Search Results

Search found 4682 results on 188 pages for 'john the horn'.

Page 158/188 | < Previous Page | 154 155 156 157 158 159 160 161 162 163 164 165  | Next Page >

  • Ruby javascript unescape equivalent

    - by vise
    I want to unescape the following string: '\u00020\u0002Standard\u00023\u0002Doe John\u000169\u0002\u0010\u0002Lorem\u0002\u0011\u0002Ipsum\u0002\u0014\u0002' Javascripts unescape function works ok, however how can I unescape it in ruby? Take in mind that unescape(previousString) is 0Standard3Doe John69LoremIpsum.

    Read the article

  • ESXi VM NTP Server

    - by jstorch
    Hello all. We need to setup an internal NTP server. Because this server will pretty much ONLY be a time server I was thinking of just creating a VM for it. However, Googling around it appears that there there might be serious clock drifting issues with VM servers. So, is running our NTP server in a VM a completely dumb idea? Thanks, John

    Read the article

  • Ignore deleted files in git?

    - by matthavener
    Is it possible to ignore deleted files in git? git update-index --assume-unchanged allows me to ignore modifications, but it still tracks deletions. (This is similar, but I couldn't find where "John Doe" restated his question: http://stackoverflow.com/questions/655243/ignore-modified-but-not-committed-files-in-git)

    Read the article

  • Help Desk Database Design

    - by user237244
    The company I work at has very specific and unique needs for a help desk system, so none of the open source systems will work for us. That being the case, I created a custom system using PHP and MySQL. It's far from perfect, but it's infinitely better than the last system they were using; trust me! It meets most of our needs quite nicely, but I have a question about the way I have the database set up. Here are the main tables: ClosedTickets ClosedTicketSolutions Locations OpenTickets OpenTicketSolutions Statuses Technicians When a user submits a help request, it goes in the "OpenTickets" table. As the technicians work on the problem, they submit entries with a description of what they've done. These entries go in the "OpenTicketSolutions" table. When the problem has been resolved, the last technician to work on the problem closes the ticket and it gets moved to the "ClosedTickets" table. All of the solution entries get moved to the "ClosedTicketSolutions" table as well. The other tables (Locations, Statuses, and Technicians) exist as a means of normalization (each location, status, and technician has an ID which is referenced). The problem I'm having now is this: When I want to view a list of all the open tickets, the SQL statement is somewhat complicated because I have to left join the "Locations", "Statuses", and "Technicians" tables. Fields from various tables need to be searchable as well. Check out how complicated the SQL statement is to search closed tickets for tickets submitted by anybody with a first name containing "John": SELECT ClosedTickets.*, date_format(ClosedTickets.EntryDate, '%c/%e/%y %l:%i %p') AS Formatted_Date, date_format(ClosedDate, '%c/%e/%y %l:%i %p') AS Formatted_ClosedDate, Concat(Technicians.LastName, ', ', Technicians.FirstName) AS TechFullName, Locations.LocationName, date_format(ClosedTicketSolutions.EntryDate, '%c/%e/%y') AS Formatted_Solution_EntryDate, ClosedTicketSolutions.HoursSpent AS SolutionHoursSpent, ClosedTicketSolutions.Tech_ID AS SolutionTech_ID, ClosedTicketSolutions.EntryText FROM ClosedTickets LEFT JOIN Technicians ON ClosedTickets.Tech_ID = Technicians.Tech_ID LEFT JOIN Locations ON ClosedTickets.Location_ID = Locations.Location_ID LEFT JOIN ClosedTicketSolutions ON ClosedTickets.TicketNum = ClosedTicketSolutions.TicketNum WHERE (ClosedTickets.FirstName LIKE '%John%') ORDER BY ClosedDate Desc, ClosedTicketSolutions.EntryDate, ClosedTicketSolutions.Entry_ID One thing that I'm not able to do right now is search both open and closed tickets at the same time. I don't think a union would work in my case. So I'm wondering if I should store the open and closed tickets in the same table and just have a field indicating whether or not the ticket is closed. The only problem I can forsee is that we have so many closed tickets already (nearly 30,000) so the whole system might perform slowly. Would it be a bad idea to combine the open and closed tickets?

    Read the article

  • Load huge sql dump to mySql

    - by jonathan
    Hi I have a huge mysql dump file generated from phpmyAdmin (150 000 lines of create table, inserts....) The mySql query tool fails to open such a big file. As a result i can't insert all the records. Is there a way to do this ? Thanks John

    Read the article

  • Python: Closing a for loop by reading stdout

    - by user1732102
    import os dictionaryfile = "/root/john.txt" pgpencryptedfile = "helloworld.txt.gpg" array = open(dictionaryfile).readlines() for x in array: x = x.rstrip('\n') newstring = "echo " + x + " | gpg --passphrase-fd 0 " + pgpencryptedfile os.popen(newstring) I need to create something inside the for loop that will read gpg's output. When gpg outputs this string gpg: WARNING: message was not integrity protected, I need the loop to close and print Success! How can I do this, and what is the reasoning behind it? Thanks Everyone!

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

  • Failed Administrator login on WSO2 IS with external OpenLDAP

    - by Marco Rivadeneyra
    I have an installation of WSO2 Identity Server and I'm trying to make it work with an external OpenLDAP instance I have followed this guide: http://wso2.org/project/solutions/identity/3.2.3/docs/user-core/admin_guide.html#LDAP For the read-only mode. But when I try to log-in I get a failed login and the following error on the console: TID: [0] [WSO2 Identity Server] [2012-08-10 17:10:25,493] WARN {org.wso2.carbon.core.services.util.CarbonAuthenticationUtil} - Failed Administrator login attempt 'john[0]' at [2012-08-10 17:10:25,0493] from IP address 127.0.0.1 {org.wso2.carbon.core.services.util.CarbonAuthenticationUtil} Full log: http://pastebin.com/pHUGXBqv My configuration file looks as follows: <UserManager> <Realm> <Configuration> <AdminRole>admin</AdminRole> <AdminUser> <UserName>john</UserName> <Password>johnldap</Password> </AdminUser> <EveryOneRoleName>everyone</EveryOneRoleName> <!-- By default users in this role sees the registry root --> <ReadOnly>true</ReadOnly> <MaxUserNameListLength>500</MaxUserNameListLength> <Property name="url">jdbc:h2:repository/database/WSO2CARBON_DB</Property> <Property name="userName">wso2carbon</Property> <Property name="password">wso2carbon</Property> <Property name="driverName">org.h2.Driver</Property> <Property name="maxActive">50</Property> <Property name="maxWait">60000</Property> <Property name="minIdle">5</Property> </Configuration> <UserStoreManager class="org.wso2.carbon.user.core.ldap.LDAPUserStoreManager"> <Property name="ReadOnly">true</Property> <Property name="MaxUserNameListLength">100</Property> <Property name="ConnectionURL">ldap://192.168.81.144:389</Property> <Property name="ConnectionName">cn=admin,dc=example,dc=com</Property> <Property name="ConnectionPassword">admin</Property> <Property name="UserSearchBase">ou=People,dc=example,dc=com</Property> <Property name="UserNameListFilter">(objectClass=inetOrgPerson)</Property> <Property name="UserNameAttribute">uid</Property> <Property name="ReadLDAPGroups">false</Property> <Property name="GroupSearchBase">ou=Groups,dc=example,dc=com</Property> <Property name="GroupSearchFilter">(objectClass=groupOfNames)</Property> <Property name="GroupNameAttribute">uid</Property> <Property name="MembershipAttribute">member</Property> </UserStoreManager> <AuthorizationManager class="org.wso2.carbon.user.core.authorization.JDBCAuthorizationManager"></AuthorizationManager> </Realm> I followed this guide to configure my LDAP server up to Loggging: https://help.ubuntu.com/12.04/serverguide/openldap-server.html Could you suggest what might be wrong? The LDAP log is available at: http://pastebin.com/T9rFYEAW

    Read the article

  • Building Great-Looking, Usable Apps: A two-day workshop applying Oracle’s best UX practices in ADF

    - by mvaughan
    By Misha Vaughan, Oracle Applications User ExperienceI have been with Oracle for more than 12 years. It is a company that has granted me extraordinary creative freedom to help deliver compelling experiences for customers.I am beyond proud to talk about one of the experiences we just took for a test drive. Recently, we delivered a first-of-its-kind, three-team collaboration, train-the-trainer event in Reading, U.K., on building great-looking, usable apps based on Oracle Fusion Applications -- using the ADF tool kit. A new kind of workshopKevin Li, Platform Product Director, asked the Oracle Applications User Experience VP, Jeremy Ashley, if the team had anything to help partners and customers build applications that looked like Fusion. He was receiving this request from European partners and customers.Some quick conversations ensued, and the idea for the workshop was born: We would conduct an experiment.  We would work with feedback from the key Platform Technology Solutions (PTS) trainers under Andre Pavanello, Director, Platform Technology Solutions, in Europe, Middle East, and Africa. We would partner with the ADF team lead by Grant Ronald, Director of Product Management, title> and leverage the Applications UX expertise in Ashley’s team.The goal: Create a pilot workshop that in two days would explain to an ADF developer how to leverage the next-generation user experience best-practices developed for Fusion Apps. Why? Customers who need integrations with Oracle Fusion Applications, who are looking for custom applications that need to co-exist with Fusion, or who quite simply want a next-generation design for a custom app, need their solutions to reflect the next-generation research and design.Building an event for an ADF developerThe biggest hurdle was figuring out where to start.  How far into user experience country do you take an ADF developer? How far into ADF do you need to go if you are a UX professional?After some time in the UX kitchen, the workshop recipe looked like this: Mix equal parts: Fusion user experience design principles and functional design patterns The art and science behind UX How to wireframe designs that you can build in Fusion How to translate those designs into an ADF application Ultan O’Broin, Director of Global User Experience, explaining the trouble ticket wireframe design exerciseLynn Munsinger, Senior Group Product Manager, explaining the follow-on trouble ticket ADF coding exercise For spice, add:•    Debra Lilley, Fujitsu and ACE director, showcasing some of the latest ADF design work in the new face of Fusion Applications •    Partner show-and-tell of example apps they have built with FMW and ADF that are dynamic, beautiful, and interactive.Debra Lilley, Oracle ACE Director and Fujitsu Fusion Champion on the new face of Fusion built with ADF and Fusion extensibility with composers as a window into “the possible”?The taste testThis first go-round of the workshop was aimed squarely at ADF developers and partners.  We were privileged to have participation and feedback from:•    Sten Vesterli, Scott/Tiger S. A., Denmark•    John Sim, Fishbowl Solutions, UK•    Josef Huber, Primus Delphi Group, Munich•    Thaddaus Weindl, Primus Delphi, Group , Munich•    Praveen Pillalamarri, EiS Technologies, Bangalore•    Balaji Kamepalli, EiS Technologies, Bangalore•    Plinio Arbizu, Services & Processes Solutions S. A., Mexico•    Yannick Ongena, infoMENTUM, UK•    Jakub Ciszek, infoMENTUM, UK•    Mauro Flores, infoMENTUM, UK•    Matteo Formica, infoMENTUM, UKRichard Bingham, Oracle, Mauro Flores and Matteo Formica, infoMENTUMWhy is this so exciting?  Oracle has invested heavily in the research and development of the Oracle Fusion Applications user experience. This investment has been and continues to be applied across the product lines. Now, we finally get to teach customers and partners how to take advantage of this investment for custom solutions.This event was a pilot to test-drive the content, as well as a train-the-trainer event that our EMEA colleagues will be using with partners who want to build with Fusion Apps design patterns.What did attendees think?"I liked most the science stuff, like eye-tracking, design patterns and best-practice (color, contrast),” Josef Huber said. “It was a very good introduction to UI design, and most developers and project managers are very bad in that.  So this course would be good for all developers and even project managers." Team Anonymous: John Sim, Fishbowl Solutions, Flavius Sana, Oracle, Josef Huber, infoMENTUM, Mireille Duroussaud, Oracle. Winners of the wireframing design exercise.  Sten Vesterli, of Scott/Tiger, said he attended to learn techniques he could use in his own projects. He wants to ensure that his applications better meet the needs of his users, and he said sessions during the workshop on user interface design and wireframing were most useful to him.  “Go to this event to learn the art and science of good user interfaces from people who really know how to do it,” he said.Sten Vesterli, Scott/Tiger, Angelo Santagata, Oracle Plinio Arbizu said the workshop fulfilled his goals, thanks to the recommendations given in how to design user interfaces to facilitate the adoption of applications among the final users. “The workshop combined these recommendations with an exercise that improved the technical comprehension, permitting the usage of JDeveloper to set forth our solutions,” he said. He added: “The first session that I really enjoyed was the five Fusion design principles. It was incredible to discover how these simple principles were included in an inherit manner in Fusion Applications, and I had been using many of them applying only ADF components.  Another topic that I enjoyed a lot was the eight recommendations about the visual design of UIs. The issues that were raised in that lesson are unknown to the developers and of great value to achieve an attractive presentation layer to the end users.  Participate in this workshop, and include these usability features in your projects and in this manner not only to facilitate and improve the user productivity, but also to distinguish you as a professional who takes advantage fully of the functionalities offered by Oracle technology. Praveen Pillalamarri came to the workshop to learn about the difficulties faced in UI and UX development, and how this can be resolved with the help of ADF.  He also appreciated the opportunity to talk with other individuals who came to the workshop. Pillalmarri said, “The way we looked at things in terms of work and projects were sharpened.  UI and UX design knowledge shared by you was quite interesting, especially the minute things which we ignored in the UI or UX design.” Plinio Arbizu, Services & Processes Solutions S. A., Richard Bingham, Oracle, Balaji Kamepalli, & Praveen Pillalamarri, EiS TechnologiesReady to spread the wordIn EMEA, Oracle customers and partners have access to three world-class trainers via Platform Technology Solutions: Mireille Duroussaud, Flavius Sana, and Angelo Santagata. Contact Andre Pavanello if you like to experience this workshop firsthand, or you have customers or partners who would benefit from the training.We are looking to bring the event to the U.S. in spring 2013. If you have interest in this kind of a workshop, leave a comment below. For those who want to follow the action, join the ADF Enterprise Methodology Group run by Oracle’s Chris Muir. Ask questions and continue with the conversation in this forum, or check blogs.oracle.com/usableapps for topics emerging from the workshop.

    Read the article

  • Creating a multi-column rollover image gallery with HTML 5

    - by nikolaosk
    I know it has been a while since I blogged about HTML 5. I have two posts in this blog about HTML 5. You can find them here and here.I am creating a small content website (only text,images and a contact form) for a friend of mine.He wanted to create a rollover gallery.The whole concept is that we have some small thumbnails on a page, the user hovers over them and they appear enlarged on a designated container/placeholder on a page. I am trying not to use Javascript scripts when I am using effects on a web page and this is what I will be doing in this post.  Well some people will say that HTML 5 is not supported in all browsers. That is true but most of the modern browsers support most of its recommendations. For people who still use IE6 some hacks must be devised.Well to be totally honest I cannot understand why anyone at this day and time is using IE 6.0.That really is beyond me.Well, the point of having a web browser is to be able to ENJOY the great experience that the WE? offers today.  Two very nice sites that show you what features and specifications are implemented by various browsers and their versions are http://caniuse.com/ and http://html5test.com/. At this times Chrome seems to support most of HTML 5 specifications.Another excellent way to find out if the browser supports HTML 5 and CSS 3 features is to use the Javascript lightweight library Modernizr.In this hands-on example I will be using Expression Web 4.0.This application is not a free application. You can use any HTML editor you like.You can use Visual Studio 2012 Express edition. You can download it here. In order to be absolutely clear this is not (and could not be ) a detailed tutorial on HTML 5. There are other great resources for that.Navigate to the excellent interactive tutorials of W3School.Another excellent resource is HTML 5 Doctor.For the people who are not convinced yet that they should invest time and resources on becoming experts on HTML 5 I should point out that HTML 5 websites will be ranked higher than others. Search engines will be able to locate better the content of our site and its relevance/importance since it is using semantic tags. Let's move now to the actual hands-on example. In this case (since I am mad Liverpool supporter) I will create a rollover image gallery of Liverpool F.C legends. I create a folder in my desktop. I name it Liverpool Gallery.Then I create two subfolders in it, large-images (I place the large images in there) and thumbs (I place the small images in there).Then I create an empty .html file called LiverpoolLegends.html and an empty .css file called style.css.Please have a look at the HTML Markup that I typed in my fancy editor package below<!doctype html><html lang="en"><head><title>Liverpool Legends Gallery</title><meta charset="utf-8"><link rel="stylesheet" type="text/css" href="style.css"></head><body><header><h1>A page dedicated to Liverpool Legends</h1><h2>Do hover over the images with the mouse to see the full picture</h2></header><ul id="column1"><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/john-barnes.jpg" alt=""><img class="large" src="large-images/john-barnes-large.jpg" alt=""></a></li><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/ian-rush.jpg" alt=""><img class="large" src="large-images/ian-rush-large.jpg" alt=""></a></li><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/graeme-souness.jpg" alt=""><img class="large" src="large-images/graeme-souness-large.jpg" alt=""></a></li></ul><ul id="column2"><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/steven-gerrard.jpg" alt=""><img class="large" src="large-images/steven-gerrard-large.jpg" alt=""></a></li><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/kenny-dalglish.jpg" alt=""><img class="large" src="large-images/kenny-dalglish-large.jpg" alt=""></a></li><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/robbie-fowler.jpg" alt=""><img class="large" src="large-images/robbie-fowler-large.jpg" alt=""></a></li></ul><ul id="column3"><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/alan-hansen.jpg" alt=""><img class="large" src="large-images/alan-hansen-large.jpg" alt=""></a></li><li><a href="http://weblogs.asp.net/controlpanel/blogs/posteditor.aspx?SelectedNavItem=Posts§ionid=1153&postid=8927200#"><img src="thumbs/michael-owen.jpg" alt=""><img class="large" src="large-images/michael-owen-large.jpg" alt=""></a></li></ul></body></html> It is very easy to follow the markup. Please have a look at the new doctype and the new semantic tag <header>. I have 3 columns and I place my images in there.There is a class called "large".I will use this class in my CSS code to hide the large image when the mouse is not on (hover) an image Make sure you validate your HTML 5 page in the validator found hereHave a look at the CSS code below that makes it all happen.img { border:none;}#column1 { position: absolute; top: 30; left: 100; }li { margin: 15px; list-style-type:none;}#column1 a img.large {  position: absolute; top: 0; left:700px; visibility: hidden;}#column1 a:hover { background: white;}#column1 a:hover img.large { visibility:visible;}#column2 { position: absolute; top: 30; left: 195px; }li { margin: 5px; list-style-type:none;}#column2 a img.large { position: absolute; top: 0; left:510px; margin-left:0; visibility: hidden;}#column2 a:hover { background: white;}#column2 a:hover img.large { visibility:visible;}#column3 { position: absolute; top: 30; left: 400px; width:108px;}li { margin: 5px; list-style-type:none;}#column3 a img.large { width: 260px; height:260px; position: absolute; top: 0; left:315px; margin-left:0; visibility: hidden;}#column3 a:hover { background: white;}#column3 a:hover img.large { visibility:visible;}?n the first line of the CSS code I set the images to have no border.Then I place the first column in the page and then remove the bullets from the list elements.Then I use the large CSS class to create a position for the large image and hide it.Finally when the hover event takes place I make the image visible.I repeat the process for the next two columns. I have tested the page with IE 10 and the latest versions of Opera,Chrome and Firefox.Feel free to style your HTML 5 gallery any way you want through the magic of CSS.I did not bother adding background colors and borders because that was beyond the scope of this post. Hope it helps!!!!

    Read the article

  • Pre-rentrée Oracle Open World 2012 : à vos agendas

    - by Eric Bezille
    A maintenant moins d'un mois de l’événement majeur d'Oracle, qui se tient comme chaque année à San Francisco, fin septembre, début octobre, les spéculations vont bon train sur les annonces qui vont y être dévoilées... Et sans lever le voile, je vous engage à prendre connaissance des sujets des "Key Notes" qui seront tenues par Larry Ellison, Mark Hurd, Thomas Kurian (responsable des développements logiciels) et John Fowler (responsable des développements systèmes) afin de vous donner un avant goût. Stratégie et Roadmaps Oracle Bien entendu, au-delà des séances plénières qui vous donnerons  une vision précise de la stratégie, et pour ceux qui seront sur place, je vous engage à ne pas manquer les séances d'approfondissement qui auront lieu dans la semaine, dont voici quelques morceaux choisis : "Accelerate your Business with the Oracle Hardware Advantage" avec John Fowler, le lundi 1er Octobre, 3:15pm-4:15pm "Why Oracle Softwares Runs Best on Oracle Hardware" , avec Bradley Carlile, le responsable des Benchmarks, le lundi 1er Octobre, 12:15pm-13:15pm "Engineered Systems - from Vision to Game-changing Results", avec Robert Shimp, le lundi 1er Octobre 1:45pm-2:45pm "Database and Application Consolidation on SPARC Supercluster", avec Hugo Rivero, responsable dans les équipes d'intégration matériels et logiciels, le lundi 1er Octobre, 4:45pm-5:45pm "Oracle’s SPARC Server Strategy Update", avec Masood Heydari, responsable des développements serveurs SPARC, le mardi 2 Octobre, 10:15am - 11:15am "Oracle Solaris 11 Strategy, Engineering Insights, and Roadmap", avec Markus Flier, responsable des développements Solaris, le mercredi 3 Octobre, 10:15am - 11:15am "Oracle Virtualization Strategy and Roadmap", avec Wim Coekaerts, responsable des développement Oracle VM et Oracle Linux, le lundi 1er Octobre, 12:15pm-1:15pm "Big Data: The Big Story", avec Jean-Pierre Dijcks, responsable du développement produits Big Data, le lundi 1er Octobre, 3:15pm-4:15pm "Scaling with the Cloud: Strategies for Storage in Cloud Deployments", avec Christine Rogers,  Principal Product Manager, et Chris Wood, Senior Product Specialist, Stockage , le lundi 1er Octobre, 10:45am-11:45am Retours d'expériences et témoignages Si Oracle Open World est l'occasion de partager avec les équipes de développement d'Oracle en direct, c'est aussi l'occasion d'échanger avec des clients et experts qui ont mis en oeuvre  nos technologies pour bénéficier de leurs retours d'expériences, comme par exemple : "Oracle Optimized Solution for Siebel CRM at ACCOR", avec les témoignages d'Eric Wyttynck, directeur IT Multichannel & CRM  et Pascal Massenet, VP Loyalty & CRM systems, sur les bénéfices non seulement métiers, mais également projet et IT, le mercredi 3 Octobre, 1:15pm-2:15pm "Tips from AT&T: Oracle E-Business Suite, Oracle Database, and SPARC Enterprise", avec le retour d'expérience des experts Oracle, le mardi 2 Octobre, 11:45am-12:45pm "Creating a Maximum Availability Architecture with SPARC SuperCluster", avec le témoignage de Carte Wright, Database Engineer à CKI, le mercredi 3 Octobre, 11:45am-12:45pm "Multitenancy: Everybody Talks It, Oracle Walks It with Pillar Axiom Storage", avec le témoignage de Stephen Schleiger, Manager Systems Engineering de Navis, le lundi 1er Octobre, 1:45pm-2:45pm "Oracle Exadata for Database Consolidation: Best Practices", avec le retour d'expérience des experts Oracle ayant participé à la mise en oeuvre d'un grand client du monde bancaire, le lundi 1er Octobre, 4:45pm-5:45pm "Oracle Exadata Customer Panel: Packaged Applications with Oracle Exadata", animé par Tim Shetler, VP Product Management, mardi 2 Octobre, 1:15pm-2:15pm "Big Data: Improving Nearline Data Throughput with the StorageTek SL8500 Modular Library System", avec le témoignage du CTO de CSC, Alan Powers, le jeudi 4 Octobre, 12:45pm-1:45pm "Building an IaaS Platform with SPARC, Oracle Solaris 11, and Oracle VM Server for SPARC", avec le témoignage de Syed Qadri, Lead DBA et Michael Arnold, System Architect d'US Cellular, le mardi 2 Octobre, 10:15am-11:15am "Transform Data Center TCO with Oracle Optimized Servers: A Customer Panel", avec les témoignages notamment d'AT&T et Liberty Global, le mardi 2 Octobre, 11:45am-12:45pm "Data Warehouse and Big Data Customers’ View of the Future", avec The Nielsen Company US, Turkcell, GE Retail Finance, Allianz Managed Operations and Services SE, le lundi 1er Octobre, 4:45pm-5:45pm "Extreme Storage Scale and Efficiency: Lessons from a 100,000-Person Organization", le témoignage de l'IT interne d'Oracle sur la transformation et la migration de l'ensemble de notre infrastructure de stockage, mardi 2 Octobre, 1:15pm-2:15pm Echanges avec les groupes d'utilisateurs et les équipes de développement Oracle Si vous avez prévu d'arriver suffisamment tôt, vous pourrez également échanger dès le dimanche avec les groupes d'utilisateurs, ou tous les soirs avec les équipes de développement Oracle sur des sujets comme : "To Exalogic or Not to Exalogic: An Architectural Journey", avec Todd Sheetz - Manager of DBA and Enterprise Architecture, Veolia Environmental Services, le dimanche 30 Septembre, 2:30pm-3:30pm "Oracle Exalytics and Oracle TimesTen for Exalytics Best Practices", avec Mark Rittman, de Rittman Mead Consulting Ltd, le dimanche 30 Septembre, 10:30am-11:30am "Introduction of Oracle Exadata at Telenet: Bringing BI to Warp Speed", avec Rudy Verlinden & Eric Bartholomeus - Managers IT infrastructure à Telenet, le dimanche 30 Septembre, 1:15pm-2:00pm "The Perfect Marriage: Sun ZFS Storage Appliance with Oracle Exadata", avec Melanie Polston, directeur, Data Management, de Novation et Charles Kim, Managing Director de Viscosity, le dimanche 30 Septembre, 9:00am-10am "Oracle’s Big Data Solutions: NoSQL, Connectors, R, and Appliance Technologies", avec Jean-Pierre Dijcks et les équipes de développement Oracle, le lundi 1er Octobre, 6:15pm-7:00pm Testez et évaluez les solutions Et pour finir, vous pouvez même tester les technologies au travers du Oracle DemoGrounds, (1133 Moscone South pour la partie Systèmes Oracle, OS, et Virtualisation) et des "Hands-on-Labs", comme : "Deploying an IaaS Environment with Oracle VM", le mardi 2 Octobre, 10:15am-11:15am "Virtualize and Deploy Oracle Applications in Minutes with Oracle VM: Hands-on Lab", le mardi 2 Octobre, 11:45am-12:45pm (il est fortement conseillé d'avoir suivi le "Hands-on-Labs" précédent avant d'effectuer ce Lab. "x86 Enterprise Cloud Infrastructure with Oracle VM 3.x and Sun ZFS Storage Appliance", le mercredi 3 Octobre, 5:00pm-6:00pm "StorageTek Tape Analytics: Managing Tape Has Never Been So Simple", le mercredi 3 Octobre, 1:15pm-2:15pm "Oracle’s Pillar Axiom 600 Storage System: Power and Ease", le lundi 1er Octobre, 12:15pm-1:15pm "Enterprise Cloud Infrastructure for SPARC with Oracle Enterprise Manager Ops Center 12c", le lundi 1er Octobre, 1:45pm-2:45pm "Managing Storage in the Cloud", le mardi 2 Octobre, 5:00pm-6:00pm "Learn How to Write MapReduce on Oracle’s Big Data Platform", le lundi 1er Octobre, 12:15pm-1:15pm "Oracle Big Data Analytics and R", le mardi 2 Octobre, 1:15pm-2:15pm "Reduce Risk with Oracle Solaris Access Control to Restrain Users and Isolate Applications", le lundi 1er Octobre, 10:45am-11:45am "Managing Your Data with Built-In Oracle Solaris ZFS Data Services in Release 11", le lundi 1er Octobre, 4:45pm-5:45pm "Virtualizing Your Oracle Solaris 11 Environment", le mardi 2 Octobre, 1:15pm-2:15pm "Large-Scale Installation and Deployment of Oracle Solaris 11", le mercredi 3 Octobre, 3:30pm-4:30pm En conclusion, une semaine très riche en perspective, et qui vous permettra de balayer l'ensemble des sujets au coeur de vos préoccupations, de la stratégie à l'implémentation... Cette semaine doit se préparer, pour tailler votre agenda sur mesure, à travers les plus de 2000 sessions dont je ne vous ai fait qu'un extrait, et dont vous pouvez retrouver l'ensemble en ligne.

    Read the article

  • T-SQL Tuesday #21 - Crap!

    - by Most Valuable Yak (Rob Volk)
    Adam Machanic's (blog | twitter) ever popular T-SQL Tuesday series is being held on Wednesday this time, and the topic is… SHIT CRAP. No, not fecal material.  But crap code.  Crap SQL.  Crap ideas that you thought were good at the time, or were forced to do due (doo-doo?) to lack of time. The challenge for me is to look back on my SQL Server career and find something that WASN'T crap.  Well, there's a lot that wasn't, but for some reason I don't remember those that well.  So the additional challenge is to pick one particular turd that I really wish I hadn't squeezed out.  Let's see if this outline fits the bill: An ETL process on text files; That had to interface between SQL Server and an AS/400 system; That didn't use SSIS (should have) or BizTalk (ummm, no) but command-line scripting, using Unix utilities(!) via: xp_cmdshell; That had to email reports and financial data, some of it sensitive Yep, the stench smell is coming back to me now, as if it was yesterday… As to why SSIS and BizTalk were not options, basically I didn't know either of them well enough to get the job done (and I still don't).  I also had a strict deadline of 3 days, in addition to all the other responsibilities I had, so no time to learn them.  And seeing how screwed up the rest of the process was: Payment files from multiple vendors in multiple formats; Sent via FTP, PGP encrypted email, or some other wizardry; Manually opened/downloaded and saved to a particular set of folders (couldn't change this); Once processed, had to be placed BACK in the same folders with the original archived; x2 divisions that had to run separately; Plus an additional vendor file in another format on a completely different schedule; So that they could be MANUALLY uploaded into the AS/400 system (couldn't change this either, even if it was technically possible) I didn't feel so bad about the solution I came up with, which was naturally: Copy the payment files to the local SQL Server drives, using xp_cmdshell Run batch files (via xp_cmdshell) to parse the different formats using sed, a Unix utility (this was before Powershell) Use other Unix utilities (join, split, grep, wc) to process parsed files and generate metadata (size, date, checksum, line count) Run sqlcmd to execute a stored procedure that passed the parsed file names so it would bulk load the data to do a comparison bcp the compared data out to ANOTHER text file so that I could grep that data out of the original file Run another stored procedure to import the matched data into SQL Server so it could process the payments, including file metadata Process payment batches and log which division and vendor they belong to Email the payment details to the finance group (since it was too hard for them to run a web report with the same data…which they ran anyway to compare the emailed file against…which always matched, surprisingly) Email another report showing unmatched payments so they could manually void them…about 3 months afterward All in "Excel" format, using xp_sendmail (SQL 2000 system) Copy the unmatched data back to the original folder locations, making sure to match the file format exactly (if you've ever worked with ACH files, you'll understand why this sucked) If you're one of the 10 people who have read my blog before, you know that I love the DOS "for" command.  Like passionately.  Like fairy-tale love.  So my batch files were riddled with for loops, nested within other for loops, that called other batch files containing for loops.  I think there was one section that had 4 or 5 nested for commands.  It was wrong, disturbed, and completely un-maintainable by anyone, even myself.  Months, even a year, after I left the company I got calls from someone who had to make a minor change to it, and they called me to talk them out of spraying the office with an AK-47 after looking at this code.  (for you Star Trek TOS fans) The funniest part of this, well, one of the funniest, is that I made the deadline…sort of, I was only a day late…and the DAMN THING WORKED practically unchanged for 3 years.  Most of the problems came from the manual parts of the overall process, like forgetting to decrypt the files, or missing/late files, or saved to the wrong folders.  I'm definitely not trying to toot my own horn here, because this was truly one of the dumbest, crappiest solutions I ever came up with.  Fortunately as far as I know it's no longer in use and someone has written a proper replacement.  Today I would knuckle down and do it in SSIS or Powershell, even if it took me weeks to get it right. The real lesson from this crap code is to make things MAINTAINABLE and UNDERSTANDABLE.  sed scripting regular expressions doesn't fit that criteria in any way.  If you ever find yourself under pressure to do something fast at all costs, DON'T DO IT.  Stop and consider long-term maintainability, not just for yourself but for others on your team.  If you can't explain the basic approach in under 5 minutes, it ultimately won't succeed.  And while you may love to leave all that crap behind, it may follow you anyway, and you'll step in it again.   P.S. - if you're wondering about all the manual stuff that couldn't be changed, it was because the entire process had gone through Six Sigma, and was deemed the best possible way.  Phew!  Talk about stink!

    Read the article

  • JavaOne 2011: Content review process and Tips for submissions

    - by arungupta
    The Technical Sessions, Birds of Feather, Panels, and Hands-on labs (basically all the content delivered at JavaOne) forms the backbone of the conference. At this year's JavaOne conference you'll have access to the rock star speakers, the ability to engage with luminaries in the hallways, and have beer (or 2) with community peers in designated areas. Even though the conference is Oct 2-6, 2011, and will be bigger and better than last year's conference, the Call for Paper submission and review/selection evaluation started much earlier.In previous years, I've participated in the review process and this year I was honored to serve as co-lead for the "Enterprise Service Architecture and Cloud" track with Ludovic Champenois. We had a stellar review team with an equal mix of Oracle and external community reviewers. The review process is very overwhelming with the reviewers going through multiple voting iterations on each submission in order to ensure that the selected content is the BEST of the submitted lot. Our ultimate goal was to ensure that the content best represented the track, and most importantly would draw interest and excitement from attendees. As always, the number and quality of submissions were just superb, making for a truly challenging (and rewarding) experience for the reviewers. As co-lead I tried to ensure that I applied a fair and balanced process in the evaluation of content in my track. . Here are some key steps followed by all track leads: Vote on sessions - Each reviewer is required to vote on the sessions on a scale of 1-5 - and also provide a justifying comment. Create buckets - Divide the submissions into different buckets to ensure a fair representation of different topics within a track. This ensures that if a particular bucket got higher votes then the track is not exclusively skewed towards it. Top 7 - The review committee provides a list of the top 7 talks that can be used in the promotional material by the JavaOne team. Generally these talks are easy to identify and a consensus is reached upon them fairly quickly. First cut - Each track is allocated a total number of sessions (including panels), BoFs, and Hands-on labs that can be approved. The track leads then start creating the first cut of the approvals using the casted votes coupled with their prior experience in the subject matter. In our case, Ludo and I have been attending/speaking at JavaOne (and other popular Java-focused conferences) for double digit years. The Grind - The first cut is then refined and refined and refined using multiple selection criteria such as sorting on the bucket, speaker quality, topic popularity, cumulative vote total, and individual vote scale. The sessions that don't make the cut are reviewed again as well to ensure if they need to replace one of the selected one as a potential alternate. I would like to thank the entire Java community for all the submissions and many thanks to the reviewers who spent countless hours reading each abstract, voting on them, and helping us refine the list. I think approximately 3-4 hours cumulative were spent on each submission to reach an evaluation, specifically the border line cases. We gave our recommendations to the JavaOne Program Committee Chairperson (Sharat Chander) and accept/decline notifications should show up in submitter inboxes in the next few weeks. Here are some points to keep in mind when submitting a session to JavaOne next time: JavaOne is a technology-focused conference so any product, marketing or seemingly marketish talk are put at the bottom of the list.Oracle Open World and Oracle Develop are better options for submitting product specific talks. Make your title catchy. Remember the attendees are more likely to read the abstract if they like the title. We try our best to recategorize the talk to a different track if it needs to but please ensure that you are filing in the right track to have all the right eyeballs looking at it. Also, it does not hurt marking an alternate track if your talk meets the criteria. Make sure to coordinate within your team before the submission - multiple sessions from the same team or company does not ensure that the best speaker is picked. In such case we rely upon your "google presence" and/or review committee's prior knowledge of the speaker. The reviewers may not know you or your product at all and you get 750 characters to pitch your idea. Make sure to use all of them, to the last 750th character. Make sure to read your abstract multiple times to ensure that you are giving all the relevant information ? Think through your presentation and see if you are leaving out any important aspects.Also look if the abstract has any redundant information that will not required by the reviewers. There are additional sections that allow you to share information about the speaker and the presentation summary. Use them to blow the horn about yourself and any other relevant details. Please don't say "call me at xxx-xxx-xxxx to find out the details" :-) The review committee enjoyed reviewing the submissions and we certainly hope you'll have a great time attending them. Happy JavaOne!

    Read the article

  • JavaOne 2011: Content review process and Tips for submissions

    - by arungupta
    The Technical Sessions, Birds of Feather, Panels, and Hands-on labs (basically all the content delivered at JavaOne) forms the backbone of the conference. At this year's JavaOne conference you'll have access to the rock star speakers, the ability to engage with luminaries in the hallways, and have beer (or 2) with community peers in designated areas. Even though the conference is Oct 2-6, 2011, and will be bigger and better than last year's conference, the Call for Paper submission and review/selection evaluation started much earlier.In previous years, I've participated in the review process and this year I was honored to serve as co-lead for the "Enterprise Service Architecture and Cloud" track with Ludovic Champenois. We had a stellar review team with an equal mix of Oracle and external community reviewers. The review process is very overwhelming with the reviewers going through multiple voting iterations on each submission in order to ensure that the selected content is the BEST of the submitted lot. Our ultimate goal was to ensure that the content best represented the track, and most importantly would draw interest and excitement from attendees. As always, the number and quality of submissions were just superb, making for a truly challenging (and rewarding) experience for the reviewers. As co-lead I tried to ensure that I applied a fair and balanced process in the evaluation of content in my track. . Here are some key steps followed by all track leads: Vote on sessions - Each reviewer is required to vote on the sessions on a scale of 1-5 - and also provide a justifying comment. Create buckets - Divide the submissions into different buckets to ensure a fair representation of different topics within a track. This ensures that if a particular bucket got higher votes then the track is not exclusively skewed towards it. Top 7 - The review committee provides a list of the top 7 talks that can be used in the promotional material by the JavaOne team. Generally these talks are easy to identify and a consensus is reached upon them fairly quickly. First cut - Each track is allocated a total number of sessions (including panels), BoFs, and Hands-on labs that can be approved. The track leads then start creating the first cut of the approvals using the casted votes coupled with their prior experience in the subject matter. In our case, Ludo and I have been attending/speaking at JavaOne (and other popular Java-focused conferences) for double digit years. The Grind - The first cut is then refined and refined and refined using multiple selection criteria such as sorting on the bucket, speaker quality, topic popularity, cumulative vote total, and individual vote scale. The sessions that don't make the cut are reviewed again as well to ensure if they need to replace one of the selected one as a potential alternate. I would like to thank the entire Java community for all the submissions and many thanks to the reviewers who spent countless hours reading each abstract, voting on them, and helping us refine the list. I think approximately 3-4 hours cumulative were spent on each submission to reach an evaluation, specifically the border line cases. We gave our recommendations to the JavaOne Program Committee Chairperson (Sharat Chander) and accept/decline notifications should show up in submitter inboxes in the next few weeks. Here are some points to keep in mind when submitting a session to JavaOne next time: JavaOne is a technology-focused conference so any product, marketing or seemingly marketish talk are put at the bottom of the list.Oracle Open World and Oracle Develop are better options for submitting product specific talks. Make your title catchy. Remember the attendees are more likely to read the abstract if they like the title. We try our best to recategorize the talk to a different track if it needs to but please ensure that you are filing in the right track to have all the right eyeballs looking at it. Also, it does not hurt marking an alternate track if your talk meets the criteria. Make sure to coordinate within your team before the submission - multiple sessions from the same team or company does not ensure that the best speaker is picked. In such case we rely upon your "google presence" and/or review committee's prior knowledge of the speaker. The reviewers may not know you or your product at all and you get 750 characters to pitch your idea. Make sure to use all of them, to the last 750th character. Make sure to read your abstract multiple times to ensure that you are giving all the relevant information ? Think through your presentation and see if you are leaving out any important aspects.Also look if the abstract has any redundant information that will not required by the reviewers. There are additional sections that allow you to share information about the speaker and the presentation summary. Use them to blow the horn about yourself and any other relevant details. Please don't say "call me at xxx-xxx-xxxx to find out the details" :-) The review committee enjoyed reviewing the submissions and we certainly hope you'll have a great time attending them. Happy JavaOne!

    Read the article

  • To SYNC or not to SYNC – Part 3

    - by AshishRay
    I can't believe it has been almost a year since my last blog post. I know, that's an absolute no-no in the blogosphere. And I know that "I have been busy" is not a good excuse. So - without trying to come up with an excuse - let me state this - my apologies for taking such a long time to write the next Part. Without further ado, here goes. This is Part 3 of a multi-part blog article where we are discussing various aspects of setting up Data Guard synchronous redo transport (SYNC). In Part 1 of this article, I debunked the myth that Data Guard SYNC is similar to a two-phase commit operation. In Part 2, I discussed the various ways that network latency may or may not impact a Data Guard SYNC configuration. In this article, I will talk in details regarding why Data Guard SYNC is a good thing. I will also talk about distance implications for setting up such a configuration. So, Why Good? Why is Data Guard SYNC a good thing? Because, at the end of the day, this gives you the assurance of zero data loss - it doesn’t matter what outage may befall your primary system. Befall! Boy, that sounds theatrical. But seriously - think about this - it minimizes your data risks. That’s a big deal. Whether you have an outage due to bad disks, faulty hardware components, hardware / software bugs, physical data corruptions, power failures, lightning that takes out significant part of your data center, fire that melts your assets, water leakage from the cooling system, human errors such as accidental deletion of online redo log files - it doesn’t matter - you can have that “Om - peace” look on your face and then you can failover to the standby system, without losing a single bit of data in your Oracle database. You will be a hero, as shown in this not so imaginary conversation: IT Manager: Well, what’s the status? You: John is doing the trace analysis on the storage array. IT Manager: So? How long is that gonna take? You: Well, he is stuck, waiting for a response from <insert your not-so-favorite storage vendor here>. IT Manager: So, no root cause yet? You: I told you, he is stuck. We have escalated with their Support, but you know how long these things take. IT Manager: Darn it - the site is down! You: Not really … IT Manager: What do you mean? You: John is stuck, but Sreeni has already done a failover to the Data Guard standby. IT Manager: Whoa, whoa - wait! Failover means we lost some data, why did you do this without letting the Business group know? You: We didn’t lose any data. Remember, we had set up Data Guard with SYNC? So now, any problems on the production – we just failover. No data loss, and we are up and running in minutes. The Business guys don’t need to know. IT Manager: Wow! Are we great or what!! You: I guess … Ok, so you get it - SYNC is good. But as my dear friend Larry Carpenter says, “TANSTAAFL”, or "There ain't no such thing as a free lunch". Yes, of course - investing in Data Guard SYNC means that you have to invest in a low-latency network, you have to monitor your applications and database especially in peak load conditions, and you cannot under-provision your standby systems. But all these are good and necessary things, if you are supporting mission-critical apps that are supposed to be running 24x7. The peace of mind that this investment will give you is priceless, especially if you are serious about HA. How Far Can We Go? Someone may say at this point - well, I can’t use Data Guard SYNC over my coast-to-coast deployment. Most likely - true. So how far can you go? Well, we have customers who have deployed Data Guard SYNC over 300+ miles! Does this mean that you can also deploy over similar distances? Duh - no! I am going to say something here that most IT managers don’t like to hear - “It depends!” It depends on your application design, application response time / throughput requirements, network topology, etc. However, because of the optimal way we do SYNC, customers have been able to stretch Data Guard SYNC deployments over longer distances compared to traditional, storage-centric ways of doing this. The MAA Database 10.2 best practices paper Data Guard Redo Transport & Network Configuration, and Oracle Database 11.2 High Availability Best Practices Manual talk about some of these SYNC-related metrics. For example, a test deployment of Data Guard SYNC over 330 miles with 10ms latency showed an impact less than 5% for a busy OLTP application. Even if you can’t deploy Data Guard SYNC over your WAN distance, or if you already have an ASYNC standby located 1000-s of miles away, here’s another nifty way to boost your HA. Have a local standby, configured SYNC. How local is “local”? Again - it depends. One customer runs a local SYNC standby across the campus. Another customer runs it across 15 miles in another data center. Both of these customers are running Data Guard SYNC as their HA standard. If a localized outage affects their primary system, no problem! They have all the data available on the standby, to which they can failover. Very fast. In seconds. Wait - did I say “seconds”? Yes, Virginia, there is a Santa Claus. But you have to wait till the next blog article to find out more. I assure you tho’ that this time you won’t have to wait for another year for this.

    Read the article

  • creating objects in list

    - by prince23
    List myList = new List { new Users{ Name="Kumar", Gender="M", Age=75, Parent="All"}, new Users{ Name="Suresh",Gender="M", Age=50, Parent="Kumar"}, new Users{ Name="Bennette", Gender="F",Age=45, Parent="Kumar"}, new Users{ Name="kian", Gender="M",Age=20, Parent="Suresh"}, new Users{ Name="Nathani", Gender="M",Age=15, Parent="Suresh"}, new Users{ Name="Peter", Gender="M",Age=90, Parent="All"}, new Users{ Name="Mica", Age=56, Gender="M",Parent="Peter"}, new Users{ Name="Linderman", Gender="M",Age=51, Parent="Peter"}, new Users{ Name="john", Age=25, Gender="M",Parent="Mica"}, new Users{ Name="tom", Gender="M",Age=21, Parent="Mica"}, new Users{ Name="Ando", Age=64, Gender="M",Parent="All"}, new Users{ Name="Maya", Age=24, Gender="M",Parent="Ando"}, new Users{ Name="Niki Sanders", Gender="F",Age=2, Parent="Maya"}, new Users{ Name="Angela Patrelli", Gender="F",Age=3, Parent="Maya"}, }; now i need to format the data like here i need to check the parent based on the parent i will be creating objects under the parent objects now { Name="Kumar", Gender="M", Age=75, Parent="All" } this is the top level as a property Parent ="all" now under parent object kumar here we again create a new object to store these information under object(kumar who is the parent) new Users{ Name="Suresh",Gender="M", Age=50, Parent="Kumar"}, new Users{ Name="Bennette", Gender="F",Age=45, Parent="Kumar"}, what i need to do here is i need to check the parent based on the parent create further objects under it ex: i need to achive like this. looking for the syntax how i can do it. public class SampleProjectData { public static ObservableCollection<Product> GetSampleData() { DateTime dtS = DateTime.Now; ObservableCollection<Product> teams = new ObservableCollection<Product>(); teams.Add(new Product() { PDName = "Product1", OverallStartTime = dtS, OverallEndTime = dtS + TimeSpan.FromDays(3), }); Project emp = new Project() { PName = "Project1", OverallStartTime = dtS + TimeSpan.FromDays(1), OverallEndTime = dtS + TimeSpan.FromDays(6) }; emp.Tasks.Add(new Task() { StartTime = dtS, EndTime = dtS + TimeSpan.FromDays(2), TaskName = "John's Task 3" }); emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(3), EndTime = dtS + TimeSpan.FromDays(4), TaskName = "John's Task 2" }); teams[0].Projects.Add(emp); emp = new Project() { PName = "Project2", OverallStartTime = dtS + TimeSpan.FromDays(1.5), OverallEndTime = dtS + TimeSpan.FromDays(5.5) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(1), EndTime = dtS + TimeSpan.FromDays(4), TaskName = "Victor's Task" }); teams[0].Projects.Add(emp); emp = new Project() { PName = "Project3", OverallStartTime = dtS + TimeSpan.FromDays(2), OverallEndTime = dtS + TimeSpan.FromDays(5) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(1), EndTime = dtS + TimeSpan.FromDays(4), TaskName = "Jason's Task 1" }); emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(7), EndTime = dtS + TimeSpan.FromDays(9), TaskName = "Jason's Task 2" }); teams[0].Projects.Add(emp); teams.Add(new Product() { PDName = "Product2", OverallStartTime = dtS, OverallEndTime = dtS + TimeSpan.FromDays(3) }); emp = new Project() { PName = "Project4", OverallStartTime = dtS + TimeSpan.FromDays(0.5), OverallEndTime = dtS + TimeSpan.FromDays(3.5) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(1.5), EndTime = dtS + TimeSpan.FromDays(4), TaskName = "Vicky's Task" }); teams[1].Projects.Add(emp); emp = new Project() { PName = "Project5", OverallStartTime = dtS + TimeSpan.FromDays(2), OverallEndTime = dtS + TimeSpan.FromDays(6) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(2.2), EndTime = dtS + TimeSpan.FromDays(3.8), TaskName = "Oleg's Task 1" }); emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(5), EndTime = dtS + TimeSpan.FromDays(6), TaskName = "Oleg's Task 2" }); emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(8), EndTime = dtS + TimeSpan.FromDays(9.6), TaskName = "Oleg's Task 3" }); teams[1].Projects.Add(emp); emp = new Project() { PName = "Project6", OverallStartTime = dtS + TimeSpan.FromDays(2.5), OverallEndTime = dtS + TimeSpan.FromDays(4.5) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(0.8), EndTime = dtS + TimeSpan.FromDays(2), TaskName = "Kim's Task" }); teams[1].Projects.Add(emp); teams.Add(new Product() { PDName = "Product3", OverallStartTime = dtS, OverallEndTime = dtS + TimeSpan.FromDays(3) }); emp = new Project() { PName = "Project7", OverallStartTime = dtS + TimeSpan.FromDays(5), OverallEndTime = dtS + TimeSpan.FromDays(7.5) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(1.5), EndTime = dtS + TimeSpan.FromDays(4), TaskName = "Balaji's Task 1" }); emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(5), EndTime = dtS + TimeSpan.FromDays(8), TaskName = "Balaji's Task 2" }); teams[2].Projects.Add(emp); emp = new Project() { PName = "Project8", OverallStartTime = dtS + TimeSpan.FromDays(3), OverallEndTime = dtS + TimeSpan.FromDays(6.3) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(1.75), EndTime = dtS + TimeSpan.FromDays(2.25), TaskName = "Li's Task" }); teams[2].Projects.Add(emp); emp = new Project() { PName = "Project9", OverallStartTime = dtS + TimeSpan.FromDays(2), OverallEndTime = dtS + TimeSpan.FromDays(6) }; emp.Tasks.Add(new Task() { StartTime = dtS + TimeSpan.FromDays(2), EndTime = dtS + TimeSpan.FromDays(3), TaskName = "Stacy's Task" }); teams[2].Projects.Add(emp); return teams; } } above is an sample data where i am grouping them with static data in the same way i need **to for teh data which is cmg from DB and i need to store them list** all these three data are comig from different services. and i am storing them in a list now i have three tables data Product , Project, Task. all the data are coming from webservies. i have created three list where i am storing the data in list. List<Project>objpro= new List<Project>(); List<Product>objproduct= new List<Product>(); LIst<Task>objTask= new List<Task>(); **now what i need to do is i need to do the mapping between these tables. if you see above. i have object of Product under Product i have added object of Project and then under project object i have added task object.** now from the above data which is stored in the list i need to do the same mapping between class. and group the data. public class Product : INotifyPropertyChanged { public Product() { this.Projects = new ObservableCollection<Project>(); } public string PDName { get; set; } public ObservableCollection<Project> Projects { get; set; } private DateTime _st; public DateTime OverallStartTime { get { return _st; } set { if (this._st != value) { TimeSpan dur = this._et - this._st; this._st = value; this.OnPropertyChanged("OverallStartTime"); this.OverallEndTime = value + dur; } } } private DateTime _et; public DateTime OverallEndTime { get { return _et; } set { if (this._et != value) { this._et = value; this.OnPropertyChanged("OverallEndTime"); } } } #region INotifyPropertyChanged Members protected void OnPropertyChanged(string name) { if (this.PropertyChanged != null) this.PropertyChanged(this, new PropertyChangedEventArgs(name)); } public event PropertyChangedEventHandler PropertyChanged; #endregion } public class Project : INotifyPropertyChanged { public Project() { this.Tasks = new ObservableCollection<Task>(); } public string PName { get; set; } public ObservableCollection<Task> Tasks { get; set; } DateTime _st; public DateTime OverallStartTime { get { return _st; } set { if (this._st != value) { TimeSpan dur = this._et - this._st; this._st = value; this.OnPropertyChanged("OverallStartTime"); this.OverallEndTime = value + dur; } } } DateTime _et; public DateTime OverallEndTime { get { return _et; } set { if (this._et != value) { this._et = value; this.OnPropertyChanged("OverallEndTime"); } } } #region INotifyPropertyChanged Members protected void OnPropertyChanged(string name) { if (this.PropertyChanged != null) this.PropertyChanged(this, new PropertyChangedEventArgs(name)); } public event PropertyChangedEventHandler PropertyChanged; #endregion } public class Task : INotifyPropertyChanged { public string TaskName { get; set; } DateTime _st; public DateTime StartTime { get { return _st; } set { if (this._st != value) { TimeSpan dur = this._et - this._st; this._st = value; this.OnPropertyChanged("StartTime"); this.EndTime = value + dur; } } } private DateTime _et; public DateTime EndTime { get { return _et; } set { if (this._et != value) { this._et = value; this.OnPropertyChanged("EndTime"); } } } #region INotifyPropertyChanged Members protected void OnPropertyChanged(string name) { if (this.PropertyChanged != null) this.PropertyChanged(this, new PropertyChangedEventArgs(name)); } public event PropertyChangedEventHandler PropertyChanged; #endregion } hope my question is clear

    Read the article

  • Is the design notion of layers contrived?

    - by Bruce
    Hi all I'm reading through Eric Evans' awesome work, Domain-Driven Design. However, I can't help feeling that the 'layers' model is contrived. To expand on that statement, it seems as if it tries to shoe-horn various concepts into a specific, neat model, that of layers talking to each other. It seems to me that the layers model is too simplified to actually capture the way that (good) software works. To expand further: Evans says: "Partition a complex program into layers. Develop a design within each layer that is cohesive and that depends only on the layers below. Follow standard architectural patterns to provide loose coupling to the layers above." Maybe I'm misunderstanding what 'depends' means, but as far as I can see, it can either mean a) Class X (in the UI for example) has a reference to a concrete class Y (in the main application) or b) Class X has a reference to a class Y-ish object providing class Y-ish services (ie a reference held as an interface). If it means (a), then this is clearly a bad thing, since it defeats re-using the UI as a front-end to some other application that provides Y-ish functionality. But if it means (b), then how is the UI any more dependent on the application, than the application is dependent on the UI? Both are decoupled from each other as much as they can be while still talking to each other. Evans' layer model of dependencies going one way seems too neat. First, isn't it more accurate to say that each area of the design provides a module that is pretty much an island to itself, and that ideally all communication is through interfaces, in a contract-driven/responsibility-driven paradigm? (ie, the 'dependency only on lower layers' is contrived). Likewise with the domain layer talking to the database - the domain layer is as decoupled (through DAO etc) from the database as the database is from the domain layer. Neither is dependent on the other, both can be swapped out. Second, the idea of a conceptual straight line (as in from one layer to the next) is artificial - isn't there more a network of intercommunicating but separate modules, including external services, utility services and so on, branching off at different angles? Thanks all - hoping that your responses can clarify my understanding on this..

    Read the article

  • ImageMagick failing to convert to JPG

    - by johnui
    Hi: We recently installed the latest version of ImageMagick onto our Linux server. I seem to be having issues performing the most basic of tasks. I am running this command line: /usr/bin/convert /location/to/source/design.ai /location/to/save/output.jpg Unfortunatly is saves design.jpg as an illustrator file (if I rename the file to output.ai it opens). Even if I do this: /usr/bin/convert /location/to/source/design.ai -rotate 90 /location/to/save/design.jpg It rotates the file and saves again as an illustrator document. This happens with all filetypes (e.g. png, bmp, etc...) It appears ImageMagick cannot figure out what I want it converted to and just saves as the same file type. Any ideas on fixing this? Regards: John

    Read the article

  • RAR Password recovery / hash extraction on Mac OS X

    - by Josh K
    I'm running Mac OS X 10.6.2 and have been handed a couple of old files that need to be extracted. Old backups or finances or bills I believe. They are RAR files, and password protected. Is there a way to extract the hash from these files so I can feed it into John The Ripper or Cain and Abel? Edit I have downloaded cRARk, but unfortunately nothing I have (SimplyRAR, RAR Expander, The Unarchiver) will extract it without a password. Can someone verify that I'm crazy and there is no password on the Mac version?

    Read the article

  • RAR Password recovery / hash extraction on OS X

    - by Josh K
    I'm running 10.6.2 and have been handed a couple of old files that need to be extracted. Old backups or finances or bills I believe. They are RAR files, and password protected. Is there a way to extract the hash from these files so I can feed it into John The Ripper or Cain and Abel? Edit I have downloaded cRARk, but unfortunately nothing I have (SimplyRAR, RAR Expander, The Unarchiver) will extract it without a password. Can someone verify that I'm crazy and there is no password on the Mac version?

    Read the article

  • Set up internal domain to use external SMTP in Exchange 2007

    - by Geoffrey
    I'm moving to Google Apps and have setup dual-delivery. Everything is fine, but for mail sent internally (from [email protected] to [email protected]), Exchange is not using the send connectors I have pointing to Google's servers. I believe my question is similar to this question: How to force internal email through an smtp connector in exchange 2007 Again, if a user is connected to the Exchange server and tries to send to [email protected] it works just fine, but I cannot seem to force *@mydomain.com to route correctly. This should be a fairly simple, but according to this: google.com/support/forum/p/Google+Apps/thread?tid=30b6ad03baa57289&hl=en (can't post two links due to spam prevention) It does not seem possible. Any ideas?

    Read the article

  • Restricting permissions to individual documents on SharePoint

    - by wahle509
    Here's what I'm trying to do: I would like to create a list of documents on a site in my company's SharePoint site. Each document should have specific user's permissions to view and edit it. For example: The list is for performance reports. John has his out there called "John_PR_09.docx". Only him and his supervisor should have permissions to view, edit, or do anything to it. And then another employee has hers out there with permissions for only her and her supervisor, and so on... I have tested this out with a document that I removed the groups and users from (since they inherit permissions from it's parent) and only gave my user account permissions to. I then asked someone else to try and open and she could, she even wrote "TEST" on the document and saved it. What am I doing wrong? I thought I stopped it from inheriting permissions from it's parent and only gave myself rights to edit it.

    Read the article

< Previous Page | 154 155 156 157 158 159 160 161 162 163 164 165  | Next Page >