Search Results

Search found 32368 results on 1295 pages for 'team project'.

Page 12/1295 | < Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >

  • How come many project-hosting sites doesn't have a forum feature?

    - by george
    I'm considering starting an open-source project, so I shopped around some popular project hosting sites. What I find surprising is that many (see here for a nice feature table) of the popular project hosting sites (e.g. GitHub, BitBucket) don't have a forum feature, i.e. a place where users can talk to the devs, ask questions, raise ideas, etc. IMHO an active forum is an important factor in creating a user community around a project, so I would expect that most project owners would be interested in such a feature. I've also noticed that some projects do have support forums (or mailing lists) hosted elsewhere - e.g. Ruby on Rails is hosted on GitHub but has a Google Groups support group, and TortoiseHG is hosted on BitBucket but has a mailing list on SourceForge - so it's not like this feature is unneeded. So how come many project hosting sites don't have a forum feature?

    Read the article

  • How can I revive a dead translation team?

    - by Rohan
    I wish to translate ubuntu in Marathi language for which a translation team already exists. But the membership of the team is moderated and unfortunately no new member has been admitted in the team after 2010-Dec-12. All request of membership are pending after that date. I tried to contact administrator of the team at his personal email id but did not get any reply from him. As I am not a team member I can not upload my translated po file. Is there any way to take charge of the team and approve all pending request? It seems that no translation work is currently being carried out. I would like to do the work but I can not.

    Read the article

  • How should I structure a solution for a long term project?

    - by sooprise
    I'm about to create a do-everything dashboard for my team and am still having second thoughts about my project/solution structure. Since this could be a long ongoing project, I want to get the structure right from the beginning. This is what I had in mind: Create a solution named "doEverythingDashboard" Delete the project named "doEverythingDashboard" under the solution "doEverythingDashboard" Create winform project named "interface" Create console applications projects for each functionality of "doEverythingDashboard" Reference each console application in "interface" Does this make any sense? Would it make more sense to just have one project and create a class per functionality instead of an entire project?

    Read the article

  • "Whole-team" C++ features?

    - by Blaisorblade
    In C++, features like exceptions impact your whole program: you can either disable them in your whole program, or you need to deal with them throughout your code. As a famous article on C++ Report puts it: Counter-intuitively, the hard part of coding exceptions is not the explicit throws and catches. The really hard part of using exceptions is to write all the intervening code in such a way that an arbitrary exception can propagate from its throw site to its handler, arriving safely and without damaging other parts of the program along the way. Since even new throws exceptions, every function needs to provide basic exception safety — unless it only calls functions which guarantee throwing no exception — unless you disable exceptions altogether in your whole project. Hence, exceptions are a "whole-program" or "whole-team" feature, since they must be understood by everybody in a team using them. But not all C++ features are like that, as far as I know. A possible example is that if I don't get templates but I do not use them, I will still be able to write correct C++ — or will I not?. I can even call sort on an array of integers and enjoy its amazing speed advantage wrt. C's qsort (because no function pointer is called), without risking bugs — or not? It seems templates are not "whole-team". Are there other C++ features which impact code not directly using them, and are hence "whole-team"? I am especially interested in features not present in C. Update: I'm especially looking for features where there's no language-enforced sign you need to be aware of them. The first answer I got mentioned const-correctness, which is also whole-team, hence everybody needs to learn about it; however, AFAICS it will impact you only if you call a function which is marked const, and the compiler will prevent you from calling it on non-const objects, so you get something to google for. With exceptions, you don't even get that; moreover, they're always used as soon as you use new, hence exceptions are more "insidious". Since I can't phrase this as objectively, though, I will appreciate any whole-team feature. Appendix: Why this question is objective (if you wonder) C++ is a complex language, so many projects or coding guides try to select "simple" C++ features, and many people try to include or exclude some ones according to mostly subjective criteria. Questions about that get rightfully closed regularly here on SO. Above, instead, I defined (as precisely as possible) what a "whole-team" language feature is, provide an example (exceptions), together with extensive supporting evidence in the literature about C++, and ask for whole-team features in C++ beyond exceptions. Whether you should use "whole-team" features, or whether that's a relevant concept, might be subjective — but that only means the importance of this question is subjective, like always.

    Read the article

  • Is there anything better than Microsoft Project? [closed]

    - by GuruAbyss
    Possible Duplicate: Project Planning Tools I'll soon be knee-deep into a very large project and I'm looking into project management software. I need users opinions on software based (no web based) solutions that are equal or better than MS Project. It can be open source or closed source. Thank you all in advanced for your insight and opinions!

    Read the article

  • Microsoft Team Foundation Equivalent stack.

    - by Nix
    I am looking for a free alternative to TFS. What would be the best alternative stack(source control, bug tracking, project management/planning, wiki, automated builds (ci))? Keeping in mind that it would be nice if they all integrated well. For example, it would be nice to be able to link bugs to source control, and then be able to link to a project plan and then be able to automate building. I do not have issues with using Microsoft project to manage project planing. I know i would like to use these....: SVN TeamCity NUnit But i am struggling to find a good Wiki/Project Planning/Bug tracking, that would integrate well. Any questions let me know.

    Read the article

  • Microsoft Team System Equivalent stack.

    - by Nix
    I am looking for a free alternative to TS. What would be the best alternative stack(source control, bug tracking, project management/planning, wiki, automated builds (ci))? Keeping in mind that it would be nice if they all integrated well. For example, it would be nice to be able to link bugs to source control, and then be able to link to a project plan and then be able to automate building. I do not have issues with using Microsoft project to manage project planing. I know i would like to use these....: SVN TeamCity NUnit But i am struggling to find a good Wiki/Project Planning/Bug tracking, that would integrate well. Any questions let me know.

