Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 352/1407 | < Previous Page | 348 349 350 351 352 353 354 355 356 357 358 359  | Next Page >

  • How to restore curropted installation?

    - by nightweels
    I have a laptop with dead battery that when there is no current connected to it turns critical so fast and in the energy management in ubuntu, when the battery is critical, there are 2 options: shutdown and hibernate witch is in grey (unclickable), so I have no choice but to chose immediate shutdown, there is no standby even if it is an option in the screen behavior. An immediate shutdown (and I mean by immediate the one that we use when we ended using the computer) happened while I was installing a program called quickly, so after the power was restored, I tried to reinstall the program then I get this translated message: An untreatable error occurred: It seems there is a software error in aptdaemon, the program that lets you install and remove software and any other task related to package management. details: Traceback (most recent call last): File "/usr/lib/python2.7/dist-packages/aptdaemon/worker.py", line 968, in simulate trans.unauthenticated = self._simulate_helper(trans) File "/usr/lib/python2.7/dist-packages/aptdaemon/worker.py", line 1092, in _simulate_helper return depends, self._cache.required_download, \ File "/usr/lib/python2.7/dist-packages/apt/cache.py", line 235, in required_download pm.get_archives(fetcher, self._list, self._records) SystemError: E:I wasn't able to locate a file for the libpng12-dev package. This might mean you need to manually fix this package.

    Read the article

  • Top 25 security issues for developers of web sites

    - by BizTalk Visionary
    Sourced from: CWE This is a brief listing of the Top 25 items, using the general ranking. NOTE: 16 other weaknesses were considered for inclusion in the Top 25, but their general scores were not high enough. They are listed in the On the Cusp focus profile. Rank Score ID Name [1] 346 CWE-79 Failure to Preserve Web Page Structure ('Cross-site Scripting') [2] 330 CWE-89 Improper Sanitization of Special Elements used in an SQL Command ('SQL Injection') [3] 273 CWE-120 Buffer Copy without Checking Size of Input ('Classic Buffer Overflow') [4] 261 CWE-352 Cross-Site Request Forgery (CSRF) [5] 219 CWE-285 Improper Access Control (Authorization) [6] 202 CWE-807 Reliance on Untrusted Inputs in a Security Decision [7] 197 CWE-22 Improper Limitation of a Pathname to a Restricted Directory ('Path Traversal') [8] 194 CWE-434 Unrestricted Upload of File with Dangerous Type [9] 188 CWE-78 Improper Sanitization of Special Elements used in an OS Command ('OS Command Injection') [10] 188 CWE-311 Missing Encryption of Sensitive Data [11] 176 CWE-798 Use of Hard-coded Credentials [12] 158 CWE-805 Buffer Access with Incorrect Length Value [13] 157 CWE-98 Improper Control of Filename for Include/Require Statement in PHP Program ('PHP File Inclusion') [14] 156 CWE-129 Improper Validation of Array Index [15] 155 CWE-754 Improper Check for Unusual or Exceptional Conditions [16] 154 CWE-209 Information Exposure Through an Error Message [17] 154 CWE-190 Integer Overflow or Wraparound [18] 153 CWE-131 Incorrect Calculation of Buffer Size [19] 147 CWE-306 Missing Authentication for Critical Function [20] 146 CWE-494 Download of Code Without Integrity Check [21] 145 CWE-732 Incorrect Permission Assignment for Critical Resource [22] 145 CWE-770 Allocation of Resources Without Limits or Throttling [23] 142 CWE-601 URL Redirection to Untrusted Site ('Open Redirect') [24] 141 CWE-327 Use of a Broken or Risky Cryptographic Algorithm [25] 138 CWE-362 Race Condition Cross-site scripting and SQL injection are the 1-2 punch of security weaknesses in 2010. Even when a software package doesn't primarily run on the web, there's a good chance that it has a web-based management interface or HTML-based output formats that allow cross-site scripting. For data-rich software applications, SQL injection is the means to steal the keys to the kingdom. The classic buffer overflow comes in third, while more complex buffer overflow variants are sprinkled in the rest of the Top 25.

    Read the article

  • Energy Firms Targetted for Sensitive Documents

    - by martin.abrahams
    Numerous multinational energy companies have been targeted by hackers who have been focusing on financial documents related to oil and gas field exploration, bidding contracts, and drilling rights, as well as proprietary industrial process documents, according to a new McAfee report. "It ... speaks to quite a sad state of our critical infrastructure security. These were not sophisticated attacks ... yet they were very successful in achieving their goals," said Dmitri Alperovitch, McAfee's vice president for threat research. Apparently, the attacks can be traced back over several years, creating a sustained security compromise that has provided access to highly sensitive information that is of huge financial value to competitors. The value of IRM as an additional layer of protection is clear. Whether your infrastructure security is in a sad state or is state of the art, breaches are always a possibility - and in any case, a lot of sensitive information is shared with third parties whose infrastructure security might not be as good as yours. IRM protects the individual information assets directly so that, even if infrastructure security is compromised, your critical information is enrypted and trackable and only accessible to authenticated, authorised, audited users. The full McAfee report is available here.

    Read the article

  • How can you Add Value to your Mobile Apps?

    - by Carlos Chang
    Author: Craig Mikus, Sr. Director, Enterprise Mobile Solutions Seems like every customer is either building or planning to build mobile apps, especially customer facing apps. Why? Inevitably, all companies want to improve the customer experience through more quality interactions that drive customer satisfaction, customer loyalty, new revenue streams, and even improve the way they service their customers. What better way than mobile apps? Right? But how can customers add more value to these mobile apps to drive more business benefit? Look closely, the answer just might be right in front of you. Still need another clue? What’s the first 4 letters of mobile – mo-bi? Or pronounced differently, More BI. That’s right – add more business intelligence to your overall mobile strategy. In today’s customer centric world where customer interactions and personalization are critical, it’s important to leverage a BI strategy that complements and feeds into your mobile strategy. For example, I was recently talking to a customer that was implementing a data warehouse project focused customer analytics. Their goal was to understand who are their best customers and why, develop customer profiles, identify customer trends & patterns, identify cross sell opportunities, and much more. The company then wanted to feed this information to marketing for targeted campaigns and programs. As we continued to talk, I asked my contact if they had plans to feed this information into their customer facing mobile apps to personalize the apps, target their interactions, and hopefully drive customer loyalty and new revenue streams? Two minutes later, my contact was calling his mobile development teams. So my advice to everyone, as you establish your enterprise mobile strategy and goals, remember that “mo-BI” is a critical component to add value to your mobile apps! So make sure you have “mo BI” in your mobile strategy. As I come to think of it, did you ever notice that Big Data also starts with BI?

    Read the article

  • Discovering Your Project

    - by Tim Murphy
    The discovery phase of any project is both exciting and critical to the project’s success.  There are several key points that you need to keep in mind as you navigate this process. The first thing you need to understand is who the players in the project are and what their motivations are for the project.  Leaving out a key stakeholder in the resulting product is one of the easiest ways to doom your project to fail.  The better the quality of the input you have at this early phase the better chance you will have of creating a well accepted deliverable. The next task you should tackle is to gather the goals for the project.  Specifically, what does the company expect to get for the money they are about to layout.  This seems like a common sense task, but you would be surprised how many teams to straight to building the system.  Even if you are following an agile methodology I believe that this is critical. Inventorying the resources that already exists gives you an idea what you are going to have to build and what you can leverage at lower risk.  This list should include documentation, servers, code repositories, databases, languages, security systems and supporting teams.  All of these are “resources” that can effect the cost and delivery schedule of your project. Finally, you need to verify what you have found and documented with the stakeholders and subject matter experts.  Documentation that has not been reviewed is actually a list of assumptions and we all know that assumptions are the mother of all screw ups. If you give the discovery phase of your project the attention that it deserves your project has a much better chance of success. I would love to hear what other people find important for this phase.  Please leave comments on this post so we can share the knowledge. del.icio.us Tags: Project discovery,documentation,business analysis,architecture

    Read the article

  • Cannot get temperatures in Dell Studio 1558

    - by Athul Iddya
    I could never get proper temperatures on my Dell Studio 1558. lm-sensors and acpi give wrong readings. The output of sensors is, $ sensors acpitz-virtual-0 Adapter: Virtual device temp1: +26.8°C (crit = +100.0°C) temp2: +0.0°C (crit = +100.0°C) acpi -V gives me, $ acpi -V Battery 0: Full, 100% Battery 0: design capacity 414 mAh, last full capacity 369 mAh = 89% Adapter 0: on-line Thermal 0: ok, 0.0 degrees C Thermal 0: trip point 0 switches to mode critical at temperature 100.0 degrees C Thermal 0: trip point 1 switches to mode passive at temperature 95.0 degrees C Thermal 0: trip point 2 switches to mode active at temperature 71.0 degrees C Thermal 0: trip point 3 switches to mode active at temperature 55.0 degrees C Thermal 1: ok, 26.8 degrees C Thermal 1: trip point 0 switches to mode critical at temperature 100.0 degrees C Thermal 1: trip point 1 switches to mode active at temperature 71.0 degrees C Thermal 1: trip point 2 switches to mode active at temperature 55.0 degrees C Cooling 0: LCD 0 of 15 Cooling 1: Processor 0 of 10 Cooling 2: Processor 0 of 10 Cooling 3: Processor 0 of 10 Cooling 4: Processor 0 of 10 Cooling 5: Fan 0 of 1 Cooling 6: Fan 0 of 1 I suspect even hddtemp gives bogus readings as its always at 46 $ sudo hddtemp /dev/sda /dev/sda: ST9500420AS: 46°C I have gone through some bug reports and some used to have the same problem after resuming from suspend. But I always have this problem. I had updated to the latest BIOS from Windows a couple of weeks ago, will updating from Ubuntu change anything? CORRECTION: hddtemp's readings do change. Its now at 45.

    Read the article

  • IDC Recommends Oracle Solaris 11

    - by user12611852
    IDC published a research report this week on Oracle Solaris 11 and described it as "Delivering unique value."  The report emphasizes the ability of Oracle Solaris to scale up and provide a mission critical platform for a wide variety of computing. Solaris built-in server and network virtualization helps to lower costs and enable consolidation while reducing administration costs and risks. Learn more about Oracle Solaris and the recently announced 11.1 update. In their conclusion, IDC reports: Today, Oracle is a multi-OS vendor that is adjusting to the opportunities presented by a significantly expanded product portfolio. The company has a long history of supporting Unix operating systems with its broad product portfolio, but the main difference is that now Oracle has direct control over the destiny of the Solaris operating system. The company has made a strong commitment to Solaris on both SPARC and x86 systems, as well as to Linux on x86 systems, and expects to continue to enhance Oracle Solaris 11 with update releases once a year as well as Solaris 12, which is already on the road map. Oracle is working to help its customers understand its strong commitment to Oracle Solaris and the product's role as a single operating system that runs on both SPARC and x86 processors. While Oracle Solaris and Oracle Linux are critical assets, the company's crown jewel is the deep collection of software that runs on top of both Oracle Solaris and Oracle Linux, software that creates a robust application environment. The continuing integration and optimization of the software and hardware stack is a differentiator for Oracle and for customers that run an Oracle Solaris stack.

    Read the article

  • Microsoft Lifecam VX-2000 doesn't work anymore in Cheese

    - by paed808
    I got have two Lifecam VX-2000's and they don't work in cheese anymore. I don't know if it's a problem with a missing package, or a package I installed. Here is the output. (cheese:11122): Clutter-WARNING **: No listener with the specified listener id 29 (cheese:11122): Clutter-WARNING **: No listener with the specified listener id 30 (cheese:11122): Clutter-WARNING **: No listener with the specified listener id 31 (cheese:11122): Clutter-WARNING **: No listener with the specified listener id 32 (cheese:11122): GLib-CRITICAL **: g_hash_table_remove_internal: assertion `hash_table != NULL' failed (cheese:11122): Clutter-WARNING **: Not able to remove listener with id 1 (cheese:11122): GLib-CRITICAL **: g_hash_table_size: assertion `hash_table != NULL' failed totem-video-thumbnailer: 'file:///home/myusername/Videos/Webcam/2012-09-20- 191530.webm' isn't thumbnailable Reason: Media contains no supported video streams. ** (cheese:11122): WARNING **: could not generate thumbnail for /home/myusername/Videos/Webcam/2012-09-20-191530.webm (video/webm) Notice the: Reason: Media contains no supported video streams. When I try to record a video it just makes a 13.2KB WEBM file with nothing. When I take a picture it works. Edit: I've been thinking that the problem started after installing the MediUbuntu repository on my system.

    Read the article

  • Customer Highlight: NTT DOCOMO

    - by jeckels
    NTT DOCOMO is the largest mobile operator in Japan, and serves over 13 million smartphone customers. Due to their growing data processing and scalability needs, they turned to Oracle's Cloud Application Foundation products for an integral soultion. At Oracle OpenWorld 2012, we first showcased NTT DOCOMO as a customer who was utilizing Oracle Coherence to process mobile data at a rate of 700,000 events per second (and then using Hadoop for distributed processing of big data). Overall, this Led to a 50% cost reduction due to the ultra-high velocity traffic processing of their customers' events. Recently, on October 7th, 2013, Oracle and NTT DOCOMO were proud to again announce a partnership around another key component of Oracle CAF: WebLogic Server. WebLogic was recently deployed as the application platform of choice to run DOCOMO's mission-critical data system ALADIN, which connects nationwide shops and information centers. ALADIN, which also utilizes Oracle Database and Oracle Tuxedo, is based on Java Platform, Enterprise Edition (Java EE), which has allowed the company to operate smoothly while minimizing additional development and modification associated with the migration of application server products. We look forward to continuing to partner with NTT DOCOMO, and are proud that Oracle Cloud Application Foundation products are providing the mission-critical solutions - at scale - that DOCOMO requires. Want to learn more about how CAF products are working in the real world? Join us for a FREE Virtual Developer Day on November 5th from 9am-1pm Pacific Time!REGISTER NOW

    Read the article

  • Configuration Error ASP.NET password format specified is invalid

    - by salvationishere
    I am getting the above error in IIS 6.0 now when I browse my C# / SQL web application. This was built in VS 2008 and SS 2008 on a 32-bit XP OS. The application was working before I added Login controls to it. However, this is my first time configuring Login/password controls so I am probably missing something really basic. This error doesn't happen until I try to login. Here are the details of my error from IIS; I get the same error in VS: Parser Error Message: Password format specified is invalid. Source Error: Line 31: <add Line 32: name="SqlProvider" Line 33: type="System.Web.Security.SqlMembershipProvider" Line 34: connectionStringName="AdventureWorksConnectionString2" Line 35: applicationName="AddFileToSQL2" Source File: C:\Inetpub\AddFileToSQL2\web.config Line: 33 And the relevant contents of my web.config are: <connectionStrings> <add name="Master" connectionString="server=MSSQLSERVER;database=Master; Integrated Security=SSPI" providerName="System.Data.SqlClient" /> <add name="AdventureWorksConnectionString" connectionString="Data Source=SIDEKICK;Initial Catalog=AdventureWorks;Integrated Security=True" providerName="System.Data.SqlClient" /> <add name="AdventureWorksConnectionString2" connectionString="Data Source=SIDEKICK;Initial Catalog=AdventureWorks;Integrated Security=True; " providerName="System.Data.SqlClient" /> </connectionStrings> <system.web> <membership defaultProvider="SqlProvider" userIsOnlineTimeWindow="15"> <providers> <clear /> <add name="SqlProvider" type="System.Web.Security.SqlMembershipProvider" connectionStringName="AdventureWorksConnectionString2" applicationName="AddFileToSQL2" enablePasswordRetrieval="false" enablePasswordReset="true" requiresQuestionAndAnswer="true" requiresUniqueEmail="false" passwordFormat="encrypted" /> </providers> </membership> <!-- Set compilation debug="true" to insert debugging symbols into the compiled page. Because this affects performance, set this value to true only during development. --> <roleManager enabled="true" /> <compilation debug="true"> <assemblies> <add assembly="System.Core, Version=3.5.0.0, Culture=neutral, PublicKeyToken=B77A5C561934E089"/> <add assembly="System.Data.DataSetExtensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=B77A5C561934E089"/> <add assembly="System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add assembly="System.Xml.Linq, Version=3.5.0.0, Culture=neutral, PublicKeyToken=B77A5C561934E089"/> </assemblies> </compilation> <!-- The <authentication> section enables configuration of the security authentication mode used by ASP.NET to identify an incoming user. --> <authentication mode="Forms"> <forms loginUrl="Password.aspx" protection="All" timeout="30" name="SqlAuthCookie" path="/FormsAuth" requireSSL="false" slidingExpiration="true" defaultUrl="default.aspx" cookieless="UseCookies" enableCrossAppRedirects="false" /> </authentication> <!--Authorization permits only authenticated users to access the application --> <authorization> <deny users="?" /> <allow users="*" /> </authorization> <!-- The <customErrors> section enables configuration of what to do if/when an unhandled error occurs during the execution of a request. Specifically, it enables developers to configure html error pages to be displayed in place of a error stack trace. <customErrors mode="RemoteOnly" defaultRedirect="GenericErrorPage.htm"> <error statusCode="403" redirect="NoAccess.htm" /> <error statusCode="404" redirect="FileNotFound.htm" /> </customErrors> --> <pages> <controls> <add tagPrefix="asp" namespace="System.Web.UI" assembly="System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add tagPrefix="asp" namespace="System.Web.UI.WebControls" assembly="System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </controls> </pages> <httpHandlers> <remove verb="*" path="*.asmx"/> <add verb="*" path="*.asmx" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add verb="*" path="*_AppService.axd" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add verb="GET,HEAD" path="ScriptResource.axd" type="System.Web.Handlers.ScriptResourceHandler, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" validate="false"/> </httpHandlers> <httpModules> <add name="ScriptModule" type="System.Web.Handlers.ScriptModule, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </httpModules> </system.web> <system.codedom> <compilers> <compiler language="c#;cs;csharp" extension=".cs" warningLevel="4" type="Microsoft.CSharp.CSharpCodeProvider, System, Version=2.0.0.0, Culture=neutral, PublicKeyToken=b77a5c561934e089"> <providerOption name="CompilerVersion" value="v3.5"/> <providerOption name="WarnAsError" value="false"/> </compiler> </compilers> </system.codedom> <!-- The system.webServer section is required for running ASP.NET AJAX under Internet Information Services 7.0. It is not necessary for previous version of IIS. --> <system.webServer> <validation validateIntegratedModeConfiguration="false"/> <modules> <remove name="ScriptModule"/> <add name="ScriptModule" preCondition="managedHandler" type="System.Web.Handlers.ScriptModule, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </modules> <handlers> <remove name="WebServiceHandlerFactory-Integrated"/> <remove name="ScriptHandlerFactory"/> <remove name="ScriptHandlerFactoryAppServices"/> <remove name="ScriptResource"/> <add name="ScriptHandlerFactory" verb="*" path="*.asmx" preCondition="integratedMode" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add name="ScriptHandlerFactoryAppServices" verb="*" path="*_AppService.axd" preCondition="integratedMode" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add name="ScriptResource" preCondition="integratedMode" verb="GET,HEAD" path="ScriptResource.axd" type="System.Web.Handlers.ScriptResourceHandler, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </handlers> </system.webServer> <runtime> <assemblyBinding xmlns="urn:schemas-microsoft-com:asm.v1"> <dependentAssembly> <assemblyIdentity name="System.Web.Extensions" publicKeyToken="31bf3856ad364e35"/> <bindingRedirect oldVersion="1.0.0.0-1.1.0.0" newVersion="3.5.0.0"/> </dependentAssembly> <dependentAssembly> <assemblyIdentity name="System.Web.Extensions.Design" publicKeyToken="31bf3856ad364e35"/> <bindingRedirect oldVersion="1.0.0.0-1.1.0.0" newVersion="3.5.0.0"/> </dependentAssembly> </assemblyBinding> </runtime> <system.net> <mailSettings> <smtp from="[email protected]"> <network host="SIDEKICK" password="" userName="" /> </smtp> </mailSettings> </system.net> </configuration> I checked and I do have an aspnetdb database in my SSMS. The Network Service account has SELECT, EXECUTE, INSERT, UPDATE access to this database. But one problem I see is that all of the tables in this database are empty except for aspnet_SchemaVersions, which just has 2 records (common and membership). Is this right? I added users and roles via ASP.NET Configuration wizard, and I believe I set this up correctly since I followed the Microsoft tutorial at http://msdn.microsoft.com/en-us/library/ms998347.aspx. One other problem I see from VS is after adding content to my Page_Load on my initial login Password.aspx.cs file, I'm getting an invalid cast problem below. I googled this problem also but the solutions I saw confused me even more. The Page_Load section I added is: protected void Page_Load(object sender, EventArgs e) { Response.Write("Hello, " + Server.HtmlEncode(User.Identity.Name)); FormsIdentity id = (FormsIdentity)User.Identity; FormsAuthenticationTicket ticket = id.Ticket; Response.Write("<p/>TicketName: " + ticket.Name); Response.Write("<br/>Cookie Path: " + ticket.CookiePath); Response.Write("<br/>Ticket Expiration: " + ticket.Expiration.ToString()); Response.Write("<br/>Expired: " + ticket.Expired.ToString()); Response.Write("<br/>Persistent: " + ticket.IsPersistent.ToString()); Response.Write("<br/>IssueDate: " + ticket.IssueDate.ToString()); Response.Write("<br/>UserData: " + ticket.UserData); Response.Write("<br/>Version: " + ticket.Version.ToString()); } And the VS exception I'm getting: System.InvalidCastException was unhandled by user code Message="Unable to cast object of type 'System.Security.Principal.GenericIdentity' to type 'System.Web.Security.FormsIdentity'." Source="AddFileToSQL" StackTrace: at AddFileToSQL.Password.Page_Load(Object sender, EventArgs e) in C:\Documents and Settings\Admin\My Documents\Visual Studio 2008\Projects\AddFileToSQL2\AddFileToSQL\Password.aspx.cs:line 22 at System.Web.Util.CalliHelper.EventArgFunctionCaller(IntPtr fp, Object o, Object t, EventArgs e) at System.Web.Util.CalliEventHandlerDelegateProxy.Callback(Object sender, EventArgs e) at System.Web.UI.Control.OnLoad(EventArgs e) at System.Web.UI.Control.LoadRecursive() at System.Web.UI.Page.ProcessRequestMain(Boolean includeStagesBeforeAsyncPoint, Boolean includeStagesAfterAsyncPoint) InnerException:

    Read the article

  • Component returned failure code: 0x80600011 [nsIXSLTProcessorObsolete.transformDocument]

    - by Sean Ochoa
    So, I'm using the XSLT plugin for JQuery, and here's my code: function AddPlotcardEventHandlers(){ // some code } function reportError(exception){ alert(exception.constructor.name + " Exception: " + ((exception.name) ? exception.name : "[unknown name]") + " - " + exception.message); } function GetPlotcards(){ $("#content").xslt("../xml/plotcards.xml","../xslt/plotcards.xsl", AddPlotcardEventHandlers,reportError); } Here's the modified jquery plugin. I say that its modified because I've added callbacks for success and error handling. /* * jquery.xslt.js * * Copyright (c) 2005-2008 Johann Burkard (<mailto:[email protected]>) * <http://eaio.com> * * Permission is hereby granted, free of charge, to any person obtaining a * copy of this software and associated documentation files (the "Software"), * to deal in the Software without restriction, including without limitation * the rights to use, copy, modify, merge, publish, distribute, sublicense, * and/or sell copies of the Software, and to permit persons to whom the * Software is furnished to do so, subject to the following conditions: * * The above copyright notice and this permission notice shall be included * in all copies or substantial portions of the Software. * * THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS * OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF * MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN * NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, * DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR * OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE * USE OR OTHER DEALINGS IN THE SOFTWARE. * */ /** * jQuery client-side XSLT plugins. * * @author <a href="mailto:[email protected]">Johann Burkard</a> * @version $Id: jquery.xslt.js,v 1.10 2008/08/29 21:34:24 Johann Exp $ */ (function($) { $.fn.xslt = function() { return this; } var str = /^\s*</; if (document.recalc) { // IE 5+ $.fn.xslt = function(xml, xslt, onSuccess, onError) { try{ var target = $(this); var change = function() { try{ var c = 'complete'; if (xm.readyState == c && xs.readyState == c) { window.setTimeout(function() { target.html(xm.transformNode(xs.XMLDocument)); if (onSuccess) onSuccess(); }, 50); } }catch(exception){ if (onError) onError(exception); } }; var xm = document.createElement('xml'); xm.onreadystatechange = change; xm[str.test(xml) ? "innerHTML" : "src"] = xml; var xs = document.createElement('xml'); xs.onreadystatechange = change; xs[str.test(xslt) ? "innerHTML" : "src"] = xslt; $('body').append(xm).append(xs); return this; }catch(exception){ if (onError) onError(exception); } }; } else if (window.DOMParser != undefined && window.XMLHttpRequest != undefined && window.XSLTProcessor != undefined) { // Mozilla 0.9.4+, Opera 9+ var processor = new XSLTProcessor(); var support = false; if ($.isFunction(processor.transformDocument)) { support = window.XMLSerializer != undefined; } else { support = true; } if (support) { $.fn.xslt = function(xml, xslt, onSuccess, onError) { try{ var target = $(this); var transformed = false; var xm = { readyState: 4 }; var xs = { readyState: 4 }; var change = function() { try{ if (xm.readyState == 4 && xs.readyState == 4 && !transformed) { var processor = new XSLTProcessor(); if ($.isFunction(processor.transformDocument)) { // obsolete Mozilla interface resultDoc = document.implementation.createDocument("", "", null); processor.transformDocument(xm.responseXML, xs.responseXML, resultDoc, null); target.html(new XMLSerializer().serializeToString(resultDoc)); } else { processor.importStylesheet(xs.responseXML); resultDoc = processor.transformToFragment(xm.responseXML, document); target.empty().append(resultDoc); } transformed = true; if (onSuccess) onSuccess(); } }catch(exception){ if (onError) onError(exception); } }; if (str.test(xml)) { xm.responseXML = new DOMParser().parseFromString(xml, "text/xml"); } else { xm = $.ajax({ dataType: "xml", url: xml}); xm.onreadystatechange = change; } if (str.test(xslt)) { xs.responseXML = new DOMParser().parseFromString(xslt, "text/xml"); change(); } else { xs = $.ajax({ dataType: "xml", url: xslt}); xs.onreadystatechange = change; } }catch(exception){ if (onError) onError(exception); }finally{ return this; } }; } } })(jQuery); And, here's my error msg: Object Exception: [unknown name] - Component returned failure code: 0x80600011 [nsIXSLTProcessorObsolete.transformDocument] Here's the info on the browser that I'm using for testing (with firebug v1.5.4 add-on installed): Mozilla/5.0 (Windows; U; Windows NT 6.1; en-US; rv:1.9.2.3) Gecko/20100401 Firefox/3.6.3 Here's my XML: <?xml version="1.0" encoding="ISO-8859-1"?> <plotcardCollection sortby="order"> <plotcard order="2" id="1378"> <name><![CDATA[[placeholder for name of plotcard 1378]]]></name> <content><![CDATA[[placeholder for content of plotcard 1378]]]></content> <tagCollection> <tag id="3"><![CDATA[[placeholder for tag with id=3]]]></tag> <tag id="7"><![CDATA[[placeholder for tag with id=7]]]></tag> </tagCollection> </plotcard> <plotcard order="1" id="2156"> <name><![CDATA[[placeholder for name of plotcard 2156]]]></name> <content><![CDATA[[placeholder for content of plotcard 2156]]]></content> <tagCollection> <tag id="2"><![CDATA[[placeholder for tag with id=2]]]></tag> <tag id="9"><![CDATA[[placeholder for tag with id=9]]]></tag> </tagCollection> </plotcard> </plotcardCollection> Here's my XSLT: <?xml version="1.0" encoding="UTF-8"?> <xsl:stylesheet version="1.0" xmlns:xsl="http://www.w3.org/1999/XSL/Transform"> <xsl:template match="/plotcardCollection"> <xsl:variable name="sortby" select="@sortby" /> <xsl:for-each select="plotcard"> <xsl:sort select="$sortby" data-type="number" order="ascending"/> <div> <!-- Start Plotcard --> <xsl:attribute name="class">Plotcard</xsl:attribute> <xsl:for-each select="@"> <xsl:value-of select="name()"/> <xsl:text>='</xsl:text> <xsl:if test="name() = 'id'"> <xsl:text>Plotcard-</xsl:text> </xsl:if> <xsl:value-of select="." /> <xsl:text>'</xsl:text> </xsl:for-each> <!-- Start Plotcard Name Section --> <div> <xsl:attribute name="class"> <xsl:text disable-output-escaping="yes">PlotcardName</xsl:text> </xsl:attribute> <xsl:value-of select="name/text()"/> </div> <!-- Start Plotcard Content Section --> <div> <xsl:attribute name="class"> <xsl:text disable-output-escaping="yes">PlotcardContent</xsl:text> </xsl:attribute> <xsl:value-of select="content/text()"/> </div> </div> </xsl:for-each> </xsl:template> </xsl:stylesheet> I'm really not sure what to do about this.... any thoughts?

    Read the article

  • JNI 'problmatic frame' causes JVM to crash

    - by HJED
    Hi I'm using JNI to access the exiv2 library (written in C++) in Java and I'm getting a weird runtime error in the JNI code. I've tried using various -Xms and -Xmx options, but that seems to have no affect. I've also tried running this code on JDK1.7.0 with the same result. # A fatal error has been detected by the Java Runtime Environment: # # SIGSEGV (0xb) at pc=0x00007ff31807757f, pid=4041, tid=140682078746368 # # JRE version: 6.0_20-b20 # Java VM: OpenJDK 64-Bit Server VM (19.0-b09 mixed mode linux-amd64 ) # Derivative: IcedTea6 1.9.2 # Distribution: Ubuntu 10.10, package 6b20-1.9.2-0ubuntu2 # Problematic frame: # V [libjvm.so+0x42757f] # # If you would like to submit a bug report, please include # instructions how to reproduce the bug and visit: # https://bugs.launchpad.net/ubuntu/+source/openjdk-6/ # --------------- T H R E A D --------------- Current thread (0x000000000190d000): JavaThread "main" [_thread_in_Java, id=4043, stack(0x00007ff319447000,0x00007ff319548000)] siginfo:si_signo=SIGSEGV: si_errno=0, si_code=1 (SEGV_MAPERR), si_addr=0x0000000000000024 Registers: ... Register to memory mapping: RAX=0x0000000000000002 0x0000000000000002 is pointing to unknown location RBX=0x000000000190db90 0x000000000190db90 is pointing to unknown location RCX=0x0000000000000000 0x0000000000000000 is pointing to unknown location RDX=0x00007ff3195463f8 0x00007ff3195463f8 is pointing into the stack for thread: 0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE RSP=0x00007ff319546270 0x00007ff319546270 is pointing into the stack for thread: 0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE RBP=0x00007ff319546270 0x00007ff319546270 is pointing into the stack for thread: 0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE RSI=0x0000000000000024 0x0000000000000024 is pointing to unknown location RDI=0x00007ff3195463e0 0x00007ff3195463e0 is pointing into the stack for thread: 0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE R8 =0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE R9 =0x000000000190db88 0x000000000190db88 is pointing to unknown location R10=0x00007ff319546300 0x00007ff319546300 is pointing into the stack for thread: 0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE R11=0x0000000000000002 0x0000000000000002 is pointing to unknown location R12=0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE R13=0x00007ff319546560 0x00007ff319546560 is pointing into the stack for thread: 0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE R14=0x00007ff3195463e0 0x00007ff3195463e0 is pointing into the stack for thread: 0x000000000190d000 "main" prio=10 tid=0x000000000190d000 nid=0xfcb runnable [0x0000000000000000] java.lang.Thread.State: RUNNABLE R15=0x0000000000000003 0x0000000000000003 is pointing to unknown location Top of Stack: (sp=0x00007ff319546270) ... Instructions: (pc=0x00007ff31807757f) 0x00007ff31807756f: e2 03 48 03 57 58 31 c9 48 8b 32 48 85 f6 74 03 0x00007ff31807757f: 48 8b 0e 48 89 0a 8b 77 68 83 c0 01 39 f0 7c d1 Stack: [0x00007ff319447000,0x00007ff319548000], sp=0x00007ff319546270, free space=1020k Native frames: (J=compiled Java code, j=interpreted, Vv=VM code, C=native code) V [libjvm.so+0x42757f] V [libjvm.so+0x42866b] V [libjvm.so+0x4275c8] V [libjvm.so+0x4331bd] V [libjvm.so+0x44e5c7] C [libExiff2-binding.so+0x1f16] _ZN7JNIEnv_15CallVoidMethodAEP8_jobjectP10_jmethodIDPK6jvalue+0x40 C [libExiff2-binding.so+0x1b96] _Z8loadIPTCSt8auto_ptrIN5Exiv25ImageEEPKcP7JNIEnv_P8_jobject+0x2ba C [libExiff2-binding.so+0x1d3f] _Z7getVarsPKcP7JNIEnv_P8_jobject+0x176 C [libExiff2-binding.so+0x1de7] Java_photo_exiv2_Exiv2MetaDataStore_impl_1loadFromExiv+0x4b j photo.exiv2.Exiv2MetaDataStore.impl_loadFromExiv(Ljava/lang/String;Lphoto/exiv2/Exiv2MetaDataStore;)V+0 j photo.exiv2.Exiv2MetaDataStore.loadFromExiv2()V+9 j photo.exiv2.Exiv2MetaDataStore.loadData()V+1 j photo.exiv2.Exiv2MetaDataStore.<init>(Lphoto/ImageFile;)V+10 j test.Main.main([Ljava/lang/String;)V+76 v ~StubRoutines::call_stub V [libjvm.so+0x428698] V [libjvm.so+0x4275c8] V [libjvm.so+0x432943] V [libjvm.so+0x447f91] C [java+0x3495] JavaMain+0xd75 --------------- P R O C E S S --------------- Java Threads: ( => current thread ) 0x00007ff2c4027800 JavaThread "Low Memory Detector" daemon [_thread_blocked, id=4060, stack(0x00007ff2c9052000,0x00007ff2c9153000)] 0x00007ff2c4025000 JavaThread "CompilerThread1" daemon [_thread_blocked, id=4059, stack(0x00007ff2c9153000,0x00007ff2c9254000)] 0x00007ff2c4022000 JavaThread "CompilerThread0" daemon [_thread_blocked, id=4058, stack(0x00007ff2c9254000,0x00007ff2c9355000)] 0x00007ff2c401f800 JavaThread "Signal Dispatcher" daemon [_thread_blocked, id=4057, stack(0x00007ff2c9355000,0x00007ff2c9456000)] 0x00007ff2c4001000 JavaThread "Finalizer" daemon [_thread_blocked, id=4056, stack(0x00007ff2c994d000,0x00007ff2c9a4e000)] 0x0000000001984000 JavaThread "Reference Handler" daemon [_thread_blocked, id=4055, stack(0x00007ff2c9a4e000,0x00007ff2c9b4f000)] =>0x000000000190d000 JavaThread "main" [_thread_in_Java, id=4043, stack(0x00007ff319447000,0x00007ff319548000)] Other Threads: 0x000000000197d800 VMThread [stack: 0x00007ff2c9b4f000,0x00007ff2c9c50000] [id=4054] 0x00007ff2c4032000 WatcherThread [stack: 0x00007ff2c8f51000,0x00007ff2c9052000] [id=4061] VM state:not at safepoint (normal execution) VM Mutex/Monitor currently owned by a thread: None Heap PSYoungGen total 18432K, used 316K [0x00007ff2fed30000, 0x00007ff3001c0000, 0x00007ff313730000) eden space 15808K, 2% used [0x00007ff2fed30000,0x00007ff2fed7f0b8,0x00007ff2ffca0000) from space 2624K, 0% used [0x00007ff2fff30000,0x00007ff2fff30000,0x00007ff3001c0000) to space 2624K, 0% used [0x00007ff2ffca0000,0x00007ff2ffca0000,0x00007ff2fff30000) PSOldGen total 42240K, used 0K [0x00007ff2d5930000, 0x00007ff2d8270000, 0x00007ff2fed30000) object space 42240K, 0% used [0x00007ff2d5930000,0x00007ff2d5930000,0x00007ff2d8270000) PSPermGen total 21248K, used 2827K [0x00007ff2cb330000, 0x00007ff2cc7f0000, 0x00007ff2d5930000) object space 21248K, 13% used [0x00007ff2cb330000,0x00007ff2cb5f2f60,0x00007ff2cc7f0000) Dynamic libraries: 00400000-00409000 r-xp 00000000 08:03 141899 /usr/lib/jvm/java-6-openjdk/jre/bin/java 00608000-00609000 r--p 00008000 08:03 141899 /usr/lib/jvm/java-6-openjdk/jre/bin/java 00609000-0060a000 rw-p 00009000 08:03 141899 /usr/lib/jvm/java-6-openjdk/jre/bin/java 01904000-019ad000 rw-p 00000000 00:00 0 [heap] ... 7ff2c820c000-7ff2c8232000 r-xp 00000000 08:03 917704 /lib/libexpat.so.1.5.2 7ff2c8232000-7ff2c8432000 ---p 00026000 08:03 917704 /lib/libexpat.so.1.5.2 7ff2c8432000-7ff2c8434000 r--p 00026000 08:03 917704 /lib/libexpat.so.1.5.2 7ff2c8434000-7ff2c8435000 rw-p 00028000 08:03 917704 /lib/libexpat.so.1.5.2 7ff2c8435000-7ff2c844a000 r-xp 00000000 08:03 917708 /lib/libgcc_s.so.1 7ff2c844a000-7ff2c8649000 ---p 00015000 08:03 917708 /lib/libgcc_s.so.1 7ff2c8649000-7ff2c864a000 r--p 00014000 08:03 917708 /lib/libgcc_s.so.1 7ff2c864a000-7ff2c864b000 rw-p 00015000 08:03 917708 /lib/libgcc_s.so.1 7ff2c864b000-7ff2c8733000 r-xp 00000000 08:03 134995 /usr/lib/libstdc++.so.6.0.14 7ff2c8733000-7ff2c8932000 ---p 000e8000 08:03 134995 /usr/lib/libstdc++.so.6.0.14 7ff2c8932000-7ff2c893a000 r--p 000e7000 08:03 134995 /usr/lib/libstdc++.so.6.0.14 7ff2c893a000-7ff2c893c000 rw-p 000ef000 08:03 134995 /usr/lib/libstdc++.so.6.0.14 7ff2c893c000-7ff2c8951000 rw-p 00000000 00:00 0 7ff2c8951000-7ff2c8af3000 r-xp 00000000 08:03 134599 /usr/lib/libexiv2.so.6.0.0 7ff2c8af3000-7ff2c8cf2000 ---p 001a2000 08:03 134599 /usr/lib/libexiv2.so.6.0.0 7ff2c8cf2000-7ff2c8d0f000 r--p 001a1000 08:03 134599 /usr/lib/libexiv2.so.6.0.0 7ff2c8d0f000-7ff2c8d10000 rw-p 001be000 08:03 134599 /usr/lib/libexiv2.so.6.0.0 7ff2c8d10000-7ff2c8d23000 rw-p 00000000 00:00 0 7ff2c8d42000-7ff2c8d45000 r-xp 00000000 08:03 800718 /home/hjed/libExiff2-binding.so 7ff2c8d45000-7ff2c8f44000 ---p 00003000 08:03 800718 /home/hjed/libExiff2-binding.so 7ff2c8f44000-7ff2c8f45000 r--p 00002000 08:03 800718 /home/hjed/libExiff2-binding.so 7ff2c8f45000-7ff2c8f46000 rw-p 00003000 08:03 800718 /home/hjed/libExiff2-binding.so 7ff2c8f46000-7ff2c8f49000 r--s 0000f000 08:03 141333 /usr/lib/jvm/java-6-openjdk/jre/lib/ext/pulse-java.jar 7ff2c8f49000-7ff2c8f51000 r--s 00066000 08:03 408472 /usr/share/java/gnome-java-bridge.jar ... 7ff2ca559000-7ff2ca55b000 r--s 0001d000 08:03 141354 /usr/lib/jvm/java-6-openjdk/jre/lib/plugin.jar 7ff2ca55b000-7ff2ca560000 r--s 00044000 08:03 141353 /usr/lib/jvm/java-6-openjdk/jre/lib/netx.jar 7ff2ca560000-7ff2ca592000 rw-p 00000000 00:00 0 7ff2ca592000-7ff2ca720000 r--s 038af000 08:03 141833 /usr/lib/jvm/java-6-openjdk/jre/lib/rt.jar ... 7ff31673b000-7ff316742000 r-xp 00000000 08:03 141867 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libzip.so 7ff316742000-7ff316941000 ---p 00007000 08:03 141867 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libzip.so 7ff316941000-7ff316942000 r--p 00006000 08:03 141867 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libzip.so 7ff316942000-7ff316943000 rw-p 00007000 08:03 141867 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libzip.so 7ff316943000-7ff31694f000 r-xp 00000000 08:03 921396 /lib/libnss_files-2.12.1.so 7ff31694f000-7ff316b4e000 ---p 0000c000 08:03 921396 /lib/libnss_files-2.12.1.so 7ff316b4e000-7ff316b4f000 r--p 0000b000 08:03 921396 /lib/libnss_files-2.12.1.so 7ff316b4f000-7ff316b50000 rw-p 0000c000 08:03 921396 /lib/libnss_files-2.12.1.so 7ff316b50000-7ff316b5a000 r-xp 00000000 08:03 921398 /lib/libnss_nis-2.12.1.so 7ff316b5a000-7ff316d59000 ---p 0000a000 08:03 921398 /lib/libnss_nis-2.12.1.so 7ff316d59000-7ff316d5a000 r--p 00009000 08:03 921398 /lib/libnss_nis-2.12.1.so 7ff316d5a000-7ff316d5b000 rw-p 0000a000 08:03 921398 /lib/libnss_nis-2.12.1.so 7ff316d5b000-7ff316d63000 r-xp 00000000 08:03 921393 /lib/libnss_compat-2.12.1.so 7ff316d63000-7ff316f62000 ---p 00008000 08:03 921393 /lib/libnss_compat-2.12.1.so 7ff316f62000-7ff316f63000 r--p 00007000 08:03 921393 /lib/libnss_compat-2.12.1.so 7ff316f63000-7ff316f64000 rw-p 00008000 08:03 921393 /lib/libnss_compat-2.12.1.so 7ff316f64000-7ff316f6c000 r-xp 00000000 08:03 141869 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/native_threads/libhpi.so 7ff316f6c000-7ff31716b000 ---p 00008000 08:03 141869 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/native_threads/libhpi.so 7ff31716b000-7ff31716c000 r--p 00007000 08:03 141869 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/native_threads/libhpi.so 7ff31716c000-7ff31716d000 rw-p 00008000 08:03 141869 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/native_threads/libhpi.so 7ff31716d000-7ff317184000 r-xp 00000000 08:03 921392 /lib/libnsl-2.12.1.so 7ff317184000-7ff317383000 ---p 00017000 08:03 921392 /lib/libnsl-2.12.1.so 7ff317383000-7ff317384000 r--p 00016000 08:03 921392 /lib/libnsl-2.12.1.so 7ff317384000-7ff317385000 rw-p 00017000 08:03 921392 /lib/libnsl-2.12.1.so 7ff317385000-7ff317387000 rw-p 00000000 00:00 0 7ff317387000-7ff3173b2000 r-xp 00000000 08:03 141850 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libjava.so 7ff3173b2000-7ff3175b1000 ---p 0002b000 08:03 141850 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libjava.so 7ff3175b1000-7ff3175b2000 r--p 0002a000 08:03 141850 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libjava.so 7ff3175b2000-7ff3175b5000 rw-p 0002b000 08:03 141850 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libjava.so 7ff3175b5000-7ff3175c3000 r-xp 00000000 08:03 141866 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libverify.so 7ff3175c3000-7ff3177c2000 ---p 0000e000 08:03 141866 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libverify.so 7ff3177c2000-7ff3177c4000 r--p 0000d000 08:03 141866 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libverify.so 7ff3177c4000-7ff3177c5000 rw-p 0000f000 08:03 141866 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/libverify.so 7ff3177c5000-7ff3177cc000 r-xp 00000000 08:03 921405 /lib/librt-2.12.1.so 7ff3177cc000-7ff3179cb000 ---p 00007000 08:03 921405 /lib/librt-2.12.1.so 7ff3179cb000-7ff3179cc000 r--p 00006000 08:03 921405 /lib/librt-2.12.1.so 7ff3179cc000-7ff3179cd000 rw-p 00007000 08:03 921405 /lib/librt-2.12.1.so 7ff3179cd000-7ff317a4f000 r-xp 00000000 08:03 921390 /lib/libm-2.12.1.so 7ff317a4f000-7ff317c4e000 ---p 00082000 08:03 921390 /lib/libm-2.12.1.so 7ff317c4e000-7ff317c4f000 r--p 00081000 08:03 921390 /lib/libm-2.12.1.so 7ff317c4f000-7ff317c50000 rw-p 00082000 08:03 921390 /lib/libm-2.12.1.so 7ff317c50000-7ff3184c4000 r-xp 00000000 08:03 141871 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/server/libjvm.so 7ff3184c4000-7ff3186c3000 ---p 00874000 08:03 141871 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/server/libjvm.so 7ff3186c3000-7ff318739000 r--p 00873000 08:03 141871 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/server/libjvm.so 7ff318739000-7ff318754000 rw-p 008e9000 08:03 141871 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/server/libjvm.so 7ff318754000-7ff31878d000 rw-p 00000000 00:00 0 7ff31878d000-7ff318907000 r-xp 00000000 08:03 921385 /lib/libc-2.12.1.so 7ff318907000-7ff318b06000 ---p 0017a000 08:03 921385 /lib/libc-2.12.1.so 7ff318b06000-7ff318b0a000 r--p 00179000 08:03 921385 /lib/libc-2.12.1.so 7ff318b0a000-7ff318b0b000 rw-p 0017d000 08:03 921385 /lib/libc-2.12.1.so 7ff318b0b000-7ff318b10000 rw-p 00000000 00:00 0 7ff318b10000-7ff318b12000 r-xp 00000000 08:03 921388 /lib/libdl-2.12.1.so 7ff318b12000-7ff318d12000 ---p 00002000 08:03 921388 /lib/libdl-2.12.1.so 7ff318d12000-7ff318d13000 r--p 00002000 08:03 921388 /lib/libdl-2.12.1.so 7ff318d13000-7ff318d14000 rw-p 00003000 08:03 921388 /lib/libdl-2.12.1.so 7ff318d14000-7ff318d18000 r-xp 00000000 08:03 141838 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/jli/libjli.so 7ff318d18000-7ff318f17000 ---p 00004000 08:03 141838 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/jli/libjli.so 7ff318f17000-7ff318f18000 r--p 00003000 08:03 141838 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/jli/libjli.so 7ff318f18000-7ff318f19000 rw-p 00004000 08:03 141838 /usr/lib/jvm/java-6-openjdk/jre/lib/amd64/jli/libjli.so 7ff318f19000-7ff318f31000 r-xp 00000000 08:03 921401 /lib/libpthread-2.12.1.so 7ff318f31000-7ff319130000 ---p 00018000 08:03 921401 /lib/libpthread-2.12.1.so 7ff319130000-7ff319131000 r--p 00017000 08:03 921401 /lib/libpthread-2.12.1.so 7ff319131000-7ff319132000 rw-p 00018000 08:03 921401 /lib/libpthread-2.12.1.so 7ff319132000-7ff319136000 rw-p 00000000 00:00 0 7ff319136000-7ff31914c000 r-xp 00000000 08:03 917772 /lib/libz.so.1.2.3.4 7ff31914c000-7ff31934c000 ---p 00016000 08:03 917772 /lib/libz.so.1.2.3.4 7ff31934c000-7ff31934d000 r--p 00016000 08:03 917772 /lib/libz.so.1.2.3.4 7ff31934d000-7ff31934e000 rw-p 00017000 08:03 917772 /lib/libz.so.1.2.3.4 7ff31934e000-7ff31936e000 r-xp 00000000 08:03 921379 /lib/ld-2.12.1.so 7ff319387000-7ff319391000 rw-p 00000000 00:00 0 7ff319391000-7ff319447000 rw-p 00000000 00:00 0 7ff319447000-7ff31944a000 ---p 00000000 00:00 0 7ff31944a000-7ff31954d000 rw-p 00000000 00:00 0 7ff319562000-7ff31956a000 rw-s 00000000 08:03 1966453 /tmp/hsperfdata_hjed/4041 7ff31956a000-7ff31956b000 rw-p 00000000 00:00 0 7ff31956b000-7ff31956c000 r--p 00000000 00:00 0 7ff31956c000-7ff31956e000 rw-p 00000000 00:00 0 7ff31956e000-7ff31956f000 r--p 00020000 08:03 921379 /lib/ld-2.12.1.so 7ff31956f000-7ff319570000 rw-p 00021000 08:03 921379 /lib/ld-2.12.1.so 7ff319570000-7ff319571000 rw-p 00000000 00:00 0 7fff0fb03000-7fff0fb24000 rw-p 00000000 00:00 0 [stack] 7fff0fbff000-7fff0fc00000 r-xp 00000000 00:00 0 [vdso] ffffffffff600000-ffffffffff601000 r-xp 00000000 00:00 0 [vsyscall] VM Arguments: jvm_args: -Dfile.encoding=UTF-8 java_command: test.Main Launcher Type: SUN_STANDARD Environment Variables: PATH=/usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin:/usr/games USERNAME=hjed LD_LIBRARY_PATH=/usr/lib/jvm/java-6-openjdk/jre/lib/amd64/server:/usr/lib/jvm/java-6-openjdk/jre/lib/amd64:/usr/lib/jvm/java-6-openjdk/jre/../lib/amd64 SHELL=/bin/bash DISPLAY=:0.0 Signal Handlers: SIGSEGV: [libjvm.so+0x712700], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGBUS: [libjvm.so+0x712700], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGFPE: [libjvm.so+0x5d4020], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGPIPE: [libjvm.so+0x5d4020], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGXFSZ: [libjvm.so+0x5d4020], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGILL: [libjvm.so+0x5d4020], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGUSR1: SIG_DFL, sa_mask[0]=0x00000000, sa_flags=0x00000000 SIGUSR2: [libjvm.so+0x5d3730], sa_mask[0]=0x00000004, sa_flags=0x10000004 SIGHUP: [libjvm.so+0x5d61a0], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGINT: SIG_IGN, sa_mask[0]=0x00000000, sa_flags=0x00000000 SIGTERM: [libjvm.so+0x5d61a0], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 SIGQUIT: [libjvm.so+0x5d61a0], sa_mask[0]=0x7ffbfeff, sa_flags=0x10000004 --------------- S Y S T E M --------------- OS:Ubuntu 10.10 (maverick) uname:Linux 2.6.35-24-generic #42-Ubuntu SMP Thu Dec 2 02:41:37 UTC 2010 x86_64 libc:glibc 2.12.1 NPTL 2.12.1 rlimit: STACK 8192k, CORE 0k, NPROC infinity, NOFILE 1024, AS infinity load average:0.25 0.16 0.21 /proc/meminfo: MemTotal: 4048200 kB MemFree: 1230476 kB Buffers: 589572 kB Cached: 911132 kB SwapCached: 0 kB Active: 1321712 kB Inactive: 1202272 kB Active(anon): 1023852 kB Inactive(anon): 7168 kB Active(file): 297860 kB Inactive(file): 1195104 kB Unevictable: 64 kB Mlocked: 64 kB SwapTotal: 7065596 kB SwapFree: 7065596 kB Dirty: 632 kB Writeback: 0 kB AnonPages: 1023368 kB Mapped: 145832 kB Shmem: 7728 kB Slab: 111136 kB SReclaimable: 66316 kB SUnreclaim: 44820 kB KernelStack: 3824 kB PageTables: 27736 kB NFS_Unstable: 0 kB Bounce: 0 kB WritebackTmp: 0 kB CommitLimit: 9089696 kB Committed_AS: 2378396 kB VmallocTotal: 34359738367 kB VmallocUsed: 332928 kB VmallocChunk: 34359397884 kB HardwareCorrupted: 0 kB HugePages_Total: 0 HugePages_Free: 0 HugePages_Rsvd: 0 HugePages_Surp: 0 Hugepagesize: 2048 kB DirectMap4k: 67136 kB DirectMap2M: 4118528 kB CPU:total 8 (4 cores per cpu, 2 threads per core) family 6 model 26 stepping 5, cmov, cx8, fxsr, mmx, sse, sse2, sse3, ssse3, sse4.1, sse4.2, popcnt, ht Memory: 4k page, physical 4048200k(1230476k free), swap 7065596k(7065596k free) vm_info: OpenJDK 64-Bit Server VM (19.0-b09) for linux-amd64 JRE (1.6.0_20-b20), built on Dec 10 2010 19:45:55 by "buildd" with gcc 4.4.5 time: Sat Jan 1 14:12:27 2011 elapsed time: 0 seconds The java code is: ... public class Main { public static void main(String[] args) { ... ImageFile img = new ImageFile(System.getProperty("user.home") + "/PC100001.JPG"); Exiv2MetaDataStore e = new Exiv2MetaDataStore(img); Iterator<Entry<String, String>> i = e.entrySet().iterator(); while (i.hasNext()) { Entry<String, String> entry = i.next(); System.out.println(entry.getKey() + ":" + entry.getValue()); } //if you switch this print statment with the while loop you get the same error. // System.out.print(e.toString()); } } and /** NB: MetaDataStore is an abstract class that extends HashMap<String,String> */ public class Exiv2MetaDataStore extends MetaDataStore{ ... private final ImageFile F; /** * Creates an meta data store from an ImageFile using Exiv2 * this calls loadData(); * @param f */ public Exiv2MetaDataStore(ImageFile f) { F = f; loadData(); } ... @Override protected void loadData() { loadFromExiv2(); } ... private void loadFromExiv2() { impl_loadFromExiv(F.getAbsolutePath(), this); } private native void impl_loadFromExiv(String path, Exiv2MetaDataStore str); //this method called by the C++ code public void exiv2_reciveElement(String key, String value) { super.put(key,value); } static { Runtime.getRuntime().load("/home/hjed/libExiff2-binding.so"); } } C++ code: #include <exif.hpp> #include <image.hpp> #include <iptc.hpp> #include <exiv2/exiv2.hpp> #include <exiv2/error.hpp> #include <iostream> #include <iomanip> #include <cassert> void loadIPTC(Exiv2::Image::AutoPtr image, const char * path, JNIEnv * env, jobject obj) { Exiv2::IptcData &iptcData = image->iptcData(); //load method jclass cls = env->GetObjectClass(obj); jmethodID mid = env->GetMethodID(cls, "exiv2_reciveElement", "(Ljava/lang/String;Ljava/lang/String;)V"); //is there any IPTC data AND check that method exists if (iptcData.empty() | (mid == NULL)) { std::string error(path); error += ": failed loading IPTC data, there may not be any data"; } else { Exiv2::IptcData::iterator end = iptcData.end(); for (Exiv2::IptcData::iterator md = iptcData.begin(); md != end; ++md) { jvalue values[2]; const char* key = md->key().c_str(); values[0].l = env->NewStringUTF(key); md->value().toString().c_str(); const char* value = md->typeName(); values[2].l = env->NewStringUTF(value); //If I replace the code for values[2] with the commented out code I get the same error. //const char* type = md->typeName(); //values[2].l = env->NewStringUTF(type); env->CallVoidMethodA(obj, mid, values); } } } void getVars(const char* path, JNIEnv * env, jobject obj) { //Load image Exiv2::Image::AutoPtr image = Exiv2::ImageFactory::open(path); assert(image.get() != 0); image->readMetadata(); //Load IPTC data loadIPTC(image, path, env, obj); } JNIEXPORT void JNICALL Java_photo_exiv2_Exiv2MetaDataStore_impl_1loadFromExiv(JNIEnv * env, jobject obj, jstring path, jobject obj2) { const char* path2 = env->GetStringUTFChars(path, NULL); getVars(path2, env, obj); env->ReleaseStringUTFChars(path, path2); } I've searched for a fix for this, but I can't find one. I don't have much experience using C++ so if I've made an obvious mistake in the C code I apologies. Thanks for any help, HJED P.S. This is my first post on this site and I wasn't sure how much of the code I needed to show. Sorry if I've put to much up.

    Read the article

  • ASP.NET SQLMembership Provider not logging in

    - by cfdev9
    My web app uses the sql memebership provider. Running it locally all is well, deploying to a dev server it works fine too in firefox, but in IE8 something unexpected is happening. Once a user logs in they're supposed to be redirected to home.aspx. What's happening when I attempt to login is it appears to accept the login credentials but then doesn't redirect to home.aspx. Instead it just redirects me to the login page as though I had attempted to access home.aspx directly without being logged in. The url parameter ReturnUrl is appended, Login.aspx?ReturnUrl=%2fhome.aspx Why is this only happening with IE8? My local PC is IIS7 but the server is IIS6. Using the same web.config Full code behind public partial class Login : System.Web.UI.Page { protected void Page_Load(object sender, EventArgs e) { if (!IsPostBack) { Session.Abandon(); FormsAuthentication.SignOut(); } } protected void btnSubmit_Click(object sender, EventArgs e) { if (Membership.ValidateUser(tbUsername.Text, tbPassword.Text)) { if (Request.QueryString["ReturnUrl"] != null) { FormsAuthentication.RedirectFromLoginPage(tbUsername.Text, false); } else { FormsAuthentication.SetAuthCookie(tbUsername.Text, false); Response.Redirect("~/Home.aspx"); } } } } Full web.config <?xml version="1.0"?> <configuration> <configSections> <sectionGroup name="system.web.extensions" type="System.Web.Configuration.SystemWebExtensionsSectionGroup, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"> <sectionGroup name="scripting" type="System.Web.Configuration.ScriptingSectionGroup, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"> <section name="scriptResourceHandler" type="System.Web.Configuration.ScriptingScriptResourceHandlerSection, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" requirePermission="false" allowDefinition="MachineToApplication"/> <sectionGroup name="webServices" type="System.Web.Configuration.ScriptingWebServicesSectionGroup, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"> <section name="jsonSerialization" type="System.Web.Configuration.ScriptingJsonSerializationSection, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" requirePermission="false" allowDefinition="Everywhere"/> <section name="profileService" type="System.Web.Configuration.ScriptingProfileServiceSection, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" requirePermission="false" allowDefinition="MachineToApplication"/> <section name="authenticationService" type="System.Web.Configuration.ScriptingAuthenticationServiceSection, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" requirePermission="false" allowDefinition="MachineToApplication"/> <section name="roleService" type="System.Web.Configuration.ScriptingRoleServiceSection, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" requirePermission="false" allowDefinition="MachineToApplication"/> </sectionGroup> </sectionGroup> </sectionGroup> </configSections> <appSettings/> <connectionStrings> <add name="ASPNET_DB" connectionString="..."/> </connectionStrings> <system.web> <membership defaultProvider="SqlMembershipProvider"> <providers> <add name="SqlMembershipProvider" type="System.Web.Security.SqlMembershipProvider, System.Web, Version=2.0.0.0, Culture=neutral, PublicKeyToken=b03f5f7f11d50a3a" connectionStringName="ASPNET_DB" enablePasswordRetrieval="true" enablePasswordReset="true" requiresQuestionAndAnswer="false" applicationName="/" requiresUniqueEmail="false" passwordFormat="Clear" maxInvalidPasswordAttempts="5" passwordAttemptWindow="10" passwordStrengthRegularExpression="" minRequiredPasswordLength="1" minRequiredNonalphanumericCharacters="0"/> </providers> </membership> <roleManager enabled="true" defaultProvider="SqlRoleManager"> <providers> <add name="SqlRoleManager" type="System.Web.Security.SqlRoleProvider" connectionStringName="ASPNET_DB" applicationName="/"/> </providers> </roleManager> <authentication mode="Forms"> <forms name="CHOUSE.ASPXAUTH" loginUrl="login.aspx" protection="All" path="/"/> </authentication> <authorization> <allow roles="AccountManager"/> <allow roles="Client"/> <deny users="*"/> </authorization> <compilation debug="true"> <assemblies> <add assembly="System.Core, Version=3.5.0.0, Culture=neutral, PublicKeyToken=B77A5C561934E089"/> <add assembly="System.Data.DataSetExtensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=B77A5C561934E089"/> <add assembly="System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add assembly="System.Xml.Linq, Version=3.5.0.0, Culture=neutral, PublicKeyToken=B77A5C561934E089"/> </assemblies> </compilation> <pages> <controls> <add tagPrefix="asp" namespace="System.Web.UI" assembly="System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add tagPrefix="asp" namespace="System.Web.UI.WebControls" assembly="System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </controls> </pages> <httpHandlers> <remove verb="*" path="*.asmx"/> <add verb="*" path="*.asmx" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add verb="*" path="*_AppService.axd" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add verb="GET,HEAD" path="ScriptResource.axd" type="System.Web.Handlers.ScriptResourceHandler, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" validate="false"/> </httpHandlers> <httpModules> <add name="ScriptModule" type="System.Web.Handlers.ScriptModule, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </httpModules> </system.web> <location path="Admin"> <system.web> <authorization> <allow roles="AccountManager"/> <deny users="*"/> </authorization> </system.web> </location> <system.codedom> <compilers> <compiler language="c#;cs;csharp" extension=".cs" warningLevel="4" type="Microsoft.CSharp.CSharpCodeProvider, System, Version=2.0.0.0, Culture=neutral, PublicKeyToken=b77a5c561934e089"> <providerOption name="CompilerVersion" value="v3.5"/> <providerOption name="WarnAsError" value="false"/> </compiler> </compilers> </system.codedom> <system.webServer> <validation validateIntegratedModeConfiguration="false"/> <modules> <remove name="ScriptModule"/> <add name="ScriptModule" preCondition="managedHandler" type="System.Web.Handlers.ScriptModule, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </modules> <handlers> <remove name="WebServiceHandlerFactory-Integrated"/> <remove name="ScriptHandlerFactory"/> <remove name="ScriptHandlerFactoryAppServices"/> <remove name="ScriptResource"/> <add name="ScriptHandlerFactory" verb="*" path="*.asmx" preCondition="integratedMode" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add name="ScriptHandlerFactoryAppServices" verb="*" path="*_AppService.axd" preCondition="integratedMode" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add name="ScriptResource" preCondition="integratedMode" verb="GET,HEAD" path="ScriptResource.axd" type="System.Web.Handlers.ScriptResourceHandler, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> </handlers> </system.webServer> <runtime> <assemblyBinding xmlns="urn:schemas-microsoft-com:asm.v1"> <dependentAssembly> <assemblyIdentity name="System.Web.Extensions" publicKeyToken="31bf3856ad364e35"/> <bindingRedirect oldVersion="1.0.0.0-1.1.0.0" newVersion="3.5.0.0"/> </dependentAssembly> <dependentAssembly> <assemblyIdentity name="System.Web.Extensions.Design" publicKeyToken="31bf3856ad364e35"/> <bindingRedirect oldVersion="1.0.0.0-1.1.0.0" newVersion="3.5.0.0"/> </dependentAssembly> </assemblyBinding> </runtime>

    Read the article

  • Adding A Custom Dropdown in RCDC for Forefront Identity Manager 2010

    - by Daniel Lackey
    My latest exploration has been FIM 2010 for Identity Management. The following is a post of how to add a custom dropdown for the FIM Portal. I have decided to document this as I cannot find documentation on how to do this anywhere else. I hope that it finds useful to others.   For starters, this was to me not an easy task to figure out. I really would like to know why it is so cumbersome to do something that seems like a lot of people would need to do, but that’s for another day J   The dropdown I wanted to add was for ‘Account Status’ which would display if the account is ‘Enabled’ or ‘Disabled’ in the data source Active Directory. This option would also allow helpdesk users or admins to administer the userAccountControl attribute in AD from the FIM Portal interface.   The first thing I had to do was create the attribute itself. This is done by going to Administration à Schema Management from the FIM 2010 portal. Once here, you click on All Attributes. What is listed here are all attributes and their associated Resource Types in FIM. To create the ‘AccountStatus’ attribute, click on New. As shown below, enter ‘AccountStatus’ with no spaces for the System Name and ‘Account Status’ for the Display Name. The Data Type is going to be ‘Indexed String’. Click Next.           Leave everything on the Localization tab default and click Next.   On the Validation tab as shown below, we will enter the regex expression ^(Enabled|Disabled)?$ with our two desired string values ‘Enabled’ and ‘Disabled’. Click on Finish and then and Submit to complete adding the attribute.       The next step involves associating the attribute with a resource type. This is called ‘Binding’ the attribute. From the Schema Management page, click on All Bindings. From the page that comes up, click on New. As shown below, enter ‘User’ for the Resource Type and ‘Account Status’ for the Attribute Type. This is essentially binding the Account Status attribute to the ‘User’ Resource Type. Click Next.    On the ‘Attribute Override’ tab, type in ‘Account Status’ for the Display Name field. Click Next.   On the ‘Localization’ tab, click Next.   On the ‘Validation’ tab, enter the regex expression ^(Enabled|Disabled)?$ we entered previously for the attribute. Click Finish and then Submit to complete.   Now that the Attribute and the Binding are complete, you have to give users permission to see the attribute on the User Edit page. Go to Administration à Management Policy Rules. Look for the rule named Administration: Administrators can read and update Users and click on it. Once it opens, click on the ‘Target Resources’ tab and look at the section named Resource Attributes. Type in at the end the ‘Account Status’ attribute and check it with the validator. Once done click on OK to save the changes.         Lastly, we need to add the actual dropdown control to the RCDC (Resource Control Display Configuration) for User Editing. Go to Administration à Resource Control Display Configuration. From here navigate until you find the RCDC named Configuration for User Editing RCDC and click on it. The following is what you will see:       First step is to export the Configuration Data file. Click on the Export configuration link and save the file to your desktop of other folder.   Find the file you just exported and open the file in your XML editor of choice. I use notepad but anything will work. Since we are adding a dropdown control, first find another control in the existing file that is already a dropdown in FIM. I used EmployeeType as my example. Copy the control from the beginning tag named <my:Control… to the ending tag </my:Control>. Now take what you copied and paste it in whatever location you desire within the form between two other controls. I chose to place the ‘Account Status’ field after the ‘Account Name’ field. After you paste the control you will need to modify so it looks like this:       Notice where you specify what attribute you are dealing with where it has AccountStatus in the XML. Once you are complete with modifying this, save the file and make sure it is a .xml file.   Now go back to the Configuration for User Editing screen and look at the section named ‘Configuration Data’. Click the ‘Browse’ button and find the XML file you just modified and choose it. Click OK on the bottom of the window and you are done!   Now when you click on a user’s name in the FIM Portal, you should see the newly added dropdown box as below:       Later I will post more about this drop down, specifically on how to automate actually ‘Disabling’ the account in the data source through the FIM Workflows and MAs.   <my:Control my:Name="AccountStatus" my:TypeName="UocDropDownList" my:Caption="{Binding Source=schema, Path=AccountStatus.DisplayName}" my:Description="{Binding Source=schema, Path=AccountStatus.Description}" my:RightsLevel="{Binding Source=rights, Path=AccountStatus}"> <my:Properties> <my:Property my:Name="ValuePath" my:Value="Value"/> <my:Property my:Name="CaptionPath" my:Value="Caption"/> <my:Property my:Name="HintPath" my:Value="Hint"/> <my:Property my:Name="ItemSource" my:Value="{Binding Source=schema, Path=AccountStatus.LocalizedAllowedValues}"/> <my:Property my:Name="SelectedValue" my:Value="{Binding Source=object, Path=AccountStatus, Mode=TwoWay}"/> </my:Properties> </my:Control>

    Read the article

  • Add Zune Desktop Player to Windows 7 Media Center

    - by DigitalGeekery
    Are you a Zune owner who prefers the Zune player for media playback? Today we’ll show you how to integrate the Zune player with WMC using Media Center Studio. You’ll need to download Media Center Studio and the Zune Desktop player software. (See download links below) Also, make sure you have Media Center closed. Some of the actions in Media Center Studio cannot be performed while WMC is open. Open Media Center Studio and click on the Start Menu tab at the top of the application.   Click the Application button. Here we will create an Entry Point for the Zune player so that we can add it to Media Center. Type in a name for your entry point in the title text box. This is the name that will appear under the tile when added to the Media Center start menu. Next, type in the path to the Zune player. By default this should be C:\Program Files\Zune\Zune.exe. Note: Be sure to use the original path, not a link to the desktop icon.   The Active image is the image that will appear on the tile in Media Center. If you wish to change the default image, click the Browse button and select a different image. Select Stop the currently playing media from the When launched do the following: dropdown list.  Otherwise, if you open Zune player from WMC while playing another form of media, that media will continue to play in the background.   Now we will choose a keystroke to use to exit the Zune player software and return to Media Center. Click on the the green plus (+) button. When prompted, press a key to use to the close the Zune player. Note: This may also work with your Media Center remote. You may want to set a keyboard keystroke as well as a button on your remote to close the program. You may not be able to set certain remote buttons to close the application. We found that the back arrow button worked well. You can also choose a keystroke to kill the program if desired. Be sure to save your work before exiting by clicking the Save button on the Home tab.   Next, select the Start Menu tab and click on the next to Entry points to reveal the available entry points. Find the Zune player tile in the Entry points area. We want to drag the tile out onto one of the menu strips on the start menu. We will drag ours onto the Extras Library strip. When you begin to drag the tile, green plus (+) signs will appear in between the tiles. When you’ve dragged the tile over any of the green plus signs, the  red “Move” label will turn to a blue “Move to” label. Now you can drop the tile into position. Save your changes and then close Media Center Studio. When you open Media Center, you should see your Zune tile on the start menu. When you select the Zune tile in WMC, Media Center will be minimized and Zune player will be launched. Now you can enjoy your media through the Zune player. When you close Zune player with the previously assigned keystroke or by clicking the “X” at the top right, Windows Media Center will be re-opened. Conclusion We found the Zune player worked with two different Media Center remotes that we tested. It was a times a little tricky at times to tell where you were when navigating through the Zune software with a remote, but it did work. In addition to managing your music, the Zune player is a nice way to add podcasts to your Media Center setup. We should also mention that you don’t need to actually own a Zune to install and use the Zune player software. Media Center Studio works on both Vista and Windows 7. We covered Media Center Studio a bit more in depth in a previous post on customizing the Windows Media Center start menu. Are you new to Zune player? Familiarize yourself a bit more by checking out some of our earlier posts like how to update your Zune player, and experiencing your music a whole new way with Zune for PC.   Downloads Zune Desktop Player download Media Center Studio download Similar Articles Productive Geek Tips How To Rip a Music CD in Windows 7 Media CenterIntegrate Hulu Desktop and Windows Media Center in Windows 7Using Netflix Watchnow in Windows Vista Media Center (Gmedia)Fixing When Windows Media Player Library Won’t Let You Add FilesBuilt-in Quick Launch Hotkeys in Windows Vista TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips VMware Workstation 7 Acronis Online Backup DVDFab 6 Revo Uninstaller Pro Bypass Waiting Time On Customer Service Calls With Lucyphone MELTUP – "The Beginning Of US Currency Crisis And Hyperinflation" Enable or Disable the Task Manager Using TaskMgrED Explorer++ is a Worthy Windows Explorer Alternative Error Goblin Explains Windows Error Codes Twelve must-have Google Chrome plugins

    Read the article

  • Silverlight Recruiting Application Part 6 - Adding an Interview Scheduling Module/View

    Between the last post and this one I went ahead and carried the ideas for the Jobs module and view into the Applicants module and view- they're both doing more or less the same thing, except with different objects being at their core.  Made for an easy cut-and-paste operation with a few items being switched from one to another.  Now that we have the ability to add postings and applicants, wouldn't it be nice if we could schedule an interview?  Of course it would! Scheduling Module I think you get the drift from previous posts that these project structures start looking somewhat similar.  The interview scheduling module is no different than the rest- it gets a SchedulingModule.cs file at the root that inherits from IModule, and there is a single SchedulerView.xsml and SchedulerViewModel.cs setup for our V+VM.  We have one unique concern as we enter into this- RadScheduler deals with AppointmentsSource, not ItemsSource, so there are some special considerations to take into account when planning this module. First, I need something which inherits from AppointmentBase.  This is the core of the RadScheduler appointment, and if you are planning to do any form of custom appointment, you'll want it to inherit from this.  Then you can add-on functionality as needed.  Here is my addition to the mix, the InterviewAppointment: 01.public class InterviewAppointment : AppointmentBase 02.{ 03.    private int _applicantID; 04.    public int ApplicantID 05.    { 06.        get { return this._applicantID; } 07.        set 08.        { 09.            if (_applicantID != value) 10.            { 11.                _applicantID = value; 12.                OnPropertyChanged("ApplicantID"); 13.            } 14.        } 15.    } 16.   17.    private int _postingID; 18.    public int PostingID 19.    { 20.        get { return _postingID; } 21.        set 22.        { 23.            if (_postingID != value) 24.            { 25.                _postingID = value; 26.                OnPropertyChanged("PostingID"); 27.            } 28.        } 29.    } 30.   31.    private string _body; 32.    public string Body 33.    { 34.        get { return _body; } 35.        set 36.        { 37.            if (_body != value) 38.            { 39.                _body = value; 40.                OnPropertyChanged("Body"); 41.            } 42.        } 43.    } 44.   45.    private int _interviewID; 46.    public int InterviewID 47.    { 48.        get { return _interviewID; } 49.        set 50.        { 51.            if (_interviewID != value) 52.            { 53.                _interviewID = value; 54.                OnPropertyChanged("InterviewID"); 55.            } 56.        } 57.    } 58.   59.    public override IAppointment Copy() 60.    { 61.        IAppointment appointment = new InterviewAppointment(); 62.        appointment.CopyFrom(this);             63.        return appointment; 64.    } 65.   66.    public override void CopyFrom(IAppointment other) 67.    {             68.        base.CopyFrom(other); 69.        var appointment = other as InterviewAppointment; 70.        if (appointment != null) 71.        { 72.            ApplicantID = appointment.ApplicantID; 73.            PostingID = appointment.PostingID; 74.            Body = appointment.Body; 75.            InterviewID = appointment.InterviewID; 76.        } 77.    } 78.} Nothing too exciting going on here, we just make sure that our custom fields are persisted (specifically set in CopyFrom at the bottom) and notifications are fired- otherwise this ends up exactly like the standard appointment as far as interactions, etc.  But if we've got custom appointment items... that also means we need to customize what our appointment dialog window will look like. Customizing the Edit Appointment Dialog This initially sounds a lot more intimidating than it really is.  The first step here depends on what you're dealing with for theming, but for ease of everything I went ahead and extracted my templates in Blend for RadScheduler so I could modify it as I pleased.  For the faint of heart, the RadScheduler template is a few thousand lines of goodness since there are some very complex things going on in that control.  I've gone ahead and trimmed down the template parts I don't need as much as possible, so what is left is all that is relevant to the Edit Appointment Dialog.  Here's the resulting Xaml, with line numbers, so I can explain further: 001.<UserControl.Resources> 002.    <!-- begin Necessary Windows 7 Theme Resources for EditAppointmentTemplate --> 003.    <helpers:DataContextProxy x:Key="DataContextProxy" /> 004.       005.    <telerik:Windows7Theme x:Key="Theme" /> 006.    <SolidColorBrush x:Key="DialogWindowBackground" 007.                     Color="White" /> 008.    <SolidColorBrush x:Key="CategorySelectorBorderBrush" 009.                     Color="#FFB1B1B1" /> 010.    <LinearGradientBrush x:Key="RadToolBar_InnerBackground" 011.                         EndPoint="0.5,1" 012.                         StartPoint="0.5,0"> 013.        <GradientStop Color="#FFFDFEFF" 014.                      Offset="0" /> 015.        <GradientStop Color="#FFDDE9F7" 016.                      Offset="1" /> 017.        <GradientStop Color="#FFE6F0FA" 018.                      Offset="0.5" /> 019.        <GradientStop Color="#FFDCE6F4" 020.                      Offset="0.5" /> 021.    </LinearGradientBrush> 022.    <Style x:Key="FormElementTextBlockStyle" 023.           TargetType="TextBlock"> 024.        <Setter Property="HorizontalAlignment" 025.                Value="Right" /> 026.        <Setter Property="VerticalAlignment" 027.                Value="Top" /> 028.        <Setter Property="Margin" 029.                Value="15, 15, 0, 2" /> 030.    </Style> 031.    <Style x:Key="FormElementStyle" 032.           TargetType="FrameworkElement"> 033.        <Setter Property="Margin" 034.                Value="10, 10, 0, 2" /> 035.    </Style> 036.    <SolidColorBrush x:Key="GenericShallowBorderBrush" 037.                     Color="#FF979994" /> 038.    <telerik:BooleanToVisibilityConverter x:Key="BooleanToVisibilityConverter" /> 039.    <telerikScheduler:ImportanceToBooleanConverter x:Key="ImportanceToBooleanConverter" /> 040.    <telerikScheduler:NullToVisibilityConverter x:Key="NullToVisibilityConverter" /> 041.    <telerikScheduler:InvertedNullToVisibilityConverter x:Key="InvertedNullToVisibilityConverter" /> 042.    <scheduler:ResourcesSeparatorConverter x:Key="ResourcesSeparatorConverter" /> 043.    <DataTemplate x:Key="IconDataEditTemplate"> 044.        <Image Source="/Telerik.Windows.Controls.Scheduler;component/Themes/Office/Images/cal.png" 045.               Margin="3,3,0,0" 046.               Width="16" 047.               Height="16" /> 048.    </DataTemplate> 049.    <DataTemplate x:Key="SingleSelectionTemplate"> 050.        <Grid VerticalAlignment="Stretch" 051.              HorizontalAlignment="Stretch"> 052.            <Grid.RowDefinitions> 053.                <RowDefinition Height="Auto" /> 054.            </Grid.RowDefinitions> 055.            <Grid.ColumnDefinitions> 056.                <ColumnDefinition Width="Auto" 057.                                  MinWidth="84" /> 058.                <ColumnDefinition Width="Auto" 059.                                  MinWidth="200" /> 060.            </Grid.ColumnDefinitions> 061.            <TextBlock x:Name="SelectionNameLabel" 062.                       Margin="0,13,4,2" 063.                       Text="{Binding ResourceType.DisplayName}" 064.                       Style="{StaticResource FormElementTextBlockStyle}" 065.                       Grid.Column="0" /> 066.            <telerikInput:RadComboBox ItemsSource="{Binding ResourceItems}" 067.                                      Width="185" 068.                                      Margin="5,10,20,2" 069.                                      HorizontalAlignment="Left" 070.                                      Grid.Column="1" 071.                                      ClearSelectionButtonVisibility="Visible" 072.                                      ClearSelectionButtonContent="Clear All" 073.                                      DisplayMemberPath="Resource.DisplayName" 074.                                      telerik:StyleManager.Theme="{StaticResource Theme}" 075.                                      SelectedItem="{Binding SelectedItem, Mode=TwoWay}" /> 076.        </Grid> 077.    </DataTemplate> 078.    <DataTemplate x:Key="MultipleSelectionTemplate"> 079.        <Grid VerticalAlignment="Stretch" 080.              HorizontalAlignment="Stretch"> 081.            <Grid.RowDefinitions> 082.                <RowDefinition Height="Auto" /> 083.            </Grid.RowDefinitions> 084.            <Grid.ColumnDefinitions> 085.                <ColumnDefinition Width="Auto" 086.                                  MinWidth="84" /> 087.                <ColumnDefinition Width="Auto" 088.                                  MinWidth="200" /> 089.            </Grid.ColumnDefinitions> 090.            <TextBlock x:Name="SelectionNameLabel" 091.                       Grid.Column="0" 092.                       Text="{Binding ResourceType.DisplayName}" 093.                       Margin="0,13,4,2" 094.                       Style="{StaticResource FormElementTextBlockStyle}" /> 095.            <telerikInput:RadComboBox Grid.Column="1" 096.                                      Width="185" 097.                                      HorizontalAlignment="Left" 098.                                      Margin="5,10,20,2" 099.                                      ItemsSource="{Binding ResourceItems}" 100.                                      SelectedIndex="{Binding SelectedIndex, Mode=TwoWay}" 101.                                      ClearSelectionButtonVisibility="Visible" 102.                                      ClearSelectionButtonContent="Clear All" 103.                                      telerik:StyleManager.Theme="{StaticResource Theme}"> 104.                <telerikInput:RadComboBox.ItemTemplate> 105.                    <DataTemplate> 106.                        <Grid HorizontalAlignment="Stretch" 107.                              VerticalAlignment="Stretch"> 108.                            <CheckBox VerticalAlignment="Center" 109.                                      HorizontalContentAlignment="Stretch" 110.                                      VerticalContentAlignment="Center" 111.                                      IsChecked="{Binding IsChecked, Mode=TwoWay}" 112.                                      Content="{Binding Resource.DisplayName}"> 113.                                <CheckBox.ContentTemplate> 114.                                    <DataTemplate> 115.                                        <TextBlock HorizontalAlignment="Stretch" 116.                                                   VerticalAlignment="Stretch" 117.                                                   Text="{Binding Content, RelativeSource={RelativeSource TemplatedParent}}" /> 118.                                    </DataTemplate> 119.                                </CheckBox.ContentTemplate> 120.                            </CheckBox> 121.                        </Grid> 122.                    </DataTemplate> 123.                </telerikInput:RadComboBox.ItemTemplate> 124.            </telerikInput:RadComboBox> 125.        </Grid> 126.    </DataTemplate> 127.    <scheduler:ResourceTypeTemplateSelector x:Key="ItemTemplateSelector" 128.                                            MultipleSelectionTemplate="{StaticResource MultipleSelectionTemplate}" 129.                                            SingleSelectionTemplate="{StaticResource SingleSelectionTemplate}" /> 130.    <!-- end Necessary Windows 7 Theme Resources for EditAppointmentTemplate -->  131.       132.    <ControlTemplate x:Key="EditAppointmentTemplate" 133.                     TargetType="telerikScheduler:AppointmentDialogWindow"> 134.        <StackPanel Background="{TemplateBinding Background}" 135.                    UseLayoutRounding="True"> 136.            <StackPanel Grid.Row="0" 137.                        Orientation="Horizontal" 138.                        Background="{StaticResource RadToolBar_InnerBackground}" 139.                        Grid.ColumnSpan="2" 140.                        Height="0"> 141.                <!-- Recurrence buttons --> 142.                <Border Margin="1,1,0,0" 143.                        Background="#50000000" 144.                        HorizontalAlignment="Left" 145.                        VerticalAlignment="Center" 146.                        Width="2" 147.                        Height="16"> 148.                    <Border Margin="0,0,1,1" 149.                            Background="#80FFFFFF" 150.                            HorizontalAlignment="Left" 151.                            Width="1" /> 152.                </Border> 153.                <Border Margin="1,1,0,0" 154.                        Background="#50000000" 155.                        HorizontalAlignment="Left" 156.                        VerticalAlignment="Center" 157.                        Width="2" 158.                        Height="16"> 159.                    <Border Margin="0,0,1,1" 160.                            Background="#80FFFFFF" 161.                            HorizontalAlignment="Left" 162.                            Width="1" /> 163.                </Border> 164.                <TextBlock telerik:LocalizationManager.ResourceKey="ShowAs" 165.                           VerticalAlignment="Center" 166.                           Margin="5,0,0,0" /> 167.                <telerikInput:RadComboBox ItemsSource="{TemplateBinding TimeMarkers}" 168.                                          Width="100" 169.                                          Height="20" 170.                                          VerticalAlignment="Center" 171.                                          Margin="5,0,0,0" 172.                                          ClearSelectionButtonVisibility="Visible" 173.                                          ClearSelectionButtonContent="Clear" 174.                                          SelectedItem="{Binding TimeMarker,RelativeSource={RelativeSource TemplatedParent},Mode=TwoWay}" 175.                                          telerik:StyleManager.Theme="{StaticResource Theme}"> 176.                    <telerikInput:RadComboBox.ItemTemplate> 177.                        <DataTemplate> 178.                            <StackPanel Orientation="Horizontal"> 179.                                <Rectangle Fill="{Binding TimeMarkerBrush}" 180.                                           Margin="2" 181.                                           Width="12" 182.                                           Height="12" /> 183.                                <TextBlock Text="{Binding TimeMarkerName}" 184.                                           Margin="2" /> 185.                            </StackPanel> 186.                        </DataTemplate> 187.                    </telerikInput:RadComboBox.ItemTemplate> 188.                </telerikInput:RadComboBox> 189.                <telerik:RadToggleButton x:Name="High" 190.                                         BorderThickness="0" 191.                                         Background="{StaticResource RadToolBar_InnerBackground}" 192.                                         DataContext="{TemplateBinding EditedAppointment}" 193.                                         telerik:StyleManager.Theme="{StaticResource Theme}" 194.                                         IsChecked="{Binding Importance,Mode=TwoWay, Converter={StaticResource ImportanceToBooleanConverter},ConverterParameter=High}" 195.                                         Margin="2,2,0,2" 196.                                         Width="23" 197.                                         Height="23" 198.                                         HorizontalContentAlignment="Center" 199.                                         ToolTipService.ToolTip="High importance" 200.                                         CommandParameter="High" 201.                                         Command="telerikScheduler:RadSchedulerCommands.SetAppointmentImportance"> 202.                    <StackPanel HorizontalAlignment="Center"> 203.                        <Path Stretch="Fill" 204.                              Height="10" 205.                              HorizontalAlignment="Center" 206.                              VerticalAlignment="Top" 207.                              Width="5.451" 208.                              Data="M200.39647,58.840393 C200.39337,58.336426 201.14566,57.683922 202.56244,57.684292 C204.06589,57.684685 204.73764,58.357765 204.72783,58.992363 C205.04649,61.795574 203.04713,64.181099 202.47388,66.133446 C201.93753,64.154961 199.9471,61.560352 200.39647,58.840393 z"> 209.                            <Path.Fill> 210.                                <LinearGradientBrush EndPoint="1.059,0.375" 211.                                                     StartPoint="-0.457,0.519"> 212.                                    <GradientStop Color="#FFFF0606" 213.                                                  Offset="0.609" /> 214.                                    <GradientStop Color="#FFBF0303" 215.                                                  Offset="0.927" /> 216.                                </LinearGradientBrush> 217.                            </Path.Fill> 218.                        </Path> 219.                        <Ellipse Height="3" 220.                                 HorizontalAlignment="Center" 221.                                 Margin="0,-1,0,0" 222.                                 VerticalAlignment="Top" 223.                                 Width="3"> 224.                            <Ellipse.Fill> 225.                                <RadialGradientBrush> 226.                                    <GradientStop Color="#FFFF0606" 227.                                                  Offset="0" /> 228.                                    <GradientStop Color="#FFBF0303" 229.                                                  Offset="1" /> 230.                                </RadialGradientBrush> 231.                            </Ellipse.Fill> 232.                        </Ellipse> 233.                    </StackPanel> 234.                </telerik:RadToggleButton> 235.                <telerik:RadToggleButton x:Name="Low" 236.                                         HorizontalContentAlignment="Center" 237.                                         BorderThickness="0" 238.                                         Background="{StaticResource RadToolBar_InnerBackground}" 239.                                         DataContext="{TemplateBinding EditedAppointment}" 240.                                         IsChecked="{Binding Importance,Mode=TwoWay, Converter={StaticResource ImportanceToBooleanConverter},ConverterParameter=Low}" 241.                                         Margin="0,2,0,2" 242.                                         Width="23" 243.                                         Height="23" 244.                                         ToolTipService.ToolTip="Low importance" 245.                                         CommandParameter="Low" 246.                                         telerik:StyleManager.Theme="{StaticResource Theme}" 247.                                         Command="telerikScheduler:RadSchedulerCommands.SetAppointmentImportance"> 248.                    <Path Stretch="Fill" 249.                          Height="12" 250.                          HorizontalAlignment="Center" 251.                          VerticalAlignment="Top" 252.                          Width="9" 253.                          Data="M222.40353,60.139881 L226.65768,60.139843 L226.63687,67.240196 L229.15347,67.240196 L224.37816,71.394943 L219.65274,67.240196 L222.37572,67.219345 z" 254.                          Stroke="#FF0365A7"> 255.                        <Path.Fill> 256.                            <LinearGradientBrush EndPoint="1.059,0.375" 257.                                                 StartPoint="-0.457,0.519"> 258.                                <GradientStop Color="#FFBBE4FF" /> 259.                                <GradientStop Color="#FF024572" 260.                                              Offset="0.836" /> 261.                                <GradientStop Color="#FF43ADF4" 262.                                              Offset="0.466" /> 263.                            </LinearGradientBrush> 264.                        </Path.Fill> 265.                    </Path> 266.                </telerik:RadToggleButton> 267.            </StackPanel > 268.            <Border DataContext="{TemplateBinding EditedAppointment}" 269.                    Background="{Binding Category.CategoryBrush}" 270.                    Visibility="{Binding Category,Converter={StaticResource NullToVisibilityConverter}}" 271.                    CornerRadius="3" 272.                    Height="20" 273.                    Margin="5,10,5,0"> 274.                <TextBlock Text="{Binding Category.DisplayName}" 275.                           VerticalAlignment="Center" 276.                           Margin="5,0,0,0" /> 277.            </Border> 278.            <Grid VerticalAlignment="Stretch" 279.                  HorizontalAlignment="Stretch" 280.                  DataContext="{TemplateBinding EditedAppointment}" 281.                  Background="{TemplateBinding Background}"> 282.                <Grid.RowDefinitions> 283.                    <RowDefinition Height="Auto" /> 284.                    <RowDefinition Height="Auto" /> 285.                    <RowDefinition Height="Auto" /> 286.                    <RowDefinition Height="Auto" /> 287.                    <RowDefinition Height="Auto" /> 288.                    <RowDefinition Height="Auto" /> 289.                    <RowDefinition Height="Auto" /> 290.                    <RowDefinition Height="Auto" /> 291.                    <RowDefinition Height="Auto" /> 292.                    <RowDefinition Height="Auto" /> 293.                </Grid.RowDefinitions> 294.                <Grid.ColumnDefinitions> 295.                    <ColumnDefinition Width="Auto" 296.                                      MinWidth="100" /> 297.                    <ColumnDefinition Width="Auto" 298.                                      MinWidth="200" /> 299.                </Grid.ColumnDefinitions> 300.                <!-- Subject --> 301.                <TextBlock x:Name="SubjectLabel" 302.                           Grid.Row="0" 303.                           Grid.Column="0" 304.                           Margin="0,15,0,2" 305.                           telerik:LocalizationManager.ResourceKey="Subject" 306.                           Style="{StaticResource FormElementTextBlockStyle}" /> 307.                <TextBox x:Name="Subject" 308.                         Grid.Row="0" 309.                         Grid.Column="1" 310.                         MinHeight="22" 311.                         Padding="4 2" 312.                         Width="340" 313.                         HorizontalAlignment="Left" 314.                         Text="{Binding Subject, Mode=TwoWay}" 315.                         MaxLength="255" 316.                         telerik:StyleManager.Theme="{StaticResource Theme}" 317.                         Margin="10,12,20,2" /> 318.                <!-- Description --> 319.                <TextBlock x:Name="DescriptionLabel" 320.                           Grid.Row="1" 321.                           Grid.Column="0" 322.                           Margin="0,13,0,2" 323.                           telerik:LocalizationManager.ResourceKey="Body" 324.                           Style="{StaticResource FormElementTextBlockStyle}" /> 325.                <TextBox x:Name="Body" 326.                         VerticalAlignment="top" 327.                         Grid.Row="1" 328.                         Grid.Column="1" 329.                         Height="Auto" 330.                         MaxHeight="82" 331.                         Width="340" 332.                         HorizontalAlignment="Left" 333.                         MinHeight="22" 334.                         Padding="4 2" 335.                         TextWrapping="Wrap" 336.                         telerik:StyleManager.Theme="{StaticResource Theme}" 337.                         Text="{Binding Body, Mode=TwoWay}" 338.                         AcceptsReturn="true" 339.                         Margin="10,10,20,2" 340.                         HorizontalScrollBarVisibility="Auto" 341.                         VerticalScrollBarVisibility="Auto" /> 342.                <!-- Start/End date --> 343.                <TextBlock x:Name="StartDateLabel" 344.                           Grid.Row="2" 345.                           Grid.Column="0" 346.                           Margin="0,13,0,2" 347.                           telerik:LocalizationManager.ResourceKey="StartTime" 348.                           Style="{StaticResource FormElementTextBlockStyle}" /> 349.                <telerikScheduler:DateTimePicker x:Name="StartDateTime" 350.                                                 Height="22" 351.                                                 Grid.Row="2" 352.                                                 Grid.Column="1" 353.                                                 HorizontalAlignment="Left" 354.                                                 Margin="10,10,20,2" 355.                                                 Style="{StaticResource FormElementStyle}" 356.                                                 SelectedDateTime="{Binding Start, Mode=TwoWay}" 357.                                                 telerikScheduler:StartEndDatePicker.EndPicker="{Binding ElementName=EndDateTime}" 358.                                                 IsTabStop="False" 359.                                                 IsEnabled="False" /> 360.                <TextBlock x:Name="EndDateLabel" 361.                           Grid.Row="3" 362.                           Grid.Column="0" 363.                           Margin="0,13,0,2" 364.                           telerik:LocalizationManager.ResourceKey="EndTime" 365.                           Style="{StaticResource FormElementTextBlockStyle}" /> 366.                <telerikScheduler:DateTimePicker x:Name="EndDateTime" 367.                                                 Height="22" 368.                                                 Grid.Row="3" 369.                                                 Grid.Column="1" 370.                                                 HorizontalAlignment="Left" 371.                                                 Margin="10,10,20,2" 372.                                                 Style="{StaticResource FormElementStyle}" 373.                                                 IsTabStop="False" 374.                                                 IsEnabled="False" 375.                                                 SelectedDateTime="{Binding End, Mode=TwoWay}" /> 376.                <!-- Is-all-day selector --> 377.                <CheckBox x:Name="AllDayEventCheckbox" 378.                          IsChecked="{Binding IsAllDayEvent, Mode=TwoWay}" 379.                          Grid.Row="4" 380.                          Grid.Column="1" 381.                          Margin="10,10,20,2" 382.                          HorizontalAlignment="Left" 383.                          telerik:StyleManager.Theme="{StaticResource Theme}" 384.                          telerik:LocalizationManager.ResourceKey="AllDayEvent"> 385.                    <telerik:CommandManager.InputBindings> 386.                        <telerik:InputBindingCollection> 387.                            <telerik:MouseBinding Command="telerikScheduler:RadSchedulerCommands.ChangeTimePickersVisibility" 388.                                                  Gesture="LeftClick" /> 389.                        </telerik:InputBindingCollection> 390.                    </telerik:CommandManager.InputBindings> 391.                </CheckBox> 392.                <Grid Grid.Row="5" 393.                      Grid.ColumnSpan="2"> 394.                    <Grid.ColumnDefinitions> 395.                        <ColumnDefinition Width="Auto" 396.                                          MinWidth="100" /> 397.                        <ColumnDefinition Width="Auto" 398.                                          MinWidth="200" /> 399.                    </Grid.ColumnDefinitions> 400.                    <Grid.RowDefinitions> 401.                        <RowDefinition Height="Auto" /> 402.                        <RowDefinition Height="Auto" /> 403.                    </Grid.RowDefinitions> 404.                    <TextBlock Text="Applicant" 405.                               Margin="0,13,0,2" 406.                               Style="{StaticResource FormElementTextBlockStyle}" /> 407.                    <telerikInput:RadComboBox IsEditable="False" 408.                                              Grid.Column="1" 409.                                              Height="24" 410.                                              VerticalAlignment="Center" 411.                                              ItemsSource="{Binding Source={StaticResource DataContextProxy}, Path=DataSource.ApplicantList}" 412.                                              SelectedValue="{Binding ApplicantID, Mode=TwoWay}" 413.                                              SelectedValuePath="ApplicantID" 414.                                              DisplayMemberPath="FirstName" /> 415.                       416.                    <TextBlock Text="Job" 417.                               Margin="0,13,0,2" 418.                               Grid.Row="1" 419.                               Style="{StaticResource FormElementTextBlockStyle}" /> 420.                    <telerikInput:RadComboBox IsEditable="False" 421.                                              Grid.Column="1" 422.                                              Grid.Row="1" 423.                                              Height="24" 424.                                              VerticalAlignment="Center" 425.                                              ItemsSource="{Binding Source={StaticResource DataContextProxy}, Path=DataSource.JobsList}" 426.                                              SelectedValue="{Binding PostingID, Mode=TwoWay}" 427.                                              SelectedValuePath="PostingID" 428.                                              DisplayMemberPath="JobTitle"/> 429.                </Grid> 430.                    <!-- Resources --> 431.                <Grid x:Name="ResourcesLayout" 432.                      Grid.Row="7" 433.                      Grid.Column="0" 434.                      Grid.ColumnSpan="2" 435.                      MaxHeight="130" 436.                      Margin="20,5,20,0"> 437.                    <Border Margin="0" 438.                            BorderThickness="1" 439.                            BorderBrush="{StaticResource GenericShallowBorderBrush}" 440.                            Visibility="{Binding ElementName=ResourcesScrollViewer, Path=ComputedVerticalScrollBarVisibility}"></Border> 441.                    <ScrollViewer x:Name="ResourcesScrollViewer" 442.                                  IsTabStop="false" 443.                                  Grid.Row="6" 444.                                  Grid.Column="0" 445.                                  Grid.ColumnSpan="2" 446.                                  Margin="1" 447.                                  telerik:StyleManager.Theme="{StaticResource Theme}" 448.                                  VerticalScrollBarVisibility="Auto"> 449.                        <scheduler:ResourcesItemsControl x:Name="PART_Resources" 450.                                                         HorizontalAlignment="Left" 451.                                                         Padding="0,2,0,5" 452.                                                         IsTabStop="false" 453.                                                         ItemsSource="{TemplateBinding ResourceTypeModels}" 454.                                                         ItemTemplateSelector="{StaticResource ItemTemplateSelector}" /> 455.                    </ScrollViewer> 456.                </Grid> 457.                <StackPanel x:Name="FooterControls" 458.                            Margin="5 10 10 10" 459.                            Grid.Row="8" 460.                            Grid.Column="1" 461.                            HorizontalAlignment="Left" 462.                            Orientation="Horizontal"> 463.                    <telerik:RadButton x:Name="OKButton" 464.                                       Margin="5" 465.                                       Padding="10 0" 466.                                       MinWidth="80" 467.                                       Command="telerikScheduler:RadSchedulerCommands.SaveAppointment" 468.                                       telerik:StyleManager.Theme="{StaticResource Theme}" 469.                                       telerikNavigation:RadWindow.ResponseButton="Accept" 470.                                       telerik:LocalizationManager.ResourceKey="SaveAndCloseCommandText"> 471.                    </telerik:RadButton> 472.                    <telerik:RadButton x:Name="CancelButton" 473.                                       Margin="5" 474.                                       Padding="10 0" 475.                                       MinWidth="80" 476.                                       telerik:LocalizationManager.ResourceKey="Cancel" 477.                                       telerik:StyleManager.Theme="{StaticResource Theme}" 478.                                       telerikNavigation:RadWindow.ResponseButton="Cancel" 479.                                       Command="telerik:WindowCommands.Close"> 480.                    </telerik:RadButton> 481.                </StackPanel> 482.            </Grid> 483.            <vsm:VisualStateManager.VisualStateGroups> 484.                <vsm:VisualStateGroup x:Name="RecurrenceRuleState"> 485.                    <vsm:VisualState x:Name="RecurrenceRuleIsNull"> 486.                        <Storyboard> 487.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="StartDateTime" 488.                                                           Storyboard.TargetProperty="IsEnabled" 489.                                                           Duration="0"> 490.                                <DiscreteObjectKeyFrame KeyTime="0" 491.                                                        Value="True" /> 492.                            </ObjectAnimationUsingKeyFrames> 493.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="EndDateTime" 494.                                                           Storyboard.TargetProperty="IsEnabled" 495.                                                           Duration="0"> 496.                                <DiscreteObjectKeyFrame KeyTime="0" 497.                                                        Value="True" /> 498.                            </ObjectAnimationUsingKeyFrames> 499.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="AllDayEventCheckbox" 500.                                                           Storyboard.TargetProperty="IsEnabled" 501.                                                           Duration="0"> 502.                                <DiscreteObjectKeyFrame KeyTime="0" 503.                                                        Value="True" /> 504.                            </ObjectAnimationUsingKeyFrames> 505.                        </Storyboard> 506.                    </vsm:VisualState> 507.                    <vsm:VisualState x:Name="RecurrenceRuleIsNotNull"> 508.                        <Storyboard> 509.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="StartDateTime" 510.                                                           Storyboard.TargetProperty="IsEnabled" 511.                                                           Duration="0"> 512.                                <DiscreteObjectKeyFrame KeyTime="0" 513.                                                        Value="False" /> 514.                            </ObjectAnimationUsingKeyFrames> 515.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="EndDateTime" 516.                                                           Storyboard.TargetProperty="IsEnabled" 517.                                                           Duration="0"> 518.                                <DiscreteObjectKeyFrame KeyTime="0" 519.                                                        Value="False" /> 520.                            </ObjectAnimationUsingKeyFrames> 521.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="AllDayEventCheckbox" 522.                                                           Storyboard.TargetProperty="IsEnabled" 523.                                                           Duration="0"> 524.                                <DiscreteObjectKeyFrame KeyTime="0" 525.                                                        Value="False" /> 526.                            </ObjectAnimationUsingKeyFrames> 527.                        </Storyboard> 528.                    </vsm:VisualState> 529.                </vsm:VisualStateGroup> 530.            </vsm:VisualStateManager.VisualStateGroups> 531.        </StackPanel> 532.    </ControlTemplate> 533.    <DataTemplate x:Key="AppointmentDialogWindowHeaderDataTemplate"> 534.        <StackPanel Orientation="Horizontal" 535.                    MaxWidth="400"> 536.            <TextBlock telerik:LocalizationManager.ResourceKey="Event" 537.                       Visibility="{Binding Appointment.IsAllDayEvent, Converter={StaticResource BooleanToVisibilityConverter}}" /> 538.            <TextBlock telerik:LocalizationManager.ResourceKey="Appointment" 539.                       Visibility="{Binding Appointment.IsAllDayEvent, Converter={StaticResource InvertedBooleanToVisibilityConverter}}" /> 540.            <TextBlock Text=" - " /> 541.            <TextBlock x:Name="SubjectTextBlock" 542.                       Visibility="{Binding Appointment.Subject, Converter={StaticResource NullToVisibilityConverter}}" 543.                       Text="{Binding Appointment.Subject}" /> 544.            <TextBlock telerik:LocalizationManager.ResourceKey="Untitled" 545.                       Visibility="{Binding Appointment.Subject, Converter={StaticResource InvertedNullToVisibilityConverter}}" /> 546.        </StackPanel> 547.    </DataTemplate> 548.    <Style x:Key="EditAppointmentStyle" 549.           TargetType="telerikScheduler:AppointmentDialogWindow"> 550.        <Setter Property="IconTemplate" 551.                Value="{StaticResource IconDataEditTemplate}" /> 552.        <Setter Property="HeaderTemplate" 553.                Value="{StaticResource AppointmentDialogWindowHeaderDataTemplate}" /> 554.        <Setter Property="Background" 555.                Value="{StaticResource DialogWindowBackground}" /> 556.        <Setter Property="Template" 557.                Value="{StaticResource EditAppointmentTemplate}" /> 558.    </Style> 559.</UserControl.Resources> The first line there is the DataContextProxy I mentioned previously- we use that again to work a bit of magic in this template. Where we start getting into the dialog in question is line 132, but line 407 is where things start getting interesting.  The ItemsSource is pointing at a list that exists in my ViewModel (or code-behind, if it is used as a DataContext), the SelectedValue is the item I am actually binding from the applicant (note the TwoWay binding), and SelectedValuePath and DisplayMemberPath ensure the proper applicant is being displayed from the collection.  You will also see similar starting on line 420 where I do the same for the Jobs we'll be displaying. Just to wrap-up the Xaml, here's the RadScheduler declaraction that ties this all together and will be the main focus of our view: 01.<telerikScheduler:RadScheduler x:Name="xJobsScheduler" 02.                  Grid.Row="1" 03.                  Grid.Column="1" 04.                  Width="800" 05.                  MinWidth="600" 06.                  Height="500" 07.                  MinHeight="300" 08.                  AppointmentsSource="{Binding Interviews}" 09.                  EditAppointmentStyle="{StaticResource EditAppointmentStyle}" 10.                  command:AppointmentAddedEventClass.Command="{Binding AddAppointmentCommand}" 11.                  command:ApptCreatedEventClass.Command="{Binding ApptCreatingCommand}" 12.                  command:ApptEditedEventClass.Command="{Binding ApptEditedCommand}" 13.                  command:ApptDeletedEventClass.Command="{Binding ApptDeletedCommand}"> 14.</telerikScheduler:RadScheduler> Now, we get to the ViewModel and what it takes to get that rigged up.  And for those of you who remember the jobs post, those command:s in the Xaml are pointing to attached behavior commands that reproduce the respective events.  This becomes very handy when we're setting up the code-behind version. ;) ViewModel I've been liking this approach so far, so I'm going to put the entire ViewModel here and then go into the lines of interest.  Of course, feel free to ask me questions about anything that isn't clear (by line number, ideally) so I can help out if I have missed anything important: 001.public class SchedulerViewModel : ViewModelBase 002.{ 003.    private readonly IEventAggregator eventAggregator; 004.    private readonly IRegionManager regionManager; 005.   006.    public RecruitingContext context; 007.   008.    private ObservableItemCollection<InterviewAppointment> _interviews = new ObservableItemCollection<InterviewAppointment>(); 009.    public ObservableItemCollection<InterviewAppointment> Interviews 010.    { 011.        get { return _interviews; } 012.        set 013.        { 014.            if (_interviews != value) 015.            { 016.                _interviews = value; 017.                NotifyChanged("Interviews"); 018.            } 019.        } 020.    } 021.   022.    private QueryableCollectionView _jobsList; 023.    public QueryableCollectionView JobsList 024.    { 025.        get { return this._jobsList; } 026.        set 027.        { 028.            if (this._jobsList != value) 029.            { 030.                this._jobsList = value; 031.                this.NotifyChanged("JobsList"); 032.            } 033.        } 034.    } 035.   036.    private QueryableCollectionView _applicantList; 037.    public QueryableCollectionView ApplicantList 038.    { 039.        get { return _applicantList; } 040.        set 041.        { 042.            if (_applicantList != value) 043.            { 044.                _applicantList = value; 045.                NotifyChanged("ApplicantList"); 046.            } 047.        } 048.    } 049.   050.    public DelegateCommand<object> AddAppointmentCommand { get; set; } 051.    public DelegateCommand<object> ApptCreatingCommand { get; set; } 052.    public DelegateCommand<object> ApptEditedCommand { get; set; } 053.    public DelegateCommand<object> ApptDeletedCommand { get; set; } 054.   055.    public SchedulerViewModel(IEventAggregator eventAgg, IRegionManager regionmanager) 056.    { 057.        // set Unity items 058.        this.eventAggregator = eventAgg; 059.        this.regionManager = regionmanager; 060.   061.        // load our context 062.        context = new RecruitingContext(); 063.        LoadOperation<Interview> loadOp = context.Load(context.GetInterviewsQuery()); 064.        loadOp.Completed += new EventHandler(loadOp_Completed); 065.   066.        this._jobsList = new QueryableCollectionView(context.JobPostings); 067.        context.Load(context.GetJobPostingsQuery()); 068.   069.        this._applicantList = new QueryableCollectionView(context.Applicants); 070.        context.Load(context.GetApplicantsQuery()); 071.   072.        AddAppointmentCommand = new DelegateCommand<object>(this.AddAppt); 073.        ApptCreatingCommand = new DelegateCommand<object>(this.ApptCreating); 074.        ApptEditedCommand = new DelegateCommand<object>(this.ApptEdited); 075.        ApptDeletedCommand = new DelegateCommand<object>(this.ApptDeleted); 076.   077.    } 078.   079.    void loadOp_Completed(object sender, EventArgs e) 080.    { 081.        LoadOperation loadop = sender as LoadOperation; 082.   083.        foreach (var ent in loadop.Entities) 084.        { 085.            _interviews.Add(EntityToAppointment(ent as Interview)); 086.        } 087.    } 088.   089.    #region Appointment Adding 090.   091.    public void AddAppt(object obj) 092.    { 093.        // now we have a new InterviewAppointment to add to our QCV :) 094.        InterviewAppointment newInterview = obj as InterviewAppointment; 095.   096.        this.context.Interviews.Add(AppointmentToEntity(newInterview)); 097.        this.context.SubmitChanges((s) => 098.        { 099.            ActionHistory myAction = new ActionHistory(); 100.            myAction.InterviewID = newInterview.InterviewID; 101.            myAction.PostingID = newInterview.PostingID; 102.            myAction.ApplicantID = newInterview.ApplicantID; 103.            myAction.Description = String.Format("Interview with {0} has been created by {1}", newInterview.ApplicantID.ToString(), "default user"); 104.            myAction.TimeStamp = DateTime.Now; 105.            eventAggregator.GetEvent<AddActionEvent>().Publish(myAction); 106.        } 107.            , null); 108.    } 109.   110.    public void ApptCreating(object obj) 111.    { 112.        // handled in the behavior, just a placeholder to ensure it runs :) 113.    } 114.   115.    #endregion 116.   117.    #region Appointment Editing 118.   119.    public void ApptEdited(object obj) 120.    { 121.        Interview editedInterview = (from x in context.Interviews 122.                            where x.InterviewID == (obj as InterviewAppointment).InterviewID 123.                            select x).SingleOrDefault(); 124.   125.        CopyAppointmentEdit(editedInterview, obj as InterviewAppointment); 126.   127.        context.SubmitChanges((s) => { 128.            ActionHistory myAction = new ActionHistory(); 129.            myAction.InterviewID = editedInterview.InterviewID; 130.            myAction.PostingID = editedInterview.PostingID; 131.            myAction.ApplicantID = editedInterview.ApplicantID; 132.            myAction.Description = String.Format("Interview with {0} has been modified by {1}", editedInterview.ApplicantID.ToString(), "default user"); 133.            myAction.TimeStamp = DateTime.Now; 134.            eventAggregator.GetEvent<AddActionEvent>().Publish(myAction); } 135.            , null); 136.    } 137.   138.    #endregion 139.   140.    #region Appointment Deleting 141.   142.    public void ApptDeleted(object obj) 143.    { 144.        Interview deletedInterview = (from x in context.Interviews 145.                                      where x.InterviewID == (obj as InterviewAppointment).InterviewID 146.                                      select x).SingleOrDefault(); 147.   148.        context.Interviews.Remove(deletedInterview); 149.        context.SubmitChanges((s) => 150.        { 151.            ActionHistory myAction = new ActionHistory(); 152.            myAction.InterviewID = deletedInterview.InterviewID; 153.            myAction.PostingID = deletedInterview.PostingID; 154.            myAction.ApplicantID = deletedInterview.ApplicantID; 155.            myAction.Description = String.Format("Interview with {0} has been deleted by {1}", deletedInterview.ApplicantID.ToString(), "default user"); 156.            myAction.TimeStamp = DateTime.Now; 157.            eventAggregator.GetEvent<AddActionEvent>().Publish(myAction); 158.        } 159.            , null); 160.    } 161.   162.    #endregion 163.   164.    #region Appointment Helpers :) 165.   166.    public Interview AppointmentToEntity(InterviewAppointment ia) 167.    { 168.        Interview newInterview = new Interview(); 169.        newInterview.Subject = ia.Subject; 170.        newInterview.Body = ia.Body; 171.        newInterview.Start = ia.Start; 172.        newInterview.End = ia.End; 173.        newInterview.ApplicantID = ia.ApplicantID; 174.        newInterview.PostingID = ia.PostingID; 175.        newInterview.InterviewID = ia.InterviewID; 176.   177.        return newInterview; 178.    } 179.   180.    public InterviewAppointment EntityToAppointment(Interview ia) 181.    { 182.        InterviewAppointment newInterview = new InterviewAppointment(); 183.        newInterview.Subject = ia.Subject; 184.        newInterview.Body = ia.Body; 185.        newInterview.Start = ia.Start; 186.        newInterview.End = ia.End; 187.        newInterview.ApplicantID = ia.ApplicantID; 188.        newInterview.PostingID = ia.PostingID; 189.        newInterview.InterviewID = ia.InterviewID; 190.   191.        return newInterview; 192.    } 193.   194.    public void CopyAppointmentEdit(Interview entityInterview, InterviewAppointment appointmentInterview) 195.    { 196.        entityInterview.Subject = appointmentInterview.Subject; 197.        entityInterview.Body = appointmentInterview.Body; 198.        entityInterview.Start = appointmentInterview.Start; 199.        entityInterview.End = appointmentInterview.End; 200.        entityInterview.ApplicantID = appointmentInterview.ApplicantID; 201.        entityInterview.PostingID = appointmentInterview.PostingID; 202.    } 203.   204.    #endregion 205.} One thing we're doing here which you won't see in any of the other ViewModels is creating a duplicate collection.  I know this is something which will be fixed down the line for using RadScheduler, simplifying this process, but with WCF RIA changing as it does I wanted to ensure functionality would remain consistent as I continued development on this application.  So, I do a little bit of duplication, but for the greater good.  This all takes place starting on line 79, so for every entity that comes back we add it to the collection that is bound to RadScheduler.  Otherwise, the DelegateCommands that you see correspond directly to the events they are named after.  In each case, rather than sending over the full event arguments, I just send in the appointment in question (coming through as the object obj in all cases) so I can add (line 91), edit (line 119), and delete appointments (line 142) like normal.  This just ensures they get updated back to my database.  Also, the one bit of code you won't see is for the Appointment Creating (line 110) event- that is because in the command I've created I simply make the replacement I need to: 1.void element_AppointmentCreating(object sender, AppointmentCreatingEventArgs e) 2.{ 3.    e.NewAppointment = new InterviewAppointment(); 4.    base.ExecuteCommand(); 5.} And the ViewModel is none the wiser, the appointments just work as far as it is concerned since as they are created they become InterviewAppointments.  End result?  I've customized my EditAppointmentDialog as follows: And adding, editing, and deleting appointments works like a charm.  I can even 'edit' by moving appointments around RadScheduler, so as they are dropped into a timeslot they perform their full edit routine and things get updated. And then, the Code-Behind Version Perhaps the thing I like the most about doing one then the other is I get to steal 90% or more of the code from the MVVM version.  For example, the only real changes to the Code-Behind Xaml file exist in the control declaration, in which I use events instead of attached-behavior-event-commands: 01.<telerikScheduler:RadScheduler x:Name="xJobsScheduler" 02.                  Grid.Row="1" 03.                  Grid.Column="1" 04.                  Width="800" 05.                  MinWidth="600" 06.                  Height="500" 07.                  MinHeight="300" 08.                  EditAppointmentStyle="{StaticResource EditAppointmentStyle}" 09.                  AppointmentAdded="xJobsScheduler_AppointmentAdded" 10.                  AppointmentCreating="xJobsScheduler_AppointmentCreating" 11.                  AppointmentEdited="xJobsScheduler_AppointmentEdited" 12.                  AppointmentDeleted="xJobsScheduler_AppointmentDeleted"> 13.</telerikScheduler:RadScheduler> Easy, right?  Otherwise, all the same styling in UserControl.Resources was re-used, right down to the DataContextProxy that lets us bind to a collection from our viewmodel (in this case, our code-behind) to use within the DataTemplate.  The code conversion gets even easier, as I could literally copy and paste almost everything from the ViewModel to my Code-Behind, just a matter of pasting the right section into the right event.  Here's the code-behind as proof: 001.public partial class SchedulingView : UserControl, INotifyPropertyChanged 002.{ 003.    public RecruitingContext context; 004.   005.    private QueryableCollectionView _jobsList; 006.    public QueryableCollectionView JobsList 007.    { 008.        get { return this._jobsList; } 009.        set 010.        { 011.            if (this._jobsList != value) 012.            { 013.                this._jobsList = value; 014.                this.NotifyChanged("JobsList"); 015.            } 016.        } 017.    } 018.   019.    private QueryableCollectionView _applicantList; 020.    public QueryableCollectionView ApplicantList 021.    { 022.        get { return _applicantList; } 023.        set 024.        { 025.            if (_applicantList != value) 026.            { 027.                _applicantList = value; 028.                NotifyChanged("ApplicantList"); 029.            } 030.        } 031.    } 032.   033.    private ObservableItemCollection<InterviewAppointment> _interviews = new ObservableItemCollection<InterviewAppointment>(); 034.    public ObservableItemCollection<InterviewAppointment> Interviews 035.    { 036.        get { return _interviews; } 037.        set 038.        { 039.            if (_interviews != value) 040.            { 041.                _interviews = value; 042.                NotifyChanged("Interviews"); 043.            } 044.        } 045.    } 046.   047.    public SchedulingView() 048.    { 049.        InitializeComponent(); 050.   051.        this.DataContext = this; 052.   053.        this.Loaded += new RoutedEventHandler(SchedulingView_Loaded); 054.    } 055.   056.    void SchedulingView_Loaded(object sender, RoutedEventArgs e) 057.    { 058.        this.xJobsScheduler.AppointmentsSource = Interviews; 059.   060.        context = new RecruitingContext(); 061.           062.        LoadOperation loadop = context.Load(context.GetInterviewsQuery()); 063.        loadop.Completed += new EventHandler(loadop_Completed); 064.   065.        this._applicantList = new QueryableCollectionView(context.Applicants); 066.        context.Load(context.GetApplicantsQuery()); 067.   068.        this._jobsList = new QueryableCollectionView(context.JobPostings); 069.        context.Load(context.GetJobPostingsQuery()); 070.    } 071.   072.    void loadop_Completed(object sender, EventArgs e) 073.    { 074.        LoadOperation loadop = sender as LoadOperation; 075.   076.        _interviews.Clear(); 077.   078.        foreach (var ent in loadop.Entities) 079.        { 080.            _interviews.Add(EntityToAppointment(ent as Interview)); 081.        } 082.    } 083.   084.    private void xJobsScheduler_AppointmentAdded(object sender, Telerik.Windows.Controls.AppointmentAddedEventArgs e) 085.    { 086.        // now we have a new InterviewAppointment to add to our QCV :) 087.        InterviewAppointment newInterview = e.Appointment as InterviewAppointment; 088.   089.        this.context.Interviews.Add(AppointmentToEntity(newInterview)); 090.        this.context.SubmitChanges((s) => 091.        { 092.            ActionHistory myAction = new ActionHistory(); 093.            myAction.InterviewID = newInterview.InterviewID; 094.            myAction.PostingID = newInterview.PostingID; 095.            myAction.ApplicantID = newInterview.ApplicantID; 096.            myAction.Description = String.Format("Interview with {0} has been created by {1}", newInterview.ApplicantID.ToString(), "default user"); 097.            myAction.TimeStamp = DateTime.Now; 098.            context.ActionHistories.Add(myAction); 099.            context.SubmitChanges(); 100.        } 101.            , null); 102.    } 103.   104.    private void xJobsScheduler_AppointmentCreating(object sender, Telerik.Windows.Controls.AppointmentCreatingEventArgs e) 105.    { 106.        e.NewAppointment = new InterviewAppointment(); 107.    } 108.   109.    private void xJobsScheduler_AppointmentEdited(object sender, Telerik.Windows.Controls.AppointmentEditedEventArgs e) 110.    { 111.        Interview editedInterview = (from x in context.Interviews 112.                                     where x.InterviewID == (e.Appointment as InterviewAppointment).InterviewID 113.                                     select x).SingleOrDefault(); 114.   115.        CopyAppointmentEdit(editedInterview, e.Appointment as InterviewAppointment); 116.   117.        context.SubmitChanges((s) => 118.        { 119.            ActionHistory myAction = new ActionHistory(); 120.            myAction.InterviewID = editedInterview.InterviewID; 121.            myAction.PostingID = editedInterview.PostingID; 122.            myAction.ApplicantID = editedInterview.ApplicantID; 123.            myAction.Description = String.Format("Interview with {0} has been modified by {1}", editedInterview.ApplicantID.ToString(), "default user"); 124.            myAction.TimeStamp = DateTime.Now; 125.            context.ActionHistories.Add(myAction); 126.            context.SubmitChanges(); 127.        } 128.            , null); 129.    } 130.   131.    private void xJobsScheduler_AppointmentDeleted(object sender, Telerik.Windows.Controls.AppointmentDeletedEventArgs e) 132.    { 133.        Interview deletedInterview = (from x in context.Interviews 134.                                      where x.InterviewID == (e.Appointment as InterviewAppointment).InterviewID 135.                                      select x).SingleOrDefault(); 136.   137.        context.Interviews.Remove(deletedInterview); 138.        context.SubmitChanges((s) => 139.        { 140.            ActionHistory myAction = new ActionHistory(); 141.            myAction.InterviewID = deletedInterview.InterviewID; 142.            myAction.PostingID = deletedInterview.PostingID; 143.            myAction.ApplicantID = deletedInterview.ApplicantID; 144.            myAction.Description = String.Format("Interview with {0} has been deleted by {1}", deletedInterview.ApplicantID.ToString(), "default user"); 145.            myAction.TimeStamp = DateTime.Now; 146.            context.ActionHistories.Add(myAction); 147.            context.SubmitChanges(); 148.        } 149.            , null); 150.    } 151.   152.    #region Appointment Helpers :) 153.   154.    public Interview AppointmentToEntity(InterviewAppointment ia) 155.    { 156.        Interview newInterview = new Interview(); 157.        newInterview.Subject = ia.Subject; 158.        newInterview.Body = ia.Body; 159.        newInterview.Start = ia.Start; 160.        newInterview.End = ia.End; 161.        newInterview.ApplicantID = ia.ApplicantID; 162.        newInterview.PostingID = ia.PostingID; 163.        newInterview.InterviewID = ia.InterviewID; 164.   165.        return newInterview; 166.    } 167.   168.    public InterviewAppointment EntityToAppointment(Interview ia) 169.    { 170.        InterviewAppointment newInterview = new InterviewAppointment(); 171.        newInterview.Subject = ia.Subject; 172.        newInterview.Body = ia.Body; 173.        newInterview.Start = ia.Start; 174.        newInterview.End = ia.End; 175.        newInterview.ApplicantID = ia.ApplicantID; 176.        newInterview.PostingID = ia.PostingID; 177.        newInterview.InterviewID = ia.InterviewID; 178.   179.        return newInterview; 180.    } 181.   182.    public void CopyAppointmentEdit(Interview entityInterview, InterviewAppointment appointmentInterview) 183.    { 184.        entityInterview.Subject = appointmentInterview.Subject; 185.        entityInterview.Body = appointmentInterview.Body; 186.        entityInterview.Start = appointmentInterview.Start; 187.        entityInterview.End = appointmentInterview.End; 188.        entityInterview.ApplicantID = appointmentInterview.ApplicantID; 189.        entityInterview.PostingID = appointmentInterview.PostingID; 190.    } 191.   192.    #endregion 193.   194.    #region INotifyPropertyChanged Members 195.   196.    public event PropertyChangedEventHandler PropertyChanged; 197.   198.    public void NotifyChanged(string propertyName) 199.    { 200.        if (string.IsNullOrEmpty(propertyName)) 201.            throw new ArgumentException("propertyName"); 202.   203.        PropertyChanged(this, new PropertyChangedEventArgs(propertyName)); 204.    } 205.   206.    #endregion 207.} Nice... right? :) One really important thing to note as well.  See on line 51 where I set the DataContext before the Loaded event?  This is super important, as if you don't have this set before the usercontrol is loaded, the DataContextProxy has no context to use and your EditAppointmentDialog Job/Applicant dropdowns will be blank and empty.  Trust me on this, took a little bit of debugging to figure out that by setting the DataContext post-loaded would only lead to disaster and frustration.  Otherwise, the only other real difference is that instead of sending an ActionHistory item through an event to get added to the database and saved, I do those right in the callback from submitting.  The Result Again, I only have to post one picture because these bad boys used nearly identical code for both the MVVM and the code-behind views, so our end result is... So what have we learned here today?  One, for the most part this MVVM thing is somewhat easy.  Yeah, you sometimes have to write a bunch of extra code, but with the help of a few useful snippits you can turn the process into a pretty streamlined little workflow.  Heck, this story gets even easier as you can see in this blog post by Michael Washington- specifically run a find on 'InvokeCommandAction' and you'll see the section regarding the command on TreeView in Blend 4.  Brilliant!  MVVM never looked so sweet! Otherwise, it is business as usual with RadScheduler for Silverlight whichever path you're choosing for your development.  Between now and the next post, I'll be cleaning up styles a bit (those RadComboBoxes are a little too close to my labels!) and adding some to the RowDetailsViews for Applicants and Jobs, so you can see all the info for an appointment in the dropdown tab view.  Otherwise, we're about ready to call a wrap on this oneDid you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • Searching for tasks with code – Executables and Event Handlers

    Searching packages or just enumerating through all tasks is not quite as straightforward as it may first appear, mainly because of the way you can nest tasks within other containers. You can see this illustrated in the sample package below where I have used several sequence containers and loops. To complicate this further all containers types, including packages and tasks, can have event handlers which can then support the full range of nested containers again. Towards the lower right, the task called SQL In FEL also has an event handler not shown, within which is another Execute SQL Task, so that makes a total of 6 Execute SQL Tasks 6 tasks spread across the package. In my previous post about such as adding a property expressionI kept it simple and just looked at tasks at the package level, but what if you wanted to find any or all tasks in a package? For this post I've written a console program that will search a package looking at all tasks no matter how deeply nested, and check to see if the name starts with "SQL". When it finds a matching task it writes out the hierarchy by name for that task, starting with the package and working down to the task itself. The output for our sample package is shown below, note it has found all 6 tasks, including the one on the OnPreExecute event of the SQL In FEL task TaskSearch v1.0.0.0 (1.0.0.0) Copyright (C) 2009 Konesans Ltd Processing File - C:\Projects\Alpha\Packages\MyPackage.dtsx MyPackage\FOR Counter Loop\SQL In Counter Loop MyPackage\SEQ For Each Loop Wrapper\FEL Simple Loop\SQL In FEL MyPackage\SEQ For Each Loop Wrapper\FEL Simple Loop\SQL In FEL\OnPreExecute\SQL On Pre Execute for FEL SQL Task MyPackage\SEQ Top Level\SEQ Nested Lvl 1\SEQ Nested Lvl 2\SQL In Nested Lvl 2 MyPackage\SEQ Top Level\SEQ Nested Lvl 1\SQL In Nested Lvl 1 #1 MyPackage\SEQ Top Level\SEQ Nested Lvl 1\SQL In Nested Lvl 1 #2 6 matching tasks found in package. The full project and code is available for download below, but first we can walk through the project to highlight the most important sections of code. This code has been abbreviated for this description, but is complete in the download. First of all we load the package, and then start by looking at the Executables for the package. // Load the package file Application application = new Application(); using (Package package = application.LoadPackage(filename, null)) { int matchCount = 0; // Look in the package's executables ProcessExecutables(package.Executables, ref matchCount); ... // // ... // Write out final count Console.WriteLine("{0} matching tasks found in package.", matchCount); } The ProcessExecutables method is a key method, as an executable could be described as the the highest level of a working functionality or container. There are several of types of executables, such as tasks, or sequence containers and loops. To know what to do next we need to work out what type of executable we are dealing with as the abbreviated version of method shows below. private static void ProcessExecutables(Executables executables, ref int matchCount) { foreach (Executable executable in executables) { TaskHost taskHost = executable as TaskHost; if (taskHost != null) { ProcessTaskHost(taskHost, ref matchCount); ProcessEventHandlers(taskHost.EventHandlers, ref matchCount); continue; } ... // // ... ForEachLoop forEachLoop = executable as ForEachLoop; if (forEachLoop != null) { ProcessExecutables(forEachLoop.Executables, ref matchCount); ProcessEventHandlers(forEachLoop.EventHandlers, ref matchCount); continue; } } } As you can see if the executable we find is a task we then call out to our ProcessTaskHost method. As with all of our executables a task can have event handlers which themselves contain more executables such as task and loops, so we also make a call out our ProcessEventHandlers method. The other types of executables such as loops can also have event handlers as well as executables. As shown with the example for the ForEachLoop we call the same ProcessExecutables and ProcessEventHandlers methods again to drill down into the hierarchy of objects that the package may contain. This code needs to explicitly check for each type of executable (TaskHost, Sequence, ForLoop and ForEachLoop) because whilst they all have an Executables property this is not from a common base class or interface. This example was just a simple find a task by its name, so ProcessTaskHost really just does that. We also get the hierarchy of objects so we can write out for information, obviously you can adapt this method to do something more interesting such as adding a property expression. private static void ProcessTaskHost(TaskHost taskHost, ref int matchCount) { if (taskHost == null) { return; } // Check if the task matches our match name if (taskHost.Name.StartsWith(TaskNameFilter, StringComparison.OrdinalIgnoreCase)) { // Build up the full object hierarchy of the task // so we can write it out for information StringBuilder path = new StringBuilder(); DtsContainer container = taskHost; while (container != null) { path.Insert(0, container.Name); container = container.Parent; if (container != null) { path.Insert(0, "\\"); } } // Write the task path // e.g. Package\Container\Event\Task Console.WriteLine(path); Console.WriteLine(); // Increment match counter for info matchCount++; } } Just for completeness, the other processing method we covered above is for event handlers, but really that just calls back to the executables. This same method is called in our main package method, but it was omitted for brevity here. private static void ProcessEventHandlers(DtsEventHandlers eventHandlers, ref int matchCount) { foreach (DtsEventHandler eventHandler in eventHandlers) { ProcessExecutables(eventHandler.Executables, ref matchCount); } } As hopefully the code demonstrates, executables (Microsoft.SqlServer.Dts.Runtime.Executable) are the workers, but within them you can nest more executables (except for task tasks).Executables themselves can have event handlers which can in turn hold more executables. I have tried to illustrate this highlight the relationships in the following diagram. Download Sample code project TaskSearch.zip (11KB)

    Read the article

  • Last week I was presented with a Microsoft MVP award in Virtual Machines – time to thank all who hel

    - by Liam Westley
    MVP in Virtual Machines Last week, on 1st April, I received an e-mail from Microsoft letting me know that I had been presented with a 2010 Microsoft® MVP Award for outstanding contributions in Virtual Machine technical communities during the past year.   It was an honour to be nominated, and is a great reflection on the vibrancy of the UK user group community which made this possible. Virtualisation for developers, not just IT Pros I consider it a special honour as my expertise in virtualisation is as a software developer utilising virtual machines to aid my software development, rather than an IT Pro who manages data centre and network infrastructure.  I’ve been on a minor mission over the past few years to enthuse developers in a topic usually seen as only for network admins, but which can make their life a whole lot easier once understood properly. Continuous learning is fun In 1676, the scientist Isaac Newton, in a letter to Robert Hooke used the phrase (http://www.phrases.org.uk/meanings/268025.html) ‘If I have seen a little further it is by standing on the shoulders of Giants’ I’m a nuclear physicist by education, so I am more than comfortable that any knowledge I have is based on the work of others.  Although far from a science, software development and IT is equally built upon the work of others. It’s one of the reasons I despise software patents. So in that sense this MVP award is a result of all the great minds that have provided virtualisation solutions for me to talk about.  I hope that I have always acknowledged those whose work I have used when blogging or giving presentations, and that I have executed my responsibility to share any knowledge gained as widely as possible. Thanks to all those who helped – a big thanks to the UK user group community I reckon this journey started in 2003 when I started attending a user group called the London .Net Users Group (http://www.dnug.org.uk) started by a nice chap called Ian Cooper. The great thing about Ian was that he always encouraged non professional speakers to take the stage at the user group, and my first ever presentation was on 30th September 2003; SQL Server CE 2.0 and the.NET Compact Framework. In 2005 Ian Cooper was on the committee for the first DeveloperDeveloperDeveloper! day, the free community conference held at Microsoft’s UK HQ in Thames Valley park in Reading.  He encouraged me to take part and so on 14th May 2005 I presented a talk previously given to the London .Net User Group on Simplifying access to multiple DB providers in .NET.  From that point on I definitely had the bug; presenting at DDD2, DDD3, groking at DDD4 and SQLBits I and after a break, DDD7, DDD Scotland and DDD8.  What definitely made me keen was the encouragement and infectious enthusiasm of some of the other DDD organisers; Craig Murphy, Barry Dorrans, Phil Winstanley and Colin Mackay. During the first few DDD events I met the Dave McMahon and Richard Costall from NxtGenUG who made it easy to start presenting at their user groups.  Along the way I’ve met a load of great user group organisers; Guy Smith-Ferrier of the .Net Developer Network, Jimmy Skowronski of GL.Net and the double act of Ray Booysen and Gavin Osborn behind what was Vista Squad and is now Edge UG. Final thanks to those who suggested virtualisation as a topic ... Final thanks have to go the people who inspired me to create my Virtualisation for Developers talk.  Toby Henderson (@holytshirt) ensured I took notice of Sun’s VirtualBox, Peter Ibbotson for being a fine sounding board at the Kew Railway over quite a few Adnam’s Broadside and to Guy Smith-Ferrier for allowing his user group to be the guinea pigs for the talk before it was seen at DDD7.  Thanks to all of you I now know much more about virtualisation than I would have thought possible and it continues to be great fun. Conclusion If this was an academy award acceptance speech I would have been cut off after the first few paragraphs, so well done if you made it this far.  I’ll be doing my best to do justice to the MVP award and the UK community.  I’m fortunate in having a new employer who considers presenting at user groups as a good thing, so don’t expect me to stop any time soon. If you’ve never seen me in action, then you can view the original DDD7 Virtualisation for Developers presentation (filmed by the Microsoft Channel 9 team) as part of the full DDD7 video list here, http://www.craigmurphy.com/blog/?p=1591.  Also thanks to Craig Murphy’s fine video work you can also view my latest DDD8 presentation on Commercial Software Development, here, http://vimeo.com/9216563 P.S. If I’ve missed anyone out, do feel free to lambast me in comments, it’s your duty.

    Read the article

  • Silverlight Recruiting Application Part 6 - Adding an Interview Scheduling Module/View

    Between the last post and this one I went ahead and carried the ideas for the Jobs module and view into the Applicants module and view- they're both doing more or less the same thing, except with different objects being at their core.  Made for an easy cut-and-paste operation with a few items being switched from one to another.  Now that we have the ability to add postings and applicants, wouldn't it be nice if we could schedule an interview?  Of course it would! Scheduling Module I think you get the drift from previous posts that these project structures start looking somewhat similar.  The interview scheduling module is no different than the rest- it gets a SchedulingModule.cs file at the root that inherits from IModule, and there is a single SchedulerView.xsml and SchedulerViewModel.cs setup for our V+VM.  We have one unique concern as we enter into this- RadScheduler deals with AppointmentsSource, not ItemsSource, so there are some special considerations to take into account when planning this module. First, I need something which inherits from AppointmentBase.  This is the core of the RadScheduler appointment, and if you are planning to do any form of custom appointment, you'll want it to inherit from this.  Then you can add-on functionality as needed.  Here is my addition to the mix, the InterviewAppointment: 01.public class InterviewAppointment : AppointmentBase 02.{ 03.    private int _applicantID; 04.    public int ApplicantID 05.    { 06.        get { return this._applicantID; } 07.        set 08.        { 09.            if (_applicantID != value) 10.            { 11.                _applicantID = value; 12.                OnPropertyChanged("ApplicantID"); 13.            } 14.        } 15.    } 16.   17.    private int _postingID; 18.    public int PostingID 19.    { 20.        get { return _postingID; } 21.        set 22.        { 23.            if (_postingID != value) 24.            { 25.                _postingID = value; 26.                OnPropertyChanged("PostingID"); 27.            } 28.        } 29.    } 30.   31.    private string _body; 32.    public string Body 33.    { 34.        get { return _body; } 35.        set 36.        { 37.            if (_body != value) 38.            { 39.                _body = value; 40.                OnPropertyChanged("Body"); 41.            } 42.        } 43.    } 44.   45.    private int _interviewID; 46.    public int InterviewID 47.    { 48.        get { return _interviewID; } 49.        set 50.        { 51.            if (_interviewID != value) 52.            { 53.                _interviewID = value; 54.                OnPropertyChanged("InterviewID"); 55.            } 56.        } 57.    } 58.   59.    public override IAppointment Copy() 60.    { 61.        IAppointment appointment = new InterviewAppointment(); 62.        appointment.CopyFrom(this);             63.        return appointment; 64.    } 65.   66.    public override void CopyFrom(IAppointment other) 67.    {             68.        base.CopyFrom(other); 69.        var appointment = other as InterviewAppointment; 70.        if (appointment != null) 71.        { 72.            ApplicantID = appointment.ApplicantID; 73.            PostingID = appointment.PostingID; 74.            Body = appointment.Body; 75.            InterviewID = appointment.InterviewID; 76.        } 77.    } 78.} Nothing too exciting going on here, we just make sure that our custom fields are persisted (specifically set in CopyFrom at the bottom) and notifications are fired- otherwise this ends up exactly like the standard appointment as far as interactions, etc.  But if we've got custom appointment items... that also means we need to customize what our appointment dialog window will look like. Customizing the Edit Appointment Dialog This initially sounds a lot more intimidating than it really is.  The first step here depends on what you're dealing with for theming, but for ease of everything I went ahead and extracted my templates in Blend for RadScheduler so I could modify it as I pleased.  For the faint of heart, the RadScheduler template is a few thousand lines of goodness since there are some very complex things going on in that control.  I've gone ahead and trimmed down the template parts I don't need as much as possible, so what is left is all that is relevant to the Edit Appointment Dialog.  Here's the resulting Xaml, with line numbers, so I can explain further: 001.<UserControl.Resources> 002.    <!-- begin Necessary Windows 7 Theme Resources for EditAppointmentTemplate --> 003.    <helpers:DataContextProxy x:Key="DataContextProxy" /> 004.       005.    <telerik:Windows7Theme x:Key="Theme" /> 006.    <SolidColorBrush x:Key="DialogWindowBackground" 007.                     Color="White" /> 008.    <SolidColorBrush x:Key="CategorySelectorBorderBrush" 009.                     Color="#FFB1B1B1" /> 010.    <LinearGradientBrush x:Key="RadToolBar_InnerBackground" 011.                         EndPoint="0.5,1" 012.                         StartPoint="0.5,0"> 013.        <GradientStop Color="#FFFDFEFF" 014.                      Offset="0" /> 015.        <GradientStop Color="#FFDDE9F7" 016.                      Offset="1" /> 017.        <GradientStop Color="#FFE6F0FA" 018.                      Offset="0.5" /> 019.        <GradientStop Color="#FFDCE6F4" 020.                      Offset="0.5" /> 021.    </LinearGradientBrush> 022.    <Style x:Key="FormElementTextBlockStyle" 023.           TargetType="TextBlock"> 024.        <Setter Property="HorizontalAlignment" 025.                Value="Right" /> 026.        <Setter Property="VerticalAlignment" 027.                Value="Top" /> 028.        <Setter Property="Margin" 029.                Value="15, 15, 0, 2" /> 030.    </Style> 031.    <Style x:Key="FormElementStyle" 032.           TargetType="FrameworkElement"> 033.        <Setter Property="Margin" 034.                Value="10, 10, 0, 2" /> 035.    </Style> 036.    <SolidColorBrush x:Key="GenericShallowBorderBrush" 037.                     Color="#FF979994" /> 038.    <telerik:BooleanToVisibilityConverter x:Key="BooleanToVisibilityConverter" /> 039.    <telerikScheduler:ImportanceToBooleanConverter x:Key="ImportanceToBooleanConverter" /> 040.    <telerikScheduler:NullToVisibilityConverter x:Key="NullToVisibilityConverter" /> 041.    <telerikScheduler:InvertedNullToVisibilityConverter x:Key="InvertedNullToVisibilityConverter" /> 042.    <scheduler:ResourcesSeparatorConverter x:Key="ResourcesSeparatorConverter" /> 043.    <DataTemplate x:Key="IconDataEditTemplate"> 044.        <Image Source="/Telerik.Windows.Controls.Scheduler;component/Themes/Office/Images/cal.png" 045.               Margin="3,3,0,0" 046.               Width="16" 047.               Height="16" /> 048.    </DataTemplate> 049.    <DataTemplate x:Key="SingleSelectionTemplate"> 050.        <Grid VerticalAlignment="Stretch" 051.              HorizontalAlignment="Stretch"> 052.            <Grid.RowDefinitions> 053.                <RowDefinition Height="Auto" /> 054.            </Grid.RowDefinitions> 055.            <Grid.ColumnDefinitions> 056.                <ColumnDefinition Width="Auto" 057.                                  MinWidth="84" /> 058.                <ColumnDefinition Width="Auto" 059.                                  MinWidth="200" /> 060.            </Grid.ColumnDefinitions> 061.            <TextBlock x:Name="SelectionNameLabel" 062.                       Margin="0,13,4,2" 063.                       Text="{Binding ResourceType.DisplayName}" 064.                       Style="{StaticResource FormElementTextBlockStyle}" 065.                       Grid.Column="0" /> 066.            <telerikInput:RadComboBox ItemsSource="{Binding ResourceItems}" 067.                                      Width="185" 068.                                      Margin="5,10,20,2" 069.                                      HorizontalAlignment="Left" 070.                                      Grid.Column="1" 071.                                      ClearSelectionButtonVisibility="Visible" 072.                                      ClearSelectionButtonContent="Clear All" 073.                                      DisplayMemberPath="Resource.DisplayName" 074.                                      telerik:StyleManager.Theme="{StaticResource Theme}" 075.                                      SelectedItem="{Binding SelectedItem, Mode=TwoWay}" /> 076.        </Grid> 077.    </DataTemplate> 078.    <DataTemplate x:Key="MultipleSelectionTemplate"> 079.        <Grid VerticalAlignment="Stretch" 080.              HorizontalAlignment="Stretch"> 081.            <Grid.RowDefinitions> 082.                <RowDefinition Height="Auto" /> 083.            </Grid.RowDefinitions> 084.            <Grid.ColumnDefinitions> 085.                <ColumnDefinition Width="Auto" 086.                                  MinWidth="84" /> 087.                <ColumnDefinition Width="Auto" 088.                                  MinWidth="200" /> 089.            </Grid.ColumnDefinitions> 090.            <TextBlock x:Name="SelectionNameLabel" 091.                       Grid.Column="0" 092.                       Text="{Binding ResourceType.DisplayName}" 093.                       Margin="0,13,4,2" 094.                       Style="{StaticResource FormElementTextBlockStyle}" /> 095.            <telerikInput:RadComboBox Grid.Column="1" 096.                                      Width="185" 097.                                      HorizontalAlignment="Left" 098.                                      Margin="5,10,20,2" 099.                                      ItemsSource="{Binding ResourceItems}" 100.                                      SelectedIndex="{Binding SelectedIndex, Mode=TwoWay}" 101.                                      ClearSelectionButtonVisibility="Visible" 102.                                      ClearSelectionButtonContent="Clear All" 103.                                      telerik:StyleManager.Theme="{StaticResource Theme}"> 104.                <telerikInput:RadComboBox.ItemTemplate> 105.                    <DataTemplate> 106.                        <Grid HorizontalAlignment="Stretch" 107.                              VerticalAlignment="Stretch"> 108.                            <CheckBox VerticalAlignment="Center" 109.                                      HorizontalContentAlignment="Stretch" 110.                                      VerticalContentAlignment="Center" 111.                                      IsChecked="{Binding IsChecked, Mode=TwoWay}" 112.                                      Content="{Binding Resource.DisplayName}"> 113.                                <CheckBox.ContentTemplate> 114.                                    <DataTemplate> 115.                                        <TextBlock HorizontalAlignment="Stretch" 116.                                                   VerticalAlignment="Stretch" 117.                                                   Text="{Binding Content, RelativeSource={RelativeSource TemplatedParent}}" /> 118.                                    </DataTemplate> 119.                                </CheckBox.ContentTemplate> 120.                            </CheckBox> 121.                        </Grid> 122.                    </DataTemplate> 123.                </telerikInput:RadComboBox.ItemTemplate> 124.            </telerikInput:RadComboBox> 125.        </Grid> 126.    </DataTemplate> 127.    <scheduler:ResourceTypeTemplateSelector x:Key="ItemTemplateSelector" 128.                                            MultipleSelectionTemplate="{StaticResource MultipleSelectionTemplate}" 129.                                            SingleSelectionTemplate="{StaticResource SingleSelectionTemplate}" /> 130.    <!-- end Necessary Windows 7 Theme Resources for EditAppointmentTemplate -->  131.       132.    <ControlTemplate x:Key="EditAppointmentTemplate" 133.                     TargetType="telerikScheduler:AppointmentDialogWindow"> 134.        <StackPanel Background="{TemplateBinding Background}" 135.                    UseLayoutRounding="True"> 136.            <StackPanel Grid.Row="0" 137.                        Orientation="Horizontal" 138.                        Background="{StaticResource RadToolBar_InnerBackground}" 139.                        Grid.ColumnSpan="2" 140.                        Height="0"> 141.                <!-- Recurrence buttons --> 142.                <Border Margin="1,1,0,0" 143.                        Background="#50000000" 144.                        HorizontalAlignment="Left" 145.                        VerticalAlignment="Center" 146.                        Width="2" 147.                        Height="16"> 148.                    <Border Margin="0,0,1,1" 149.                            Background="#80FFFFFF" 150.                            HorizontalAlignment="Left" 151.                            Width="1" /> 152.                </Border> 153.                <Border Margin="1,1,0,0" 154.                        Background="#50000000" 155.                        HorizontalAlignment="Left" 156.                        VerticalAlignment="Center" 157.                        Width="2" 158.                        Height="16"> 159.                    <Border Margin="0,0,1,1" 160.                            Background="#80FFFFFF" 161.                            HorizontalAlignment="Left" 162.                            Width="1" /> 163.                </Border> 164.                <TextBlock telerik:LocalizationManager.ResourceKey="ShowAs" 165.                           VerticalAlignment="Center" 166.                           Margin="5,0,0,0" /> 167.                <telerikInput:RadComboBox ItemsSource="{TemplateBinding TimeMarkers}" 168.                                          Width="100" 169.                                          Height="20" 170.                                          VerticalAlignment="Center" 171.                                          Margin="5,0,0,0" 172.                                          ClearSelectionButtonVisibility="Visible" 173.                                          ClearSelectionButtonContent="Clear" 174.                                          SelectedItem="{Binding TimeMarker,RelativeSource={RelativeSource TemplatedParent},Mode=TwoWay}" 175.                                          telerik:StyleManager.Theme="{StaticResource Theme}"> 176.                    <telerikInput:RadComboBox.ItemTemplate> 177.                        <DataTemplate> 178.                            <StackPanel Orientation="Horizontal"> 179.                                <Rectangle Fill="{Binding TimeMarkerBrush}" 180.                                           Margin="2" 181.                                           Width="12" 182.                                           Height="12" /> 183.                                <TextBlock Text="{Binding TimeMarkerName}" 184.                                           Margin="2" /> 185.                            </StackPanel> 186.                        </DataTemplate> 187.                    </telerikInput:RadComboBox.ItemTemplate> 188.                </telerikInput:RadComboBox> 189.                <telerik:RadToggleButton x:Name="High" 190.                                         BorderThickness="0" 191.                                         Background="{StaticResource RadToolBar_InnerBackground}" 192.                                         DataContext="{TemplateBinding EditedAppointment}" 193.                                         telerik:StyleManager.Theme="{StaticResource Theme}" 194.                                         IsChecked="{Binding Importance,Mode=TwoWay, Converter={StaticResource ImportanceToBooleanConverter},ConverterParameter=High}" 195.                                         Margin="2,2,0,2" 196.                                         Width="23" 197.                                         Height="23" 198.                                         HorizontalContentAlignment="Center" 199.                                         ToolTipService.ToolTip="High importance" 200.                                         CommandParameter="High" 201.                                         Command="telerikScheduler:RadSchedulerCommands.SetAppointmentImportance"> 202.                    <StackPanel HorizontalAlignment="Center"> 203.                        <Path Stretch="Fill" 204.                              Height="10" 205.                              HorizontalAlignment="Center" 206.                              VerticalAlignment="Top" 207.                              Width="5.451" 208.                              Data="M200.39647,58.840393 C200.39337,58.336426 201.14566,57.683922 202.56244,57.684292 C204.06589,57.684685 204.73764,58.357765 204.72783,58.992363 C205.04649,61.795574 203.04713,64.181099 202.47388,66.133446 C201.93753,64.154961 199.9471,61.560352 200.39647,58.840393 z"> 209.                            <Path.Fill> 210.                                <LinearGradientBrush EndPoint="1.059,0.375" 211.                                                     StartPoint="-0.457,0.519"> 212.                                    <GradientStop Color="#FFFF0606" 213.                                                  Offset="0.609" /> 214.                                    <GradientStop Color="#FFBF0303" 215.                                                  Offset="0.927" /> 216.                                </LinearGradientBrush> 217.                            </Path.Fill> 218.                        </Path> 219.                        <Ellipse Height="3" 220.                                 HorizontalAlignment="Center" 221.                                 Margin="0,-1,0,0" 222.                                 VerticalAlignment="Top" 223.                                 Width="3"> 224.                            <Ellipse.Fill> 225.                                <RadialGradientBrush> 226.                                    <GradientStop Color="#FFFF0606" 227.                                                  Offset="0" /> 228.                                    <GradientStop Color="#FFBF0303" 229.                                                  Offset="1" /> 230.                                </RadialGradientBrush> 231.                            </Ellipse.Fill> 232.                        </Ellipse> 233.                    </StackPanel> 234.                </telerik:RadToggleButton> 235.                <telerik:RadToggleButton x:Name="Low" 236.                                         HorizontalContentAlignment="Center" 237.                                         BorderThickness="0" 238.                                         Background="{StaticResource RadToolBar_InnerBackground}" 239.                                         DataContext="{TemplateBinding EditedAppointment}" 240.                                         IsChecked="{Binding Importance,Mode=TwoWay, Converter={StaticResource ImportanceToBooleanConverter},ConverterParameter=Low}" 241.                                         Margin="0,2,0,2" 242.                                         Width="23" 243.                                         Height="23" 244.                                         ToolTipService.ToolTip="Low importance" 245.                                         CommandParameter="Low" 246.                                         telerik:StyleManager.Theme="{StaticResource Theme}" 247.                                         Command="telerikScheduler:RadSchedulerCommands.SetAppointmentImportance"> 248.                    <Path Stretch="Fill" 249.                          Height="12" 250.                          HorizontalAlignment="Center" 251.                          VerticalAlignment="Top" 252.                          Width="9" 253.                          Data="M222.40353,60.139881 L226.65768,60.139843 L226.63687,67.240196 L229.15347,67.240196 L224.37816,71.394943 L219.65274,67.240196 L222.37572,67.219345 z" 254.                          Stroke="#FF0365A7"> 255.                        <Path.Fill> 256.                            <LinearGradientBrush EndPoint="1.059,0.375" 257.                                                 StartPoint="-0.457,0.519"> 258.                                <GradientStop Color="#FFBBE4FF" /> 259.                                <GradientStop Color="#FF024572" 260.                                              Offset="0.836" /> 261.                                <GradientStop Color="#FF43ADF4" 262.                                              Offset="0.466" /> 263.                            </LinearGradientBrush> 264.                        </Path.Fill> 265.                    </Path> 266.                </telerik:RadToggleButton> 267.            </StackPanel > 268.            <Border DataContext="{TemplateBinding EditedAppointment}" 269.                    Background="{Binding Category.CategoryBrush}" 270.                    Visibility="{Binding Category,Converter={StaticResource NullToVisibilityConverter}}" 271.                    CornerRadius="3" 272.                    Height="20" 273.                    Margin="5,10,5,0"> 274.                <TextBlock Text="{Binding Category.DisplayName}" 275.                           VerticalAlignment="Center" 276.                           Margin="5,0,0,0" /> 277.            </Border> 278.            <Grid VerticalAlignment="Stretch" 279.                  HorizontalAlignment="Stretch" 280.                  DataContext="{TemplateBinding EditedAppointment}" 281.                  Background="{TemplateBinding Background}"> 282.                <Grid.RowDefinitions> 283.                    <RowDefinition Height="Auto" /> 284.                    <RowDefinition Height="Auto" /> 285.                    <RowDefinition Height="Auto" /> 286.                    <RowDefinition Height="Auto" /> 287.                    <RowDefinition Height="Auto" /> 288.                    <RowDefinition Height="Auto" /> 289.                    <RowDefinition Height="Auto" /> 290.                    <RowDefinition Height="Auto" /> 291.                    <RowDefinition Height="Auto" /> 292.                    <RowDefinition Height="Auto" /> 293.                </Grid.RowDefinitions> 294.                <Grid.ColumnDefinitions> 295.                    <ColumnDefinition Width="Auto" 296.                                      MinWidth="100" /> 297.                    <ColumnDefinition Width="Auto" 298.                                      MinWidth="200" /> 299.                </Grid.ColumnDefinitions> 300.                <!-- Subject --> 301.                <TextBlock x:Name="SubjectLabel" 302.                           Grid.Row="0" 303.                           Grid.Column="0" 304.                           Margin="0,15,0,2" 305.                           telerik:LocalizationManager.ResourceKey="Subject" 306.                           Style="{StaticResource FormElementTextBlockStyle}" /> 307.                <TextBox x:Name="Subject" 308.                         Grid.Row="0" 309.                         Grid.Column="1" 310.                         MinHeight="22" 311.                         Padding="4 2" 312.                         Width="340" 313.                         HorizontalAlignment="Left" 314.                         Text="{Binding Subject, Mode=TwoWay}" 315.                         MaxLength="255" 316.                         telerik:StyleManager.Theme="{StaticResource Theme}" 317.                         Margin="10,12,20,2" /> 318.                <!-- Description --> 319.                <TextBlock x:Name="DescriptionLabel" 320.                           Grid.Row="1" 321.                           Grid.Column="0" 322.                           Margin="0,13,0,2" 323.                           telerik:LocalizationManager.ResourceKey="Body" 324.                           Style="{StaticResource FormElementTextBlockStyle}" /> 325.                <TextBox x:Name="Body" 326.                         VerticalAlignment="top" 327.                         Grid.Row="1" 328.                         Grid.Column="1" 329.                         Height="Auto" 330.                         MaxHeight="82" 331.                         Width="340" 332.                         HorizontalAlignment="Left" 333.                         MinHeight="22" 334.                         Padding="4 2" 335.                         TextWrapping="Wrap" 336.                         telerik:StyleManager.Theme="{StaticResource Theme}" 337.                         Text="{Binding Body, Mode=TwoWay}" 338.                         AcceptsReturn="true" 339.                         Margin="10,10,20,2" 340.                         HorizontalScrollBarVisibility="Auto" 341.                         VerticalScrollBarVisibility="Auto" /> 342.                <!-- Start/End date --> 343.                <TextBlock x:Name="StartDateLabel" 344.                           Grid.Row="2" 345.                           Grid.Column="0" 346.                           Margin="0,13,0,2" 347.                           telerik:LocalizationManager.ResourceKey="StartTime" 348.                           Style="{StaticResource FormElementTextBlockStyle}" /> 349.                <telerikScheduler:DateTimePicker x:Name="StartDateTime" 350.                                                 Height="22" 351.                                                 Grid.Row="2" 352.                                                 Grid.Column="1" 353.                                                 HorizontalAlignment="Left" 354.                                                 Margin="10,10,20,2" 355.                                                 Style="{StaticResource FormElementStyle}" 356.                                                 SelectedDateTime="{Binding Start, Mode=TwoWay}" 357.                                                 telerikScheduler:StartEndDatePicker.EndPicker="{Binding ElementName=EndDateTime}" 358.                                                 IsTabStop="False" 359.                                                 IsEnabled="False" /> 360.                <TextBlock x:Name="EndDateLabel" 361.                           Grid.Row="3" 362.                           Grid.Column="0" 363.                           Margin="0,13,0,2" 364.                           telerik:LocalizationManager.ResourceKey="EndTime" 365.                           Style="{StaticResource FormElementTextBlockStyle}" /> 366.                <telerikScheduler:DateTimePicker x:Name="EndDateTime" 367.                                                 Height="22" 368.                                                 Grid.Row="3" 369.                                                 Grid.Column="1" 370.                                                 HorizontalAlignment="Left" 371.                                                 Margin="10,10,20,2" 372.                                                 Style="{StaticResource FormElementStyle}" 373.                                                 IsTabStop="False" 374.                                                 IsEnabled="False" 375.                                                 SelectedDateTime="{Binding End, Mode=TwoWay}" /> 376.                <!-- Is-all-day selector --> 377.                <CheckBox x:Name="AllDayEventCheckbox" 378.                          IsChecked="{Binding IsAllDayEvent, Mode=TwoWay}" 379.                          Grid.Row="4" 380.                          Grid.Column="1" 381.                          Margin="10,10,20,2" 382.                          HorizontalAlignment="Left" 383.                          telerik:StyleManager.Theme="{StaticResource Theme}" 384.                          telerik:LocalizationManager.ResourceKey="AllDayEvent"> 385.                    <telerik:CommandManager.InputBindings> 386.                        <telerik:InputBindingCollection> 387.                            <telerik:MouseBinding Command="telerikScheduler:RadSchedulerCommands.ChangeTimePickersVisibility" 388.                                                  Gesture="LeftClick" /> 389.                        </telerik:InputBindingCollection> 390.                    </telerik:CommandManager.InputBindings> 391.                </CheckBox> 392.                <Grid Grid.Row="5" 393.                      Grid.ColumnSpan="2"> 394.                    <Grid.ColumnDefinitions> 395.                        <ColumnDefinition Width="Auto" 396.                                          MinWidth="100" /> 397.                        <ColumnDefinition Width="Auto" 398.                                          MinWidth="200" /> 399.                    </Grid.ColumnDefinitions> 400.                    <Grid.RowDefinitions> 401.                        <RowDefinition Height="Auto" /> 402.                        <RowDefinition Height="Auto" /> 403.                    </Grid.RowDefinitions> 404.                    <TextBlock Text="Applicant" 405.                               Margin="0,13,0,2" 406.                               Style="{StaticResource FormElementTextBlockStyle}" /> 407.                    <telerikInput:RadComboBox IsEditable="False" 408.                                              Grid.Column="1" 409.                                              Height="24" 410.                                              VerticalAlignment="Center" 411.                                              ItemsSource="{Binding Source={StaticResource DataContextProxy}, Path=DataSource.ApplicantList}" 412.                                              SelectedValue="{Binding ApplicantID, Mode=TwoWay}" 413.                                              SelectedValuePath="ApplicantID" 414.                                              DisplayMemberPath="FirstName" /> 415.                       416.                    <TextBlock Text="Job" 417.                               Margin="0,13,0,2" 418.                               Grid.Row="1" 419.                               Style="{StaticResource FormElementTextBlockStyle}" /> 420.                    <telerikInput:RadComboBox IsEditable="False" 421.                                              Grid.Column="1" 422.                                              Grid.Row="1" 423.                                              Height="24" 424.                                              VerticalAlignment="Center" 425.                                              ItemsSource="{Binding Source={StaticResource DataContextProxy}, Path=DataSource.JobsList}" 426.                                              SelectedValue="{Binding PostingID, Mode=TwoWay}" 427.                                              SelectedValuePath="PostingID" 428.                                              DisplayMemberPath="JobTitle"/> 429.                </Grid> 430.                    <!-- Resources --> 431.                <Grid x:Name="ResourcesLayout" 432.                      Grid.Row="7" 433.                      Grid.Column="0" 434.                      Grid.ColumnSpan="2" 435.                      MaxHeight="130" 436.                      Margin="20,5,20,0"> 437.                    <Border Margin="0" 438.                            BorderThickness="1" 439.                            BorderBrush="{StaticResource GenericShallowBorderBrush}" 440.                            Visibility="{Binding ElementName=ResourcesScrollViewer, Path=ComputedVerticalScrollBarVisibility}"></Border> 441.                    <ScrollViewer x:Name="ResourcesScrollViewer" 442.                                  IsTabStop="false" 443.                                  Grid.Row="6" 444.                                  Grid.Column="0" 445.                                  Grid.ColumnSpan="2" 446.                                  Margin="1" 447.                                  telerik:StyleManager.Theme="{StaticResource Theme}" 448.                                  VerticalScrollBarVisibility="Auto"> 449.                        <scheduler:ResourcesItemsControl x:Name="PART_Resources" 450.                                                         HorizontalAlignment="Left" 451.                                                         Padding="0,2,0,5" 452.                                                         IsTabStop="false" 453.                                                         ItemsSource="{TemplateBinding ResourceTypeModels}" 454.                                                         ItemTemplateSelector="{StaticResource ItemTemplateSelector}" /> 455.                    </ScrollViewer> 456.                </Grid> 457.                <StackPanel x:Name="FooterControls" 458.                            Margin="5 10 10 10" 459.                            Grid.Row="8" 460.                            Grid.Column="1" 461.                            HorizontalAlignment="Left" 462.                            Orientation="Horizontal"> 463.                    <telerik:RadButton x:Name="OKButton" 464.                                       Margin="5" 465.                                       Padding="10 0" 466.                                       MinWidth="80" 467.                                       Command="telerikScheduler:RadSchedulerCommands.SaveAppointment" 468.                                       telerik:StyleManager.Theme="{StaticResource Theme}" 469.                                       telerikNavigation:RadWindow.ResponseButton="Accept" 470.                                       telerik:LocalizationManager.ResourceKey="SaveAndCloseCommandText"> 471.                    </telerik:RadButton> 472.                    <telerik:RadButton x:Name="CancelButton" 473.                                       Margin="5" 474.                                       Padding="10 0" 475.                                       MinWidth="80" 476.                                       telerik:LocalizationManager.ResourceKey="Cancel" 477.                                       telerik:StyleManager.Theme="{StaticResource Theme}" 478.                                       telerikNavigation:RadWindow.ResponseButton="Cancel" 479.                                       Command="telerik:WindowCommands.Close"> 480.                    </telerik:RadButton> 481.                </StackPanel> 482.            </Grid> 483.            <vsm:VisualStateManager.VisualStateGroups> 484.                <vsm:VisualStateGroup x:Name="RecurrenceRuleState"> 485.                    <vsm:VisualState x:Name="RecurrenceRuleIsNull"> 486.                        <Storyboard> 487.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="StartDateTime" 488.                                                           Storyboard.TargetProperty="IsEnabled" 489.                                                           Duration="0"> 490.                                <DiscreteObjectKeyFrame KeyTime="0" 491.                                                        Value="True" /> 492.                            </ObjectAnimationUsingKeyFrames> 493.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="EndDateTime" 494.                                                           Storyboard.TargetProperty="IsEnabled" 495.                                                           Duration="0"> 496.                                <DiscreteObjectKeyFrame KeyTime="0" 497.                                                        Value="True" /> 498.                            </ObjectAnimationUsingKeyFrames> 499.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="AllDayEventCheckbox" 500.                                                           Storyboard.TargetProperty="IsEnabled" 501.                                                           Duration="0"> 502.                                <DiscreteObjectKeyFrame KeyTime="0" 503.                                                        Value="True" /> 504.                            </ObjectAnimationUsingKeyFrames> 505.                        </Storyboard> 506.                    </vsm:VisualState> 507.                    <vsm:VisualState x:Name="RecurrenceRuleIsNotNull"> 508.                        <Storyboard> 509.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="StartDateTime" 510.                                                           Storyboard.TargetProperty="IsEnabled" 511.                                                           Duration="0"> 512.                                <DiscreteObjectKeyFrame KeyTime="0" 513.                                                        Value="False" /> 514.                            </ObjectAnimationUsingKeyFrames> 515.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="EndDateTime" 516.                                                           Storyboard.TargetProperty="IsEnabled" 517.                                                           Duration="0"> 518.                                <DiscreteObjectKeyFrame KeyTime="0" 519.                                                        Value="False" /> 520.                            </ObjectAnimationUsingKeyFrames> 521.                            <ObjectAnimationUsingKeyFrames Storyboard.TargetName="AllDayEventCheckbox" 522.                                                           Storyboard.TargetProperty="IsEnabled" 523.                                                           Duration="0"> 524.                                <DiscreteObjectKeyFrame KeyTime="0" 525.                                                        Value="False" /> 526.                            </ObjectAnimationUsingKeyFrames> 527.                        </Storyboard> 528.                    </vsm:VisualState> 529.                </vsm:VisualStateGroup> 530.            </vsm:VisualStateManager.VisualStateGroups> 531.        </StackPanel> 532.    </ControlTemplate> 533.    <DataTemplate x:Key="AppointmentDialogWindowHeaderDataTemplate"> 534.        <StackPanel Orientation="Horizontal" 535.                    MaxWidth="400"> 536.            <TextBlock telerik:LocalizationManager.ResourceKey="Event" 537.                       Visibility="{Binding Appointment.IsAllDayEvent, Converter={StaticResource BooleanToVisibilityConverter}}" /> 538.            <TextBlock telerik:LocalizationManager.ResourceKey="Appointment" 539.                       Visibility="{Binding Appointment.IsAllDayEvent, Converter={StaticResource InvertedBooleanToVisibilityConverter}}" /> 540.            <TextBlock Text=" - " /> 541.            <TextBlock x:Name="SubjectTextBlock" 542.                       Visibility="{Binding Appointment.Subject, Converter={StaticResource NullToVisibilityConverter}}" 543.                       Text="{Binding Appointment.Subject}" /> 544.            <TextBlock telerik:LocalizationManager.ResourceKey="Untitled" 545.                       Visibility="{Binding Appointment.Subject, Converter={StaticResource InvertedNullToVisibilityConverter}}" /> 546.        </StackPanel> 547.    </DataTemplate> 548.    <Style x:Key="EditAppointmentStyle" 549.           TargetType="telerikScheduler:AppointmentDialogWindow"> 550.        <Setter Property="IconTemplate" 551.                Value="{StaticResource IconDataEditTemplate}" /> 552.        <Setter Property="HeaderTemplate" 553.                Value="{StaticResource AppointmentDialogWindowHeaderDataTemplate}" /> 554.        <Setter Property="Background" 555.                Value="{StaticResource DialogWindowBackground}" /> 556.        <Setter Property="Template" 557.                Value="{StaticResource EditAppointmentTemplate}" /> 558.    </Style> 559.</UserControl.Resources> The first line there is the DataContextProxy I mentioned previously- we use that again to work a bit of magic in this template. Where we start getting into the dialog in question is line 132, but line 407 is where things start getting interesting.  The ItemsSource is pointing at a list that exists in my ViewModel (or code-behind, if it is used as a DataContext), the SelectedValue is the item I am actually binding from the applicant (note the TwoWay binding), and SelectedValuePath and DisplayMemberPath ensure the proper applicant is being displayed from the collection.  You will also see similar starting on line 420 where I do the same for the Jobs we'll be displaying. Just to wrap-up the Xaml, here's the RadScheduler declaraction that ties this all together and will be the main focus of our view: 01.<telerikScheduler:RadScheduler x:Name="xJobsScheduler" 02.                  Grid.Row="1" 03.                  Grid.Column="1" 04.                  Width="800" 05.                  MinWidth="600" 06.                  Height="500" 07.                  MinHeight="300" 08.                  AppointmentsSource="{Binding Interviews}" 09.                  EditAppointmentStyle="{StaticResource EditAppointmentStyle}" 10.                  command:AppointmentAddedEventClass.Command="{Binding AddAppointmentCommand}" 11.                  command:ApptCreatedEventClass.Command="{Binding ApptCreatingCommand}" 12.                  command:ApptEditedEventClass.Command="{Binding ApptEditedCommand}" 13.                  command:ApptDeletedEventClass.Command="{Binding ApptDeletedCommand}"> 14.</telerikScheduler:RadScheduler> Now, we get to the ViewModel and what it takes to get that rigged up.  And for those of you who remember the jobs post, those command:s in the Xaml are pointing to attached behavior commands that reproduce the respective events.  This becomes very handy when we're setting up the code-behind version. ;) ViewModel I've been liking this approach so far, so I'm going to put the entire ViewModel here and then go into the lines of interest.  Of course, feel free to ask me questions about anything that isn't clear (by line number, ideally) so I can help out if I have missed anything important: 001.public class SchedulerViewModel : ViewModelBase 002.{ 003.    private readonly IEventAggregator eventAggregator; 004.    private readonly IRegionManager regionManager; 005.   006.    public RecruitingContext context; 007.   008.    private ObservableItemCollection<InterviewAppointment> _interviews = new ObservableItemCollection<InterviewAppointment>(); 009.    public ObservableItemCollection<InterviewAppointment> Interviews 010.    { 011.        get { return _interviews; } 012.        set 013.        { 014.            if (_interviews != value) 015.            { 016.                _interviews = value; 017.                NotifyChanged("Interviews"); 018.            } 019.        } 020.    } 021.   022.    private QueryableCollectionView _jobsList; 023.    public QueryableCollectionView JobsList 024.    { 025.        get { return this._jobsList; } 026.        set 027.        { 028.            if (this._jobsList != value) 029.            { 030.                this._jobsList = value; 031.                this.NotifyChanged("JobsList"); 032.            } 033.        } 034.    } 035.   036.    private QueryableCollectionView _applicantList; 037.    public QueryableCollectionView ApplicantList 038.    { 039.        get { return _applicantList; } 040.        set 041.        { 042.            if (_applicantList != value) 043.            { 044.                _applicantList = value; 045.                NotifyChanged("ApplicantList"); 046.            } 047.        } 048.    } 049.   050.    public DelegateCommand<object> AddAppointmentCommand { get; set; } 051.    public DelegateCommand<object> ApptCreatingCommand { get; set; } 052.    public DelegateCommand<object> ApptEditedCommand { get; set; } 053.    public DelegateCommand<object> ApptDeletedCommand { get; set; } 054.   055.    public SchedulerViewModel(IEventAggregator eventAgg, IRegionManager regionmanager) 056.    { 057.        // set Unity items 058.        this.eventAggregator = eventAgg; 059.        this.regionManager = regionmanager; 060.   061.        // load our context 062.        context = new RecruitingContext(); 063.        LoadOperation<Interview> loadOp = context.Load(context.GetInterviewsQuery()); 064.        loadOp.Completed += new EventHandler(loadOp_Completed); 065.   066.        this._jobsList = new QueryableCollectionView(context.JobPostings); 067.        context.Load(context.GetJobPostingsQuery()); 068.   069.        this._applicantList = new QueryableCollectionView(context.Applicants); 070.        context.Load(context.GetApplicantsQuery()); 071.   072.        AddAppointmentCommand = new DelegateCommand<object>(this.AddAppt); 073.        ApptCreatingCommand = new DelegateCommand<object>(this.ApptCreating); 074.        ApptEditedCommand = new DelegateCommand<object>(this.ApptEdited); 075.        ApptDeletedCommand = new DelegateCommand<object>(this.ApptDeleted); 076.   077.    } 078.   079.    void loadOp_Completed(object sender, EventArgs e) 080.    { 081.        LoadOperation loadop = sender as LoadOperation; 082.   083.        foreach (var ent in loadop.Entities) 084.        { 085.            _interviews.Add(EntityToAppointment(ent as Interview)); 086.        } 087.    } 088.   089.    #region Appointment Adding 090.   091.    public void AddAppt(object obj) 092.    { 093.        // now we have a new InterviewAppointment to add to our QCV :) 094.        InterviewAppointment newInterview = obj as InterviewAppointment; 095.   096.        this.context.Interviews.Add(AppointmentToEntity(newInterview)); 097.        this.context.SubmitChanges((s) => 098.        { 099.            ActionHistory myAction = new ActionHistory(); 100.            myAction.InterviewID = newInterview.InterviewID; 101.            myAction.PostingID = newInterview.PostingID; 102.            myAction.ApplicantID = newInterview.ApplicantID; 103.            myAction.Description = String.Format("Interview with {0} has been created by {1}", newInterview.ApplicantID.ToString(), "default user"); 104.            myAction.TimeStamp = DateTime.Now; 105.            eventAggregator.GetEvent<AddActionEvent>().Publish(myAction); 106.        } 107.            , null); 108.    } 109.   110.    public void ApptCreating(object obj) 111.    { 112.        // handled in the behavior, just a placeholder to ensure it runs :) 113.    } 114.   115.    #endregion 116.   117.    #region Appointment Editing 118.   119.    public void ApptEdited(object obj) 120.    { 121.        Interview editedInterview = (from x in context.Interviews 122.                            where x.InterviewID == (obj as InterviewAppointment).InterviewID 123.                            select x).SingleOrDefault(); 124.   125.        CopyAppointmentEdit(editedInterview, obj as InterviewAppointment); 126.   127.        context.SubmitChanges((s) => { 128.            ActionHistory myAction = new ActionHistory(); 129.            myAction.InterviewID = editedInterview.InterviewID; 130.            myAction.PostingID = editedInterview.PostingID; 131.            myAction.ApplicantID = editedInterview.ApplicantID; 132.            myAction.Description = String.Format("Interview with {0} has been modified by {1}", editedInterview.ApplicantID.ToString(), "default user"); 133.            myAction.TimeStamp = DateTime.Now; 134.            eventAggregator.GetEvent<AddActionEvent>().Publish(myAction); } 135.            , null); 136.    } 137.   138.    #endregion 139.   140.    #region Appointment Deleting 141.   142.    public void ApptDeleted(object obj) 143.    { 144.        Interview deletedInterview = (from x in context.Interviews 145.                                      where x.InterviewID == (obj as InterviewAppointment).InterviewID 146.                                      select x).SingleOrDefault(); 147.   148.        context.Interviews.Remove(deletedInterview); 149.        context.SubmitChanges((s) => 150.        { 151.            ActionHistory myAction = new ActionHistory(); 152.            myAction.InterviewID = deletedInterview.InterviewID; 153.            myAction.PostingID = deletedInterview.PostingID; 154.            myAction.ApplicantID = deletedInterview.ApplicantID; 155.            myAction.Description = String.Format("Interview with {0} has been deleted by {1}", deletedInterview.ApplicantID.ToString(), "default user"); 156.            myAction.TimeStamp = DateTime.Now; 157.            eventAggregator.GetEvent<AddActionEvent>().Publish(myAction); 158.        } 159.            , null); 160.    } 161.   162.    #endregion 163.   164.    #region Appointment Helpers :) 165.   166.    public Interview AppointmentToEntity(InterviewAppointment ia) 167.    { 168.        Interview newInterview = new Interview(); 169.        newInterview.Subject = ia.Subject; 170.        newInterview.Body = ia.Body; 171.        newInterview.Start = ia.Start; 172.        newInterview.End = ia.End; 173.        newInterview.ApplicantID = ia.ApplicantID; 174.        newInterview.PostingID = ia.PostingID; 175.        newInterview.InterviewID = ia.InterviewID; 176.   177.        return newInterview; 178.    } 179.   180.    public InterviewAppointment EntityToAppointment(Interview ia) 181.    { 182.        InterviewAppointment newInterview = new InterviewAppointment(); 183.        newInterview.Subject = ia.Subject; 184.        newInterview.Body = ia.Body; 185.        newInterview.Start = ia.Start; 186.        newInterview.End = ia.End; 187.        newInterview.ApplicantID = ia.ApplicantID; 188.        newInterview.PostingID = ia.PostingID; 189.        newInterview.InterviewID = ia.InterviewID; 190.   191.        return newInterview; 192.    } 193.   194.    public void CopyAppointmentEdit(Interview entityInterview, InterviewAppointment appointmentInterview) 195.    { 196.        entityInterview.Subject = appointmentInterview.Subject; 197.        entityInterview.Body = appointmentInterview.Body; 198.        entityInterview.Start = appointmentInterview.Start; 199.        entityInterview.End = appointmentInterview.End; 200.        entityInterview.ApplicantID = appointmentInterview.ApplicantID; 201.        entityInterview.PostingID = appointmentInterview.PostingID; 202.    } 203.   204.    #endregion 205.} One thing we're doing here which you won't see in any of the other ViewModels is creating a duplicate collection.  I know this is something which will be fixed down the line for using RadScheduler, simplifying this process, but with WCF RIA changing as it does I wanted to ensure functionality would remain consistent as I continued development on this application.  So, I do a little bit of duplication, but for the greater good.  This all takes place starting on line 79, so for every entity that comes back we add it to the collection that is bound to RadScheduler.  Otherwise, the DelegateCommands that you see correspond directly to the events they are named after.  In each case, rather than sending over the full event arguments, I just send in the appointment in question (coming through as the object obj in all cases) so I can add (line 91), edit (line 119), and delete appointments (line 142) like normal.  This just ensures they get updated back to my database.  Also, the one bit of code you won't see is for the Appointment Creating (line 110) event- that is because in the command I've created I simply make the replacement I need to: 1.void element_AppointmentCreating(object sender, AppointmentCreatingEventArgs e) 2.{ 3.    e.NewAppointment = new InterviewAppointment(); 4.    base.ExecuteCommand(); 5.} And the ViewModel is none the wiser, the appointments just work as far as it is concerned since as they are created they become InterviewAppointments.  End result?  I've customized my EditAppointmentDialog as follows: And adding, editing, and deleting appointments works like a charm.  I can even 'edit' by moving appointments around RadScheduler, so as they are dropped into a timeslot they perform their full edit routine and things get updated. And then, the Code-Behind Version Perhaps the thing I like the most about doing one then the other is I get to steal 90% or more of the code from the MVVM version.  For example, the only real changes to the Code-Behind Xaml file exist in the control declaration, in which I use events instead of attached-behavior-event-commands: 01.<telerikScheduler:RadScheduler x:Name="xJobsScheduler" 02.                  Grid.Row="1" 03.                  Grid.Column="1" 04.                  Width="800" 05.                  MinWidth="600" 06.                  Height="500" 07.                  MinHeight="300" 08.                  EditAppointmentStyle="{StaticResource EditAppointmentStyle}" 09.                  AppointmentAdded="xJobsScheduler_AppointmentAdded" 10.                  AppointmentCreating="xJobsScheduler_AppointmentCreating" 11.                  AppointmentEdited="xJobsScheduler_AppointmentEdited" 12.                  AppointmentDeleted="xJobsScheduler_AppointmentDeleted"> 13.</telerikScheduler:RadScheduler> Easy, right?  Otherwise, all the same styling in UserControl.Resources was re-used, right down to the DataContextProxy that lets us bind to a collection from our viewmodel (in this case, our code-behind) to use within the DataTemplate.  The code conversion gets even easier, as I could literally copy and paste almost everything from the ViewModel to my Code-Behind, just a matter of pasting the right section into the right event.  Here's the code-behind as proof: 001.public partial class SchedulingView : UserControl, INotifyPropertyChanged 002.{ 003.    public RecruitingContext context; 004.   005.    private QueryableCollectionView _jobsList; 006.    public QueryableCollectionView JobsList 007.    { 008.        get { return this._jobsList; } 009.        set 010.        { 011.            if (this._jobsList != value) 012.            { 013.                this._jobsList = value; 014.                this.NotifyChanged("JobsList"); 015.            } 016.        } 017.    } 018.   019.    private QueryableCollectionView _applicantList; 020.    public QueryableCollectionView ApplicantList 021.    { 022.        get { return _applicantList; } 023.        set 024.        { 025.            if (_applicantList != value) 026.            { 027.                _applicantList = value; 028.                NotifyChanged("ApplicantList"); 029.            } 030.        } 031.    } 032.   033.    private ObservableItemCollection<InterviewAppointment> _interviews = new ObservableItemCollection<InterviewAppointment>(); 034.    public ObservableItemCollection<InterviewAppointment> Interviews 035.    { 036.        get { return _interviews; } 037.        set 038.        { 039.            if (_interviews != value) 040.            { 041.                _interviews = value; 042.                NotifyChanged("Interviews"); 043.            } 044.        } 045.    } 046.   047.    public SchedulingView() 048.    { 049.        InitializeComponent(); 050.   051.        this.DataContext = this; 052.   053.        this.Loaded += new RoutedEventHandler(SchedulingView_Loaded); 054.    } 055.   056.    void SchedulingView_Loaded(object sender, RoutedEventArgs e) 057.    { 058.        this.xJobsScheduler.AppointmentsSource = Interviews; 059.   060.        context = new RecruitingContext(); 061.           062.        LoadOperation loadop = context.Load(context.GetInterviewsQuery()); 063.        loadop.Completed += new EventHandler(loadop_Completed); 064.   065.        this._applicantList = new QueryableCollectionView(context.Applicants); 066.        context.Load(context.GetApplicantsQuery()); 067.   068.        this._jobsList = new QueryableCollectionView(context.JobPostings); 069.        context.Load(context.GetJobPostingsQuery()); 070.    } 071.   072.    void loadop_Completed(object sender, EventArgs e) 073.    { 074.        LoadOperation loadop = sender as LoadOperation; 075.   076.        _interviews.Clear(); 077.   078.        foreach (var ent in loadop.Entities) 079.        { 080.            _interviews.Add(EntityToAppointment(ent as Interview)); 081.        } 082.    } 083.   084.    private void xJobsScheduler_AppointmentAdded(object sender, Telerik.Windows.Controls.AppointmentAddedEventArgs e) 085.    { 086.        // now we have a new InterviewAppointment to add to our QCV :) 087.        InterviewAppointment newInterview = e.Appointment as InterviewAppointment; 088.   089.        this.context.Interviews.Add(AppointmentToEntity(newInterview)); 090.        this.context.SubmitChanges((s) => 091.        { 092.            ActionHistory myAction = new ActionHistory(); 093.            myAction.InterviewID = newInterview.InterviewID; 094.            myAction.PostingID = newInterview.PostingID; 095.            myAction.ApplicantID = newInterview.ApplicantID; 096.            myAction.Description = String.Format("Interview with {0} has been created by {1}", newInterview.ApplicantID.ToString(), "default user"); 097.            myAction.TimeStamp = DateTime.Now; 098.            context.ActionHistories.Add(myAction); 099.            context.SubmitChanges(); 100.        } 101.            , null); 102.    } 103.   104.    private void xJobsScheduler_AppointmentCreating(object sender, Telerik.Windows.Controls.AppointmentCreatingEventArgs e) 105.    { 106.        e.NewAppointment = new InterviewAppointment(); 107.    } 108.   109.    private void xJobsScheduler_AppointmentEdited(object sender, Telerik.Windows.Controls.AppointmentEditedEventArgs e) 110.    { 111.        Interview editedInterview = (from x in context.Interviews 112.                                     where x.InterviewID == (e.Appointment as InterviewAppointment).InterviewID 113.                                     select x).SingleOrDefault(); 114.   115.        CopyAppointmentEdit(editedInterview, e.Appointment as InterviewAppointment); 116.   117.        context.SubmitChanges((s) => 118.        { 119.            ActionHistory myAction = new ActionHistory(); 120.            myAction.InterviewID = editedInterview.InterviewID; 121.            myAction.PostingID = editedInterview.PostingID; 122.            myAction.ApplicantID = editedInterview.ApplicantID; 123.            myAction.Description = String.Format("Interview with {0} has been modified by {1}", editedInterview.ApplicantID.ToString(), "default user"); 124.            myAction.TimeStamp = DateTime.Now; 125.            context.ActionHistories.Add(myAction); 126.            context.SubmitChanges(); 127.        } 128.            , null); 129.    } 130.   131.    private void xJobsScheduler_AppointmentDeleted(object sender, Telerik.Windows.Controls.AppointmentDeletedEventArgs e) 132.    { 133.        Interview deletedInterview = (from x in context.Interviews 134.                                      where x.InterviewID == (e.Appointment as InterviewAppointment).InterviewID 135.                                      select x).SingleOrDefault(); 136.   137.        context.Interviews.Remove(deletedInterview); 138.        context.SubmitChanges((s) => 139.        { 140.            ActionHistory myAction = new ActionHistory(); 141.            myAction.InterviewID = deletedInterview.InterviewID; 142.            myAction.PostingID = deletedInterview.PostingID; 143.            myAction.ApplicantID = deletedInterview.ApplicantID; 144.            myAction.Description = String.Format("Interview with {0} has been deleted by {1}", deletedInterview.ApplicantID.ToString(), "default user"); 145.            myAction.TimeStamp = DateTime.Now; 146.            context.ActionHistories.Add(myAction); 147.            context.SubmitChanges(); 148.        } 149.            , null); 150.    } 151.   152.    #region Appointment Helpers :) 153.   154.    public Interview AppointmentToEntity(InterviewAppointment ia) 155.    { 156.        Interview newInterview = new Interview(); 157.        newInterview.Subject = ia.Subject; 158.        newInterview.Body = ia.Body; 159.        newInterview.Start = ia.Start; 160.        newInterview.End = ia.End; 161.        newInterview.ApplicantID = ia.ApplicantID; 162.        newInterview.PostingID = ia.PostingID; 163.        newInterview.InterviewID = ia.InterviewID; 164.   165.        return newInterview; 166.    } 167.   168.    public InterviewAppointment EntityToAppointment(Interview ia) 169.    { 170.        InterviewAppointment newInterview = new InterviewAppointment(); 171.        newInterview.Subject = ia.Subject; 172.        newInterview.Body = ia.Body; 173.        newInterview.Start = ia.Start; 174.        newInterview.End = ia.End; 175.        newInterview.ApplicantID = ia.ApplicantID; 176.        newInterview.PostingID = ia.PostingID; 177.        newInterview.InterviewID = ia.InterviewID; 178.   179.        return newInterview; 180.    } 181.   182.    public void CopyAppointmentEdit(Interview entityInterview, InterviewAppointment appointmentInterview) 183.    { 184.        entityInterview.Subject = appointmentInterview.Subject; 185.        entityInterview.Body = appointmentInterview.Body; 186.        entityInterview.Start = appointmentInterview.Start; 187.        entityInterview.End = appointmentInterview.End; 188.        entityInterview.ApplicantID = appointmentInterview.ApplicantID; 189.        entityInterview.PostingID = appointmentInterview.PostingID; 190.    } 191.   192.    #endregion 193.   194.    #region INotifyPropertyChanged Members 195.   196.    public event PropertyChangedEventHandler PropertyChanged; 197.   198.    public void NotifyChanged(string propertyName) 199.    { 200.        if (string.IsNullOrEmpty(propertyName)) 201.            throw new ArgumentException("propertyName"); 202.   203.        PropertyChanged(this, new PropertyChangedEventArgs(propertyName)); 204.    } 205.   206.    #endregion 207.} Nice... right? :) One really important thing to note as well.  See on line 51 where I set the DataContext before the Loaded event?  This is super important, as if you don't have this set before the usercontrol is loaded, the DataContextProxy has no context to use and your EditAppointmentDialog Job/Applicant dropdowns will be blank and empty.  Trust me on this, took a little bit of debugging to figure out that by setting the DataContext post-loaded would only lead to disaster and frustration.  Otherwise, the only other real difference is that instead of sending an ActionHistory item through an event to get added to the database and saved, I do those right in the callback from submitting.  The Result Again, I only have to post one picture because these bad boys used nearly identical code for both the MVVM and the code-behind views, so our end result is... So what have we learned here today?  One, for the most part this MVVM thing is somewhat easy.  Yeah, you sometimes have to write a bunch of extra code, but with the help of a few useful snippits you can turn the process into a pretty streamlined little workflow.  Heck, this story gets even easier as you can see in this blog post by Michael Washington- specifically run a find on 'InvokeCommandAction' and you'll see the section regarding the command on TreeView in Blend 4.  Brilliant!  MVVM never looked so sweet! Otherwise, it is business as usual with RadScheduler for Silverlight whichever path you're choosing for your development.  Between now and the next post, I'll be cleaning up styles a bit (those RadComboBoxes are a little too close to my labels!) and adding some to the RowDetailsViews for Applicants and Jobs, so you can see all the info for an appointment in the dropdown tab view.  Otherwise, we're about ready to call a wrap on this oneDid you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • Searching for tasks with code – Executables and Event Handlers

    Searching packages or just enumerating through all tasks is not quite as straightforward as it may first appear, mainly because of the way you can nest tasks within other containers. You can see this illustrated in the sample package below where I have used several sequence containers and loops. To complicate this further all containers types, including packages and tasks, can have event handlers which can then support the full range of nested containers again. Towards the lower right, the task called SQL In FEL also has an event handler not shown, within which is another Execute SQL Task, so that makes a total of 6 Execute SQL Tasks 6 tasks spread across the package. In my previous post about such as adding a property expressionI kept it simple and just looked at tasks at the package level, but what if you wanted to find any or all tasks in a package? For this post I've written a console program that will search a package looking at all tasks no matter how deeply nested, and check to see if the name starts with "SQL". When it finds a matching task it writes out the hierarchy by name for that task, starting with the package and working down to the task itself. The output for our sample package is shown below, note it has found all 6 tasks, including the one on the OnPreExecute event of the SQL In FEL task TaskSearch v1.0.0.0 (1.0.0.0) Copyright (C) 2009 Konesans Ltd Processing File - C:\Projects\Alpha\Packages\MyPackage.dtsx MyPackage\FOR Counter Loop\SQL In Counter Loop MyPackage\SEQ For Each Loop Wrapper\FEL Simple Loop\SQL In FEL MyPackage\SEQ For Each Loop Wrapper\FEL Simple Loop\SQL In FEL\OnPreExecute\SQL On Pre Execute for FEL SQL Task MyPackage\SEQ Top Level\SEQ Nested Lvl 1\SEQ Nested Lvl 2\SQL In Nested Lvl 2 MyPackage\SEQ Top Level\SEQ Nested Lvl 1\SQL In Nested Lvl 1 #1 MyPackage\SEQ Top Level\SEQ Nested Lvl 1\SQL In Nested Lvl 1 #2 6 matching tasks found in package. The full project and code is available for download below, but first we can walk through the project to highlight the most important sections of code. This code has been abbreviated for this description, but is complete in the download. First of all we load the package, and then start by looking at the Executables for the package. // Load the package file Application application = new Application(); using (Package package = application.LoadPackage(filename, null)) { int matchCount = 0; // Look in the package's executables ProcessExecutables(package.Executables, ref matchCount); ... // // ... // Write out final count Console.WriteLine("{0} matching tasks found in package.", matchCount); } The ProcessExecutables method is a key method, as an executable could be described as the the highest level of a working functionality or container. There are several of types of executables, such as tasks, or sequence containers and loops. To know what to do next we need to work out what type of executable we are dealing with as the abbreviated version of method shows below. private static void ProcessExecutables(Executables executables, ref int matchCount) { foreach (Executable executable in executables) { TaskHost taskHost = executable as TaskHost; if (taskHost != null) { ProcessTaskHost(taskHost, ref matchCount); ProcessEventHandlers(taskHost.EventHandlers, ref matchCount); continue; } ... // // ... ForEachLoop forEachLoop = executable as ForEachLoop; if (forEachLoop != null) { ProcessExecutables(forEachLoop.Executables, ref matchCount); ProcessEventHandlers(forEachLoop.EventHandlers, ref matchCount); continue; } } } As you can see if the executable we find is a task we then call out to our ProcessTaskHost method. As with all of our executables a task can have event handlers which themselves contain more executables such as task and loops, so we also make a call out our ProcessEventHandlers method. The other types of executables such as loops can also have event handlers as well as executables. As shown with the example for the ForEachLoop we call the same ProcessExecutables and ProcessEventHandlers methods again to drill down into the hierarchy of objects that the package may contain. This code needs to explicitly check for each type of executable (TaskHost, Sequence, ForLoop and ForEachLoop) because whilst they all have an Executables property this is not from a common base class or interface. This example was just a simple find a task by its name, so ProcessTaskHost really just does that. We also get the hierarchy of objects so we can write out for information, obviously you can adapt this method to do something more interesting such as adding a property expression. private static void ProcessTaskHost(TaskHost taskHost, ref int matchCount) { if (taskHost == null) { return; } // Check if the task matches our match name if (taskHost.Name.StartsWith(TaskNameFilter, StringComparison.OrdinalIgnoreCase)) { // Build up the full object hierarchy of the task // so we can write it out for information StringBuilder path = new StringBuilder(); DtsContainer container = taskHost; while (container != null) { path.Insert(0, container.Name); container = container.Parent; if (container != null) { path.Insert(0, "\\"); } } // Write the task path // e.g. Package\Container\Event\Task Console.WriteLine(path); Console.WriteLine(); // Increment match counter for info matchCount++; } } Just for completeness, the other processing method we covered above is for event handlers, but really that just calls back to the executables. This same method is called in our main package method, but it was omitted for brevity here. private static void ProcessEventHandlers(DtsEventHandlers eventHandlers, ref int matchCount) { foreach (DtsEventHandler eventHandler in eventHandlers) { ProcessExecutables(eventHandler.Executables, ref matchCount); } } As hopefully the code demonstrates, executables (Microsoft.SqlServer.Dts.Runtime.Executable) are the workers, but within them you can nest more executables (except for task tasks).Executables themselves can have event handlers which can in turn hold more executables. I have tried to illustrate this highlight the relationships in the following diagram. Download Sample code project TaskSearch.zip (11KB)

    Read the article

  • Games to Vista Game explorer with Inno Setup

    - by Kraemer
    Ok, i'm trying to force my inno setup installer to add a shortcut of my game to Vista Games Explorer. Theoretically this should do the trick: [Files] Source: "GameuxInstallHelper.dll"; DestDir: "{app}"; Flags: ignoreversion overwritereadonly; [Registry] Root: HKLM; Subkey: SOFTWARE\dir\dir; Flags: uninsdeletekeyifempty Root: HKLM; Subkey: SOFTWARE\dir\dir; ValueName: Path; ValueType: String; ValueData: {app}; Flags: uninsdeletekey Root: HKLM; Subkey: SOFTWARE\dir\dir; ValueName: AppFile; ValueType: String; ValueData:{app}\executable.exe ; Flags: uninsdeletekey [CustomMessages] en.Local=en en.removemsg=Do you wish to remove game saves and settings? en.taskentry=Play [Code] const PlayTask = 0; AllUsers = 2; Current = 3; type TGUID = record Data1: Cardinal; Data2, Data3: Word; Data4: array [0..7] of char; end; var GUID: TGUID; function GetDC(HWND: DWord): DWord; external '[email protected] stdcall'; function GetDeviceCaps(DC: DWord; Index: Integer): Integer; external '[email protected] stdcall'; function ReleaseDC(HWND: DWord;DC: DWord): Integer; external '[email protected] stdcall'; function ShowWindow(hWnd: DWord; nCmdShow: Integer): boolean; external '[email protected] stdcall'; function SetWindowLong(hWnd: DWord; nIndex: Integer; dwNewLong: Longint):Longint; external '[email protected] stdcall'; function GenerateGUID(var GUID: TGUID): Cardinal; external 'GenerateGUID@files:GameuxInstallHelper.dll stdcall setuponly'; function AddToGameExplorer(Binary: String; Path: String; InstallType: Integer; var GUID: TGUID): Cardinal; external 'AddToGameExplorerW@files:GameuxInstallHelper.dll stdcall setuponly'; function CreateTask(InstallType: Integer; var GUID: TGUID; TaskType: Integer; TaskNumber: Integer; TaskName: String; Binary: String; Parameters: String): Cardinal; external 'CreateTaskW@files:GameuxInstallHelper.dll stdcall setuponly'; function RetrieveGUIDForApplication(Binary: String; var GUID: TGUID): Cardinal; external 'RetrieveGUIDForApplicationW@{app}\GameuxInstallHelper.dll stdcall uninstallonly'; function RemoveFromGameExplorer(var GUID: TGUID): Cardinal; external 'RemoveFromGameExplorer@{app}\GameuxInstallHelper.dll stdcall uninstallonly'; function RemoveTasks(var GUID: TGUID): Cardinal; external 'RemoveTasks@{app}\GameuxInstallHelper.dll stdcall uninstallonly'; function InitializeSetup(): Boolean; var appath: string; ResultCode: Integer; begin if RegKeyExists(HKEY_LOCAL_MACHINE, 'SOFTWARE\dir\dir') then begin RegQueryStringValue(HKEY_LOCAL_MACHINE, 'SOFTWARE\dir\dir', 'Path', appath) Exec((appath +'\unins000.exe'), '', '', SW_SHOW, ewWaitUntilTerminated, ResultCode) end else begin Result := TRUE end; end; procedure CurUninstallStepChanged(CurUninstallStep: TUninstallStep); begin if CurUninstallStep = usUninstall then begin if GetWindowsVersion shr 24 > 5 then begin RetrieveGUIDForApplication(ExpandConstant('{app}\AWL_Release.dll'), GUID); RemoveFromGameExplorer(GUID); RemoveTasks(GUID); UnloadDll(ExpandConstant('{app}\GameuxInstallHelper.dll')); end; end; if CurUninstallStep = usPostUninstall then begin if MsgBox(ExpandConstant('{cm:removemsg}'), mbConfirmation, MB_YESNO)=IDYES then begin DelTree(ExpandConstant('{app}'), True, True, True); end; end; end; procedure CurStepChanged(CurStep: TSetupStep); begin if GetWindowsVersion shr 24 > 5 then begin if CurStep = ssInstall then GenerateGUID(GUID); if CurStep = ssPostInstall then begin AddToGameExplorer(ExpandConstant('{app}\AWL_Release.dll'), ExpandConstant('{app}'), Current, GUID); CreateTask(3, GUID, PlayTask, 0, ExpandConstant('{cm:taskentry}'), ExpandConstant('{app}\executable.exe'), ''); CreateTask(3, GUID, 1, 0, 'Game Website', 'http://www.gamewebsite.com/', ''); end; end; end; The installer works just fine, but it doesn't place a shortcut of my game to Games explorer. Since i believe that the problem is on the binary file i guess for that part i should ask for some help. So, can anyone please give me a hand here?

    Read the article

  • Measuring Usability with Common Industry Format (CIF) Usability Tests

    - by Applications User Experience
    Sean Rice, Manager, Applications User Experience A User-centered Research and Design Process The Oracle Fusion Applications user experience was five years in the making. The development of this suite included an extensive and comprehensive user experience design process: ethnographic research, low-fidelity workflow prototyping, high fidelity user interface (UI) prototyping, iterative formative usability testing, development feedback and iteration, and sales and customer evaluation throughout the design cycle. However, this process does not stop when our products are released. We conduct summative usability testing using the ISO 25062 Common Industry Format (CIF) for usability test reports as an organizational framework. CIF tests allow us to measure the overall usability of our released products.  These studies provide benchmarks that allow for comparisons of a specific product release against previous versions of our product and against other products in the marketplace. What Is a CIF Usability Test? CIF refers to the internationally standardized method for reporting usability test findings used by the software industry. The CIF is based on a formal, lab-based test that is used to benchmark the usability of a product in terms of human performance and subjective data. The CIF was developed and is endorsed by more than 375 software customer and vendor organizations led by the National Institute for Standards and Technology (NIST), a US government entity. NIST sponsored the CIF through the American National Standards Institute (ANSI) and International Organization for Standardization (ISO) standards-making processes. Oracle played a key role in developing the CIF. The CIF report format and metrics are consistent with the ISO 9241-11 definition of usability: “The extent to which a product can be used by specified users to achieve specified goals with effectiveness, efficiency and satisfaction in a specified context of use.” Our goal in conducting CIF tests is to measure performance and satisfaction of a representative sample of users on a set of core tasks and to help predict how usable a product will be with the larger population of customers. Why Do We Perform CIF Testing? The overarching purpose of the CIF for usability test reports is to promote incorporation of usability as part of the procurement decision-making process for interactive products. CIF provides a common format for vendors to report the methods and results of usability tests to customer organizations, and enables customers to compare the usability of our software to that of other suppliers. CIF also enables us to compare our current software with previous versions of our software. CIF Testing for Fusion Applications Oracle Fusion Applications comprises more than 100 modules in seven different product families. These modules encompass more than 400 task flows and 400 user roles. Due to resource constraints, we cannot perform comprehensive CIF testing across the entire product suite. Therefore, we had to develop meaningful inclusion criteria and work with other stakeholders across the applications development organization to prioritize product areas for testing. Ultimately, we want to test the product areas for which customers might be most interested in seeing CIF data. We also want to build credibility with customers; we need to be able to make the case to current and prospective customers that the product areas tested are representative of the product suite as a whole. Our goal is to test the top use cases for each product. The primary activity in the scoping process was to work with the individual product teams to identify the key products and business process task flows in each product to test. We prioritized these products and flows through a series of negotiations among the user experience managers, product strategy, and product management directors for each of the primary product families within the Oracle Fusion Applications suite (Human Capital Management, Supply Chain Management, Customer Relationship Management, Financials, Projects, and Procurement). The end result of the scoping exercise was a list of 47 proposed CIF tests for the Fusion Applications product suite.  Figure 1. A participant completes tasks during a usability test in Oracle’s Usability Labs Fusion Supplier Portal CIF Test The first Fusion CIF test was completed on the Supplier Portal application in July of 2011.  Fusion Supplier Portal is part of an integrated suite of Procurement applications that helps supplier companies manage orders, schedules, shipments, invoices, negotiations and payments. The user roles targeted for the usability study were Supplier Account Receivables Specialists and Supplier Sales Representatives, including both experienced and inexperienced users across a wide demographic range.  The test specifically focused on the following functionality and features: Manage payments – view payments Manage invoices – view invoice status and create invoices Manage account information – create new contact, review bank account information Manage agreements – find and view agreement, upload agreement lines, confirm status of agreement lines upload Manage purchase orders (PO) – view history of PO, request change to PO, find orders Manage negotiations – respond to request for a quote, check the status of a negotiation response These product areas were selected to represent the most important subset of features and functionality of the flow, in terms of frequency and criticality of use by customers. A total of 20 users participated in the usability study. The results of the Supplier Portal evaluation were favorable and exceeded our expectations. Figure 2. Fusion Supplier Portal Next Studies We plan to conduct two Fusion CIF usability studies per product family over the next nine months. The next product to be tested will be Self-service Procurement. End users are currently being recruited to participate in this usability study, and the test sessions are scheduled to begin during the last week of November.

    Read the article

  • The Year 2010, The Year of Change

    As I look back on the year of 2010, I could have never predicted the wonderful changes that have occurred for my wife and me. The beginning of this year started out as the 9th year that we lived in South Florida, and my fourth year working for DentalPlans.com as a software engineer/network admin. About 3 months in to the year I was given an excellent opportunity to work for MovieTickets.com in the software engineering department. This opportunity allowed me to gain experience with jQuery due to one of my projects was to reengineering MovieTickets.com existing Marketing Panel System. About 3 months after working at MovieTickets.com, my wife and I were offered an opportunity of a life time. I was offered a Job in a large background\information security company located in Nashville, TN as software engineer II.  I must note that after living in South Florida for 9 years, my wife and I really had a strong distaste for the South Florida life style and the general attitude/culture of the area. Even though we shared a strong dislike for the area in which we lived I must admit that it was a tough decision to leave MovieTickets.com because I was really doing well and I made some great new friends like Chris Catto, and Tyson Nero.  In fact, they introduced me to Local Microsoft User Groups, and software development podcast like DotNetRocks.com and Hanselminutes.com.  In addition, we also went to my first Microsoft launch down in Miami for Visual Studios 2010. I must admit it was a cool experience.  I truly hope to keep in touch with them to see how their careers grow, and I know they will. I must admit I was nervous and excited to start the next chapter in our live as I started up the 26 foot U-Haul truck and got on the road for Nashville from Boca Raton. I knew that the change was going to lead to new adventures and new opportunities that I could never imagine.  As we pulled in to the long driveway of our rental house, we knew that this was the right place for my wife and I. Natalie, my wife had actually come up to Nashville and within one week of my job offer had set up a nice rental home for us to restart our lives in TN.  I must admit that the wonderful southern hospitality took a bit to get use to due to the type of people we were used to dealing with on a regular basis. Our first 2 months seemed like we were living a dream because of our new area and the wonderful people we live around. So far my new job is going really well and I really like the people on my team and department. In fact after 6 months I am now in charge of all application builds for our new deployment process. I am also leading up a push for setting up of continuous integration within our new build process.  In addition to starting my new job, I was also offered a position as an adjust instructor at ITT Tech teaching course like VB.net, Java Script, Ajax, and database development. So far I have really like teaching at the college level.  Information technology has really been great for my life so I am really glad to be able to give back. That is actually why I started DotNetBlocks. This site allows me to document things I have learned as I work with technology, and allows others to borrow from my experiences.  I hope that this site can help others as others have helped me get where I am. Finally, I am glade to report that I only have 4 classes left for my master’s degree at Capella University. I am proud to announce that I am still on track to graduate with 3.91 GPA.  This last class was really a test because I had a crazy idea that I could work full time as a software engineer, teach two college courses as a first time teacher and also take an advanced masters class in application architecture. I have no idea how I actually survived, but I am really surprised how well I actually did. I was invited back to reach again at ITT Tech, and I passed my masters class with an “A”.  I have decided to take this next term off from my master’s program so that I do not get burned out.  Also, so that my new current employer will pay for more of my education, tuition reimbursement is an awesome benefit. This was my year 2010, how was yours?

    Read the article

  • Searching for the Perfect Developer&rsquo;s Laptop.

    - by mbcrump
    I have been in the market for a new computer for several months. I set out with a budget of around $1200. I knew up front that the machine would be used for developing applications and maybe some light gaming. I kept switching between buying a laptop or a desktop but the laptop won because: With a Laptop, I can carry it everywhere and with a desktop I can’t. I searched for about 2 weeks and narrowed it down to a list of must-have’s : i7 Processor (I wasn’t going to settle for an i5 or AMD. I wanted a true Quad-core machine, not 2 dual-core fused together). 15.6” monitor SSD 128GB or Larger. – It’s almost 2011 and I don’t want an old standard HDD in this machine. 8GB of DDR3 Ram. – The more the better, right? 1GB Video Card (Prefer NVidia) – I might want to play games with this. HDMI Port – Almost a standard on new Machines. This would be used when I am on the road and want to stream Netflix to the HDTV in the Hotel room. Webcam Built-in – This would be to video chat with the wife and kids if I am on the road. 6-Cell Battery. – I’ve read that an i7 in a laptop really kills the battery. A 6-cell or 9-cell is even better. That is a pretty long list for a budget of around $1200. I searched around the internet and could not buy this machine prebuilt for under $1200. That was even with coupons and my company’s 10% Dell discount. The only way that I would get a machine like this was to buy a prebuilt and replace parts. I chose the  Lenovo Y560 on Newegg to start as my base. Below is a top-down picture of it.   Part 1: The Hardware The Specs for this machine: Color :  GrayOperating System : Windows 7 Home Premium 64-bitCPU Type : Intel Core i7-740QM(1.73GHz)Screen : 15.6" WXGAMemory Size : 4GB DDR3Hard Disk : 500GBOptical Drive : DVD±R/RWGraphics Card : ATI Mobility Radeon HD 5730Video Memory : 1GBCommunication : Gigabit LAN and WLANCard slot : 1 x Express Card/34Battery Life : Up to 3.5 hoursDimensions : 15.20" x 10.00" x 0.80" - 1.30"Weight : 5.95 lbs. This computer met most of the requirements above except that it didn’t come with an SSD or have 8GB of DDR3 Memory. So, I needed to start shopping except this time for an SSD. I asked around on twitter and other hardware forums and everyone pointed me to the Crucial C300 SSD. After checking prices of the drive, it was going to cost an extra $275 bucks and I was going from a spacious 500GB drive to 128GB. After watching some of the SSD videos on YouTube I started feeling better. Below is a pic of the Crucial C300 SSD. The second thing that I needed to upgrade was the RAM. It came with 4GB of DDR3 RAM, but it was slow. I decided to buy the Crucial 8GB (4GB x 2) Kit from Newegg. This RAM cost an extra $120 and had a CAS Latency of 7. In the end this machine delivered everything that I wanted and it cost around $1300. You are probably saying, well your budget was $1200. I have spare parts that I’m planning on selling on eBay or Anandtech.  =) If you are interested then shoot me an email and I will give you a great deal mbcrump[at]gmail[dot]com. 500GB Laptop 7200RPM HDD 4GB of DDR3 RAM (2GB x 2) faceVision HD 720p Camera – Unopened In the end my Windows Experience Rating of the SSD was 7.7 and the CPU 7.1. The max that you can get is a 7.9. Part 2: The Software I’m very lucky that I get a lot of software for free. When choosing a laptop, the OS really doesn’t matter because I would never keep the bloatware pre-installed or Windows 7 Home Premium on my main development machine. Matter of fact, as soon as I got the laptop, I immediately took out the old HDD without booting into it. After I got the SSD into the machine, I installed Windows 7 Ultimate 64-Bit. The BIOS was out of date, so I updated that to the latest version and started downloading drivers off of Lenovo’s site. I had to download the Wireless Networking Drivers to a USB-Key before I could get my machine on my wireless network. I also discovered that if the date on your computer is off then you cannot join the Windows 7 Homegroup until you fix it. I’m aware that most people like peeking into what programs other software developers use and I went ahead and listed my “essentials” of a fresh build. I am a big Silverlight guy, so naturally some of the software listed below is specific to Silverlight. You should also check out my master list of Tools and Utilities for the .NET Developer. See a killer app that I’m missing? Feel free to leave it in the comments below. My Software Essential List. CPU-Z Dropbox Everything Search Tool Expression Encoder Update Expression Studio 4 Ultimate Foxit Reader Google Chrome Infragistics NetAdvantage Ultimate Edition Keepass Microsoft Office Professional Plus 2010 Microsoft Security Essentials 2  Mindscape Silverlight Elements Notepad 2 (with shell extension) Precode Code Snippet Manager RealVNC Reflector ReSharper v5.1.1753.4 Silverlight 4 Toolkit Silverlight Spy Snagit 10 SyncFusion Reporting Controls for Silverlight Telerik Silverlight RadControls TweetDeck Virtual Clone Drive Visual Studio 2010 Feature Pack 2 Visual Studio 2010 Ultimate VS KB2403277 Update to get Feature Pack 2 to work. Windows 7 Ultimate 64-Bit Windows Live Essentials 2011 Windows Live Writer Backup. Windows Phone Development Tools That is pretty much it, I have a new laptop and am happy with the purchase. If you have any questions then feel free to leave a comment below.  Subscribe to my feed

    Read the article

  • College Courses through distance learning

    - by Matt
    I realize this isn't really a programming question, but didn't really know where to post this in the stackexchange and because I am a computer science major i thought id ask here. This is pretty unique to the programmer community since my degree is about 95% programming. I have 1 semester left, but i work full time. I would like to finish up in December, but to make things easier i like to take online classes whenever I can. So, my question is does anyone know of any colleges that offer distance learning courses for computer science? I have been searching around and found a few potential classes, but not sure yet. I would like to gather some classes and see what i can get approval for. Class I need: Only need one C SC 437 Geometric Algorithms C SC 445 Algorithms C SC 473 Automata Only need one C SC 452 Operating Systems C SC 453 Compilers/Systems Software While i only need of each of the above courses i still need to take two more electives. These also have to be upper 400 level classes. So i can take multiple in each category. Some other classes I can take are: CSC 447 - Green Computing CSC 425 - Computer Networking CSC 460 - Database Design CSC 466 - Computer Security I hoping to take one or two of these courses over the summer. If not, then online over the regular semester would be ok too. Any help in helping find these classes would be awesome. Maybe you went to a college that offered distance learning. Some of these classes may be considered to be graduate courses too. Descriptions are listed below if you need. Thanks! Descriptions Computer Security This is an introductory course covering the fundamentals of computer security. In particular, the course will cover basic concepts of computer security such as threat models and security policies, and will show how these concepts apply to specific areas such as communication security, software security, operating systems security, network security, web security, and hardware-based security. Computer Networking Theory and practice of computer networks, emphasizing the principles underlying the design of network software and the role of the communications system in distributed computing. Topics include routing, flow and congestion control, end-to-end protocols, and multicast. Database Design Functions of a database system. Data modeling and logical database design. Query languages and query optimization. Efficient data storage and access. Database access through standalone and web applications. Green Computing This course covers fundamental principles of energy management faced by designers of hardware, operating systems, and data centers. We will explore basic energy management option in individual components such as CPUs, network interfaces, hard drives, memory. We will further present the energy management policies at the operating system level that consider performance vs. energy saving tradeoffs. Finally we will consider large scale data centers where energy management is done at multiple layers from individual components in the system to shutting down entries subset of machines. We will also discuss energy generation and delivery and well as cooling issues in large data centers. Compilers/Systems Software Basic concepts of compilation and related systems software. Topics include lexical analysis, parsing, semantic analysis, code generation; assemblers, loaders, linkers; debuggers. Operating Systems Concepts of modern operating systems; concurrent processes; process synchronization and communication; resource allocation; kernels; deadlock; memory management; file systems. Algorithms Introduction to the design and analysis of algorithms: basic analysis techniques (asymptotics, sums, recurrences); basic design techniques (divide and conquer, dynamic programming, greedy, amortization); acquiring an algorithm repertoire (sorting, median finding, strong components, spanning trees, shortest paths, maximum flow, string matching); and handling intractability (approximation algorithms, branch and bound). Automata Introduction to models of computation (finite automata, pushdown automata, Turing machines), representations of languages (regular expressions, context-free grammars), and the basic hierarchy of languages (regular, context-free, decidable, and undecidable languages). Geometric Algorithms The study of algorithms for geometric objects, using a computational geometry approach, with an emphasis on applications for graphics, VLSI, GIS, robotics, and sensor networks. Topics may include the representation and overlaying of maps, finding nearest neighbors, solving linear programming problems, and searching geometric databases.

    Read the article

< Previous Page | 348 349 350 351 352 353 354 355 356 357 358 359  | Next Page >