Search Results

Search found 1531 results on 62 pages for 'ben rees'.

Page 2/62 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • netsh.exe: Error 87

    - by Ben
    I'm having some trouble creating a urlacl reservation in Windows Server 2008; probably this a rookie mistake. The command line I'm using is: netsh http add urlacl url=http://+:99898/ user=ben The error that I see is: Url reservation add failed, Error: 87 The parameter is incorrect. There is a local user account named 'ben' that has admin privileges. I've made sure to put a trailing slash after the port number in the URL. Google and MSDN documentation are letting me down now - does anyone have any clue what I'm doing incorrectly?

    Read the article

  • Continuous Integration for SQL Server Part II – Integration Testing

    - by Ben Rees
    My previous post, on setting up Continuous Integration for SQL Server databases using GitHub, Bamboo and Red Gate’s tools, covered the first two parts of a simple Database Continuous Delivery process: Putting your database in to a source control system, and, Running a continuous integration process, each time changes are checked in. However there is, of course, a lot more to to Continuous Delivery than that. Specifically, in addition to the above: Putting some actual integration tests in to the CI process (otherwise, they don’t really do much, do they!?), Deploying the database changes with a managed, automated approach, Monitoring what you’ve just put live, to make sure you haven’t broken anything. This post will detail how to set up a very simple pipeline for implementing the first of these (continuous integration testing). NB: A lot of the setup in this post is built on top of the configuration from before, so it might be difficult to implement this post without running through part I first. There’ll then be a third post on automated database deployment followed by a final post dealing with the last item – monitoring changes on the live system. In the previous post, I used a mixture of Red Gate products and other 3rd party software – GitHub and Atlassian Bamboo specifically. This was partly because I believe most people work in an heterogeneous environment, using software from different vendors to suit their purposes and I wanted to show how this could work for this process. For example, you could easily substitute Atlassian’s BitBucket or Stash for GitHub, depending on your needs, or use an alternative CI server such as TeamCity, TFS or Jenkins. However, in this, post, I’ll be mostly using Red Gate products only (other than tSQLt). I would do this, firstly because I work for Red Gate. However, I also think that in the area of Database Delivery processes, nobody else has the offerings to implement this process fully – so I didn’t have any choice!   Background on Continuous Delivery For me, a great source of information on what makes a proper Continuous Delivery process is the Jez Humble and David Farley classic: Continuous Delivery – Reliable Software Releases through Build, Test, and Deployment Automation This book is not of course, primarily about databases, and the process I outline here and in the previous article is a gross simplification of what Jez and David describe (not least because it’s that much harder for databases!). However, a lot of the principles that they describe can be equally applied to database development and, I would argue, should be. As I say however, what I describe here is a very simple version of what would be required for a full production process. A couple of useful resources on handling some of these complexities can be found in the following two references: Refactoring Databases – Evolutionary Database Design, by Scott J Ambler and Pramod J. Sadalage Versioning Databases – Branching and Merging, by Scott Allen In particular, I don’t deal at all with the issues of multiple branches and merging of those branches, an issue made particularly acute by the use of GitHub. The other point worth making is that, in the words of Martin Fowler: Continuous Delivery is about keeping your application in a state where it is always able to deploy into production.   I.e. we are not talking about continuously delivery updates to the production database every time someone checks in an amendment to a stored procedure. That is possible (and what Martin calls Continuous Deployment). However, again, that’s more than I describe in this article. And I doubt I need to remind DBAs or Developers to Proceed with Caution!   Integration Testing Back to something practical. The next stage, building on our set up from the previous article, is to add in some integration tests to the process. As I say, the CI process, though interesting, isn’t enormously useful without some sort of test process running. For this we’ll use the tSQLt framework, an open source framework designed specifically for running SQL Server tests. tSQLt is part of Red Gate’s SQL Test found on http://www.red-gate.com/products/sql-development/sql-test/ or can be downloaded separately from www.tsqlt.org - though I’ll provide a step-by-step guide below for setting this up. Getting tSQLt set up via SQL Test Click on the link http://www.red-gate.com/products/sql-development/sql-test/ and click on the blue Download button to download the Red Gate SQL Test product, if not already installed. Follow the install process for SQL Test to install the SQL Server Management Studio (SSMS) plugin on to your machine, if not already installed. Open SSMS. You should now see SQL Test under the Tools menu:   Clicking this link will give you the basic SQL Test dialogue: As yet, though we’ve installed the SQL Test product we haven’t yet installed the tSQLt test framework on to any particular database. To do this, we need to add our RedGateApp database using this dialogue, by clicking on the + Add Database to SQL Test… link, selecting the RedGateApp database and clicking the Add Database link:   In the next screen, SQL Test describes what will be installed on the database for the tSQLt framework. Also in this dialogue, uncheck the “Add SQL Cop tests” option (shown below). SQL Cop is a great set of pre-defined tests that work within the tSQLt framework to check the general health of your SQL Server database. However, we won’t be using them in this particular simple example: Once you’ve clicked on the OK button, the changes described in the dialogue will be made to your database. Some of these are shown in the left-hand-side below: We’ve now installed the framework. However, we haven’t actually created any tests, so this will be the next step. But, before we proceed, we’ve made an update to our database so should, again check this in to source control, adding comments as required:   Also worth a quick check that your build still runs with the new additions!: (And a quick check of the RedGateAppCI database shows that the changes have been made).   Creating and Testing a Unit Test There are, of course, a lot of very interesting unit tests that you could and should set up for a database. The great thing about the tSQLt framework is that you can write these in SQL. The example I’m going to use here is pretty Mickey Mouse – our database table is going to include some email addresses as reference data and I want to check whether these are all in a correct email format. Nothing clever but it illustrates the process and hopefully shows the method by which more interesting tests could be set up. Adding Reference Data to our Database To start, I want to add some reference data to my database, and have this source controlled (as well as the schema). First of all I need to add some data in to my solitary table – this can be done a number of ways, but I’ll do this in SSMS for simplicity: I then add some reference data to my table: Currently this reference data just exists in the database. For proper integration testing, this needs to form part of the source-controlled version of the database – and so needs to be added to the Git repository. This can be done via SQL Source Control, though first a Primary Key needs to be added to the table. Right click the table, select Design, then right-click on the first “id” row. Then click on “Set Primary Key”: NB: once this change is made, click Save to save the change to the table. Then, to source control this reference data, right click on the table (dbo.Email) and selecting the following option:   In the next screen, link the data in the Email table, by selecting it from the list and clicking “save and close”: We should at this point re-commit the changes (both the addition of the Primary Key, and the data) to the Git repo. NB: From here on, I won’t show screenshots for the GitHub side of things – it’s the same each time: whenever a change is made in SQL Source Control and committed to your local folder, you then need to sync this in the GitHub Windows client (as this is where the build server, Bamboo is taking it from). An interesting point to note here, when these changes are committed in SQL Source Control (right-click database and select “Commit Changes to Source Control..”): The display gives a warning about possibly needing a migration script for the “Add Primary Key” step of the changes. This isn’t actually necessary in this case, but this mechanism would allow you to create override scripts to replace the default change scripts created by the SQL Compare engine (which runs underneath SQL Source Control). Ignoring this message (!), we add a comment and commit the changes to Git. I then sync these, run a build (or the build gets run automatically), and check that the data is being deployed over to the target RedGateAppCI database:   Creating and Running the Test As I mention, the test I’m going to use here is a very simple one - are the email addresses in my reference table valid? This isn’t of course, a full test of email validation (I expect the email addresses I’ve chosen here aren’t really the those of the Fab Four) – but just a very basic check of format used. I’ve taken the relevant SQL from this Stack Overflow article. In SSMS select “SQL Test” from the Tools menu, then click on + New Test: In the next screen, give your new test a name, and also enter a name in the Test Class box (test classes are schemas that help you keep things organised). Also check that the database in which the test is going to be created is correct – RedGateApp in this example: Click “Create Test”. After closing a couple of subsequent dialogues, you’ll see a dummy script for the test, that needs filling in:   We now need to define the SQL for our test. As mentioned before, tSQLt allows you to write your unit tests in T-SQL, and the code I’m going to use here is as below. This needs to be copied and pasted in to the query window, to replace the default given by tSQLt: –  Basic email check test ALTER PROCEDURE [MyChecks].[test Check Email Addresses] AS BEGIN SET NOCOUNT ON         Declare @Output VarChar(max)     Set @Output = ”       SELECT  @Output = @Output + Email +Char(13) + Char(10) FROM dbo.Email WHERE email NOT LIKE ‘%_@__%.__%’       If @Output > ”         Begin             Set @Output = Char(13) + Char(10)                           + @Output             EXEC tSQLt.Fail@Output         End   END;   Once this script is entered, hit execute to add the Stored Procedure to the database. Before committing the test to source control,  it’s worth just checking that it works! For a positive test, click on “SQL Test” from the Tools menu, then click Run Tests. You should see output like the following: - a green tick to indicate success! But of course, what we also need to do is test that this is actually doing something by showing a failed test. Edit one of the email addresses in your table to an incorrect format: Now, re-run the same SQL Test as before and you’ll see the following: Great – we now know that our test is really doing something! You’ll also see a useful error message at the bottom of SSMS: (leave the email address as invalid for now, for the next steps). The next stage is to check this new test in to source control again, by right-clicking on the database and checking in the changes with a commit message (and not forgetting to sync in the GitHub client):   Checking that the Tests are Running as Integration Tests After the changes above are made, and after a build has run on Bamboo (manual or automatic), looking at the Stored Procedures for the RedGateAppCI, the SPROC for the new test has been moved over to the database. However this is not exactly what we were after. We didn’t want to just copy objects from one database to another, but actually run the tests as part of the build/integration test process. I.e. we’re continuously checking any changes we make (in this case, to the reference data emails), to ensure we’re not breaking a test that we’ve set up. The behaviour we want to see is that, if we check in static data that is incorrect (as we did in step 9 above) and we have the tSQLt test set up, then our build in Bamboo should fail. However, re-running the build shows the following: - sadly, a successful build! To make sure the tSQLt tests are run as part of the integration test, we need to amend a switch in the Red Gate CI config file. First, navigate to file sqlCI.targets in your working folder: Edit this document, make the following change, save the document, then commit and sync this change in the GitHub client: <!-- tSQLt tests --> <!-- Optional --> <!-- To run tSQLt tests in source control for the database, enter true. --> <enableTsqlt>true</enableTsqlt> Now, if we re-run the build in Bamboo (NB: I’ve moved to a new server here, hence different address and build number): - superb, a broken build!! The error message isn’t great here, so to get more detailed info, click on the full build log link on this page (below the fold). The interesting part of the log shown is towards the bottom. Pulling out this part:   21-Jun-2013 11:35:19 Build FAILED. 21-Jun-2013 11:35:19 21-Jun-2013 11:35:19 "C:\Users\Administrator\bamboo-home\xml-data\build-dir\RGA-RGP-JOB1\sqlCI.proj" (default target) (1) -> 21-Jun-2013 11:35:19 (sqlCI target) -> 21-Jun-2013 11:35:19 EXEC : sqlCI error occurred: RedGate.Deploy.SqlServerDbPackage.Shared.Exceptions.InvalidSqlException: Test Case Summary: 1 test case(s) executed, 0 succeeded, 1 failed, 0 errored. [C:\Users\Administrator\bamboo-home\xml-data\build-dir\RGA-RGP-JOB1\sqlCI.proj] 21-Jun-2013 11:35:19 EXEC : sqlCI error occurred: [MyChecks].[test Check Email Addresses] failed: [C:\Users\Administrator\bamboo-home\xml-data\build-dir\RGA-RGP-JOB1\sqlCI.proj] 21-Jun-2013 11:35:19 EXEC : sqlCI error occurred: ringo.starr@beatles [C:\Users\Administrator\bamboo-home\xml-data\build-dir\RGA-RGP-JOB1\sqlCI.proj] 21-Jun-2013 11:35:19 EXEC : sqlCI error occurred: [C:\Users\Administrator\bamboo-home\xml-data\build-dir\RGA-RGP-JOB1\sqlCI.proj] 21-Jun-2013 11:35:19 EXEC : sqlCI error occurred: +----------------------+ [C:\Users\Administrator\bamboo-home\xml-data\build-dir\RGA-RGP-JOB1\sqlCI.proj] 21-Jun-2013 11:35:19 EXEC : sqlCI error occurred: |Test Execution Summary| [C:\Users\Administrator\bamboo-home\xml-data\build-dir\RGA-RGP-JOB1\sqlCI.proj]   As a final check, we should make sure that, if we now fix this error, the build succeeds. So in SSMS, I’m going to correct the invalid email address, then check this change in to SQL Source Control (with a comment), commit to GitHub, and re-run the build:   This should have fixed the build: It worked! Summary This has been a very quick run through the implementation of CI for databases, including tSQLt tests to test whether your database updates are working. The next post in this series will focus on automated deployment – we’ve tested our database changes, how can we now deploy these to target sites?  

    Read the article

  • C++ Set Erase Entry Question

    - by Wallace
    Hi. I encountered a problem here. I'm using C++ multiset. This is the test file. Score: 3-1 Ben Steven Score: 1-0 Ben Score: 0-0 Score: 1-1 Cole Score: 1-2 Ben I'm using while loop and ifstream (fin1) to read in from the test file above. multiset<string, less<string> > myset; while(!fin1.eof()) { fin1 >> scoreName; if(scoreName == "Score:") { //calculates number of matches played } else { goalCheck = scoreName.substr(1,1); if(goalCheck == "-") { string lGoal, rGoal; lGoal = scoreName.substr(0,1); rGoal = scoreName.substr(2,1); int leftGoal, rightGoal; leftGoal = atoi(lGoal.c_str()); rightGoal = atoi(rGoal.c_str()); if(leftGoal > rightGoal) //if team wins { //some computations } else if(leftGoal < rightGoal) //if team loses { //computations } else if(leftGoal == rightGoal) //if team draws { //computations } else { myset.insert(myset.begin(), scoreName); } } } I'm inserting all names into myset (regardless of wins/loses/draws) in my last else statement. But I only require the names of those matches who won/draw. Those names whose matches lost will not be included in myset. In the test file above, there's only one match that lost (1-2) and I wanted to remove "Ben". How can I do that? I tried to use myset.erase(), but I'm not sure how to get it point to Ben and remove it from myset. Any help is much appreciated. Thanks.

    Read the article

  • Pins on Pinterest link to 404 - yet link is valid

    - by Damian Rees
    this is a really strange one. I've set up a bunch of pins on Pinterest linking through to our services which all work fine. Then I decided to do the same on our blog articles (we use Wordpress), yet everytime I click the link (and I've done this on different computers) the link goes to a 404 page on our site. However the link is valid and if you right click the pin and open in new window it opens fine. I have contacted Pinterest who are next to useless. I have also tried different browsers, different computers and different Pinterest accounts. I can't see any weirdness in my htaccess files causing this so I'm a little stumped. Any suggestions?

    Read the article

  • overheating when using flash

    - by Ben
    I am having overheating issues when watching flash videos. Here is all the relevant information that I could think of. Please help. --Often when playing flash videos it operates at 95 degrees C. --Only gets that hot when on full screen (but still in the 80s otherwise) --Sometimes reaches 100 degrees and shuts down. --fan runs at around 4500 RPM when hot (not to mention I can here it speed up) --Happens under Ubuntu 12.04 and 12.10 (did not use Ubuntu before then) --Overheating happens on more than one site (for example youtube and Comedy Central) --My computer does not overheat otherwise. --Usually runs around 50-60 degrees C. --Maybe if compiling or doing updates can it get to 70 or 75 degree C. --Have a dual boot, and under Windows I do not have this issue. --I use firefox, but have the same issue if using Chrome --I have a Lenovo T410, currently running Ubuntu 12.10 --Intel® Core™ i5 CPU M 540 @ 2.53GHz × 4 --4 GB of memory, 64 bit OS --Graphics: NVS 3100M/PCIe/SSE2 Thanks and let me know if you need more info, Ben

    Read the article

  • Towards Database Continuous Delivery – What Next after Continuous Integration? A Checklist

    - by Ben Rees
    .dbd-banner p{ font-size:0.75em; padding:0 0 10px; margin:0 } .dbd-banner p span{ color:#675C6D; } .dbd-banner p:last-child{ padding:0; } @media ALL and (max-width:640px){ .dbd-banner{ background:#f0f0f0; padding:5px; color:#333; margin-top: 5px; } } -- Database delivery patterns & practices STAGE 4 AUTOMATED DEPLOYMENT If you’ve been fortunate enough to get to the stage where you’ve implemented some sort of continuous integration process for your database updates, then hopefully you’re seeing the benefits of that investment – constant feedback on changes your devs are making, advanced warning of data loss (prior to the production release on Saturday night!), a nice suite of automated tests to check business logic, so you know it’s going to work when it goes live, and so on. But what next? What can you do to improve your delivery process further, moving towards a full continuous delivery process for your database? In this article I describe some of the issues you might need to tackle on the next stage of this journey, and how to plan to overcome those obstacles before they appear. Our Database Delivery Learning Program consists of four stages, really three – source controlling a database, running continuous integration processes, then how to set up automated deployment (the middle stage is split in two – basic and advanced continuous integration, making four stages in total). If you’ve managed to work through the first three of these stages – source control, basic, then advanced CI, then you should have a solid change management process set up where, every time one of your team checks in a change to your database (whether schema or static reference data), this change gets fully tested automatically by your CI server. But this is only part of the story. Great, we know that our updates work, that the upgrade process works, that the upgrade isn’t going to wipe our 4Tb of production data with a single DROP TABLE. But – how do you get this (fully tested) release live? Continuous delivery means being always ready to release your software at any point in time. There’s a significant gap between your latest version being tested, and it being easily releasable. Just a quick note on terminology – there’s a nice piece here from Atlassian on the difference between continuous integration, continuous delivery and continuous deployment. This piece also gives a nice description of the benefits of continuous delivery. These benefits have been summed up by Jez Humble at Thoughtworks as: “Continuous delivery is a set of principles and practices to reduce the cost, time, and risk of delivering incremental changes to users” There’s another really useful piece here on Simple-Talk about the need for continuous delivery and how it applies to the database written by Phil Factor – specifically the extra needs and complexities of implementing a full CD solution for the database (compared to just implementing CD for, say, a web app). So, hopefully you’re convinced of moving on the the next stage! The next step after CI is to get some sort of automated deployment (or “release management”) process set up. But what should I do next? What do I need to plan and think about for getting my automated database deployment process set up? Can’t I just install one of the many release management tools available and hey presto, I’m ready! If only it were that simple. Below I list some of the areas that it’s worth spending a little time on, where a little planning and prep could go a long way. It’s also worth pointing out, that this should really be an evolving process. Depending on your starting point of course, it can be a long journey from your current setup to a full continuous delivery pipeline. If you’ve got a CI mechanism in place, you’re certainly a long way down that path. Nevertheless, we’d recommend evolving your process incrementally. Pages 157 and 129-141 of the book on Continuous Delivery (by Jez Humble and Dave Farley) have some great guidance on building up a pipeline incrementally: http://www.amazon.com/Continuous-Delivery-Deployment-Automation-Addison-Wesley/dp/0321601912 For now, in this post, we’ll look at the following areas for your checklist: You and Your Team Environments The Deployment Process Rollback and Recovery Development Practices You and Your Team It’s a cliché in the DevOps community that “It’s not all about processes and tools, really it’s all about a culture”. As stated in this DevOps report from Puppet Labs: “DevOps processes and tooling contribute to high performance, but these practices alone aren’t enough to achieve organizational success. The most common barriers to DevOps adoption are cultural: lack of manager or team buy-in, or the value of DevOps isn’t understood outside of a specific group”. Like most clichés, there’s truth in there – if you want to set up a database continuous delivery process, you need to get your boss, your department, your company (if relevant) onside. Why? Because it’s an investment with the benefits coming way down the line. But the benefits are huge – for HP, in the book A Practical Approach to Large-Scale Agile Development: How HP Transformed LaserJet FutureSmart Firmware, these are summarized as: -2008 to present: overall development costs reduced by 40% -Number of programs under development increased by 140% -Development costs per program down 78% -Firmware resources now driving innovation increased by a factor of 8 (from 5% working on new features to 40% But what does this mean? It means that, when moving to the next stage, to make that extra investment in automating your deployment process, it helps a lot if everyone is convinced that this is a good thing. That they understand the benefits of automated deployment and are willing to make the effort to transform to a new way of working. Incidentally, if you’re ever struggling to convince someone of the value I’d strongly recommend just buying them a copy of this book – a great read, and a very practical guide to how it can really work at a large org. I’ve spoken to many customers who have implemented database CI who describe their deployment process as “The point where automation breaks down. Up to that point, the CI process runs, untouched by human hand, but as soon as that’s finished we revert to manual.” This deployment process can involve, for example, a DBA manually comparing an environment (say, QA) to production, creating the upgrade scripts, reading through them, checking them against an Excel document emailed to him/her the night before, turning to page 29 in his/her notebook to double-check how replication is switched off and on for deployments, and so on and so on. Painful, error-prone and lengthy. But the point is, if this is something like your deployment process, telling your DBA “We’re changing everything you do and your toolset next week, to automate most of your role – that’s okay isn’t it?” isn’t likely to go down well. There’s some work here to bring him/her onside – to explain what you’re doing, why there will still be control of the deployment process and so on. Or of course, if you’re the DBA looking after this process, you have to do a similar job in reverse. You may have researched and worked out how you’d like to change your methodology to start automating your painful release process, but do the dev team know this? What if they have to start producing different artifacts for you? Will they be happy with this? Worth talking to them, to find out. As well as talking to your DBA/dev team, the other group to get involved before implementation is your manager. And possibly your manager’s manager too. As mentioned, unless there’s buy-in “from the top”, you’re going to hit problems when the implementation starts to get rocky (and what tool/process implementations don’t get rocky?!). You need to have support from someone senior in your organisation – someone you can turn to when you need help with a delayed implementation, lack of resources or lack of progress. Actions: Get your DBA involved (or whoever looks after live deployments) and discuss what you’re planning to do or, if you’re the DBA yourself, get the dev team up-to-speed with your plans, Get your boss involved too and make sure he/she is bought in to the investment. Environments Where are you going to deploy to? And really this question is – what environments do you want set up for your deployment pipeline? Assume everyone has “Production”, but do you have a QA environment? Dedicated development environments for each dev? Proper pre-production? I’ve seen every setup under the sun, and there is often a big difference between “What we want, to do continuous delivery properly” and “What we’re currently stuck with”. Some of these differences are: What we want What we’ve got Each developer with their own dedicated database environment A single shared “development” environment, used by everyone at once An Integration box used to test the integration of all check-ins via the CI process, along with a full suite of unit-tests running on that machine In fact if you have a CI process running, you’re likely to have some sort of integration server running (even if you don’t call it that!). Whether you have a full suite of unit tests running is a different question… Separate QA environment used explicitly for manual testing prior to release “We just test on the dev environments, or maybe pre-production” A proper pre-production (or “staging”) box that matches production as closely as possible Hopefully a pre-production box of some sort. But does it match production closely!? A production environment reproducible from source control A production box which has drifted significantly from anything in source control The big question is – how much time and effort are you going to invest in fixing these issues? In reality this just involves figuring out which new databases you’re going to create and where they’ll be hosted – VMs? Cloud-based? What about size/data issues – what data are you going to include on dev environments? Does it need to be masked to protect access to production data? And often the amount of work here really depends on whether you’re working on a new, greenfield project, or trying to update an existing, brownfield application. There’s a world if difference between starting from scratch with 4 or 5 clean environments (reproducible from source control of course!), and trying to re-purpose and tweak a set of existing databases, with all of their surrounding processes and quirks. But for a proper release management process, ideally you have: Dedicated development databases, An Integration server used for testing continuous integration and running unit tests. [NB: This is the point at which deployments are automatic, without human intervention. Each deployment after this point is a one-click (but human) action], QA – QA engineers use a one-click deployment process to automatically* deploy chosen releases to QA for testing, Pre-production. The environment you use to test the production release process, Production. * A note on the use of the word “automatic” – when carrying out automated deployments this does not mean that the deployment is happening without human intervention (i.e. that something is just deploying over and over again). It means that the process of carrying out the deployment is automatic in that it’s not a person manually running through a checklist or set of actions. The deployment still requires a single-click from a user. Actions: Get your environments set up and ready, Set access permissions appropriately, Make sure everyone understands what the environments will be used for (it’s not a “free-for-all” with all environments to be accessed, played with and changed by development). The Deployment Process As described earlier, most existing database deployment processes are pretty manual. The following is a description of a process we hear very often when we ask customers “How do your database changes get live? How does your manual process work?” Check pre-production matches production (use a schema compare tool, like SQL Compare). Sometimes done by taking a backup from production and restoring in to pre-prod, Again, use a schema compare tool to find the differences between the latest version of the database ready to go live (i.e. what the team have been developing). This generates a script, User (generally, the DBA), reviews the script. This often involves manually checking updates against a spreadsheet or similar, Run the script on pre-production, and check there are no errors (i.e. it upgrades pre-production to what you hoped), If all working, run the script on production.* * this assumes there’s no problem with production drifting away from pre-production in the interim time period (i.e. someone has hacked something in to the production box without going through the proper change management process). This difference could undermine the validity of your pre-production deployment test. Red Gate is currently working on a free tool to detect this problem – sign up here at www.sqllighthouse.com, if you’re interested in testing early versions. There are several variations on this process – some better, some much worse! How do you automate this? In particular, step 3 – surely you can’t automate a DBA checking through a script, that everything is in order!? The key point here is to plan what you want in your new deployment process. There are so many options. At one extreme, pure continuous deployment – whenever a dev checks something in to source control, the CI process runs (including extensive and thorough testing!), before the deployment process keys in and automatically deploys that change to the live box. Not for the faint hearted – and really not something we recommend. At the other extreme, you might be more comfortable with a semi-automated process – the pre-production/production matching process is automated (with an error thrown if these environments don’t match), followed by a manual intervention, allowing for script approval by the DBA. One he/she clicks “Okay, I’m happy for that to go live”, the latter stages automatically take the script through to live. And anything in between of course – and other variations. But we’d strongly recommended sitting down with a whiteboard and your team, and spending a couple of hours mapping out “What do we do now?”, “What do we actually want?”, “What will satisfy our needs for continuous delivery, but still maintaining some sort of continuous control over the process?” NB: Most of what we’re discussing here is about production deployments. It’s important to note that you will also need to map out a deployment process for earlier environments (for example QA). However, these are likely to be less onerous, and many customers opt for a much more automated process for these boxes. Actions: Sit down with your team and a whiteboard, and draw out the answers to the questions above for your production deployments – “What do we do now?”, “What do we actually want?”, “What will satisfy our needs for continuous delivery, but still maintaining some sort of continuous control over the process?” Repeat for earlier environments (QA and so on). Rollback and Recovery If only every deployment went according to plan! Unfortunately they don’t – and when things go wrong, you need a rollback or recovery plan for what you’re going to do in that situation. Once you move in to a more automated database deployment process, you’re far more likely to be deploying more frequently than before. No longer once every 6 months, maybe now once per week, or even daily. Hence the need for a quick rollback or recovery process becomes paramount, and should be planned for. NB: These are mainly scenarios for handling rollbacks after the transaction has been committed. If a failure is detected during the transaction, the whole transaction can just be rolled back, no problem. There are various options, which we’ll explore in subsequent articles, things like: Immediately restore from backup, Have a pre-tested rollback script (remembering that really this is a “roll-forward” script – there’s not really such a thing as a rollback script for a database!) Have fallback environments – for example, using a blue-green deployment pattern. Different options have pros and cons – some are easier to set up, some require more investment in infrastructure; and of course some work better than others (the key issue with using backups, is loss of the interim transaction data that has been added between the failed deployment and the restore). The best mechanism will be primarily dependent on how your application works and how much you need a cast-iron failsafe mechanism. Actions: Work out an appropriate rollback strategy based on how your application and business works, your appetite for investment and requirements for a completely failsafe process. Development Practices This is perhaps the more difficult area for people to tackle. The process by which you can deploy database updates is actually intrinsically linked with the patterns and practices used to develop that database and linked application. So you need to decide whether you want to implement some changes to the way your developers actually develop the database (particularly schema changes) to make the deployment process easier. A good example is the pattern “Branch by abstraction”. Explained nicely here, by Martin Fowler, this is a process that can be used to make significant database changes (e.g. splitting a table) in a step-wise manner so that you can always roll back, without data loss – by making incremental updates to the database backward compatible. Slides 103-108 of the following slidedeck, from Niek Bartholomeus explain the process: https://speakerdeck.com/niekbartho/orchestration-in-meatspace As these slides show, by making a significant schema change in multiple steps – where each step can be rolled back without any loss of new data – this affords the release team the opportunity to have zero-downtime deployments with considerably less stress (because if an increment goes wrong, they can roll back easily). There are plenty more great patterns that can be implemented – the book Refactoring Databases, by Scott Ambler and Pramod Sadalage is a great read, if this is a direction you want to go in: http://www.amazon.com/Refactoring-Databases-Evolutionary-paperback-Addison-Wesley/dp/0321774515 But the question is – how much of this investment are you willing to make? How often are you making significant schema changes that would require these best practices? Again, there’s a difference here between migrating old projects and starting afresh – with the latter it’s much easier to instigate best practice from the start. Actions: For your business, work out how far down the path you want to go, amending your database development patterns to “best practice”. It’s a trade-off between implementing quality processes, and the necessity to do so (depending on how often you make complex changes). Socialise these changes with your development group. No-one likes having “best practice” changes imposed on them, so good to introduce these ideas and the rationale behind them early.   Summary The next stages of implementing a continuous delivery pipeline for your database changes (once you have CI up and running) require a little pre-planning, if you want to get the most out of the work, and for the implementation to go smoothly. We’ve covered some of the checklist of areas to consider – mainly in the areas of “Getting the team ready for the changes that are coming” and “Planning our your pipeline, environments, patterns and practices for development”, though there will be more detail, depending on where you’re coming from – and where you want to get to. This article is part of our database delivery patterns & practices series on Simple Talk. Find more articles for version control, automated testing, continuous integration & deployment.

    Read the article

  • Unity does not display properly [closed]

    - by Ben Isaacs
    Ubuntu Unity on the Ubuntu netbook edition installs without a problem but when I log in though, where the panels are, there is just blank area with a shadow effect style thing on it. I can open apps but the Window buttons and the global menu are not visable. Does this mean that I cannot use Unity. I'm running it through Wubi on a Dell Inspiron 1501 laptop. My total ammount of graphics memory is 831MB My dedicated memory is 128MB. The odd thing is is that Windows Aero displays without a problem so why is there a problem with Unity Hope this helps Ben

    Read the article

  • How Mature is Your Database Change Management Process?

    - by Ben Rees
    .dbd-banner p{ font-size:0.75em; padding:0 0 10px; margin:0 } .dbd-banner p span{ color:#675C6D; } .dbd-banner p:last-child{ padding:0; } @media ALL and (max-width:640px){ .dbd-banner{ background:#f0f0f0; padding:5px; color:#333; margin-top: 5px; } } -- Database Delivery Patterns & Practices Further Reading Organization and team processes How do you get your database schema changes live, on to your production system? As your team of developers and DBAs are working on the changes to the database to support your business-critical applications, how do these updates wend their way through from dev environments, possibly to QA, hopefully through pre-production and eventually to production in a controlled, reliable and repeatable way? In this article, I describe a model we use to try and understand the different stages that customers go through as their database change management processes mature, from the very basic and manual, through to advanced continuous delivery practices. I also provide a simple chart that will help you determine “How mature is our database change management process?” This process of managing changes to the database – which all of us who have worked in application/database development have had to deal with in one form or another – is sometimes known as Database Change Management (even if we’ve never used the term ourselves). And it’s a difficult process, often painfully so. Some developers take the approach of “I’ve no idea how my changes get live – I just write the stored procedures and add columns to the tables. It’s someone else’s problem to get this stuff live. I think we’ve got a DBA somewhere who deals with it – I don’t know, I’ve never met him/her”. I know I used to work that way. I worked that way because I assumed that making the updates to production was a trivial task – how hard can it be? Pause the application for half an hour in the middle of the night, copy over the changes to the app and the database, and switch it back on again? Voila! But somehow it never seemed that easy. And it certainly was never that easy for database changes. Why? Because you can’t just overwrite the old database with the new version. Databases have a state – more specifically 4Tb of critical data built up over the last 12 years of running your business, and if your quick hotfix happened to accidentally delete that 4Tb of data, then you’re “Looking for a new role” pretty quickly after the failed release. There are a lot of other reasons why a managed database change management process is important for organisations, besides job security, not least: Frequency of releases. Many business managers are feeling the pressure to get functionality out to their users sooner, quicker and more reliably. The new book (which I highly recommend) Lean Enterprise by Jez Humble, Barry O’Reilly and Joanne Molesky provides a great discussion on how many enterprises are having to move towards a leaner, more frequent release cycle to maintain their competitive advantage. It’s no longer acceptable to release once per year, leaving your customers waiting all year for changes they desperately need (and expect) Auditing and compliance. SOX, HIPAA and other compliance frameworks have demanded that companies implement proper processes for managing changes to their databases, whether managing schema changes, making sure that the data itself is being looked after correctly or other mechanisms that provide an audit trail of changes. We’ve found, at Red Gate that we have a very wide range of customers using every possible form of database change management imaginable. Everything from “Nothing – I just fix the schema on production from my laptop when things go wrong, and write it down in my notebook” to “A full Continuous Delivery process – any change made by a dev gets checked in and recorded, fully tested (including performance tests) before a (tested) release is made available to our Release Management system, ready for live deployment!”. And everything in between of course. Because of the vast number of customers using so many different approaches we found ourselves struggling to keep on top of what everyone was doing – struggling to identify patterns in customers’ behavior. This is useful for us, because we want to try and fit the products we have to different needs – different products are relevant to different customers and we waste everyone’s time (most notably, our customers’) if we’re suggesting products that aren’t appropriate for them. If someone visited a sports store, looking to embark on a new fitness program, and the store assistant suggested the latest $10,000 multi-gym, complete with multiple weights mechanisms, dumb-bells, pull-up bars and so on, then he’s likely to lose that customer. All he needed was a pair of running shoes! To solve this issue – in an attempt to simplify how we understand our customers and our offerings – we built a model. This is a an attempt at trying to classify our customers in to some sort of model or “Customer Maturity Framework” as we rather grandly term it, which somehow simplifies our understanding of what our customers are doing. The great statistician, George Box (amongst other things, the “Box” in the Box-Jenkins time series model) gave us the famous quote: “Essentially all models are wrong, but some are useful” We’ve taken this quote to heart – we know it’s a gross over-simplification of the real world of how users work with complex legacy and new database developments. Almost nobody precisely fits in to one of our categories. But we hope it’s useful and interesting. There are actually a number of similar models that exist for more general application delivery. We’ve found these from ThoughtWorks/Forrester, from InfoQ and others, and initially we tried just taking these models and replacing the word “application” for “database”. However, we hit a problem. From talking to our customers we know that users are far less further down the road of mature database change management than they are for application development. As a simple example, no application developer, who wants to keep his/her job would develop an application for an organisation without source controlling that code. Sure, he/she might not be using an advanced Gitflow branching methodology but they’ll certainly be making sure their code gets managed in a repo somewhere with all the benefits of history, auditing and so on. But this certainly isn’t the case (yet) for the database – a very large segment of the people we speak to have no source control set up for their databases whatsoever, even at the most basic level (for example, keeping change scripts in a source control system somewhere). By the way, if this is you, Red Gate has a great whitepaper here, on the barriers people face getting a source control process implemented at their organisations. This difference in maturity is the same as you move in to areas such as continuous integration (common amongst app developers, relatively rare for database developers) and automated release management (growing amongst app developers, very rare for the database). So, when we created the model we started from scratch and biased the levels of maturity towards what we actually see amongst our customers. But, what are these stages? And what level are you? The table below describes our definitions for four levels of maturity – Baseline, Beginner, Intermediate and Advanced. As I say, this is a model – you won’t fit any of these categories perfectly, but hopefully one will ring true more than others. We’ve also created a PDF with a flow chart to help you find which of these groups most closely matches your team:  Download the Database Delivery Maturity Framework PDF here   Level D1 – Baseline Work directly on live databases Sometimes work directly in production Generate manual scripts for releases. Sometimes use a product like SQL Compare or similar to do this Any tests that we might have are run manually Level D2 – Beginner Have some ad-hoc DB version control such as manually adding upgrade scripts to a version control system Attempt is made to keep production in sync with development environments There is some documentation and planning of manual deployments Some basic automated DB testing in process Level D3 – Intermediate The database is fully version-controlled with a product like Red Gate SQL Source Control or SSDT Database environments are managed Production environment schema is reproducible from the source control system There are some automated tests Have looked at using migration scripts for difficult database refactoring cases Level D4 – Advanced Using continuous integration for database changes Build, testing and deployment of DB changes carried out through a proper database release process Fully automated tests Production system is monitored for fast feedback to developers   Does this model reflect your team at all? Where are you on this journey? We’d be very interested in knowing how you get on. We’re doing a lot of work at the moment, at Red Gate, trying to help people progress through these stages. For example, if you’re currently not source controlling your database, then this is a natural next step. If you are already source controlling your database, what about the next stage – continuous integration and automated release management? To help understand these issues, there’s a summary of the Red Gate Database Delivery learning program on our site, alongside a Patterns and Practices library here on Simple-Talk and a Training Academy section on our documentation site to help you get up and running with the tools you need to progress. All feedback is welcome and it would be great to hear where you find yourself on this journey! This article is part of our database delivery patterns & practices series on Simple Talk. Find more articles for version control, automated testing, continuous integration & deployment.

    Read the article

  • Dutch for once: op zoek naar een nieuwe uitdaging!

    - by Dennis Vroegop
    Originally posted on: http://geekswithblogs.net/dvroegop/archive/2013/10/11/dutch-for-once-op-zoek-naar-een-nieuwe-uitdaging.aspxI apologize to my non-dutch speaking readers: this post is about me looking for a new job and since I am based in the Netherlands I will do this in Dutch… Next time I will be technical (and thus in English) again! Het leuke van interim zijn is dat een klus een keer afloopt. Ik heb heel bewust gekozen voor het leven als freelancer: ik wil graag heel veel verschillende mensen en organisaties leren kennen. Dit werk is daar bij uitstek geschikt voor! Immers: bij iedere klus breng ik niet alleen nieuwe ideeën en kennis maar ik leer zelf ook iedere keer ontzettend veel. Die kennis kan ik dan weer gebruiken bij een vervolgklus en op die manier verspreid ik die kennis onder de bedrijven in Nederland. En er is niets leukers dan zien dat wat ik meebreng een organisatie naar een ander niveau brengt! Iedere keer een ander bedrijf zoeken houdt in dat ik iedere keer weg moet gaan bij een organisatie. Het lastige daarvan is het juiste moment te vinden. Van buitenaf gezien is dat lastig in te schatten: wanneer kan ik niets vernieuwends meer bijdragen en is het tijd om verder te gaan? Wanneer is het tijd om te zeggen dat de organisatie alles weet wat ik ze kan bijbrengen? In mijn huidige klus is dat moment nu aangebroken. In de afgelopen elf maanden heb ik dit bedrijf zien veranderen van een kleine maar enthousiaste groep ontwikkelaars naar een professionele organisatie met ruim twee keer zo veel ontwikkelaars. Dat veranderingsproces is erg leerzaam geweest en ik ben dan ook erg blij dat ik die verandering heb kunnen en mogen begeleiden. Van drie teams met ieder vijf of zes ontwikkelaars naar zes teams met zeven tot acht ontwikkelaars per team groeien betekent dat je je ontwikkelproces heel anders moet insteken. Ook houdt dat in dat je je teams anders moet indelen, dat de organisatie zelf anders gemodelleerd moet worden en dat mensen anders met elkaar om moeten gaan. Om dat voor elkaar te krijgen is er door iedereen heel hard gewerkt, is er een aantal fouten gemaakt, is heel veel van die fouten geleerd en is uiteindelijk een vrijwel nieuw bedrijf ontstaan. Het is tijd om dit bedrijf te verlaten. Ik ben benieuwd waar ik hierna terecht kom: ik ben aan het rondkijken naar mogelijkheden. Ik weet wèl: het bedrijf waar ik naar op zoek ben, is een bedrijf dat openstaat voor veranderingen. Veranderingen, maar dan wel met het oog voor het individu; mensen staan immers centraal in de software ontwikkeling! Ik heb er in ieder geval weer zin in!

    Read the article

  • Troubleshooting Windows Blue Screen Errors

    The so-called ‘Blue Screen of Death’ has inspired fear in the hearts of mere mortals, but Systems Administrators are expected be capable of casually beating back this sinister beast. So imagine Ben Lye’s distress when he discovered that many aspiring SysAdmins had no structured approach to tackling the root of the problem. Setting out to remedy the situation, Ben lays out a simple 3-step plan, and dispenses some good advice.

    Read the article

  • Woolrich Parka re elegante nel design e nella qualità

    - by WoolrichParka
    Il broker di sicurezza in teflon deve essere un fronte di nuovo leader della tecnologia nella nuova creazione di negozio outfits.Cool Woolrich Prezzi su internet dovrebbero essere le nuove gamme prossimi Woolrich qui che sono l'ideale per il vostro options.Not solo è resistente e ben protetto, con 625 oca completo potere bianco giù, ma il suo design famoso dispone anche Giubbotti Woolrich di una selezione altamente efficiente di tasche esterne, ideale per lo spazio di un facile deposito attrezzature e mano-warming.It è ben conosciuta dal mercato del design.wufengfengmaple36

    Read the article

  • ANTS Memory Profiler 8 released!

    - by Ben Emmett
    I’m excited to say that we’ve just released ANTS Memory Profiler 8! The big news is support for profiling .NET’s usage of unmanaged memory. There are two main parts to this. Firstly you can see a breakdown of unmanaged memory usage by module. This lets you see at a high level where unmanaged memory is being used – for example in the image below, it’s being used by a PDF generation library. Separately, when looking at a list of .NET classes, you can see how much unmanaged memory those classes are responsible for holding on to. You can also see that information for individual instances of those classes. Some clues you might need this: You’re using system objects or 3rd party components which deal with unmanaged memory under the hood (this includes things like the GDI+ functions used for working with bitmaps) Your application still relies on some legacy Delphi / C++ / etc code from left over from the days before your company moved over to using .NET You’ve used a previous version of ANTS Memory Profiler, and have ever seen a pie chart that looks something like this: You’ll also notice that the startup process has been entirely redesigned, bringing it in line with ANTS Performance Profiler 8, which was released earlier in the year. This makes it faster to start profiling and to run repeat profiling sessions, lets you profile using any browser instead of Internet Explorer, and also provides a host of stability improvements, particularly when launching websites in IIS. Download the new version (there’s a free trial), and as always I’d love to know what you think – just email [email protected]. Cheers! Ben

    Read the article

  • I'm tasked with leading the documentation effort for an existing, entirely undocumented, software product - what resources are there to help me?

    - by Ben Rose
    I'm a software developer at a technology company. I have been tasked with leading the documentation effort for the product I work on. The goal is to produce documentation internal to developer, and the project spills over into the business side, where it covers requirements documentation. This project is challenging. Specifically, I'm dealing with a product which: - has been around for a long time, at least 6 years. - has no form of documentation other than some small, outdated pieces here and there. - has comments in the code, but they are technical and do not convey any over-arching behavior (even on technical side). - as a consequence of having little to no documentation, is often unnecessarily complex under the covers In addition, we have not been given a lot of time to work on this project. I do not have any formal documentation or writing background, training, or experience. I have displayed some ability in writing/communication around the office, which may be why I was assigned to this project. Please share your advice or recommendation for resources to help me prepare and deal with this project. I'm looking for references to books/website/forums/whatever, to help me come up with the design of a plan with milestones, learn about best practices, task delegation, templates, buy-in, etc. I'm hoping specifically for resources targeting or giving special mention of introducing good documentation to existing, undocumented, projects. I would be very grateful for your responses. Ben

    Read the article

  • New database profiling support in ANTS Performance Profiler

    - by Ben Emmett
    In May last year, the ANTS Performance Profiler team added the ability to profile database requests your application makes to SQL Server or Oracle. The really cool thing is that you’re shown those requests in the application’s call tree, so you can see what .NET code caused those queries to run. It’s particularly helpful if you’re using an ORM which automagically generates and runs queries for you, but which doesn’t necessarily do it in the most efficient way possible. Now by popular demand, we’ve added support for profiling MySQL (or MariaDB) and PostgreSQL, so you can see queries run against those databases too. Some of you have also said that you’re using the Devart dotConnect data providers instead of the native .NET ones, so we’ve added support for those drivers too. Hope it helps! For the record, here’s a list of supported connectors (ones in bold are new): SQL Server .NET Framework Data Provider Devart dotConnect for SQL Server Oracle .NET Framework Data Provider Oracle Data Provider for .NET Devart dotConnect for Oracle MySQL / MariaDB MySQL Connector/Net Devart dotConnect for MySQL PostgreSQL Npgsql .NET Data Provider for PostgreSQL Devart dotConnect for PostgreSQL SQL Server Compact Edition .NET Framework Data Provider for SQL Server Compact Edition Devart dotConnect for SQL Server Pro Have we missed a connector or database which you’d find useful? Tell us about it in the comments or by emailing [email protected]. Ben

    Read the article

  • Are there good resources for leading documentation for an existing software product having none?

    - by Ben Rose
    Hello. I'm a software developer at a technology company. I have been tasked with leading the documentation effort for the product I work on, both internal to developers as well as spilling over into facilitating the business side of requirements documentation. This internal product has been around for at least 6 years. One challenge is that this software application has no form of documentation other than some small, outdated pieces here and there. There are comments in the code, but they are technical and do not convey any over-arching behavior (even on technical side). As a consequence of having little to no documentation, this product is often unnecessarily complex under the covers adding to the challenge. We are very limited on time that will be given to us to work on documentation. Another thing about me is that I've displayed some ability in writing/communication around the office, but I'm not coming from any sort of documentation or formal writing background (beyond my academic career). Please share your advise or recommend resources, book/website/forum/whatever, for helping me come up with a plan with milestones, best practices, task delegation, templates, buy-in, etc. I'm hoping for a resource targeting or giving special mention of introducing good documentation on existing projects where there previously was none. I would be very grateful for your responses. Ben

    Read the article

  • Checkpoint Endpoint Connect Imaging - Are there any gotchas?

    - by Ben
    I am about to install CheckPoint EPC on a load of new laptops being rolled out. I plan to add it to the image, but want to check if there are any gotchas? By this I mean are there any UIDs that need removing before the image is taken to "depersonalise" the install. For example when you install LANDesk or McAfee (when using ePolicy) you need to remove the identifiers - do I need to do the same with EPC? Thanks in advance, Ben

    Read the article

  • Outlook uses > 700mb of RAM. How do I fix this?!

    - by Ben Baril
    I've been using outlook for years now, and I've never run into this problem before. Using Microsoft Outlook 2007, with only 1 email account, and no more than 100 emails in my inbox (though I have many many folders, with emails in them), Outlook can sit around and eventually get up to 700mb of ram usage. I've tried different types I've read, like compacting my folders, or not using Internet Calendars / RSS features, and right now I've even disabled Xobni...but still no effect. Any ideas?! Thanks! Ben

    Read the article

  • What is causing my newly built PC to BSOD?

    - by Ben S
    I recently built my own PC from parts and installed Windows 7 and I have been getting BSODs with various different stop codes. The latest was 0x24, but I've also had 0xd1 and 0x1e. However, Windows does not let me know where the fault occurred, so I have no idea how to go about resolving this. I've uploaded the last three minidumps in case someone can make sense out of them and let me know what could be causing my BSODs. Thanks, Ben

    Read the article

  • How to interpret Rackspace server diagnostics?

    - by Ben
    We've been having some trouble lately with our site timing out during times of high traffic. We're working on a number of things to resolve it. During this process I came across our server diagnostics page on Rackspace, and it has the following line: The host server's load is: 0.08 0.08 0.03 1/204 2437 I couldn't find an explanation on their site or Google. Can anyone explain what these numbers mean? For I am a lowly programmer. Much appreciated, -Ben

    Read the article

  • Account to read AD, join machine to domain, delete computer accounts and move computers to OUs

    - by Ben
    I want to create an account that will perform the following: Join computers to a domain (not restricted to 10, like a normal user) Check for computer accounts in AD Delete computers from AD Move computers between OUs I don't want to allow it to do anything else, so don't want a domain admin account. Can anyone guide me in the right direction in terms of permissions? Not sure if I should be using delegation of control wizard? Cheers, Ben

    Read the article

  • Running a shell script in *nix

    - by Ben
    Bit of a newb using *nix (I'm actually using a bash shell in OS X 10.5) and I wondered what the probably very simple answer is to this... When I write a script (called, say, my_script) and I've saved it to the current directory, why do I have to put a period and a forward slash in front of its name to run it? Like this: ./my_script Can't the shell tell that I want to run it from the current directory? Windows seems to handle that situation. Cheers Ben

    Read the article

  • Zend Server + Daemontools

    - by Ben
    Hey, Is anyone running Zend Server under Daemontools? I know I can use -D NO_DETACH to run apache under daemontools. But, I'm not sure if the other Zend Server components (monitor, lighthttpd, scd, jobqueue) have similar options. (The end goal is "run Zend Server with service supervision", so upstart would be fine too. For reference, my servers are running Ubuntu 10.04 LTS.) Ben

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >