Search Results

Search found 7247 results on 290 pages for '2 digit year'.

Page 36/290 | < Previous Page | 32 33 34 35 36 37 38 39 40 41 42 43  | Next Page >

  • Computer Games Technolgy or Software Engineering?

    - by Suleman Anwar
    I'm in the last year of my college and going to university next year. Could you tell me what the difference between Software Engineering and Computer Games Technology is? I know a bit of both but don't know the actual difference. I'm kind off in a dilemma between these two. I want to be a programmer, I'd love to go into gaming but I heard getting a job within a computer games company is really hard.

    Read the article

  • The True Cost of a Solution

    - by D'Arcy Lussier
    I had a Twitter chat recently with someone suggesting Oracle and SQL Server were losing out to OSS (Open Source Software) in the enterprise due to their issues with scaling or being too generic (one size fits all). I challenged that a bit, as my experience with enterprise sized clients has been different – adverse to OSS but receptive to an established vendor. The response I got was: Found it easier to influence change by showing how X can’t solve our problems or X is extremely costly to scale. Money talks. I think this is definitely the right approach for anyone pitching an alternate or alien technology as part of a solution: identify the issue, identify the solution, then present pros and cons including a cost/benefit analysis. What can happen though is we get tunnel vision and don’t present a full view of the costs associated with a solution. An “Acura”te Example (I’m so clever…) This is my dream vehicle, a Crystal Black Pearl coloured Acura MDX with the SH-AWD package! We’re a family of 4 (5 if my daughters ever get their wish of adding a dog), and I’ve always wanted a luxury type of vehicle, so this is a perfect replacement in a few years when our Rav 4 has hit the 8 – 10 year mark. MSRP – $62,890 But as we all know, that’s not *really* the cost of the vehicle. There’s taxes and fees added on, there’s the extended warranty if I choose to purchase it, there’s the finance rate that needs to be factored in… MSRP –   $62,890 Taxes –      $7,546 Warranty - $2,500 SubTotal – $72,936 Finance Charge – $ 1094.04 Grand Total – $74,030 Well! Glad we did that exercise – we discovered an extra $11k added on to the MSRP! Well now we have our true price…or do we? Lifetime of the Vehicle I’m expecting to have this vehicle for 7 – 10 years. While the hard cost of the vehicle is known and dealt with, the costs to run and maintain the vehicle are on top of this. I did some research, and here’s what I’ve found: Fuel and Mileage Gas prices are high as it is for regular fuel, but getting into an MDX will require that I *only* purchase premium fuel, which comes at a premium price. I need to expect my bill at the pump to be higher. Comparing the MDX to my 2007 Rav4 also shows I’ll be gassing up more often. The Rav4 has a city MPG of 21, while the MDX plummets to 16! The MDX does have a bigger fuel tank though, so all in all the number of times I hit the pumps might even out. Still, I estimate I’ll be spending approximately $8000 – $10000 more on gas over a 10 year period than my current Rav4. Service Options Limited Although I have options with my Toyota here in Winnipeg (we have 4 Toyota dealerships), I do go to my original dealer for any service work. Still, I like the fact that I have options. However, there’s only one Acura dealership in all of Winnipeg! So if, for whatever reason, I’m not satisfied with the level of service I’m stuck. Non Warranty Service Work Also let’s not forget that there’s a bulk of work required every year that is *not* covered under warranty – oil changes, tire rotations, brake pads, etc. I expect I’ll need to get new tires at the 5 years mark as well, which can easily be $1200 – $1500 (I just paid $1000 for new tires for the Rav4 and we’re at the 5 year mark). Now these aren’t going to be *new* costs that I’m not used to from our existing vehicles, but they should still be factored in. I’d budget $500/year, or $5000 over the 10 years I’ll own the vehicle. Final Assessment So let’s re-assess the true cost of my dream MDX: MSRP                    $62,890 Taxes                       $7,546 Warranty                 $2,500 Finance Charge         $1094 Gas                        $10,000 Service Work            $5000 Grand Total           $89,030 So now I have a better idea of 10 year cost overall, and I’ve identified some concerns with local service availability. And there’s now much more to consider over the original $62,890 price tag. Tying This Back to Technology Solutions The process that we just went through is no different than what organizations do when considering implementing a new system, technology, or technology based solution, within their environments. It’s easy to tout the short term cost savings of particular product/platform/technology in a vacuum. But its when you consider the wider impact that the true cost comes into play. Let’s create a scenario: A company is not happy with its current data reporting suite. An employee suggests moving to an open source solution. The selling points are: - Because its open source its free - The organization would have access to the source code so they could alter it however they wished - It provided features not available with the current reporting suite At first this sounds great to the management and executive, but then they start asking some questions and uncover more information: - The OSS product is built on a technology not used anywhere within the organization - There are no vendors offering product support for the OSS product - The OSS product requires a specific server platform to operate on, one that’s not standard in the organization All of a sudden, the true cost of implementing this solution is starting to become clearer. The company might save money on licensing costs, but their training costs would increase significantly – developers would need to learn how to develop in the technology the OSS solution was built on, IT staff must learn how to set up and maintain a new server platform within their existing infrastructure, and if a problem was found there was no vendor to contact for support. The true cost of implementing a “free” OSS solution is actually spinning up a project to implement it within the organization – no small cost. And that’s just the short-term cost. Now the organization must ensure they maintain trained staff who can make changes to the OSS reporting solution and IT staff that will stay knowledgeable in the new server platform. If those skills are very niche, then higher labour costs could be incurred if those people are hard to find or if trained employees use that knowledge as leverage for higher pay. Maybe a vendor exists that will contract out support, but then there are those costs to consider as well. And let’s not forget end-user training – in our example, anyone that runs reports will need to be trained on how to use the new system. Here’s the Point We still tend to look at software in an “off the shelf” kind of way. It’s very easy to say “oh, this product is better than vendor x’s product – and its free because its OSS!” but the reality is that implementing any new technology within an organization has a cost regardless of the retail price of the product. Training, integration, support – these are real costs that impact an organization and span multiple departments. Whether you’re pitching an improved business process, a new system, or a new technology, you need to consider the bigger picture costs of implementation. What you define as success (in our example, having better reporting functionality) might not be what others define as success if implementing your solution causes them issues. A true enterprise solution needs to consider the entire enterprise.

    Read the article

  • A "First" at Oracle OpenWorld

    - by Kathryn Perry
    A guest post by Adam May, Director, Fusion CRM, Oracle Applications Development There are always firsts at OpenWorld. These firsts keep the conference fresh and are the reason people come back year after year. An important first this year is our Fusion CRM customers who are using the product and deriving real benefit from Fusion CRM. Everyone can learn from and interact with them -- including us!  We love talking to customers, especially those who are using our solutions in unexpected ways because they challenge us! At previous OpenWorlds, we presented our overall Fusion vision and our plans for Fusion CRM. Those presentations helped customers plan their strategies and map out their new release uptakes. Fast forward to March of this year when the first Fusion CRM customer went live. Since then we've watched the pace of go-lives accelerate every single month. Now we're at the threshold of another OpenWorld -- with over 45,000 attendees, 2,500 sessions and LOTS of other activities. To avoid having our customers curl into a ball with sensory overload, we designed a Focus On Document to outline the most important Fusion CRM activities. Here are some of the highlights: Anthony Lye's "Oracle Fusion Customer Relationship Management: Overview/Strategy/Customer Experiences/Roadmap" on Monday at 3:15 p.m. The CRM Pavilion, open in Moscone West from Monday through Wednesday; features our strategic Fusion CRM partners and provides live demonstrations of their capabilities General Session: "Oracle Fusion CRM--Improving Sales Effectiveness, Efficiency, and Ease of Use" on Tuesday at 11:45 a.m.; features Anthony Lye and Deloitte "Meet the Fusion CRM Experts" on Tuesday at 5:00 p.m.; this session gives customers the opportunity to interact one-on-one with Fusion experts divided into eight categories of expertise CRM Social Reception on Tuesday from 6-8 p.m.; there's no better way to spend the early evening than discussing Fusion CRM with Oracle experts and strategic partners over appetizers and drinks Wednesday night is Oracle's Customer Appreciation event; enjoy Pearl Jam, Kings of Leon, etc. beginning at 7:30 p.m. at Treasure Island Be sure to drink plenty of water before sleeping Wednesday night and don't stay out too late because we have lots of great content on Thursday; at the top of the list is "Oracle Fusion Social CRM Strategy and Roadmap: Future of Collaboration and Social Engagement" at 11:15 a.m. We hope you have a fantastic experience at OpenWorld 2012! And here's a little video treat to whet your appetite: http://www.youtube.com/user/FusionAppsAtOracle

    Read the article

  • Rails time stamps on images in CSS

    - by brad
    Just posted this on Stack but realized it may be more appropriate here: So Rails time stamping is great. I'm using it to add expires headers to all files that end in the 10 digit timestamp. Most of my images however are referenced in my CSS. Has anyone come across any method that allows for timestamps to be added to CSS referenced images, or some funky re-write rule that achieves this? I'd love for ALL images in my site, both inline and in css to have this timestamp so I can tell the browser to cache them, but refresh any time the file itself changes. I couldn't find anything on the net regarding this and I can't believe this isn't a more frequently discussed topic. I don't think my setup will matter because the actual expiring will hopefully happen the same way, based on the 10 digit timestamp, but I'm using apache to serve all static content if that matters

    Read the article

  • Microsoft Visual C# MVP 2012

    - by James Michael Hare
    I was informed on July 1st, 2012 that I was awarded a Microsoft Visual C# MVP recognition for 2012.  This is my second year now, and I'm doubly thankful to have been nominated and selected, and thankful that you guys all find my posts informative and useful! Even though life has thrown me some curve balls in this past last year, I look forward to continuing my posts (especially the Little Wonders) as much as possible!Thanks again!

    Read the article

  • Turning my website into a non-profit

    - by GoodbyeWebsite
    I was given an established website about a year ago. It makes some money on ads, but not much (less than 10k/year). I am no longer able to manage the site and am considering turning it over to another person. I don't want them to turn around and sell it. It was suggested that I establish a non-profit of sorts and transfer the assets to that entity. Does anybody have experience or advice on this subject?

    Read the article

  • JSR 355 Final Release, and moves JCP to version 2.9

    - by heathervc
    JSR 355, JCP EC Merge, passed the JCP EC Final Approval Ballot on 13 August 2012, with 14 Yes votes, 1 abstain (1 member did not vote) on the SE/EE EC, and 12 yes votes (2 members were not eligible to vote) on the ME EC.  JSR 355 posted a Final Release this week, moving the JCP program version to JCP 2.9.  The transition to a merged EC will happen after the 2012 EC Elections, as defined in the Appendix B of the JCP (pasted below), and the EC will operate under the new EC Standing Rules. In the previous version (2.8) of this Process Document there were two separate Executive Committees, one for Java ME and one for Java SE and Java EE combined. The single Executive Committee described in this version of the Process Document will be implemented through the following process: The 2012 annual elections will be held as defined in JCP 2.8, but candidates will be informed that if they are elected their term will be for only a single year, since all candidates must stand for re-election in 2013. Immediately after the 2012 election the two ECs will be merged. Oracle and IBM's second seats will be eliminated, resulting in a single EC with 30 members. All subsequent JSR ballots (even for in-progress JSRs) will then be voted on by the merged EC. For the 2013 annual elections three Ratified and two Elected Seats will be eliminated, thereby reducing the EC to 25 members. All 25 seats will be up for re-election in 2013. Members elected in 2013 will be ranked to determine whether their initial term will be one or two years. The 50% of Ratified and 50% of Elected members who receive the most votes will serve an initial two-year term, while all others will serve an initial one year term. All members elected in 2014 and subsequently will serve a two-year term. For clarity, note that the provisions specified in this version of the Process Document regarding a merged EC will apply to subsequent ballots on all existing JSRs, whether or not the Spec Leads of those JSRs chose to adopt this version of the Process Document in its entirety. <end of Appendix> Also of note:  the materials and minutes from the July EC meeting and the June EC Meeting are now available--following the July EC Meeting, Samsung and SK Telecom lost their EC seats. The June EC meeting also had a public portion--the audio from the public portion of the EC meeting are now posted online.  For Spec Leads there is also the recording of the EG Nominations call.

    Read the article

  • Over $50 Billion NOT Lost due to Software Piracy

    <b>IT News Today:</b> "If you've been paying attention to the IT industry for the last year or so you probably already know where I'm going with this: Making a claim that $50 billion was lost last year due to piracy is a very bold claim, and cannot be proven"

    Read the article

  • An introduction to Igelle 1.0

    <b>Distrowatch:</b> "Igelle is a young distribution which first appeared with its 0.6 release about a year ago. In February of this year the Igelle developers announced the availability of version 1.0, calling it "the world's most flexible operating system.""

    Read the article

  • Anticipating JavaOne 2012 – Number 17!

    - by Janice J. Heiss
    As I write this, JavaOne 2012 (September 30-October 4 in San Francisco, CA) is just over a week away -- the seventeenth JavaOne! I’ll resist the impulse to travel in memory back to the early days of JavaOne. But I will say that JavaOne is a little like your birthday or New Year’s in that it invites reflection, evaluation, and comparison. It’s a time when we take the temperature of Java and assess the world of information technology generally. At JavaOne, insight and information flow amongst Java developers like no other time of the year.This year, the status of Java seems more secure in the eyes of most Java developers who agree that Oracle is doing an acceptable job of stewarding the platform, and while the story is still in progress, few doubt that Oracle is engaging strongly with the Java community and wants to see Java thrive. From my perspective, the biggest news about Java is the growth of some 250 alternative languages for the JVM – from Groovy to Jython to JRuby to Scala to Clojure and on and on – offering both new opportunities and challenges. The JVM has proven itself to be unusually flexible, resulting in an embarrassment of riches in which, more and more, developers are challenged to find ways to optimally mix together several different languages on projects.    To the matter at hand -- I can say with confidence that Oracle is working hard to make each JavaOne better than the last – more interesting, more stimulating, more networking, and more fun! A great deal of thought and attention is being devoted to the task. To free up time for the 475 technical sessions/Birds of feather/Hands-on-Labs slots, the Java Strategy, Partner, and Technical keynotes will be held on Sunday September 30, beginning at 4:00 p.m.   Let’s not forget Java Embedded@JavaOne which is being held Wednesday, Oct. 3rd and Thursday, Oct. 4th at the Hotel Nikko. It will provide business decision makers, technical leaders, and ecosystem partners important information about Java Embedded technologies and new business opportunities.   This year's JavaOne theme is “Make the Future Java”. So come to JavaOne and make your future better by:--Choosing from 475 sessions given by the experts to improve your working knowledge and coding expertise --Networking with fellow developers in both casual and formal settings--Enjoying world-class entertainment--Delighting in one of the world’s great cities (my home town) Hope to see you there! Originally published on blogs.oracle.com/javaone.

    Read the article

  • Certification Progress

    - by NeilHambly
    Like a lot of us, I had set myself some goals @ the start of the year, and I did not make them all that easy I had set myself the goal to become Microsoft certified in SQL Server 2008 & 2012 {the details on what exactly where the 2012 certifications where not clear when the goal was initially set} I duly spent the best part of the 1st half of the year, in studies for and taking the 4 exams to become an MCITP 2008 SQL Server for both Database Administrator & Developer Exam 70-432 This was...(read more)

    Read the article

  • PASS Summit 2012, Day 1

    - by KKline
    One of the most positive experiences I can have, as a former leader of the PASS organization, is when I see a neophyte become a passionate support and champion for the community. On my first day in Seattle, before the event had even begun, I was stopped several by people who'd attended their first PASS Summit last year. But this year, they were excited to tell me that they'd started user groups in their own community, spoken for the first time at a PASS event, or even helped launch a SQL Saturday...(read more)

    Read the article

  • Excel 2010 started changing my numbers

    - by Going Crazy
    If I type in a 16 digit number (format: number, no decimals) it changes the number on me. Example: 1234567812345678 changes the view to 1234567812345670. If I type it in as a general format it changes the numbers above so it displays 1.23457E+15 but if you click on the cell, the display shows the last digit as a 0 instead of an 8 once again. I opened the file on a different computer and same issue now with it. I have changed the auto correcting and auto formating all to no avail. Help!

    Read the article

  • The Oracle Excellence Awards 2012 are Open for Nominations

    - by Javier Puerta
    Specialized Partners: Submit your Nominations for the Specialized Partner of the Year by 29 June! The Specialized Partner of the Year Award celebrates OPN Specialized partners in EMEA who have demonstrated success with specialization, delivering customer value, and outstanding solution or service innovation in categories that complement OPN Specialization investments. Full information here!

    Read the article

  • The Oracle Excellence Awards 2012 are Open for Nominations

    - by Javier Puerta
    Specialized Partners: Submit your Nominations for the Specialized Partner of the Year by 29 June! The Specialized Partner of the Year Award celebrates OPN Specialized partners in EMEA who have demonstrated success with specialization, delivering customer value, and outstanding solution or service innovation in categories that complement OPN Specialization investments. Full information here! Exadata partners can submit nominations either for the Database section or for the Oracle on Oracle section

    Read the article

  • windows azure thoughts.

    - by foxjazz
    Well I had a relatively unpleasant exprience with Microsoft's new offerings when it comes to azure.And of course they deleted the forum trail.They don't want the consumer as a customer, expect to pay $200 - $250 or more a year for azure and that doesn't include a good email solution. This is for the smallest slice offering.If you want a simple website solution 1and1.com isn't a bad choice and it's less than $50 a year.

    Read the article

  • Live from the #summit13 keynote : 2013-10-16

    - by AaronBertrand
    Early morning start here in Charlotte. I'm going to try and keep this post updated as I have new information from the keynote to share, so refresh often! 8:24 AM Bill Graziano takes the stage and welcomes us to the 15th PASS Summit. He mentions that PASS delivered over 700,000 hours of technical training in the previous fiscal year, and shows a Power BI Power Map video talking about all of the SQL Saturday accomplishments in the last few years. She introduces Amy Lewis, who wins this year's PASSion...(read more)

    Read the article

  • [Speaking] PowerShell at the PASS Summit

    - by AllenMWhite
    Next week is the annual PASS Summit , the event of the year for those of us in the SQL Server community. We get to see our old friends, make new friends, and learn an amazing amount about SQL Server, and it'll be in Seattle, so it's close to the mother ship. I love having Microsoft close, because it's easier to get to know the people who actually make this amazing product we spend our lives working with. This year I'm fortunate to have been selected to present three sessions. One is a regular session...(read more)

    Read the article

  • Planning Your Online Marketing Budget For 2010

    Although Social Media is everywhere, you'll find that Maryland businesses and companies everywhere are still planning a balanced online attack for 2010, with search engine optimization and online advertising as front runners, as they've provided proven success on the web. Despite a recession, Search Engine Optimization and search engine marketing practices are still growing each year. Experts predict that Search Engine marketing activities in the US will have doubled from $13 billion dollars spent in 2009 to $26 billion by the year 2014.

    Read the article

  • Slides and Scripts from SharePoint Cincy 2014

    - by Brian T. Jackett
    Originally posted on: http://geekswithblogs.net/bjackett/archive/2014/06/06/slides-and-scripts-from-sharepoint-cincy-2014.aspx   I was pleased to present at SharePoint Cincy again for the third year.  Geoff and all the organizers do a great job.  My presentation this year was “PowerShell for Your SharePoint Tool Belt”.  Below are my slides and demo scripts.  Thanks for all who attended, I hope you found something that will be useful for you in your work.   Demo PowerShell Scripts   Slidedeck           -Frog Out

    Read the article

  • [AJAX Numeric Updown Control] Microsoft JScript runtime error: The number of fractional digits is out of range

    - by Jenson
    If you have using Ajax control toolkits a lot (which I will skip the parts on where to download and how to configure it in Visual Studio 2010), you might have encountered some bugs or limitations of the controls, or rather, some weird behaviours. I would call them weird behaviours though. Recently, I've been working on a Ajax numeric updown control, which i remember clearly it was working fine without problems. In fact, I use 2 numeric updown control this time. So I went on to configure it to be as simple as possible and I will just use the default up and down buttons provided by it (so that I won't need to design my own). I have two textbox controls to display the value controlled by the updown control. One for month, and another for year. <asp:TextBox ID="txtMonth" runat="server" CssClass="txtNumeric" ReadOnly="True" Width="150px" /> <asp:TextBox ID="txtYear" runat="server" CssClass="txtNumeric" ReadOnly="True" Width="150px" /> So I will now drop 1 numeric updown control for each of the textboxes. <asp:NumericUpDownExtender ID="txtMonth_NumericUpDownExtender"     runat="server" TargetControlID="txtMonth" Maximum="12" Minimum="1" Width="152"> </asp:NumericUpDownExtender>                          <asp:NumericUpDownExtender ID="txtYear_NumericUpDownExtender"     runat="server" TargetControlID="txtYear" Width="152"> </asp:NumericUpDownExtender>                                                  You noticed that I configure the Maximum and Minimum value for the first numericupdown control, but I never did the same for the second one (for txtYear). That's because it won't work, well, at least for me. So I remove the Minimum="2000" and Maximum="2099" from there. Then I would configure the initial value to the the current year, and let the year to flow up and down freely. If you want, you want write the codes to restrict it. Here are the codes I used on PageLoad:     Protected Sub Page_Load(ByVal sender As Object, ByVal e As System.EventArgs) Handles Me.Load         If Not Page.IsPostBack Then             If Trim(txtMonth.Text) = "" Then                 Me.txtMonth.Text = System.DateTime.Today.Month             End If             If Trim(txtYear.Text) = "" Then                 Me.txtYear.Text = System.DateTime.Today.Year             End If         End If     End Sub   Enjoy!

    Read the article

< Previous Page | 32 33 34 35 36 37 38 39 40 41 42 43  | Next Page >