Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 221/1407 | < Previous Page | 217 218 219 220 221 222 223 224 225 226 227 228  | Next Page >

  • Any FTP clients for Mac OS X that support upload via temporary filename?

    - by Chris582
    Hi, does anybody know of a FTP client (for Mac OS X) that supports uploading to a temporary filename? When overwriting a file on the server, most FTP clients first empty the file and then proceed to upload new content. (Which is how FTP is supposed to work, so everything is fine.) However, what I would like to see is that the FTP client uploads content to a temporary file and once all the content is on the server, replaces original file. This is good feature, because existing file is upgraded almost instantaneously; otherwise, it would be "broken" while the upload is still in progress. On Windows, this feature is available in WinSCP, but I have not found any options for Mac, so far. Any recommendations?

    Read the article

  • misaligned raid partition in Ubuntu 10.04

    - by Linux Jedi
    I attached two identical hard drives to my linux machine. Then using gparted I formated the first 1024 mb at the beginning of each drive as linux swap space. Then I went into system-administration-disk utility. In there I went to file-create-RAID array. I selected the remaining space in each of the two identical hard drives and created a striped raid array. After the array was created, a warning message appeared. It said "The partition is misaligned by 522240 bytes. This may result in very poor performance. Repartitioning is suggested." What do I do now? As far as I can tell, the partitions are identical.

    Read the article

  • Windows app that can stream video over local net with remote browsing

    - by Nifle
    What I want: An app that runs on a windows 7 computer that can stream movies to the other computers in the house. I want to be able to brows the movies on my "server" from the other computers and start streaming. I'm aware that VLC can do some (all?) of this but it's looks to complicated for my 6year old to use. Ideally I'd like something "Air Video Server" but for mac/win computers with a native client for browsing the movies on the PC running as server.

    Read the article

  • Program to set time on local computer using GPS data

    - by dmkerr
    I have a laptop running Windows XP that does not connect to the Internet and I would like to use a USB GPS receiver as a time source to set the clock. Generally, the laptop will not have access to the open sky so getting a strong, multi-satellite connection is not likely. Ideally, I would like to be able to have the program detect the GPS receiver and set the clock without intervention from the user. Is what I'm seeking even feasible?

    Read the article

  • What is a Windows text editor that will make it easy for me to have four text files open onscreen at once?

    - by Ascendant
    When brainstorming / planning I like to have four text files open onscreen at once: One for notes/stream of consciousness, one for action items to follow up on, one for a rough outline, etc.... What I'm looking for is an easy way to create / save four text files in this manner in Windows. Most importantly, I need the lines to wrap based on the width of the actual window itself. Not based on a ruler or document size (a la Word or WordPad) and not wrapping "manually only" (like Windows' built in Notepad application.) Also, I need the windows to have no, or at least, little, fluff at the top of each document (menubars, ribbons, etc.) On my Mac, I've found that the built-in TextEdit application is almost perfect for this. There's no header or ribbon taking up space for each document, and lines wrap when they hit the end of the window. I haven't had any luck finding a Windows application that works the same way.

    Read the article

  • How do you move the subscription folder to a different folder than the default Music Folder?

    - by Bryant
    I'm using Skydrive to store the music I purchase from Zune in the cloud so that I can share the songs with my wife's computer. However, I don't want to sync all the subscription music which is music I haven't purchased. Zune puts all the subscription music into the default music folder in a separate folder called Subscription. Is there a way to have just this folder somewhere else? I know you can't currently exclude folders in Skydrive, otherwise I would just take this route.

    Read the article

  • Creating a partitioned raid1 array for booting a debian squeeze system

    - by gucki
    I'd like to have the following raid1 (mirror) setup: /dev/md0 consists of /dev/sda and /dev/sdb I created this raid1 device using mdadm --create --verbose /dev/md0 --auto=yes --level=1 --raid-devices=2 /dev/sda /dev/sdb This gave a warning about metadata being 1.2 and my system might not boot. I cannot use 0.9 because it restricts the size of the raid to 2TB and I assume grub shipped with latest debian (squeeze) should be able to handle metadata 1.2. So then I created the needed partitions like this: # creating new label (partition table) parted -s /dev/md0 mklabel 'msdos' # creating partitions sfdisk -uM /dev/md0 << EOF 0,4096 ,1024,S ; EOF # making root filesystem mkfs -t ext4 -L boot -m 0 /dev/md0p1 # making swap filesystem mkswap /dev/md0p2 # making data filesystem mkfs -t ext4 -L data /dev/md0p3 Then I mounted the root partition, copied a minimal debian install inside and temporary mounted /dev /proc /sys. Afer this I chrooted to the new root folder and executed: grub-install --no-floppy --recheck /dev/md0 However this fails badly with: /usr/sbin/grub-probe: error: unknown filesystem. Auto-detection of a filesystem of /dev/md0p1 failed. Please report this together with the output of "/usr/sbin/grub-probe --device-map=/boot/grub/device.map --target=fs -v /boot/grub" to I don't think it's a bug in grub (so I didn't report it yet) but a fault of mine. So I really wonder how to properly setup my raid1, everything I tried so far failed.

    Read the article

  • What is a good lightweight webradio program

    - by Robert Vukovic
    I am currently using Screamer Radio but it is a little bit buggy. It freezes a lot if internet connection is bad and can not continue if there are interruptions in the internet connection. I am not interested in some full sized MP3/media player, just a simple (with low memory footprint) application that can play streaming internet radio stations.

    Read the article

  • Looking for a Windows 7 compatible Partition Manager!

    - by NoCanDo
    Since Acronis Disk Director Suite 10.0 is no longer compatible with Windows 7, I'm in need of an alternative. I'm not interested in Acronis Disk Director Suite workarounds, particularly not an application as dangerous as a partition manager. I don't want to mess it up my partitions due to incompatibality. Anyone got any ideas? Open Source, Commercial or Freeware, doesn't mater!

    Read the article

  • Linux: grab audio from a video clip

    - by liori
    Hello, I'd like to take audio track from a video clip in FLV container and save it to something playable by portable music players. Are there any easy to use tools for that? I know how to do that using console tools (mplayer+lame/oggenc), but I'd like to get something clickable, preferably for GNOME. Thanks!

    Read the article

  • App to slice'n'dice video, specifically remove chunks, on a Mac?

    - by Phillip Oldham
    I have a couple of collections of DVD Box-Sets I've ripped to my mac. Now I'd like to sweeten the viewing experience by removing the title sequences and credits so that viewing doesn't mean I have to keep reaching for the remote to skip 30 seconds of annoying music (think watching multiple episodes of Family Guy). If I can find an app that will let me do this reasonably quickly manually that would be great, but it would be perfect if I could dump a load of commands into a file and have everything trimmed while the mac is "inactive". I'm thinking that if I can specify chunks of time to remove from the original file that would be perfect. I had a quick look at importing into iMovie to do it manually and gave up at the "Processing Thumbnails" stage as it said it would be a couple of hours to produce them for a 45min mp4 file, which I can understand at 25fps but I'm not willing to wait, especially when I've got over a week's worth of files. Any suggestions?

    Read the article

  • How to Create Boot CD

    - by joe
    How to Create boot CD for Dual Booting System? Just consider I am having Windows and Ubuntu, Grup is boot loader. I just want to create Dual Boot CD for the same operation.

    Read the article

  • GRUB2 not detecting OS on raid partitions

    - by sleeves
    I have recently added a drive to a system and have successfully raid'ed (RAID-1) the paritions, with the exception of the boot partition. I have it ready and mirrored, but can't get GRUB2 (update-grub) to find it. System: Ubuntu 11.04 Raid Metadata: 1.2 If I run update-grub, it finds the kernel images on the /dev/sda2 partition (present root) but not the images on /dev/md127. /dev/md127 is composed of "missing" and "/dev/sdb2". fdisk on /dev/sdb confirms that sdb2 is of type fd (raid autodetect) and is also flagged bootable. I have two things I want to do. Make the boot.cfg on /dev/sdb2 have a menu option to have the root be /dev/md127 Install grub onto /dev/md127 so the actual boot.cfg from there is being used. Thanks!

    Read the article

  • Any tool to monitor which softwares consume the connexion?

    - by user23392
    Hello, i have a weired problem here, i'm running windows vista which is connected to the internet throught a 3g key, so sometimes i go to see how much datas are being downloaded and i find 200kb/s even if i don't use the internet, i closed all softwares like antivirus and everything and still the internet being consumed, thanks god because i only pay by month. So is there a tool for pc to monitor the softwares that are using my connexion? Thanks

    Read the article

  • What happens to missed writes after a zpool clear?

    - by Kevin
    I am trying to understand ZFS' behaviour under a specific condition, but the documentation is not very explicit about this so I'm left guessing. Suppose we have a zpool with redundancy. Take the following sequence of events: A problem arises in the connection between device D and the server. This causes a large number of failures and ZFS therefore faults the device, putting the pool in degraded state. While the pool is in degraded state, the pool is mutated (data is written and/or changed.) The connectivity issue is physically repaired such that device D is reliable again. Knowing that most data on D is valid, and not wanting to stress the pool with a resilver needlessly, the admin instead runs zpool clear pool D. This is indicated by Oracle's documentation as the appropriate action where the fault was due to a transient problem that has been corrected. I've read that zpool clear only clears the error counter, and restores the device to online status. However, this is a bit troubling, because if that's all it does, it will leave the pool in an inconsistent state! This is because mutations in step 2 will not have been successfully written to D. Instead, D will reflect the state of the pool prior to the connectivity failure. This is of course not the normative state for a zpool and could lead to hard data loss upon failure of another device - however, the pool status will not reflect this issue! I would at least assume based on ZFS' robust integrity mechanisms that an attempt to read the mutated data from D would catch the mistakes and repair them. However, this raises two problems: Reads are not guaranteed to hit all mutations unless a scrub is done; and Once ZFS does hit the mutated data, it (I'm guessing) might fault the drive again because it would appear to ZFS to be corrupting data, since it doesn't remember the previous write failures. Theoretically, ZFS could circumvent this problem by keeping track of mutations that occur during a degraded state, and writing them back to D when it's cleared. For some reason I suspect that's not what happens, though. I'm hoping someone with intimate knowledge of ZFS can shed some light on this aspect.

    Read the article

  • Dictionary Apps for Mac OS X ?

    - by mgpyone
    I like to use "Dictionary" app for seeking unknown meanings for Mac. Are there any freeware app with additional (add-on) dictionaries you recommend over that default app? Any suggestions are most welcome.

    Read the article

  • Use old raid drive as boot device without data loss

    - by Gabriel
    There were two disks in sw-raid. There were /dev/md1 as swap, /dev/md2 as boot and a /dev/md3 with ext4. The sw-raid was disabled by stopping and removing mdadm and then zeroing the superblock on each /dev/mdX partition with: sudo mdadm --zero-superblock /dev/sda1 sudo mdadm --zero-superblock /dev/sda2 sudo mdadm --zero-superblock /dev/sda3 In the disk that is the first boot device, I don't know if it's relevant, the system type of each partition was set back from fd to 82 or 83 with fdisk, /etc/fstab was updated, changing /dev/mdX to /dev/sdaX, and grub was reinstalled on the boot partition (/dev/sda2) with grub-instal. But the system wont boot. What else should I do to use this disk as the boot device without reinstall or data loss? Current output of fdisk Device Boot Start End Blocks Id System /dev/sda1 2048 33556480 16777216+ 82 Linux swap / Solaris /dev/sda2 * 33558528 34607104 524288+ 83 Linux /dev/sda3 34609152 3907027120 1936208984+ 83 Linux With it doesn't boot I mean that it stops in the grub console (with the grub> symbol). A ls command says: (hd0) (hd0,msdos3) (hd0,msdos2) (hd0,msdos1) (hd1) (hd1,msdos1) It's weird because hd1 was formatted with ext4...

    Read the article

< Previous Page | 217 218 219 220 221 222 223 224 225 226 227 228  | Next Page >