Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 378/1407 | < Previous Page | 374 375 376 377 378 379 380 381 382 383 384 385  | Next Page >

  • HAProxy: session stickiness triggered by response header possible?

    - by zoli
    I'm investigating HAProxy as a possible replacement for F5. F5 is capable of persisting a session based on a response header value: when HTTP_RESPONSE { set session [HTTP::header X-Session] if {$session ne ""} { persist add uie $session } } and then route all subsequent requests which contain the same session ID in a header, query parameter, path, etc. to the same machine, eg: when HTTP_REQUEST { set session [findstr [HTTP::path] "/session/" 9 / if {$session} { persist uie $session } } I'm wondering if this is even possible to do with HAProxy?

    Read the article

  • Specifying an additional Applications directory on Mac OS X

    - by 341008
    Is there any way I can specify an additional Applications directory. I basically want to keep the applications that come with Mac OS X in the default Applications directory, but, install all third-party software to a different directory which is in a separate partition. I want to retain all advantages of the actual Applications directory such as the one where copying files from a .dmg to the Applications folder installs software.

    Read the article

  • Apache Solr Admin on Tomcat Deployed in WebApps Directory

    - by KM01
    I am trying to get Apache Solr to work on Redhat6 and Tomcat6 (using these instructions), but get this error when browsing to the admin section, http://localhost:8080/solr-example/admin: HTTP Status 404 - missing core name in path type Status report message missing core name in path description The requested resource (missing core name in path) is not available. http://localhost:8080/solr-example loads fine, with a link to "Solr Admin." My setup is as follows: tomcat6: /etc/tomcat6 Solr: /app/solr/example I have a solr-example.xml in /etc/tomcat6/Catalina/localhost/, which reads: <?xml version="1.0" encoding="utf-8"?> <Context docBase="/app/solr/example/apache-solr-3.4.0.war" debug="0" crossContext="true"> <Environment name="solr/home" type="java.lang.String" value="/app/solr/example" override="true"/> </Context> I don't see anything in the logs (/var/log/tomcat6) ... only entires in catalina.out are regarding the starting and stopping of tomcat6. My questions are: 1.What else do I need to do to get "Solr Admin" to work under Tomcat? 2.Where are these "cores" supposed to be specified? I see an entry in /app/solr/example/solr/solr.xml ? <solr persistent="false"> adminPath: RequestHandler path to manage cores. If 'null' (or absent), cores will not be manageable via request handler <cores adminPath="/admin/cores" defaultCoreName="collection1"> <core name="collection1" instanceDir="." /> </cores> </solr> 3.How do I got about ensuring that logs are working correctly? I can't find logs that contain mention of the 404 above. Update in response to @quanta's comment: Downloaded former (apache-solr-3.4.0.tgz) dataDir was not set, now set to: <dataDir>${solr.data.dir:../solr/data}</dataDir> JAVA_OPTS: /usr/lib/jvm/java/bin/java -classpath :/usr/share/tomcat6/bin/bootstrap.jar:/usr/share/tomcat6/bin/tomcat-juli.jar:/usr/share/java/commons-daemon.jar -Dcatalina.base=/usr/share/tomcat6 -Dcatalina.home=/usr/share/tomcat6 -Djava.endorsed.dirs= -Djava.io.tmpdir=/var/cache/tomcat6/temp -Djava.util.logging.config.file=/usr/share/tomcat6/conf/logging.properties -Djava.util.logging.manager=org.apache.juli.ClassLoaderLogManager org.apache.catalina.startup.Bootstrap start catalina.out contains no indication of the above error

    Read the article

  • blur a moving area in a movie on osx

    - by Stefano Borini
    Note, there's already a question on this regard, but it's totally useless. I need to blur, or put a small opaque mask to a moving object on a movie I took, I am using mac osx. Clearly, I don't want to shell out a lot of money for something so simple, so getting adobe premiere or similar software is a no go. I could however consider paying a small software (max 30 dollars) for this specific task.

    Read the article

  • How to see the olddir after mount --bind olddir newdir?

    - by freestyler
    In my debian 7: $ pwd /home/freestyler $ mkdir old new # mount --bind old new then $ mount /dev/cciss/c0d0p9 on /home/freestyler/new type ext4(rw,noatime,nodiratime,user_xattr,barrier=1,data=ordered) I can only see the /dev/cciss/c0d0p9, which is not the same as /home/freestyler/old How can I get the original olddir path? In debian 6: the mount outpt the olddir path well: $ mount /home/freestyler/old on /home/freestyler/new type none (rw,bind)

    Read the article

  • Cracking truecrypt files in minutes? Or just truecrypt harddrives in minutes?

    - by oshirowanen
    Apparently http://www.lostpassword.com/kit-forensic.htm can be used to crack truecrypt hard drive encryption. Has anyone tried it and is it possible to crack truecrypt files too with this software? Passware Kit Forensic, complete with Passware FireWire Memory Imager, is the first and only commercial software that decrypts BitLocker and TrueCrypt hard disks, and instantly recovers Mac and Windows login passwords of seized computers.

    Read the article

  • Windows 7: Creating a password-protected task (NOT a programming question)

    - by Matthias
    Hello, I would like to configure a task like "child control software", so it would hibernate the pc at certain times. Is it possible to prevent modification (here: pausing) of a task through requiring the entering of the admin password to modify, EVEN THOUGH the currently-logged-in (and only) user is the admin account itself? (Do you know of any child control software that does NOT require an additional account yet is able to hibernate the system at certain times?) Thanks a lot! Matthias

    Read the article

  • Splitting an internet connection between multiple separate subnetworks

    - by pythonian4000
    Problem I have an internet connection that I want to split between four separate networks. My requirements are: I need to be able to monitor the amount of bandwidth and data being used by each network, and notify or control as necessary. The four networks should only be able to connect to the internet, not each other. My parents need to be able to operate it, so it needs a simple, preferably Windows-based GUI. Progress so far Server I have a mini-ITX server with six Gigabit ethernet ports - one for the ethernet internet connection, one for each of the four networks, and one for remote access to the server for administration. Bandwidth control I spent a long time researching solutions here. The majority of the control systems/software I found could control bandwidth usage via QOS, but could not monitor or control the amount of data being used. Eventually I found the SoftPerfect Bandwidth Manager, which has everything I need in terms of monitoring and control - per-interface quota management, usage statistics, a web interface for checking usage, and email notifications when quotas are exceeded. It is also Windows-based and has a simple GUI. Internet sharing This is where I am having issues. I am currently using Windows XP Pro SP2 for the server (yes, I know this is far from ideal, but it's the only spare Windows OS I currently have). I can't use the built-in Internet Connection Sharing for several reasons: The upstream internet router has an IP of 192.168.0.1 which ICS clashes with, and I cannot change the router settings. ICS can only share an internet connection with a single interface, but I have four. I have tried bridging the four network cards, but then the Bandwidth Manager cannot see the four individual interfaces - it only sees the bridge. I have tried setting up Dual DHCP DNS server (and am having issues getting DHCP offers to be received by clients), but that would still require gateway software of some sort, which I have been unable to find. My current attempt is to use OpenVPN, with a server for the internet NIC and a separate client for each of the four networks. My thought is that I could bridge the OpenVPN TAP devices to each NIC, meaning that the Bandwidth Manager would control traffic from the bridge instead of the interface. I have not made much progress here though - I've never used OpenVPN before. Questions Is there a Windows software package that does everything I need? (Unlikely, I know) Is there a Windows software package that will share internet between multiple NICs without bridging? Are either of my about attempts feasible? Would it help to have a newer/server version of Windows? Is there a non-Windows alternative that is easy to use?

    Read the article

  • Turn old rack server into a telephone server

    - by Jake Elsley
    I have an old server lying around and I am thinking of using it as an internal telephone server. Its main use would be to set up a 1 to 1 telephone system that could be used internally to connect to different users in different offices. I have looked at software like Asterisk, but it seems that this is mainly for external telephone systems. Is this possible to do with Asterisk (or other software) or is this not possible without involving a VOIP company?

    Read the article

  • my multi boot can't boot to XP 'resumeobject' is missing

    - by GwenKillerby
    In my multi boot set up, booting to vista and 7 goes fine, but when I try to boot to XP, i get an error Windows failed to start. A recent hardware or software change might be the cause. To fix the problem: 1. Insert your Windows installation disc and restart your computer. 2. Choose your language settings, and then click "Next." 3. Click "Repair your computer." If you do not have this disc, contact your system administrator or computer manufacturer for assistance. File: \NTLDR Status: 0xc000000e Info: The selected entry could not be loaded because the application is missing or corrupt. See below. Clearly the resumeobject seems to be missing in the XP entry ("Real Mode Boot sector"), only I don't know how to restore it. Vista is on **C:**, Win7 is on **F:** (as is the bootmgr ??? ) and WinXP is on **E:** What I've tried: [1] I've used about 5 windows discs, that is the Recovery Consoles from real XP install CD's and 3 virtual Recovery Consoles. All failed. The real CD's work ONE time, but won't let me finish, I only got as far as [b]fixboot E:[/b] Then they shut the laptop down, I kid you not. On a next startup, all 5 CD's ask me for some Admin password that I've never added! [2] I have VisualBCD and EasyBCD, but the most obvious things I tried there didn't solve the problem. So know I don't exactly know what to do with them. [3] I CAN boot into XP with the FIX NTLDR workaround of http://milescomer.com/tinyempire.com/notes/ntldrismissing.htm, but it doesn't fix it permanently QUESTION: How do I fix it permanently? bcdedit /enum output: Windows Boot Manager -------------------- identifier {bootmgr} device partition=F: path \bootmgr description Windows Boot Manager locale en-US default {current} displayorder {current} {812e27a9-27b7-11e4-8fb4-dfa8174ae8dc} {812e27ac-27b7-11e4-8fb4-dfa8174ae8dc} timeout 30 resume No Windows Boot Loader ------------------- identifier {current} device partition=C: path \Windows\system32\winload.exe description Vista locale nl-NL osdevice partition=C: systemroot \Windows resumeobject {73d8b5bc-2764-11e4-b181-806e6f6e6963} Windows Boot Loader ------------------- identifier {812e27a9-27b7-11e4-8fb4-dfa8174ae8dc} device partition=F: path \Windows\system32\winload.exe description Daisy Etta locale en-US osdevice partition=F: systemroot \Windows resumeobject {b8c234a4-27b0-11e4-b8b3-806e6f6e6963} Real-mode Boot Sector --------------------- identifier {812e27ac-27b7-11e4-8fb4-dfa8174ae8dc} device partition=E: path \NTLDR description XP Thank you.

    Read the article

  • HP to Cisco spanning tree root flapping

    - by Tim Brigham
    Per a recent question I recently configured both my HP (2x 2900) and Cisco (1x 3750) hardware to use MSTP for interoperability. I thought this was functional until I applied the change to the third device (HP switch 1 below) at which time the spanning tree root started flapping causing performance issues (5% packet loss) between my two HP switches. I'm not sure why. HP Switch 1 A4 connected to Cisco 1/0/1. HP Switch 2 B2 connected to Cisco 2/0/1. HP Switch 1 A2 connected to HP Switch 2 A1. I'd prefer the Cisco stack to act as the root. EDIT: There is one specific line - 'spanning-tree 1 path-cost 500000' in the HP switch 2 that I didn't add and was preexisting. I'm not sure if it could have the kind of impact that I'm describing. I'm more a security and monitoring guy then networking. EDIT 2: I'm starting to believe the problem lies in the fact that the value for my MST 0 instance on the Cisco is still at the default 32768. I worked up a diagram: This is based on every show command I could find for STP. I'll make this change after hours and see if it helps. Cisco 3750 Config: version 12.2 spanning-tree mode mst spanning-tree extend system-id spanning-tree mst configuration name mstp revision 1 instance 1 vlan 1, 40, 70, 100, 250 spanning-tree mst 1 priority 0 vlan internal allocation policy ascending interface TenGigabitEthernet1/1/1 switchport trunk encapsulation dot1q switchport mode trunk ! interface TenGigabitEthernet2/1/1 switchport trunk encapsulation dot1q switchport mode trunk ! interface Vlan1 no ip address ! interface Vlan100 ip address 192.168.100.253 255.255.255.0 ! Cisco 3750 show spanning tree: show spanning-tree MST0 Spanning tree enabled protocol mstp Root ID Priority 32768 Address 0004.ea84.5f80 Cost 200000 Port 53 (TenGigabitEthernet1/1/1) Hello Time 2 sec Max Age 20 sec Forward Delay 15 sec Bridge ID Priority 32768 (priority 32768 sys-id-ext 0) Address a44c.11a6.7c80 Hello Time 2 sec Max Age 20 sec Forward Delay 15 sec Interface Role Sts Cost Prio.Nbr Type ------------------- ---- --- --------- -------- -------------------------------- Te1/1/1 Root FWD 2000 128.53 P2p MST1 Spanning tree enabled protocol mstp Root ID Priority 1 Address a44c.11a6.7c80 This bridge is the root Hello Time 2 sec Max Age 20 sec Forward Delay 15 sec Bridge ID Priority 1 (priority 0 sys-id-ext 1) Address a44c.11a6.7c80 Hello Time 2 sec Max Age 20 sec Forward Delay 15 sec Interface Role Sts Cost Prio.Nbr Type ------------------- ---- --- --------- -------- -------------------------------- Te1/1/1 Desg FWD 2000 128.53 P2p Cisco 3750 show logging: %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan1, changed state to down %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan100, changed state to down %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan1, changed state to up %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan100, changed state to up %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan1, changed state to down %LINEPROTO-5-UPDOWN: Line protocol on Interface Vlan1, changed state to up HP Switch 1: ; J9049A Configuration Editor; Created on release #T.13.71 vlan 1 name "DEFAULT_VLAN" untagged 1-8,10,13-16,18-23,A1-A4 ip address 100.100.100.17 255.255.255.0 no untagged 9,11-12,17,24 exit vlan 100 name "192.168.100" untagged 9,11-12,17,24 tagged 1-8,10,13-16,18-23,A1-A4 no ip address exit vlan 21 name "Users_2" tagged 1,A1-A4 no ip address exit vlan 40 name "Cafe" tagged 1,4,7,A1-A4 no ip address exit vlan 250 name "Firewall" tagged 1,4,7,A1-A4 no ip address exit vlan 70 name "DMZ" tagged 1,4,7-8,13,A1-A4 no ip address exit spanning-tree spanning-tree config-name "mstp" spanning-tree config-revision 1 spanning-tree instance 1 vlan 1 40 70 100 250 password manager password operator HP Switch 1 show spanning tree: show spanning-tree Multiple Spanning Tree (MST) Information STP Enabled : Yes Force Version : MSTP-operation IST Mapped VLANs : 2-39,41-69,71-99,101-249,251-4094 Switch MAC Address : 0021f7-126580 Switch Priority : 32768 Max Age : 20 Max Hops : 20 Forward Delay : 15 Topology Change Count : 363,490 Time Since Last Change : 14 hours CST Root MAC Address : 0004ea-845f80 CST Root Priority : 32768 CST Root Path Cost : 200000 CST Root Port : 1 IST Regional Root MAC Address : 0021f7-126580 IST Regional Root Priority : 32768 IST Regional Root Path Cost : 0 IST Remaining Hops : 20 Root Guard Ports : TCN Guard Ports : BPDU Protected Ports : BPDU Filtered Ports : PVST Protected Ports : PVST Filtered Ports : | Prio | Designated Hello Port Type | Cost rity State | Bridge Time PtP Edge ----- --------- + --------- ---- ---------- + ------------- ---- --- ---- A1 | Auto 128 Disabled | A2 10GbE-CX4 | 2000 128 Forwarding | 0021f7-126580 2 Yes No A3 10GbE-CX4 | Auto 128 Disabled | A4 10GbE-SR | Auto 128 Disabled | HP Switch 1 Logging: I removed the date / time fields since they are inaccurate (no NTP configured on these switches) 00839 stp: MSTI 1 Root changed from 0:a44c11-a67c80 to 32768:0021f7-126580 00839 stp: MSTI 1 Root changed from 32768:0021f7-126580 to 0:a44c11-a67c80 00842 stp: MSTI 1 starved for an MSTI Msg Rx on port A4 from 0:a44c11-a67c80 00839 stp: MSTI 1 Root changed from 0:a44c11-a67c80 to 32768:0021f7-126580 00839 stp: MSTI 1 Root changed from 32768:0021f7-126580 to 0:a44c11-a67c80 00839 stp: MSTI 1 Root changed from 0:a44c11-a67c80 to ... HP Switch 2 Configuration: ; J9146A Configuration Editor; Created on release #W.14.49 vlan 1 name "DEFAULT_VLAN" untagged 1,3-17,21-24,A1-A2,B2 ip address 100.100.100.36 255.255.255.0 no untagged 2,18-20,B1 exit vlan 100 name "192.168.100" untagged 2,18-20 tagged 1,3-17,21-24,A1-A2,B1-B2 no ip address exit vlan 21 name "Users_2" tagged 1,A1-A2,B2 no ip address exit vlan 40 name "Cafe" tagged 1,13-14,16,A1-A2,B2 no ip address exit vlan 250 name "Firewall" tagged 1,13-14,16,A1-A2,B2 no ip address exit vlan 70 name "DMZ" tagged 1,13-14,16,A1-A2,B2 no ip address exit logging 192.168.100.18 spanning-tree spanning-tree 1 path-cost 500000 spanning-tree config-name "mstp" spanning-tree config-revision 1 spanning-tree instance 1 vlan 1 40 70 100 250 HP Switch 2 Spanning Tree: show spanning-tree Multiple Spanning Tree (MST) Information STP Enabled : Yes Force Version : MSTP-operation IST Mapped VLANs : 2-39,41-69,71-99,101-249,251-4094 Switch MAC Address : 0024a8-cd6000 Switch Priority : 32768 Max Age : 20 Max Hops : 20 Forward Delay : 15 Topology Change Count : 21,793 Time Since Last Change : 14 hours CST Root MAC Address : 0004ea-845f80 CST Root Priority : 32768 CST Root Path Cost : 200000 CST Root Port : A1 IST Regional Root MAC Address : 0021f7-126580 IST Regional Root Priority : 32768 IST Regional Root Path Cost : 2000 IST Remaining Hops : 19 Root Guard Ports : TCN Guard Ports : BPDU Protected Ports : BPDU Filtered Ports : PVST Protected Ports : PVST Filtered Ports : | Prio | Designated Hello Port Type | Cost rity State | Bridge Time PtP Edge ----- --------- + --------- ---- ---------- + ------------- ---- --- ---- A1 10GbE-CX4 | 2000 128 Forwarding | 0021f7-126580 2 Yes No A2 10GbE-CX4 | Auto 128 Disabled | B1 SFP+SR | 2000 128 Forwarding | 0024a8-cd6000 2 Yes No B2 | Auto 128 Disabled | HP Switch 2 Logging: I removed the date / time fields since they are inaccurate (no NTP configured on these switches) 00839 stp: CST Root changed from 32768:0021f7-126580 to 32768:0004ea-845f80 00839 stp: IST Root changed from 32768:0021f7-126580 to 32768:0024a8-cd6000 00839 stp: CST Root changed from 32768:0004ea-845f80 to 32768:0024a8-cd6000 00839 stp: CST Root changed from 32768:0024a8-cd6000 to 32768:0004ea-845f80 00839 stp: CST Root changed from 32768:0004ea-845f80 to 32768:0024a8-cd6000 00435 ports: port B1 is Blocked by STP 00839 stp: CST Root changed from 32768:0024a8-cd6000 to 32768:0021f7-126580 00839 stp: IST Root changed from 32768:0024a8-cd6000 to 32768:0021f7-126580 00839 stp: CST Root changed from 32768:0021f7-126580 to 32768:0004ea-845f80

    Read the article

  • Sending email from various domains

    - by IMHO
    We are building hosted software service that is used by multiple customers. These customers want to communicate with their customers (end customer). So, today we send it from our domain: example.com However, we would like to send email to come from their specific domains. When we put their customer emails in Reply-To - it shows up as "on behalf" in clients like outlook. What are the ways to send email from their domain without installing software on their network?

    Read the article

  • Excluding executables in winsxs folder

    - by Yasser Sobhdel
    I am facing a big problem since there are many msbuild.exe files in .Netframework and winsxs folders and I don't know if it is required to set all of them as trusted in the antivirus. The path changes server to server and hence it makes life harder! If it matters to you, I am using Kaspersky endpoint security 10. When defining trusted application, as far as I know, you must point exactly to the executable with hard-coded path. Thanks

    Read the article

  • Is there anything better then Microsoft Project?

    - by GuruAbyss
    I'll soon be knee deep into a very large project and I'm looking into project management software. I need users opinions on software based (no web based) solutions that are equal or better then MS Project. It can be open source or closed source. Thank you all in advanced for your insight and opinions!

    Read the article

  • proftpd: copying uploaded files to an additional directory

    - by Matthew Iselin
    Using proftpd, is there a good way to automatically synchronise uploaded files from the upload directory to some other directory? Our layout ends up a bit like this: ~/ftp/some/path <-- Files are uploaded here ~/some/other/path/not/accessible/via/ftp <-- But also need to be here after uploading Is there a good way to do this automatically, or do I have to tell anyone uploading files to upload twice, and open up an additional directory (containing data we cannot redistribute)?

    Read the article

  • How to Copy CD+Graphics / Karaoke CDs?

    - by Jim McKeeth
    Is there any good software to copy CD+Graphics (aka Karaoke CDs) for Windows 7? Preferably free. I can copy the audio portion just fine, but for some reason I keep looking the karaoke lyrics / graphics portion. It used to be that a lot of the software supported these specifically, but now I am having a hard time finding any mention of this feature, and the ones I have tried didn't work.

    Read the article

  • Test Environment configuration Management

    - by TechTestDude
    I am after a solution which will enable me to enter all my hardware/software elements (sort of like resource management), create a set of 'test environments' and assign hardware and software to that test environment for a given period. The idea is so that everyone can see and update what they need in any given environment to meet their project needs. Does anyone know of any systems out there which can achieve this? Vendor recommendations are welcome, but please call out your interest in it.

    Read the article

  • Is there a web-based VNC client that I can use from my own web site? [closed]

    - by Eliot Solomon
    I'm interested in being able to control one of my computers remotely, without having to download and install a bunch of software on every machine I want to access my computer from. Is there a VNC client or RDP software that can be embedded in a web page? I realize this seems like it might be a web application based question, but the web application portion would only end up being one small portion of the whole solution. Would VNC really be the way to go for this?

    Read the article

  • How can I create a short cut to a directory on a Windows Phone device?

    - by Mokilok
    When I plug in my Windows mobile it appears in My Computer as a portable device but the data I need regular access to is many sub directories in. Is it possible to create a shortcut or access a path on a mobile device directly? When I open the properties of the folder I want it says the location starts with "Computer\Name of Phone\Phone\". The problem is using that as a path to navigate straight to the files doesn't work. Thanks for your help.

    Read the article

  • SARA Security Auditor Alternative

    - by bradlis7
    I have attempted to install and run Sara, but it seems that the software is broken. I could get it to run on 127.0.0.1, but it seems that no network packets ever leave the current computer that it is installed on. It tests for known security holes in a network. It was based on an older software SATAN. Is there another free alternative to this program? I did not see anything listed in this thread.

    Read the article

  • Reg Query Issues

    - by Fitz
    I have a batch script that does reporting on our systems and part of it queries the registry for information. The script fails to get the key's value when its ran by the system, but whenever I run the script myself, it works perfectly the command: REG QUERY "HKEY_LOCAL_MACHINE\SOFTWARE\TrendMicro\ScanMail for Exchange\CurrentVersion" /v PatternStringFormatted > current1.tmp should return: HKEY_LOCAL_MACHINE\SOFTWARE\TrendMicro\ScanMail for Exchange\CurrentVersion PatternStringFormatted REG_SZ 6.645.00 This script is failing on a Server 2008 R2 machine, but runs fine on Server 2003 R2 machines.

    Read the article

  • Unable to open an ra_local session to URL

    - by AntonAL
    I have repository on my Windows machine, using VisualSVN + TortoiseSVN I want to use this repositories on my Mac with Versions.app I create a new Repository bookmark, choose a repository directory and after clicking "Create", get following error: Unable to open an ra_local session to URL Unable to open repository 'file://localhost/Path/to/my/repositories/MyRepo' Expected FS format '2'; found format '4' I can surf through the repository, using svn ls file://localhost/Path/to/my/repositories/MyRepo Also, when i create local repository, using Versions.app, the bookmark is created well and i can work with it Help!

    Read the article

  • Muxing DVD to Mpeg TS

    - by eckesicle
    I am looking for good software to generate a MPEG transport stream from DVDs and other MPEG2 files. I have tried with ffmpeg but it produces broken streams. Preferably Linux software but Windows is fine too. Free or commercial. Thanks.

    Read the article

  • How to run radio stations in your laptop?

    - by Prashant
    I want to run on-air-radio channels in my laptop, just like we run MP3 using VLC Media player, Windows Media Player, or any other. Is there any way to do that, what hardware or software are required Or Is there any way with which I can just install a software and using internet I can listen (tune) radio station in my laptop?

    Read the article

< Previous Page | 374 375 376 377 378 379 380 381 382 383 384 385  | Next Page >