Search Results

Search found 1324 results on 53 pages for 'scheduled'.

Page 23/53 | < Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >

  • Can only connect to file server on second attempt

    - by Ross Fleming
    I have a FreeNas file server on my local network and I usually connect to it from Windows and Ubuntu computers. Ever since I have upgraded from Ubuntu 12.04 to 12.10 Ubuntu will only connect after a second attempt. By which I mean, I will browse to it via the file manager and once I click on the link in "Bookmarks" it complains that it could not connect. If I then try again it connects successfully and will keep up it's connection until the laptop is suspended or looses connection to the LAN for whatever reason. This isn't much of a problem as I don't mind having to click twice but my real problem is that this means that my scheduled backup will complain that it cannot connect to the storage device if it has not already been accessed during the current session. If there is some way to either stop the issue all together or to force the backup tool (default) to immediately have a second attempt at connecting.

    Read the article

  • Product Support Webcast for Existing Customers: Oracle Webcenter Portal 11g User & Administration Tips

    - by John Klinke
    Register for our upcoming Advisor Webcast 'Oracle WebCenter Portal 11g: User & Administration Tips' scheduled for November 12, 2013 at 11:00 am, Eastern Standard Time (8:00 am Pacific Standard Time, 4:00 pm GMT Time, 5:00 pm Europe Time). This 1-hour session is recommended for technical and functional users who use Oracle WebCenter Portal to build company portals using run-time tools.Topics will include:• Whats new in 11.1.1.8 of WebCenter Portal• Terminology Changes• Using the Portal once its built• Setting up Self Registration (Admins)• End User Experience• Development Environment• Patching InformationFor more information and to register for this Advisor Webcast, please see Oracle WebCenter Portal 11g: User & Administration Tips (Doc ID 1585902.1).

    Read the article

  • What subject do you discuss with your manager during a one-on-one?

    - by Martin
    Every week, I have a 30 minutes meeting scheduled with my manager to talk about pretty much anything. So far, I haven't taken those one-on-one very seriously. As a new year resolution, I would like to take more seriously my one-on-ones with my manager. One way I though I could do that is to plan in advance (come up with a list of questions and/or agenda) my one-on-one. With the exception of the status report, what subject do you discuss with your manager during a one-on-one? Have you ever seen an agenda for one-on-one?

    Read the article

  • World Backup Day

    - by red(at)work
    Here at Red Gate Towers, the SQL Backup development team have been hunkered down in their shed for the last few months, with the toolbox, blowtorch and chamois leather out, upgrading SQL Backup. When we started, autumn leaves were falling. Now we're about to finish, spring flowers are budding. If not quite a gleaming new machine, at the very least a familiar, reliable engine with some shiny new bits on it will trundle magnificently out of the workshop. One of the interesting things I've noticed about working on software development teams is that the team is together for so long 'implementing' stuff - designing, coding, testing, fixing bugs and so on - that you occasionally forget why you're doing what you're doing. Doubt creeps in. It feels like a long time since we launched this project in a fanfare of optimism and enthusiasm, and all that clarity of purpose and mission "yee-haw" has dissipated with the daily pressures of development. Every now and again, we look up from our bunker and notice all those thousands of users out there, with their different configurations and working practices and each with their own set of problems and requirements, and we ask ourselves "does anyone care about what we're doing?" Has the world moved on while we've been busy? Could we have been doing something more useful with the time and talent of all these excellent people we've assembled? In truth, you can research and test and validate all you like, but you never really know if you've done the right thing (or at least, something valuable for some users) until you release. All projects suffer this insecurity. If they don't, maybe you're not worrying enough about what you're building. The two enemies of software development are certainty and complacency. Oh, and of course, rival teams with Nerf guns. The goal of SQL Backup 7 is to make it so easy to schedule regular restores of your backups that you have no excuse not to. Why schedule a restore? Because your data is not as good as your last backup. It's only as good as your last successful restore. If you're not checking your backups by restoring them and running an integrity check on the database, you're only doing half the job. It seems that most DBAs know that this is best practice, but it can be tricky and time-consuming to set up, so it's one of those tasks that can get forgotten in the midst all the other demands on their time. Sometimes, they're just too busy firefighting. But if it was simple to do? That was our inspiration for SQL Backup 7. So it was heartening to read Brent Ozar's blog post the other day about World Backup Day. To be honest, I'd never heard of World Backup Day (Talk Like a Pirate Day, yes, but not this one); however, its emphasis on not just backing up your data but checking the validity of those backups was exactly the same message we had in mind when building SQL Backup 7. It's printed on a piece of A3 above our planning board - "Make backup verification so easy to do that no DBA has an excuse for not doing it" It's the missing piece that completes the puzzle. Simple idea, great concept, useful feature, but, as it turned out, far from straightforward to implement. The problem is the future. As Marty McFly discovered over the course of three movies, the future is uncertain and hard to predict - so when you are scheduling a restore to take place an hour, day, week or month after the backup, there are all kinds of questions that you wouldn't normally have to consider. Where will this backup live? Will it even exist at the time? Will it be split into multiple files? What will the file names be? Will it be encrypted? What files should it be restored to? SQL Backup needs to know what to expect at the time the restore job is actually run. Of course, a DBA will know the answer to all these questions, but to deliver the whole point of version 7, we wanted to make it easy for them to input that information into SQL Backup. We think we've done that. When you create your scheduled backup job, there is now an option to create a "reminder" to follow it up with a scheduled restore to verify the resulting backups. Actually, it's much more than a reminder, as it stores all the relevant data so you can click it and pre-populate the wizard with all the right settings to set up your verification restores. Simple. But, what do you think? We'd love you to try it. Post by Brian Harris

    Read the article

  • Solaris 11 Technology Forums, NYC and Boston

    - by dminer
    By now you're certainly aware that we released Solaris 11; I was on vacation during the launch so haven't had time to write any material related to the Solaris 11 installers, but will get to that soon.  Following onto the release, we're scheduling events in various locations around the world to talk about some of the key new features in Solaris 11 in more depth.  In the northeast US, we've scheduled technology forums in New York City on November 29, and Burlington, MA on November 30.  Click on those links to go to the detailed info and registration.  I'll be one of the speakers at both of them, so hope to see you there!

    Read the article

  • Speaking at PASS 2012 Summit in Seattle #sqlpass

    - by Marco Russo (SQLBI)
    I will deliver two sessions at the next PASS Summit 2012: one is title Inside DAX Query Plans and the other is Near Real-Time Analytics with xVelocity (without DirectQuery).These will be two sessions that require a lot of preparation and even if I have already much to say, I still have a long work to do this summer in order to go deeper in several details that I want to investigate for completing these sessions.I already look forward to come back in Seattle!In the meantime, you have to study SSAS Tabular and if you want to get a real jumpstart why not attending one of the next SSAS Tabular Workshop Online? We are working on more dates for this fall, but there are a few dates already scheduled.And, last but not least, the early Rough Cuts edition of our upcoming SSAS Tabular book is finally available here (really near to the final print)!

    Read the article

  • Executive overview of Oracle Fusion Applications in 1-day from your desktop

    - by mseika
    Designed from the ground up using the latest technology advances and incorporating the best practices gathered from Oracle's thousands of customers, Oracle Fusion Applications are 100% open-standards-based business applications that set a new standard for the way we innovate, work, and adopt technology. Learn more about them: Oracle University has scheduled a 1–day executive overview as a Live Virtual Class on the following dates: · 18 November · 22 November · 1 December · 2 December Your OPN discount applies to the standard price shown on the website! New In Class and Online dates will be shared on education.oracle.com. Book online or contact your local Oracle University representative for scheduling requests and more information.

    Read the article

  • Speaking at PASS 2012 Summit in Seattle #sqlpass

    - by Marco Russo (SQLBI)
    I will deliver two sessions at the next PASS Summit 2012: one is title Inside DAX Query Plans and the other is Near Real-Time Analytics with xVelocity (without DirectQuery).These will be two sessions that require a lot of preparation and even if I have already much to say, I still have a long work to do this summer in order to go deeper in several details that I want to investigate for completing these sessions.I already look forward to come back in Seattle!In the meantime, you have to study SSAS Tabular and if you want to get a real jumpstart why not attending one of the next SSAS Tabular Workshop Online? We are working on more dates for this fall, but there are a few dates already scheduled.And, last but not least, the early Rough Cuts edition of our upcoming SSAS Tabular book is finally available here (really near to the final print)!

    Read the article

  • Mojarra (JSF) 2.1.2 is here

    - by alexismp
    The Mojarra 2.1.2 release was cut a few days ago. Here are the full Maven coordinates : api, impl. You can also get to the release notes and to the list of bugs fixed in this release. This is scheduled for inclusion into the upcoming GlassFish 3.1.1 release. In fact it's already integrated in the latest promoted build (#8) which also includes woodstox 4.1.1. Weld 1.1.1.Final has already been integrated a few builds ago. The JSF team is now working on JSR 344 (JSF 2.2) for which you can get a status by visiting http://jsf-spec.java.net/ and the associated mailing lists. A first expert draft is now available.

    Read the article

  • When designing a job queue, what should determine the scope of a job?

    - by Stuart Pegg
    We've got a job queue system that'll cheerfully process any kind of job given to it. We intend to use it to process jobs that each contain 2 tasks: Job (Pass information from one server to another) Fetch task (get the data, slowly) Send task (send the data, comparatively quickly) The difficulty we're having is that we don't know whether to break the tasks into separate jobs, or process the job in one go. Are there any best practices or useful references on this subject? Is there some obvious benefit to a method that we're missing? So far we can see these benefits for each method: Split Job lease length reflects job length: Rather than total of two Finer granularity on recovery: If we lose outgoing connectivity we can tell them all to retry The starting state of the second task is saved to job history: Helps with debugging (although similar logging could be added in single task method) Single Single job to be scheduled: Less processing overhead Data not stale on recovery: If the outgoing downtime is quite long, the pending Send jobs could be outdated

    Read the article

  • Mercurial release management. Rejecting changes that fail testing

    - by MYou
    Researching distributed source control management (specifically mercurial). My question is more or less what is the best practice for rejecting entire sets of code that fail testing? Example: A team is working on a hello world program. They have testers and a scheduled release coming up with specific features planned. Upcoming Release: Add feature A Add feature B Add feature C So, the developers make their clones for their features, do the work and merge them into a QA repo for the testers to scrutinize. Let's say the testers report back that "Feature B is incomplete and in fact dangerous", and they would like to retest A and C. End example. What's the best way to do all this so that feature B can easily be removed and you end up with a new repo that contains only feature A and C merged together? Recreate the test repo? Back out B? Other magic?

    Read the article

  • JavaFX 2.1.1 Documentation

    - by NancyH
    JavaFX 2.1.1 released on June 12, and few documents were updated on the docs.oracle.com/javafx website. Besides a new set of release documentation, the Concurrency in JavaFX article was updated with a discussion of how to cancel a task, with a code sample to illustrate that. A new section describes the WorkerStateEvent class and how to use the convenience methods such as cancelled, failed, running, scheduled, and succeeded, which are invoked when the Worker implementation state changes. Other documents were updated to reflect minor bug fixes, many of them contributed by JavaFX readers using the feedback alias in the sidebar of all of our documentation. Yes, we do respond and pay attention to what you say and at least try to point you in the right direction if we can't solve a problem you're having with a tutorial. We appreciate your feedback!

    Read the article

  • Tasks, jobs, activities, operations... which term to use when?

    - by Paul Stovell
    My application has a number of different asynchronous 'things' that it performs: There are things that fire off a schedule (every 5 minutes) There are things that are fired when a user clicks a button There are things that are triggered by an incoming web service call I use the terms like this: Scheduled things = Jobs User-triggered things = Tasks Web service-triggered things = Operations Tasks are quite complicated, so they're implemented using a hierarchy of different objects which I call Activities (operations and jobs may also begin to use these Activities as their building blocks). I feel like I might be using the wrong terms - for example, would you expect something that happens every 5 minutes automatically to be a Job or a Task? Is there an industry standard for this? All of the words seem to mean the same thing.

    Read the article

  • Simple way to create a SQL Server Job Using T-SQL

    Sometimes we have a T-SQL process that we need to run that takes some time to run or we want to run it during idle time on the server. We could create a SQL Agent job manually, but is there any simple way to create a scheduled job? The seven tools in the SQL DBA Bundle support your core SQL Server database administration tasks.Make backups a breeze! Enjoy trouble-free troubleshooting! Make the most of monitoring! Download a free trial now.

    Read the article

  • Webcast: Maximum Availability with Oracle GoldenGate

    - by Markus Weber
    Make sure to register here for this upcoming live webcast, with great speakers, and a live Q&A chat session.It is scheduled for Thursday, December 13th, 2012, at 10am Pacific Time. There are no doubts about the strength, and depth, of Oracle's offerings for highly available database environments. But depending on the nature of your data center environments, your different uses cases and workloads, your service level agreements and expectations, there might still be some open questions about what the best solutions and architectures are to assure high availability and/or affordable, efficient disaster recovery. Therefore, this webcast will answer questions such as: How does Oracle GoldenGate fit into Oracle's Maximum Availability Architecture ? When to use Oracle Active Data Guard ? When Oracle GoldenGate ? When both ? When Oracle GoldenGate is a definite requirement for Database High Availability ? Overall, what are new high availability features in Oracle GoldenGate 11g Release 2 ? 

    Read the article

  • Next Quarterly Customer Update Webcast is Nov 27th (Nov 28th in Asia Pacific)

    - by John Klinke
    Join the WebCenter team as we present the latest product direction that was recently shared at the Oracle OpenWorld conference in San Francisco last month.   This Oracle WebCenter Quarterly Customer Update Webcast is scheduled on Nov 27th (Nov 28th in Asia Pacific). We will also be sharing the latest product updates and key support announcements that all WebCenter professionals and solution owners need to know. Don’t miss out on getting the latest information.  There will be two live sessions with Q&A at the end of each session.   Register for Session 1 -  Nov 27th at 9am San Francisco, 12pm New York, and 5pm London Register for Session 2 – Nov 28th at 9am Singapore, 11am Sydney, and 6pm (Nov 27th) San Francisco

    Read the article

  • MEA Oracle University Partner Enablement Update (22nd March)

    - by swalker
    Become an Oracle GoldenGate 10 Certified Implementation Specialist Let Oracle University help you become an Oracle GoldenGate 10 Certified Implementation Specialist. The following Boot Camp has been scheduled so that you can gain the required knowledge not only to develop and implement solutions that will drive your customers’ organizations to make better decisions, take informed actions, and run more-efficient business processes but also for you to pass the associated exam and get yourself specialized: Boot Camp Dates Location OPN Only Oracle GoldenGate 10 Implementation Boot Camp 26-28 Mar Dubai Oracle University OPN Only Boot Camps are co-funded by Oracle Alliances and Channels so are offered to you at very attractive prices. For prices, more information and assistance with registering please contact: Ion Georgescu eMail:  [email protected] Telephone:  +40 21.367.93.72

    Read the article

  • Should iOS games use a Timer?

    - by ????
    No matter what frameworks we use -- Core Graphics, Cocos2D, OpenGL ES -- to write games, should a timer be used (for games that has animation even when a user doesn't do any input, such as after firing a missile and waiting to see if the UFO is hit)? I read that NSTimer might not get fired until after scheduled time (interval), and CADisplayLink can delay and get fired at a later time as well, only that it tells you how late it is so you can move the object more, so it can make the object look like it skipped frame. Must we use a Timer? And if so, what is the best one to use?

    Read the article

  • EBS Applications Technology Group (ATG) Advisor Webcast December 2012

    - by LuciaC
    Invitation : Advisor Webcast December 2012 In December 2012 we have scheduled an Advisor Webcast, where we want to give you a closer look into the invalid objects in an E-Business Suite Environment. E-Business Suite - Troubleshooting invalid objectsAgenda : Introduction Activities that generate invalid objects EBS Architecture EBS Patching Concepts Troubleshooting Invalid Objects References EMEA Session : Tuesday December 11th, 2012 at 09:00 AM UK / 10:00 AM CET / 13:30 India / 17:00 Japan / 18:00 Australia Details & Registration : Doc ID 1501696.1Direct link to register in WebExUS Session : Wednesday December 12th, 2012 at 18:00 UK / 19:00 CET / 10:00 AM Pacific / 11:00 AM Mountain/ 01:00 PM Eastern Details & Registration : Doc ID 1501697.1Direct link to register in WebExIf you have any question about the schedules or if you have a suggestion for an Advisor Webcast to be planned in future, please send an E-Mail to Ruediger Ziegler.

    Read the article

  • TELERIK DELIVERS NEW TEAM PRODUCTIVITY TOOLS TO MARKET

    Companys holistic TeamPulse solution addresses agile project management needs Waltham, MA, April 13, 2010 Telerik, a leading provider of development tools and solutions for the Microsoft .NET platform, today announced the launch of TeamPulse, an integrated suite of agile scheduling and planning tools for Microsofts team collaboration platform, Team Foundation Server (TFS). The first version of TeamPulse is available to users immediately in Beta, and is scheduled for commercial launch in July 2010. Developed...Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • Domain in PENDINGDELETE, question about drop

    - by kcdwayne
    A domain I want is in the pendingDelete stage according to WHOIS. I have been monitoring it since redemptionPeriod, and it entered into pendingDelete 5 days ago today. After checking a few services (SnapNames, etc), they report it is scheduled to drop on the 11th (7 days, by my calculations). I'm not quite sure what to believe. The domain isn't highly valuable. It is to me and one other company. I can see no backorders placed on the big name sites, so I'm thinking of trying to get it without a backorder service. Any insight as to when it will actually drop? I've read 11AM-2PM PST, but I'm unsure. Thanks.

    Read the article

  • MySQL User Group Meeting in Madrid, Spain

    - by Lenka Kasparova
    We are pleased to announce another MySQL User Group meeting scheduled for June 5 in Madrid, Spain. Keith Hollman, the MySQL Principal Sales Consultant will be talking about MySQL & Oracle strategy and MySQL Cluster. A small demo of MySQL Cluster will be part of the presentation.  Details about the event: Date: June 5, 2014 Time: 7:00 pm-8:30 pm Place: Edificio Telefonica, Gran via 28, Madrid, Entrada por C/ Valverde 2 We are looking forward to seeing you in Madrid! See more information & registration.

    Read the article

  • JSR 348, 355, and 358: Moving JCP Forward

    - by arungupta
    The three-step JCP evolution consists of the following JSRs: • JSR 348, JCP transparency • JSR 355, Merging the two existing Executive Committees • JSR 358, complex issues moved postponed from JSR 348 The JSR 348 is already completed and JSR 355 is scheduled to be complete later this year. JSR 358 was recently filed and plans to revise several items such as modify the JSPA, Process Document, and a large number of complex issues. Because of the nature and scope of work, the Expert Group consists of representatives from all companies in the Executive Committee. Following the process set by JSR 348, all the work is done in open at jsr358.java.net. All the email discussions are here and JIRA here. Read Patrick Curran's blog for more details as well. The JSR review ballot ends on Jul 9th however the work has already happening for the past few months. Now is your chance to contribute and make JCP more effective!

    Read the article

  • WebCenter Customer Webcast - Nov 27th/28th

    - by Kellsey Ruppel
    WebCenter Customer Webcast - Nov 27th/28th Join the Oracle WebCenter team on this all important webcast as we present the latest product direction that was recently shared at the Oracle OpenWorld 2012 conference in San Francisco, CA. This next Oracle WebCenter Quarterly Customer Update Webcast is scheduled to air on Nov 27th (Nov 28th in Asia Pacific). We will also be sharing the latest product updates and key support announcements that all Oracle WebCenter professionals and solution owners need to know. Don’t miss out on getting the latest information! There will be two live sessions with Q&A at the end of each session. Register for Session 1 -  Nov 27th 9am San Francisco, 12pm New York, 5 pm London Register for Session 2 – Nov 28thth 9am Singapore, 11am Sydney, (27th) 6pm San Francisco

    Read the article

  • Get Trained in Storage

    - by mseika
    Oracle University has scheduled the following OPN Only Storage course: Course: Pillar Axiom 600 Install and MaxRep Replication Dates:         14-18 Jul 2014                     27-31 Oct 2014 Location:    Edinburgh You will gain the knowledge and skills necessary to install, administer, configure, and maintain Pillar Axiom 600 SAN Storage and Pillar Axiom MaxRep Replication. More details and online registration Remember: your OPN discount will be applied to the standard prices shown on Oracle University web pages. For assistance in booking and more information, contact the Oracle University Service Desk: eMail: [email protected] Telephone: 01 189 249 066

    Read the article

< Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >