Search Results

Search found 19778 results on 792 pages for 'task management'.

Page 4/792 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • Windows Server Task Scheduler: Running scheduled executable fail-safe?

    - by Mikael Koskinen
    I have an executable which I've scheduled to run once in every five minutes (using Window's built-in Task Scheduler). It's crucial that this executable is run because it updates few time critical files. But how can I react if the virtual server running the executable goes down? At no point there shouldn't be more than 15 minutes break between the runs. As I'm using Windows Server and its Task Scheduler, I wonder is it possible to create some kind of a cluster which automatically handles the situation? The problem is that the server in question is running on Windows Azure and I don't think I can create actual clusters using the virtual machines. If the problem can be solved using a 3rd party tool, that's OK too. To generalize the question a little bit: How to make sure that an executable is run once in every 5 minutes, even if there might be server failures?

    Read the article

  • How would one run a task sequence within a task sequence in SCCM 2012 SP1

    - by BigHomie
    A Shining Example: Inside all of my task sequences I have a group that installs driver packages conditionally based on computer model: And of course, this list does nothing but grow. The fact that it grows isn't a big deal, what is a big deal is that every time it changes I have to manually copy and paste those changes across every task sequence I have, which of course leaves huge room for human error. The same goes for other groups of tasks that are common across task sequences. Looking for a solution where I could centrally manage these tasks, be it link other task sequences to a group within another task sequence, or create a separate task sequence and link to that. I came across a solution by John Marcum (SCCM MVP) that mentioned this ability, but this was a while ago and I can't find the link to it anymore to see if it's even still being updated/maintained, but I'm looking for more of a free solution, or even using Powershell or the ConfigMgr SDK is fine with me, I'm no stranger to either. Update Getting close: http://msdn.microsoft.com/en-us/library/jj217869.aspx

    Read the article

  • Looking for a good free or cheap task tracking system

    - by JWood
    I've finally decided that pen and paper/whiteboards are not up to the job as my workload increases so I'm looking for a good task tracking system. I need something that can track tasks in categories (projects) and allow me to assign priority to each task. I've tried iTeamWork which requires projects to have an end time which is no good for me as at least one of my projects is ongoing. I also tried Teamly which was required tasks to be set to a specific day which is no good as tasks sometimes take more than a day and I would like them organised by priority rather than specific days. Preferably looking for something hosted but I'm happy to install on our servers if it supports PHP/MySQL. Oh, and an iPhone client would be the icing on the cake! Can anyone recommend anything?

    Read the article

  • Is it unusual for a small company (15 developers) not to use managed source/version control?

    - by LordScree
    It's not really a technical question, but there are several other questions here about source control and best practice. The company I work for (which will remain anonymous) uses a network share to host its source code and released code. It's the responsibility of the developer or manager to manually move source code to the correct folder depending on whether it's been released and what version it is and stuff. We have various spreadsheets dotted around where we record file names and versions and what's changed, and some teams also put details of different versions at the top of each file. Each team (2-3 teams) seems to do this differently within the company. As you can imagine, it's an organised mess - organised, because the "right people" know where their stuff is, but a mess because it's all different and it relies on people remembering what to do at any one time. One good thing is that everything is backed up on a nightly basis and kept indefinitely, so if mistakes are made, snapshots can be recovered. I've been trying to push for some kind of managed source control for a while, but I can't seem to get enough support for it within the company. My main arguments are: We're currently vulnerable; at any point someone could forget to do one of the many release actions we have to do, which could mean whole versions are not stored correctly. It could take hours or even days to piece a version back together if necessary We're developing new features along with bug fixes, and often have to delay the release of one or the other because some work has not been completed yet. We also have to force customers to take versions that include new features even if they just want a bug fix, because there's only really one version we're all working on We're experiencing problems with Visual Studio because multiple developers are using the same projects at the same time (not the same files, but it's still causing problems) There are only 15 developers, but we all do stuff differently; wouldn't it be better to have a standard company-wide approach we all have to follow? My questions are: Is it normal for a group of this size not to have source control? I have so far been given only vague reasons for not having source control - what reasons would you suggest could be valid for not implementing source control, given the information above? Are there any more reasons for source control that I could add to my arsenal? I'm asking mainly to get a feel for why I have had so much resistance, so please answer honestly. I'll give the answer to the person I believe has taken the most balanced approach and has answered all three questions. Thanks in advance

