Search Results

Search found 14882 results on 596 pages for 'xfce4 power manager'.

Page 220/596 | < Previous Page | 216 217 218 219 220 221 222 223 224 225 226 227  | Next Page >

  • All about the Fusion Middleware Best Practice Centers for Applications

    Nishit Rao, Group Product Manager and Markus Zirn, Senior Director, Oracle Fusion Middleware discuss Oracle's Fusion Middlware Best Practice Centers for E-Business Suite, Peoplesoft and Siebel, and how Application Developers can use the how-to guides, blogs and webcasts to learn FMW components and create SOA solutions with their favorite applications.

    Read the article

  • How do I can install libxcb-render-unil0?

    - by Nazar Kovalenko
    I need libxcb-render-unil0 for running DraftSight™ 32x ver under my 64x os. I was trying to install it by a terminal or Synaptic Package Manager but it I didn't succeed in this. root@nazar-Aspire-5720Z:/home/nazar# sudo apt-get install libxcb-render-unil0 Reading package lists... Done Building dependency tree Reading state information... Done E: Unable to locate package libxcb-render-unil0 I just can't understand what's wrong. Thank u.

    Read the article

  • ATG Live Webcast March 29: Diagnosing E-Business Suite JVM and Forms Performance Issues (Performance Series Part 4 of 4)

    - by BillSawyer
    The next webcast in our popular EBS series on performance management is going to be a showstopper.  Dave Suri, Project Lead, Applications Performance and Gustavo Jimenez, Senior Development Manager will discuss some of the steps involved in triaging and diagnosing E-Business Suite systems related to JVM and Forms components. Please join us for our next ATG Live Webcast on Mar. 29, 2012: Triage and Diagnostics for E-Business Suite JVM and Forms The topics covered in this webcast will be: Overall Menu/Sections Architecture Patches/Certified browsers/jdk versions JVM Tuning JVM Tools (jstat,eclipse mat, ibm tda) Forms Tools (strace/FRD) Java Concurrent Program options location Case studies Case Studies JVM Thread dump case for Oracle Advanced Product Catalog Forms FRD trace relating to Saving an SR Java Concurrent Program for BT Date:               Thursday, March 29, 2012Time:              8:00 AM - 9:00 AM Pacific Standard TimePresenters:  Dave Suri, Project Lead, Applications Performance                        Gustavo Jimenez, Senior Development ManagerWebcast Registration Link (Preregistration is optional but encouraged)To hear the audio feed:   Domestic Participant Dial-In Number:            877-697-8128    International Participant Dial-In Number:      706-634-9568    Additional International Dial-In Numbers Link:    Dial-In Passcode:                                              99342To see the presentation:    The Direct Access Web Conference details are:    Website URL: https://ouweb.webex.com    Meeting Number:  597073984 If you miss the webcast, or you have missed any webcast, don't worry -- we'll post links to the recording as soon as it's available from Oracle University.  You can monitor this blog for pointers to the replay. And, you can find our archive of our past webcasts and training here.If you have any questions or comments, feel free to email Bill Sawyer (Senior Manager, Applications Technology Curriculum) at BilldotSawyer-AT-Oracle-DOT-com. 

    Read the article

  • Towards Database Continuous Delivery – What Next after Continuous Integration? A Checklist

    - by Ben Rees
    .dbd-banner p{ font-size:0.75em; padding:0 0 10px; margin:0 } .dbd-banner p span{ color:#675C6D; } .dbd-banner p:last-child{ padding:0; } @media ALL and (max-width:640px){ .dbd-banner{ background:#f0f0f0; padding:5px; color:#333; margin-top: 5px; } } -- Database delivery patterns & practices STAGE 4 AUTOMATED DEPLOYMENT If you’ve been fortunate enough to get to the stage where you’ve implemented some sort of continuous integration process for your database updates, then hopefully you’re seeing the benefits of that investment – constant feedback on changes your devs are making, advanced warning of data loss (prior to the production release on Saturday night!), a nice suite of automated tests to check business logic, so you know it’s going to work when it goes live, and so on. But what next? What can you do to improve your delivery process further, moving towards a full continuous delivery process for your database? In this article I describe some of the issues you might need to tackle on the next stage of this journey, and how to plan to overcome those obstacles before they appear. Our Database Delivery Learning Program consists of four stages, really three – source controlling a database, running continuous integration processes, then how to set up automated deployment (the middle stage is split in two – basic and advanced continuous integration, making four stages in total). If you’ve managed to work through the first three of these stages – source control, basic, then advanced CI, then you should have a solid change management process set up where, every time one of your team checks in a change to your database (whether schema or static reference data), this change gets fully tested automatically by your CI server. But this is only part of the story. Great, we know that our updates work, that the upgrade process works, that the upgrade isn’t going to wipe our 4Tb of production data with a single DROP TABLE. But – how do you get this (fully tested) release live? Continuous delivery means being always ready to release your software at any point in time. There’s a significant gap between your latest version being tested, and it being easily releasable. Just a quick note on terminology – there’s a nice piece here from Atlassian on the difference between continuous integration, continuous delivery and continuous deployment. This piece also gives a nice description of the benefits of continuous delivery. These benefits have been summed up by Jez Humble at Thoughtworks as: “Continuous delivery is a set of principles and practices to reduce the cost, time, and risk of delivering incremental changes to users” There’s another really useful piece here on Simple-Talk about the need for continuous delivery and how it applies to the database written by Phil Factor – specifically the extra needs and complexities of implementing a full CD solution for the database (compared to just implementing CD for, say, a web app). So, hopefully you’re convinced of moving on the the next stage! The next step after CI is to get some sort of automated deployment (or “release management”) process set up. But what should I do next? What do I need to plan and think about for getting my automated database deployment process set up? Can’t I just install one of the many release management tools available and hey presto, I’m ready! If only it were that simple. Below I list some of the areas that it’s worth spending a little time on, where a little planning and prep could go a long way. It’s also worth pointing out, that this should really be an evolving process. Depending on your starting point of course, it can be a long journey from your current setup to a full continuous delivery pipeline. If you’ve got a CI mechanism in place, you’re certainly a long way down that path. Nevertheless, we’d recommend evolving your process incrementally. Pages 157 and 129-141 of the book on Continuous Delivery (by Jez Humble and Dave Farley) have some great guidance on building up a pipeline incrementally: http://www.amazon.com/Continuous-Delivery-Deployment-Automation-Addison-Wesley/dp/0321601912 For now, in this post, we’ll look at the following areas for your checklist: You and Your Team Environments The Deployment Process Rollback and Recovery Development Practices You and Your Team It’s a cliché in the DevOps community that “It’s not all about processes and tools, really it’s all about a culture”. As stated in this DevOps report from Puppet Labs: “DevOps processes and tooling contribute to high performance, but these practices alone aren’t enough to achieve organizational success. The most common barriers to DevOps adoption are cultural: lack of manager or team buy-in, or the value of DevOps isn’t understood outside of a specific group”. Like most clichés, there’s truth in there – if you want to set up a database continuous delivery process, you need to get your boss, your department, your company (if relevant) onside. Why? Because it’s an investment with the benefits coming way down the line. But the benefits are huge – for HP, in the book A Practical Approach to Large-Scale Agile Development: How HP Transformed LaserJet FutureSmart Firmware, these are summarized as: -2008 to present: overall development costs reduced by 40% -Number of programs under development increased by 140% -Development costs per program down 78% -Firmware resources now driving innovation increased by a factor of 8 (from 5% working on new features to 40% But what does this mean? It means that, when moving to the next stage, to make that extra investment in automating your deployment process, it helps a lot if everyone is convinced that this is a good thing. That they understand the benefits of automated deployment and are willing to make the effort to transform to a new way of working. Incidentally, if you’re ever struggling to convince someone of the value I’d strongly recommend just buying them a copy of this book – a great read, and a very practical guide to how it can really work at a large org. I’ve spoken to many customers who have implemented database CI who describe their deployment process as “The point where automation breaks down. Up to that point, the CI process runs, untouched by human hand, but as soon as that’s finished we revert to manual.” This deployment process can involve, for example, a DBA manually comparing an environment (say, QA) to production, creating the upgrade scripts, reading through them, checking them against an Excel document emailed to him/her the night before, turning to page 29 in his/her notebook to double-check how replication is switched off and on for deployments, and so on and so on. Painful, error-prone and lengthy. But the point is, if this is something like your deployment process, telling your DBA “We’re changing everything you do and your toolset next week, to automate most of your role – that’s okay isn’t it?” isn’t likely to go down well. There’s some work here to bring him/her onside – to explain what you’re doing, why there will still be control of the deployment process and so on. Or of course, if you’re the DBA looking after this process, you have to do a similar job in reverse. You may have researched and worked out how you’d like to change your methodology to start automating your painful release process, but do the dev team know this? What if they have to start producing different artifacts for you? Will they be happy with this? Worth talking to them, to find out. As well as talking to your DBA/dev team, the other group to get involved before implementation is your manager. And possibly your manager’s manager too. As mentioned, unless there’s buy-in “from the top”, you’re going to hit problems when the implementation starts to get rocky (and what tool/process implementations don’t get rocky?!). You need to have support from someone senior in your organisation – someone you can turn to when you need help with a delayed implementation, lack of resources or lack of progress. Actions: Get your DBA involved (or whoever looks after live deployments) and discuss what you’re planning to do or, if you’re the DBA yourself, get the dev team up-to-speed with your plans, Get your boss involved too and make sure he/she is bought in to the investment. Environments Where are you going to deploy to? And really this question is – what environments do you want set up for your deployment pipeline? Assume everyone has “Production”, but do you have a QA environment? Dedicated development environments for each dev? Proper pre-production? I’ve seen every setup under the sun, and there is often a big difference between “What we want, to do continuous delivery properly” and “What we’re currently stuck with”. Some of these differences are: What we want What we’ve got Each developer with their own dedicated database environment A single shared “development” environment, used by everyone at once An Integration box used to test the integration of all check-ins via the CI process, along with a full suite of unit-tests running on that machine In fact if you have a CI process running, you’re likely to have some sort of integration server running (even if you don’t call it that!). Whether you have a full suite of unit tests running is a different question… Separate QA environment used explicitly for manual testing prior to release “We just test on the dev environments, or maybe pre-production” A proper pre-production (or “staging”) box that matches production as closely as possible Hopefully a pre-production box of some sort. But does it match production closely!? A production environment reproducible from source control A production box which has drifted significantly from anything in source control The big question is – how much time and effort are you going to invest in fixing these issues? In reality this just involves figuring out which new databases you’re going to create and where they’ll be hosted – VMs? Cloud-based? What about size/data issues – what data are you going to include on dev environments? Does it need to be masked to protect access to production data? And often the amount of work here really depends on whether you’re working on a new, greenfield project, or trying to update an existing, brownfield application. There’s a world if difference between starting from scratch with 4 or 5 clean environments (reproducible from source control of course!), and trying to re-purpose and tweak a set of existing databases, with all of their surrounding processes and quirks. But for a proper release management process, ideally you have: Dedicated development databases, An Integration server used for testing continuous integration and running unit tests. [NB: This is the point at which deployments are automatic, without human intervention. Each deployment after this point is a one-click (but human) action], QA – QA engineers use a one-click deployment process to automatically* deploy chosen releases to QA for testing, Pre-production. The environment you use to test the production release process, Production. * A note on the use of the word “automatic” – when carrying out automated deployments this does not mean that the deployment is happening without human intervention (i.e. that something is just deploying over and over again). It means that the process of carrying out the deployment is automatic in that it’s not a person manually running through a checklist or set of actions. The deployment still requires a single-click from a user. Actions: Get your environments set up and ready, Set access permissions appropriately, Make sure everyone understands what the environments will be used for (it’s not a “free-for-all” with all environments to be accessed, played with and changed by development). The Deployment Process As described earlier, most existing database deployment processes are pretty manual. The following is a description of a process we hear very often when we ask customers “How do your database changes get live? How does your manual process work?” Check pre-production matches production (use a schema compare tool, like SQL Compare). Sometimes done by taking a backup from production and restoring in to pre-prod, Again, use a schema compare tool to find the differences between the latest version of the database ready to go live (i.e. what the team have been developing). This generates a script, User (generally, the DBA), reviews the script. This often involves manually checking updates against a spreadsheet or similar, Run the script on pre-production, and check there are no errors (i.e. it upgrades pre-production to what you hoped), If all working, run the script on production.* * this assumes there’s no problem with production drifting away from pre-production in the interim time period (i.e. someone has hacked something in to the production box without going through the proper change management process). This difference could undermine the validity of your pre-production deployment test. Red Gate is currently working on a free tool to detect this problem – sign up here at www.sqllighthouse.com, if you’re interested in testing early versions. There are several variations on this process – some better, some much worse! How do you automate this? In particular, step 3 – surely you can’t automate a DBA checking through a script, that everything is in order!? The key point here is to plan what you want in your new deployment process. There are so many options. At one extreme, pure continuous deployment – whenever a dev checks something in to source control, the CI process runs (including extensive and thorough testing!), before the deployment process keys in and automatically deploys that change to the live box. Not for the faint hearted – and really not something we recommend. At the other extreme, you might be more comfortable with a semi-automated process – the pre-production/production matching process is automated (with an error thrown if these environments don’t match), followed by a manual intervention, allowing for script approval by the DBA. One he/she clicks “Okay, I’m happy for that to go live”, the latter stages automatically take the script through to live. And anything in between of course – and other variations. But we’d strongly recommended sitting down with a whiteboard and your team, and spending a couple of hours mapping out “What do we do now?”, “What do we actually want?”, “What will satisfy our needs for continuous delivery, but still maintaining some sort of continuous control over the process?” NB: Most of what we’re discussing here is about production deployments. It’s important to note that you will also need to map out a deployment process for earlier environments (for example QA). However, these are likely to be less onerous, and many customers opt for a much more automated process for these boxes. Actions: Sit down with your team and a whiteboard, and draw out the answers to the questions above for your production deployments – “What do we do now?”, “What do we actually want?”, “What will satisfy our needs for continuous delivery, but still maintaining some sort of continuous control over the process?” Repeat for earlier environments (QA and so on). Rollback and Recovery If only every deployment went according to plan! Unfortunately they don’t – and when things go wrong, you need a rollback or recovery plan for what you’re going to do in that situation. Once you move in to a more automated database deployment process, you’re far more likely to be deploying more frequently than before. No longer once every 6 months, maybe now once per week, or even daily. Hence the need for a quick rollback or recovery process becomes paramount, and should be planned for. NB: These are mainly scenarios for handling rollbacks after the transaction has been committed. If a failure is detected during the transaction, the whole transaction can just be rolled back, no problem. There are various options, which we’ll explore in subsequent articles, things like: Immediately restore from backup, Have a pre-tested rollback script (remembering that really this is a “roll-forward” script – there’s not really such a thing as a rollback script for a database!) Have fallback environments – for example, using a blue-green deployment pattern. Different options have pros and cons – some are easier to set up, some require more investment in infrastructure; and of course some work better than others (the key issue with using backups, is loss of the interim transaction data that has been added between the failed deployment and the restore). The best mechanism will be primarily dependent on how your application works and how much you need a cast-iron failsafe mechanism. Actions: Work out an appropriate rollback strategy based on how your application and business works, your appetite for investment and requirements for a completely failsafe process. Development Practices This is perhaps the more difficult area for people to tackle. The process by which you can deploy database updates is actually intrinsically linked with the patterns and practices used to develop that database and linked application. So you need to decide whether you want to implement some changes to the way your developers actually develop the database (particularly schema changes) to make the deployment process easier. A good example is the pattern “Branch by abstraction”. Explained nicely here, by Martin Fowler, this is a process that can be used to make significant database changes (e.g. splitting a table) in a step-wise manner so that you can always roll back, without data loss – by making incremental updates to the database backward compatible. Slides 103-108 of the following slidedeck, from Niek Bartholomeus explain the process: https://speakerdeck.com/niekbartho/orchestration-in-meatspace As these slides show, by making a significant schema change in multiple steps – where each step can be rolled back without any loss of new data – this affords the release team the opportunity to have zero-downtime deployments with considerably less stress (because if an increment goes wrong, they can roll back easily). There are plenty more great patterns that can be implemented – the book Refactoring Databases, by Scott Ambler and Pramod Sadalage is a great read, if this is a direction you want to go in: http://www.amazon.com/Refactoring-Databases-Evolutionary-paperback-Addison-Wesley/dp/0321774515 But the question is – how much of this investment are you willing to make? How often are you making significant schema changes that would require these best practices? Again, there’s a difference here between migrating old projects and starting afresh – with the latter it’s much easier to instigate best practice from the start. Actions: For your business, work out how far down the path you want to go, amending your database development patterns to “best practice”. It’s a trade-off between implementing quality processes, and the necessity to do so (depending on how often you make complex changes). Socialise these changes with your development group. No-one likes having “best practice” changes imposed on them, so good to introduce these ideas and the rationale behind them early.   Summary The next stages of implementing a continuous delivery pipeline for your database changes (once you have CI up and running) require a little pre-planning, if you want to get the most out of the work, and for the implementation to go smoothly. We’ve covered some of the checklist of areas to consider – mainly in the areas of “Getting the team ready for the changes that are coming” and “Planning our your pipeline, environments, patterns and practices for development”, though there will be more detail, depending on where you’re coming from – and where you want to get to. This article is part of our database delivery patterns & practices series on Simple Talk. Find more articles for version control, automated testing, continuous integration & deployment.

    Read the article

  • Fixing the #mvvmlight code snippets in Visual Studio 11

    - by Laurent Bugnion
    If you installed the latest MVVM Light version for Windows 8, you may encounter an issue where code snippets are not displayed correctly in the Intellisense popup. I am working on a fix, but for now here is how you can solve the issue manually. The code snippets MVVM Light, when installed correctly, will install a set of code snippets that are very useful to allow you to type less code. As I use to say, code is where bugs are, so you want to type as little of that as possible ;) With code snippets, you can easily auto-insert segments of code and easily replace the keywords where needed. For instance, every coder who uses MVVM as his favorite UI pattern for XAML based development is used to the INotifyPropertyChanged implementation, and how boring it can be to type these “observable properties”. Obviously a good fix would be something like an “Observable” attribute, but that is not supported in the language or the framework for the moment. Another fix involves “IL weaving”, which is a post-build operation modifying the generate IL code and inserting the “RaisePropertyChanged” instruction. I admire the invention of those who developed that, but it feels a bit too much like magic to me. I prefer more “down to earth” solutions, and thus I use the code snippets. Fixing the issue Normally, you should see the code snippets in Intellisense when you position your cursor in a C# file and type mvvm. All MVVM Light snippets start with these 4 letters. Normal MVVM Light code snippets However, in Windows 8 CP, there is an issue that prevents them to appear correctly, so you won’t see them in the Intellisense windows. To restore that, follow the steps: In Visual Studio 11, open the menu Tools, Code Snippets Manager. In the combobox, select Visual C#. Press Add… Navigate to C:\Program Files (x86)\Laurent Bugnion (GalaSoft)\Mvvm Light Toolkit\SnippetsWin8 and select the CSharp folder. Press Select Folder. Press OK to close the Code Snippets Manager. Now if you type mvvm in a C# file, you should see the snippets in your Intellisense window. Cheers Laurent   Laurent Bugnion (GalaSoft) Subscribe | Twitter | Facebook | Flickr | LinkedIn

    Read the article

  • Using Google Analytics tracking URLs in Facebook ads

    - by Ted
    I generated the following Google Analytics tracking URL to use in a Facebook ad: https://www.somewebsite.org/?utm_source=facebook&utm_medium=cpc&utm_term=schools&utm_content=newsfeed&utm_campaign=facebookad3 I know the ad is being clicked (Facebook ad manager data) but the referred traffic is not appearing in my site's Google Analytics data. I think it's because Facebook is doing some weird redirect URL modifying. Any ideas?

    Read the article

  • Bluetooth Dial-Up Networking using Blueman

    - by leemes
    I want to configure a dial up network connection via bluetooth to my phone in order to access the internet. I use Lubuntu 12.04 (Ubuntu with LXDE) which has the Network Manager Applet and Blueman applet installed. I guess these are the same tools than on an Ubuntu installation, hence I ask my question on this site. My phone is a Sony Ericsson W810i, my laptop is a Lenovo S10-2, my mobile phone provider is o2 Germany. I scanned for my mobile phone using the Blueman applet. I connected the dial-up network via the context menu - Serial Ports - Dial-up Networking. A notification bubble says that the connection is available on the interface named ppp0. ipconfig is telling something different: There is no ppp0 or something similar. I only see my eth0 (wired ethernet), eth1 (wifi) and lo interfaces. Of course, I can't ping google.com as the interface really seems to be not present at all. When the dial-up network is being connected, my mobile phone says that it connects to the internet. Afterwards, I see the active connection on the phone's screen. When successfully connecting with the phone using another computer, it behaves exactly the same, so I guess that the phone isn't the problem. I don't know if I configured the Dial-Up correctly. I use the phone number *99# which is very common on most mobile ISPs. I use the APN which my ISP is telling me to use. (I can't find the number on their support page, so I just use the default value *99#.) My mobile ISP is o2 Germany. There are How-Tos out there which use the Network Manager Applet to setup a bluetooth dial-up connection, but I can't see any bluetooth devices in the context menu as on the screenshots in those How-Tos. Do you have any suggestions what might be wrong / what I should try? EDIT: When choosing "Network Access Point" in the device's context menu instead of Serial Ports - Dial-Up Networking, an interface bnep0 appears. However, neither an IPv4 address is assigned for that interface (but IPv6), nor the phone connects to the internet. Am I missing something? Can I connect to the internet after setting up this network connection?

    Read the article

  • Oracle OpenWorld 2012: Focus On Oracle Database

    - by jgelhaus
    As Oracle OpenWorld approaches and you work to plan your schedule.  We know there's a lot to sort through.  To help we've put together some Oracle Database Focus On Documents to help guide you through the database sessions at the show. Oracle Database Oracle Database Application Development Oracle Database Security Oracle Spatial and Graph Oracle Enterprise Manager Cloud Control 12c (and Private Cloud) Big Data Oracle Exadata Data Warehousing High Availability Oracle Database Utilities Oracle Database Upgrade See you in San Francisco!

    Read the article

  • SCOM, 90 days in, III. Stuff to Add

    - by merrillaldrich
    This is the third installment of a series on our deployment of System Center at my workplace, emphasis on SQL Server MP. At this point we’ve got Operations Manager installed, and up and running, and we’ve been able to categorize all the monitored servers into production, preproduction, test and DR using groups that have dynamic membership rules. We’ve got the SQL management pack working with out-of-the-box settings, and used it to locate all the SQL Server stack services like the engine, reporting...(read more)

    Read the article

  • Siebel CRM: Alive and Jamming at OpenWorld

    - by Tony Berk
    Yes, a rock 'n roll reference in a CRM/Customer Experience blog entry! Sorry, but we are getting excited about OpenWorld and all of the great CRM and Customer Experience sessions we've been planning for the past 6 months (yes, we really do start planning in March!). I also heard that some band named Pearl Jam is making an appearance. Who's tried the Rock Band guitar solo for Alive? Way too difficult for an amateur like me. Anyhow, we are supposed to be highlighting Siebel CRM at OpenWorld. Yes, Siebel will once again have a major presence at OpenWorld and there is a lot of new things to tell you about. If you search the OpenWorld Content Catalog with the tag "siebel", you'll find over 75 sessions. That's over 75 hours of opportunity to hear from Siebel customers, product managers, and implementers. While I invite you to read through the descriptions of all 75+ sessions or check out the OpenWorld Focus On Siebel document, I'd like to try and help with some highlights. The roadmap and strategy session was mentioned in my previous post, but it is important enough to mention again. Siebel CRM Overview, Strategy, and Roadmap (CON9700) - Oct 1, 12:15PM. Come to this session to learn about the Siebel product roadmap and how Oracle is committed to accelerating the pace of innovation and value for its customers on this platform. Additionally, the session covers how Siebel customers can leverage many Oracle assets such as Oracle WebCenter Sites; InQuira, RightNow, and ATG/Endeca applications, and Oracle Policy Automation in conjunction with their current Siebel investments. This session was FULL last year, so I strongly suggest you pre-register via the OpenWorld Schedule Builder. Every year, my favorites are the customer panels, where you get hear 2, 3 or even 4 customers talk about their implementations and often share best practices and lessons learned. Customer Panel: Business Benefits of Deploying Siebel CRM (Session ID: CON9717) - Oct 1, 10:45AM featuring GlaxoSmithKline, PNC Bank and Southwest Airlines. Maximizing User Adoption Rates for Siebel Sales and Siebel Partner Relationship Management (CON9690) Oct 1, 12:15PM featuring CSL Behring, Intuit and McKesson. Best Practices for Upgrading Your Siebel CRM Implementations: Customer Successes (CON9715) - Oct 1, 3:15PM featuring Citrix, Sunlife Financial and Oracle experts. Driving Great Customer Experiences with Siebel Service Applications (CON9604) - Oct 1, 4:45 featuring Farmers Insurance, US Department of Homeland Security and Waste Management There are also a number of customer case study sessions including: Lowe's (CON9740), American Red Cross (CON6535), Ontario Lottery & Gaming's Siebel Marketing and Loyalty (CON4114), and LexisNexis (CON9551). Also, an interesting session on optimizing Siebel on Oracle with ACCOR (CON4289). Have you heard about the new Open UI for Siebel? If you haven't, you should! There are sessions focused on introducing you to the new functionality and how you can unleash the power of the new user interface: User Interface Innovations with the New Siebel “Open UI” (CON9703) Oct 2, 10:15AM and Unleash the Power of “Open UI” (CON9705) - Oct 3, 11:45AM. Other Siebel-related topics you might want to check out: Knowledge Management: Increasing Return on Your CRM Investments with Knowledge (CON9779) - Oct 1, 3:15PM Mobile: Mobile Solutions for Siebel CRM (CON9697) - Oct 2, 5:00PM Siebel Loyalty: Best Practices for Maximizing the Success of Your Loyalty Program with Siebel Loyalty (CON9588) - Oct 2, 5:00PM  Siebel Marketing: Next-Generation Cross-Channel Insight-Driven Customer Dialogue with Siebel Marketing (CON9600) - Oct 3, 10:15AM Integrating with Oracle Commerce: Administer Once and Deploy Everywhere: Integrating the Siebel, ATG, and Endeca Platforms (CON9761) - Oct 2 5:00PM Finally, don't forget the Oracle Applications User Group (OAUG) Special Interest Group for Siebel on Sunday, September 30 at 2:15PM. And of course, the Demogrounds in Moscone West will be full of Oracle and partner demos and information on new solutions. Wow! I told you there was a lot! Good luck finding the best sessions for you and have a great time at OpenWorld. Don't forget to sing along with Pearl Jam!

    Read the article

  • Praise for Europe's Smart Metering & Conservation Efforts

    - by caroline.yu
    Recently, a writer at the Home Energy Team praised the UK for its efforts towards smart metering and energy conservation, with an article entitled UK Blazing A Trail With Smart Metering At Home? The article highlighted that the Department of Energy and Climate Change has announced that smart metering will be introduced in the next decade and that all UK households will have smart meters by the year 2020. In fact, the UK is not the only country striving to achieve carbon reduction targets, as many of its European counterparts have begun to take positive steps towards tackling the issue of energy conservation by implementing innovative new metering and billing technologies as well as promoting alternative energy solutions, such as wind and solar power. Since 1997, the states of the European Union, including France, Germany and Spain, have been working towards achieving a target of 12 percent renewable energy electricity by 2010. Germany in particular has made a significant achievement so far, having surpassed the target early in 2007. This success is largely due to the German Renewable Energy Act (EEG), which promoted the use of renewable energy. Recently, analysis from the European Wind Energy Association (EWEA) found that 21 of the EU Member States are meeting or exceeding their national target to achieve 20 percent renewable energy by 2020. However, six states - Belgium, Italy, Luxembourg, Malta, Bulgaria and Denmark - say they will not manage to reach their target through domestic action alone. Bulgaria and Denmark believe that with fresh national initiatives they could meet or exceed their targets, but others, including Italy, may need to import renewable energy from neighboring non-EU countries. Top achievers, according to the EWEA report, are Spain, which believes its renewable energy will reach 22.7 percent by 2020, as well as Germany, Estonia, Greece, Ireland, Poland, Slovakia and Sweden, who will all exceed their targets. "Importantly, the way that this renewable energy is controlled and distributed must be addressed in order to ensure its success," said Bastian Fischer, vice president and general manager EMEA, Oracle Utilities. "A smart gird infrastructure can enable utilities to deal with load distribution in times of increased need and ensure power is always available from these means. A smart grid also underpins the success of metering and billing technologies, such as smart metering, and allows utilities to deal with increased usage data and provide accurate billing." Outside of Europe, Australia has made significant steps towards improving water conservation. The Australian Department of Sustainability and Environment took some of the recent advancements made in the energy sector, including new metering and billing solutions, and applied them to the water industry, enhancing customer service and reducing consumption as a result. The adoption of smart metering in Europe is mainly driven by regulation, but significant technological improvements are being made the world over to change the way we use all kinds of energy. However, the developing markets are lagging behind. One of the primary reasons for this is the lack of infrastructure in place to use as a foundation for setting up energy-saving solutions, which is slowing the adoption of technologies such as smart meters. However, these countries do benefit from fewer outdated infrastructure and legacy systems, which is often cited by others as a difficult barrier to deploying new solutions. As a result, some countries should find new technologies easier to implement and adapt to in the immediate future, without this roadblock.

    Read the article

  • UPK for Testing Webinar Recording Now Available!

    - by Karen Rihs
    For anyone who missed last week’s event, a recording of the UPK for Testing webinar is now available.  As an implementation and enablement tool, Oracle’s User Productivity Kit (UPK) provides value throughout the software lifecycle.  Application testing is one area where customers like Northern Illinois University (NIU) are finding huge value in UPK and are using it to validate their systems.  Hear Beth Renstrom, UPK Product Manager and Bettylynne Gregg, NIU ERP Coordinator, discuss how the Test It Mode, Test Scripts, and Test Cases of UPK can be used to facilitate applications testing.

    Read the article

  • Java Cloud and Developer Service

    - by JuergenKress
    At our WebLogic Community Workspace (WebLogic Community membership required) you can find the latest Java and Developer Cloud presentations and demos: General+Session-+Building+and+Managing+a+Private+Oracle+Java Experiences-building-JavaEE-based-PaaS-Platform_Compressed.ppt Oracle Enterprise Manager 12c Cloud Control Demo.zip WebLogic Partner Community For regular information become a member in the WebLogic Partner Community please visit: http://www.oracle.com/partners/goto/wls-emea ( OPN account required). If you need support with your account please contact the Oracle Partner Business Center. BlogTwitterLinkedInMixForumWiki Technorati Tags: Oracle cloud,Cloud,Java Cloud,Oracle developer cloud,Java as a service,Oracle PAAS,WebLogic Community,Oracle,OPN,Jürgen Kress

    Read the article

  • Microsoft Forefront Endpoint Protection 2010 sort en version RTM avec un nouveau moteur anti-malwares

    Microsoft Forefront Endpoint Protection 2010 sort en version RTM Pour les constructeurs et les revendeurs, elle embarque un nouveau moteur anti-malwares Microsoft vient d'annoncer la disponibilité pour les constructeurs et revendeurs (version RTM) de Forefront Endpoint Security 2010, sa solution d'administration unifiée pour la protection contre les malwares pour les serveurs et les postes de travail des entreprises. En Release Candidate depuis novembre, cette version s'appuie sur « System Center Configuration Manager 2007 », facilitant ainsi le déploiement au niveau des entreprises ayant déjà mis en place des infrastructures de gestion des postes clients de Microsoft. Fore...

    Read the article

  • Announcement Oracle Virtual Networking

    - by uwes
    Oracle Virtual Networking information and collateral are now available on Oracle.com and Oracle Technical Network (OTN). Oracle Virtual Networking revolutionizes data center economics with a complete portfolio of hardware and software products to provision and manage virtual I/O and networks for servers and storage. These products are available for ordering now. They were part of the Xsigo acquisition on November 6, 2012. For More Information Go To: Oracle Fabric Interconnect oracle.com OTN Oracle Fabric Manager oracle.com OTN Oracle Fabric Monitor oracle.com OTN Oracle SDN oracle.com OTN

    Read the article

  • Archbeat Link-O-Rama Top 10 Facebook Faves for October 20-26, 2013

    - by OTN ArchBeat
    Here's this week's list of the Top 10 items shared on the OTN ArchBeat Facebook Page from October 27 - November 2, 2013. Visualizing and Process (Twitter) Events in Real Time with Oracle Coherence | Noah Arliss This OTN Virtual Developer Day session explores in detail how to create a dynamic HTML5 Web application that interacts with Oracle Coherence as it’s processing events in real time, using the Avatar project and Oracle Coherence’s Live Events feature. Part of OTN Virtual Developer Day: Harnessing the Power of Oracle WebLogic and Oracle Coherence, November 5, 2013. 9am to 1pm PT / 12pm to 4pm ET / 1pm to 5pm BRT. Register now! HTML5 Application Development with Oracle WebLogic Server | Doug Clarke This free OTN Virtual Developer Day session covers the support for WebSockets, RESTful data services, and JSON infrastructure available in Oracle WebLogic Server. Part of OTN Virtual Developer Day: Harnessing the Power of Oracle WebLogic and Oracle Coherence, November 5, 2013. 9am to 1pm PT / 12pm to 4pm ET / 1pm to 5pm BRT. Register now! Video: ADF BC and REST services | Frederic Desbiens Spend a few minutes with Oracle ADF principal product manager Frederic Desbiens and learn how to publish ADF Business Components as RESTful web services. One Client Two Clusters | David Felcey "Sometimes its desirable to have a client connect to multiple clusters, either because the data is dispersed or for instance the clusters are in different locations for high availability," says David Felcey. David shows you how in this post, which includes a simple example. Exceptions Handling and Notifications in ODI | Christophe Dupupet Oracle Fusion Middleware A-Team director Christophe Dupupet reviews the techniques that are available in Oracle Data Integrator to guarantee that the appropriate individuals are notified in the event that ODI processes are impacted by network outages or other mishaps. Securing WebSocket applications on Glassfish | Pavel Bucek WebSocket is a key capability standardized into Java EE 7. Many developers wonder how WebSockets can be secured. One very nice characteristic for WebSocket is that it in fact completely piggybacks on HTTP. In this post Pavel Bucek demonstrates how to secure WebSocket endpoints in GlassFish using TLS/SSL. Oracle Coherence, Split-Brain and Recovery Protocols In Detail | Ricardo Ferreira Ricardo Ferreira's article "provides a high level conceptual overview of Split-Brain scenarios in distributed systems," focusing on a "specific example of cluster communication failure and recovery in Oracle Coherence." Non-programmatic Authentication Using Login Form in JSF (For WebCenter & ADF) | JayJay Zheng Oracle ACE JayJay Zheng shares an approach that "avoids the programmatic authentication and works great for having a custom login page developed in WebCenter Portal integrated with OAM authentication." The latest article in the Industrial SOA series looks at mobile computing and how companies are developing SOA to go. http://pub.vitrue.com/PUxT Tech Article: SOA in Real Life: Mobile Solutions The ACE Director Thing | Dr. Frank Munz Frank Munz finally gets around to blogging about achieving Oracle ACE Director status and shares some interesting insight into what will change—and what won't—thanks to that new status. A good, short read for those interested in learning more about the Oracle ACE program. Thought for the Day "Even if you're on the right track, you'll get run over if you just sit there." — Will Rogers, American humorist (November 4, 1879 – August 15, 1935) Source: brainyquote.com

    Read the article

  • Advice on Project Management Software?

    - by Zenph
    I was wondering, does anybody work as part of a team, or as a project manager who highly recommends a certain project management solution (self-hosted or otherwise) ? Ideally I want something where I can manage the entire project, and also manage the financial side of things too. Should also add a few other things: notifications for team members for individual projects version control integration (like codebase) real time collaboration like chat

    Read the article

  • PRUEBAS DE ESPECIALIZACION GRATUITAS 2013

    - by agallego
    Consigue  tu Certificado de Especialista Oracle  de forma GRATUITA , 27 y 28 de Noviembre de 2013  Ahora puedes realizar los exámenes de implementación de las especializaciones de Oracle y convertirte en especialista. Podrás realizar cualquiera de los exámenes de implementación de la siguiente lista: Oracle Fusion Customer Relationship Management 11g Sales Certified Implementation Specialist (1Z0-456) Oracle Fusion Financials 11g General Ledger Implementation Specialist(1Z0-508) Oracle Fusion Financials 11g Accounts Payable Implementation Specialist(1Z0-507) Oracle Fusion Financials 11g Accounts Receivable Implementation Specialist(1Z0-506) Oracle Fusion Human Capital Management 11g Human Resources Certified Implementation Specialist (1Z0-584) Oracle Fusion Human Capital Management 11g Talent Management Certified Implementation Specialist (1Z0-585) Oracle ATG Web Commerce 10 Implementation Developer Certified Implementation Specialist (1Z0-510) Oracle Hyperion Planning 11 Essentials (1Z0-533) Oracle Business Intelligence Applications 7.9.6 for ERP Essentials (1Z0-525) Oracle Hyperion Financial Management 11 Essentials (1Z0-532) Oracle Business Intelligence Applications 7.9.6 for CRM Essentials (1Z0-524) Oracle Hyperion Data Relationship Management 11.1.2 Essentials (1Z1-588) Oracle Business Intelligence Foundation Suite 11g Essentials (1Z0-591) Oracle Essbase 11 Essentials (1Z0-531) SPARC T4-Based Server Installation Essentials (1Z0-597) Oracle Solaris 11 Installation and Configuration Essentials (1Z0-580) Sun ZFS Storage Appliance Certified Implementation Specialist Exalogic Elastic Cloud X2-2 Certified Implementation Specialist Oracle Exadata 11g Essentials (1Z0-536) Oracle VM 3 for x86 Essenstials (1Z0-590) Oracle Linux Fundamentals (1Z0-402) Oracle Linux System Administration (1Z0-403) Oracle Service-Oriented Architecture Certified Implementation Specialist (1Z0-451) Oracle Unified Business Process Management Suite 11g Certified Implementation Specialist (1Z0-560) Oracle WebLogic Server 12c Certified Implementation Specialist (1Z0-599) Oracle WebCenter Portal 11g Essentials (1Z0-541) Oracle WebCenter Content 11g Essentials (1Z0-542) Oracle Application Development Framework 11g Certified Implementation Specialist Oracle Identity Analytics 11g Certified Implementation Specialist (1Z0-545) Oracle Enterprise Manager 12c Essentials (1Z0-457) Puedes consultar la información acerca de los examenes en cada uno de los enlaces. Para prepararte los examenes sigue la Guia de estudio que encontrarás en la página de cada examen. Requisitos: ser  Partner Gold, Platinum o Diamond de Oracle y tener un usuario de Oracle Pearson Vue.  ¿Cuándo?: 27 y 28 de noviembre  a las (9:00, 12:00, 16:00)  ¿Dónde?: Core Networks, C.E.Parque Norte, Edificio Olmo, Planta 1 Serrano Galvache 56 | 28033, Madrid Para inscribirte: Create una cuenta en Pearson Vue (www.pearsonvue.com/oracle). Para Registrarte aquí. Para más información sobre el programa de especializaciones, haz clic aquí. No pierdas esta oportunidad e inscríbete hoy.  Para cualquier duda contactar con [email protected]. Ana María Gallego Partner Enablement Manager Spain and Portugal      

    Read the article

  • Black areas with default (gray) theme

    - by August Karlstrom
    I use Ubuntu 12.04 with the Blackbox window manager and the default (gray) GTK theme. With some GTK 3 applications, like Gedit, Disk utility and Evince I see black areas which should be gray and these black backgrounds make the black text on top of them impossible to read. It seems to me that very few people use the default theme as this bug (or bugs) has still not been fixed. Is anyone else experiencing this problem?

    Read the article

  • links for 2011-02-16

    - by Bob Rhubart
    On the Software Architect Trail Software architect is the #1 job, according to a 2010 CNN-Money poll. In this article in Oracle Magazine, several members of the OTN architect community talk about the career paths that led them to this lucrative role.  (tags: oracle oraclemagazine softwarearchitect) Oracle Technology Network Architect Day: Denver Registration opens soon for this event to be held in Denver on March 23, 2011.  (tags: oracle otn entarch) How the Internet Gets Inside Us : The New Yorker "It isn’t just that we’ve lived one technological revolution among many; it’s that our technological revolution is the big social revolution that we live with." - Adam Gopnik (tags: internet progress technology innovation) The Insider Threat: Understand and Mitigate Your Risks: CSO Webcast February 23, 2011 at 1:00 PM EST/ 10:00 AM PST .  Speakers: Randy Trzeciak, lead for the CERT Insider Threat research team, and  Roxana Bradescu, Director of Database Security at Oracle. (tags: oracle CERT security) The Tom Kyte Blog: An Interesting Read... Tom looks at "an internet security firm brought down by not following the most *basic* of security principals." (tags: security oracle) Jason Williamson: Oracle as a Service in the Cloud "It is not trivial to migrate large amounts of pre-relational or 'devolved' relational data. To do this, we again must revert back to a tight roadmap to migration and leverage the growing tools and services that we have." - Jason Williamson (tags: oracle cloud soa) Edwin Biemond: Java / Oracle SOA blog: Building an asynchronous web service with JAX-WS "Building an asynchronous web service can be complex especially when you are used to synchronous Web services where you can wait for the response in your favorite tool." - Oracle ACE Edwin Biemond (tags: oracle oracleace java soa) Shared Database Servers (The SaaS Report) "Outside the virtualization world, there are capabilities of Oracle Database which can be used to prevent resource contention and guarantee SLA." - Shivanshu Upadhyay (tags: oracle database cloud SaaS) White Paper: Experiencing the New Social Enterprise "Increasingly organizations recognize the mandate to create a modern user experience that transforms existing business processes and increases business efficiency and agility." (tags: e20 enterprise2.0 socialcomputing oracle) Clusterware 11gR2 - Setting up an Active/Passive failover configuration Gilles Haro illustrates the steps necessary to achieve "a fully operational 11gR2 database protected by automatic failover capabilities." (tags: oracle clusterware) Oracle ERP: How to overcome local hurdles in a global implementation "The corporate world becomes a global village as many companies expand their business and offices around different countries and even continents. And this number keeps increasing. This globalization raises interesting questions..." - Jan Verhallen (tags: oracle capgemini entarch erp) Webcast: Successful Strategies for Optimizing Your Data Warehouse. March 3. 10 a.m. PT/1 p.m. ET Thursday, March 3, 2011. 10 a.m. PT/1 p.m. ET. Speakers: Mala Narasimharajan (Senior Product Marketing Manager, Oracle Data Integration) and Denis Gray (Principal Product Manager, Oracle Data Integration) (tags: oracle dataintegration datawarehousing)

    Read the article

  • how can I disable ssh prompt from kvm remote

    - by kamil
    when I upgraded my KVM virtual machine manager to the latest version I got a question prompt every time I try to connect remotely to my machines: The authenticity of host 'kvm.local (ip address)' can't be established. ECDSA key fingerprint is b5:fa:0a:d0:39:af:0a:60:fa:04:87:6c:31:1d:13:15. Are you sure you want to continue connecting (yes/no)? And when changing any setting on a VM I was obliged to type yes and then type the root password in another dialog using ubuntu 12.04 64bit

    Read the article

  • JWT Token Security with Fusion Sales Cloud

    - by asantaga
    When integrating SalesCloud with a 3rd party application you often need to pass the users identity to the 3rd party application so that  The 3rd party application knows who the user is The 3rd party application needs to be able to do WebService callbacks to Sales Cloud as that user.  Until recently without using SAML, this wasn't easily possible and one workaround was to pass the username, potentially even the password, from Sales Cloud to the 3rd party application using URL parameters.. With Oracle Fusion R8 we now have a proper solution and that is called "JWT Token support". This is based on the industry JSON Web Token standard , for more information see here JWT Works by allowing the user the ability to generate a token (lasts a short period of time) for a specific application. This token is then passed to the 3rd party application as a GET parameter.  The 3rd party application can then call into SalesCloud and use this token for all webservice calls, the calls will be executed as the user who generated the token in the first place, or they can call a special HR WebService (UserService-findSelfUserDetails() ) with the token and Fusion will respond with the users details. Some more details  The following will go through the scenario that you want to embed a 3rd party application within a WebContent frame (iFrame) within the opportunity screen.  1. Define your application using the topology manager in setup and maintenance  See this documentation link on topology manager 2. From within your groovy script which defines the iFrame you wish to embed, write some code which looks like this : def thirdpartyapplicationurl = oracle.topologyManager.client.deployedInfo.DeployedInfoProvider.getEndPoint("My3rdPartyApplication" )def crmkey= (new oracle.apps.fnd.applcore.common.SecuredTokenBean().getTrustToken())def url = thirdpartyapplicationurl +"param1="+OptyId+"&jwt ="+crmkeyreturn (url)  This snippet generates a URL which contains The Hostname/endpoint of the 3rd party application Two Parameters The opportunityId stored in parameter "param1" The JWT Token store in  parameter "jwt" 3. From your 3rd Party Application you now have two options Execute a webservice call by first setting the header parameter "Authentication" to the JWT token. The webservice call will be executed against Fusion Applications "As" the user who execute the process To find out "Who you are" , set the header parameter to "Authentication" and execute the special webservice call findSelfUserDetails(), in the UserDetailsService For more information  Oracle Sales Cloud Documentation , specific chapter on JWT Token OTN samples, specifically the Rich UI With JWT Token Sample Oracle Fusion Applications General Documentation

    Read the article

  • BPEL 11.1.1.6 Certified for Prebuilt E-Business Suite 12.1.3 SOA Integrations

    - by Steven Chan (Oracle Development)
    Service Oriented Architecture (SOA) integrations with Oracle E-Business Suite can either be custom integrations that you build yourself or prebuilt integrations from Oracle.  For more information about the differences between the two options for SOA integrations, see this previously-published certification announcement. There are five prebuilt BPEL business processes by Oracle E-Business Suite Release 12 product teams: Oracle Price Protection (DPP) Complex Maintenance, Repair & Overhaul (CMRO/AHL) Oracle Transportation Management (WMS, WSH, PO) Advanced Supply Chain Planning (MSC) Product Information Management (PIM/EGO) Last year we announced the certification of BPEL 11.1.1.5 for Prebuilt E-Business Suite 12.1.3 SOA integrations.  The five prebuilt BPEL processes have now been certified with Oracle BPEL Process Manager 11g version 11.1.1.6 (in Oracle Fusion Middleware SOA Suite 11g).  These prebuilt BPEL processes are certified with Oracle E-Business Suite Release 12.1.3 and higher. Note: The Supply Chain Trading Connector (CLN) product team has opted not to support BPEL 11g with their prebuilt business processes previously certified with BPEL 10.1.3.5.  If you have a requirement for that certification, I would recommend contacting your Oracle account manager to ensure that the Supply Chain team is notified appropriately.  For additional information about prebuilt integrations with Oracle E-Business Suite Release 12.1.3, please refer to the following documentation: Integrating Oracle E-Business Suite Release 12 with Oracle BPEL available in Oracle SOA Suite 11g (Note 1321776.1) Oracle Fusion Middleware 11g (11.1.1.6.0) Documentation Library Installing Oracle SOA Suite and Oracle Business Process Management Suite Release Notes for Oracle Fusion Middleware 11g (11.1.1.6) Certified Platforms Linux x86 (Oracle Linux 4, 5) Linux x86 (RHEL 5) Linux x86 (SLES 10) Linux x86-64 (Oracle Linux 4, 5, 6) Linux x86-64 (RHEL 5) Linux x86-64 (SLES 10)  Oracle Solaris on SPARC (64-bit) (9, 10, 11) HP-UX Itanium (11.23, 11.31) HP-UX PA-RISC (64-bit) (11.23, 11.31) IBM AIX on Power Systems (64-bit) (5.3, 6.1, 7) IBM: Linux on System z (RHEL 5, SLES 10) Microsoft Windows Server (32-bit) (2003, 2008)  Microsoft Windows x64 (64-bit) (2008 R2) Getting SupportIf you need support for the prebuilt EBS 12.1.3 BPEL business processes, you can log Service Requests against the Applications Technology Group product family. Related Articles BPEL 11.1.1.5 Certified for Prebuilt E-Business Suite 12.1.3 SOA Integrations Webcast Replay Available: SOA Integration Options for E-Business Suite Securing E-Business Suite Web Services with Integrated SOA Gateway

    Read the article

  • GDL Presents: Women Techmakers with Pixel Qi

    GDL Presents: Women Techmakers with Pixel Qi Jean Wang sits down with 2011 Anita Borg "Woman of Vision" Award for Innovation winner Mary Lou Jepsen of Pixel Qi to discuss overcoming technical challenges in hardware, drawing on Mary Lou's experience leading the engineering and architectural design of the $100 laptops that inspired the One Laptop Per Child (OLPC) organization. Hosts: Jean Wang - Lead Hardware Engineer for Project Glass | Vivian Cromwell - Manager, Global Chrome Developer Relations Guest: Mary Lou Jepsen - CEO and Founder, Pixel Qi From: GoogleDevelopers Views: 0 0 ratings Time: 01:00:00 More in Science & Technology

    Read the article

< Previous Page | 216 217 218 219 220 221 222 223 224 225 226 227  | Next Page >