Search Results

Search found 1324 results on 53 pages for 'scheduled'.

Page 15/53 | < Previous Page | 11 12 13 14 15 16 17 18 19 20 21 22  | Next Page >

  • LLBLGen Pro v3.0 with Entity Framework v4.0 (12m video)

    Today I recorded a video in which I illustrate some of the database-first functionality available in LLBLGen Pro v3.0. LLBLGen Pro v3.0 also supports model-first functionality, which I hope to illustrate in an upcoming video. LLBLGen Pro v3.0 is currently in beta and is scheduled to RTM some time in May 2010. It supports the following frameworks out of the box, with more scheduled to follow in the coming year: LLBLGen Pro RTL (our own o/r mapper framework), Linq to Sql, NHibernate and Entity Framework...Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • More Maintenance Plan Weirdness

    - by AjarnMark
    I’m not a big fan of the built-in Maintenance Plan functionality in SQL Server.  I like the interface in SQL 2005 better than 2000 (it looks more like building an SSIS package) but it’s still a bit of a black box.  You don’t really know what commands are being run based on the selections you have made, and you can easily make some unwise choices without realizing it, such as shrinking your database on a regular basis.  I really prefer to know exactly what commands and with which options are being run on my servers. Recently I had another very strange thing happen with a Maintenance Plan, this time in SQL 2005, SP3.  I inherited this server and have done a bit of cleanup on it, but had not yet gotten around to replacing the Maintenance Plans with all my own scripts.  However, one of the maintenance plans which was just responsible for doing LOG backups was running more frequently than that system needed, and I thought I would just tweak the schedule a bit.  So I opened the Maintenance Plan and edited the properties of the Subplan, setting a new schedule, saved it and figured all was good to go.  But the next execution of the Scheduled Job that triggers the Maintenance Plan code failed with an error about the Owner of the job.  Specifically the error was, “Unable to determine if the owner (OldDomain\OldDBAUserID) of job MaintenancePlanName.Subplan has server access (reason: Could not obtain information about Windows NT group/user 'OldDomain\OldDBAUserID’..”  I was really confused because I had previously updated all of the jobs to have current accounts as the owners.  At first I thought it was just a fluke, but it happened on the next scheduled cycle so I investigated further and sure enough, that job had the old DBA’s account listed as the owner.  I fixed it and the job successfully ran to completion. Now, I don’t really like mysteries like that, so I did some more testing and verified that, sure enough, just editing the Subplan schedule and saving the Maintenance Job caused the Scheduled Job to be recreated with the old credentials.  I don’t know where it is getting those credentials, but I can only assume that it is the same as the original creator of the Maintenance Plan, and for some reason it insists on using that ID for the job owner.  I looked through the options in SSMA and could not find anything would let me easily set the value that I wanted it to use.  I suspect that if I did something like executing sp_changeobjectowner against the Maintenance Plan that it would use that new ID instead.  I’m sure that there is good reason that it works this way, but rather than mess around with it much more, I’m just going to spend my time rolling out my replacement scripts instead. Chalk this little hidden oddity up as yet one more reason I’m not a fan of Maintenance Plans.

    Read the article

  • Cocos2d update leaking memory

    - by Andrey Chernukha
    I have a weird issue - my app is leaking memory on device only, not on a simulator. It is leaking if i schedule update method anywhere, on any scene. It is leaking despite update method is empty, there's nothing inside it except NSLog. How can it be? I have even scheduled update on the very first scene where it seems there's nothing to leak, and scheduled another empty and it's leaking or not leaking but allocating something, the result is the same - the volume of the memory consumed is increasing and my app is crashing soon. I can detect the leakage via using Instruments-Memory-Activity Monitor or with help of following function: void report_memory(void) { struct task_basic_info info; mach_msg_type_number_t size = sizeof(info); kern_return_t kerr = task_info(mach_task_self(), TASK_BASIC_INFO, (task_info_t)&info, &size); if( kerr == KERN_SUCCESS ) { NSLog(@"Memory in use (in bytes): %u", info.resident_size); } else { NSLog(@"Error with task_info(): %s", mach_error_string(kerr)); } } Can anyone explain me what's going on?

    Read the article

  • The answer to the unfathomable question: what is meaning of error value 2147943645?

    - by Jim Lahman
    I scheduled a task to perform a windows backup of a single disk on the my server.  When I tested it, the task ran successfully – no problems, no errors; just as I expected.    However, when the task ran as scheduled, it failed with error value 2147943645.  I wondered was this the answer to life, the universe and everything in it?  No.  That is 42.    After doing some research and reviewing the task configuration, I realize that the task will only run if the user of logged on:   So, this was the answer!!  I have to configure the task to run whether the user is logged or not.  Or, else I’ll get that nasty error value.

    Read the article

  • Cron job running successfully suddenly reports script is not found

    - by Ted B
    What might cause cron to suddenly report a file it is supposed to run is "not found," when the file hasn't been touched, and in fact, the entire system hasn't been touched since it last ran successfully? I have a cronjob schedule I define by doing sudo crontab -e In it, I have dozens of cron jobs that run successfully.. I do not have a PATH specified, and I use absolute paths to call all my scheduled scripts, setting the PATH in them as needed. I do not specify a SHELL in the crontab. All scripts identify the shell as their first line. Without me touching the system, a particular job defined in the middle of other jobs will suddenly stop running. To debug this, I added an output redirection to a log file. In that, the output clearly shows the output of the script successfully running time after time for weeks, and then suddenly the following appears: /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found /bin/sh: /home/iupress/bin/sync-email_images: not found If I do the ls command, copying and pasting that exact path from the error message, it clearly reports the file is still there (no surprise). Yet the log continues to report that file is "not found" until I take action. I can run the script manually and it runs just fine. If I do sudo crontab -e and save the file, the job runs on the next scheduled time, putting its output in the log, no longer reporting the script is "not found". It seems to me the contents of the script trying to be run are irrelevant since cron doesn't even process the file because it is "not found". I have a job scheduled below the one that is encountering this problem that I know is continuing to run, because I have its output mailed to me. So I know cron is running and continues to run at least one other job, even after it suddenly reports this job's script is "not found". All my lines end with a newline. I had no periods in the crontab until I added the redirection to a log file. I have now added a PATH specification, but left the absolute paths in the jobs. Unfortunately, I have no idea if and when this problem will occur. It will likely be weeks from now. By the way, I am running a script to syncronize the clock, and I see the time is exactly what it should be.

    Read the article

  • .NET mulithreading and quad core processors

    - by w0051977
    I have a single threaded application that runs on a machine with a quad core processor. The scheduled tasks that run VB.NET forms are too slow. I am new to multi threading and parallel computing. If you have a single threaded application that runs on a server with a multi core processor then does the application only ever use one of the processors? What happens if you have multiple scheduled tasks and multiple instances are in memory at the same time? I have read this question on Stackoverflow: http://stackoverflow.com/questions/607775/how-to-write-net-applications-that-utilize-multi-core-processors, but I am still not clear.

    Read the article

  • EE&CIS Oracle University Partner Enablement Update (5th April)

    - by swalker
    Untitled Document Let Oracle University help you become a BI 11g expert! The 5-day Oracle BI Enterprise Edition 11g Implementation Boot Camp has been scheduled exclusively for our partners in Bucharest (Romania) to give them the opportunity to gain differentiation and a competitive advantage today’s market. Oracle BI Enterprise Edition 11g Implementation Bucharest 11-15 June 2012 Click here * Bookmark the EMEA OPN Only Boot Camp schedule web page to view new locations and dates as they are scheduled ** Your OPN discount applies to these bootcamps. Spaces are limited for these events, so register now to guarantee your seat! For a complete list of OPN Bootcamps - both In Class Events and Live Virtual Classes, please refer to the following OPN Schedule. For more information, advice and assistance, please contact us at: Oracle University Romania+4021 3678820 [email protected] oracle.com/ro/education Stay Connected to Oracle University: LinkedIn OracleMix Twitter Facebook Google+

    Read the article

  • HTPC/DVR computer won't go into standby

    - by Robert
    When I select Start-Turn off computer-Standby the 'turn off computer' option window closes, and then nothing else happens. I can start new applications, and Windows acts like I never selected standby. I ran it for several hours after that. If I have a TV program scheduled to record when I select standby I get a window (the Pinnacle TV software) asking if I'm sure, there are programs scheduled to record - and the computer just keeps running after I select yes, never going into standby. I added that detail as it shows the standby process is starting. [This problem also happens if a TV program is not scheduled, so the scheduler task in not running/in memory. This problem happens regardless of whether I'm not watching TV. This problem happens regardless of whether Media Center is running (it usually isn't, I'm using Pinnacle to watch TV).] I looked at "How to troubleshoot hibernation and standby issues in Windows XP" http://support.microsoft.com/kb/907477 - ACPI is enabled, and "standby" is an option in "Power Options Properties." So it appears to be setup correctly. Windows XP SP3 Media Center Edition, all current updates installed.

    Read the article

  • TV won't go into standby

    - by Robert
    When I select Start-Turn off computer-Standby the 'turn off computer' option window closes, and then nothing else happens. I can start new applications, and Windows acts like I never selected standby. I ran it for several hours after that. If I have a TV program scheduled to record when I select standby I get a window (the Pinnacle TV software) asking if I'm sure, there are programs scheduled to record - and the computer just keeps running after I select yes, never going into standby. I added that detail as it shows the standby process is starting. [This problem also happens if a TV program is not scheduled, so the scheduler task in not running/in memory. This problem happens regardless of whether I'm not watching TV. This problem happens regardless of whether Media Center is running (it usually isn't, I'm using Pinnacle to watch TV).] I looked at "How to troubleshoot hibernation and standby issues in Windows XP" http://support.microsoft.com/kb/907477 - ACPI is enabled, and "standby" is an option in "Power Options Properties." So it appears to be setup correctly. Windows XP SP3 Media Center Edition, all current updates installed.

    Read the article

  • Alternative software for Pinnacle PCTV 100e

    - by Stijn Sanders
    I have a Pinnacle PCTV 100e external USB cable television receiver. I've been using Pinnacle's software that came with the card (TVCenter Pro) to record things at given times. Things I don't like is an extremely high CPU load, and that it doesn't seem to halt the screensaver from running when watching in full screen. Also, I was away the last two weeks, and the schedules went terribly bust. Some items were recorded hours before or after the actual scheduled time (and now I missed some shows), and some recurring schedules weren't converted into the next occurrence correctly! Is there good alternative software that would work with my PCTV 100e? (Preferalby cheap or free) I've tried VLC Player, which gets video, but no audio. I've tried MediaPortal, which crashes when trying to scan for channels. When I select a channel manually, the stored mpg has big errors in encoding and is also missing audio. There's VirtualDub, but that doesn't have ready-made scheduled-recording options. This I can conjure some scheduled scripts for, but I've noticed the sync gets awfully wrong after some time. I've tried Windows Media Center, but it doesn't seem to support the PCTV 100e.

    Read the article

  • Computer won't go into standby

    - by Robert
    When I select Start-Turn off computer-Standby the 'turn off computer' option window closes, and then nothing else happens. I can start new applications, and Windows acts like I never selected standby. I ran it for several hours after that. If I have a TV program scheduled to record when I select standby I get a window (the Pinnacle TV software) asking if I'm sure, there are programs scheduled to record - and the computer just keeps running after I select yes, never going into standby. I added that detail as it shows the standby process is starting. [This problem also happens if a TV program is not scheduled, so the scheduler task in not running/in memory. This problem happens regardless of whether I'm not watching TV. This problem happens regardless of whether Media Center is running (it usually isn't, I'm using Pinnacle to watch TV).] I looked at "How to troubleshoot hibernation and standby issues in Windows XP" http://support.microsoft.com/kb/907477 - ACPI is enabled, and "standby" is an option in "Power Options Properties." So it appears to be setup correctly. Windows XP SP3 Media Center Edition, all current updates installed.

    Read the article

  • How can I import tasks into Project that have already been started?

    - by unknown
    I am writing a feature to import tasks from an online bug tracking / project management tool into Microsoft Project, primarily for resource leveling. Currently I am importing all tasks in as Fixed work, and giving them an assignment to a single resource for 100% of the work. The duration is then dynamically calculated, which at import time is equal to the amount of work. However, I am not a project manager by any means, and am having difficulty on how to get the start dates to calculate correctly. I've never used Project either. I am using Schedule From Start and setting the Project Start Date to the date the contract was signed / work was approved. However, this can be in the past, and I do not want current tasks scheduled from that date. Should it be today then? Another problem I have is with tasks that were already started. I have remaining work set, and I was placing a constraint on them to be started on the day the work was first applied. However, the remaining work for the task would be scheduled from that date, which was sometimes in the past. Using task constraints, a project start date, and whatever other settings available to me that I don't know about, what is the correct way to have the tasks scheduled?

    Read the article

  • AlarmManager triggers PendingIntent too soon

    - by Wezelkrozum
    I've searched for 3 days now but didn't find a solution or similar problem/question anywhere else. Here is the deal: Trigger in 1 hour - works correct Trigger in 2 hours - Goes of in 1:23 Trigger in 1 day - Goes of in ~11:00 So why is the AlarmManager so unpredictable and always too soon? Or what am I doing wrong? And is there another way so that it could work correctly? This is the way I register my PendingIntent in the AlarmManager (stripped down): AlarmManager alarmManager = (AlarmManager)parent.getSystemService(ALARM_SERVICE); Intent myIntent = new Intent(parent, UpdateKlasRoostersService.class); PendingIntent pendingIntent = PendingIntent.getService(parent, 0, myIntent, PendingIntent.FLAG_UPDATE_CURRENT); //Set startdate of PendingIntent so it triggers in 10 minutes Calendar start = Calendar.getInstance(); start.setTimeInMillis(SystemClock.elapsedRealtime()); start.add(Calendar.MINUTE, 10); //Set interval of PendingIntent so it triggers every day Integer interval = 1*24*60*60*1000; //Cancel any similar instances of this PendingIntent if already scheduled alarmManager.cancel(pendingIntent); //Schedule PendingIntent alarmManager.setRepeating(AlarmManager.ELAPSED_REALTIME_WAKEUP, start.getTimeInMillis(), interval, pendingIntent); //Old way I used to schedule a PendingIntent, didn't seem to work either //alarmManager.set(AlarmManager.RTC_WAKEUP, start.getTimeInMillis(), pendingIntent); It would be awesome if anyone has a solution. Thanks for any help! Update: 2 hours ago it worked to trigger it with an interval of 2 hours, but after that it triggered after 1:20 hours. It's getting really weird. I'll track the triggers down with a logfile and post it here tomorrow. Update: The PendingIntent is scheduled to run every 3 hours. From the log's second line it seems like an old scheduled PendingIntent is still running: [2012-5-3 2:15:42 519] Updating Klasroosters [2012-5-3 4:15:15 562] Updating Klasroosters [2012-5-3 5:15:42 749] Updating Klasroosters [2012-5-3 8:15:42 754] Updating Klasroosters [2012-5-3 11:15:42 522] Updating Klasroosters But, I'm sure I cancelled the scheduled PendingIntent's before I schedule a new one. And every PendingIntent isn't recreated in the same way, so it should be exactly the same. If not , this threads question isn't relevant anymore.

    Read the article

  • Spring 3: task namespace: How to find out time of next execution?

    - by Bernd Haug
    I have a bean that has a method executed on a schedule using <task:scheduled> in the context configuration. Is there a way for me to find the time of the next scheduled run during execution of that method? The same method is also executed manually, and the mechanism for receiving scheduler information may not break executions from outside the scheduler...

    Read the article

  • How to get details about the DTS Step in a running job?

    - by vikasde
    I have scheduled a DTS to run from a scheduled job. The DTS has several steps in it. Now whenever the job is running and I take a look at the jobs section in Enterprise manager, then it always displays the following in the status: Executing Job Step 1'.... although its running all steps properly. How do I know at what step the DTS is running at?

    Read the article

  • Windows server Task Scheduler, close after?

    - by Probocop
    I have a scheduled task on my server which runs a PHP script every minute. In the 'Run' part of the scheduled task I have the following: "C:\Program Files\Internet Explorer\iexplore.exe" "http://www.example.co.uk/script.php" So when it runs it opens Internet Explorer and browses to that URL. Is it possible to get it to close Internet Explorer after running the script?

    Read the article

  • How To Clear An Alert - Part 2

    - by werner.de.gruyter
    There were some interesting comments and remarks on the original posting, so I decided to do a follow-up and address some of the issues that got raised... Handling Metric Errors First of all, there is a significant difference between an 'error' and an 'alert'. An 'alert' is the violation of a condition (a threshold) specified for a given metric. That means that the Agent is collecting and gathering the data for the metric, but there is a situation that requires the attention of an administrator. An 'error' on the other hand however, is a failure to collect metric data: The Agent is throwing the error because it cannot determine the value for the metric Whereas the 'alert' guarantees continuity of the metric data, an 'error' signals a big unknown. And the unknown aspect of all this is what makes an error a lot more serious than a regular alert: If you don't know what the current state of affairs is, there could be some serious issues brewing that nobody is aware of... The life-cycle of a Metric Error Clearing a metric error is pretty much the same workflow as a metric 'alert': The Agent signals the error after it failed to execute the metric The error is uploaded to the OMS/repository, where it becomes visible in the Console The error will remain active until the Agent is able to execute the metric successfully. Even though the metric is still getting scheduled and executed on a regular basis, the error will remain outstanding as long as the Agent is not capable of executing the metric correctly Knowing this, the way to fix the metric error should be obvious: Take the 'problem' away, and as soon as the metric is executed again (based on the frequency of the metric), the error will go away. The same tricks used to clear alerts can be used here too: Wait for the next scheduled execution. For those metrics that are executed regularly (like every 15 minutes or so), it's just a matter of waiting those minutes to see the updates. The 'Reevaluate Alert' button can be used to force a re-execution of the metric. In case a metric is executed once a day, this will be a better way to make sure that the underlying problem has been solved. And if it has been, the metric error will be removed, and the regular data points will be uploaded to the repository. And just in case you have to 'force' the issue a little: If you disable and re-enable a metric, it will get re-scheduled. And that means a new metric execution, and an update of the (hopefully) fixed problem. Database server-generated alerts and problem checkers There are various ways the Agent can collect metric data: Via a script or a SQL statement, reading a log file, getting a value from an SNMP OID or listening for SNMP traps or via the DBMS_SERVER_ALERTS mechanism of an Oracle database. For those alert which are generated by the database (like tablespace metrics for 10g and above databases), the Agent just 'waits' for the database to report any new findings. If the Agent has lost the current state of the server-side metrics (due to an incomplete recovery after a disaster, or after an improper use of the 'emctl clearstate' command), the Agent might be still aware of an alert that the database no longer has (or vice versa). The same goes for 'problem checker' alerts: Those metrics that only report data if there is a problem (like the 'invalid objects' metric) will also have a problem if the Agent state has been tampered with (again, the incomplete recovery, and after improper use of 'emctl clearstate' are the two main causes for this). The best way to deal with these kinds of mismatches, is to simple disable and re-enable the metric again: The disabling will clear the state of the metric, and the re-enabling will force a re-execution of the metric, so the new and updated results can get uploaded to the repository. Starting 10gR5, the Agent performs additional checks and verifications after each restart of the Agent and/or each state change of the database (shutdown/startup or failover in case of DataGuard) to catch these kinds of mismatches.

    Read the article

  • Unexpected server restart - Windows 2003 SP2 fully patched

    - by PCTech
    I'm having problems with a server that has been restarting itself randomly for the past 3 months. The server is windows 2003 with SP2 Domain Controller and it is fully patched. I have seen the following errors in event log: Source: USER32 Category: None Type: Information Event ID: 1074 User: Domain\Administrator The process winlogon.exe has initiated the restart of computer (server name) on behalf of user domainname\Administrator for the following reason: No title for this reason could be found Reason Code: 0x840000ff Shutdown Type: restart I have ran out of ideas as to what might be causing this issue. The system is clean and not infected. There are no scheduled tasks responsible for the restart either. I'm considering moving the backup (Backup Exec 12.5) to a different server but I'm almost certain that this is not the issue as the restart times vary and do not match the scheduled backup jobs. Any suggestions to help me resolve this issue would be appreciated, thanks.

    Read the article

  • Software for monitoring internal software?

    - by Tyler Eaves
    Is there any good software for monitoring the health of a collection of related software? Requirements are as follows: Web-based, deployable on standard Linux/BSD software. Configurable to support a variety of processes, scheduled at various intervals. Some sort of dashboard interface, for monitoring status, viewing errors, etc. As an example, suppose we have a daily export that's scheduled to run at 6AM each morning. After the export completes, it would POST a status message, saying it had completed, passing in some sort of application key to identify the export. If that status message hadn't come in, by, say, 6:30AM, an e-mail might be sent, that application should go red on the dashboard, etc. Applications should also be able to post error/warning messages. Basically the goal is to be able to monitor all of our internal projects from one system, rather than a multitude of e-mails, log files, etc. I suspect that I'll probably have to end up writing this from scratch, but I just thought I'd ask.

    Read the article

  • Load login shell inside user cronjob

    - by sa125
    I'm trying to run a rake task using a scheduled cronjob. My crontab looks something like this: 0 1 * * 1-7 /bin/bash -l -c "cd ~/jobs/rake && rake reports:create >> ~/jobs/logs/cron.log" Ruby on my account is provided by RVM, which is loaded via ~/.bashrc (before the no-interaction check): # load RVM env [[ -s $HOME/.rvm/scripts/rvm ]] && source $HOME/.rvm/scripts/rvm # If not running interactively, don't do anything [ -z "$PS1" ] && return # ... rest of logic Time and again, this task fails to run since RVM isn't loaded when the task is called (uses system's /usr/bin/ruby instead), and gem dependencies are missing. How can I make crontab load my shell environment before executing my scheduled jobs? thanks.

    Read the article

  • Way to update / refresh / reschedule project plan after adding a vacation / changing calendar

    - by CodeCanvas
    I had created a project plan using MS-Project 2010 (not server). I had set the task schedule mode to "Auto Scheduled" and entered the necessary tasks. Since it is a single person project I also added one person to the Resource of the file and assigned that resource to all the tasks and leveled the project. After the plan was put in and tasks were leveled I figured the calendar was not correctly set (in UAE the weekend is Friday and Saturday instead of Saturday and Sunday). So, I updated the default calendar (Standard) of the project by going to Project-Change Working Time-Work Weeks and changed them as needed. But after doing this, the tasks are still scheduled over Friday and Saturday even though I have marked them as nonworking days in the standard calendar. I tried the following for the tasks to refresh, but I was not successful: Updated all tasks to use the "Standard" calendar in the project Selected option so that tasks do not ignore resource calendars Added a constraint "As Soon As Possible" Executed "Level All" Any help on solving this issue would be much appreciated, thanks in advance.

    Read the article

  • Strange Maintenance Plan SubPlans behaviour: each SP runs all the tasks of all other SP at odd times

    - by Wentu
    SQL Server 2005: I have a problem with scheduling a Maintenance Plan (MP) with 3 subplans (SP). SP1 is scheduled to run hourly, SP2 daily at 7.00 and SP3 on sundays at 8.00 Reading MP history I see that what happened (I know it seems crazy) is: 11: SP1 runs and executes all the tasks of SP1 SP2 and SP3 12: SP2 runs and does the same 13: SP3 runs and does the same 14: SP1 runs and does the same From the job Activity monitor, SP1 has last run time at 14, SP2 and SP3 are never been executed. All of the SP are scheduled correctly in the Job Activity Monitor (SP2 for tomorrow at 7, SP3 for next sunday at 8) Do you have any idea what is happening? Thankx a lot Wentu

    Read the article

  • Windows XP: Consequences of setting a password for an account

    - by sleske
    I do not quite understand how Windows (specifically Windows XP) handles accounts with/without passwords. As far as I can see, on a fresh Windows XP install I have one default account which has admin rights does not have a password will auto-login (without password prompt) when the computer boots What happens if I set a password for this account? Will it still auto-login? Or will it always prompt for the PW? And generally, what consequences does it have if I set a password? I noted that Scheduled Tasks apparently cannot run under an account w/o password (creating a scheduled task will prompt for the account PW). Is there anything that will not work with a password set? Why is it even possible to have accounts without a password? I have some Unix/Linux background, but the concepts appear a little different under Windows.

    Read the article

  • FTP script download from linux to windows

    - by user53864
    I'm using following FTP script on windows xp to download zip files from ubuntu cloud servers. A zip file is created every day on ubutnu servers and I will download it to windows via this ftp script. I run this script everyday manually as I have to edit the last line(mget /usr/backup_02-11-2010.Zip) of the script to match today's date. I want to edit this script so that it will download only today's zip file at the scheduled time without needing to edit it everyday, when scheduled. It's clear that date is appended to the zip files and is in the format dd-mm-yyyy. Need help... open server-ip-here username-here user-password-here lcd C:\Backup\files bin hash prompt mget /usr/backup_02-11-2010.zip

    Read the article

  • critical swap nagios

    - by Toby Joiner
    I installed nagios a very long time ago, and have started trying to use it now. I am getting this error: Current Status: CRITICAL (for 231d 16h 52m 49s) Status Information: SWAP CRITICAL - 100% free (0 MB out of 0 MB) Performance Data: swap=0MB;0;0;0;0 Current Attempt: 4/4 (HARD state) Last Check Time: 01-09-2011 13:26:34 Check Type: ACTIVE Check Latency / Duration: 0.125 / 0.004 seconds Next Scheduled Check: 01-09-2011 13:31:34 Last State Change: 05-22-2010 21:36:47 Last Notification: 01-09-2011 13:01:42 (notification 5521) Is This Service Flapping? NO (0.00% state change) In Scheduled Downtime? NO Last Update: 01-09-2011 13:29:32 ( 0d 0h 0m 4s ago) Is this normal? Should I be concerned? If more info is needed please let me know.

    Read the article

< Previous Page | 11 12 13 14 15 16 17 18 19 20 21 22  | Next Page >