Search Results

Search found 36141 results on 1446 pages for 'ms project 2007'.

Page 39/1446 | < Previous Page | 35 36 37 38 39 40 41 42 43 44 45 46  | Next Page >

  • Paste textbox from Powerpoint to Word as an editable control

    - by George Harris
    I have a Powerpoint 2007 file that contains a number of textboxes and shapes with text on them. I can edit, resize, change the text, etc. in these boxes in Powerpoint. However, if I select an item, copy it, and paste it into a Word 2007 document, I can't edit it. I can resize the entire thing, but it acts more like an image than a text box. I've tried the paste special options and keep source formatting options, but still can't edit it. Is there a way to be able to paste the editable content from Powerpoint and still have it editable in Word? Update I found this question that appears to get to the root of the problem: The MS Office Art graphics engine (aka Escher 2) is new to MS Office 2007 and while fully implemented in Excel and Powerpoint is only partially implemented in Word 2007 for backwards compatibility with the MS Office Drawing/Graphics engine (aka Escher) still available in Word It should work in earlier versions of Word and Word 2010, but not Word 2007. This is quite frustrating as I have to edit the slide in Powerpoint before copying it into Word. While doable, it adds another step, but the problem is that everyone who wants to update the Word document will have to do the same thing, adding complexity and steps for everyone. If I embed the Powerpoint slide in the document, I can edit the controls, but they don't scale the same way and takes a lot of work.

    Read the article

  • Reinstall of Microsoft Office 2010 beta isn't prompting me for upgrade vs. side-by-side installation

    - by Howiecamp
    I'm running Office 2007 on Windows 7. When I ran the Microsoft Office 2010 beta installation, it asked if I wanted to upgrade the existing 2007 installation or install along side 2007. I later uninstalled 2010 and rebooted. When I re-ran the Office 2010 setup program, it no longer asked if I wanted to upgrade or install side by side. It just did a side by side install by default. How can I get it to re-prompt me, as I'd now like to upgrade my 2007 install.

    Read the article

  • Open excel 2007 excel files and save as 97-2003 formats in VBA

    - by ABB
    I have a weird situation where I have a set of excel files, all having the extension .xls., in a directory where I can open all of them just fine in Excel 2007. The odd thing is that I cannot open them in Excel 2003, on the same machine, without opening the file first in 2007 and going and saving the file as an "Excel 97-2003 Workbook". Before I save the file as an "Excel 97-2003 Workbook" from Excel 2007, when I open the excel files in 2003 I get the error that the file is not in a recognizable format. So my question is: if I already have the excel file opened in 2007 and I already have the file name of the open file stored in a variable, programatically how can I mimic the action of going up to the "office button" in the upper right and selecting, "save as" and then selecting "Excel 97-2003 Workbook"? I've tried something like the below but it does not save the file at all: ActiveWorkbook.SaveAs TempFilePath & TempFileName & ".xls", FileFormat:=56 Thanks for any help or guidance!

    Read the article

  • Android Studio Could not call IncrementalTask.taskAction() on task ':project:dexDebug'

    - by akenawell85x
    I recently decided to switch from Eclipse to Android Studio. I imported a project I was working on and am now getting this error when I try to run the project. Gradle: Execution failed for task ':project:dexDebug'. > Could not call IncrementalTask.taskAction() on task ':project:dexDebug' I've been cruising this site for 2 days now and trying different suggestions to no avail. I did run gradlew compileDebug --stacktrace and this is what I got: C:\Users\adam\AndroidStudioProjects\projectProject>gradlew compileDebug --stacktrace Relying on packaging to define the extension of the main artifact has been deprecated and is scheduled to be removed in Gradle 2.0 :project:preBuild UP-TO-DATE :project:preDebugBuild UP-TO-DATE :project:preReleaseBuild UP-TO-DATE :project:prepareComAndroidSupportAppcompatV71800Library UP-TO-DATE :project:prepareComGoogleAndroidGmsPlayServices3225Library UP-TO-DATE :project:prepareDebugDependencies :project:compileDebugAidl UP-TO-DATE :project:compileDebugRenderscript UP-TO-DATE :project:generateDebugBuildConfig UP-TO-DATE :project:mergeDebugAssets UP-TO-DATE :project:mergeDebugResources UP-TO-DATE :project:processDebugManifest UP-TO-DATE :project:processDebugResources UP-TO-DATE :project:generateDebugSources UP-TO-DATE :project:compileDebug UP-TO-DATE BUILD SUCCESSFUL Total time: 10.459 secs However I am still getting that error when I try to actually run the project. Here is my build.gradle (i do have a 'libs' folder in my project with all the jars for a google maps/places app): buildscript { repositories { mavenCentral() } dependencies { classpath 'com.android.tools.build:gradle:0.6.+' } } apply plugin: 'android' repositories { mavenCentral() } android { compileSdkVersion 18 buildToolsVersion "18.1.1" defaultConfig { minSdkVersion 8 targetSdkVersion 18 } } dependencies { compile fileTree(dir: 'libs') compile 'com.google.android.gms:play-services:3.2.25' compile 'com.android.support:support-v4:18.0.0' compile 'com.android.support:appcompat-v7:+' } and my settings.gradle: include ':project', ':project:libs:android-support-v4', ':project:libs:google-api-client-1.10.3-beta', ':project:libs:google-api-client-android2-1.10.3-beta', ':project:libs:google-http-client-1.10.3-beta', ':project:libs:google-http-client-android2-1.10.3-beta', ':project:libs:google-oauth-client-1.10.1-beta', ':project:libs:gson-2.1', ':project:libs:guava-11.0.1', ':project:libs:jackson-core-asl-1.9.4', ':project:libs:jsr305-1.3.9', ':project:libs:protobuf-java-2.2.0', ':project:libs:GoogleAdMobAdsSdk-6.4.1' As I said, I've tried pretty much everything I have read on here about this error and am having no luck. Any help would be greatly appreciated.

    Read the article

  • Accessing Sharepoint 2007 documents outside network

    - by Ruby
    Hello, I just installed MOSS 2007 and configure it on a machine. The machine is not in a domain. When I try to create a new document in my document library (Server is on a remote location and my laptop is not a part of the domain), MS Word 2007 opens, asks me for login credentials 3 times and then disappears leaving me with a new blank word document. Is there any way to enable remote access of MOSS 2007 documents? Thanks :)

    Read the article

  • Which of the following relational database management systems would a company adopt (for migration), if any, MS Access, MS SQL Server or MySQL?

    - by Hassan Hagi
    Dear programmers, as part of my final year university project, I am conducting research into relational database management systems such as Microsoft Office Access 2007, Microsoft SQL Server 2008 and MySQL 5.1. The description does not need to be detailed however; I am trying to find empirical evidence and professional opinion/fact to determine which of the three databases are best suited for the required size of company (stated or unstated). OS: Microsoft windows (XP or newer) Please consider the following, but full details are not necessary: Memory management Migration Design constraints Integrity (data and others) Triggers User constraints Ease of use Performance Crash Recovery (not the operating system) Total Cost of Ownership (TCO) Also any info on Open source (to do with the three RDBMS) Thank you for your time and help. Hassan Hagi

    Read the article

  • How to dynamically reference a "partial template" in MS Word?

    - by scunliffe
    I want to make use of an "external reference" in Word. (for anyone that knows AutoCAD, I want XREF abilities in Word) Essentially I have a custom "header" that I want included in a whole pile of documents... that all reference a single file... such that if my address, logo, tagline, phone, fax or email changes, I update the one file, and all of the other 101 files that use it automatically update when I next open/use them. I'm using Office 2007 if that makes any difference.

    Read the article

  • MS Access Draw line around detail section that can grow

    - by LanguaFlash
    This really shouldn't be hard, I just can't figure out how to do it. I am making a proposal report that needs to have a border around it. The problem is to get the vertical lines on the side. I can't figure out how to get a line to grow and shrink based on the height of the detail section. I have used Crystal reports and sure wish Microsoft would learn a few things in regards to MS Access report writing! I am very comfortable with VBA so have no fears there. :-) Thanks, Jeff

    Read the article

  • CreateObject "Access.Application.10"

    - by Daniel
    I have two Access versions installed: Microsoft Access XP (aka 2002, aka version 10.0) Microsoft Access 2007 (aka version 12.0) Wenn I let an Application run in Microsoft Access XP and call Dim o As Object Set o = CreateObject("Access.Application.10") Debug.print o.version This returns 12.0 instead of 10.0! Solutions anybody? I don't get this.

    Read the article

  • The action or event has been blocked by Disabled Mode

    - by mattruma
    I am using Microsoft Access 2007 to move and massage some data between two SQL Servers. Yesterday everything was working correctly, I was able to run queries, update data, and delete data. Today I opened up the Access database to finish my data migration and am now receiving the following message when I try to run some update queries: The action or event has been blocked by Disabled Mode. Any ideas what this is talking about?

    Read the article

  • Use subform record set as domain argument in DAvg()

    - by harto
    Is it possible to use a subform's 'current' record set as the domain argument to DAvg() (etc.)? Basically, I have a subform that displays a subset of records from a query. I would like to run DAvg() over this subset. This is how I've gotten around it: =DAvg([FieldToAvg], [SubformQuery], "ChildField=Forms.MasterForm.MasterField And FieldToAvg > 0") but what I actually want is something like: =DAvg([FieldToAvg], [SubformCurrentlyDisplayedData], "FieldToAvg > 0") Is this possible in Access 2007?

    Read the article

  • 10 Quick Tips to Get the Most from Microsoft Office

    - by Lori Kaufman
    We have published some useful tips and tricks for getting the most out of Office 2010 and 2007. This article compiles 10 of the best tips and tricks we have covered. How to See What Web Sites Your Computer is Secretly Connecting To HTG Explains: When Do You Need to Update Your Drivers? How to Make the Kindle Fire Silk Browser *Actually* Fast!

    Read the article

  • SharePoint 2010 Workflow for Multiple Items (Architecture)

    - by erobillard
    I had the question today of whether SharePoint 2010 supports workflow on multiple items, since Groove's workflow apparently supported multiple items and that model disappeared when Groove Workspaces were amalgamated into SharePoint Sites and SharePoint Workspace (the client utility). It's a great question, the short answer is that yes, it's possible. You could brute-force it in 2007 and that strategy should still carry over to 2010, and 3 new features (that I can think of) support multi-item scenarios...(read more)

    Read the article

  • Advice on Project Management Software?

    - by Zenph
    I was wondering, does anybody work as part of a team, or as a project manager who highly recommends a certain project management solution (self-hosted or otherwise) ? Ideally I want something where I can manage the entire project, and also manage the financial side of things too. Should also add a few other things: notifications for team members for individual projects version control integration (like codebase) real time collaboration like chat

    Read the article

  • Improve Engineering & Construction Project Productivity

    - by [email protected]
    Driving successful project delivery and providing greater value and return for all stakeholders are key goals for firms in the engineering and construction industry. However, increasingly complex construction projects, compressed schedules, ineffective collaboration among project stakeholders, and limited interoperability, can get in the way of these goals and lead to reduced productivity. What E&C firms need are solutions that will improve global team collaboration, optimize processes and better communicate electronic project data. Check out the AutoVue for Engineering and Construction Solution Brief and learn how AutoVue enterprise visualization solutions can: - improve global project collaboration and communication - improve data interoperability - support virtual design and construction projects - improve change management and maintain accountability

    Read the article

  • How to deal with project managers who micromanage?

    - by entens
    Perhaps I'm just naive, but when I try to decipher the wall of tasks I'm targeted to do over the course of a week, I just can't help but think whoever builds the project schedule needs to get some remedial training on basic project management. For example, I am assigned 13 tasks today, the shortest lasting .13 days (default time metric in Microsoft Project), and the longest lasting .75 days. I can't help but think that it is blatant micromanagement scheduling projects in sub 10 minute intervals. The effects of management are becoming evident in slipped tasks, resource assignment exceeding capacity by a factor of two at some points in time, and spending more time clearing tasks and figuring out what comes next than actually doing work. How can I convince the project manager to create tasks with larger duration and to see the larger picture?

    Read the article

  • What makes a project big?

    - by Jonny
    Just out of curiosity what's the difference between a small, medium and large size project? Is it measured by lines of code or complexity or what? Im building a bartering system and so far have about 1000 lines of code for login/registration. Even though there's lots of LOC i wouldnt consider it a big project because its not that complex though this is my first project so im not sure. How is it measured?

    Read the article

  • Failed Project: When to call it?

    - by Dan Ray
    A few months ago my company found itself with its hands around a white-hot emergency of a project, and my entire team of six pulled basically a five week "crunch week". In the 48 hours before go-live, I worked 41 of them, two back to back all-nighters. Deep in the middle of that, I posted what has been my most successful question to date. During all that time there was never any talk of "failure". It was always "get it done, regardless of the pain." Now that the thing is over and we as an organization have had some time to sit back and take stock of what we learned, one question has occurred to me. I can't say I've ever taken part in a project that I'd say had "failed". Plenty that were late or over budget, some disastrously so, but I've always ended up delivering SOMETHING. Yet I hear about "failed IT projects" all the time. I'm wondering about people's experience with that. What were the parameters that defined "failure"? What was the context? In our case, we are a software shop with external clients. Does a project that's internal to a large corporation have more space to "fail"? When do you make that call? What happens when you do? I'm not at all convinced that doing what we did is a smart business move. It wasn't my call (I'm just a code monkey) but I'm wondering if it might have been better to cut our losses, say we're not delivering, and move on. I don't just say that due to the sting of the long hours--the company royally lost its shirt on the project, plus the intangible costs to the company in terms of employee morale and loyalty were large. Factor that against the PR hit of failing to deliver a high profile project like this one was... and I don't know what the right answer is.

    Read the article

  • What is a correct/polite way to inherit from an abandoned open-source project for a new open-source project?

    - by Kabumbus
    My team just tried to contact some guys from an old open source project hosted on code.google.com. We told them that we'd like to join their project and commit to it — at least to some branch of it — but no one responded to us. We tried everyone, owners and committers; no one was in any way active, and no one replied. But we have some code to commit and we really would love to continue work on that project. So we need to create a new project. We came up with a name for it which is close to but not a duplicate of the name of the project we want to inherit from. How should we do our first commit, and what should the commit message be? Should we just copy their code to our repository with a comment like "we inherited this code, we found it here under such and such a license ... now we're upgrading it to this more/less strict license ..."? Or should we just use their code as our first commit, with updates saying "we inherited from ... we made such and such changes ..."?

    Read the article

  • Setting up Clojure Project And Sub Projects

    - by octopusgrabbus
    This is primarily a lein question about setting up a major project and its sub-projects, and is not intended to be a discussion question. Instead, I am interested in either a pointer to documentation or to a Clojure/lein best practices link. I have a municipal property assessments application that splits two master flies into different subset files, depending on whether a billing transfer is taking place or we want to batch update new accounts, rather than making our assessment department enter new accounts once in their system and then again in the tax collection system. My application is going to be large enough, that I can see a common library lein project with support functions, like splitting apart the files, and then individual lein projects that use the common library. Should the lein projects be set up at the same level and support included through the project.clj/core.clj files? Is there an advantage to creating lein new projects underneath a major project? Is there a problem with combing all functions in one project? I can probably make my one core.clj contain all flavors of the program, but coming from a C/C++ and Python background, I would prefer to have a lot of little projects.

    Read the article

  • How to start to gain experience of managing a project

    - by Tim
    There are some job requirements of project management experience for a programmer, such as: the candidate has to have some experience managing a project, not necessarily with subordinates, but rather having worked on a project all the way from design down to test. I was wondering what "subordinates" mean here? if there are some books, webpages or elsewhere with both general guideline and simple practical sample projects to help one get some basics about the whole process of a project. I am particularly interested in projects for both Linux and Windows, in C, C++, Python, Java. I am considering to start by playing on my own, not eager to find a company yet. My major was not CS, so I might lack the basics.

    Read the article

< Previous Page | 35 36 37 38 39 40 41 42 43 44 45 46  | Next Page >