Search Results

Search found 11400 results on 456 pages for 'automated testing'.

Page 2/456 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • Automating GUI testing using C#

    - by ladar
    I am doing on a project to built automatic GUI testing for graphical application in .NET. I will use C# but i am trying to reading to get some ideas. But I don't have any idea on how to record and replay back. So can you give me your ideas.

    Read the article

  • How much detail is in a good UI regression test?

    - by GlenPeterson
    We use a detailed step-by-step user-interface regression test for our commercial web application. It has a "backbone" test for the most used / most important parts of the system, with optional tests for specific areas of functionality. Using this plan has definitely helped us ensure high quality software. But, having very specific tests can be counter-productive. The tester concentrates on following the test and will completely miss usability issues, or not notice fairly obvious problems such as the bottom part of a page that is missing. By contrast, some of the best UI testing happens when building a demo of a new feature. I often do my own best testing by pretending to demonstrate the system to an imaginary prospect. Yet when I tell the testers, "Just demonstrate the system to yourself" they don't cover nearly as much functionality as they do with a detailed point-by-point test. I'm repeatedly asked to provide more and more detail in the test plan so that a new untrained tester can test with it without asking any questions. Yet details seem to be counter-productive. How much detail do you put in a regression test to make it effective? What techniques make the tester to focus more on the system than on checking off items on the test?

    Read the article

  • Unit testing a database connection and general questions on database-dependent code and unit testing

    - by dotnetdev
    Hi, If I have a method which establishes a database connection, how could this method be tested? Returning a bool in the event of a successful connection is one way, but is that the best way? From a testability method, is it best to have the connection method as one method and the method to get data back a seperate method? Also, how would I test methods which get back data from a database? I may do an assert against expected data but the actual data can change and still be the right resultset. EDIT: For the last point, to check data, if it's supposed to be a list of cars, then I can check they are real car models. Or if they are a bunch of web servers, I can have a list of existant web servers on the system, return that from the code under test, and get the test result. If the results are different, the data is the issue but the query not? THnaks

    Read the article

  • Learning about tests for junior programmers

    - by RHaguiuda
    I`m not sure if its okay to ask it on stackoverflow. Ive been reading a log about tests, unit tests, tests frameworks, mocks and so on, but as a junior programmer I dont know anything about tests, not even where to start! Can anyone explain to young programmers about tests, how they`re run, where and what to test, what is unit testing, integration testing, automated tests? How much to test? And more important: how much test is enough? I belive this would be very helpfull. If possible indicate a few books too about these subjects. Thanks

    Read the article

  • introducing automated testing without steep learning curve

    - by esther h
    We're a group of 4 developers on a ajax/mysql/php web application. 2 of us end up focusing most of our efforts on testing the application, as it is time-consuming, instead of actually coding. When I say testing, I mean opening screens and testing links, making sure nothing is broken and the data is correct. I understand there are test frameworks out there which can automate this kind of testing for you, but I am not familiar with any of them (neither is anyone on the team), or the fancy jargon (is it test-driven? behavior-driven? acceptance testing?) So, we're looking to slowly incorporate automated testing. We're all programmers, so it doesn't have to be super-simple. But we don't want something that will take a week to learn... And it has to match our php/ajax platform... What do you recommend?

    Read the article

  • SharePoint Unit Testing and Load Testing Finally?

    - by Kit Ong
    It has always been a real pain to incorporate extensive SharePoint Unit Testing and Load Testing in a project, could Visual Studio 2012 finally make this easier? It certaining looks like it, here's a brief overview on SharePoint support in Visual Studio 2012. Load testing – We now support load testing for SharePoint out of the box. This is more involved than you might imagine due to how dynamic SharePoint is. You can’t just record a script and play it back – it won’t work because SharePoint generates and expects dynamic data (like GUIDs). We’ve built the extensions to our load testing solution to parse the dynamic SharePoint data and include it appropriately in subsequent requests. So now you can record a script and play it back and we will dynamically adjust it to match what SharePoint expects.Unit testing – One of the big problems with unit testing SharePoint is that most code requires SharePoint to be running and trying to run tests against a live SharePoint instance is a pain. So we’ve built a SharePoint “emulator” using our new VS 2012 Fakes & Stubs capability. This will make unit testing of SharePoint components WAY easier.Read more in the link belowhttp://blogs.msdn.com/b/bharry/archive/2012/09/12/visual-studio-update-this-fall.aspx

