Search Results

Search found 3986 results on 160 pages for 'financial planning'.

Page 13/160 | < Previous Page | 9 10 11 12 13 14 15 16 17 18 19 20  | Next Page >

  • Is there a "rigorous" method for choosing a database?

    - by Andrew Martin
    I'm not experienced with NoSQL, but one person on my team is calling for its use. I believe our data and its usage isn't optimal for a NoSQL implementation. However, my understanding is based off reading various threads on various websties. I'd like to get some stronger evidence as to who's correct. My question is therefore, "Is there a technique for estimating the performance and requirements of a certain database, that I could use to confirm or modify my intuitions?". Is there, for example, a good book for calculating the performance of equivalent MongoDB/MySQL schema? Is the only really reliable option to build the whole thing and take metrics?

    Read the article

  • Spreadsheet functions to query route planner for travel time/distance

    - by Rich
    I would like to achieve something whereby I have a spreadsheet such that the columns are: Column A - place name Column B - place name Column C - distance by road between places in columns A and B Column D - travel time by road between places in columns A and B I thought it might be possible using Google Docs' spreadsheet and its 'Google' functions, but I've not found any that might do the trick. In the end I could knock up an app to do it using the Google Maps API but would rather avoid it if I can.

    Read the article

  • "Hostile" network in the company - please comment on a security setup

    - by TomTom
    I have a little specific problem here that I want (need) to solve in a satisfactory way. My company has multiple (IPv4) networks that are controlled by our router sitting in the middle. Typical smaller shop setup. There is now one additional network that has an IP Range OUTSIDE of our control, connected to the internet with another router OUTSIDE of our control. Call it a project network that is part of another companies network and combined via VPN they set up. This means: They control the router that is used for this network and They can reconfigure things so that they can access the machines in this network. The network is physically split on our end through some VLAN capable switches as it covers three locations. At one end there is the router the other company controls. I Need / want to give the machines used in this network access to my company network. In fact, it may be good to make them part of my active directory domain. The people working on those machines are part of my company. BUT - I need to do so without compromising the security of my company network from outside influence. Any sort of router integration using the externally controlled router is out by this idea So, my idea is this: We accept the IPv4 address space and network topology in this network is not under our control. We seek alternatives to integrate those machines into our company network. The 2 concepts I came up with are: Use some sort of VPN - have the machines log into VPN. Thanks to them using modern windows, this could be transparent DirectAccess. This essentially treats the other IP space not different than any restaurant network a laptop of the company goes in. Alternatively - establish IPv6 routing to this ethernet segment. But - and this is a trick - block all IPv6 packets in the switch before they hit the third party controlled router, so that even IF they turn on IPv6 on that thing (not used now, but they could do it) they would get not a single packet. The switch can nicely do that by pulling all IPv6 traffic coming to that port into a separate VLAN (based on ethernet protocol type). Anyone sees a problem with using he switch to isolate the outer from IPv6? Any security hole? It is sad we have to treat this network as hostile - would be a lot easier - but the support personnel there is of "known dubious quality" and the legal side is clear - we can not fulfill our obligations when we integrate them into our company while they are under a jurisdiction we don't have a say in.

    Read the article

  • Custom DHCP Server on home network

    - by DanSpd
    Hello I have a computer network at my house which consists of two computers and one server. I have a software on dedicated server which requires direct connection to internet (port forwarding doesn't work for this). So I plan to setup network in following way. link text Please let me know if this will work. How good or bad could this be? Internet Connection: Verizon Fios 25/25

    Read the article

  • Custom DHCP Server on home network

    - by DanSpd
    Hello I have a computer network at my house which consists of two computers and one server. I have a software on dedicated server which requires direct connection to internet (port forwarding doesn't work for this). So I plan to setup network in following way. link text Please let me know if this will work. How good or bad could this be? Internet Connection: Verizon Fios 25/25

    Read the article

  • Is it possible create a 4TB bootable partition in the x86 edition of Windows Server 2003 Enterprise?

    - by Giffyguy
    I'd like to find out if there is any way to accomplish this, since it would benifit my storage server greatly. I am using a Promise FastTrak 8660 and five Seagate ST31000340NS 1TB drives in a RAID 5 array. I figure that if the x86 ENTERPRISE edition of Server 2003 can handle 64GB of RAM, it should have no problem supporting larger HDD volumes as well. I've read (somewhere...) that the Windows Server operating systems are not limited to the standard 2TB like Windows XP and 2000 are. I'm hoping it's something that just needs to be turned on, similar to the way PAE works for the 4GB RAM limit in x86 servers.

    Read the article

  • Anyone know a good mind mapper that works with a scheduler?

    - by GLycan
    TL;DR: Mind mapping tasks to be processed into a schedule based on task metadata. I have all sorts of ideas about what to invest resources (mainly time) in, but when I actually have time to do something I useually end up browsing reddit for not knowing what do to, and the frequancy with which I forget deadlines scares me. I'd love to bring order and structure into my mind, and always know what to do next. So, I want a mind mapping app, where I'd give each branch (types and subtypes of things I want to do) a importance score (if there were two branches, and one had 60 while the other 40, they would respectivily get 60% and 40% of the parent's importance, with the root being 100) and a how soon that branch should be revised/updated (an hobby I want to try out might be checked, say, once a week, while a school subject should be checked once a day) and give each leaf (something I want/need to do) how much time it takes, deadline (if any), and optionally an absolute importance, reoccurrence (guitar practice might repeat once a week), and prerequisites (reading something requires that book (although that could be brought somewhere), coding requires a box, jogging requires being outside) and maybe some other flags, like if it's enjoyable or not. It should either be packaged or working with a schedular app, to which I'd say, look, my day works this way (completely busy from 8 to 9:15, then 15 minutes of being inside with nothing, ..., two hours with box and possibility to go outside, etc), saying that such-and-such pattern is school and happens ever weekday except such-and-such days. The output should be of the form of a schedule, fit for printing or, when I finally get an android, mobile viewing, that schedules tasks with regards to availability of resources and importance (importance being derived from the leaf-task's parent branches), and the set of flags (all work and no play makes me a dull boy). One of these tasks should be reviewing anything that should be updated on that day, including future day layouts (e.g, if the time slots of future days have changed. This should be done every day.) Does anyone know some collection of preferably open-source (or free, or pirateable) tools, or better yet a single one, that accomplishes this task? I know python pretty well, and should be able to write any necessary glue.

    Read the article

  • Pros and Cons of using internal or external domain name for Active Directory

    - by MadBoy
    I was always thought to use internal domain name (company.local or company.corp) for Active Directory instead of (company.com or company.pl). Recently we were thinking that by using external domain name we can get some advantages for stuff like certificates for Exchange, Sharepoint and alike where internal and external name would be exactly the same making it unnecessary to buy special certificates. What are advantages and disadvantages for both? What could be potential problem when doing so and what could be a big advantage?

    Read the article

  • Programmatically query route planner for travel time/distance?

    - by Rich
    Hi I would like to achieve something whereby I have a spreadsheet such that the columns are: Column A - place name Column B - place name Column C - distance by road between places in columns A and B Column D - travel time by road between places in columns A and B I thought it might be possible using Google Docs' spreadsheet and its 'Google' functions, but I've not found any that might do the trick. In the end I could knock up an app to do it using the Google Maps API but would rather avoid it if I can. Thanks in advance for any suggestions. Rich

    Read the article

  • Replacing a Windows File Server

    - by Keltari
    We have a Windows file server that needs to be replaced. Unfortunately, there are to many custom build applications, shares, and random things that rely on the existence of that file server to just stand up a new one, so we need to make the transition as seamless as possible. We decided to copy the contents of the old server to the new and then rename the new one with the same name. I have made a list of everything I need to do. Am I missing anything? The new file server is up and running I copied the directories of the old file server to the new one I set up all the shares/permissions for those directories in advance Copy the contents from oldserver to newserver robocopy \vash\d$\nasshare\ \vash2\l$\originalvash\nasshare\ /E /ZB /copyall /dcopy:T /FP /x /v /fp /np /mt:8 /eta /log:robocopy.log /tee Rename and reIP oldserver to something else (need it available if something is missing) Rename and reIP newserver to oldserver Obviously, I need to test if shares are working properly. Are there any steps im missing?

    Read the article

  • Looking for personal scheduling software / todo list with rather particular requirements

    - by Cthulhu
    I've been scouring the web for a couple of (my boss') hours, looking for a piece of software that can organize my tasks in two ways. First, I have a list of bullet points / todo items I can do at any given time. Think of stuff like solve issue X, ask X about Y, write documentation about Z, etcetera. Second, I have a number of running projects I'd like to organize better, as in schedule for a certain part of a day of the week. Ideally (I think), my day would be organized as 50% spent on projects and 50% on the other small things. Now, I don't like most calendar applications (such as Outlook & friends), their UI is too 'official', not really easy to move stuff around (in my experience). I don't like most todo lists either, too static and things. I like new, fast and hip software. I've looked at GTD versions of Tiddlywiki, and I like mGSD for one particular feature. You can make lists of tasks and basically give them one of three statusses - Now (nothing required, you can do it right away), Waiting (you need someone or something before you can work on this), or the most gratifying of all, Done. I like that feature because it's a simple todo list, but indicates more accurately the things you can do right now and the things you depend on someone else for to do. Anyways, that's just a small aspect of that program - most of the other things in there I can't find a particularly good use for. If there's something like that (maybe something that works even snappier, cleaner UI), combined with an easy to use bit of scheduling software (optionally separated into two applications, but preferrably not), I think I'd like that. (Besides something like that, I also use several instances of Trac to monitor tasks and bugs and things for the various clients and projects I have to serve, and TaskCoach to monitor the amount of time I spend on each task / each client. An easy / low-maintenance time tracking software would be neat too) Of course, the software has to be free to use. I don't like shareware, trials, limited software and the like. I could develop my own too, but I'm lazy like that and there's a dozen other projects I'd like to do in my free time (neither of which I actually do). Edit: I like David Seah's printable CEO stuff, if something like that (with some video game / instant achievement / gratification) exists in software, it'd be awesome.

    Read the article

  • Website Reference about Server Placement

    - by Manuel Faux
    I have to do a student research project about "Server Placement in a Server Room". The paper should contain something like "place the racks about 3 meters away from any wall", "mind the maximum capacity load of the (false) floor" and other placement strategies. I have been searching for a while, but I did not find any reliable reference I can use in my work. Does anyone know some useful websites about server placement?

    Read the article

  • vSphere education - What are the downsides of configuring virtual machines with *too* much RAM?

    - by ewwhite
    VMware memory management seems to be a tricky balancing act. With cluster RAM, Resource Pools, VMware's management techniques (TPS, ballooning, host swapping), in-guest RAM utilization, swapping, reservations, shares and limits, there are a lot of variables. I'm in a situation where clients are using dedicated vSphere cluster resources. However, they are configuring the virtual machines as though they were on physical hardware. In turn, this means a standard VM build may have 4 vCPUs and 16GB or more of RAM. I come from the school of starting small (1 vCPU, minimal RAM), checking real-world use and adjusting up as necessary. Some examples from a "problem" cluster. Resource pool summary - Looks almost 4:1 overcommitted. Note the high amount of ballooned RAM. Resource allocation - The Worst Case Allocation column shows that these VMs would have access to less than 50% of their configured RAM under constrained conditions. The real-time memory utilization graph of the top VM in the listing above. 4 vCPU and 64GB RAM allocated. It averages under 9GB use. Summary of the same VM What are the downsides of overcommitting and overconfiguring resources (specifically RAM) in vSphere environments? Assuming that the VMs can run in less RAM, is it fair to say that there's overhead to configuring virtual machines with more RAM than they need? What is the counter-argument to: "if a VM has 16GB of RAM allocated, but only uses 4GB, what's the problem??"? E.g. do customers need to be educated? What specific metric should be used to meter RAM usage. Tracking the peaks of "Active" versus time?

    Read the article

  • How many websites can my server potentially hold?

    - by Daniel Kindler
    Sorry for the "noob" question, but... About how many medium-sized websites with average traffic could this server hold? Just like the average website, kind of like a small business site. How many sites could this server hold, but still maintain nice, decent speed? PowerEdge R510 PE R510 Chassis for Up to Four 3.5" Cabled Hard Drives, LED edit Processor Intel® Xeon® E5630 2.53Ghz, 12M Cache,Turbo, HT, 1066MHz Max Mem edit Memory 8GB Memory (4x2GB), 1333MHz Single Ranked UDIMMs for 1 Procs, Optimized edit Operating System SUSE Linux Enterprise Server 10, SP3, Up To 32 CPU Lic, 1 YR Sub, DIB, Media edit Red Hat Enterprise Linux Licensing Hard Drives 250GB 7.2K RPM SATA 3.5" Cabled Hard Drive edit Hard Drives 1TB 7.2K RPM SATA 3.5" Cabled Hard Drive edit Hard Drives 2 X 2TB 7.2K RPM SATA 3.5in Cabled Hard Drive Hard Drive Configuration No RAID, Embedded SATA Controller for x4 Chassis edit Power Supply 480 Watt Non-Redundant Power Supply edit Thank you!

    Read the article

  • Sizing Switches for Storage and Production

    - by Untalented
    Couple questions. Should you always completely separate the storage network switches from production switches or are VLANs fine to segment this traffic? Is there a golden rule here? How do you properly size a switch for your environment based on the specifications the manufacturer provide (Throughput, Forwarding Throughput, Stacking Throughput, Max Mac)? If you have two switch options and one has a maximum Mac address of 8,000 vs. another with 16,0000. What does this really mean to me? How do make sure one vs. another is sized properly for me? Besides VLAN and Jumbo Frame support, is there any other "Must" haves for a virtual environments production or storage networks? There is a wealth of knowledge on sizing SANs and such, but this seems equally important and it's quite challenging to find as much information. -- Just to add some tidbits of information for the environment. This setup above is referring to the data centers which supports two different locations which have about 100 users between the two in total. The storage traffic will be iSCSI and will be 3 ESXi Hosts and one SAN housing about 2.7TB of data. Since there is currently no storage network in place (no SAN), I'm having a hard time regarding #2 to really determine what backplane throughput and switch specifications will be sufficient.

    Read the article

  • How to visualize Feature branches?

    - by crauscher
    We are using separate branches for separate features and we need to visualize these brances. Is there a tool that can help us? We do not need a tool that uses our source-repository to generate the graph. We want to use the tool for planning new branches and for visalizing them.

    Read the article

  • How do we provide valid time estimates during Sprint Planning without doing "too much" design?

    - by Michael Edenfield
    My team is getting up to speed with Scrum, but most of us are more familiar with non-agile or "pseudo-"agile methodologies. The part that is the biggest hurdle for us is running an efficient Sprint Planning meeting where we break our backlog items into tasks, and estimate hours. (I'm using the terminology from the VS2010 Scrum Template; apologies if I use the wrong word somewhere.) When we try to figure out how long a task is going to take, we often fall into the trap of designing the feature at the code level -- table layout, interfaces, etc -- in order to figure out how long that's going to take. I'm pretty sure this is not the appropriate place to be doing that kind of design. We should be scheduling tasks for these design meetings during the sprint. However, we are having trouble figuring out how else to come up with meaningful estimates for the tasks. Are there any practical habits/techniques/etc. for making a judgement call about how long a feature is going to take, without knowing how you plan to implement it? If our time estimates are going to change significantly once the design has been completed, how can we properly budget our Sprint backlog ahead of time? EDIT: Just to clarify, since some of the comments/answers are very valid but I think addressing the wrong question. We know that what we're doing is not right, and that we should be building time into the sprint for this design. Conceptually all of the developers understand that. We also also bringing in a team member with Scrum experience to keep us on track if we start going off into the weeds. The problem is that, without going through this design process, we are finding it difficult to provide concrete time estimates for anything. We are constantly saying things like "well if we design it this way it might take 8 hours but if we end up having to do this other way instead that will take about 32 but it might not be as bad once we start trying to write it...". I also assume that this process will get better once we have some historical velocity to work from, but many of the technologies and architectural patterns we are using are new to us. But if potentially-wildly-wrong estimates are just a natural part of adapting this process then we will just need to recondition ourselves to accept that :)

    Read the article

  • What kind of innovative non-cash financial benefits do I offer to my developers to retain them along with a competitive salary?

    - by Fanatic23
    Stock options don't make much sense, since the company's private. [It still does, if you are a facebook of sorts AND the regulatory system permits sites like secondmarket, but I digress.] I could think of some: Health benefits to parents and parents-in-laws Sponsoring a fuel-saving bike to drive to office Gift cards for occasions like completion of 1, 3, 5 years of service I really could do with more suggestions here. Appreciate 1 response per entry for ease of up-voting.

    Read the article

  • Premera Blue Cross Deploys PeopleSoft Enterprise 9.1 Human Capital Management, Financial Management, Enterprise Learning Management and Enterprise Portal Solutions

    - by jay.richey
    Optimum Solutions Implements Oracle's PeopleSoft Enterprise 9.1 at Premera Blue Cross Premera chose to upgrade to the latest version of PeopleSoft to help the company achieve its strategic goals, which include building and maintaining a skilled employee team that enables the company to deliver highly efficient and valuable service to plan subscribers, sponsors, and healthcare providers. Its decision was influenced by the key capabilities in PeopleSoft Talent Management 9.1, as well as the common technology enhancements for the PeopleSoft PeopleTools 8.50 toolset across all business process areas, which has helped Premera to maximize process automation, increased ease of use, and minimize long term IT support overhead. Read more...

    Read the article

  • What's New in Oracle's EPM System?

    - by jmorourke
    Oracle’s EPM System R11.1.2.2  is now generally available to customers and partners on the download center.  Although the release number doesn’t sound significant, this is a major release of Oracle’s Hyperion EPM Suite with new modules as well as significant enhancements across the suite.  This release was announced back on April 4th as part of Oracle’s Business Analytics Strategy launch, so analytics is a key aspect of the release.  But the three biggest pieces of news in this release are Oracle Hyperion Planning support for the Exalytics In-Memory Machine, the new Project Financial Planning Application and the new Account Reconciliations Manager module. The Oracle Exalytics In-Memory Machine was announced back in October 2011, at Oracle OpenWorld.  It’s the latest installment from Oracle in a line of engineered systems that combine Oracle Sun hardware, with Oracle database and application technologies – in solutions that are designed to provide high scalability and performance for specific tasks.  Exalytics is the first engineered system specifically designed for high performance analytics.  Running in-memory versions of Oracle Essbase, as well as the Oracle TimesTen database and Oracle BI tools, Exalytics provides speed of thought response times for complex analytic processes with advanced visualizations.  Early adopter customers have achieved 5X to 100X faster interactivity and 6X to 10X faster planning cycles.  Hyperion Planning running with Oracle Exalytics will support enterprise-wide planning, budgeting and forecasting with more detailed data, with hundreds to thousands of users across an organization getting speed of thought performance. The new Hyperion Project Financial Planning application delivered with EPM 11.1.2.2 is also great news for Oracle customers.  This application follows on the heels of other special-purpose planning applications that Oracle has delivered for Workforce and Capital Asset planning.  It allows Project Managers to identify project-related expenses and revenues, plan and propose new projects, and track results over time. Finance Managers can evaluate and compare different projects, manage the funding process, monitor and report the actual financial results and impacts of projects and project portfolios. This new application is applicable to capital projects, contract projects and indirect projects like IT and HR projects across all industries.  This application is a great complement to existing Project Management applications, and helps bridge the gap between these applications, and the financial planning and budgeting process. Account reconciliations has to be one of the biggest bottlenecks and risks in the financial close and reporting process, and many organizations rely on spreadsheets and manual processes to perform this critical process.  To help address this problem, Oracle developed an Account Reconciliation Manager module that is being delivered as part of Oracle Hyperion Financial Close Management.   This module helps automate and streamline account reconciliations and eliminates the chances for errors, omissions and fraud.  But unlike standalone account reconciliation packages, it’s integrated with the rest of the Oracle Hyperion Financial Close suite, and can integrate balances from any source system.  This can help alleviate a major bottleneck in the financial close process, increase accuracy and reduce risk, and can complement existing investments in Hyperion Financial Management, as well as Oracle and non-Oracle transaction processing systems. Other enhancements in this release include an enhanced Web 2.0 interface for Hyperion Planning and Hyperion Financial Management (HFM), configurable dimensionality in HFM, new Predictive Planning feature in Hyperion Planning, new Detailed Profitability feature in Hyperion Profitability and Cost Management, new Smart View interface for Hyperion Strategic Finance, and integration of the Hyperion applications with JD Edwards Financials. For more information about Oracle EPM System R11.1.2.2 check out the links below: Press Release:  http://www.oracle.com/us/corporate/press/1575775 Product Information on O.com:  http://www.oracle.com/us/solutions/business-analytics/overview/index.html Product Information on OTN:  http://www.oracle.com/technetwork/middleware/epm/downloads/index.html Webcast Replay:  http://www.oracle.com/us/go/index.html?Src=7317510&Act=65&pcode=WWMK11054701MPP046 Please contact me if you have any questions or need additional information – [email protected]

    Read the article

  • Challenges in Corporate Reporting - New Independent Research

    - by ndwyouell
    Earlier this year, Oracle and Accenture sponsored a global study on trends in financial close and reporting. We surveyed 1,123 finance professionals in large organizations in 12 countries around the world during February and March. Financial Consolidation and Reporting is the most mature aspect of Enterprise Performance Management with mainstream solutions having been around for over 30 years. But of course over this time there have been many changes and very significant increases in regulation. So just what is the current state is Financial Consolidation and Reporting in our major corporations across the world? We commissioned this independent research to find out. Highlights of the result are: •          Seeking change: Businesses recognize they need to invest in financial reporting to address the challenges they currently face. 47 percent of companies have made substantial investments over the last year to the financial close, filing, and reporting processes. •          Ineffective investments: Despite these investments, spreadsheets (72 percent) and e-mails (68 percent) are still being used daily to track and manage reporting, suggesting that new investments are falling short of expectations. •          Increased costs and uncertainty: The situation is so opaque that managers across the finance function are unable to fully understand the financial impact or cost implications of reporting, with 60 percent of respondents admitting they did not know the total cost of managing and publicizing their financial results. •          Persistent challenges: 68 percent of respondents admitted that they have inadequate visibility into reporting processes, while 84 percent of finance managers surveyed said they find it difficult to control the quality of financial data across the entire reporting process. •          Decreased effectiveness: 71 percent of finance managers feel their effectiveness is limited in some way by data-analysis–related issues, while 39 percent of C-level or VP-level respondents say their effectiveness is impaired by limited visibility. •          Missed deadlines: Due to late changes to the chart of accounts, 15 percent of global businesses have missed statutory filings, putting their companies at risk of financial penalties and potentially impacting share value. The report makes it clear that investments made to date by these large organizations around the world have been uneven across the close, reporting, and filing processes, which has led to the challenges these organizations currently face in the overall process. Regardless of whether companies are using a variety of solutions or a single solution, the report shows they continue to witness increased costs, ineffectual data management, and missed reporting, which—in extreme circumstances—can impact a company’s corporate image and share value. The good news is that businesses realize that these problems persist and 86 percent of companies are likely to make a significant investment during the next five years to address these issues. While they should invest, it is critical that they direct investments correctly to address the key issues this research identified: •          Improving data integrity •          Optimizing processes •          Integrating the extended financial close process By addressing these issues and with clear guidance on how to implement the correct business processes, infrastructure, and software solutions, finance teams will find that their reporting processes are much more effective, cost-efficient, and aligned with their performance expectations. To get a copy of the full report: http://www.oracle.com/webapps/dialogue/ns/dlgwelcome.jsp?p_ext=Y&p_dlg_id=11747758&src=7300117&Act=92 To replay a webcast discussing the findings: http://www.cfo.com/webcast.cfm?webcast=14639438&pcode=ORA061912_ORA

    Read the article

< Previous Page | 9 10 11 12 13 14 15 16 17 18 19 20  | Next Page >