  • What options do individual have to fork a project?

    - by skrco
    Let's assume our example individual has an idea, engagement, ... to fork project. By project I mean any kind of software - thick client, web site, portal, service, driver, plc, ... - anything that can be programmed. Motto of question: What options do our example individual have to fork this project from the early beginning through getting collaborators and users to mature software? Here are the main subquestions: Sandbox phase: Where can he announce his idea and proposal and receive positive/negative critic and feedback? Development phase: Where can he build his team to work on this project? Yet deployed phase: Where can he schedule tasks, assign tickets and bugs to be solved? and the list can go on... What really interests me is the "sandbox phase question".

    Read the article

  • Safe project development - free repositories

    - by friko
    Some time ago we started a private hobby project. We made a project on javaforge.com, created an svn repository and started developing our app. Right now we are really far with our project, but somehow we never worried if our project is really safe on such free development tool like javaforge ? I mean, what if our project would earn some money and the source code become valuable ? Could it be stolen or could somebody take it over ? We want to be sure that we are not wasting our time and want to be really sure about our project safety. Is it possible to safely develop a project in such free repository ? We would like also to start using redmine, so if you know any safe place for moving our project, please take this under consideration. Thanks a lot.

    Read the article

  • Assigning resources to MS Project 2007

    - by adam
    Hi, I'm planning a redesign of a site in Project 2007. I have three developers to hand, all with the same skills. There are about 80 templates to be rendered as part of the redesign, and each template has been added as a project task. Each of these tasks can be done by any of the 3 devs, and each will take a day (with a few exceptions). There is no order in which the tasks must be completed, so there are no predecessor rules. I'd like to be able to assign tasks to a 'Developer' resource group, and for Project to see that three tasks can be done at once (as the group has three resources members) and queue the tasks as such. Googling leads me to Team Assignment, but that appears to be part of Project Server. Surely I can do this in standalone Project? Thanks, Adam

    Read the article

  • The Future of Project Management is Social

    - by Natalia Rachelson
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} A guest post by Kazim Isfahani, Director, Product Marketing, Oracle Rapid Ascent. Breakneck Speed. Lightning Fast. Perhaps even overwhelming. No matter which set of adjectives we use to describe it, social media’s rise into the enterprise mainstream has been unprecedented. Indeed, the big 4 social media powerhouses (Facebook, Google+, LinkedIn, and Twitter), have nearly 2 Billion users between them. You may be asking (as you should really) “That’s all well and good for the consumer, but for me at my company, what’s your point? Beyond the fact that I can check and post updates, that is.” Good question, kind sir. Impact of Social and Collaboration on Project Management I’ll dovetail this discussion to the project management realm, since that’s what I’m writing about. Speed is a big challenge for project-driven organizations. Anything that can help speed up project delivery - be it a new product introduction effort or a geographical expansion project - fast is a good thing. So where does this whole social thing fit particularly since there are already a host of tools to help with traditional project execution? The fact is companies have seen improvements in their productivity by deploying departmental collaboration and other social-oriented solutions. McKinsey’s survey on social tools shows we have reached critical scale: 72% of respondents report that their companies use at least one and over 40% say they are using social networks and blogs. We don’t hear as much about the impact of social media technologies at the project and project manager level, but that does not mean there is none. Consider the new hire. The type of individual entering the workforce and executing on projects is a generation of worker expecting visually appealing, easy to use and easy to understand technology meshing hand-in-hand with business processes. Consider the project manager. The social era has enhanced the role that the project manager must play. Today’s project manager must be a supreme communicator, an influencer, a sympathizer, a negotiator, and still manage to keep all stakeholders in the loop on project progress. Social tools play a significant role in this effort. Now consider the impact to the project team. The way that a project team functions has changed, with newer, social oriented technologies making the process of information dissemination and team communications much more fluid. It’s clear that a shift is occurring where “social” is intersecting with project management. The Rise of Social Project Management We refer to the melding of project management and social networking as Social Project Management. Social Project Management is based upon the philosophy that the project team is one part of an integrated whole, and that valuable and unique abilities exist within the larger organization. For this reason, Social Project Management systems should be integrated into the collaborative platform(s) of an organization, allowing communication to proceed outside the project boundaries. What makes social project management "social" is an implicit awareness where distributed teams build connected links in ways that were previously restricted to teams that were co-located. Just as critical, Social Project Management embraces the vision of seamless online collaboration within a project team, but also provides for, (and enhances) the use of rigorous project management techniques. Social Project Management acknowledges that projects (particularly large projects) are a social activity - people doing work with people, for other people, with commitments to yet other people. The more people (larger projects), the more interpersonal the interactions, and the more social affects the project. The Epitome of Social - Fusion Project Portfolio Management If I take this one level further to discuss Fusion Project Portfolio Management, the notion of Social Project Management is on full display. With Fusion Project Portfolio Management, project team members have a single place for interaction on projects and access to any other resources working within the Fusion ERP applications. This allows team members the opportunity to be informed with greater participation and provide better information. The application’s the visual appeal, and highly graphical nature makes it easy to navigate information. The project activity stream adds to the intuitive user experience. The goal of productivity is pervasive throughout Fusion Project Portfolio Management. Field research conducted with Oracle customers and partners showed that users needed a way to stay in the context of their core transactions and yet easily access social networking tools. This is manifested in the application so when a user executes a business process, they not only have the transactional application at their fingertips, but also have things like e-mail, SMS, text, instant messaging, chat – all providing a number of different ways to interact with people and/or groups of people, both internal and external to the project and enterprise. But in the end, connecting people is relatively easy. The larger issue is finding a way to serve up relevant, system-generated, actionable information, in real time, which will allow for more streamlined execution on key business processes. Fusion Project Portfolio Management’s design concept enables users to create project communities, establish discussion threads, manage event calendars as well as deliver project based work spaces to organize communications within the context of a project – all within a secure business environment. We’d love to hear from you and get your thoughts and ideas about how Social Project Management is impacting your organization. To learn more about Oracle Fusion Project Portfolio Management, please visit this link

    Read the article

  • Employee Info Starter Kit: Project Mission

    - by Mohammad Ashraful Alam
    Employee Info Starter Kit is an open source ASP.NET project template that is intended to address different types of real world challenges faced by web application developers when performing common CRUD operations. Using a single database table ‘Employee’, it illustrates how to utilize Microsoft ASP.NET 4.0, Entity Framework 4.0 and Visual Studio 2010 effectively in that context. Employee Info Starter Kit is highly influenced by the concept ‘Pareto Principle’ or 80-20 rule. where it is targeted to enable a web developer to gain 80% productivity with 20% of effort with respect to learning curve and production. User Stories The user end functionalities of this starter kit are pretty simple and straight forward that are focused in to perform CRUD operation on employee records as described below. Creating a new employee record Read existing employee record Update an existing employee record Delete existing employee records Key Technology Areas ASP.NET 4.0 Entity Framework 4.0 T-4 Template Visual Studio 2010 Architectural Objective There is no universal architecture which can be considered as the best for all sorts of applications around the world. Based on requirements, constraints, environment, application architecture can differ from one to another. Trade-off factors are one of the important considerations while deciding a particular architectural solution. Employee Info Starter Kit is highly influenced by the concept ‘Pareto Principle’ or 80-20 rule, where it is targeted to enable a web developer to gain 80% productivity with 20% of effort with respect to learning curve and production. “Productivity” as the architectural objective typically also includes other trade-off factors as well as, such as testability, flexibility, performance etc. Fortunately Microsoft .NET Framework 4.0 and Visual Studio 2010 includes lots of great features that have been implemented cleverly in this project to reduce these trade-off factors in the minimum level. Why Employee Info Starter Kit is Not a Framework? Application frameworks are really great for productivity, some of which are really unavoidable in this modern age. However relying too many frameworks may overkill a project, as frameworks are typically designed to serve wide range of different usage and are less customizable or editable. On the other hand having implementation patterns can be useful for developers, as it enables them to adjust application on demand. Employee Info Starter Kit provides hundreds of “connected” snippets and implementation patterns to demonstrate problem solutions in actual production environment. It also includes Visual Studio T-4 templates that generate thousands lines of data access and business logic layer repetitive codes in literally few seconds on the fly, which are fully mock testable due to language support for partial methods and latest support for mock testing in Entity Framework. Why Employee Info Starter Kit is Different than Other Open-source Web Applications? Software development is one of the rapid growing industries around the globe, where the technology is being updated very frequently to adapt greater challenges over time. There are literally thousands of community web sites, blogs and forums that are dedicated to provide support to adapt new technologies. While some are really great to enable learning new technologies quickly, in most cases they are either too “simple and brief” to be used in real world scenarios or too “complex and detailed” which are typically focused to achieve a product goal (such as CMS, e-Commerce etc) from "end user" perspective and have a long duration learning curve with respect to the corresponding technology. Employee Info Starter Kit, as a web project, is basically "developer" oriented which actually considers a hybrid approach as “simple and detailed”, where a simple domain has been considered to intentionally illustrate most of the architectural and implementation challenges faced by web application developers so that anyone can dive into deep into the corresponding new technology or concept quickly. Roadmap Since its first release by 2008 in MSDN Code Gallery, Employee Info Starter Kit gained a huge popularity in ASP.NET community and had 1, 50,000+ downloads afterwards. Being encouraged with this great response, we have a strong commitment for the community to provide support for it with respect to latest technologies continuously. Currently hosted in Codeplex, this community driven project is planned to have a wide range of individual editions, each of which will be focused on a selected application architecture, framework or platform, such as ASP.NET Webform, ASP.NET Dynamic Data, ASP.NET MVC, jQuery Ajax (RIA), Silverlight (RIA), Azure Service Platform (Cloud), Visual Studio Automated Test etc. See here for full list of current and future editions.

    Read the article

  • How To Customize Wallpaper in Windows 7 Starter Edition

    - by Asian Angel
    If you have the Starter Edition of Windows 7 installed on your netbook you may be sick of looking at the default wallpaper. With Starter Background Changer you can access other customization options with ease. Before There is not a lot that you can say about the singular default wallpaper included with the Starter Edition…it just kind of sits there all boring like. Installing Starter Background Changer Since the installer part of the program is in French we have the entire set of install windows shown here with the appropriate buttons highlighted to get you through the whole process without any problems. Using Starter Background Changer Once the installation process has finished you will simply see a quiet screen with no desktop icons or Start Menu entries visible. Now if you are wondering at this point “Did the program finish installing or did it install at all?” the answer is yes. Right click on your desktop and you will notice a new entry on the Context Menu…the same one that is included in the other editions but not Starter. Time to have some fun… The Personalization Window will open maximized but we have reduced it here for our screenshots. You have four regular categories to choose from in the lower part of the window: Wallpaper, Colors, Sounds, & Screensavers. The first category that we chose for our example was Wallpaper. As you can see here the main display area (My Collection) has no wallpapers showing at the moment. You can use the drop-down menu to access your My Pictures Folder or browse for a different location. Notice that you can choose how the image fills the screen and set up a timed wallpaper slideshow at the bottom. Any picture (or pictures) selected will be added to the My Collection display for easy access the next time you open the window. Once you choose a picture click on Validate the modification to set the wallpaper for your desktop and return to the main window. When you return to the main window you will see a preview for your selection. At this point you can simply close the window or make further adjustments in the other categories. Starter Background Changer provides easy one-stop access to other customization areas. We started off with Colors… Followed by Sounds… And finally Screensavers. Before you do close the main window you can take a quick look at the Options if desired. We did set Optimization of the images to High on our system. Quick and easy wallpaper satisfaction. We did pin the Program Window to our Taskbar…nice if you prefer this method as opposed to the Desktop Context Menu. Conclusion If you have been longing for a way to change the wallpaper in Windows 7 Starter Edition then you will definitely want to give this program a try. Goodbye boring default wallpaper! For more wonderful ways to customize your Windows 7 Started Edition be sure to read our article here. Links Download Starter Background Changer Similar Articles Productive Geek Tips Awesome Desktop Wallpapers: The Windows 7 EditionWindows 7 Welcome Screen Taking Forever? Here’s the Fix (Maybe)Desktop Fun: Starship Theme WallpapersDesktop Fun: Starscape Theme WallpapersDesktop Fun: Fantasy Theme Wallpapers TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips DVDFab 6 Revo Uninstaller Pro Registry Mechanic 9 for Windows PC Tools Internet Security Suite 2010 Office 2010 reviewed in depth by Ed Bott FoxClocks adds World Times in your Statusbar (Firefox) Have Fun Editing Photo Editing with Citrify Outlook Connector Upgrade Error Gadfly is a cool Twitter/Silverlight app Enable DreamScene in Windows 7

    Read the article

  • Project-Based ERP - The Evolution of Project Managemen

    Fred Studer speaks with Ray Wang, Principal Analyst at Forrester Research and Ted Kempf, Senior Director for Oracle's Project Management Solutions about trends in the project management market, where enterprise project management is heading in the next 2 - 3 years and highlights from Ray's new line of research on project management solutions.

    Read the article

  • How to represent an agile project to people focused on waterfall [closed]

    - by ahsteele
    Our team has been asked to represent our development efforts in a project plan. No one is unhappy with our work or questioning our ability to deliver, we are just participating in an IT cattle call for project plans. Trouble is we are an agile team and haven't thought about our work in terms of a formal project plan. While we have a general idea of what we are working on next we aren't 100% sure until we plan an iteration. Until now our team has largely operated in a vacuum and has not been required to present our methodology or metrics to outside parties. We follow most of the practices espoused in Extreme Programming. We hold quarterly planning meetings to have a general idea of the stories we are going to work on for a quarter. That said, our stories are documented on 3x5 cards and are only estimated at the beginning of the iteration in which they are going to be worked. After estimation we document the story in Team Foundation Sever. During an iteration, we attach code to stories and mark stories as completed once finished. From this data we are able to generate burn down and velocity charts. Most importantly we know our average velocity for an iteration keeping us from biting off more than we can chew. I am not looking to modify the way we do development but want to present our development activities in a report that someone only familiar with waterfall will understand. In What Does an Agile Project Plan Look Like, Kent McDonald does a good job laying out the differences between agile and waterfall project plans. He specifies the differences in consumable bullets: An agile project plan is feature based An Agile Project Plan is organized into iterations An Agile Project Plan has different levels of detail depending on the time frame An Agile Project Plan is owned by the Team Being able to explain the differences is great, but how best to present the data?

    Read the article

  • Windows 7 Starter Screensaver Program Original Files

    - by Mark
    Dear Sir or Madam I used the program by Sopan and Javier to change the wallpaper in Windows 7 Starter Edition on my laptop and it worked fine. I have now upgraded to Home Edition but there seems to be remnants of the program still lurking somewhere as when I set photos up for the screensaver they are always stretched no matter what I set the picture position as, ie fill,fit,stretched, tiled or centred. Can Sopan or Javier or anyone else supply original copies please of the files the program modified so that I can over-write the modified files back to the original ones? I know I can re-install the full windows 7 software but I want to save the agony of that along with the re-installation of all my programs and drivers! Many thanks for your help. Mark

    Read the article

  • Getting your bearings and defining the project objective

    - by johndoucette
    I wrote this two years ago and thought it was worth posting… Some may think this is a daunting task and some may even say “what a waste of time” and want to open MS Project and start typing out tasks because someone asked for an estimate and a task list. Hell, maybe you even use Excel and pump out a spreadsheet with some real scientific formula for guessing how long it will take to code a bunch of classes. However, this short exercise will provide the basis for the entire project, whether small or large and be a great friend when communicating to anyone on your team or even your client. I call this the Project Brief. If you find yourself going beyond a single page, then you must decompose the sections and summarize your findings so there is a complete and clear picture of the project you are working on in a relatively short statement. Here is a great quote from the PMBOK (Project Management Body of Knowledge) relative to what a project is;   A project is a temporary endeavor undertaken to create a unique product, service or result. With this in mind, the project brief should encompass the entirety (objective) of the endeavor in its explanation and what it will take (goals) to create the product, service or result (deliverables). Normally the process of identifying the project objective is done during the first stage of a project called the Project Kickoff, but you can perform this very important step anytime to help you get a bearing. There are many more parts to helping a project stay on course, but this is usually the foundation where it can be grounded on. Through a series of 3 exercises, you should be able to come up with the objective, goals and deliverables on your project. Follow these steps, and in no time (about &frac12; hour), you will have the foundation of your project plan. (See examples below) Exercise 1 – Objectives Begin with the end in mind. Think about your project in business terms with a couple things to help you understand the objective; Reference the business benefit in terms of cost, speed and / or quality, Provide a higher level of what the outcome will look like (future sense) It should be non-measurable, that’s what the goals are all about The output should be a single paragraph with three sentences and take 10 minutes to write. *Typically, agreement must be reached on the objectives of the project before you would proceed to the next steps of the project. Exercise 2 – Goals A project goal is a statement that answers questions about who, what, why, where and when. A good project goal statement; Answers the five “W” questions for the project Is measurable in each of its parts Is published and agreed on by all the owners This helps the Project Manager receive confirmation on defining the project target. Using the established project objective done in the first exercise, think about the things it will take to get the job done. Think about tangible activities which are the top level tasks in a typical Work Breakdown Structure (WBS). The overall goal statement plus all the deliverables (next exercise) can be seen as the project team’s contract with the project owners. Write 3 - 5 goals in about 10 minutes. You should not write the words “Who, what, why, where and when, but merely be able to answer the questions when you read a goal. Exercise 3 – Deliverables Every project creates some type of output and these outputs are called deliverables. There are two classes of deliverables; Internal – produced for project team members to meet their goals External – produced for project owners to meet their expectations The list you enter here provides a checklist for the team’s delivery and/or is a statement of all the expectations of the project owners. Here are some typical project deliverables; Product and product documentation End product/system Requirements/feature documents Installation guides Demo/prototype System design documents User guides/help files Plans Project plan Training plan Conversion/installation/delivery plan Test plans Documentation plan Communication plan Reports and general documentation Progress reports System acceptance tests Outstanding bug list Procedures Risk and issue logs Project history Deliverables should go with each of the goals. Have 3-5 deliverables for each goal. When you are done, you will have established a great foundation for the clarity of your project. This exercise can take some time, but with practice, you should be able to whip this one out in 10 minutes as well, especially if you are intimate with an ongoing project. Samples  Objective [Client] is implementing a series of MOSS sites to support external public (Internet), internal employee (Intranet) and an external secure (password protected Internet) applications. This project will focus on the public-facing web site and will provide [Client] with architectural recommendations based on the current design being done by their design partner [Partner] and the internal Content Team. In addition, it will provide [Client] with a development plan and confidence they need to deploy a world class public Internet website. Goals 1.  [Consultant] will provide technical guidance and set project team expectations for the implementation of the MOSS Internet site based on provided features/functions within three weeks. 2.  [Consultant] will understand phase 2 secure password-protected Internet site design and provide recommendations.   Deliverables 1.1  Public Internet (unsecure) Architectural Recommendation Plan 1.2  Physical Site construction Work Breakdown Structure and plan (Time, cost and resources needed) 2.1  Two Factor authentication recommendation document   Objective [Client] is currently using an application developed by [Consultant] many years ago called "XXX". This application, although functional, does not meet their new updated business requirements and contains a few defects which [Client] has developed work-around processes. [Client] would like to have a "new and improved" system to support their membership management needs by expanding membership and subscription capabilities, provide accounting integration with internal (GL) and external (VeriSign) systems, and implement hooks to the current CRM solution. This effort will take place through a series of phases, beginning with envisioning. Goals 1. Through discussions with users, [Consultant] will discover current issues/bugs which need to be resolved which must meet the current functionality requirements within three weeks. 2. [Consultant] will gather requirements from the users about what is "needed" vs. "what they have" for enhancements and provide a high level document supporting their needs. 3. [Consultant] will meet with the team members through a series of meetings and help define the overall project plan to deliver a new and improved solution. Deliverables 1.1 Prioritized list of Current application issues/bugs that need to be resolved 1.2 Provide a resolution plan on the issues/bugs identified in the current application 1.3 Risk Assessment Document 2.1 Deliver a Requirements Document showing high-level [Client] needs for the new XXX application. · New feature functionality not in the application today · Existing functionality that will remain in the new functionality 2.2 Reporting Requirements Document 3.1 A Project Plan showing the deliverables and cost for the next (second) phase of this project. 3.2 A Statement of Work for the next (second) phase of this project. 3.3 An Estimate of any work that would need to follow the second phase.

    Read the article

  • Organizational characteristics that impact the selection of Development Methodology concepts applied to a project

    Based on my experience, no one really follows a specific methodology exactly as it is formally designed. In fact, the key concepts of a few methodologies are usually combined to form a hybrid methodology for each project based on the current organizational makeup and the project need/requirements to be accomplished. Organizational characteristics that impact the selection of methodology concepts applied to a project. Prior subject knowledge pertaining to a project can be critical when deciding on what methodology or combination of methodologies to apply to a project. For example, if a project is very straight forward, and the development staff has experience in developing  that are similar, then the waterfall method could possibly be the best choice because little to no research is needed  in order to complete the project tasks and there is very little need for changes to occur.  On the other hand, if the development staff has limited subject knowledge or the requirements/specification of the project could possibly change as the project progresses then the use of spiral, iterative, incremental, agile, or any combination would be preferred. The previous methodologies used by an organization typically do not change much from project to project unless the needs of a project dictate differently. For example, if the waterfall method is the preferred development methodology then most projects will be developed by the waterfall method. Depending on the time allotted to a project each day can impact the selection of a development methodology. In one example, if the staff can only devote a few hours a day to a project then the incremental methodology might be ideal because modules can be added to the final project as they are developed. On the other hand, if daily time allocation is not an issue, then a multitude of methodologies could work well for a project. Project characteristics that impact the selection of methodology concepts applied to a project. The type of project being developed can often dictate the type of methodology used for the project. Based on my experience, projects that tend to have a lot of user interaction, follow a more iterative, incremental, or agile approach typically using a prototype that develops into a final project. These methodologies desire back and forth communication between users, clients, and developers to allow for requirements to change and functionality to be enhanced. Conversely, limited interaction applications or automated services can still sometimes get away with using the waterfall or transactional approach. The timeline of a project can also force an organization to prefer a particular methodology over the rest. For instance, if the project must be completed within 24 hours, then there is very little time for discussions back and forth between clients, users and the development team. In this scenario, the waterfall method would be perfect because the only interaction with the client occurs prior to a development project to outline the system requirements, and the development team can quickly move through the software development stages in order to complete the project within the deadline. If the team had more time, then the other methodologies could also be considered because there is more time for client and users to review the project and make changes as they see fit, and/or allow for more time to review the project in order to enhance the business performance and functionality. Sometimes the client and or user involvement can dictate the selection of methodologies applied to a project. One example of this is if a client is highly motivated to get a project completed and desires to play an active part in the development process then the agile development approach would work perfectly with this client because it allows for frequent interaction between clients, users and the development team. The inverse of this situation is a client that just wants to provide the project requirements and only wants to get involved when the project is to be delivered. In this case the waterfall method would work well because there is no room for changes and no back and forth between the users, clients or the development team.

    Read the article

  • How to Implement Project Type "Copy", "Move", "Rename", and "Delete"

    - by Geertjan
    You've followed the NetBeans Project Type Tutorial and now you'd like to let the user copy, move, rename, and delete the projects conforming to your project type. When they right-click a project, they should see the relevant menu items and those menu items should provide dialogs for user interaction, followed by event handling code to deal with the current operation. Right now, at the end of the tutorial, the "Copy" and "Delete" menu items are present but disabled, while the "Move" and "Rename" menu items are absent: The NetBeans Project API provides a built-in mechanism out of the box that you can leverage for project-level "Copy", "Move", "Rename", and "Delete" actions. All the functionality is there for you to use, while all that you need to do is a bit of enablement and configuration, which is described below. To get started, read the following from the NetBeans Project API: http://bits.netbeans.org/dev/javadoc/org-netbeans-modules-projectapi/org/netbeans/spi/project/ActionProvider.html http://bits.netbeans.org/dev/javadoc/org-netbeans-modules-projectapi/org/netbeans/spi/project/CopyOperationImplementation.html http://bits.netbeans.org/dev/javadoc/org-netbeans-modules-projectapi/org/netbeans/spi/project/MoveOrRenameOperationImplementation.html http://bits.netbeans.org/dev/javadoc/org-netbeans-modules-projectapi/org/netbeans/spi/project/DeleteOperationImplementation.html Now, let's do some work. For each of the menu items we're interested in, we need to do the following: Provide enablement and invocation handling in an ActionProvider implementation. Provide appropriate OperationImplementation classes. Add the new classes to the Project Lookup. Make the Actions visible on the Project Node. Run the application and verify the Actions work as you'd like. Here we go: Create an ActionProvider. Here you specify the Actions that should be supported, the conditions under which they should be enabled, and what should happen when they're invoked, using lots of default code that lets you reuse the functionality provided by the NetBeans Project API: class CustomerActionProvider implements ActionProvider { @Override public String[] getSupportedActions() { return new String[]{ ActionProvider.COMMAND_RENAME, ActionProvider.COMMAND_MOVE, ActionProvider.COMMAND_COPY, ActionProvider.COMMAND_DELETE }; } @Override public void invokeAction(String string, Lookup lkp) throws IllegalArgumentException { if (string.equalsIgnoreCase(ActionProvider.COMMAND_RENAME)) { DefaultProjectOperations.performDefaultRenameOperation( CustomerProject.this, ""); } if (string.equalsIgnoreCase(ActionProvider.COMMAND_MOVE)) { DefaultProjectOperations.performDefaultMoveOperation( CustomerProject.this); } if (string.equalsIgnoreCase(ActionProvider.COMMAND_COPY)) { DefaultProjectOperations.performDefaultCopyOperation( CustomerProject.this); } if (string.equalsIgnoreCase(ActionProvider.COMMAND_DELETE)) { DefaultProjectOperations.performDefaultDeleteOperation( CustomerProject.this); } } @Override public boolean isActionEnabled(String command, Lookup lookup) throws IllegalArgumentException { if ((command.equals(ActionProvider.COMMAND_RENAME))) { return true; } else if ((command.equals(ActionProvider.COMMAND_MOVE))) { return true; } else if ((command.equals(ActionProvider.COMMAND_COPY))) { return true; } else if ((command.equals(ActionProvider.COMMAND_DELETE))) { return true; } return false; } } Importantly, to round off this step, add "new CustomerActionProvider()" to the "getLookup" method of the project. If you were to run the application right now, all the Actions we're interested in would be enabled (if they are visible, as described in step 4 below) but when you invoke any of them you'd get an error message because each of the DefaultProjectOperations above looks in the Lookup of the Project for the presence of an implementation of a class for handling the operation. That's what we're going to do in the next step. Provide Implementations of Project Operations. For each of our operations, the NetBeans Project API lets you implement classes to handle the operation. The dialogs for interacting with the project are provided by the NetBeans project system, but what happens with the folders and files during the operation can be influenced via the operations. Below are the simplest possible implementations, i.e., here we assume we want nothing special to happen. Each of the below needs to be in the Lookup of the Project in order for the operation invocation to succeed. private final class CustomerProjectMoveOrRenameOperation implements MoveOrRenameOperationImplementation { @Override public List<FileObject> getMetadataFiles() { return new ArrayList<FileObject>(); } @Override public List<FileObject> getDataFiles() { return new ArrayList<FileObject>(); } @Override public void notifyRenaming() throws IOException { } @Override public void notifyRenamed(String nueName) throws IOException { } @Override public void notifyMoving() throws IOException { } @Override public void notifyMoved(Project original, File originalPath, String nueName) throws IOException { } } private final class CustomerProjectCopyOperation implements CopyOperationImplementation { @Override public List<FileObject> getMetadataFiles() { return new ArrayList<FileObject>(); } @Override public List<FileObject> getDataFiles() { return new ArrayList<FileObject>(); } @Override public void notifyCopying() throws IOException { } @Override public void notifyCopied(Project prjct, File file, String string) throws IOException { } } private final class CustomerProjectDeleteOperation implements DeleteOperationImplementation { @Override public List<FileObject> getMetadataFiles() { return new ArrayList<FileObject>(); } @Override public List<FileObject> getDataFiles() { return new ArrayList<FileObject>(); } @Override public void notifyDeleting() throws IOException { } @Override public void notifyDeleted() throws IOException { } } Also make sure to put the above methods into the Project Lookup. Check the Lookup of the Project. The "getLookup()" method of the project should now include the classes you created above, as shown in bold below: @Override public Lookup getLookup() { if (lkp == null) { lkp = Lookups.fixed(new Object[]{ this, new Info(), new CustomerProjectLogicalView(this), new CustomerCustomizerProvider(this), new CustomerActionProvider(), new CustomerProjectMoveOrRenameOperation(), new CustomerProjectCopyOperation(), new CustomerProjectDeleteOperation(), new ReportsSubprojectProvider(this), }); } return lkp; } Make Actions Visible on the Project Node. The NetBeans Project API gives you a number of CommonProjectActions, including for the actions we're dealing with. Make sure the items in bold below are in the "getActions" method of the project node: @Override public Action[] getActions(boolean arg0) { return new Action[]{ CommonProjectActions.newFileAction(), CommonProjectActions.copyProjectAction(), CommonProjectActions.moveProjectAction(), CommonProjectActions.renameProjectAction(), CommonProjectActions.deleteProjectAction(), CommonProjectActions.customizeProjectAction(), CommonProjectActions.closeProjectAction() }; } Run the Application. When you run the application, you should see this: Let's now try out the various actions: Copy. When you invoke the Copy action, you'll see the dialog below. Provide a new project name and location and then the copy action is performed when the Copy button is clicked below: The message you see above, in red, might not be relevant to your project type. When you right-click the application and choose Branding, you can find the string in the Resource Bundles tab, as shown below: However, note that the message will be shown in red, no matter what the text is, hence you can really only put something like a warning message there. If you have no text at all, it will also look odd.If the project has subprojects, the copy operation will not automatically copy the subprojects. Take a look here and here for similar more complex scenarios. Move. When you invoke the Move action, the dialog below is shown: Rename. The Rename Project dialog below is shown when you invoke the Rename action: I tried it and both the display name and the folder on disk are changed. Delete. When you invoke the Delete action, you'll see this dialog: The checkbox is not checkable, in the default scenario, and when the dialog above is confirmed, the project is simply closed, i.e., the node hierarchy is removed from the application. However, if you truly want to let the user delete the project on disk, pass the Project to the DeleteOperationImplementation and then add the children of the Project you want to delete to the getDataFiles method: private final class CustomerProjectDeleteOperation implements DeleteOperationImplementation { private final CustomerProject project; private CustomerProjectDeleteOperation(CustomerProject project) { this.project = project; } @Override public List<FileObject> getDataFiles() { List<FileObject> files = new ArrayList<FileObject>(); FileObject[] projectChildren = project.getProjectDirectory().getChildren(); for (FileObject fileObject : projectChildren) { addFile(project.getProjectDirectory(), fileObject.getNameExt(), files); } return files; } private void addFile(FileObject projectDirectory, String fileName, List<FileObject> result) { FileObject file = projectDirectory.getFileObject(fileName); if (file != null) { result.add(file); } } @Override public List<FileObject> getMetadataFiles() { return new ArrayList<FileObject>(); } @Override public void notifyDeleting() throws IOException { } @Override public void notifyDeleted() throws IOException { } } Now the user will be able to check the checkbox, causing the method above to be called in the DeleteOperationImplementation: Hope this answers some questions or at least gets the discussion started. Before asking questions about this topic, please take the steps above and only then attempt to apply them to your own scenario. Useful implementations to look at: http://kickjava.com/src/org/netbeans/modules/j2ee/clientproject/AppClientProjectOperations.java.htm https://kenai.com/projects/nbandroid/sources/mercurial/content/project/src/org/netbeans/modules/android/project/AndroidProjectOperations.java

    Read the article

  • Handling inconcistent resource availability in Project 2007

    - by Lachlan McDonald
    Afternoon all, I have four resources; a project manager, and three developers. The project manager can work anywhere from 9 to 5pm each day, but only for a total of 10 hours per week. It doesn't matter when he works, as long as he isn't over-allocated 10 hours per week. The developers on the other hand can only work up to 2 hours per day, for a total of 10 hours per week. If they work more than 2 hours in a day, they are over-allocated. How do I best configure Project to handle this kind of scheduling requirement?

    Read the article

  • Use Your Favorite Wallpapers in Windows 7 Starter Edition

    - by Asian Angel
    If you have Windows 7 Starter Edition installed on your netbook, the default wallpaper can get old. If you are tired of looking at the default wallpaper, then join us today as we look at changing it with Oceanis Change Background Windows 7. Special Notes This information is quoted directly from the website and needs to be kept in mind when using Oceanis Change Background Windows 7: If the Oceanis Change Background Windows 7 program no longer works properly after installing some Windows Updates, then uninstall and reinstall the Oceanis Change Background Windows 7 program to have it run properly again. If you ever do an in-place upgrade to another higher level edition of Windows 7 in the future, then be sure to uninstall this Oceanis Change Background Windows 7 program first to avoid incompatibility issues with it in the new edition of Windows 7. It was designed to only work in Windows 7 Starter edition. Before There it is…the default wallpaper everyone with the Starter Edition gets stuck with. Some people may not mind it, but if you are one of the people who really wants something different then get ready to rejoice. After The install file for Oceanis is contained in a zip file so you will need to unzip it to get started. The install process is quick and simple but you will need to do a system restart afterwards. Once you have restarted your computer this is what your screen will look like…do not panic and think that this is all there is to it. This is just the Starter Screen and can be easily changed… Note: Oceanis will auto-start with Windows each time. Using either the Desktop Icon or the Start Menu Entry, open up the Oceanis Main Window. You will see the set of four default wallpapers shown here. At this point the best thing to do is browse for the appropriate folder where you have all of those wonderful new wallpapers just waiting to be used. Note: We found Stretch to be the best Picture Position setting on our system. For our example we had three ready and waiting. We decided to try out the Wallpaper Slideshow feature first. We chose a time frame and saved our changes. Here are our three wallpapers as they switched through. This can be much more interesting than the default wallpaper. There was only one quirk that we encountered while using the Slideshow Setting. On occasion if we minimized a non-maximized window there would be a leftover partial image in place of the window. Our suggestion? Go with one wallpaper at a time and the settings shown below. These are the settings that we had terrific luck with…Only one picture selected, Picture Position = Stretch, & Change Picture Every = Every Day. Using these settings, the Starter Edition acted just like any of the other editions with regard to wallpaper management. Conclusion If you have grown tired of looking at the default wallpaper in Windows 7 Starter Edition then you will certainly appreciate what Oceanis Change Background Windows 7 can do to fix that problem. For more ways to customize your Windows 7 Started Edition, be sure to to check out how to personalize Windows 7 Starter. Links Download Oceanis Change Background Windows 7 Similar Articles Productive Geek Tips Windows 7 Welcome Screen Taking Forever? Here’s the Fix (Maybe)Awesome Desktop Wallpapers: The Windows 7 EditionHow To Customize Wallpaper in Windows 7 Starter EditionDesktop Fun: Starship Theme WallpapersDesktop Fun: Underwater Theme Wallpapers TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Acronis Online Backup DVDFab 6 Revo Uninstaller Pro Registry Mechanic 9 for Windows Vista style sidebar for Windows 7 Create Nice Charts With These Web Based Tools Track Daily Goals With 42Goals Video Toolbox is a Superb Online Video Editor Fun with 47 charts and graphs Tomorrow is Mother’s Day

    Read the article

  • Print Microsoft Project chart as giant PDF

    - by Eric
    Hi, I have Adobe's PDF creator installed and I'm using Microsoft Project 2007... I want to print my gantt chart as one giant single-page PDF. (Currently it's set to print on letter sized paper, and it's six pages in a 3x2 layout.) I can't figure out where or how to make those settings. The PDF page setup doesn't seem to be right, nor "page setup" in Project. Help :-)

    Read the article

  • How do I (tactfully) tell my project manager or lead developer that the project's codebase needs serious work?

    - by Adam Maras
    I just joined a (relatively) small development team that's been working on a project for several months, if not a year. As with most developer joining a project, I spent my first couple of days reviewing the project's codebase. The project (a medium- to large-sized ASP.NET WebForms internal line of business application) is, for lack of a more descriptive term, a disaster. There are three immediately noticeable problems with the coding standards: The standard is very loose. It describes more of what not to do (don't use Hungarian notation, etc..) than what to do. The standard isn't always followed. There are inconsistencies with the code formatting everywhere. The standard doesn't follow Microsoft's style guidelines. In my opinion, there's no value in deviating from the guidelines that were set forth by the developer of the framework and the largest contributor to the language specification. As for point 3, perhaps it bothers me more because I've taken the time to get my MCPD with a focus on web applications (specifically, ASP.NET). I'm also the only Microsoft Certified Professional on the team. Because of what I learned in all of my schooling, self-teaching, and on-the-job learning (including my preparation for the certification exams) I've also spotted several instances in the project's code where things are simply not done in the best way. I've only been on this team for a week, but I see so many issues with their codebase that I imagine I'll be spending more time fighting with what's already written to do things in "their way" than I would if I were working on a project that, for example, followed more widely accepted coding standards, architecture patterns, and best practices. This brings me to my question: Should I (and if so, how do I) propose to my project manager and team lead that the project needs to be majorly renovated? I don't want to walk into their office, waving my MCTS and MCPD certificates around, saying that their project's codebase is crap. But I also don't want to have to stay silent and have to write kludgey code atop their kludgey code, because I actually want to write quality software and I want the end product to be stable and easily maintainable.

    Read the article

  • Seperation of project responsibilities in new project

    - by dreza
    We have very recently started a new project (MVC 3.0) and some of our early discussion has been around how the work and development will be split amongst the team members to ensure we get the least amount of overlap of work and so help make it a bit easier for each developer to get on and do their work. The project is expected to take about 6 months - 1 year (although not all developers are likely to be on and might filter off towards the end), Our team is going to be small so this will help out a bit I believe. The team will essentially consist of: 3 x developers (1 a slightly more experienced and will be the lead) 1 x project manager / product owner / tester An external company responsbile for doing our design work General project/development decisions so far have included: Develop in an Agile way using SCRUM techniques (We are still very much learning this approach as a company) Use MVVM archectecture Use Ninject and DI where possible Attempt to use as TDD as much as possible to drive development. Keep our controllers as skinny as possible Keep our views as simple as possible During our discussions two approaches have been broached as too how to seperate the workload given our objectives outlined above. OPTION 1: A framework seperation where each person is responsible for conceptual areas with overlap and discussion primarily in the integration areas. The integration areas would the responsibily of both developers as required. View prototypes (**Graphic designer**) | - Mockups | Views (Razor and view helpers etc) & Javascript (**Developer 1**) | - View models (Integration point) | Controllers and Application logic (**Developer 2**) | - Models (Integration point) | Domain model and persistence (**Developer 3**) PROS: Integration points are quite clear and so developers can work without dependencies on others fairly easily Code practices such as naming conventions and style is more easily managed in regards to consistancy as primarily only one developer will be handling an area CONS: Completion of an entire feature becomes a bit grey as no single person is responsible for an entire feature (story?) A person might not have a full appreciation for all areas of the project and so code overlap might be lacking if suddenly that person left. OPTION 2: A more task orientated approach where each person is responsible for the completion of the entire task from view - controller - model. PROS: A person is responsible for one entire feature so it's "complete" state can be clearly defined Code overlap into different areas will occur so each individual has good coverage over the entire application CONS: Overlap of development will occur in all the modules and developers can develop/extend without a true understanding of what the original code owner was intending. This could potentially lead more easily to code bloat? Following a convention might be harder as developers are adding to all areas of the project If a developer sets up a way of doing things would it be harder to enforce the other developers to follow that convention or even build on it (or even discuss it?). Dunno.. Bugs could more easily be introduced into areas not thought about by the developer It's easier to possibly to carry a team member in so far as one member just hacks code together to complete a task whilst another takes time to build a foundation that could be used by others and so help make future tasks easier i.e. starts building a framework? QUESTION: As it might appear I'm more in favor of option 1, however I'm interested to see how others might have approached this or what is the standard or best or preferred way of undertaking a project. Or indeed any different approach to handling this?

    Read the article

  • Parsing an MS Project 2007 xml project file.

    - by fred-22
    Has anyone got any idea how to read the XML file saved by MS Project 2007? The standard binary format is .MPP but I'd like to view a project in a different viewer. I've saved the project spec as XML and the viewer I'm using needs the parent task Id for each task. Where can i find that in the rather huge amount of XML data created by ms project?

    Read the article

  • Web Deployment Project builds files that are no longer part of the project

    - by Howard
    This is the error I get: Error 101 Could not load type 'control'. /Test.vbproj/x.ascx 1 1 WebDeployProject This is a left over file that was part of the project last week, but one of the developers deleted it from the project. I have to manually delete the file in order to get the WDP to build. Is there a way to tell the WDP to ignore the files that are not part of the project or to see that these files are not part of the project and delete them?

    Read the article

  • How can i use JIRA for project management with Green Hopper

    - by user22
    I am thinking of using JIRA + GreenHopper for my project management. I have seen that Green Hopper is for making User stories , sprints. I am not able to find how do i need to add tasks , or how to break user stories in to sub stoires. DO i first need to create project in JIRA and then use Green Hopper or i can use use Green Hopper as stand alone for project management. I am thinking of JIRA as issue tracker not project management.

    Read the article

  • Employee Info Starter Kit - Visual Studio 2010 and .NET 4.0 Version (4.0.0) Available

    - by Mohammad Ashraful Alam
    Employee Info Starter Kit is a ASP.NET based web application, which includes very simple user requirements, where we can create, read, update and delete (crud) the employee info of a company. Based on just a database table, it explores and solves most of the major problems in web development architectural space.  This open source starter kit extensively uses major features available in latest Visual Studio, ASP.NET and Sql Server to make robust, scalable, secured and maintanable web applications quickly and easily. Since it's first release, this starter kit achieved a huge popularity in web developer community and includes 1,40,000+ download from project web site. Visual Studio 2010 and .NET 4.0 came up with lots of exciting features to make software developers life easier.  A new version (v4.0.0) of Employee Info Starter Kit is now available in both MSDN Code Gallery and CodePlex. Chckout the latest version of this starter kit to enjoy cool features available in Visual Studio 2010 and .NET 4.0. [ Release Notes ] Architectural Overview Simple 2 layer architecture (user interface and data access layer) with 1 optional cache layer ASP.NET Web Form based user interface Custom Entity Data Container implemented (with primitive C# types for data fields) Active Record Design Pattern based Data Access Layer, implemented in C# and Entity Framework 4.0 Sql Server Stored Procedure to perform actual CRUD operation Standard infrastructure (architecture, helper utility) for automated integration (bottom up manner) and unit testing Technology UtilizedProgramming Languages/Scripts Browser side: JavaScript Web server side: C# 4.0 Database server side: T-SQL .NET Framework Components .NET 4.0 Entity Framework .NET 4.0 Optional/Named Parameters .NET 4.0 Tuple .NET 3.0+ Extension Method .NET 3.0+ Lambda Expressions .NET 3.0+ Aanonymous Type .NET 3.0+ Query Expressions .NET 3.0+ Automatically Implemented Properties .NET 3.0+ LINQ .NET 2.0 + Partial Classes .NET 2.0 + Generic Type .NET 2.0 + Nullable Type   ASP.NET 3.5+ List View (TBD) ASP.NET 3.5+ Data Pager (TBD) ASP.NET 2.0+ Grid View ASP.NET 2.0+ Form View ASP.NET 2.0+ Skin ASP.NET 2.0+ Theme ASP.NET 2.0+ Master Page ASP.NET 2.0+ Object Data Source ASP.NET 1.0+ Role Based Security Visual Studio Features Visual Studio 2010 CodedUI Test Visual Studio 2010 Layer Diagram Visual Studio 2010 Sequence Diagram Visual Studio 2010 Directed Graph Visual Studio 2005+ Database Unit Test Visual Studio 2005+ Unit Test Visual Studio 2005+ Web Test Visual Studio 2005+ Load Test Sql Server Features Sql Server 2005 Stored Procedure Sql Server 2005 Xml type Sql Server 2005 Paging support

    Read the article

  • Announcement: Employee Info Starter Kit (v5.0) is Released

    - by Mohammad Ashraful Alam
    Ever wanted to have a simple jQuery menu bound with ASP.NET web site map file? Ever wanted to have cool css design stuffs implemented on your ASP.NET data bound controls? Ever wanted to let Visual Studio generate logical layers for you, which can be easily tested, customized and bound with ASP.NET data controls? If your answers with respect to above questions are ‘yes’, then you will probably happy to try out latest release (v5.0) of Employee Starter Kit, which is intended to address different types of real world challenges faced by web application developers when performing common CRUD operations. Using a single database table ‘Employee’, the current release illustrates how to utilize Microsoft ASP.NET 4.0 Web Form Data Controls, Entity Framework 4.0 and Visual Studio 2010 effectively in that context. Employee Info Starter Kit is an open source ASP.NET project template that is highly influenced by the concept ‘Pareto Principle’ or 80-20 rule, where it is targeted to enable a web developer to gain 80% productivity with 20% of effort with respect to learning curve and production. This project template is titled as “Employee Info Starter Kit”, which was initially hosted on Microsoft Code Gallery and been downloaded 1, 50,000+ of copies afterword.  The latest version of this starter kit is hosted in Codeplex. Release Highlights User End Functional Specification The user end functionalities of this starter kit are pretty simple and straight forward that are focused in to perform CRUD operation on employee records as described below. Creating a new employee record Read existing employee records Update an existing employee record Delete existing employee records Architectural Overview Simple 3 layer architecture (presentation, business logic and data access layer) ASP.NET web form based user interface Built-in code generators for logical layers, implemented in Visual Studio default template engine (T4) Built-in Entity Framework entities as business entities (aka: data containers) Data Mapper design pattern based Data Access Layer, implemented in C# and Entity Framework Domain Model design pattern based Business Logic Layer, implemented in C# Object Model for Cross Cutting Concerns (such as validation, logging, exception management) Minimum System Requirements Visual Studio 2010 (Web Developer Express Edition) or higher Sql Server 2005 (Express Edition) or higher Technology Utilized Programming Languages/Scripts Browser side: JavaScript Web server side: C# Code Generation Template: T-4 Template Frameworks .NET Framework 4.0 JavaScript Framework: jQuery 1.5.1 CSS Framework: 960 grid system .NET Framework Components .NET Entity Framework .NET Optional/Named Parameters (new in .net 4.0) .NET Tuple (new in .net 4.0) .NET Extension Method .NET Lambda Expressions .NET Anonymous Type .NET Query Expressions .NET Automatically Implemented Properties .NET LINQ .NET Partial Classes and Methods .NET Generic Type .NET Nullable Type ASP.NET Meta Description and Keyword Support (new in .net 4.0) ASP.NET Routing (new in .net 4.0) ASP.NET Grid View (CSS support for sorting - (new in .net 4.0)) ASP.NET Repeater ASP.NET Form View ASP.NET Login View ASP.NET Site Map Path ASP.NET Skin ASP.NET Theme ASP.NET Master Page ASP.NET Object Data Source ASP.NET Role Based Security Getting Started Guide To see Employee Info Starter Kit in action is pretty easy! Download the latest version. Extract the file. From the extracted folder click the C# project file (Eisk.Web.csproj) to open it in Visual Studio 2010 Hit Ctrl+F5! The current release (v5.0) of Employee Info Starter Kit is properly packaged, fully documented and well tested. If you want to learn more about it in details, just check the following links: Release Home Page Installation Walkthrough Hand on Coding Walkthrough Technical Reference Enjoy!

    Read the article

  • Version control and project management for freelancing jobs

    - by Groo
    Are there version control and project management tools which "work well" with freelancing jobs, if I want to keep my customer involved in the project at all times? What concerns me is that repository hosting providers have their fees based on the "number of users", which I feel is the number which will constantly increase as I finish one project after another. For each project, for example, I would have to add permissions to my contractor to allow him to pull the source code and collaborate. So how does that work in practice? Do I "remove" the contractor from the project once it's done? This means I basically state that I offer no support and bugfixes anymore. Or do freelances end up paying more and more money for these services? Do you use such online services, or you host them by yourself? Or do you simply send your code to your customer by e-mail in weekly iterations?