    Read the article

  • Multiple Condition Coverage Testing

    - by David Relihan
    Hi Folks, When using the White Box method of testing called Multiple Condition Coverage, do we take all conditional statements or just the ones with multiple conditions? Now maybe the clues in the name but I'm not sure. So if I have the following method void someMethod() { if(a && b && (c || (d && e)) ) //Conditional A { } if(z && q) // Conditional B { } } Do I generate the truth table for just "Conditional A", or do I also do Conditional B? Thanks,

    Read the article

  • Automate Testing on future only items business rules

    - by Titan
    I currently have a business object with a validation business rule, which is it can only be created for the future, tomorrow onwards, and I cannot create new items for today. I have a process, which runs the non-future business objects through some steps.. Because I have to set things up today, and test tomorrow, and when it fails, I can only create a new object tomorrow and test the following day. Are there any easy ways to automate this process in any testing frameworks? I think our testers are using the visual studio 2010 test manager. How do you guys manage situations like this? Cheers

    Read the article

  • What is the objective of unit testing?

    - by user728750
    I've been working with C# for the last 2 years, and I've never done any unit testing. I just need to know what the objective of unit testing is. What kind of results do we expect from unit testing? Is code quality checked by unit testing? In my view, unit testing is the job of testers; if that is true, then as a developer why would I need to write test code if the tester does the unit testing? Why should I write extra code for testing? Do I need to maintain a separate copy of a project for unit testing?

    Read the article

  • Link between tests and user stories

    - by Sardathrion
    I have not see these links explicitly stated in the Agile literature I have read. So, I was wondering if this approach was correct: Let a story be defined as "In order to [RESULT], [ROLE] needs to [ACTION]" then RESULT generates system tests. ROLE generates acceptance tests. ACTION generates component and unit tests. Where the definitions are the ones used in xUnit Patterns which to be fair are fairly standard. Is this a correct interpretation or did I misunderstand something?

    Read the article

  • What is the difference between debugging and testing?

    - by persepolis
    Introduction To Software Testing (Ammann & Offutt) mentions on p.32 a 5-level testing maturity model: Level 0 There’s no difference between testing and debugging. Level 1 The purpose of testing is to show that the software works. Level 2 The purpose of testing is to show that the software doesn’t work. Level 3 The purpose of testing is not to prove anything specific, but to reduce the risk of using the software. Level 4 Testing is a mental discipline that helps all IT professionals develop higher quality software. Although they don't go into much further detail. What are the differences between debugging and testing?

    Read the article

  • Understanding how software testing works and what to test.

    - by RHaguiuda
    Intro: I've seen lots of topics here on SO about software testing and other terms I don't understand. Problem: As a beginner developer I, unfortunately, have no idea how software testing works, not even how to test a simple function. This is a shame, but thats the truth. I also hope this question can help others beginners developers too. Question: Can you help me to understand this subject a little bit more? Maybe some questions to start would help: When I develop a function, how should I test it? For example: when working with a sum function, should I test every input value possible or just some limits? How about testing functions with strings as parameters? In a big program, do I have to test every single piece of code of it? When you guys program do you test every code written? How automated test works and how can I try one? How tools for automated testing works and what they do? I`ve heard about unit testing. Can I have a brief explanation on this? What is a testing framework? If possible please post some code with examples to clarify the ideas. Any help on this topic is very welcome! Thanks.

    Read the article

  • Rails testing authlogic

    - by pepernik
    I just started using tests. I try to test the login like this require 'test_helper' class UserFlowsTest < ActionController::IntegrationTest fixtures :all # Replace this with your real tests. test "login and browse" do https! get "/users/new" assert_response :success post "/user_sessions", :email => '[email protected]', :password => 'aaaa' follow_redirect! assert_equal root_path, path end end I use authlogic gem in my rails app. What is wrong with this test? It breaks at 'follow_redirect!' saying it is not a redirection but login through a browser works. Thx!

    Read the article

  • Run unit tests in Jenkins / Hudson in automated fashion from dev to build server

    - by Kevin Donde
    We are currently running a Jenkins (Hudson) CI server to build and package our .net web projects and database projects. Everything is working great but I want to start writing unit tests and then only passing the build if the unit tests pass. We are using the built in msbuild task to build the web project. With the following arguments ... MsBuild Version .NET 4.0 MsBuild Build File ./WebProjectFolder/WebProject.csproj Command Line Arguments ./target:Rebuild /p:Configuration=Release;DeployOnBuild=True;PackageLocation=".\obj\Release\WebProject.zip";PackageAsSingleFile=True We need to run automated tests over our code that run automatically when we build on our machines (post build event possibly) but also run when Jenkins does a build for that project. If you run it like this it doesn't build the unit tests project because the web project doesn't reference the test project. The test project would reference the web project but I'm pretty sure that would be butchering our automated builds as they exist primarily to build and package our deployments. Running these tests should be a step in that automated build and package process. Options ... Create two Jenkins jobs. one to run the tests ... if the tests pass another build is triggered which builds and packages the web project. Put the post build event on the test project. Build the solution instead of the project (make sure the solution contains the required tests) and put post build events on any test projects that would run the nunit console to run the tests. Then use the command line to copy all the required files from each of the bin and content directories into a package. Just build the test project in jenkins instead of the web project in jenkins. The test project would reference the web project (depending on what you're testing) and build it. Problems ... There's two jobs and not one. Two things to debug not one. One to see if the tests passed and one to build and compile the web project. The tests could pass but the build could fail if its something that isn't used by what you're testing ... This requires us to know exactly what goes into the build. Right now msbuild does it all for us. If you have multiple teams working on a project everytime an extra folder is created you have to worry about the possibly brittle command line statements. This seems like a corruption of our main purpose here. The tests should be a step in this process not the overriding most important thing in this process. I'm also not 100% sure that a triggered build is the same as a normal build does it do all the same things as a normal build. Move all the correct files in the same way move them all into the same directories etc. Initial problem. We want to run our tests whenever our main project is built. But adding a post build event to the web project that runs against the test project doesn't work because the web project doesn't reference the test project and won't trigger a build of this project. I could go on ... but that's enough ... We've spent about a week trying to make this work nicely but haven't succeeded. Feel free to edit this if you feel you can get a better response ...

    Read the article

  • Functional testing in the verification

    - by user970696
    Yesterday my question How come verification does not include actual testing? created a lot of controversy, yet did not reveal the answer for related and very important question: does black box functional testing done by testers belong to verification or validation? ISO 12207:12208 here mentiones testing explicitly only as a validation activity, however, it speaks about validation of requirements of the intended use. For me its more high level, like UAT test cases written by business users ISO mentioned above does not mention any specific verification (7.2.4.3.2)except for Requirement verification, Design verification, Document and Code & Integration verification. The last two can be probably thought as unit and integrated testing. But where is then the regular testing done by testers at the end of the phase? The book I mentioned in the original question mentiones that verification is done by static techniques, yet on the V model graph it describes System testing against high level description as a verification, mentioning it includes all kinds of testing like functional, load etc. In the IEEE standard for V&V, you can read this: Even though the tests and evaluations are not part of the V&V processes, the techniques described in this standard may be useful in performing them. So that is different than in ISO, where validation mentiones testing as the activity. Not to mention a lot of contradicting information on the net. I would really appreciate a reference to e.g. a standard in the answer or explanation of what I missed in the ISO. For me, I am unable to tell where the testers work belong.

    Read the article

  • Oracle Functional Testing Suite Advanced Pack for Oracle EBS Now Available

    - by Anne Carlson (Oracle Development)
    There’s new news about automated testing of E-Business Suite using the Oracle Application Testing Suite, a.k.a, “OATS”. E-Business Suite Development is pleased to announce the availability of the new Oracle Functional Testing Suite Advanced Pack for Oracle E-Business Suite. The new pack, available with the latest release of Oracle Application Testing Suite (12.4.0.2), provides pre-built test components and flows to automate the in-depth testing of Oracle E-Business Suite applications. Designed for use with the Oracle Application Testing Suite and its Oracle Flow Builder capability, these pre-built components and flows can help Oracle E-Business Suite customers to significantly reduce the time and effort needed to create and maintain automated test scripts. The Oracle Functional Testing Suite Advanced Pack for Oracle E-Business Suite is available now for EBS 12.1.3, and availability for EBS 12.2 is planned. Some Background on Automating Testing with Oracle Application Testing Suite and Oracle Flow Builder      Testing complex packaged applications like Oracle E-Business Suite can be time-consuming and challenging for organizations, hampering their ability to upgrade to latest releases or apply latest patches. Oracle Application Testing Suite offers organizations a unique and powerful testing platform for Oracle E-Business Suite and other Oracle applications. With the 12.3.0.1 release of Oracle Application Testing Suite, we introduced the Oracle Flow Builder testing framework and accompanying starter pack of pre-built test components and flows. The starter pack, which contains over 2000 components and 200 flows, provides broad coverage of commonly-used base functionality and is designed to jump-start the test automation effort. Using Oracle Flow Builder, even non-technical testers can create working test scripts using the pre-built components that Oracle provides. Each component represents an atomic test operation such as “create an invoice batch” or “apply an invoice hold.” Testers can assemble the pre-built components into test flows, and combine test flows with spreadsheet data to drive the testing of multiple data conditions. The Oracle Flow Builder framework allows customers to add, modify and extend the pre-built components to address new functionality and customizations of the Oracle E-Business Suite. Using Oracle Flow Builder’s component-based test generation framework instead of a traditional record/playback approach has allowed the EBS Quality Assurance team to reduce their test automation effort by 60%. E-Business Suite customers can significantly reduce their test automation effort using Oracle Application Testing Suite with Oracle Flow Builder and the pre-built test components and flows that Oracle provides. Oracle Functional Testing Suite Advanced Pack for Oracle E-Business Suite Improves Test Coverage With the Oracle Application Testing Suite 12.4.0.2 and the new Oracle Functional Testing Suite Advanced Pack for Oracle E-Business Suite, we are now delivering a significant number of additional test components and flows beyond those contained in the Oracle Flow Builder starter pack. These additional test components and flows provide 70-80% test coverage and enable the automation of detailed and complex test flows across the following Oracle E-Business Suite products: Oracle Asset Lifecycle Management Oracle Channel Revenue Management Oracle Discrete Manufacturing Oracle Incentive Compensation Oracle Lease and Finance Management Oracle Process Manufacturing Oracle Procurement Oracle Project Management Oracle Property Manager Oracle Service Downloads You can download the Oracle Functional Testing Suite Advanced Pack for Oracle E-Business Suite from the Oracle Technology Network. References Oracle Applications Testing Suite YouTube: Oracle Flow Builder Training YouTube: Oracle Applications Testing Suite and Flow Builder Demonstration Oracle Functional Testing Suite Advanced Pack Readme for E-Business Suite, id=1905989.1">Note 1905989.1 Related Articles Automate Testing Using Oracle Application Testing Suite with Flow Builder for E-Business Suite EBS 12.1.1 Test Starter Kit Now Available for Oracle Applications Testing Suite Oracle Application Testing Suite 9.0 Supported with Oracle E-Business Suite Using the Oracle Application Testing Suite with EBS: Interim Update #1

    Read the article

  • Inspection, code review - is it really testing?

    - by user970696
    ISTQB, Wikipedia or other sources classify verification acitivities (reviews etc.) as a static testing, yet other do not. If we can say that peer reviews and inspections are actually a kind of a testing, then a lot of standards do not make sense (consider e.g. ISO which say that validation is done by testing, while verification by checking of work products) - it should at least say dynamic testing for validation, shouldn't it? I am completing master thesis dealing with QA and I must admit that I have never seen worse and more ambiguous and contradicting literature than in this field :/ Do you think (and if so, why) that static testing is a good and justifiable term or should we stick to testing and static checks/analysis?

    Read the article

  • What are best practices for testing programs with stochastic behavior?

    - by John Doucette
    Doing R&D work, I often find myself writing programs that have some large degree of randomness in their behavior. For example, when I work in Genetic Programming, I often write programs that generate and execute arbitrary random source code. A problem with testing such code is that bugs are often intermittent and can be very hard to reproduce. This goes beyond just setting a random seed to the same value and starting execution over. For instance, code might read a message from the kernal ring buffer, and then make conditional jumps on the message contents. Naturally, the ring buffer's state will have changed when one later attempts to reproduce the issue. Even though this behavior is a feature it can trigger other code in unexpected ways, and thus often reveals bugs that unit tests (or human testers) don't find. Are there established best practices for testing systems of this sort? If so, some references would be very helpful. If not, any other suggestions are welcome!

    Read the article

  • Rescue overdue offshore projects and convince management to use automated tests

    - by oazabir
    I have published two articles on codeproject recently. One is a story where an offshore project was two months overdue, my friend who runs it was paying the team from his own pocket and he was drowning in ever increasing number of change requests and how we brainstormed together to come out of that situation. Tips and Tricks to rescue overdue projects Next one is about convincing management to go for automated test and give developers extra time per sprint, at the cost of reduced productivity for couple of sprints. It’s hard to negotiate this with even dev leads, let alone managers. Whenever you tell them - there’s going to be less features/bug fixes delivered for next 3 or 4 sprints because we want to automate the tests and reduce manual QA effort; everyone gets furious and kicks you out of the meeting. Especially in a startup where every sprint is jam packed with new features and priority bug fixes to satisfy various stakeholders, including the VCs, it’s very hard to communicate the benefits of automated tests across the board. Let me tell you of a story of one of my startups where I had the pleasure to argue on this and came out victorious. How to convince developers and management to use automated test instead of manual test If you like these, please vote for me!

    Read the article

  • Agile Testing Days 2012 – Day 2 – Learn through disagreement

    - by Chris George
    I think I was in the right place! During Day 1 I kept on reading tweets about Lean Coffee that has happened earlier that morning. It intrigued me and I figured in for a penny in for a pound, and set my alarm for 6:45am. Following the award night the night before, it was _really_ hard getting up when it went off, but I did and after a very early breakfast, set off for the 10 min walk to the Dorint. With Lean Coffee due to start at 07:30, I arrived at the hotel and made my way to one of the hotel bars. I soon realised I was in the right place as although the bar was empty, there was a table with post-it’s and pens! This MUST be the place! The premise of Lean Coffee is to have several small timeboxed discussions. Everyone writes down what they would like to discuss on post-its that are then briefly explained and submitted to the pile. Once everyone is done, the group dot-votes on the topics. The topics are then sorted by the dot vote counts and the discussions begin. Each discussion had 8 mins to start with, which meant it prevented the discussions getting off topic too much. After the time elapsed, the group had a vote whether to extend the discussion by a further 4 mins or move on. Several discussion were had around training, soft skills etc. The conversations were really interesting and there were quite a few good ideas. Overall it was a very enjoyable experience, certainly worth the early start! Make Melly Happy Following Lean Coffee was real coffee, and much needed that was! The first keynote of the day was “Let’s help Melly (Changing Work into Life)”by Jurgen Appelo. Draw lines to track happiness This was a very interesting presentation, and set the day nicely. The theme to the keynote was projects are about the people, more-so than the actual tasks. So he started by showing a photo of an employee ‘Melly’ who looked happy enough. He then stated that she looked happy but actually hated her job. In fact 50% of Americans hate their jobs. He went on to say that the world over 50% of people hate Americans their jobs. Jurgen talked about many ways to reduce the feedback cycle, not only of the project, but of the people management. Ideas such as Happiness doors, happiness tracking (drawing lines on a wall indicating your happiness for that day), kudo boxes (to compliment a colleague for good work). All of these (and more) ideas stimulate conversation amongst the team, lead to early detection of issues and investigation of solutions. I’ve massively simplified Jurgen’s keynote and have certainly not done it justice, so I will post a link to the video once it’s available. Following more coffee, the next talk was “How releasing faster changes testing” by Alexander Schwartz. This is a topic very close to our hearts at the moment, so I was eager to find out any juicy morsels that could help us achieve more frequent releases, and Alex did not disappoint. He started off by confirming something that I have been a firm believer in for a number of years now; adding more people can do more harm than good when trying to release. This is for a number of reasons, but just adding new people to a team at such a critical time can be more of a drain on resources than they add. The alternative is to have the whole team have shared responsibility for faster delivery. So the whole team is responsible for quality and testing. Obviously you will have the test engineers on the project who have the specialist skills, but there is no reason that the entire team cannot do exploratory testing on the product. This links nicely with the Developer Exploratory testing presented by Sigge on Day 1, and certainly something that my team are really striving towards. Focus on cycle time, so what can be done to reduce the time between dev cycles, release cycles. What’s stops a release, what delays a release? all good solid questions that can be answered. Alex suggested that perhaps the product doesn’t need to be fully tested. Doing less testing will reduce the cycle time therefore get the release out faster. He suggested a risk-based approach to planning what testing needs to happen. Reducing testing could have an impact on revenue if it causes harm to customers, so test the ‘right stuff’! Determine a set of tests that are ‘face saving’ or ‘smoke’ tests. These tests cover the core functionality of the product and aim to prevent major embarrassment if these areas were to fail! Amongst many other very good points, Alex suggested that a good approach would be to release after every new feature is added. So do a bit of work -> release, do some more work -> release. By releasing small increments of work, the impact on the customer of bugs being introduced is reduced. Red Pill, Blue Pill The second keynote of the day was “Adaptation and improvisation – but your weakness is not your technique” by Markus Gartner and proved to be another very good presentation. It started off quoting lines from the Matrix which relate to adapting, improvising, realisation and mastery. It has alot of nerds in the room smiling! Markus went on to explain how through deliberate practice ( and a lot of it!) you can achieve mastery, but then you never stop learning. Through methods such as code retreats, testing dojos, workshops you can continually improve and learn. The code retreat idea was one that interested me. It involved pairing to write an automated test for, say, 45 mins, they deleting all the code, finding a different partner and writing the same test again! This is another keynote where the video will speak louder than anything I can write here! Markus did elaborate on something that Lisa and Janet had touched on yesterday whilst busting the myth that “Testers Must Code”. Whilst it is true that to be a tester, you don’t need to code, it is becoming more common that there is this crossover happening where more testers are coding and more programmers are testing. Markus made a special distinction between programmers and developers as testers develop tests code so this helped to make that clear. “Extending Continuous Integration and TDD with Continuous Testing” by Jason Ayers was my next talk after lunch. We already do CI and a bit of TDD on my project team so I was interested to see what this continuous testing thing was all about and whether it would actually work for us. At the start of the presentation I was of the opinion that it just would not work for us because our tests are too slow, and that would be the case for many people. Jason started off by setting the scene and saying that those doing TDD spend between 10-15% of their time waiting for tests to run. This can be reduced by testing less often, reducing the test time but this then increases the risk of introduced bugs not being spotted quickly. Therefore, in comes Continuous Testing (CT). CT systems run your unit tests whenever you save some code and runs them in the background so you can continue working. This is a really nice idea, but to do this, your tests must be fast, independent and reliable. The latter two should be the case anyway, and the first is ideal, but hard! Jason makes several suggestions to make tests fast. Firstly keep the scope of the test small, secondly spin off any expensive tests into a suite which is run, perhaps, overnight or outside of the CT system at any rate. So this started to change my mind, perhaps we could re-engineer our tests, and continuously run the quick ones to give an element of coverage. This talk was very interesting and I’ve already tried a couple of the tools mentioned on our product (Mighty Moose and NCrunch). Sadly due to the way our solution is built, it currently doesn’t work, but we will look at whether we can make this work because this has the potential to be a mini-game-changer for us. Using the wrong data Gojko’s Hierarchy of Quality The final keynote of the day was “Reinventing software quality” by Gojko Adzic. He opened the talk with the statement “We’ve got quality wrong because we are using the wrong data”! Gojko then went on to explain that we should judge a bug by whether the customer cares about it, not by whether we think it’s important. Why spend time fixing issues that the customer just wouldn’t care about and releasing months later because of this? Surely it’s better to release now and get customer feedback? This was another reference to the idea of how it’s better to build the right thing wrong than the wrong thing right. Get feedback early to make sure you’re making the right thing. Gojko then showed something which was very analogous to Maslow’s heirachy of needs. Successful – does it contribute to the business? Useful – does it do what the user wants Usable – does it do what it’s supposed to without breaking Performant/Secure – is it secure/is the performance acceptable Deployable Functionally ok – can it be deployed without breaking? He then explained that User Stories should focus on change. In other words they should focus on the users needs, not the users process. Describe what the change will be, how that change will happen then measure it! Networking and Beer Following the day’s closing keynote, there were drinks and nibble for the ‘Networking’ evening. This was a great opportunity to talk to people. I find approaching strangers very uncomfortable but once again, when in Rome! Pete Walen and I had a long conversation about only fixing issues that the customer cares about versus fixing issues that make you proud of your software! Without saying much, and asking the right questions, Pete made me re-evaluate my thoughts on the matter. Clever, very clever!  Oh and he ‘bought’ me a beer! My Takeaway Triple from Day 2: release small and release often to minimize issues creeping in and get faster feedback from ‘the real world’ Focus on issues that the customers care about, not what we think is important It’s okay to disagree with someone, even if they are well respected agile testing gurus, that’s how discussion and learning happens!  

    Read the article

  • Point to Taken Care while Microsoft SQL Patching Testing in Production

    - by AbhishekLohani
    Originally posted on: http://geekswithblogs.net/AbhishekLohani/archive/2013/10/29/point-to-taken-care-while-sql-patching-testing--in.aspx Point to Taken Care while Microsoft SQL Patching Testing in Production It very critical testing like Paching testing  1. Build the Test Environment Parrel to Production Environment i.e Staging Environment2 Check the Version of Application deployed is same as Production Environment if Staging Environment not parrel to production environment then risk of defect in production 3.Check End to End Flow of Appliction 4 Check the Eventlog entries 5 Check the performance of the Application . Thanks & RegardsAbhishek

    Read the article

  • Any thoughts on A/B testing in Django based project?

    - by Maddy
    We just now started doing the A/B testing for our Django based project. Can I get some information on best practices or useful insights about this A/B testing. Ideally each new testing page will be differentiated with a single parameter(just like Gmail). mysite.com/?ui=2 should give a different page. So for every view I need to write a decorator to load different templates based on the 'ui' parameter value. And I dont want to hard code any template names in decorators. So how would urls.py url pattern will be?

    Read the article

  • Software or testing pipeline for testing multiple hard drives

    - by lions_leash
    I have a whole bunch of hard drives (maybe 10 or so) from a variety of sources that I'd like to test. If they work, I will put them in use and/or give them away. I was going to simply open up one of my machines and plug each one in, one at a time, and troubleshoot from there. Is there a way (or set of tools) that I can use to make this process easier and/or faster?

    Read the article

  • Testing tools for Django Project

    - by Bharath
    Can anyone please suggest me some good testing tools for a django project? I need to test the different use case scenarios, unit testing, as well as load testing for my project. Is there any good standard testing suite available?? Any other suggestion(s) for the testing process is greatly appreciated. I use Django, postgresql on Ubuntu server if this information is necessary.

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >