Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 216/1407 | < Previous Page | 212 213 214 215 216 217 218 219 220 221 222 223  | Next Page >

  • Openfiler RAID 10 option not found

    - by chrisling106
    Hi, I'm building a NAS using Openfiler2.3 (from 32-bit ISO), first of all I want to experiment it on VM first before going out and buy the harddrives needed. I created 5 virtual drives on VMware, sda is 2GB and the rest 1GB each (sdb to sde). I left sda blank and want to setup a RAID 10 disk using sdb, sdc, sdd and sde, 4 RAID partitions are setup successfully, but when I try to create a RAID device the only option for RAID level is 1, 0, 5 and 6. RAID 10 is not there! Can someone let me know what have I missed, please? TIA.

    Read the article

  • Degraded RAID5 and no md superblock on one of remaining drive

    - by ark1214
    This is actually on a QNAP TS-509 NAS. The RAID is basically a Linux RAID. The NAS was configured with RAID 5 with 5 drives (/md0 with /dev/sd[abcde]3). At some point, /dev/sde failed and drive was replaced. While rebuilding (and not completed), the NAS rebooted itself and /dev/sdc dropped out of the array. Now the array can't start because essentially 2 drives have dropped out. I disconnected /dev/sde and hoped that /md0 can resume in degraded mode, but no luck.. Further investigation shows that /dev/sdc3 has no md superblock. The data should be good since the array was unable to assemble after /dev/sdc dropped off. All the searches I done showed how to reassemble the array assuming 1 bad drive. But I think I just need to restore the superblock on /dev/sdc3 and that should bring the array up to a degraded mode which will allow me to backup data and then proceed with rebuilding with adding /dev/sde. Any help would be greatly appreciated. mdstat does not show /dev/md0 # cat /proc/mdstat Personalities : [linear] [raid0] [raid1] [raid10] [raid6] [raid5] [raid4] [multipath] md5 : active raid1 sdd2[2](S) sdc2[3](S) sdb2[1] sda2[0] 530048 blocks [2/2] [UU] md13 : active raid1 sdd4[3] sdc4[2] sdb4[1] sda4[0] 458880 blocks [5/4] [UUUU_] bitmap: 40/57 pages [160KB], 4KB chunk md9 : active raid1 sdd1[3] sdc1[2] sdb1[1] sda1[0] 530048 blocks [5/4] [UUUU_] bitmap: 33/65 pages [132KB], 4KB chunk mdadm show /dev/md0 is still there # mdadm --examine --scan ARRAY /dev/md9 level=raid1 num-devices=5 UUID=271bf0f7:faf1f2c2:967631a4:3c0fa888 ARRAY /dev/md5 level=raid1 num-devices=2 UUID=0d75de26:0759d153:5524b8ea:86a3ee0d spares=2 ARRAY /dev/md0 level=raid5 num-devices=5 UUID=ce3e369b:4ff9ddd2:3639798a:e3889841 ARRAY /dev/md13 level=raid1 num-devices=5 UUID=7384c159:ea48a152:a1cdc8f2:c8d79a9c With /dev/sde removed, here is the mdadm examine output showing sdc3 has no md superblock # mdadm --examine /dev/sda3 /dev/sda3: Magic : a92b4efc Version : 00.90.00 UUID : ce3e369b:4ff9ddd2:3639798a:e3889841 Creation Time : Sat Dec 8 15:01:19 2012 Raid Level : raid5 Used Dev Size : 1463569600 (1395.77 GiB 1498.70 GB) Array Size : 5854278400 (5583.08 GiB 5994.78 GB) Raid Devices : 5 Total Devices : 4 Preferred Minor : 0 Update Time : Sat Dec 8 15:06:17 2012 State : active Active Devices : 4 Working Devices : 4 Failed Devices : 1 Spare Devices : 0 Checksum : d9e9ff0e - correct Events : 0.394 Layout : left-symmetric Chunk Size : 64K Number Major Minor RaidDevice State this 0 8 3 0 active sync /dev/sda3 0 0 8 3 0 active sync /dev/sda3 1 1 8 19 1 active sync /dev/sdb3 2 2 8 35 2 active sync /dev/sdc3 3 3 8 51 3 active sync /dev/sdd3 4 4 0 0 4 faulty removed [~] # mdadm --examine /dev/sdb3 /dev/sdb3: Magic : a92b4efc Version : 00.90.00 UUID : ce3e369b:4ff9ddd2:3639798a:e3889841 Creation Time : Sat Dec 8 15:01:19 2012 Raid Level : raid5 Used Dev Size : 1463569600 (1395.77 GiB 1498.70 GB) Array Size : 5854278400 (5583.08 GiB 5994.78 GB) Raid Devices : 5 Total Devices : 4 Preferred Minor : 0 Update Time : Sat Dec 8 15:06:17 2012 State : active Active Devices : 4 Working Devices : 4 Failed Devices : 1 Spare Devices : 0 Checksum : d9e9ff20 - correct Events : 0.394 Layout : left-symmetric Chunk Size : 64K Number Major Minor RaidDevice State this 1 8 19 1 active sync /dev/sdb3 0 0 8 3 0 active sync /dev/sda3 1 1 8 19 1 active sync /dev/sdb3 2 2 8 35 2 active sync /dev/sdc3 3 3 8 51 3 active sync /dev/sdd3 4 4 0 0 4 faulty removed [~] # mdadm --examine /dev/sdc3 mdadm: No md superblock detected on /dev/sdc3. [~] # mdadm --examine /dev/sdd3 /dev/sdd3: Magic : a92b4efc Version : 00.90.00 UUID : ce3e369b:4ff9ddd2:3639798a:e3889841 Creation Time : Sat Dec 8 15:01:19 2012 Raid Level : raid5 Used Dev Size : 1463569600 (1395.77 GiB 1498.70 GB) Array Size : 5854278400 (5583.08 GiB 5994.78 GB) Raid Devices : 5 Total Devices : 4 Preferred Minor : 0 Update Time : Sat Dec 8 15:06:17 2012 State : active Active Devices : 4 Working Devices : 4 Failed Devices : 1 Spare Devices : 0 Checksum : d9e9ff44 - correct Events : 0.394 Layout : left-symmetric Chunk Size : 64K Number Major Minor RaidDevice State this 3 8 51 3 active sync /dev/sdd3 0 0 8 3 0 active sync /dev/sda3 1 1 8 19 1 active sync /dev/sdb3 2 2 8 35 2 active sync /dev/sdc3 3 3 8 51 3 active sync /dev/sdd3 4 4 0 0 4 faulty removed fdisk output shows /dev/sdc3 partition is still there. [~] # fdisk -l Disk /dev/sdx: 128 MB, 128057344 bytes 8 heads, 32 sectors/track, 977 cylinders Units = cylinders of 256 * 512 = 131072 bytes Device Boot Start End Blocks Id System /dev/sdx1 1 8 1008 83 Linux /dev/sdx2 9 440 55296 83 Linux /dev/sdx3 441 872 55296 83 Linux /dev/sdx4 873 977 13440 5 Extended /dev/sdx5 873 913 5232 83 Linux /dev/sdx6 914 977 8176 83 Linux Disk /dev/sda: 1500.3 GB, 1500301910016 bytes 255 heads, 63 sectors/track, 182401 cylinders Units = cylinders of 16065 * 512 = 8225280 bytes Device Boot Start End Blocks Id System /dev/sda1 * 1 66 530113+ 83 Linux /dev/sda2 67 132 530145 82 Linux swap / Solaris /dev/sda3 133 182338 1463569695 83 Linux /dev/sda4 182339 182400 498015 83 Linux Disk /dev/sda4: 469 MB, 469893120 bytes 2 heads, 4 sectors/track, 114720 cylinders Units = cylinders of 8 * 512 = 4096 bytes Disk /dev/sda4 doesn't contain a valid partition table Disk /dev/sdb: 1500.3 GB, 1500301910016 bytes 255 heads, 63 sectors/track, 182401 cylinders Units = cylinders of 16065 * 512 = 8225280 bytes Device Boot Start End Blocks Id System /dev/sdb1 * 1 66 530113+ 83 Linux /dev/sdb2 67 132 530145 82 Linux swap / Solaris /dev/sdb3 133 182338 1463569695 83 Linux /dev/sdb4 182339 182400 498015 83 Linux Disk /dev/sdc: 1500.3 GB, 1500301910016 bytes 255 heads, 63 sectors/track, 182401 cylinders Units = cylinders of 16065 * 512 = 8225280 bytes Device Boot Start End Blocks Id System /dev/sdc1 1 66 530125 83 Linux /dev/sdc2 67 132 530142 83 Linux /dev/sdc3 133 182338 1463569693 83 Linux /dev/sdc4 182339 182400 498012 83 Linux Disk /dev/sdd: 2000.3 GB, 2000398934016 bytes 255 heads, 63 sectors/track, 243201 cylinders Units = cylinders of 16065 * 512 = 8225280 bytes Device Boot Start End Blocks Id System /dev/sdd1 1 66 530125 83 Linux /dev/sdd2 67 132 530142 83 Linux /dev/sdd3 133 243138 1951945693 83 Linux /dev/sdd4 243139 243200 498012 83 Linux Disk /dev/md9: 542 MB, 542769152 bytes 2 heads, 4 sectors/track, 132512 cylinders Units = cylinders of 8 * 512 = 4096 bytes Disk /dev/md9 doesn't contain a valid partition table Disk /dev/md5: 542 MB, 542769152 bytes 2 heads, 4 sectors/track, 132512 cylinders Units = cylinders of 8 * 512 = 4096 bytes Disk /dev/md5 doesn't contain a valid partition table

    Read the article

  • CentOS - mdadm raid1 drive won't mount to default location

    - by danny
    I'm running CentOS 5.5, the system, boot, swap, etc. is all on /dev/sda and I have two identical single-partition drives /dev/sdb1 /dev/sdc1 that are configured in RAID1 (using mdadm). It was working fine (configured to mount to /mnt/data in the fstab file) and I recently let yum install a couple of automatic updates without paying attention to what they were, and now it doesn't work. Raid is working fine (dmesg shows it gets loaded correctly). mdstat shows: # cat /proc/mdstat Personalities : [raid1] md0 : active raid1 sdc1[1] sdb1[0] XXXX blocks [2/2] [UU] unused devices: <none> Additionally, I can mount it anywhere other than its default directory (i.e. the following works, and I can read data off the drives). # mount /dev/md0 /mnt/data2 EXT3-fs warning: mounting fs with errors, running e2fsck is recommended But when I run the following I get: # mount -a mount: /dev/sdb1 already mounted or /mnt/data busy It says nothing is mounted when I try to umount /dev/sdb1 or umount /mnt/data, so I assume it's the second of those errors. However, lsof | grep mnt shows nothing. The weird thing is that I can save files in /mnt/data. So something is obviously mounted there, but when I try to umount it I get the error that nothing is mounted. /etc/mtab doesn't mention any of the partitions or files I am trying to work with, and fstab just has that one line I mentioned above that is supposed to mount my raid partition. Again, it was all working fine until I On Google I've found a few things about dmraid interfering with mdadm after an update, but I yum remove'd dmraid and rebooted and it didn't help. I'm really confused and need to get this working to get on with my work!

    Read the article

  • Hosted version of Yahoo! answers [closed]

    - by Neil
    Hi all. Does anyone know of a hosted version of Yahoo! Answers (or Stackoverflow/Superuser) that I could integrate with my site? I know that there are some open-source implementations (see http://meta.stackoverflow.com/questions/2267/stack-overflow-clones?page=1&tab=votes#tab-top) but I'd rather have some hosted if possible. I know there is http://stackexchange.com/ as well, but I really want some tight integration with the rest of my site. Failing that, has anyone got any experience with the open source versions? Some of them look a little, erm, unfinished... Thanks. Neil.

    Read the article

  • App or apps like NetLimiter Monitor for Linux

    - by Nathaniel
    I find NetLimiter Monitor quite handy on Windows both for the realtime per-process bandwidth monitoring and the recorded data usage. What tool or tools can I use to replicate this functionality in Linux? I am okay using two separate apps for the bandwidth and the usage monitoring, but the usage monitoring is a must have.

    Read the article

  • Should I use Evernote or Org-mode for taking notes?

    - by tobeannounced
    I am looking for an app that will help me manage my notes, and after coming across Org-mode, I was wondering whether Org-mode's functionality is strong enough that it can remove the need for me to use another note taking app (because org is more of a task management app), such as Evernote. My wishes for a note taking app are: can be accessed offline in some form, eg through an iPhone app or desktop client Org-Mode and Evernote can both do this, however it seems like MobileOrg is more aimed at tasks, rather than notes? If this is the case, I probably would use Evernote in addition to MobileOrg. I can clip web content into easily for research Evernote has the browser extension, how is it with Org-Mode? I know I can use c-c c-l, but how suited is it really for taking notes on stuff I am browsing in Chrome/Firefox? has voice notes on the iPhone and computer too, if possible Org-Mode cannot do this on the iPhone, on the computer could I record audio externally and then link the files in? I can add notes too on my iPhone & computer while not connected to the internet both can do this. The types of notes I am likely to have include: howtos/things I have learnt, documentation on my setup/stuff, research on things I may do in the future, ideas, and task specific notes. I have thought about where I would want to access each of these notes and will post that here if you think it would help. So, is Org-mode strong enough in note-taking and the requirements I listed that I can avoid the need to use a separate tool for taking notes?

    Read the article

  • What is a good alternative to Camtasia Studio (screen recording not required)?

    - by tnorthcutt
    I'm looking for a good alternative to Camtasia Studio - really just the video editing part. My current workflow looks like this: Record audio (with Audacity) Save screenshots of the subject matter (websites) Import audio and screenshots into Camtasia Use the zoom and callout tools in Camtasia to go along with the spoken audio and highlight certain parts of the sites Given that Camtasia costs $300 (I've been using a trial version), I'd like to find something else that can do this well. I suspect that a lot of the pricetag for Camtasia is because of the screencasting features. I've tried Sony Vegas Movie Studio, but it was really a lot more than I need. I'd like something relatively simple (so that new users can pick it up relatively quickly), with the zoom and callout functionality that Camtasia has. Any suggestions? Edit for clarity: I'm looking for a program that will let me combine the screenshots and audio, and (most importantly) that has features equal to or better than Camtasia for text overlays, highlighting areas on the screen, etc.

    Read the article

  • What is a good program for mixed mode circuit simulation?

    - by Jeff Shattock
    I'm looking for a program that will perform schematic capture and mixed-mode (analog and digital) circuit simulation. If it also did PCB layout and routing, that would be a bonus, but not necessary. I currently use an old version of CircuitMaker/TraxMaker, but its dated, and the simulation engine is a bit lacking. Windows or Linux, doesn't really matter. What is a good program for this purpose?

    Read the article

  • Does SpinRite do what it claims to do?

    - by romandas
    I don't have any real (i.e. professional) experience with Steve Gibson's SpinRite so I'd like to put this to the SF community. Does SpinRite actually do what it claims? Is it a good product to use? With a proper backup solution and RAID fault tolerance, I've never found need for it, but I'm curious. There seems to be some conflicting messages regarding it, and no hard data to be found either way. On one hand, I've heard many home users claim it helped them, but I've heard home users say a lot of things -- most of the time they don't have the knowledge or experience to accurately describe what really happened. On the other hand, Steve's own description and documentation don't give me a warm fuzzy about it either. So what is the truth of the matter? Would you use it?

    Read the article

  • Online Backup strategy for family individuals

    - by marlon brando
    The majority of my family, including myself, uses Dropbox and Syncplicity free accounts for our syncing needs. However our backup strategy is pretty non-existent, we all have access (via webDav) to our qnap nas located at home, however we copy files accross when we can remember to do so, terrible I know. Is there tools like CrashPlan or Spideroak that allows each the accomodation of each family members syncing and back-up needs under one main account? I'm not sure how this would work, as each family member would need a seperate sub-account or would I manage each computer's syncing and backup lists from a single account? Any thoughts?

    Read the article

  • Where does PGP keep its license file within OS X?

    - by romant
    I was using a trial from PGP. Now have a license supplied by the company I work for. Upon trying to overwrite/upgrade - PGP is reporting that its using the 'old', namely trial license. Which has long expired. How can I completely rid my machine of PGP - and thus be able to install a fresh copy? Where does this pesky license file reside? OS: 10.6.2 PGP: 10

    Read the article

  • How decode xfs lost+found directory

    - by Satpal
    I have managed to trash my homebrew Nas box (an old hp d530 + 2x 750gb sata soft raid1 + 17gb boot disk with ubuntu server 8.10) I have searched the web and tried to repair the file system but to no avail :( I was thinking that the dirs/files located under the root of the lost+found directory are 64 bit numbers. Is there any way that I could decant the number into binary form, from there reconstruct the directory/file structure. More to the point can anyone point to the information on how xfs inodes are broken down(does that make sense)?

    Read the article

  • Auto-rebuild RAID6 with MDADM

    - by user65632
    Hello everybody, i'm new in this forum, and because I see that a lot of people get helped here, i'll ask my question here! I have a openSUSE 11.3 Linux computer with 5 disks of 1TB (WD enterprise disks) in it. with mdadm I configured an RAID6 device. Now, after a lot of thorough testing, i've noticed that when the computer goes down unsuspectedly it could happen (1 time out of 10) that while booting, the md0 device isn't recognised, and then the machine goes in "recovery mode", which means that i have to 'CTRL + C' it so it can boot to openSUSE. Once in openSUSE i have to readd the drive manually with 'mdadm /dev/md0 --add /dev/sdX'. After this everything works back fine (after resynching). So my question is: Is there a way to auto-rebuild the RAID6 device when there are problems? and how can I stop this "recovery mode" from happening. Because the computer will be in a place I can't go to, to connect a keyboard, 'CTRL + C' it just to get in openSUSE. If you could help me, I would be a very very very! happy man! :-) thanks in advance! Mikhail

    Read the article

  • Selecting a Color Selector

    - by RCIX
    I'm looking for a nice full featured color selector program, i currently use Color Cop but i feel its missing some features (mainly a nice interface for selecting a color from a spectrum). Does anyone have any other suggestions?

    Read the article

< Previous Page | 212 213 214 215 216 217 218 219 220 221 222 223  | Next Page >