    Read the article

  • How to Open Any Folder as a Project in the NetBeans Platform

    - by Geertjan
    Typically, as described in the NetBeans Project Type Tutorial, you'll define a project type based on the presence of a file (e.g., "project.xml" or "customer.txt" or something like that) in a folder. I.e., if the file is there, then its parent, i.e., the folder that contains the file, is a project and should be opened in your application. However, in some scenarios (as with the HTML5 project type introduced in NetBeans IDE 7.3), the user should be able to open absolutely any folder at all into the application. How to create a project type that is that liberal? Here you go, the only condition that needs to be true is that the selected item in the "Open Project" dialog is a folder, as defined in the "isProject" method below. Nothing else. That's it. If you select a folder, it will be opened in your application, displaying absolutely everything as-is (since below there's no ProjectLogicalView defined): import java.beans.PropertyChangeListener; import java.io.IOException; import javax.swing.Icon; import org.netbeans.api.project.Project; import org.netbeans.api.project.ProjectInformation; import org.netbeans.spi.project.ProjectFactory; import org.netbeans.spi.project.ProjectState; import org.openide.filesystems.FileObject; import org.openide.loaders.DataFolder; import org.openide.loaders.DataObjectNotFoundException; import org.openide.nodes.FilterNode; import org.openide.util.Exceptions; import org.openide.util.ImageUtilities; import org.openide.util.Lookup; import org.openide.util.lookup.Lookups; import org.openide.util.lookup.ServiceProvider; @ServiceProvider(service = ProjectFactory.class) public class FolderProjectFactory implements ProjectFactory { @Override public boolean isProject(FileObject projectDirectory) { return DataFolder.findFolder(projectDirectory) != null; } @Override public Project loadProject(FileObject dir, ProjectState state) throws IOException { return isProject(dir) ? new FolderProject(dir) : null; } @Override public void saveProject(Project prjct) throws IOException, ClassCastException { // leave unimplemented for the moment } private class FolderProject implements Project { private final FileObject projectDir; private Lookup lkp; private FolderProject(FileObject dir) { this.projectDir = dir; } @Override public FileObject getProjectDirectory() { return projectDir; } @Override public Lookup getLookup() { if (lkp == null) { lkp = Lookups.fixed(new Object[]{ new Info(), }); } return lkp; } private final class Info implements ProjectInformation { @Override public Icon getIcon() { Icon icon = null; try { icon = ImageUtilities.image2Icon( new FilterNode(DataFolder.find( getProjectDirectory()).getNodeDelegate()).getIcon(1)); } catch (DataObjectNotFoundException ex) { Exceptions.printStackTrace(ex); } return icon; } @Override public String getName() { return getProjectDirectory().getName(); } @Override public String getDisplayName() { return getName(); } @Override public void addPropertyChangeListener(PropertyChangeListener pcl) { //do nothing, won't change } @Override public void removePropertyChangeListener(PropertyChangeListener pcl) { //do nothing, won't change } @Override public Project getProject() { return FolderProject.this; } } } } Even the ProjectInformation implementation really isn't needed at all, since it provides nothing more than the icon in the "Open Project" dialog, the rest (i.e., the display name in the "Open Project" dialog) is provided by default regardless of whether you have a ProjectInformation implementation or not.

    Read the article

  • Project Time Tracker

    - by Geertjan
    Based on yesterday's blog entry, let's do something semi useful and display, in the project popup, which is available when you right-click a project in the Projects window, the time since the last change was made anywhere in the project, i.e., we can listen recursively to any changes done within a project and then update the popup with the newly acquired information, dynamically: import java.awt.event.ActionEvent; import java.text.DateFormat; import java.text.SimpleDateFormat; import java.util.ArrayList; import java.util.Collection; import java.util.List; import javax.swing.AbstractAction; import org.netbeans.api.project.Project; import org.netbeans.api.project.ProjectUtils; import org.openide.awt.ActionID; import org.openide.awt.ActionReference; import org.openide.awt.ActionRegistration; import org.openide.awt.StatusDisplayer; import org.openide.filesystems.FileAttributeEvent; import org.openide.filesystems.FileChangeListener; import org.openide.filesystems.FileEvent; import org.openide.filesystems.FileRenameEvent; import org.openide.util.Lookup; import org.openide.util.LookupEvent; import org.openide.util.LookupListener; import org.openide.util.Utilities; import org.openide.util.WeakListeners; @ActionID( category = "Demo", id = "org.ptt.TrackProjectSelectionAction") @ActionRegistration( lazy = false, displayName = "NOT-USED") @ActionReference( path = "Projects/Actions", position = 0) public final class TrackProjectSelectionAction extends AbstractAction implements LookupListener, FileChangeListener { private Lookup.Result<Project> projects; private Project context; private Long startTime; private Long changedTime; private DateFormat formatter; private List<Project> timedProjects; public TrackProjectSelectionAction() { putValue("popupText", "Timer"); formatter = new SimpleDateFormat("HH:mm:ss"); timedProjects = new ArrayList<Project>(); projects = Utilities.actionsGlobalContext().lookupResult(Project.class); projects.addLookupListener( WeakListeners.create(LookupListener.class, this, projects)); resultChanged(new LookupEvent(projects)); } @Override public void resultChanged(LookupEvent le) { Collection<? extends Project> allProjects = projects.allInstances(); if (allProjects.size() == 1) { Project currentProject = allProjects.iterator().next(); if (!timedProjects.contains(currentProject)) { String currentProjectName = ProjectUtils.getInformation(currentProject).getDisplayName(); putValue("popupText", "Start Timer for Project: " + currentProjectName); StatusDisplayer.getDefault().setStatusText( "Current Project: " + currentProjectName); timedProjects.add(currentProject); context = currentProject; } } } @Override public void actionPerformed(ActionEvent e) { refresh(); } protected void refresh() { startTime = System.currentTimeMillis(); String formattedStartTime = formatter.format(startTime); putValue("popupText", "Timer started: " + formattedStartTime + " (" + ProjectUtils.getInformation(context).getDisplayName() + ")"); } @Override public void fileChanged(FileEvent fe) { changedTime = System.currentTimeMillis(); formatter = new SimpleDateFormat("mm:ss"); String formattedLapse = formatter.format(changedTime - startTime); putValue("popupText", "Time since last change: " + formattedLapse + " (" + ProjectUtils.getInformation(context).getDisplayName() + ")"); startTime = changedTime; } @Override public void fileFolderCreated(FileEvent fe) {} @Override public void fileDataCreated(FileEvent fe) {} @Override public void fileDeleted(FileEvent fe) {} @Override public void fileRenamed(FileRenameEvent fre) {} @Override public void fileAttributeChanged(FileAttributeEvent fae) {} } Some more work needs to be done to complete the above, i.e., for each project you somehow need to maintain the start time and last change and redisplay that whenever the user right-clicks the project.

    Read the article

  • VSTS Team Build Mail notification should include the "associateChangeSets"

    - by Kris
    Team Build Guru's I am looking for "Associated ChangeSets" list included in the build mail notifications say, by default we get a build notification like this, Team Project: Content Server Build Number: MerchantPortal_1.0.0707.69 Build Agent: \Content Server\MerchantPortalBuildBox Build Definition: \Content Server\MerchantPortal QA Build started by: ENETDOM\jrichter Build Start Time: 7/7/2009 8:25:30 AM Build Finish Time: 7/7/2009 8:30:49 AM Notes: - All dates and times are shown in GMT -05:00:00 Central Daylight Time - You are receiving this notification because of a subscription created by ENETDOM\enbuild Provided by Microsoft Visual Studio® Team System 2008 What I really would like is an email containing the changes. So the user does NOT have to click an URL to retrieve the list of changes. So... I would the mail to look something like this instead: Team Project: Content Server Build Number: MerchantPortal_1.0.0707.69 Build Agent: \Content Server\MerchantPortalBuildBox Build Definition: \Content Server\MerchantPortal QA Build started by: ENETDOM\enbuild Build Start Time: 7/7/2009 8:25:30 AM Build Finish Time: 7/7/2009 8:30:49 AM **Associated changesets: 482 DOMAIN\johny Not needed... 486 DOMAIN\adam A final synchronization with SourceSafe files after the 15 december release. 487 DOMAIN\bob Corrected the naught millenium bug.... 488 DOMAIN\sarah Reverted back to csproj file with SC changes.... Associated work items:** .... Notes: - All dates and times are shown in GMT -05:00:00 Central Daylight Time - You are receiving this notification because of a subscription created by ENETDOM\enbuild Provided by Microsoft Visual Studio® Team System 2008

    Read the article

  • Oracle Social Network Developer Challenge: TEAM Informatics

    - by Kellsey Ruppel
    Originally posted by Jake Kuramoto on The Apps Lab blog. Here comes another Oracle Social Network Developer Challenge entry, this one courtesy of TEAM Informatics (@teaminformatics). As their name suggests, their entry was a true team effort, featuring the work of Jon Chartrand, Deepthi Sanikommu, Dmitry Shtulman, Raghavendra Joshi, and Daniel Stitely with Wayne Boerger doing the presentation honors. Speaking of the presentation, Wayne’s laptop wouldn’t project onto the plasma we had in the OTN Lounge, but luckily, Noel (@noelportugal) had his iPad and VGA dongle in his backpack of goodies, so they were able to improvise by using the iPad camera to capture Wayne’s demo and project the video to the plasma. Code will find a way. Anyway, TEAM built Do Over, an integration with Atlassian’s JIRA, coincidentally something I’ve chatted with Rich (@rmanalan) about in the past. The basic idea is simple; integrate JIRA issues with Oracle Social Network to expand and centralize the conversation around issue resolution. In Dmitry’s words: We were able to put together a team on fairly short notice and, after batting a few ideas around, decided to pursue an integration with JIRA, an issue and project tracking tool used in-house at TEAM.  After getting to know WebCenter Social, we saw immediate benefits that a JIRA integration could bring, primarily due to the fact that JIRA only allows assignment of an issue to one person at a time.  Integrating Social would allow collaboration and issue resolution to happen right from the JIRA Issue interface. TEAM tackled a very common pain point among developers, i.e. including everyone who needs to be involved in issue resolution into a single thread. If you’ve ever fixed bugs or participated in that process, you’ll know that not everyone has access to the issue resolution system, which makes consolidating discussion time-consuming and fragmented. Why? Because we typically use email as the tool for collaboration. Oracle Social Network allows for all parties involved to work in a single, private and secure conversation, and through its RESTful Public API, information from external systems like JIRA can be brought in for context. TEAM only had time to address half the solution, but given more time, I’m sure they would have made the integration bidirectional, allowing for relevant commentary to be pushed back to JIRA, closing the loop. Here are some screenshot of their integration. #gallery-1 { margin: auto; } #gallery-1 .gallery-item { float: left; margin-top: 10px; text-align: center; width: 33%; } #gallery-1 img { border: 2px solid #cfcfcf; } #gallery-1 .gallery-caption { margin-left: 0; } When Oracle Social Network is released, TEAM will have something they use internally to work on issues, and maybe they’ll even productize their work and add it to the Atlassian Marketplace so that other JIRA users can benefit from the combination of Oracle Social Network and JIRA. Thanks to everyone at TEAM for participating in our challenge. We hope they had a good experience. Look for the details of the other entries this week. Be sure to check out a full recap from Dmitry over on the TEAM blog.

    Read the article

  • Xcode custom project template creates only references to files

    - by user315374
    Hi, I tried to create a custom project template for setting up unit testing. The problem is that when i create a new project based on this template it creates references to the template files : When i edit a file, it changes my template files instead of my actual project files ! When i delete my template, files from my actual project becomes red ! The project template is in : /Developer/Platforms/iPhoneOS.platform/Developer/Library/Xcode/Project Templates/Application/Test-based Application Reading some question on stack overflow i tried to install my template project in /Library/Application Support/Developer/Shared/Xcode/Project Templates But i cannot see my template when i create a new project. Can anybody help ? Thanks, Vincent

    Read the article

  • How to merge VB.NET WEB Project with C#.NET MVC project

    - by Thushara Perera
    Hi All, I've got an existing asp.net project written in vb.net need to merge into C# ASP.NET MVC 1.0 application. I couldn't find a good article on this. I have successfully created a sample project and merge it. It works successfully. But when merge it into my real project it does not work. I've used C#.csproj project file and deleted VB project file. for the merging i could find a good article this link successful on sample project not with the real project. good one: http://www.packtpub.com/article/mixing-asp.net-webforms-and-asp.net-mvc how it is possible to merge VB Default.aspx, C# Default.aspx and VB Global.asax, C# Global.asax. Can I used VB.vbproj file insted of csproj Thanks Thushara Perera

    Read the article

  • Adding gwt project to existing java servlet 3 project

    - by Michael
    I have a standalone gwt project with RPC built with Maven. I also have java servlet 3.0 project. Both the servlet and gwt projects have war packaging but I want to have only one war file so I changed the packaging of the gwt project to jar and included it in my servlet project. Now I have a problem understanding how to wire everything together. Do I need to migrate gwt project's web.xml into the main project web.xml file ? How do I redirect to my gwt project entry index.html ? Thanks.

    Read the article

  • Is it relatively safe to install kernel from "Canonical Kernel Team ppa" than "Mainline"

    - by tijybba
    I already referred most of the questions stating Upgrade from Mainline Builds or Compiling from latest source or PPA and also concluded that it can cause breakage to Current stable installed system. My question is regarding the kernel builds from Canonical Kernel Team which i have subscribed in Ubuntu 12.04 64-bit , states This is the core kernel team as hired by Canonical. Do not use this team, use ubuntu-kernel-team instead. My stable kernel states 3.2.0-27.42 from Ubuntu repository , also i consider Canonical Kernel Team to be Official ,currently urging me to Upgrade 3.2.0-27.43 , so from the Odd numbered and through the PPA description it is categorized as Unstable. From this ,it can be said next stable release would be 3.2.0-27.44. Is upgrading to .43 version is stable enough to continue , since .44 will be provide by Ubuntu itself based on .43 version and so on. Though i can't expect a lot of Changes ,but does it provide new Improvements or just Bug Fixes since it is just a preceding Release. Also , apart from Ubuntu mainline kernel , is Canonical Kernel Team different. If so , in what development or contribution terms. Is the Ubuntu kernel developed by Two different teams or same team. P.S.: Just noticed that sudo apt-get update && sudo apt-get upgrade provides me upgrade to .43 kernel , which normally requires sudo apt-get dist-upgrade to upgrade to newer kernel available , unless it normally provides message like " Following packages were not upgraded..." , is it an error or an exception to this Canonical Kernel PPA.

    Read the article

  • Does a mature agile team requires any management?

    - by ashy_32bit
    After a recent heated debate over Scrum, I realized my problem is that I think of management as a quite unnecessary and redundant activity in a fully agile team. I believe a mature Agile team does not require management or any non-technical decision making process whatsoever. To my (apparently erring) eyes it is more than obvious that the only one suitable and capable of managing a mature development team is their coach (who is the most technically competent colleague with proper communication skills). I can't imagine how a Scrum master can contribute to such a team. I am having great difficulty realizing and understanding the value of such things in Scrum and the manager as someone who is not a veteran developer but is well skilled in planning the production cycles when a coach exists in the team. What does that even mean? How on earth can someone with no edge-skills of development manage a highly technical team? Perhaps management here means something else? I see management as a total waste of time and a by-product of immaturity. In my understanding a mature team is fully self-managing. Apparently I'm mistaken since many great people say the contrary but I can't convince myself.

    Read the article

  • Emacs recursive project search

    - by hekevintran
    I am switching to Emacs from TextMate. One feature of TextMate that I would really like to have in Emacs is the "Find in Project" search box that uses fuzzy matching. Emacs sort of has this with ido, but ido does not search recursively through child directories. It searches only within one directory. Is there a way to give ido a root directory and to search everything under it? Update: The questions below pertain to find-file-in-project.el from Michal Marczyk's answer. If anything in this message sounds obvious it's because I have used Emacs for less than one week. :-) As I understand it, project-local-variables lets me define things in a .emacs-project file that I keep in my project root. How do I point find-file-in-project to my project root? I am not familiar with regex syntax in Emacs Lisp. The default value for ffip-regexp is: ".*\\.\\(rb\\|js\\|css\\|yml\\|yaml\\|rhtml\\|erb\\|html\\|el\\)" I presume that I can just switch the extensions to the ones appropriate for my project. Could you explain the ffip-find-options? From the file: (defvar ffip-find-options "" "Extra options to pass to `find' when using find-file-in-project. Use this to exclude portions of your project: \"-not -regex \\".vendor.\\"\"") What does this mean exactly and how do I use it to exclude files/directories? Could you share an example .emacs-project file?

    Read the article

  • What are the elements of a team development suite?

    - by mhempey
    For small-to-large teams developing software together, what tools are used to form a comprehensive team development framework? Specifically, I'm looking for a comprehensive list of all the individual functions involved (e.g. source control, bug management, testing tools, project management), not specific product recommendations. I'm also not restricting the list to a particular methodology (e.g. Scrum).

    Read the article

  • I am looking for an graduation project idea for bacelor of computer engineering [closed]

    - by project idea
    I am interested in computer graphics and I have developed many hobby projects, mostly 2D and 3D games/scenes in directX and openGL, But for a grad project, proffesors wont allow games. I browsed many similar questions here and I am convinced project should be something I am really interested in as I will give considerable time to it. But apart from games I am not able to decide on the topic. I am also open to ideas on social apps and android.

    Read the article

  • Build one to throw away vs Second-system effect

    - by m3th0dman
    One one hand there is an advice that says "Build one to throw away". Only after finishing a software system and seeing the end product we realize what went wrong in the design phase and understand how we should have really done it. On the other hand there is the "second-system effect" which says that the second system of the same kind that is designed is usually worse than the first one; there are many features that did not fit in the first project and were pushed into the second version usually leading to overly complex and overly engineered. Isn't here some contradiction between these principles? What is the correct view over the problems and where is the border between these two? I believe that these "good practices" are were firstly promoted in the seminal book The Mythical Man-Month by Fred Brooks. I know that some of these issues are solved by Agile methodologies, but deep down, the problem is still the principles still stand; for example we would not make important design changes 3 sprints before going live.

    Read the article

  • Professional Scrum Developer (.NET) Training in London

    - by Martin Hinshelwood
    On the 26th - 30th July in Microsoft’s offices in London Adam Cogan from SSW will be presenting the first Professional Scrum Developer course in the UK. I will be teaching this course along side Adam and it is a fantastic experience. You are split into teams and go head-to-head to deliver units of potentially shippable work in four two hour sprints. The Professional Scrum Developer course is the only course endorsed by both Microsoft and Ken Schwaber and they have worked together very effectively in brining this course to fruition. This course is the brain child of Richard Hundhausen, a Microsoft Regional Director, and both Adam and I attending the Trainer Prep in Sydney when he was there earlier this year. He is a fantastic trainer and no matter where you do this course you can be safe in the knowledge that he has trained and vetted all of the teachers. A tools version of Ken if you will Find a course and register Download this syllabus Download the Scrum Guide What is the Professional Scrum Developer course all about? Professional Scrum Developer course is a unique and intensive five-day experience for software developers. The course guides teams on how to turn product requirements into potentially shippable increments of software using the Scrum framework, Visual Studio 2010, and modern software engineering practices. Attendees will work in self-organizing, self-managing teams using a common instance of Team Foundation Server 2010. Who should attend this course? This course is suitable for any member of a software development team – architect, programmer, database developer, tester, etc. Entire teams are encouraged to attend and experience the course together, but individuals are welcome too. Attendees will self-organize to form cross-functional Scrum teams. These teams require an aggregate of skills specific to the selected case study. Please see the last page of this document for specific details. Product Owners, ScrumMasters, and other stakeholders are welcome too, but keep in mind that everyone who attends will be expected to commit to work and pull their weight on a Scrum team. What should you know by the end of the course? Scrum will be experienced through a combination of lecture, demonstration, discussion, and hands-on exercises. Attendees will learn how to do Scrum correctly while being coached and critiqued by the instructor, in the following topic areas: Form effective teams Explore and understand legacy “Brownfield” architecture Define quality attributes, acceptance criteria, and “done” Create automated builds How to handle software hotfixes Verify that bugs are identified and eliminated Plan releases and sprints Estimate product backlog items Create and manage a sprint backlog Hold an effective sprint review Improve your process by using retrospectives Use emergent architecture to avoid technical debt Use Test Driven Development as a design tool Setup and leverage continuous integration Use Test Impact Analysis to decrease testing times Manage SQL Server development in an Agile way Use .NET and T-SQL refactoring effectively Build, deploy, and test SQL Server databases Create and manage test plans and cases Create, run, record, and play back manual tests Setup a branching strategy and branch code Write more maintainable code Identify and eliminate people and process dysfunctions Inspect and improve your team’s software development process What does the week look like? This course is a mix of lecture, demonstration, group discussion, simulation, and hands-on software development. The bulk of the course will be spent working as a team on a case study application delivering increments of new functionality in mini-sprints. Here is the week at a glance: Monday morning and most of the day Friday will be spent with the computers powered off, so you can focus on sharpening your game of Scrum and avoiding the common pitfalls when implementing it. The Sprints Timeboxing is a critical concept in Scrum as well as in this course. We expect each team and student to understand and obey all of the timeboxes. The timebox duration will always be clearly displayed during each activity. Expect the instructor to enforce it. Each of the ½ day sprints will roughly follow this schedule: Component Description Minutes Instruction Presentation and demonstration of new and relevant tools & practices 60 Sprint planning meeting Product owner presents backlog; each team commits to delivering functionality 10 Sprint planning meeting Each team determines how to build the functionality 10 The Sprint The team self-organizes and self-manages to complete their tasks 120 Sprint Review meeting Each team will present their increment of functionality to the other teams = 30 Sprint Retrospective A group retrospective meeting will be held to inspect and adapt 10 Each team is expected to self-organize and manage their own work during the sprint. Pairing is highly encouraged. The instructor/product owner will be available if there are questions or impediments, but will be hands-off by default. You should be prepared to communicate and work with your team members in order to achieve your sprint goal. If you have development-related questions or get stuck, your partner or team should be your first level of support. Module 1: INTRODUCTION This module provides a chance for the attendees to get to know the instructors as well as each other. The Professional Scrum Developer program, as well as the day by day agenda, will be explained. Finally, the Scrum team will be selected and assembled so that the forming, storming, norming, and performing can begin. Trainer and student introductions Professional Scrum Developer program Agenda Logistics Team formation Retrospective Module 2: SCRUMDAMENTALS This module provides a level-setting understanding of the Scrum framework including the roles, timeboxes, and artifacts. The team will then experience Scrum firsthand by simulating a multi-day sprint of product development, including planning, review, and retrospective meetings. Scrum overview Scrum roles Scrum timeboxes (ceremonies) Scrum artifacts Simulation Retrospective It’s required that you read Ken Schwaber’s Scrum Guide in preparation for this module and course. MODULE 3: IMPLEMENTING SCRUM IN VISUAL STUDIO 2010 This module demonstrates how to implement Scrum in Visual Studio 2010 using a Scrum process template*. The team will learn the mapping between the Scrum concepts and how they are implemented in the tool. After connecting to the shared Team Foundation Server, the team members will then return to the simulation – this time using Visual Studio to manage their product development. Mapping Scrum to Visual Studio 2010 User Story work items Task work items Bug work items Demonstration Simulation Retrospective Module 4: THE CASE STUDY In this module the team is introduced to their problem domain for the week. A kickoff meeting by the Product Owner (the instructor) will set the stage for the why and what that will take during the upcoming sprints. The team will then define the quality attributes of the project and their definition of “done.” The legacy application code will be downloaded, built, and explored, so that any bugs can be discovered and reported. Introduction to the case study Download the source code, build, and explore the application Define the quality attributes for the project Define “done” How to file effective bugs in Visual Studio 2010 Retrospective Module 5: HOTFIX This module drops the team directly into a Brownfield (legacy) experience by forcing them to analyze the existing application’s architecture and code in order to locate and fix the Product Owner’s high-priority bug(s). The team will learn best practices around finding, testing, fixing, validating, and closing a bug. How to use Architecture Explorer to visualize and explore Create a unit test to validate the existence of a bug Find and fix the bug Validate and close the bug Retrospective Module 6: PLANNING This short module introduces the team to release and sprint planning within Visual Studio 2010. The team will define and capture their goals as well as other important planning information. Release vs. Sprint planning Release planning and the Product Backlog Product Backlog prioritization Acceptance criteria and tests Sprint planning and the Sprint Backlog Creating and linking Sprint tasks Retrospective At this point the team will have the knowledge of Scrum, Visual Studio 2010, and the case study application to begin developing increments of potentially shippable functionality that meet their definition of done. Module 7: EMERGENT ARCHITECTURE This module introduces the architectural practices and tools a team can use to develop a valid design on which to develop new functionality. The teams will learn how Scrum supports good architecture and design practices. After the discussion, the teams will be presented with the product owner’s prioritized backlog so that they may select and commit to the functionality they can deliver in this sprint. Architecture and Scrum Emergent architecture Principles, patterns, and practices Visual Studio 2010 modeling tools UML and layer diagrams SPRINT 1 Retrospective Module 8: TEST DRIVEN DEVELOPMENT This module introduces Test Driven Development as a design tool and how to implement it using Visual Studio 2010. To maximize productivity and quality, a Scrum team should setup Continuous Integration to regularly build every team member’s code changes and run regression tests. Refactoring will also be defined and demonstrated in combination with Visual Studio’s Test Impact Analysis to efficiently re-run just those tests which were impacted by refactoring. Continuous integration Team Foundation Build Test Driven Development (TDD) Refactoring Test Impact Analysis SPRINT 2 Retrospective Module 9: AGILE DATABASE DEVELOPMENT This module lets the SQL Server database developers in on a little secret – they can be agile too. By using the database projects in Visual Studio 2010, the database developers can join the rest of the team. The students will see how to apply Agile database techniques within Visual Studio to support the SQL Server 2005/2008/2008R2 development lifecycle. Agile database development Visual Studio database projects Importing schema and scripts Building and deploying Generating data Unit testing SPRINT 3 Retrospective Module 10: SHIP IT Teams need to know that just because they like the functionality doesn’t mean the Product Owner will. This module revisits acceptance criteria as it pertains to acceptance testing. By refining acceptance criteria into manual test steps, team members can execute the tests, recording the results and reporting bugs in a number of ways. Manual tests will be defined and executed using the Microsoft Test Manager tool. As the Sprint completes and an increment of functionality is delivered, the team will also learn why and when they should create a branch of the codeline. Acceptance criteria Testing in Visual Studio 2010 Microsoft Test Manager Writing and running manual tests Branching SPRINT 4 Retrospective Module 11: OVERCOMING DYSFUNCTION This module introduces the many types of people, process, and tool dysfunctions that teams face in the real world. Many dysfunctions and scenarios will be identified, along with ideas and discussion for how a team might mitigate them. This module will enable you and your team to move toward independence and improve your game of Scrum when you depart class. Scrum-butts and flaccid Scrum Best practices working as a team Team challenges ScrumMaster challenges Product Owner challenges Stakeholder challenges Course Retrospective What will be expected of you and you team? This is a unique course in that it’s technically-focused, team-based, and employs timeboxes. It demands that the members of the teams self-organize and self-manage their own work to collaboratively develop increments of software. All attendees must commit to: Pay attention to all lectures and demonstrations Participate in team and group discussions Work collaboratively with other team members Obey the timebox for each activity Commit to work and do your best to deliver All teams should have these skills: Understanding of Scrum Familiarity with Visual Studio 201 C#, .NET 4.0 & ASP.NET 4.0 experience*  SQL Server 2008 development experience Software testing experience * Check with the instructor ahead of time for the exact technologies Self-organising teams Another unique attribute of this course is that it’s a technical training class being delivered to teams of developers, not pairs, and not individuals. Ideally, your actual software development team will attend the training to ensure that all necessary skills are covered. However, if you wish to attend an open enrolment course alone or with just a couple of colleagues, realize that you may be placed on a team with other attendees. The instructor will do his or her best to ensure that each team is cross-functional to tackle the case study, but there are no guarantees. You may be required to try a new role, learn a new skill, or pair with somebody unfamiliar to you. This is just good Scrum! Who should NOT take this course? Because of the nature of this course, as explained above, certain types of people should probably not attend this course: Students requiring command and control style instruction – there are no prescriptive/step-by-step (think traditional Microsoft Learning) labs in this course Students who are unwilling to work within a timebox Students who are unwilling to work collaboratively on a team Students who don’t have any skill in any of the software development disciplines Students who are unable to commit fully to their team – not only will this diminish the student’s learning experience, but it will also impact their team’s learning experience Find a course and register Download this syllabus Download the Scrum Guide Technorati Tags: Scrum,SSW,Pro Scrum Dev

    Read the article

  • Agile development challenges

    - by Bob
    With Scrum / user story / agile development, how does one handle scheduling out-of-sync tasks that are part of a user story? We are a small gaming company working with a few remote consultants who do graphics and audio work. Typically, graphics work should be done at least a week (sometimes 2 weeks) in advance of the code so that it's ready for integration. However, since SCRUM is supposed to focus on user stories, how should I split the stories across iteration so that they still follow the user story model? Ideally, a user story should be completed by all the team members in the same iteration, I feel that splitting them in any way violates the core principle of user story driven development. Also, one front end developer can work at 2X pace of backend developers. However, that throws the scheduling out of sync as well because he is either constantly ahead of them or what we have done is to have him work on tasks that not specific to this iteration just to keep busy. Either way, it's the same issue as above, splitting up user story tasks. If someone can recommend an active Google agile development group that discusses these and other issues, that'll be great. Also, if you know of a free alternative to Pivotal Labs, let me know as well. I'm looking now at Agilo.

    Read the article

  • Building The Right SharePoint Team For Your Organization

    - by Mark Rackley
    I see the question posted fairly often asking what kind SharePoint team an organization should have. How many people do I need? What roles do I need to fill? What is best for my organization? Well, just like every other answer in SharePoint, the correct answer is “it depends”. Do you ever get sick of hearing that??? I know I do… So, let me give you my thoughts and opinions based upon my experience and what I’ve seen and let you come to your own conclusions. What are the possible SharePoint roles? I guess the first thing you need to understand are the different roles that exist in SharePoint (and their are LOTS). Remember, SharePoint is a massive beast and you will NOT find one person who can do it all. If you are hoping to find that person you will be sorely disappointed. For the most part this is true in SharePoint 2007 and 2010. However, generally things are improved in 2010 and easier for junior individuals to grasp. SharePoint Administrator The absolutely positively only role that you should not be without no matter the size of your organization or SharePoint deployment is a SharePoint administrator. These guys are essential to keeping things running and figuring out what’s wrong when things aren’t running well. These unsung heroes do more before 10 am than I do all day. The bad thing is, when these guys are awesome, you don’t even know they exist because everything is running so smoothly. You should definitely invest some time and money here to make sure you have some competent if not rockstar help. You need an admin who truly loves SharePoint and will go that extra mile when necessary. Let me give you a real world example of what I’m talking about: We have a rockstar admin… and I’m sure she’s sick of my throwing her name around so she’ll just have to live with remaining anonymous in this post… sorry Lori… Anyway! A couple of weeks ago our Server teams came to us and said Hi Lori, I’m finalizing the MOSS servers and doing updates that require a restart; can I restart them? Seems like a harmless request from your server team does it not? Sure, go ahead and apply the patches and reboot during our scheduled maintenance window. No problem? right? Sounded fair to me… but no…. not to our fearless SharePoint admin… I need a complete list of patches that will be applied. There is an update that is out there that will break SharePoint… KB973917 is the patch that has been shown to cause issues. What? You mean Microsoft released a patch that would actually adversely affect SharePoint? If we did NOT have a rockstar admin, our server team would have applied these patches and then when some problem occurred in SharePoint we’d have to go through the fun task of tracking down exactly what caused the issue and resolve it. How much time would that have taken? If you have a junior SharePoint admin or an admin who’s not out there staying on top of what’s going on you could have spent days tracking down something so simple as applying a patch you should not have applied. I will even go as far to say the only SharePoint rockstar you NEED in your organization is a SharePoint admin. You can always outsource really complicated development projects or bring in a rockstar contractor every now and then to make sure you aren’t way off track in other areas. For your day-to-day sanity and to keep SharePoint running smoothly, you need an awesome Admin. Some rockstars in this category are: Ben Curry, Mike Watson, Joel Oleson, Todd Klindt, Shane Young, John Ferringer, Sean McDonough, and of course Lori Gowin. SharePoint Developer Another essential role for your SharePoint deployment is a SharePoint developer. Things do start to get a little hazy here and there are many flavors of “developers”. Are you writing custom code? using SharePoint Designer? What about SharePoint Branding?  Are all of these considered developers? I would say yes. Are they interchangeable? I’d say no. Development in SharePoint is such a large beast in itself. I would say that it’s not so large that you can’t know it all well, but it is so large that there are many people who specialize in one particular category. If you are lucky enough to have someone on staff who knows it all well, you better make sure they are well taken care of because those guys are ready-made to move over to a consulting role and charge you 3 times what you are probably paying them. :) Some of the all-around rockstars are Eric Shupps, Andrew Connell (go Razorbacks), Rob Foster, Paul Schaeflein, and Todd Bleeker SharePoint Power User/No-Code Solutions Developer These SharePoint Swiss Army Knives are essential for quick wins in your organization. These people can twist the out-of-the-box functionality to make it do things you would not even imagine. Give these guys SharePoint Designer, jQuery, InfoPath, and a little time and they will create views, dashboards, and KPI’s that will blow your mind away and give your execs the “wow” they are looking for. Not only can they deliver that wow factor, but they can mashup, merge, and really help make your SharePoint application usable and deliver an overall better user experience. Before you hand off a project to your SharePoint Custom Code developer, let one of these rockstars look at it and show you what they can do (in probably less time). I would say the second most important role you can fill in your organization is one of these guys. Rockstars in this category are Christina Wheeler, Laura Rogers, Jennifer Mason, and Mark Miller SharePoint Developer – Custom Code If you want to really integrate SharePoint into your legacy systems, or really twist it and make it bend to your will, you are going to have to open up Visual Studio and write some custom code.  Remember, SharePoint is essentially just a big, huge, ginormous .NET application, so you CAN write code to make it do ANYTHING, but do you really want to spend the time and effort to do so? At some point with every other form of SharePoint development you are going to run into SOME limitation (SPD Workflows is the big one that comes to mind). If you truly want to knock down all the walls then custom development is the way to go. PLEASE keep in mind when you are looking for a custom code developer that a .NET developer does NOT equal a SharePoint developer. Just SOME of the things these guys write are: Custom Workflows Custom Web Parts Web Service functionality Import data from legacy systems Export data to legacy systems Custom Actions Event Receivers Service Applications (2010) These guys are also the ones generally responsible for packaging everything up into solution packages (you are doing that, right?). Rockstars in this category are Phil Wicklund, Christina Wheeler, Geoff Varosky, and Brian Jackett. SharePoint Branding “But it LOOKS like SharePoint!” Somebody call the WAAAAAAAAAAAAHMbulance…   Themes, Master Pages, Page Layouts, Zones, and over 2000 styles in CSS.. these guys not only have to be comfortable with all of SharePoint’s quirks and pain points when branding, but they have to know it TWICE for publishing and non-publishing sites.  Not only that, but these guys really need to have an eye for graphic design and be able to translate the ramblings of business into something visually stunning. They also have to be comfortable with XSLT, XML, and be able to hand off what they do to your custom developers for them to package as solutions (which you are doing, right?). These rockstars include Heater Waterman, Cathy Dew, and Marcy Kellar SharePoint Architect SharePoint Architects are generally SharePoint Admins or Developers who have moved into more of a BA role? Is that fair to say? These guys really have a grasp and understanding for what SharePoint IS and what it can do. These guys help you structure your farms to meet your needs and help you design your applications the correct way. It’s always a good idea to bring in a rockstar SharePoint Architect to do a sanity check and make sure you aren’t doing anything stupid.  Most organizations probably do not have a rockstar architect on staff. These guys are generally brought in at the deployment of a farm, upgrade of a farm, or for large development projects. I personally also find architects very useful for sitting down with the business to translate their needs into what SharePoint can do. A good architect will be able to pick out what can be done out-of-the-box and what has to be custom built and hand those requirements to the development Staff. Architects can generally fill in as an admin or a developer when needed. Some rockstar architects are Rick Taylor, Dan Usher, Bill English, Spence Harbar, Neil Hodgkins, Eric Harlan, and Bjørn Furuknap. Other Roles / Specialties On top of all these other roles you also get these people who specialize in things like Reporting, BDC (BCS in 2010), Search, Performance, Security, Project Management, etc... etc... etc... Again, most organizations will not have one of these gurus on staff, they’ll just pay out the nose for them when they need them. :) SharePoint End User Everyone else in your organization that touches SharePoint falls into this category. What they actually DO in SharePoint is determined by your governance and what permissions you give these guys. Hopefully you have these guys on a fairly short leash and are NOT giving them access to tools like SharePoint Designer. Sadly end users are the ones who truly make your deployment a success by using it, but are also your biggest enemy in breaking it.  :)  We love you guys… really!!! Okay, all that’s fine and dandy, but what should MY SharePoint team look like? It depends! Okay… Are you just doing out of the box team sites with no custom development? Then you are probably fine with a great Admin team and a great No-Code Solution Development team. How many people do you need? Depends on how busy you can keep them. Sorry, can’t answer the question about numbers without knowing your specific needs. I can just tell you who you MIGHT need and what they will do for you. I’ll leave you with what my ideal SharePoint Team would look like for a particular scenario: Farm / Organization Structure Dev, QA, and 2 Production Farms. 5000 – 10000 Users Custom Development and Integration with legacy systems Team Sites, My Sites, Intranet, Document libraries and overall company collaboration Team Rockstar SharePoint Administrator 2-3 junior SharePoint Administrators SharePoint Architect / Lead Developer 2 Power User / No-Code Solution Developers 2-3 Custom Code developers Branding expert With a team of that size and skill set, they should be able to keep a substantial SharePoint deployment running smoothly and meet your business needs. This does NOT mean that you would not need to bring in contract help from time to time when you need an uber specialist in one area. Also, this team assumes there will be ongoing development for the life of your SharePoint farm. If you are just going to be doing sporadic custom development, it might make sense to partner with an awesome firm that specializes in that sort of work (I can give you the name of a couple if you are interested).  Again though, the size of your team depends on the number of requests you are receiving and how much active deployment you are doing. So, don’t bring in a team that looks like this and then yell at me because they are sitting around with nothing to do or are so overwhelmed that nothing is getting done. I do URGE you to take the proper time to asses your needs and determine what team is BEST for your organization. Also, PLEASE PLEASE PLEASE do not skimp on the talent. When it comes to SharePoint you really do get what you pay for when it comes to employees, contractors, and software.  SharePoint can become absolutely critical to your business and because you skimped on hiring a developer he created a web part that brings down the farm because he doesn’t know what he’s doing, or you hire an admin who thinks it’s fine to stick everything in the same Content Database and then can’t figure out why people are complaining. SharePoint can be an enormous blessing to an organization or it’s biggest curse. Spend the time and money to do it right, or be prepared to spending even more time and money later to fix it.

    Read the article

  • Cannot create a project TFS 2012 - TF218027

    - by GrandMasterFlush
    I've just installed TFS2012 and am trying to create a new project in the default collection via Visual Studio 2012 but I keep getting this error message: TF218027: The following reporting folder could not be created on the server that is running SQL Server Reporting Services: /TfsReports/DefaultCollection. The report server is located at: http://<servername>/Reports. The error is: The permissions granted to user '<domain>/grandmasterflush' are insufficient for performing this operation.. Verify that the path is correct and that you have sufficient permissions to create the folder on that server and then try again. I've checked the permissions and my user is a member of the Project Collection Administrators and the Project Collection Administrators group has the 'Create new project' permission set to allow. The only thing I think it might be is that the user that I created during installation for the Sharepoint access and reports viewing does not have permission to write to the reports folder, however if I select "Do not configure a SharePoint site at this time" then I still get the error messages. I can't find the reports folder to check the permissions either. TFS is using an instance of SQL 2012 that was already on the machine when TFS was installed. Can anyone see what I'm doing wrong please?

    Read the article

< Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >