Search Results

Search found 1365 results on 55 pages for 'june'.

Page 30/55 | < Previous Page | 26 27 28 29 30 31 32 33 34 35 36 37  | Next Page >

  • Windows 7 computer apparently connected to working wireless network but can't access router page or internet

    - by Hemmer
    I can consistently connect successfully to both the router and the internet using both my phone and two different computers which strongly suggests that the issue is at the desktop end. Only my Windows 7 desktop machine has stopped getting internet connectivity. It manages to connect to the router's network using the Windows 7 wireless dialog, but can't access either the router configuration page (192.168.1.1) or the internet in general once connected. The strange thing is the wireless network icon in the notification bar shows a full strength signal, sometimes with the yellow warning triangle. The output of ipconfig /all is: Wireless LAN adapter Wireless Network Connection: Connection-specific DNS Suffix . : Description . . . . . . . . . . . : Broadcom 802.11g Network Adapter Physical Address. . . . . . . . . : 00-12-17-94-98-90 DHCP Enabled. . . . . . . . . . . : Yes Autoconfiguration Enabled . . . . : Yes IPv4 Address. . . . . . . . . . . : 192.168.1.102(Preferred) Subnet Mask . . . . . . . . . . . : 255.255.255.0 Lease Obtained. . . . . . . . . . : 08 June 2011 10:32:16 Lease Expires . . . . . . . . . . : 08 June 2011 12:32:16 Default Gateway . . . . . . . . . : 192.168.1.1 DHCP Server . . . . . . . . . . . : 192.168.1.1 DNS Servers . . . . . . . . . . . : 194.168.4.100 194.168.8.100 NetBIOS over Tcpip. . . . . . . . : Enabled I've tried renewing DCHP settings disabling IPv6 resetting TCP stack uninstalling and reinstalling WLAN card drivers I've not installed anything new or made any changes to my knowledge, this just happened out of the blue. The only possible change is my friend connected his macbook to the network, but that has gone now and shouldn't have any lasting effects? TCP/IPv4 is set to automatically find an IP address. Antivirus is MSE (up to date) and doesn't detect anything unusual. Any ideas where to go next? Any help is greatly appreciated. For reference, the results of ipconfig /all on one of the working computers is: Ethernet adapter Wireless Network Connection: Connection-specific DNS Suffix . : Description . . . . . . . . . . . : Broadcom 802.11g Network Adapter Physical Address. . . . . . . . . : 00-16-CF-67-E5-97 Dhcp Enabled. . . . . . . . . . . : Yes Autoconfiguration Enabled . . . . : Yes IP Address. . . . . . . . . . . . : 192.168.1.100 Subnet Mask . . . . . . . . . . . : 255.255.255.0 Default Gateway . . . . . . . . . : 192.168.1.1 DHCP Server . . . . . . . . . . . : 192.168.1.1 DNS Servers . . . . . . . . . . . : 194.168.4.100 194.168.8.100 Lease Obtained. . . . . . . . . . : 08 June 2011 10:26:38 Lease Expires . . . . . . . . . . : 08 June 2011 12:26:38 UPDATE: Still not working, but I've managed to find a temporary workaround by tethering my Android phone, effectively becoming a new wifi adapter. Will be moving to a new flat so will test if it is a network specific thing - maybe the card has got damaged somehow? Also will see if the card is working with Linux soon.

    Read the article

  • Flatten XML using XSLT but based on nesting level

    - by user2532750
    I'm new to XSLT and I'm trying to write some XSLT that will flatten any given XML such that a new line occurs whenever the nesting level changes. My input can be any XML document, with any number of nested levels so the structure isn't known to the XSLT. Due to the tools available to me, my solution has to use XSLT version 1.0. For example. <?xml version="1.0"?> <ROWSET> <ROW> <CUSTOMER_ID>0</CUSTOMER_ID> <NAME>Default Company</NAME> <BONUSES> <BONUSES_ROW> <BONUS_ID>21</BONUS_ID> <DESCRIPTION>Performance Bonus</DESCRIPTION> </BONUSES_ROW> <BONUSES_ROW> <BONUS_ID>26</BONUS_ID> <DESCRIPTION>Special Bonus</DESCRIPTION> </BONUSES_ROW> </BONUSES> </ROW> <ROW> <CUSTOMER_ID>1</CUSTOMER_ID> <NAME>Dealer 1</NAME> <BONUSES> <BONUSES_ROW> <BONUS_ID>27</BONUS_ID> <DESCRIPTION>June Bonus</DESCRIPTION> <BONUS_VALUES> <BONUS_VALUES_ROW> <VALUE>10</VALUE> <PERCENT>N</PERCENT> </BONUS_VALUES_ROW> <BONUS_VALUES_ROW> <VALUE>11</VALUE> <PERCENT>Y</PERCENT> </BONUS_VALUES_ROW> </BONUS_VALUES> </BONUSES_ROW> </BONUSES> </ROW> <ROWSET> needs to becomes.... 0, Default Company 21, Performance Bonus 26, Special Bonus 1, Dealer 1 27, June Bonus 10, N 11, Y The XSLT I've written so far is... <xsl:stylesheet version="1.0" xmlns:xsl="http://www.w3.org/1999/XSL/Transform"> <xsl:output method="text" encoding="iso-8859-1"/> <xsl:strip-space elements="*" /> <xsl:template match="/*/child::*"> <xsl:apply-templates select="*"/> </xsl:template> <xsl:template match="*"> <xsl:value-of select="text()" /> <xsl:if test="position()!= last()"><xsl:text>,</xsl:text></xsl:if> <xsl:if test="position()= last()"><xsl:text>&#xD;</xsl:text></xsl:if> <xsl:apply-templates select="./child::*"/> </xsl:template> </xsl:stylesheet> but my output just isn't correct, with gaps and unnecessary data. 0,Default Company, ,21,Performance Bonus 26,Special Bonus 1,Dealer 1, 27,June Bonus, ,10,N 11,Y It seems there needs to be a check as whether or not a node can contain text, but I'm stuck and could do with an XSLT expert's help.

    Read the article

  • Do We Indeed Have a Future? George Takei on Star Wars.

    - by Bil Simser
    George Takei (rhymes with Okay), probably best known for playing Hikaru Sulu on the original Star Trek, has always had deep concerns for the present and the future. Whether on Earth or among the stars, he has the welfare of humanity very much at heart. I was digging through my old copies of Famous Monsters of Filmland, a great publication on monster and films that I grew up with, and came across this. This was his reaction to STAR WARS from issue 139 of Famous Monsters of Filmland and was written June 6, 1977. It is reprinted here without permission but I hope since the message is still valid to this day and has never been reprinted anywhere, nobody will mind me sharing it. STAR WARS is the most pre-posterously diverting galactic escape and at the same time the most hideously credible portent of the future yet.While I thrilled to the exploits that reminded me of the heroics of Errol Flynn as Robin Hood, Burt Lancaster as the Crimson Pirate and Buster Crabbe as Flash Gordon, I was at the same time aghast at the phantasmagoric violence technology can place at our disposal. STAR WARS raised in my mind the question - do we indeed have a future?It seems to me what George Lucas has done is to masterfully guide us on a journey through space and time and bring us back face to face with today's reality. STAR WARS is more than science fiction, I think it is science fictitious reality.Just yesterday, June 7, 1977, I read that the United States will embark on the production of a neutron bomb - a bomb that will kill people on a gigantic scale but will not destroy buildings. A few days before that, I read that the Pentagon is fearful that the Soviets may have developed a warhead that could neutralize ours that have a capacity for that irrational concept overkill to the nth power. Already, it seems we have the technology to realize the awesome special effects simulations that we saw in the film.The political scene of STAR WARS is that of government by force and power, of revolutions based on some unfathomable grievance, survival through a combination of cunning and luck and success by the harnessing of technology -  a picture not very much at variance from the political headlines that we read today.And most of all, look at the people; both the heroes in the film and the reaction of the audience. First, the heroes; Luke Skywalker is a pretty but easily led youth. Without any real philosophy to guide him, he easily falls under the influence of a mystical old man believed previously to be an eccentric hermit. Recognize a 1960's hippie or a 1970's moonie? Han Solo has a philosophy coupled with courage and skill. His philosophy is money. His proficiency comes for a price - the highest. Solo is a thoroughly avaricious mercenary. And the Princess, a decisive, strong, self-confident and chilly woman. The audience cheered when she wielded a gun. In all three, I missed qualities that could be called humane - love, kindness, yes, I missed sensuality. I also missed a sense of ideals and faith. In this regard the machines seemed more human. They demonstrated real affection for each other and an occasional poutiness. They exhibited a sense of fidelity and constancy. The machines were humanized and the humans conversely seemed mechanical.As a member of the audience, I was swept up by the sheer romantic escapsim of it all. The deering-dos, the rope swing escape across the pit, the ray gun battles and especially the swash buckle with the ray swords. Great fun!But I just hope that we weren't too intoxicated by the escapism to be able to focus on the recognizable. I hope the beauty of the effects didn't narcotize our sensitivity to violence. I hope the people see through the fantastically well done futuristic mirrors to the disquieting reflection of our own society. I hope they enjoy STAR WARS without being "purely entertained".

    Read the article

  • STOP PRESS: FY15 Q1 Oracle ZS3 Contest for Partners

    - by Cinzia Mascanzoni
    04 JUNE 2014 Oracle EMEA Partners Stop Press Stay Connected Oracle Media Network   OPN on PartnerCast   STOP PRESS: FY15 Q1 Oracle ZS3 Contest for PartnersShare an unforgettable experience at the Teatro Alla Scala in Milan Dear valued Partner, We are pleased to launch a partner contest exclusive to our partners dedicated to promoting and selling Oracle Systems! You are essential to the success of Oracle and we want to recognize your contribution and effort in driving Oracle Storage to the market. To show our appreciation we are delighted to announce a contest, giving the winners the opportunity to attend a roundtable chaired by Senior Oracle Executives and spend an unforgettable evening at the magnificent Teatro Alla Scala in Milan, followed by a stay at the Grand Hotel et de Milan, courtesy of Oracle. Recognition will be given to 12 partner companies (10 VARs & 2 VADs) who will be recognized for their ZFS storage booking achievement in the broad market between June 1st and July 18th 2014. Criteria of Eligibility A minimum deal value of $30k is required for qualification Partners who are wholly or partially owned by a public sector organization are not eligible for participation Winners The winning VARs will be: The highest ZS3 or ZBA bookings achievers by COB on July 18th, 2014 in each Oracle EMEA region (1) The highest Oracle on Oracle (2) ZS3 or ZBA bookings achievers by COB on July 18th, 2014 in each Oracle EMEA region The winning VADs (3) will be: The highest ZS3 or ZBA bookings achiever by COB on July 18th 2014 in EMEA The highest Oracle on Oracle (2) ZS3 or ZBA bookings achiever by COB on July 18th 2014 in EMEA (1) Two VAR winners for each EMEA region – Eastern Europe & CIS, Middle East & Africa, South Europe, North Europe, UK/Ireland & Israel - as per the criteria outlined above(2) Oracle on Oracle, in this instance, means ZS3 or ZBA storage attached to DB or DB options, Engineered Systems or Sparc servers sold to the same customer by the same partner within the contest timelines.(3) Two VAD winners, one for each of the criteria outlined above, will be selected from across EMEA. Oracle shall be the final arbiter in selecting the winners. All winners will be notified via their Oracle account manager. Full details about the contest, expenses covered by Oracle and timetable of events can be found on the Oracle EMEA Hardware (Servers & Storage) Partner Community workspace (FY15 Q1 ZFS Partner Contest). Access to the community workspace requires membership. If you are not a member please register here. The Prize Winners will be invited to participate to a roundtable chaired by Oracle on Monday September 8th 2014 in Milan and to be guests of Oracle in the evening of September 8th, 2014 at the Teatro Alla Scala. The evening will comprise of a private tour of the Scala museum, cocktail reception at the elegant museum rooms and attending the performance by the renowned Soprano, Maria Agresta. Our guests will then retire for the evening to the Grand Hotel et de Milan, courtesy of Oracle. Good Luck!! For more information, please contact Sasan Moaveni. Regards, Olivier TordoSenior Director - Systems Business DevelopmentOracle EMEA Alliances & Channels Resources EMEA Hardware Partner Community EMEA Oracle Partner Days Find Partner Events EMEA Partner News Blog EMEA Partner Enablement Blog Oracle PartnerNetwork Copyright © 2014, Oracle and/or its affiliates.All rights reserved. Contact Us | Legal Notices and Terms of Use | Privacy Statement

    Read the article

  • Where can you find the Oracle Applications User Experience team in the next several months?

    - by mvaughan
    By Misha Vaughan, Applications User ExperienceNovember is one of my favorite times of year at Oracle. The blast of OpenWorld work is over, and it’s time to get down to business and start taking our messages and our work on the road out to the user groups. We’re in the middle of planning all of that right now, so we decided to provide a snapshot of where you can see us and hear about the Oracle Applications User Experience – whether it’s Fusion Applications, PeopleSoft, or what we’re planning for the next-generation of Oracle Applications.On the road with Apps UX...In December, you can find us at UKOUG 2012 in Birmingham, UK: UKOUG, UK Oracle User Group Conference 2012?December 3 – 5, 2012?ICC, Birmingham, UKIn March, we will be at Alliance 2013 in Indianapolis, and our fingers are crossed for OBUG Connect 2013 in Antwerp:? Alliance 2013March 17 - 20, 2013 ?Indianapolis, IndianaOBUG Benelux Connect 2013?March 26, 2013?Antwerp, Belgium?? In April, you will see us at COLLABORATE13 in Denver:? Collaborate13April 7 - April 11, 2013 ?Denver, Colorado?? And in June, we round out the kick-off to summer at OHUG 2013 in Dallas and Kscope13 in New Orleans:? OHUG 2013June 9 -13, 2013?Dallas, Texas ODTUG Kscope13?June 23-27, 2013 ?New Orleans, LA? The Labs & DemosAs always, a hallmark of our team is our mobile usability labs. If you haven’t seen them, they are a great way for customers and partners to get a peek at what Oracle is working on next, and a chance for you to provide your candid perspective. Based on the interest and enthusiasm from customers last year at Collaborate, we are adding more demo-stations to our user group presence in the year ahead. If you want to see some of the work we are doing first-hand but don’t have a lot of time, the demo stations are a great way to get a quick update on the latest wow-factor we are researching. I can promise that you will see whatever we think is new and interesting at the demo stations first. Oracle OpenWorld 2012 Apps UX DemostationFor Applications DevelopersMore and more, I get asked the question, “How do I build an application that looks like a Fusion?” My answer is Fusion Applications Design Patterns. You can find out more about how Fusion Applications developers can leverage ADF and the user experience best practices we developed for Fusion at sessions lead by Ultan O’Broin, Director of Global User Experience, in the year ahead. Ultan O'Broin, On Fusion Design Patterns Building mobile applications are also top of mind these days. If you want to understand how Oracle is approaching this strategy, check out our session on Mobile user experience design patterns with Mobile ADF.  In many cases, this will be presented by Lynn Rampoldi-Hnilo, Senior Manager of Mobile User Experiences, and in a few cases our ever-ready traveler Ultan O’Broin will be on deck. Lynn Rampoldi-Hnilo, on Mobile User Experience Design PatternsApplications User ExperiencesFusion Applications continues to evolve, and you will see the new face of Fusion Applications at our executive sessions in the year ahead, which are led by vice president Jeremy Ashley or a hand-picked presenter, such as one of our Fusion User Experience Advocates.  Edward Roske, CEO InterRel Consulting & Fusion User Experience AdvocateAs always, our strategy is to take our lessons learned and spread them across the Applications product lines. A great example is the enhancements coming in the PeopleSoft user experience, which you can hear about from Harris Kravatz, Senior Manager, PeopleSoft User Experience. Fusion Applications ExtensibilityWe can’t talk about Fusion Applications without talking about how to make it look like your business. If tailoring Fusion applications is a question in your mind, and it should be, you should hit one of these sessions. These sessions will be lead by our own Killian Evers, Senior Director, Tim Dubois, User Experience Architect, and some well-trained Fusion User Experience Advocates.Find out moreIf you want to stay on top of where and when we will be, you can always sign up for our newsletter or check out the events page of usableapps.

    Read the article

  • SharePoint Saturday DC

    - by Mark Rackley
    Wow… did you see this thing? 927 attendees? An exhibition hall full of vendors? 94 speakers? 100 sessions?? Insane is a word that comes to mind… SharePoint Saturday DC was definitely epic as far as SharePoint Saturdays go. I got to catch up with a lot of friends and make some new ones.  Met a couple of fans of the blog (hello ladies…;))  Did you know that people actually read this thing? I guess that means I need to stop putting so much garbage on here and more content. I’ll get right on that as soon as I find out how to add 6 hours to each day. Anyway, once again I did my “Wrapping Your Head Around the SharePoint Beast” session.  I tweaked it even more from Huntsville and presented to a packed room with some people sitting on the floor and standing in the aisles. It was a great crowd, very interactive and they seemed interested at least. Thank you guys so much for attending and please feel free to tell me of any suggestions you have to make the presentation better.  This is one of the presentations that will probably never die. Everyone beginning SharePoint development needs a good introduction and starting point. My goal is to make this THE session to see on the subject. So, a little interesting data about my class. Half of the room was brand new to SharePoint and only one person was using 2010. That tells me that this session still has legs and that 2007 isn’t going anywhere anytime soon.  I know my organization will be using 2007 for at least a couple more years. Oh yeah… the slide deck?  Here it is: SharePoint Saturday DC Slide Deck So, SharePoint Saturday was truly tremendous and if you weren’t there you missed out. @meetdux, @usher, and the rest of their crew did a spectacular job. You guys rock and are a huge asset to the community. Thanks for allowing me to speak. What’s up next for me?  I’m so glad you asked…. SHAREPOINT SATURDAY OZARKS IS JUNE 12TH! Although SharePoint Saturday Ozarks on June 12 in Harrison Arkansas will be a much more intimate event than DC, it promises to be a most memorable event. We’ve got over 30 speakers and sessions, some cool stuff to give away, and we’re going floating down the Buffalo River on the 13th. Let’s see you do THAT in DC.  :) Anyway, I hope to see you there and I would truly appreciate any help you can do to help publicize the event. We just got internet here in the hills and most people here are still looking for the “any” key….

    Read the article

  • Joy! | Important Information About Your iPad 3G

    - by Jeff Julian
    Looks like I was one of the lucky 114,000 who AT&T lost their email to “hackers”.  Why is “hackers” in “double quotes”.  I can just imagine some executive at AT&T in their “Oh No, We Messed Up Meeting” saying, what happened?  Then someone replied, well we have had a breach and “hackers” broke in (using the quote in the air gesture) and stole our iPad 3G customers emails. Oh well, I am sure my email has been sold and sold again by many different vendors, why not AT&T now.  At least Dorothy Attwood could have gave us her email to give to someone else instead of blinking it through a newsletter system. June 13, 2010 Dear Valued AT&T Customer, Recently there was an issue that affected some of our customers with AT&T 3G service for iPad resulting in the release of their customer email addresses. I am writing to let you know that no other information was exposed and the matter has been resolved.  We apologize for the incident and any inconvenience it may have caused. Rest assured, you can continue to use your AT&T 3G service on your iPad with confidence. Here’s some additional detail: On June 7 we learned that unauthorized computer “hackers” maliciously exploited a function designed to make your iPad log-in process faster by pre-populating an AT&T authentication page with the email address you used to register your iPad for 3G service.  The self-described hackers wrote software code to randomly generate numbers that mimicked serial numbers of the AT&T SIM card for iPad – called the integrated circuit card identification (ICC-ID) – and repeatedly queried an AT&T web address.   When a number generated by the hackers matched an actual ICC-ID, the authentication page log-in screen was returned to the hackers with the email address associated with the ICC-ID already populated on the log-in screen. The hackers deliberately went to great efforts with a random program to extract possible ICC-IDs and capture customer email addresses.  They then put together a list of these emails and distributed it for their own publicity. As soon as we became aware of this situation, we took swift action to prevent any further unauthorized exposure of customer email addresses.  Within hours, AT&T disabled the mechanism that automatically populated the email address. Now, the authentication page log-in screen requires the user to enter both their email address and their password. I want to assure you that the email address and ICC-ID were the only information that was accessible. Your password, account information, the contents of your email, and any other personal information were never at risk.  The hackers never had access to AT&T communications or data networks, or your iPad.  AT&T 3G service for other mobile devices was not affected. While the attack was limited to email address and ICC-ID data, we encourage you to be alert to scams that could attempt to use this information to obtain other data or send you unwanted email. You can learn more about phishing by visiting the AT&T website. AT&T takes your privacy seriously and does not tolerate unauthorized access to its customers’ information or company websites.   We will cooperate with law enforcement in any investigation of unauthorized system access and to prosecute violators to the fullest extent of the law. AT&T acted quickly to protect your information – and we promise to keep working around the clock to keep your information safe.  Thank you very much for your understanding, and for being an AT&T customer. Sincerely, Dorothy Attwood Senior Vice President, Public Policy and Chief Privacy Officer for AT&T Technorati Tags: AT&T,iPad 3G,Email

    Read the article

  • WebCenter Customer Spotlight: Ancestry.com

    - by me
    Author: Peter Reiser - Social Business Evangelist, Oracle WebCenter  Solution SummaryAncestry.com Inc is the largest for-profit genealogy company in the world and it operates a network of genealogical and historical record websites focused on the U.S. and nine foreign countries, develops and markets genealogical software, and offers a wide array of genealogical related services. As of June 2012, the company provided access to more than 10 billion records, 38 million family trees, and 2 million paying subscribers. Their main business challenges were to improve time to market and agility to respond quickly to fast changing Internet waves while integrating with their existing content (4 PetaByte) and legacy systems. Ancestry.com implemented Oracle WebCenter Sites as their Web Experience Management System for their landing pages and marketing micro sites, added dynamic sections to their existing websites and integrated the existing content and legacy systems through web services. The Ancestry.com landing pages and marketing sites are now managed by the business team without any involvement of engineering resources. Managed content can quickly be added to existing pages without having to refactor the whole page and existing content (4 PetaBytes)  is now served trough Oracle WebCenter Sites without having to migrate from existing systems. Company OverviewAncestry.com Inc is a publicly traded Internet company (NASDAQ: ACOM) based in Provo, Utah, USA. The largest for-profit genealogy company in the world, it operates a network of genealogical and historical record websites focused on the U.S. and nine foreign countries, develops and markets genealogical software, and offers a wide array of genealogical related services. As of June 2012, the company provided access to more than 10 billion records, 38 million family trees, and 2 million paying subscribers. Business ChallengesAncestry main business challenge was to respond quickly to fast changing Internet waves.  Product marketing could not change Web site content without going through development. They needed dedicated developers just to support their marketing efforts. Technical Requirements Support current systems and environments - ASP.NET, MVC.NET, Java, JSP, PHP Scalable and manageable for a world wide network Marketing Requirements Easy to enter content – Without having a degree in HTML Scheduling of content – When is content visible to users Product Requirements Easy to manage content – See when content is out-of-date Rotation of content – Producing new content as old content expires Solution DeployedAncestry implemented  Oracle WebCenter Sites as their Web Experience Management System to manage their landing pages and marketing micro sites. This sites are fully managed by their business team without involvement of any engineering resources. The integration with their existing Web sites is done through Spot Management which allows the ability to add dynamic content to certain sections of a web page. The dynamic content is managed by  Oracle WebCenter Sites. The integration with the existing content (4 PetaBytes!) is done trough  a custom content provider interface which allows to mix existing content with content from  Oracle WebCenter Sites. Business ResultsAncestry.com has achieved following impressive business results: Landing pages and marketing sites are now managed by the business team without any involvement of engineering resources Managed content can quickly be added to existing pages without having to refactor the whole page Provide access to existing content (4 PetaBytes)  without having to migrate from existing systems Additional Information Ancestry Webcast Oracle WebCenter Sites

    Read the article

  • ArchBeat Link-o-Rama for 2012-06-29

    - by Bob Rhubart
    Backward-compatible vs. forward-compatible: a tale of two clouds | William Vambenepe "There is the Cloud that provides value by requiring as few changes as possible. And there is the Cloud that provides value by raising the abstraction and operation level," says William Vambenepe. "The backward-compatible Cloud versus the forward-compatible Cloud." Vambenepe was a panelist on the recent ArchBeat podcast Public, Private, and Hybrid Clouds. Andrejus Baranovskis's Blog: ADF 11g PS5 Application with Customized BPM Worklist Task Flow (MDS Seeded Customization) Oracle ACE Director Andrejus Baranovskis investigates "how you can customize a standard BPM Task Flow through MDS Seeded customization." Oracle OpenWorld 2012 Music Festival If, after a day spent in sessions at Oracle Openworld, you want nothing more than to head back to your hotel for a quiet evening spent responding to email, please ignore the rest of this message. Because every night from Sept 30 to Oct 4 the streets of San Francisco will pulsate with music from a vast array of bands representing more musical styles than a single human brain an comprehend. It's the first ever Oracle Music Festival, baby, 7:00pm to 1:00am every night. Are those emails that important...? Resource Kit: Oracle Exadata - includes demos, videos, product datasheets, and technical white papers. This free resource kit includes several customer case study videos, two 3D product demos, several product datasheets, and three technical architecture white papers. Registration is required for the who don't already have a free Oracle.com membership account. Some execs contemplate making 'Bring Your Own Device' mandatory | ZDNet "Companies and agencies are recognizing that individual employees are doing a better job of handling and managing their devices than their harried and overworked IT departments – who need to focus on bigger priorities, such as analytics and cloud," says ZDNet SOA blogger Joe McKendrick. Podcast Show Notes: Public, Private, and Hybrid Clouds All three parts of this discussion are now available. Featuring a panel of leading Oracle cloud computing experts, including Dr. James Baty, Mark T. Nelson, Ajay Srivastava, and William Vambenepe, the discussion covers an overview of the various flavors of cloud computing, the importance of standards, Why cloud computing is a paradigm shift—and why it isn't, and advice on what architects need to know to take advantage of the cloud. And for those who prefer reading to listening, a complete transcript is also available. Amazon AMIs and Oracle VM templates (Cloud Migrations) Cloud migration expert Tom Laszewski shares an objective comparison of these two resources. IOUC : Blogs : Read the latest news on the global user group community - June 2012! The June 2012 edition of "Are You a Member Yet?"—the quarterly newsletter about Oracle user group communities around the world. Webcast: Introducing Identity Management 11g R2 - July 19 Date: Thursday, July 19, 2012 Time: 10am PT / 1pm ET Please join Oracle and customer executives for the launch of Oracle Identity Management 11g R2, the breakthrough technology that dramatically expands the reach of identity management to cloud and mobile environments. Thought for the Day "The most important single aspect of software development is to be clear about what you are trying to build." — Bjarne Stroustrup Source: SoftwareQuotes.com

    Read the article

  • Process Power to the People that Create Engagement

    - by Michael Snow
    Organizations often speak about their engagement problems as if the problem is the people they are trying to engage - employees,  partners, customers and citizens.  The reality of most engagement problems is that the processes put in place to engage are impersonal, inflexible, unintuitive, and often completely ignorant of the population they are trying to serve. Life, Liberty and the Pursuit of Delight? How appropriate during this short week of the US Independence Day Holiday that we're focusing on People, Process and Engagement. As we celebrate this holiday in the US and the historic independence we gained (sorry Brits!) - it's interesting to think back to 1776 to the creation of that pivotal document, the Declaration of Independence. What tremendous pressure to create an engaging document and founding experience they must have felt. "On June 11, 1776, in anticipation of the impending vote for independence from Great Britain, the Continental Congress appointed five men — Thomas Jefferson, John Adams, Benjamin Franklin, Roger Sherman, and Robert Livingston — to write a declaration that would make clear to people everywhere why this break from Great Britain was both necessary and inevitable. The committee then appointed Jefferson to draft a statement. Jefferson produced a "fair copy" of his draft declaration, which became the basic text of his "original Rough draught." The text was first submitted to Adams, then Franklin, and finally to the other two members of the committee. Before the committee submitted the declaration to Congress on June 28, they made forty-seven emendations to the document. During the ensuing congressional debates of July 1-4, 1776, Congress adopted thirty-nine further revisions to the committee draft. (http://www.constitution.org) If anything was an attempt for engaging the hearts and minds of the 13 Colonies at the time, this document certainly succeeded in its mission. ...Their tools at the time were pen and ink and parchment. Although the final document would later be typeset with lead type for a printing press to distribute to the colonies, all of the original drafts were hand written. And today's enterprise complains about using "Review and Track Changes" at times.  Can you imagine the manual revision control process? or lack thereof?  Collaborative process? Time delays? Would  implementing a better process have helped our founding fathers collaborate better? Declaration of Independence rough draft below. One of many during the creation process. Great comparison across multiple versions of the document here. (from http://www.ushistory.org/): While you may not be creating a new independent nation, getting your employees to engage is crucial to your success as a company in today's world. Oracle WebCenter provides the tools that power engagement. Employees that have better tools for communication, collaboration and getting their job done are more engaged employees. Better engaged employees create more engaged customers and partners. 12.00 Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 -"/ /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman","serif"; mso-fareast-font-family:"Times New Roman";}

    Read the article

  • Oracle Excellence Award

    - by Hartmut Wiese
    CALL FOR NOMINATIONS 2014 Oracle Excellence Award: Sustainability Innovation Is your organization using an Oracle product to help with a sustainability initiative while reducing costs? Saving energy? Saving gas? Saving paper? For example, you may use Oracle’s Agile Product Lifecycle Management to design more eco-friendly products, Oracle Transportation Management to reduce fleet emissions, Oracle Exadata Database Machine to decrease power and cooling needs while increasing database performance, Oracle Business Intelligence to measure environmental impacts, or one of many other Oracle products. Your organization may be eligible for the 2014 Oracle Excellence Award: Sustainability Innovation. Submit a nomination form located here by Friday June 20 if your company is using any Oracle product to take an environmental lead as well as to reduce costs and improve business efficiencies by using green business practices. These awards will be presented during Oracle OpenWorld 2014 (September 28-October 2) in San Francisco.  Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 About the Award • Winners will be selected from the customer and/or partner nominations. Either a customer, their partner, or Oracle representative can submit the nomination form on behalf of the customer.• There is a nomination form here to discuss your use of Oracle products and how they have helped your sustainability efforts and reduced costs. • Winners will be selected based on the extent of the environmental impact they have had as well as the business efficiencies they have achieved through their combined use of Oracle products. Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 Nomination Eligibility • Your company uses at least one component of Oracle products, whether it's the Oracle database, business applications, Fusion Middleware, or Sun servers/storage. • This solution should be in production or in active development. • Nomination deadline: Friday June 20, 2014. Benefits to Award Winners • Award presented to winners during Oracle OpenWorld by Jeff Henley, Oracle Chairman of the Board • Free Oracle OpenWorld registration pass for each winning customer • 2014 Oracle Excellence Award: Sustainability Innovation award logo for inclusion on your own website &/or press release • Possible placement in Oracle Profit Magazine &/or Oracle Magazine • ‘Enable the Eco-Enterprise’ podcast opportunity See last year's winners here Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 ______________________________________________________________________________________ Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Questions? Send an email to: [email protected] Follow Oracle’s Sustainability Solutions on Twitter, LinkedIn, YouTube, and the Sustainability Matters blog Web page with award details:  http://www.oracle.com/us/products/applications/green/call-for-nominations-185050.html  

    Read the article

  • Node.js running under IIS Express Keeps Crashing

    - by PazoozaTest Pazman
    I recently resinstalled Windows 7 on my machine and went back to downloading and installing the tools to help me continue developing node.js windows azure web applications. I followed the instructions given on the node.js azure site: http://www.windowsazure.com/en-us/develop/nodejs/ and using web installer 4.0 it says I have successfully installed these tools: Windows Azure Powershell Windows Azure SDK for Node.js - June 2012 Windows Azure SDK for .Net (VS 2012 RC) - June 2012 IIS Recommend Configuration The problem I am experiencing is that when I run the site using powershell e.g: start-azureemulator -launch it goes ahead and runs IIS Express, and after several minutes IIS Express crashes with the following information: Problem signature: Problem Event Name: APPCRASH Application Name: iisexpress.exe Application Version: 8.0.8298.0 Application Timestamp: 4f620349 Fault Module Name: iiscore.dll Fault Module Version: 8.0.8298.0 Fault Module Timestamp: 4f63b65c Exception Code: c0000005 Exception Offset: 00021767 OS Version: 6.1.7601.2.1.0.256.28 Locale ID: 1033 Additional Information 1: f66d Additional Information 2: f66d807b515d6b2dc6f28f66db769a01 Additional Information 3: 7b2f Additional Information 4: 7b2f6797d07ebc2c23f2b227e779722e I am running 2 instances each time, and both of them crash one after the other. Is anyone experiencing something similar and fix this issue ? Is their an upgrade I need to do ? I've run windows update but it says I've got all the latest updates etc. Can I tell the powershell cmdlet to use IIS 7 instead of IIS Express? I'm guessing its something to do with IIS Express on my machine. I did some hunting around and found this person here who experienced a similar problem: https://github.com/tjanczuk/iisnode/issues/149 I've got a cron job running every 1 second, to check if any website totals need to be updated. Could this be causing IIS Express to crash? Cheers

    Read the article

  • What caused the rails application crash?

    - by so1o
    I'm sure someone can explain this. we have an application that has been in production for an year. recently we saw an increase in number of support requests for people having difficulty signing into the system. after scratching our head because we couldn't recreate the problem in development, we decided we'll switch on debug logger in production for a month. that was june 5th. application worked fine with the above change and we were waiting. then yesterday we noticed that the log files were getting huge so we made another change in production config.logger = Logger.new("#{RAILS_ROOT}/log/production.log", 50, 1048576) after this change, the application started crashing while processing a particular file. this particular line of code was RAILS_DEFAULT_LOGGER.info "Payment Information Request: ", request.inspect as you can see there was a comma instead of a plus sign. this piece of code was introduced in Mar. the question is this: why did the application fail now? if changing the debug level caused the application to process this line of code it should have started failing on june 5th! why today. please someone help us. Are we missing the obvious here? if you dont have an answer, at least let us know we aren't the only one that are bonkers.

    Read the article

  • Why it's important to specify the complete class name in your association when using namespaces

    - by Carmine Paolino
    In my Rails application there is a model that has some has_one associations (this is a fabricated example): class Person::Admin < ActiveRecord::Base has_one :person_monthly_revenue has_one :dude_monthly_niceness accepts_nested_attributes_for :person_monthly_revenue, :dude_monthly_niceness end class Person::MonthlyRevenue < ActiveRecord::Base belongs_to :person_admin end class Dude::MonthlyNiceness < ActiveRecord::Base belongs_to :person_admin end The application talks to a backend that computes some data and returns a piece of JSON like this: { "dude_monthly_niceness": { "february": 1.1153232569518972, "october": 1.1250217200558268, "march": 1.3965786869658541, "august": 1.6293418014601631, "september": 1.4062771500697835, "may": 1.7166279693955291, "january": 1.0086401628086725, "june": 1.5711510228365859, "april": 1.5614525597326563, "december": 0.99894169970474289, "july": 1.7263264324994585, "november": 0.95044938418509506 }, "person_monthly_revenue": { "february": 10.585596551505297, "october": 10.574823016656749, "march": 9.9125274764852787, "august": 9.2111604702328922, "september": 9.7905249446675153, "may": 9.1329712474607962, "january": 10.479614016604238, "june": 9.3710235926961936, "april": 9.5897372624830304, "december": 10.052587677671438, "july": 8.9508877843925561, "november": 10.925339756096172 }, } To deserialize it, I use ActiveRecord's from_json, but instead of a Person::Admin object with all the associations in place, I get this error: >> Person::Admin.new.from_json(json) NameError: uninitialized constant Person::Admin::DudeMonthlyNiceness Am I doing something wrong? Is there a better way to deserialize data? (I can modify the backend easily) UPDATE: the original title was "How to deserialize from json to ActiveRecord objects with associations?" but it ended up being my mistake in specifying associations so I changed the title.

    Read the article

  • Interval arithmetic to correctly deal with end of month - Oracle SQL

    - by user2003974
    I need a function which will do interval arithmetic, dealing "correctly" with the different number of days in a month. For my version of "correctly" - see below! First try select to_date('31-May-2014') + interval '1' months from dual This returns an error, because there is no 31st June. I understand that this behaviour is expected due to the ANSI standard. Second try select add_months(to_date('31-May-2014'),1) from dual This correctly (in my use case) returns 30th June 2014, which is great. BUT select add_months(to_date('28-Feb-2014'),1) from dual returns 31st March 2014, when I want 28th March 2014. Background This has to do with legal deadlines. The deadlines are expressed in law as a number of months (say, 3) from a base date. If the base date is last day of the month and three months later the month is longer, then the deadline does NOT extend to the end of the longer month (as per the add_months function). However, if the base date is last day of the month and three months later the month is shorter, then the deadline expires on the last day of the shorter month. Question Is there a function that does what I need? I have intervals (year to month) stored in a table, so preferably the function would look like: add_interval_correctly(basedate DATE, intervaltoadd INTERVAL YEAR TO MONTH)

    Read the article

  • How to change time (Advanced Eastern Time) on Slackware 8.1

    - by r0ca
    Hi all, I have a linux (Slackware) machine and the time/date is like, June 23rd 2003, 10:00am (It's 11 here) and I am not able to set the time to have it correct. I change the timezome to Montreal but the time is still wrong. Is there a way to force it to sync with my domain controler or even another online NTP server? Thanks, David.

    Read the article

  • Router reporting failed admin login attempts from home server

    - by jeffora
    I recently noticed in the logs of my home router that it relatively regularly lists the following entry: [admin login failure] from source 192.168.0.160, Monday, June 20,2011 18:13:25 192.168.0.160 is the internal address of my home server, running Windows Home Server 2011. Is there anyway I can find out what specifically is trying to login to the router? Or is there some explanation for this behaviour? (not sure if this belongs here or on superuser...)

    Read the article

  • Run a specific Windows application with different regional settings?

    - by robertc
    We have an old VB6 application, written in the UK, which we want to run on a client's server in Canada. The application must have some hard-coded date formats in it somewhere, as it's misinterpreting dates, eg, 6th April is getting recorded as 4th June. I know I could change the user's date format, but this would affect all applications. Is it possible, perhaps with some sort of wrapper script, to set specific regional settings for this single application?

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

  • Stephen Forte visits IDEP Foundation Recipient of our post-tsunami .NET Charity Auction

    Earlier this week I got an email from Stephen Forte saying he was in Bali and would love to meet the folks from IDEP Foundation. IDEP is an Indonesian NGO for which Stephen and I coordinated a charity auction 5 years ago and raised $10,000. We raised another chunk of money in a repeat auction in June of that year as well. I sent an email to my dear friend Petra, a Canadian ex-pat, who runs IDEP. I met Petra through Keith Pleas who had connections to IDEP and was looking for help for them after...Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • The Deadline Cometh

    - by Oracle Staff
    Only Two More Days to Suggest a Session. We've received 2,906 votes for presentations since the launch of the Suggest a Session program. Have you voted? Have you suggested a presentation for Oracle OpenWorld 2010 or Oracle Develop 2010? If "yes," you've done well. If "no," you still have a chance to redeem yourself. Get all the information on the Suggest a Session process, timeline, and guidelines and submit your idea or vote. The last grain of sand runs out on June 20.

    Read the article

  • Deck from London UG 20110616 - Building a Reporting Brick capable of 1.2GBytes/sec and 80K IOs/sec for less than £2K

    - by tonyrogerson
    The Reporting Brick concept is not really anything new, it starts the walk toward bringing the work Jim Gray and Tom Barclay et al did on CyberBricks up-to-date in terms of current kit. A reporting brick is simply a box built from commodity kit utilising commodity SSD, namely the OCZ IBIS drives to gain extremely high levels of performance for a fraction of the cost required for typical server and san installs today. I'll write up over the next few months as I work further on the concept, for now the deck attached summarises some of the ideas around it, the deck was presented at last nights London SQL Server User Group, I will be presenting it again in Edinburgh on the 29th June and other locations later in the year. Deck: Commodity Kit.pptx  

    Read the article

  • OTN Developer Day: Oracle Database 11g Application Development

    - by stephen.garth
    When and Where: Tuesday June 15, 2010 from 8:00 am - 5:30 pm Hyatt Regency Reston, Reston VA This full-day FREE event offers a great learning and networking opportunity. With support from Oracle database application development experts, you'll get valuable hands-on experience developing database-backed apps with the latest Oracle tools and frameworks. Oh yeah, you get to use your own notebook and download some cool and very useful materials. Find out more and register here. var gaJsHost = (("https:" == document.location.protocol) ? "https://ssl." : "http://www."); document.write(unescape("%3Cscript src='" + gaJsHost + "google-analytics.com/ga.js' type='text/javascript'%3E%3C/script%3E")); try { var pageTracker = _gat._getTracker("UA-13185312-1"); pageTracker._trackPageview(); } catch(err) {}

    Read the article

  • GrapeCity &amp; ComponentOne Merger

    - by Jim Duffy
    Big news in the software component industry today… my good friends over at GrapeCity have unofficially announced (official announcement is tomorrow June 11, 2012) that they have acquired ComponentOne and will be merging the two companies. Yes, the people who bring you Spread.Net and ActiveReports have merged with one of the market’s leading developer component vendors and will continue to do business under the ComponentOne brand. I think this move will propel the company to new heights in the component market and I look forward to working with them as they continue being an industry leader. Congratulations guys! UPDATE: Additional information available here: http://our.componentone.com/2012/06/06/thenewcomponentone/. The new company will be called ComponentOne, a Division of GrapeCity.

    Read the article

  • ArcSig Meeting at 04/20/2010 with Sam Abraham

    - by Rainer
    Sam Abraham gave a great presentation, “MVC2 – Do it your way in VS 2010”, at our monthly ArcSig meeting on 04/20/2010 at Global Response. The interest in Sam’s talk was immense, we almost run out of seats. The audience got an in-depth view and walkthrough of the Model View Controller functionality in Visual Studio 2010 with detailed code examples. Sam answered many user questions about practical applications in MVC. Free soft drinks and pizza kept the participants energized during the whole presentation and a raffle of books and software completed this meeting, with a preview about the upcoming meetings and events in May and June. Thank you to Sam for the exciting presentation, and to the Shooster family for hosting us this month at Global Response! Posted: Rainer Habermann ArcSig Site Director CIO @ Global Response

    Read the article

< Previous Page | 26 27 28 29 30 31 32 33 34 35 36 37  | Next Page >