Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 17/1407 | < Previous Page | 13 14 15 16 17 18 19 20 21 22 23 24  | Next Page >

  • getting the path of a file from its grandparent folder

    - by Saswat
    i have a php file which has the followng path Shubhmangalam/admin/welcome_image_edition/delete_image.php and an image file with the follwing path Shubhmangalam/welcome_images/image_1.jpg i want to delete the image_1.jpg file which i know can be done by using unlink() method.. but the prob is that the parent folder of the .php file and .jpg file is different, and so is their level of file-system...and i cant find the proper way to get the path to delete the image_1.jpg file. now the code on the delete_image.php is accordingly <?php $image=$_REQUEST['image']; if(unlink("./../welcome_images/".$image)) echo "Successfully Deleted"; else echo "Wrong"; ?> now the above is server-scripting code, i want to delete the image by getting appropriate path.. i dnt want the actual path, but the path from the project folder that is Shubhmangalam thanks in advance

    Read the article

  • PATH command not found

    - by joslinm
    Hi, I'm not experienced with PATH (Any good reference would be appreciated), but I made a mistake and did PATH=/google_appengine, which I'm assuming completely overrid PATH. Still, I restarted bash and echo'd PATH and found that the folders were back. mark@mark-laptop:~$ echo $PATH /usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin:/usr/games However, when I then tried to append to it, I got an error that PATH wasn't found. I've looked around Google and couldn't find a good answer. Any help would be appreciated mark@mark-laptop:~$ PATH = $PATH:/google_appengine PATH: command not found

    Read the article

  • Path Modifier in Tower Of Defense Game

    - by Siddharth
    I implemented PathModifier for path of each enemy in my tower of defense game. So I applied fixed time to path modifier in that enemy complete their path. Like following code describe. new PathModifier(speed, path); Here speed define the time to complete the path. But in tower of defense game my problem is, there is a tower which slow down the movement of the enemy. In that particular situation I was stuck. please someone provide me some guidance what to do in this situation. EDIT : Path path = new Path(wayPointList.size()); for (int j = 0; j < wayPointList.size(); j++) { Point point = grid.getCellPoint(wayPointList.get(j).getRow(), wayPointList.get(j).getCol()); path.to(point.x, point.y); }

    Read the article

  • Tools to test softwares against any attacks for programmers ?

    - by berkay
    in these days, i'm interested in software security. As i'm reading papers i see that there are many attacks and researchers are trying to invent new methods for softwares to get more secure systems. this question can be a general including all types of attacks.There are many experienced programmers in SO, i just want to learn what are using to check your code against these attacks ? Is there any tools you use or you don't care ? For example i heard about,static,dynamic code analysis, fuzz testing. SQL injection attacks Cross Site Scripting Bufferoverflow attacks Logic errors Any kind of Malwares Covert Channels ... ... thanks

    Read the article

  • "Path Not Found" when attempting to write to a sub folder within a mapped drive

    - by Adam
    We have an interesting issue with one of our server shares, or possibly, our Win 7 desktops. When our users try to save files in a sub folder, either via copy/paste or through an application, to a mapped drive on our DC they receive an error saying "Path not found". They can however browse this folder and open files from it. This is where the "Path Not Found" error doesn't seem to stack up in my opinion. Users can however save files fine in the root folder of the mapped drive, it appears only to affect sub folders. It seems to be random which users and machines this affects. The users can log on to a different machine and be able to save in sub folders fine, on the same mapped drive. Event viewer hasn't been much help either. Currently, the only solution we have found is to image the machines affected which solves the issue. Our servers are Server 2008 R2 with Win 7 Pro desktops. Any help/pointers/suggestions would greatly be appreciated.

    Read the article

  • Shortest acyclic path on directed cyclic graph with negative weights/cycles

    - by Janathan
    I have a directed graph which has cycles. All edges are weighted, and the weights can be negative. There can be negative cycles. I want to find a path from s to t, which minimizes the total weight on the path. Sure, it can go to negative infinity when negative cycles exist. But what if I disallow cycles in the path (not in the original graph)? That is, once the path leaves a node, it can not enter the node again. This surely avoids the negative infinity problem, but surprisingly no known algorithm is found by a search on Google. The closest is Floyd–Warshall algorithm, but it does not allow negative cycles. Thanks a lot in advance. Edit: I may have generalized my original problem too much. Indeed, I am given a cyclic directed graph with nonnegative edge weights. But in addition, each node has a positive reward too. I want to find a simple path which minimizes (sum of edge weights on the path) - (sum of node rewards covered by the path). This can be surely converted to the question that I posted, but some structure is lost. And some hint from submodular analysis suggests this motivating problem is not NP-hard. Thanks a lot

    Read the article

  • Git is not using the first editor in my $PATH

    - by GuillaumeA
    I am using OS X 10.8, and I used brew to install a more recent version of emacs than the one shipped with OS X. The newer emacs binary is installed in /usr/local/bin (24.2.1), and the old "shipped-with-osx" one in /usr/bin (22.1.1). I updated my $PATH env variable by prepending /usr/local/bin to it. It works fine in my shell (ie. typing emacs runs the 24.2.1 version), but when git opens the editor, the emacs version is 22.1.1. Isn't git supposed to use $PATH to find the editor I want to use ? Additional informations: $ type -a emacs emacs is /usr/local/bin/emacs emacs is /usr/bin/emacs emacs is /usr/local/bin/emacs $ env PATH=/usr/local/bin:/usr/local/sbin:/usr/bin:/bin:/usr/sbin:/sbin:/usr/local/bin SHELL=/bin/zsh PAGER=most EDITOR=emacs -nw _=/usr/bin/env Please note that I'd prefer not to set the absolute path of my editor directly in my git conf, as I use this conf across multiple systems. EDIT: Here's an bit of my .zshrc: # Mac OS X if [ `uname` = "Darwin" ]; then # Brew binaries PATH="/usr/local/bin":"/usr/local/sbin":$PATH else # Everyone else (Linux) # snip fi So, yes, I could add a line export EDITOR='/usr/local/bin emacs -nw' in the first if, but I'd like to understand why git is not using my PATH variable :)

    Read the article

  • Can I distribute a software with the following permission notice

    - by Parham
    I've recently written a piece of software (without any other contributors) for a company which I part own. I was wondering if I could distribute it with the following permission notice, which is a modified version of the MIT License. Are there any obvious risks if I do distribute with this licence and does it give me the right to reuse the code in other projects? Permission is hereby granted, to any person within CompanyName (the "Company") obtaining a copy of this software and associated documentation files, excluding any third party libraries (the "Software"), to deal with the Software, with limitations restricted to use, copy, modify and merge, the Software may not be published, distributed, sublicensed and/or sold without the explicit permission from AuthorName (the "Author"). This notice doesn't apply to sections of the Software where copyright is held by any persons other than the Author. The Author remains the owner of the Software and may deal in the Software without restriction, including without limitation the rights to use, copy, modify, merge, publish, distribute, sublicense, and/or sell copies of the Software. The above copyright notice and this permission notice shall be included in all copies or substantial portions of the Software. THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.

    Read the article

  • Setting default path in Unix

    - by eSKay
    I just installed valgrind on my Fedora12 machine. $ valgrind // 1 $ valgrind: Command not found. //error $ /usr/local/bin/valgrind // 2 works fine My $PATH has /usr/local/bin in it. Is there something else that I need to do to make 1 work?

    Read the article

  • Cannot change default path to php on OS X Snow Leopard

    - by Sakis Vtdk
    I have installed MAMP on OS X Snow Leopard (10.6.8) and I want to change the default path for PHP. I tried both of the answers on this question, and on this question, and in this thread but when I'm trying which php in Terminal I still get /usr/bin/php. I'm starting to get the impression that I'm doing something profoundly wrong, so any idea about what that might be, will be greatly appreciated. Thanks in advance.

    Read the article

  • Full File Path in Reference to Another Workbook in Excel

    - by SHARIQ MUSANI
    I have two Excel files, one on D:\ and the other one on E:\. I reference one from the other, for example, using vlookup in the E: file to search from the D: file, like that: VLOOKUP(A1,'D:\SHARIQ\[FILE NAME.XLS]SHEETNAME'!A1:10,3,FALSE) As long as D:\SHARIQ\FILE NAME.XLS is open, I get the formula in the E: file displayed like this: VLOOKUP(A1,'[FILE NAME.XLS]SHEETNAME'!A1:10,3,FALSE) Why does it remove the whole path?

    Read the article

  • What's wrong with the analogy between software and building construction?

    - by kuosan
    Many people like to think of building software as constructing a building so we have terms like building blocks and architecture. However, lately I've been to a couple of talks and most people say this analogy is wrong especially around the idea of having a non-coding software architect in a project. In my experience, good software architects are those who also write code so they won't design things that only looks good on paper. I've worked with several Architecture Astronauts, who have either limited or outdated experience in programming. These architecture astronauts quite often missed out critical details in their design and cause more harm than good in a project. This makes me wonder what are the differences between constructing a software and a building? How come in the building industry they can have architects who probably never build a house in their life and purely handles design work but not in the software development field?

    Read the article

  • $_SERVER['DOCUMENT_ROOT'] path not working

    - by aeonsleo
    I am using document root to provide absolute path which is not working. if i echo this path it turns out to be C:wamp/www/proman/header.php. I i give relative path it works fine what is the problem here? $path = $_SERVER['DOCUMENT_ROOT']."proman/header.php";

    Read the article

  • What's the best Wireframing tool?

    - by DaNieL
    Im looking for something similar to iPlotz or Mockup. I've found Pencil Project, but it require xulrunner-1.9 (seem to be incompatible with xulrunner-1.9.2) to be run as a standalone application; However it can be used as a firefox plugin..but is a bit slower. The error on my desktop (ubuntu 10.04) is: Could not find compatible GRE between version 1.9.1 and 1.9.2.* Does anyone know other software? Edit: open-source softwares are preferred, doesnt matter if free.

    Read the article

  • Software for monitoring internal software?

    - by Tyler Eaves
    Is there any good software for monitoring the health of a collection of related software? Requirements are as follows: Web-based, deployable on standard Linux/BSD software. Configurable to support a variety of processes, scheduled at various intervals. Some sort of dashboard interface, for monitoring status, viewing errors, etc. As an example, suppose we have a daily export that's scheduled to run at 6AM each morning. After the export completes, it would POST a status message, saying it had completed, passing in some sort of application key to identify the export. If that status message hadn't come in, by, say, 6:30AM, an e-mail might be sent, that application should go red on the dashboard, etc. Applications should also be able to post error/warning messages. Basically the goal is to be able to monitor all of our internal projects from one system, rather than a multitude of e-mails, log files, etc. I suspect that I'll probably have to end up writing this from scratch, but I just thought I'd ask.

    Read the article

  • Is there any reason to install software as root as opposed to sudo installing software as a sudoer?

    - by Tchalvak
    I'm setting up a new server running Ubuntu Server Edition, and I'm not certain what the difference would be between installing most of the basic software as root, vs installing the basic software as an admin user using sudo apt-get install . For one thing, I'm not sure whether after installing the software as root, I'll need sudo access when running the software as a user (e.g. if I install git as root). On the other hand, if I install software as a user, I could conceive of it not being available to other users that I create in the future. What's the best practice here?

    Read the article

  • Software for scanning installation process?

    - by no name
    I forgot what is the name of the very good software which make some kind of restore point (save registry, and program files folder, etc...) before installing any software. After you install some program (ie "Notepad++") you can easily see what registry data use new installed program, on what location are the file's is stored and many more. The reason that I'm asking for help is that I have to automate some installation of public software, so after installation I need to uninstall it, so i have to delete all junk files. The software is called something like install wizard, or wizard install I forgot. If you have any idea of other application that do same thing , or you know exactly name of that software, or you have some good idea how to solve easy solve many installation and uninstallation, please let me know. Os: win7/xp 64/32

    Read the article

  • How to run RSA software fob on Ubuntu?

    - by Ashish
    I am using RSA software fob on windows. I want to use software fob on ubuntu. I didnot find any relevant software on RSA website for using software fob on ubuntu. I tried to use RSA firefox plugin but even that does not work properly. With firefox plugin I am not able to add my id file. The button doesnot work with my firefox version 3.6.3. Has anybody used RSA software fob on ubuntu? I have heard that it works with J2ME simulator but I dont want to use it for just for RSA.

    Read the article

  • greengeeks drupal install imagemagik 'path /usr/bin/convert' does not exists error

    - by letapjar
    I just signed up with greengeeks. I have a drupal install (6.19) on my public_html directory. The ImageMagic Toolkit can't find the binary - the error I get is "the path /usr/bin/convert" does not exist. when I use a terminal and do 'which convert' it shows /usr/bin/convert also, I have a second drupal install in an addon domain - it's home directory is above the public_html directory (in a directory called '/home/myusername/addons/seconddomain') The drupal install in the addon domain finds the imagemagick binary just fine. I am at a total loss as to why the original install cannot find the binary. The tech support guys at greengeeks have no clue either. Any ideas of things to try?

    Read the article

  • How to specify or add directory to Python.h search path during setup.py build/install

    - by ca2longoria
    I'm running Linux, and have downloaded a python module I must install without access to any but my particular /home/user directory (I have no root privileges nor the option to pursue them). This of course requires the Python source. This I've downloaded and have laying around in said user directory. While asking the admin to copy the proper files into /usr/include/python2.7 is the easiest way to go about this, I am hoping for a more general and portable solution to this kind of problem. Changing only data in the module source (MANIFEST.in, README.txt, setup.py, etc.), how might I add an arbitrary directory to the search path for Python.h and friends? (Without a solution, "python setup.py build" will continue returning with the "Python.h: No such file or directory" error) Thank you very much. (Additionally, is it acceptable to post this both here and on StackOverflow?)

    Read the article

  • Can't install software from Ubuntu software center

    - by Casbar
    I've been experimenting with Ubuntu 10.04(64bit) inside a VirtualBox VM. This isn't my first experience with Linux, but I'm still very much a Linux noob. Whenever I try to install software from the Ubuntu Software Center, the installation gets interrupted and I get a warning that this installation requires untrusted sources. I can install anything I want using apt-get, it's just the gui that doesn't work. I've done research on the issue and taken the following precautions with no result: under software sources Allowed Canonical partners Allowed source code Changed the download source to main server I get no errors when running an apt-get update. Can anyone shed some light on the issue?

    Read the article

< Previous Page | 13 14 15 16 17 18 19 20 21 22 23 24  | Next Page >