    Read the article

  • Smart Taskbar Is a Thumb Friendly Android Task Launcher

    - by ETC
    If you frequently use your phone one handed you’ll definitely want to check out Smart Taskbar, an add-on for Android phones that makes it easy to launch apps with the swipe of your thumb. Smart Taskbar tucks an application launcher on the side of your screen, out of sight. Swipe your thumb across the screen and it slides out like a dock, revealing five of your favorite apps in a toolbar across the top and your lesser used apps in the main panel below. It’s much easier to swipe to view your applications than it is to peck at the application icon on the home screen; Smart Taskbar is great for one handed launching. Search for “Smart Taskbar” in the Android Market to download a copy or hit up the link below to read more. Smart Taskbar [AppBrain] Latest Features How-To Geek ETC How To Make Hundreds of Complex Photo Edits in Seconds With Photoshop Actions How to Enable User-Specific Wireless Networks in Windows 7 How to Use Google Chrome as Your Default PDF Reader (the Easy Way) How To Remove People and Objects From Photographs In Photoshop Ask How-To Geek: How Can I Monitor My Bandwidth Usage? Internet Explorer 9 RC Now Available: Here’s the Most Interesting New Stuff Smart Taskbar Is a Thumb Friendly Android Task Launcher Comix is an Awesome Comics Archive Viewer for Linux Get the MakeUseOf eBook Guide to Speeding Up Windows for Free Need Tech Support? Call the Star Wars Help Desk! [Video Classic] Reclaim Vertical UI Space by Adding a Toolbar to the Left or Right Side of Firefox Androidify Turns You into an Android-style Avatar

    Read the article

  • Transformation of Product Management in Telecommunications for Rapid Launch of Next Generation Products

    - by raul.goycoolea
    @font-face { font-family: "Arial"; }@font-face { font-family: "Courier New"; }@font-face { font-family: "Wingdings"; }@font-face { font-family: "Cambria"; }p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0cm 0cm 0.0001pt; font-size: 12pt; font-family: "Times New Roman"; }a:link, span.MsoHyperlink { color: blue; text-decoration: underline; }a:visited, span.MsoHyperlinkFollowed { color: purple; text-decoration: underline; }p.MsoListParagraph, li.MsoListParagraph, div.MsoListParagraph { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }p.MsoListParagraphCxSpFirst, li.MsoListParagraphCxSpFirst, div.MsoListParagraphCxSpFirst { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }p.MsoListParagraphCxSpMiddle, li.MsoListParagraphCxSpMiddle, div.MsoListParagraphCxSpMiddle { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }p.MsoListParagraphCxSpLast, li.MsoListParagraphCxSpLast, div.MsoListParagraphCxSpLast { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }div.Section1 { page: Section1; }ol { margin-bottom: 0cm; }ul { margin-bottom: 0cm; } The Telecom industry continues to evolve through disruptive products, uncertain markets, shorter product lifecycles and convergence of technologies. Today’s market has moved from network centric to consumer centric and focuses primarily on the customer experience. It has resulted in several product management challenges such as an increased complexity and volume of offerings, creating product variants, accelerating time-to-market, ability to provide multiple product views for varied stakeholders, leveraging OSS intelligence to BSS layer, product co-creation and increasing audit and security concerns for service providers. The document discusses how enterprise product management enabled by PLM-based product catalogue solutions helps to launch next generation products rapidly in the context of the Telecommunication Industry.   1.0.       Introduction   Figure 1: Business Scenario   Modern business demands the launch of complex products in a very short timeframe and effecting changes in the price plan faster without IT intervention. One of the key transformation initiatives companies are focusing on is in the area of product management transformation and operational efficiency improvement. As part of these initiatives, companies are investing in best- in-class COTs-based Product Management solutions developed on industry-wide standards.   The new COTs packages are planned to integrate with existing or new B/OSS systems to provide a strategic end-to-end agile solution for reduced time-to-market and order journey time. In addition, system rationalization is being undertaken to phase out legacy systems and migrate to strategic systems.   2.0.       An Overview of Product Management in Telecom   Product data in telecom is multi- dimensional and difficult to manage. It increased significantly due to the complexity of the product, product offerings on the converged network, increased volume of offerings, bundled offering structures and ever increasing regulatory requirements.   In addition, the shrinking product lifecycle in telecom makes it difficult to manage the dynamic product data. Mergers and acquisitions coupled with organic growth pose major challenges in product portfolio management. It is a roadblock in the journey towards becoming an agile organization.       Figure 2: Complexity in Product Management   Network Technology’ is the new dimension in telecom product management where the same products are realized through different networks i.e., Soiled network to Converged network. Consequently, the product solution is different.     Figure 3: Current Scenario - Pain Points in Product Management   The major business implications arising out of the current scenario are slow time-to-market and an inefficient process that affects innovation.   3.0. Transformation of Next Generation Product Management   Companies must focus on their Product Management Transformation Journey in the areas of:   ·       Management of single truth of product information across the organization/geographies which is currently managed in heterogeneous systems   ·       Management of the Intellectual Property (IP) on the product concept and partnership in the design of discrete components to integrate into the system   ·       Leveraging structured and unstructured product data within the extended enterprise to extract consumer insights and drive innovation   ·       Management of effective operational separation to comply with regulatory bodies   ·       Reuse of existing designs and add relevant features such as value-added services to enable effective product bundling     Figure 4: Next generation needs   PLM-based Enterprise Product Catalogue solutions efficiently address the above requirements and act as an enabler towards product management transformation and rapid product launch.   4.0. PLM-based Enterprise Product Management     Figure 5: PLM-based Enterprise Product Mastering   Enterprise Product Management (EPM) enables the business to manage complex product attributes of data in complex environments. Product Mastering helps create a 'single view' of the product by creating a business-driven, IT-supported environment where a global 'single truth record' is created, managed and reused.   4.1 The Business Case for Telco PLM-based solutions for Enterprise Product Management   ·       Telco PLM-based Product Mastering solutions provide a centralized authoring environment for product definition and control of all product data and rules   ·       PLM packages are designed to support multiple perspectives of product data (ordering perspective, billing perspective, provisioning perspective)   ·       Maintains relationships/links between different elements of the entire product definition   ·       Telco PLM packages are specialized in next generation lifecycle management requirements of products such as revision and state management, test and release management, role management and impact analysis)   ·       Takes into consideration all aspects of OSS product requirements compared to CRM product catalogue solutions where the product data managed is mostly order oriented and transactional     ·       New breed of Telco PLM packages are designed with 'open' standards such as SID and eTOM. They are interoperable, support integration frameworks such as subscription and notification.   ·       Telco PLM packages have developed good collaboration frameworks to integrate suppliers and partners into the product development value chain   4.2 Various Architectures/Approaches for Product Mastering using Telco PLM systems   4. 2.a Single Central Product Management (Mastering) Approach   Figure 6: Single Central Product Management (Master) Approach       This approach is implemented across verticals such as aerospace and automotive. It focuses on a physically centralized product master to which other sources are dependent on. The product definition data (Product bundles, service bundles, price plans, offers and discounts, product configuration rules and market campaigns) is created and maintained physically in a centralized environment. In addition, the product definition/authoring environment is centralized. The existing legacy product definition data available in CRM product catalogue, billing catalogue and the legacy product catalogue is migrated to the centralized PLM-based Enterprise Product Management solution.   Architectural changes must be made in the existing business landscape of applications to create and revise data because the applications have to refer to the central repository for approvals and validation of product configurations. It is achieved by modifying how the applications write data or how the applications can be adapted to use the rules to be managed and published.   Complete product configuration validation will be done in enterprise / central product catalogue and final configuration will be sent to the B/OSS system through the SOA compliant product distribution architecture. The approach/architecture enables greater control in terms of product data management and product data governance.   4.2.b Federated Product Management (Mastering) Architecture     Figure 7: Federated Product Management (Mastering) Architecture   In the federated product mastering approach, the basic unique product definition data (product id, description product hierarchy, basic price plans and simple product design rules) will be centrally created and will be maintained. And, the advanced product definition (Product bundling, promotions, offers & discount plans) will be created in respective down stream OSS systems. The advanced product definition (Product bundling, promotions, offers and discount plans) will be created in respective downstream OSS systems.   For example, basic product definitions such as attributes, product hierarchy and basic price plans will be created and maintained in Enterprise/Central product reference catalogue and distributed to downstream OSS systems. Respective downstream OSS systems build product bundles, promotions, advanced price plans over the basic product definition and master the advanced product definition. Central reference database accesses the respective other source product master data and assembles a point-in-time consolidated view of the product. The approach is typically adapted in some merger and acquisition scenarios where there is a low probability of a central physical authority managing the data. In addition, the migration effort in this case is minimal and there are no big architectural changes to the organization application landscape. However, this approach will not result in better product data management and data governance.   5.0 Customer Scenario – Before EPC deployment   A leading global telecommunications service provider wanted to launch a quad play and triple play service offering in the shortest possible lead time. The service provider was offering Broadband and VoIP services to customers. The company wanted to reuse a majority of the Broadband services and price plans and bundle them with new wireless and IPTV services for quad play and triple play. The challenges in launching the new service offerings were:       Figure 8: Triple Play Plan   ·       Broadband product data was stored in multiple product catalogues (CRM catalogue, Billing catalogue, spread sheets)   ·       Product managers spent a lot of time performing tasks involving duplication or re-keying of data. Manual effort caused errors, cost and time over-runs.   ·       No effective product and price data governance mechanism. Price change issues arising from the lack of data consistency across systems resulted in leakage of customer value and revenue.   ·       Product data had re-usability issues and was not in a structured format. It resulted in uncontrolled product portfolio creation and product management issues.   ·       Lack of enterprise product model resulted into product distribution challenges and thus delays in product launch.   ·       Designers are constrained by existing legacy product management solutions to model product/service requirements and product configuration rules such as upgrading, downgrading and cross selling.    5.1 Customer Scenario - After EPC deployment     Figure 9: SOA-based end-to-end EPC Solution   The company deployed PLM-based Enterprise Product Catalogue solutions to launch quad play service after evaluating various product catalogues. The broadband product offering, service and price data were migrated to the new system, and the product and price plan hierarchy for new offerings were created using the entities defined in the Enterprise Product Model. Supplier product catalogue data such as routers and set up boxes were loaded onto the new solution through SOA-based web service. Price plans and configuration rules were built in the new system. The validated final product configurations were extracted from the product catalogue in a SID format and were distributed to the downstream B/OSS systems through exposed SOA-based web services. The transformations required for the B/OSS system were handled using the transformation layer as part of the solution.   6.0 How PLM enabled Product Management Transformation         Figure 10: Product Management Transformation     PLM-based Product Catalogue Solution helped the customer reduce the product launch cycle time by 30% and enable transformation of Product Management for next generation services.   7.0 Conclusion   On the one hand, the telecom industry is undergoing changes due to disruptions, uncertain product markets and increased complexity of products. On the other hand, the ARPU is decreasing year-on-year. Communications Service Providers are embarking on convergence, bundled service offerings, flexibility to cross-sell and up-sell, introduce new value-added services, leverage Web 2.0 concepts and network capabilities. Consequently, large scale IT transformation initiatives to improve their ARPU supporting network and business transformations are a business imperative. Product Management has become a focus area. Companies are investing in best-in- class COTS solutions to reduce time-to-market, ensure rapid service delivery and improve operational efficiency. An efficient PLM-based enterprise product mastering solution plays a key role in achieving zero touch automation and rapid product launch.   References:   1.     Preston G.Smith, Donald G.Reineristsem, Van Nostrand Reinhold “Developing Products in Half the time”.   2.     John G. Innes, "Achieving Successful Product Change", Pitman Publishing.   3.     D T Pham and R M Setchi (16th Jan, 2001) "Authoring environment for documentation development" University of Wales Cardiff, U.K., Proceedings on Institution of Mechanical Engineers, Vol. 215, Part B.   4.     Oracle Product Hub for Communications:   http://www.oracle.com/us/products/applications/master-data-management/product-hub-082059.html  

    Read the article

  • How important is patch management?

    - by James Hill
    Problem I'm trying to sell the idea of organizational patch/update management and antivirus management to my superiors. Thus far, my proposition has been met with two responses: We haven't had any issues yet (I would add that we know of) We just don't think it's that big of a risk. Question Are there any resources available that can help me sell this idea? I've been told that 55-85% of all security related issues can be resolved by proper anti-virus and patch/update management but the individual that told me couldn't substantiate the claim. Can it be substantiated? Additional Information 1/5 of our computers (the ones on the building) have Windows update turned on by default and anti-virus installed. 4/5 of our computers are outside corporate and the users currently have full control over anti-virus and Windows updates (I know this is an issue, one step at a time).

    Read the article

  • SharePoint Edit Tasklist Task

    - by Oliver S
    Hi, I have SharePoint setup, and for a test I added a Task List, added a few columns, and tested it out. I wanted to modify the task list task page, not the task list page. I can edit the task list page, but I cannot edit the task list task page. I am missing the Edit Page button from site actions on that page. How can I edit the page of the actual task? Thanks.

    Read the article

  • Windows scheduled task fails to complete with error code 0xc000013a

    - by Brian
    I'm using Windows Server 2003 and have a scheduled task that fails to complete. The task is set to run a Windows Command Script (.cmd) at 3pm each day. The script runs a program that extracts some data from a SQL Server database and uploads that data to an FTP server. The error code displayed in the "Last result" column of the scheduled tasks folder is 0xc000013a. A quick Google search leads to this Microsoft support page that states: The most common "C" error code is "0xC000013A: The application terminated as a result of a CTRL+C". No-one is logged in at the time the task runs, so there's no-one around to press CTRL+C. I'm not sure I understand what is being said here in the Microsoft documentation. I've checked the rudimentary things - the scheduled task is enabled, scheduled to run each day, and pointing to a file that does exist in a valid location. Interestingly, when I run this task manually (either by running the .cmd script from the command line, or by right-clicking the task and clicking "Run") the task completes successfully. What does this error code mean, and how can I get this task to run when I'm not there to force it?

    Read the article

  • Task Scheduler not able to execute .vbs scripts successfully

    - by Django Reinhardt
    Apologies if this has a really obvious answer! We have several daily tasks we run via a .vbs script on our server (through the Task Scheduler), and for months it has been fine, but recently we've hit a problem. The .vbs scripts stopped successfully executing (always timing out)... but could still be executed manually with no problems(!). Not knowing any good reason why the Task Scheduler should start having problems, we thought we'd try a little "creative thinking", and run the .vbs another way: Via a .bat file executed by the Task Scheduler. Again we hit weird issues, but with a little more debugging information, this time around. The .bat file run by Task Scheduler is nothing more than... CScript "C:\location\script.vbs" > Log.txt But after an attempt to run it, the Task Scheduler fails with the following error: 0x1: An incorrect function was called or an unknown function was called. The Log.txt (as output from the .bat file above) says: CScript Error: Initialization of the Windows Script Host failed. (Not enough storage is available to process this command. ) But get this: The .bat file executes perfectly (vbs script and all) if it's executed with a double click! There's only a problem when it's run by Task Scheduler. What the hell? We're running Windows Server 2008 R2 (x64) and yes, the Task Sheduler's results are the same whether the user is logged in or not. Also, the user that can run the scripts successfully manually, is also the same user that runs the scripts in Task Scheduler. Thanks for any help for this weird problem!

    Read the article

  • Why am I getting a warning that windows is logging on with a temporary profile to run a task scheduler task?

    - by Dan C
    I am having a strange problem with the Windows Server 2008 Task Scheduler. I have to run a small command-line application every few minutes. This application just executes a quick web service call on the localhost and adds an entry to a log file; so it should not need anything special in terms of permissions. First, I created a new user account "my_scheduler" just for the task. This account is a member of the Users group (not sure what other settings I should turn on/off) and set it's password to not expire. I then create a task to run the application every few minutes. I set it to "Run whether user is logged on or not" and turned on "Do not store password. The task will only have access to local resources" (I did this since it's not hitting anything on the network. I did not turn on "Run with highest privileges" since it does not seem to need them. I set the schedule to "After triggered, repeat every 30 minutes for a duration of 1 day" and "Allow task to be run on demand" (no other settings enabled). However, I notice that in the Event Log, I see a bunch of these warnings whenever the task is run: "Windows cannot find the local profile and is logging you on with a temporary profile. Changes you make to this profile will be lost when you log off." Even though I get the warning, the task is executing (I see the log entries appearing). Another (possibly related) issue is that I also see that it's starting multiple copies of the task (within a few seconds of each other) even though it should only start one. This is also a big problem. Any idea how I can fix this? Thanks in advance, Dan

    Read the article

  • Install and enforce a scheduled task across a Windows domain

    - by Ricket
    We have a small domain of about 70 Windows computers (XP and 7). We want to schedule a command (an update mechanism) to run on all computers periodically, and we want the task to run regardless of the computer's connection to our network (i.e. the task should run even on a laptop that isn't connected to our VPN). We have a Microsoft System Center Essentials 2010 server so that might come in handy. The options I see are these: Do it completely manually. Install the scheduled task by hand or remotely using psexec (and the at command?) for each computer in our network. Enforce that newly imaged computers should have this task installed on them before deployed to the employee, or the task should be in the image. High initial cost (having to do this for each of 70 computers) but building it into the image might work... But there is some maintenance in making sure the task is added to everything. And I fear that a year or two down the road, we will have forgotten about it or gotten sloppy or had new IT employees who miss this step and some computers won't have the task. Having one of our servers run a script that loops through all computers and psexec's the command on each computer in the network -- it would only run on running, connected computers, so this solution wouldn't work. I suspect SCE could do something like this too, but again this is not a good solution. Neither of these are ideal, and I'm certain there is a better way to do it -- right? What is the best way to accomplish this task?

    Read the article

  • Task Sequence boots to logon screen instead of task sequence mode

    - by Ben M.
    I'm running a task sequence, and so that users don't accidentally interfere, I have the task sequence reboot to currently installed operating system, which as I understand, is supposed to boot to a sort of single user mode and all that shows is task sequence progress. However, this does not happen, it boots up like normal and comes to the logon screen and the task sequence runs in background. How can I adjust this behavior to the desired result?

    Read the article

  • Thursday at OpenWorld: Identity Management

    - by Tanu Sood
    Before you know it, we are at the last day at Oracle OpenWorld. But just the same, Thursday is packed with informational, educational and networking opportunities. Here’s what is in store for you today: Thursday, October 4, 2012 CON5749: Solutions for Migration of Oracle Waveset to Oracle Identity Manager 11:15 a.m. – 12:15 p.m., Moscone West 3008 Many customers of Oracle Waveset (formerly Sun Identity Manager) are planning a migration to the strategic provisioning product Oracle Identity Manager. There are several approaches to migrating to Oracle Identity Manager. Presented by Hub City Media and Oracle, this session covers these various approaches to help you select the optimum choice for your implementation. CON9640: Evolving Identity Management 12:45 p.m. – 1:45 p.m., Moscone West 3008 Identity management requirements have evolved and are continuing to evolve as organizations seek to secure cloud and mobile access.  Customers are seeing good success reducing costs and supporting business growth with by embracing a service-oriented, platform approach to addressing identity management requirements.  This session will explore these emerging requirements and share best practices for evolving your implementation. CON9662: Securing Oracle Applications with the Oracle Enterprise Identity Management Platform 2:15 p.m. – 3:15 p.m., Moscone West 3008 Oracle Enterprise Identity Management solutions are designed to secure access and simplify compliance to Oracle Applications.  Whether you are an EBS customer looking to upgrade from Oracle Single Sign-on or a Fusion Application customer seeking to leverage the Identity instance as an enterprise security platform, this session with Qualcomm and Oracle will help you understand how to get the most out of your investment. HOL10479: Integrated Identity Governance 12:45 p.m. – 1:45 p.m., Marriott Marquis – Salon 1/2 This hands-on lab demonstrates Oracle’s integrated and self-service-oriented identity governance solution, which includes simple access request, business-user-friendly access certification, closed-loop remediation, and both standard and privileged accounts. For a complete listing, refer to the Focus on Identity Management document. And as always, you can find us on @oracleidm on twitter and FaceBook. Use #oow and #idm to join in the conversation.

    Read the article

  • Oracle at Information Security and Risk Management Conference (ISACA Conferences)

    - by Tanu Sood
    The North America Information Security and Risk Management (ISRM) Conference hosted by ISACA will be held this year from November 14 - 16 in Las Vegas, Nevada and Oracle is a platinum sponsor. The ISRM / IT GRC event is not only designed to meet the exact needs of information security, governance, compliance and risk management professionals like you, but also gives you the tools you need to solve the issues you currently face. The event builds on and includes the key elements of information security, governance, compliance and risk management practices, and offers a fresh perspective on current and future trends. As a Platinum Sponsor Oracle will not only have an opportunity to demonstrate but talk through our strategic roadmap and support to ensure all organizations understand our key role within the industry to ensure corporate data and information remains safe. Join us at the Lunch and Learn to learn more about the latest advances in Oracle Identity Management. Lunch and Learn Session: Trends in Identity Management Speaker: Mike Neuenschwander, Senior Product Development Director, Oracle Identity Management As enterprises embrace mobile and social applications, security and audit have moved into the foreground. The way we work and connect with our customers is changing dramatically and this means, re-thinking how we secure the interaction and enable the experience. Work is an activity not a place - mobile access enables employees to work from any device anywhere and anytime. Organizations are utilizing "flash teams" - instead of a dedicated group to solve problems, organizations utilize more cross-functional teams. Work is now social - email collaboration will be replaced by dynamic social media style interaction. In this session, we will examine these three secular trends and discuss how organizations can secure the work experience and adapt audit controls to address the "new work order". We also recommend you bookmark the following session: T1 Session 301: Gone in 60 Seconds: Mitigating Database Security Risk Friday, November 16, 8:30 am – 9:30 am And, do be sure to stop by our booth, # 100 & #102, to not only network with our Product Development Team, but also get an onsite demonstration of Oracle Security Solutions. See you there? ISRM /  IT GRC November 14 – 16, 2012 Mirage Casino-Hotel 3400 Las Vegas Boulevard South Las Vegas, NV, 89109

    Read the article

  • Memory Management/Embedded Management in C

    - by Sauron
    Im wondering if there is a set or a few good books/Tutorials/Etc.. that go into Memory Management/Allocation Specifically (or at least have a good dedicated section to it) when it comes to C. This is more for me learning Embedded and trying to keep Size down. I've read and Learned C fine, and the "standard" Learning books. However most of the books don't spend a huge amount of time (Understandably since C is pretty huge in general) going into the Finer details about whats going on Down Under. I saw a few on Amazon: http://www.amazon.com/C-Pointers-Dynamic-Memory-Management/dp/0471561525 http://www.amazon.com/Understanding-Pointers-C-Yashavant-Kanetkar/dp/8176563587/ref=pd_sim_b_1 (Not sure how relevant this would be) A specific Book for Embedded that has to do with this would be nice. But Code Samples or...Heck tutorials or anything about this topic would be helpful!

    Read the article

  • Windows scheduled task not running

    - by Ravi Kumar Singh
    I have several SQL server backups on a server. I have created a batch file which then copies these to network drives. These are mapped to the server, and it works properly. Now, I've created a scheduled task to do this. If I select "run the task when logged in", I can test the task. It works fine. However I cannot test it with the other option "run task if logged in or not". I've read that testing this task is not possible manually. However the task runs when we log off the server automatically.

    Read the article

  • Why is Windows Task Scheduler trying to launch multiple instances?

    - by Paul H
    We have a number of Windows Scheduled tasks that run on one Server 2008 Webserver (not R2) which is in a cluster. We recently moved from an original webserver Cluster to a new webserver Cluser (Server 2008 - not R2). The new webserver (in the cluster) running the Windows Tasks is setup the same as on the original we believe. BUT we now find that on the new Windows Server the Windows Task Scheduler seems to want to instantly start each task three times. If we set the option to queue up a new task we get: Event ID 324 Task Scheduler queued instance "{9a1a8411-b042-45ff-8e6b-89874df230d7}" of task "\Client Reporting" and will launch it as soon as instance "{2bcc3df6-ea3b-4453-90c2-75b8b1946388}" completes. If we set the option to stop an existing task we get: Event ID 323 Task Scheduler stopped instance "{e685a910-b32b-414e-85fd-96bbe54314a2}" of task "\Client Reporting" in order to launch new instance "{4db66265-1f51-4ede-8535-ac7c3cb5c4c1}" . Ticked settings: Allow task to be run on demand. Run task as soon as possible after a scheduled start is missed. Stop the task if running for longer than 1 hour. If the running task does not end when requested force it to stop. Start the task only if the computer is on AC power. Stop the task if the computer switches to battery power. Selected option: If the task is already running - stop the existing instance. Note: We moved the tasks from one server to another in the cluster to see if it the Task Scheduler on the particular server we'd picked causing the problem. Same behaviour. Could it be something to do with the build of the new servers? We have very similar tasks set up on another server cluster that work OK without all this multiple starting. Comparing those tasks to the ones here - there does not seem to be anything obviously different in terms of settings available to us through the options within the Task Scheduler. Trigger: The task is scheduled to be triggered daily, once an hour - and to be stopped if it exceeds this time. Action: Runs a .bat file. What could be causing this/where we can look to see what logic is causing the tasks to start multiple times in this way?

    Read the article

  • task scheduler - run interactively as any user with admin credentials

    - by Force Flow
    I'm trying to deploy a scheduled task with a GPO. The task is set to run at login and executes a batch file, which then executes an EXE file. However, I also need it to be interactive and run with admin privledges to bypass the UAC prompt for a username and password when the exe file runs. I created the task for "Vista and later". I've tried running the task as mydoman\administrator and as NT AUTHORITY\Authenticated users with "run only when user is logged in" and "run with highest privledges" selected. If I log in as anyone but administrator, the task does run in the background, as I can see the cmd.exe process running in task manager as mydomain\administrator. Only if I log in as administrator do I then see the cmd window with the batch script running. How can I get the cmd window to display no matter which user logs in?

    Read the article

  • Windows Task Scheduler won't let me uncheck "Wake the computer" option for a backup task

    - by KdawgUD
    I have a problem with my windows 7 laptop automatically waking after I put it to sleep and then I find it later with the battery drained. I tracked down the culprit using the "powercfg -lastwake" command to be a Backup task in the "Windows Server" section of the task scheduler. I have tried unchecking the "Wake the computer to run this task" checkbox for this task, but after I do this and reboot, the box is always rechecked again. How can I make this setting persist? I have full admin rights to this laptop, but it is on a domain. Edit: I looked into the domain policy settings as suggested by Dave below and did not find any policies related to scheduled task settings. Any other ideas?

    Read the article

  • Unique task queue task names only for active duration

    - by antony.trupe
    I want to guarantee that a task is not in a task queue more then once, so I generate a unique name based on it's payload. But, that task name is reserved for up to 7 days, which is not what I want; I only want it reserved for the duration the task is queued; it could be immediately re-queued. Once a Task with name N is written, any subsequent attempts to insert a Task named N will fail. Eventually (at least seven days after the task successfully executes), the task will be deleted and the name N can be reused. Is there a way to check if the named task is already in the queue then add it if it's not? Or a totally different approach?

    Read the article

  • Task Management - How important it is for a entry level developer?

    - by Naveen Kumar
    I hold masters in CS & now I'm mobile apps developer (Entry Level) , I always start to plan things when starting or doing any project both at work & projects i do at Home (for passion) - as I can deliver the project on time but sometimes i m running out of time like 10 tasks a day vs my time forecast will take 2 on that day? As I'm beginner level, I want your suggestions on How important is Task Management for a person like me & for achieving my goals? My target for the next 3 year will be a Project Manager or Similiar Role - i belive which these time managing skills will be a needed quality.

    Read the article

  • Process runs slower as a scheduled task than it does interactively

    - by Charlie
    I have a scheduled task which is very CPU- and IO-intensive, and takes about four hours to run (building source code, if you're curious). The task is a Powershell script which spawns various sub-processes to do its work. When I run the same process interactively from a Powershell prompt, as the same user account, it runs in about two and a half hours. The task is running on Windows Server 2008 R2. What I want to know is why it takes so much longer to run as a scheduled task - more than an hour longer. One thing I noticed is that the task scheduler runs at Below-Normal priority, so when my task starts, it inherits the same lowered priority. However, I've updated the script to set the Powershell process priority back to Normal, and it still takes just as long. Anybody have an idea what could be different between the two scenarios? I've ruled out differences in processor and IO load - this task is the only thing the system is used for, so there's nothing else running that could be competing for resources.

    Read the article

  • legitimacy of the tasks in the task scheduler

    - by Eyad
    Is there a way to know the source and legitimacy of the tasks in the task scheduler in windows server 2008 and 2003? Can I check if the task was added by Microsoft (ie: from sccm) or by a 3rd party application? For each task in the task scheduler, I want to verify that the task has not been created by a third party application. I only want to allow standards Microsoft Tasks and disable all other non-standards tasks. I have created a PowerShell script that goes through all the xml files in the C:\Windows\System32\Tasks directory and I was able to read all the xml task files successfully but I am stuck on how to validate the tasks. Here is the script for your reference: Function TaskSniper() { #Getting all the fils in the Tasks folder $files = Get-ChildItem "C:\Windows\System32\Tasks" -Recurse | Where-Object {!$_.PSIsContainer}; [Xml] $StandardXmlFile = Get-Content "Edit Me"; foreach($file in $files) { #constructing the file path $path = $file.DirectoryName + "\" + $file.Name #reading the file as an XML doc [Xml] $xmlFile = Get-Content $path #DS SEE: http://social.technet.microsoft.com/Forums/en-US/w7itprogeneral/thread/caa8422f-6397-4510-ba6e-e28f2d2ee0d2/ #(get-authenticodesignature C:\Windows\System32\appidpolicyconverter.exe).status -eq "valid" #Display something $xmlFile.Task.Settings.Hidden } } Thank you

    Read the article

  • Task Scheduler permissions error for some jobs

    - by MaseBase
    I have recently moved to a 64-bit Windows Server 2008 R2. I setup my Scheduled Tasks to run under one user (TaskUser) specifically created for the scheduler and most run just fine. However some of them do not run under TaskUser but will for my own credentials. Here is the Event Log entry I found, which from my research points me to believe that it doesn't have permissions, but it does. It also has the option "Run with highest privileges" checked on. I have seen this particular checkbox work wonders on some tasks, but I have a number of them that it's not helping for. The error is ERROR_ELEVATION_REQUIRED but the user is a member of the administrators group and has folder/file permission and is set to "Run with highest privileges" Log Name: Microsoft-Windows-UAC/Operational Source: Microsoft-Windows-UAC Date: 4/27/2010 2:21:44 PM Event ID: 1 Task Category: (1) Level: Error Keywords: User: LIVE\TaskUser Computer: www2 Description: The process failed to handle ERROR_ELEVATION_REQUIRED during the creation of a child process. Event Xml: <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event"> <System> <Provider Name="Microsoft-Windows-UAC" Guid="{E7558269-3FA5-46ED-9F4D-3C6E282DDE55}" /> <EventID>1</EventID> <Version>0</Version> <Level>2</Level> <Task>1</Task> <Opcode>0</Opcode> <Keywords>0x8000000000000000</Keywords> <TimeCreated SystemTime="2010-04-27T21:21:44.407053800Z" /> <EventRecordID>19</EventRecordID> <Correlation /> <Execution ProcessID="2460" ThreadID="5960" /> <Channel>Microsoft-Windows-UAC/Operational</Channel> <Computer>www2</Computer> <Security UserID="S-1-5-21-4017510424-2083581016-1307463562-1640" /> </System> <EventData></EventData> </Event> The errors shown in the Task Scheduler History tab display these results and states This operation requires an interactive window station. (0x800705B3) EventID 103 Task Scheduler failed to launch action "F:\App\Path\ConsoleApp.exe" in instance "{1a6d3450-b85a-40c0-b3db-72b98c1aa395}" of task "\taskFolder\taskName". Additional Data: Error Value: 2147943859. EventID 203 Task Scheduler failed to start instance "{1a6d3450-b85a-40c0-b3db-72b98c1aa395}" of "\taskFolder\taskName" task for user "LIVE\TaskUser" . Additional Data: Error Value: 2147943859.

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >