who gave new developer permission to production server. This has to be carefully avoided. Here was my response to the individual. “I cannot write to your manager anything as he has not asked me anything. Honestly I believe he is correct in his behavior as you should have not executed anything on the production server without prior approval and testing on the development server. Any R&D must be done on local box or development box. I suggest you request your manager to prevent access to users who does not need access. If he is a good manager, he might have already implemented by now recent event. I also see your screenshot. Here is the issue: While you were playing with project, you might have closed the project half the way, without completing it. Due to the same reason it is locked. You can open and continue from the same place where you have left the project. If you do not need the project any more. Right click on it, click on unlock the project. This will enable the DELETE option and now you can delete the project. Next time, be safe out there. It may be dangerous to have admin access to production server when not needed.“ I have yet not heard from him but I believe he will take my words positively. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: PostADay, SQL, SQL Authority, SQL Query, SQL Server, SQL Tips and Tricks, T SQL, Technology Tagged: Data Quality Services, DQS

    Read the article

  • When building a web Application project, TFS 2008 Builds two spearate projects in the _PublishedFold

    - by Steve Johnson
    Hi all, I am trying to a perform build automation on one of web application projects built using VS 2008. The _PublishedWebSites contains two folders: Web and Deploy. I just want the TFS 2008 to generate only the Deploy Folder and Not the Web Folder. Here is my TFSBuild.proj File <Project ToolsVersion="3.5" DefaultTargets="Compile" xmlns="http://schemas.microsoft.com/developer/msbuild/2003"> <Import Project="$(MSBuildExtensionsPath)\Microsoft\VisualStudio\TeamBuild\Microsoft.TeamFoundation.Build.targets" /> <Import Project="$(MSBuildExtensionsPath)\Microsoft\WebDeployment\v9.0\Microsoft.WebDeployment.targets" /> <ItemGroup> <SolutionToBuild Include="$(BuildProjectFolderPath)/../../Development/Main/MySoftware.sln"> <Targets></Targets> <Properties></Properties> </SolutionToBuild> </ItemGroup> <ItemGroup> <ConfigurationToBuild Include="Release|AnyCPU"> <FlavorToBuild>Release</FlavorToBuild> <PlatformToBuild>Any CPU</PlatformToBuild> </ConfigurationToBuild> </ItemGroup> <!--<ItemGroup> <SolutionToBuild Include="$(BuildProjectFolderPath)/../../Development/Main/MySoftware.sln"> <Targets></Targets> <Properties></Properties> </SolutionToBuild> </ItemGroup> <ItemGroup> <ConfigurationToBuild Include="Release|x64"> <FlavorToBuild>Release</FlavorToBuild> <PlatformToBuild>x64</PlatformToBuild> </ConfigurationToBuild> </ItemGroup>--> <ItemGroup> <AdditionalReferencePath Include="C:\3PR" /> </ItemGroup> <Target Name="GetCopyToOutputDirectoryItems" Outputs="@(AllItemsFullPathWithTargetPath)" DependsOnTargets="AssignTargetPaths;_SplitProjectReferencesByFileExistence"> <!-- Get items from child projects first. --> <MSBuild Projects="@(_MSBuildProjectReferenceExistent)" Targets="GetCopyToOutputDirectoryItems" Properties="%(_MSBuildProjectReferenceExistent.SetConfiguration); %(_MSBuildProjectReferenceExistent.SetPlatform)" Condition="'@(_MSBuildProjectReferenceExistent)'!=''"> <Output TaskParameter="TargetOutputs" ItemName="_AllChildProjectItemsWithTargetPathNotFiltered"/> </MSBuild> <!-- Remove duplicates. --> <RemoveDuplicates Inputs="@(_AllChildProjectItemsWithTargetPathNotFiltered)"> <Output TaskParameter="Filtered" ItemName="_AllChildProjectItemsWithTargetPath"/> </RemoveDuplicates> <!-- Target outputs must be full paths because they will be consumed by a different project. --> <CreateItem Include="@(_AllChildProjectItemsWithTargetPath->'%(FullPath)')" Exclude= "$(BuildProjectFolderPath)/../../Development/Main/Web/Bin*.pdb; *.refresh; *.vshost.exe; *.manifest; *.compiled; $(BuildProjectFolderPath)/../../Development/Main/Web/Auth/MySoftware.dll; $(BuildProjectFolderPath)/../../Development/Main/Web/BinApp_Web_*.dll;" Condition="'%(_AllChildProjectItemsWithTargetPath.CopyToOutputDirectory)'=='Always' or '%(_AllChildProjectItemsWithTargetPath.CopyToOutputDirectory)'=='PreserveNewest'" > <Output TaskParameter="Include" ItemName="AllItemsFullPathWithTargetPath"/> <Output TaskParameter="Include" ItemName="_SourceItemsToCopyToOutputDirectoryAlways" Condition="'%(_AllChildProjectItemsWithTargetPath.CopyToOutputDirectory)'=='Always'"/> <Output TaskParameter="Include" ItemName="_SourceItemsToCopyToOutputDirectory" Condition="'%(_AllChildProjectItemsWithTargetPath.CopyToOutputDirectory)'=='PreserveNewest'"/> </CreateItem> </Target> <!-- To modify your build process, add your task inside one of the targets below and uncomment it. Other similar extension points exist, see Microsoft.WebDeployment.targets. <Target Name="BeforeBuild"> </Target> <Target Name="BeforeMerge"> </Target> <Target Name="AfterMerge"> </Target> <Target Name="AfterBuild"> </Target> --> </Project> I want to build everything that the builtin Deploy project is doing for me. But i dont want the generated Web Project as it conatains App_Web_xxxx.dll assemblies instead of a single compiled assembly. Please help. Thanks

    Read the article

  • Any tips on getting hired as a software project manager straight out of college?

    - by MHarrison
    I graduated with a BS in compsci last September, and I've been trying (unsuccessfully) to find a job as a project manager ever since. I fell in love with software engineering (the formal practice behind it all, not just coding) in school, and I've dedicated the last 3-4 years of my life to learning everything I can about project management and gaining experience. I've managed several projects (with teams around 12 people) while in school, and I worked with my university's software engineering research lab. My résumé is also decent - I worked as a programmer before I went to school (I'm 27 now), and I did Google Summer of Code for 3 summers. I also have general "people management" experience via working as the photo editor for my university's newspaper for 2 years. My first problem with the job hunt is not getting enough interviews. I use careers.stackoverflow.com, which is awesome because I usually get contacted by non-HR people who know what they're talking about, but there's just not enough companies using it for me to get interviews on a regular basis. I've also tried sites like monster.com, and in a fit of desperation, I sent out no less than 60 applications to project management positions. I've gotten 3 automated rejection letters and that's it. At least careers.stackoverflow gets me a phone interview with 8/10 places I apply to. But the main (and extremely frustrating) problem is the matter of experience. I've successfully managed projects from start to finish (in my software engineering classes we had real customers come in with a real software need and we built it for them), but I've never had to deal with budgets and money (I know this is why HR people immediately turn me away). Most of these positions require 5+ years PM experience, and I've seen absurd things like 12+ years required. Interviews are also maddening. I've had so many places who absolutely loved me and I made it to the final round of interviews, and I left thinking things went extremely well and they'd consider me. However, when I check in with them a week later, they tell me "We really liked you and your qualifications are excellent, but we're hoping to find someone with more experience." The bad interviews I can understand - like the PM position that would have had me managing developers both locally and overseas - I had 3 interviews with them and the ENTIRE interview process was them asking me CS brainteasers and having me waste time on things like writing quicksort on paper or writing binary search trees. Even when I tried steering the discussion towards more relevant PM stuff, they gave me some vague generic replies and went back to the "We want to be Google/MS" crap. But when I have a GOOD interview, they say my "qualifications are excellent" but they want "more experience"...that makes me want to tear my hair out. What else can I DO? While I'm aiming for technically-involved PM positions (not just crunching budget numbers), I really don't want a straight development job because I like creating software from the very high-level vs. spending a lot of time debugging memory leaks. In fact, I can't even GET development positions that I'm qualified for because I make the mistake of telling them that my future career goals are as PM (which usually results in them saying something like "Well we already have PMs and this position isn't really set up to get you there." - which I take to mean "No, that's my job, stay away.") My apologies on the long rant, but I'm seriously hellbent on getting hired as a PM since it's both my career goal and the passion that keeps me awake at night. Any suggestions on what the heck else I can do? I'm currently writing a blog where I talk about my philosophies about software engineering, and I'm writing up specs for an iOS app which I will design, code, and show employers, but this takes an awful lot of time that I don't have.

    Read the article

  • MS Project - Schedule short duration tasks that stay within working hrs

    - by Dave Warwick
    I am planning a series of tests that take a couple of hours each. However, you can not split a test so I do not want the next test to begin if there is not enough time within the specified working hours of the day to complete it. Also, I would like to begin each day with a set-up period before the actual testing can begin. Is there a way to automatically begin each day with a setup period and have tasks that can not complete before the end of the specified work day defer starting until the next day?

    Read the article

  • Looking for Light Time Management Software Suggestions (for Mac)

    - by tmo256
    I'm looking for a simple project management app that performs task scheduling, along the line of Merlin or MS Project, but no where near as robustly. I don't need to deal with other (human) resources, but I work on anything from 3 to 6 different projects at a time. What I'd like is to be able to input deadlines and tasks, and have a schedule suggested to complete them. I do technical work, but I don't think I need anything specifically for software development, especially considering I do plenty of other kinds of things, like graphic design and social media PR. I'd really like this to be dead simple, as simple as possible. Suggestions? OmniPlan, something web-based? Definitely cannot afford anything too extravagant, really looking for something under $200. Thanks for your input!

    Read the article

  • MS Project 2010 Filter and Highlights

    - by claubervs
    I'd like to know if there is a way to highlight dates that differs from one another. I have two columns "Baseline Finish Date" and "Re-forecast Finish Date" and I would like to highlight the dates that for each task, is different in those columns. Meaning the tasks that suffered a re-forecast due to other circumstances, and does not equal to the original dates. I also would like a filter that does the same thing as above, showing only this different date tasks.

    Read the article

< Previous Page | 10 11 12 13 14 15 16 17 18 19 20 21  | Next Page >