Search Results

Search found 8815 results on 353 pages for 'task scheduler'.

Page 4/353 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • Idle state detection for server

    - by odinmillion
    Windows OS has a service that detects idle state. Details: Task Idle Conditions The computer is considered idle if all the processors and all the disks were idle for more than 90% of the past 15 minutes and if there is no keyboard or mouse input during this period of time. When the Task Scheduler service detects that the computer is idle, the service only waits for user input to mark the end of the idle state. It is very useful for usual PCs that have keyboard amd mouse. We can use standard task scheduler to start some process like defrag when PC in idle state and stop when PC isn't in idle state. But what should we use when we using a standalone server without keyboard and mouse? Server sometimes receives commands by TCP/IP and starts CPU and HDD activity. But sometimes CPU and HDD activity at zero level. I would like to use this periods of time to start defrag or another process. But this started at "idle" state processes should be terminated when another commands will appear. So, standard idle state conditions cant help me because we have not got user input to stop idle state. I need more customizable idle state detector. Automatically started processes shouldn't influence to idle state, but PC should go away from idle state when another process will apperar. What should I use? Maybe exists some advansed task scheduler? Or I should write some useful utility on C#? I hope that it is a standard task and all useful utilities already compiled :)

    Read the article

  • Product Recommendation: Good job scheduler for windows servers?

    - by Bret Fisher
    Looking for a mostly-GUI tool that is low cost (less then $1k, but not required) and allows you to create scheduled tasks and jobs without writing vbscript, batch files, or powershell. Something simple that speaks SMB/CIFS, SMTP, LDAP, etc. for such things as "delete some files based on a list of folders from this text file" or "disable all users with expired accounts" or "delete all disabled users not in this AD group". I've seen some of the big multi-OS enterprise task automation systems and they just look way overkill. We're a windows-only shop, Server 2003 or newer and there's got to be a simple non-agent based product that is drag-n-drop for some of this basic automation. Today we use all three languages mentioned above, and the scripts are not as reliable as a workflow-based-tool would be. Thanks.

    Read the article

  • How would one run a task sequence within a task sequence in SCCM 2012 SP1

    - by BigHomie
    A Shining Example: Inside all of my task sequences I have a group that installs driver packages conditionally based on computer model: And of course, this list does nothing but grow. The fact that it grows isn't a big deal, what is a big deal is that every time it changes I have to manually copy and paste those changes across every task sequence I have, which of course leaves huge room for human error. The same goes for other groups of tasks that are common across task sequences. Looking for a solution where I could centrally manage these tasks, be it link other task sequences to a group within another task sequence, or create a separate task sequence and link to that. I came across a solution by John Marcum (SCCM MVP) that mentioned this ability, but this was a while ago and I can't find the link to it anymore to see if it's even still being updated/maintained, but I'm looking for more of a free solution, or even using Powershell or the ConfigMgr SDK is fine with me, I'm no stranger to either. Update Getting close: http://msdn.microsoft.com/en-us/library/jj217869.aspx

    Read the article

  • Websphere Scheduler

    - by Dileep81
    Websphere Scheduler is using scheduler datasource XA driver . When task is executed by scheduler it is starting a global transaction, but in our application we are creating a new connection to another database and explicitly commiting the data and closing the connection. This data source configured using non-XA driver datasource. For the application we have also enabled the Accept heuristic hazard (Last participant support extension) . Now while running the scheudler we are getting the exception DSRA9350E: Operation Connection.commit is not allowed during a global transaction . Can any one help me out in this

    Read the article

  • Smart Taskbar Is a Thumb Friendly Android Task Launcher

    - by ETC
    If you frequently use your phone one handed you’ll definitely want to check out Smart Taskbar, an add-on for Android phones that makes it easy to launch apps with the swipe of your thumb. Smart Taskbar tucks an application launcher on the side of your screen, out of sight. Swipe your thumb across the screen and it slides out like a dock, revealing five of your favorite apps in a toolbar across the top and your lesser used apps in the main panel below. It’s much easier to swipe to view your applications than it is to peck at the application icon on the home screen; Smart Taskbar is great for one handed launching. Search for “Smart Taskbar” in the Android Market to download a copy or hit up the link below to read more. Smart Taskbar [AppBrain] Latest Features How-To Geek ETC How To Make Hundreds of Complex Photo Edits in Seconds With Photoshop Actions How to Enable User-Specific Wireless Networks in Windows 7 How to Use Google Chrome as Your Default PDF Reader (the Easy Way) How To Remove People and Objects From Photographs In Photoshop Ask How-To Geek: How Can I Monitor My Bandwidth Usage? Internet Explorer 9 RC Now Available: Here’s the Most Interesting New Stuff Smart Taskbar Is a Thumb Friendly Android Task Launcher Comix is an Awesome Comics Archive Viewer for Linux Get the MakeUseOf eBook Guide to Speeding Up Windows for Free Need Tech Support? Call the Star Wars Help Desk! [Video Classic] Reclaim Vertical UI Space by Adding a Toolbar to the Left or Right Side of Firefox Androidify Turns You into an Android-style Avatar

    Read the article

  • SharePoint Edit Tasklist Task

    - by Oliver S
    Hi, I have SharePoint setup, and for a test I added a Task List, added a few columns, and tested it out. I wanted to modify the task list task page, not the task list page. I can edit the task list page, but I cannot edit the task list task page. I am missing the Edit Page button from site actions on that page. How can I edit the page of the actual task? Thanks.

    Read the article

  • Windows scheduled task fails to complete with error code 0xc000013a

    - by Brian
    I'm using Windows Server 2003 and have a scheduled task that fails to complete. The task is set to run a Windows Command Script (.cmd) at 3pm each day. The script runs a program that extracts some data from a SQL Server database and uploads that data to an FTP server. The error code displayed in the "Last result" column of the scheduled tasks folder is 0xc000013a. A quick Google search leads to this Microsoft support page that states: The most common "C" error code is "0xC000013A: The application terminated as a result of a CTRL+C". No-one is logged in at the time the task runs, so there's no-one around to press CTRL+C. I'm not sure I understand what is being said here in the Microsoft documentation. I've checked the rudimentary things - the scheduled task is enabled, scheduled to run each day, and pointing to a file that does exist in a valid location. Interestingly, when I run this task manually (either by running the .cmd script from the command line, or by right-clicking the task and clicking "Run") the task completes successfully. What does this error code mean, and how can I get this task to run when I'm not there to force it?

    Read the article

  • Install and enforce a scheduled task across a Windows domain

    - by Ricket
    We have a small domain of about 70 Windows computers (XP and 7). We want to schedule a command (an update mechanism) to run on all computers periodically, and we want the task to run regardless of the computer's connection to our network (i.e. the task should run even on a laptop that isn't connected to our VPN). We have a Microsoft System Center Essentials 2010 server so that might come in handy. The options I see are these: Do it completely manually. Install the scheduled task by hand or remotely using psexec (and the at command?) for each computer in our network. Enforce that newly imaged computers should have this task installed on them before deployed to the employee, or the task should be in the image. High initial cost (having to do this for each of 70 computers) but building it into the image might work... But there is some maintenance in making sure the task is added to everything. And I fear that a year or two down the road, we will have forgotten about it or gotten sloppy or had new IT employees who miss this step and some computers won't have the task. Having one of our servers run a script that loops through all computers and psexec's the command on each computer in the network -- it would only run on running, connected computers, so this solution wouldn't work. I suspect SCE could do something like this too, but again this is not a good solution. Neither of these are ideal, and I'm certain there is a better way to do it -- right? What is the best way to accomplish this task?

    Read the article

  • Task Sequence boots to logon screen instead of task sequence mode

    - by Ben M.
    I'm running a task sequence, and so that users don't accidentally interfere, I have the task sequence reboot to currently installed operating system, which as I understand, is supposed to boot to a sort of single user mode and all that shows is task sequence progress. However, this does not happen, it boots up like normal and comes to the logon screen and the task sequence runs in background. How can I adjust this behavior to the desired result?

    Read the article

  • Alternative for Windows Task Scheduler

    - by Richard
    hi, I need a Task Scheduler for Windows. Unfortunately the builtin scheduler doesn't meet my needs, which are: can run tasks every minute/hour runs on Linux and Windows 32 and 64 bit versions GUI interface free Nice to haves: supports CRON files open source status reports of execution times thanks!

    Read the article

  • Updating a script currently being ran by Task Scheduler on Windows

    - by orangechicken
    I have a scheduled task that runs a script on a ahem schedule ahem that updates a local git repo. This script is a file in this local git repo. Currently, what I'm seeing is that the script is ran, git complains that permissions are denied to write to file which actually results in the script being deleted! The next time the scheduled task runs the script file is now missing! How can I ensure that when I pull changes to this script from the repo that the file is actually updated?

    Read the article

  • Windows Task Scheduler won't let me uncheck "Wake the computer" option for a backup task

    - by KdawgUD
    I have a problem with my windows 7 laptop automatically waking after I put it to sleep and then I find it later with the battery drained. I tracked down the culprit using the "powercfg -lastwake" command to be a Backup task in the "Windows Server" section of the task scheduler. I have tried unchecking the "Wake the computer to run this task" checkbox for this task, but after I do this and reboot, the box is always rechecked again. How can I make this setting persist? I have full admin rights to this laptop, but it is on a domain. Edit: I looked into the domain policy settings as suggested by Dave below and did not find any policies related to scheduled task settings. Any other ideas?

    Read the article

  • Unique task queue task names only for active duration

    - by antony.trupe
    I want to guarantee that a task is not in a task queue more then once, so I generate a unique name based on it's payload. But, that task name is reserved for up to 7 days, which is not what I want; I only want it reserved for the duration the task is queued; it could be immediately re-queued. Once a Task with name N is written, any subsequent attempts to insert a Task named N will fail. Eventually (at least seven days after the task successfully executes), the task will be deleted and the name N can be reused. Is there a way to check if the named task is already in the queue then add it if it's not? Or a totally different approach?

    Read the article

  • Task ownership with Wordpress - CSS - Designer or Developer?

    - by Syed Absar
    We have a dispute regarding who owns which tasks when it comes to the CSS on our live site. Our designer argues that he is not responsible to log-in to word press and modify the css or use ftp for any changes because that's not his job description while developer argues that since it is css, it belongs to designer and that he is to update the changes to the server and then compare and correct the output. I'd like experienced people working in professional development environment to put a light on this scenario. I'm not sure if this is the right place to ask this question, or is there a separate forum for business development or project management specific questions?

    Read the article

  • Process runs slower as a scheduled task than it does interactively

    - by Charlie
    I have a scheduled task which is very CPU- and IO-intensive, and takes about four hours to run (building source code, if you're curious). The task is a Powershell script which spawns various sub-processes to do its work. When I run the same process interactively from a Powershell prompt, as the same user account, it runs in about two and a half hours. The task is running on Windows Server 2008 R2. What I want to know is why it takes so much longer to run as a scheduled task - more than an hour longer. One thing I noticed is that the task scheduler runs at Below-Normal priority, so when my task starts, it inherits the same lowered priority. However, I've updated the script to set the Powershell process priority back to Normal, and it still takes just as long. Anybody have an idea what could be different between the two scenarios? I've ruled out differences in processor and IO load - this task is the only thing the system is used for, so there's nothing else running that could be competing for resources.

    Read the article

  • Parallelism in .NET – Part 18, Task Continuations with Multiple Tasks

    - by Reed
    In my introduction to Task continuations I demonstrated how the Task class provides a more expressive alternative to traditional callbacks.  Task continuations provide a much cleaner syntax to traditional callbacks, but there are other reasons to switch to using continuations… Task continuations provide a clean syntax, and a very simple, elegant means of synchronizing asynchronous method results with the user interface.  In addition, continuations provide a very simple, elegant means of working with collections of tasks. Prior to .NET 4, working with multiple related asynchronous method calls was very tricky.  If, for example, we wanted to run two asynchronous operations, followed by a single method call which we wanted to run when the first two methods completed, we’d have to program all of the handling ourselves.  We would likely need to take some approach such as using a shared callback which synchronized against a common variable, or using a WaitHandle shared within the callbacks to allow one to wait for the second.  Although this could be accomplished easily enough, it requires manually placing this handling into every algorithm which requires this form of blocking.  This is error prone, difficult, and can easily lead to subtle bugs. Similar to how the Task class static methods providing a way to block until multiple tasks have completed, TaskFactory contains static methods which allow a continuation to be scheduled upon the completion of multiple tasks: TaskFactory.ContinueWhenAll. This allows you to easily specify a single delegate to run when a collection of tasks has completed.  For example, suppose we have a class which fetches data from the network.  This can be a long running operation, and potentially fail in certain situations, such as a server being down.  As a result, we have three separate servers which we will “query” for our information.  Now, suppose we want to grab data from all three servers, and verify that the results are the same from all three. With traditional asynchronous programming in .NET, this would require using three separate callbacks, and managing the synchronization between the various operations ourselves.  The Task and TaskFactory classes simplify this for us, allowing us to write: var server1 = Task.Factory.StartNew( () => networkClass.GetResults(firstServer) ); var server2 = Task.Factory.StartNew( () => networkClass.GetResults(secondServer) ); var server3 = Task.Factory.StartNew( () => networkClass.GetResults(thirdServer) ); var result = Task.Factory.ContinueWhenAll( new[] {server1, server2, server3 }, (tasks) => { // Propogate exceptions (see below) Task.WaitAll(tasks); return this.CompareTaskResults( tasks[0].Result, tasks[1].Result, tasks[2].Result); }); .csharpcode, .csharpcode pre { font-size: small; color: black; font-family: consolas, "Courier New", courier, monospace; background-color: #ffffff; /*white-space: pre;*/ } .csharpcode pre { margin: 0em; } .csharpcode .rem { color: #008000; } .csharpcode .kwrd { color: #0000ff; } .csharpcode .str { color: #006080; } .csharpcode .op { color: #0000c0; } .csharpcode .preproc { color: #cc6633; } .csharpcode .asp { background-color: #ffff00; } .csharpcode .html { color: #800000; } .csharpcode .attr { color: #ff0000; } .csharpcode .alt { background-color: #f4f4f4; width: 100%; margin: 0em; } .csharpcode .lnum { color: #606060; } This is clean, simple, and elegant.  The one complication is the Task.WaitAll(tasks); statement. Although the continuation will not complete until all three tasks (server1, server2, and server3) have completed, there is a potential snag.  If the networkClass.GetResults method fails, and raises an exception, we want to make sure to handle it cleanly.  By using Task.WaitAll, any exceptions raised within any of our original tasks will get wrapped into a single AggregateException by the WaitAll method, providing us a simplified means of handling the exceptions.  If we wait on the continuation, we can trap this AggregateException, and handle it cleanly.  Without this line, it’s possible that an exception could remain uncaught and unhandled by a task, which later might trigger a nasty UnobservedTaskException.  This would happen any time two of our original tasks failed. Just as we can schedule a continuation to occur when an entire collection of tasks has completed, we can just as easily setup a continuation to run when any single task within a collection completes.  If, for example, we didn’t need to compare the results of all three network locations, but only use one, we could still schedule three tasks.  We could then have our completion logic work on the first task which completed, and ignore the others.  This is done via TaskFactory.ContinueWhenAny: var server1 = Task.Factory.StartNew( () => networkClass.GetResults(firstServer) ); var server2 = Task.Factory.StartNew( () => networkClass.GetResults(secondServer) ); var server3 = Task.Factory.StartNew( () => networkClass.GetResults(thirdServer) ); var result = Task.Factory.ContinueWhenAny( new[] {server1, server2, server3 }, (firstTask) => { return this.ProcessTaskResult(firstTask.Result); }); .csharpcode, .csharpcode pre { font-size: small; color: black; font-family: consolas, "Courier New", courier, monospace; background-color: #ffffff; /*white-space: pre;*/ } .csharpcode pre { margin: 0em; } .csharpcode .rem { color: #008000; } .csharpcode .kwrd { color: #0000ff; } .csharpcode .str { color: #006080; } .csharpcode .op { color: #0000c0; } .csharpcode .preproc { color: #cc6633; } .csharpcode .asp { background-color: #ffff00; } .csharpcode .html { color: #800000; } .csharpcode .attr { color: #ff0000; } .csharpcode .alt { background-color: #f4f4f4; width: 100%; margin: 0em; } .csharpcode .lnum { color: #606060; } Here, instead of working with all three tasks, we’re just using the first task which finishes.  This is very useful, as it allows us to easily work with results of multiple operations, and “throw away” the others.  However, you must take care when using ContinueWhenAny to properly handle exceptions.  At some point, you should always wait on each task (or use the Task.Result property) in order to propogate any exceptions raised from within the task.  Failing to do so can lead to an UnobservedTaskException.

    Read the article

  • Windows Server 2008 CMD Task Schedule not running

    - by Jonathan Platovsky
    I have a BAT/CMD file that when run from the command prompt runs completely. When I run it through the Task Scheduler it partially runs. Here is a copy of the file cd\sqlbackup ren Apps_Backup*.* Apps.Bak ren Apps_Was_Backup*.* Apps_Was.Bak xcopy /Y c:\sqlbackup\*.bak c:\sqlbackup\11\*.bak xcopy /y c:\sqlbackup\*.bak \\igweb01\c$\sqlbackup\*.bak Move /y c:\sqlbackup\*.bak "\\igsrv01\d$\sql backup\" The last two lines do not run when the task scheduler calls it. But again, work when manually run from the command line. All the local sever commands run but when it comes to the last two lines where it goes to another server then it does not work.

    Read the article

  • Scheduled Task unable to create/update any files

    - by East of Nowhere
    I have several tasks in Task Scheduler in Windows Server 2008 SP2 (32-bit) and they all successfully "do their work", except for creating or updating any files on Windows. All the tasks point to simple .cmd files that have the real work but beyond that there's no pattern: some call robocopy with the /LOG option, some call .exe files I wrote that manipulate XML files, some just do stuff with > redirection. With all of them, if I double-click the .cmd file myself, it works fine and the files are created or updated or whatever. If I run it from Task Scheduler (by the schedule or just clicking Run), the task always completes "successfully" but without any of the desired changes to files. I don't see any "unable to create file" errors in Event Viewer either. The tasks do all Run As a specific account, but I have logged in as that account and verified that it has permissions to do everything it needs to. Further details -- Task is set to Run whether user is logged in or not. Configured for: "Windows Vista or Windows Server 2008", there is no other Configured for option available.

    Read the article

  • Scheduled tasks fail to start unless I'm logged in to the server

    - by Chuck
    Tasks need to open a CMD window and pass net use commands, then do a DIR command, pipping the output to a file on the server. Log in as either me (Sysadmin) or with one of the system accounts and task will only run if I'm physically logged into the server. Run as batch file is set in security properties for both users (me and service account), security is granted to all directories, etc. It almost acts like a scheduled task, since it is not physically connected to a display can't create a CMD window and pass the WinID so the command can be sent. I'm guessing. Anyone know of a document that explains how the server handles initiation of a window if done via scheduled task and no attached user is associated with the task? If I log onto the box and run the scheduled tasks they run fine, but produce no errors or event log entries and then just show that it ran successfully and sets the next run time. Have tried both with the run if logged in checkbox on and off and makes no difference. Other tasks work fine, except that they are acting on local drives with no display writing or updating taking place, so I'm guessing the system either can't instantiate a window if no display is connected to a logged on user, or it can't establish a point if it is trying to create a virtual screen. You'd think it is just creating a memory map and then mapping it to a device to display, but that doesn't seem to be the case, but I can find no documentation on how the system handles a scheduled task and how to invoke a fake or virtual screen that it could write to so it appears that a user was connected. Thanks This is driving me nuts and I've tried everything I can think of as well as our network boys ideas and nothing seems to work.

    Read the article

  • How to set up Task Scheduler task that cleans up firefox window it opens?

    - by WilliamKF
    I have a Task Scheduler Windows 7 task that invokes firefox.exe on a URL which is an iMacro. Upon completion, the firefox window is left open. I always have firefox running, but it brings up a new window, not sure if this is a new instance of firefox, or a second window. Upon completion of the macro, I'd like the extra window closed. The extra window has a blank tab and a tab for the macro that ran. How can I set up the task to clean up after itself?

    Read the article

  • "The user account does not have permission to run this task"

    - by Ken
    I'm trying to get a scheduled task to run on Windows Server 2008. It has been working fine for months, and then hung, so I killed it, and now I can't get it to start. (In case it's not obvious, I'm not a Windows sysadmin by any stretch of the imagination. I inherited responsibility for this system, more or less.) The error it gives is: "The user account does not have permission to run this task". The task's "author" is "A". The task's "When running the task, use the following user account:" is "B". And my user is "C". All of A, B, C are members of the Administrators group, so I'm a bit puzzled as to why it thinks I don't have permissions to run this. Ideas?

    Read the article

  • Where are task scheduler event files stored on Windows Server 2008?

    - by MacGyver
    I tried setting up triggers in Task Scheduler Windows Server 2008, but Microsoft needs to fix a bug that I documented on Stack Overflow. So I can't use triggers until they fix this bug. Basically the Task Scheduler doesn't trigger an event that has a Result Code of 2147942402. http://stackoverflow.com/questions/10933033/windows-server-2008-task-scheduler-trigger-xml-syntax-for-email-notification-ta In the mean time, I'd like to write a task that runs .NET code that queries the log/event files programmatically every 15 minutes and sends success/failure emails based on the events that occured for the given tasks in task scheduler. Here's where the XPath is stored for the Task Trigger XML tab (that I can't rely on): C:\Windows\System32\Tasks\ I cannot find where the events (or log files containing the event ids) of each task are stored. Does anyone know where to find these log files? The log name is "Microsoft-Windows-TaskScheduler/Operational".

    Read the article

  • Windows XP Task Management: no execution

    - by Ice09
    Hi, we used the following scenario sucessfully over a long period of time: Remotely log onto a Win XP server, which is used by one user most/all of time Schedule a task using the "task planner" Task was run at "almost" each scheduled point of time (seldom it did not start, presumably when someone else was logged in). For some time now, we share the server with several users. Even though I checked an option for running independently of the logged in user, this option does not seem to work. Now, the task is seldom executed, not seldom not executed. Now, the question is: is there some other option I can't see which disables the execution OR, even better, is there some other tool which we can use for task scheduling on Win XP servers with several different users?

    Read the article

  • Scheduled task based on Microsoft patch release cycle

    - by floyd
    I have a simple powershell script which unapproves all patches based on computer group name in WSUS which works great. All of our servers patch on a specific Day/Week/Time starting on Week0-Wednesday which would be the Wednesday after Microsoft Patch Tuesday (2nd Tuesday of every month) all the way to Week3-Sunday. This obviously causes problems as sometimes not all patches get applied in one reboot cycle, and then will install patches the following week during their group policy scheduled patching day/time which is what I'm trying to prevent. My question is I'm trying to schedule my script to run based on this schedule and I am finding it next to impossible using Windows Task Scheduler. For instance if I wanted something to always run on the 4th Monday after Microsoft Patch Tuesday, I cant always use the task scheduler option "4th Monday of the Month" Has anyone run into a similar situation, or know of any task scheduling tools which give you more flexibility than Windows Task Scheduler?

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >