Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 407/1407 | < Previous Page | 403 404 405 406 407 408 409 410 411 412 413 414  | Next Page >

  • Talking JavaOne with Rock Star Martijn Verburg

    - by Janice J. Heiss
    JavaOne Rock Stars, conceived in 2005, are the top-rated speakers at each JavaOne Conference. They are awarded by their peers, who, through conference surveys, recognize them for their outstanding sessions and speaking ability. Over the years many of the world’s leading Java developers have been so recognized. Martijn Verburg has, in recent years, established himself as an important mover and shaker in the Java community. His “Diabolical Developer” session at the JavaOne 2011 Conference got people’s attention by identifying some of the worst practices Java developers are prone to engage in. Among other things, he is co-leader and organizer of the thriving London Java User Group (JUG) which has more than 2,500 members, co-represents the London JUG on the Executive Committee of the Java Community Process, and leads the global effort for the Java User Group “Adopt a JSR” and “Adopt OpenJDK” programs. Career highlights include overhauling technology stacks and SDLC practices at Mizuho International, mentoring Oracle on technical community management, and running off shore development teams for AIG. He is currently CTO at jClarity, a start-up focusing on automating optimization for Java/JVM related technologies, and Product Advisor at ZeroTurnaround. He co-authored, with Ben Evans, "The Well-Grounded Java Developer" published by Manning and, as a leading authority on technical team optimization, he is in high demand at major software conferences.Verburg is participating in five sessions, a busy man indeed. Here they are: CON6152 - Modern Software Development Antipatterns (with Ben Evans) UGF10434 - JCP and OpenJDK: Using the JUGs’ “Adopt” Programs in Your Group (with Csaba Toth) BOF4047 - OpenJDK Building and Testing: Case Study—Java User Group OpenJDK Bugathon (with Ben Evans and Cecilia Borg) BOF6283 - 101 Ways to Improve Java: Why Developer Participation Matters (with Bruno Souza and Heather Vancura-Chilson) HOL6500 - Finding and Solving Java Deadlocks (with Heinz Kabutz, Kirk Pepperdine, Ellen Kraffmiller and Henri Tremblay) When I asked Verburg about the biggest mistakes Java developers tend to make, he listed three: A lack of communication -- Software development is far more a social activity than a technical one; most projects fail because of communication issues and social dynamics, not because of a bad technical decision. Sadly, many developers never learn this lesson. No source control -- Developers simply storing code in local filesystems and emailing code in order to integrate Design-driven Design -- The need for some developers to cram every design pattern from the Gang of Four (GoF) book into their source code All of which raises the question: If these practices are so bad, why do developers engage in them? “I've seen a wide gamut of reasons,” said Verburg, who lists them as: * They were never taught at high school/university that their bad habits were harmful.* They weren't mentored in their first professional roles.* They've lost passion for their craft.* They're being deliberately malicious!* They think software development is a technical activity and not a social one.* They think that they'll be able to tidy it up later.A couple of key confusions and misconceptions beset Java developers, according to Verburg. “With Java and the JVM in particular I've seen a couple of trends,” he remarked. “One is that developers think that the JVM is a magic box that will clean up their memory, make their code run fast, as well as make them cups of coffee. The JVM does help in a lot of cases, but bad code can and will still lead to terrible results! The other trend is to try and force Java (the language) to do something it's not very good at, such as rapid web development. So you get a proliferation of overly complex frameworks, libraries and techniques trying to get around the fact that Java is a monolithic, statically typed, compiled, OO environment. It's not a Golden Hammer!”I asked him about the keys to running a good Java User Group. “You need to have a ‘Why,’” he observed. “Many user groups know what they do (typically, events) and how they do it (the logistics), but what really drives users to join your group and to stay is to give them a purpose. For example, within the LJC we constantly talk about the ‘Why,’ which in our case is several whys:* Re-ignite the passion that developers have for their craft* Raise the bar of Java developers in London* We want developers to have a voice in deciding the future of Java* We want to inspire the next generation of tech leaders* To bring the disparate tech groups in London together* So we could learn from each other* We believe that the Java ecosystem forms a cornerstone of our society today -- we want to protect that for the futureLooking ahead to Java 8 Verburg expressed excitement about Lambdas. “I cannot wait for Lambdas,” he enthused. “Brian Goetz and his group are doing a great job, especially given some of the backwards compatibility that they have to maintain. It's going to remove a lot of boiler plate and yet maintain readability, plus enable massive scaling.”Check out Martijn Verburg at JavaOne if you get a chance, and, stay tuned for a longer interview yours truly did with Martijn to be publish on otn/java some time after JavaOne.

    Read the article

  • Web security course ?

    - by vtortola
    I'd like to do a course about web security. I've seen some certifications that could be interesting: CIW Web Security Professional CISSP® - Certified Information Systems Security Professional Certified Secure Software Lifecycle Professional What do you know about these certifications? are they recognized? I'm not trying to become a hacker, I just want to ensure I have enough knowledge about web security to cope with today internet. From my inexpert point of view, "Certified Secure Software Lifecycle Professional" looks exactly as I want, the problem is that it cost more than 500 bucks! Why certification? well, I want to learn but I would like also have a way to demonstrate to a future employer/customer that I had to study and pass exams, not only attend to a course. Regards.

    Read the article

  • Set App Windows to Always be on Top

    - by Asian Angel
    Sometimes you have a small app or other software that you want to keep topmost but how do you keep it on top without a lot of hassle? If this sounds like your situation then you might want to have a look at OnTop. Before For our example we had four individual apps open…any of the four could easily be on top at the moment. OnTop in Action The exe file for the app comes in a zip file. Simply unzip the file, place it in the Program Files Folder, create a shortcut and you are ready to go. Once you start OnTop you will see a new System Tray Icon…right click to access the Context Menu with a list of currently open apps. We decided to set Winamp to be always topmost first. Note: OnTop detected all three individual sections of our Winamp Player along with the individual monitors running in our Taskbar. Clicking on Paint.NET brought it forward over Firefox and Microsoft Word but Winamp was still sitting on top. Clicking on Microsoft Word next still did not affect Winamp’s topmost status. Nice. As soon as we switched the topmost status to Microsoft Word you can see that it immediately came to the front. One thing that we did note in our tests…the best method for switching topmost status is either to choose a different app or close the app that was topmost. Conclusion OnTop might be considered niche software but if you have an app window that you need to keep on top of other windows then you might want to give this small app a try. Links Download OnTop at Softpedia Similar Articles Productive Geek Tips Use the Windows Key for the "Start" Menu in Ubuntu LinuxIncrease the Cached Logon Count for Windows Computers on a DomainUsing Windows 7 or Vista Compatibility ModeQuick Tip: Change the Registered Owner in WindowsMake Safari Stop Crashing Every 20 Seconds on Windows Vista TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips Xobni Plus for Outlook All My Movies 5.9 CloudBerry Online Backup 1.5 for Windows Home Server Snagit 10 2010 World Cup Schedule Boot Snooze – Reboot and then Standby or Hibernate Customize Everything Related to Dates, Times, Currency and Measurement in Windows 7 Google Earth replacement Icon (Icons we like) Build Great Charts in Excel with Chart Advisor tinysong gives a shortened URL for you to post on Twitter (or anywhere)

    Read the article

  • Is OpenGL after C++ job oriented?

    - by Ani
    First, my regards to all programmers out there who have put their endless efforts in learning and becoming expert, wise, efficient and best. Let me describe my situation. I have just graduated from Electronics and Communication Stream. Though I have more interest in software development and hence I have opted to become a software developer rather than Electronics engg. I have learned C++ and wish to wish to go more deep. I have started to learn OpenGL. Guide me in the following: Is OpenGL good to learn and is it job oriented? Should I learn some other language rather then OpenGL after C++?

    Read the article

  • Shutdown Hangs for 5 Minutes on Kubuntu 14.04

    - by Augustinus
    I've had persistent problems with a 5 minute hang at shutdown for the last three versions of Kubuntu (13.04, 13.10, and now 14.04). I suspect this is not a KDE-specific problem. Recently, I performed a fresh installation of Kubuntu 14.04 from a live-USB, and shutdown worked normally for about a week. The hang-up is now happening again, and I can't figure out why. A brief description of the problem: The hang-up occurs with all methods of initiating a normal shutdown: Clicking the shutdown or restart button in KDE, sudo shutdown -h now, sudo reboot The shutdown splash screen appears. Using the down-arrow to access verbose messages, I see "Asking all remaining processes to terminate." This message remains for 5 minutes with no disk activity. Finally, a rapid series of messages flurries to the screen: * All processes ended within 300 seconds... [ OK ] nm-dispatcher.action: Caught signal 15, shutting down... ModemManager[852]: <warn> Could not acquire the 'org.freedesktop.ModemManager1' service name ModemManager[852]: <info> ModemManager is shut down * Deactivating swap... [ OK ] * Unmounting local filesystems... [ OK ] * Will now restart` Possible Sources of the Problem: Before the problem re-appeared, I have mainly been doing routine computing. I have kept the system up-to-date using apt-get upgrade and apt-get dist-upgrade. The only other notable incident was a power failure. I do not have the computer connected to a UPS, so the power failure resulted in an immediate shutdown. Could this have corrupted an important file which must be accessed at shutdown? Is there any way that could cause a 5-minute hang-up? Here is a list of packages that have been updated before the problem appeared: bash iotop dpkg dpkg-dev python3-software-properties libdpkg-perl software-properties-kde software-properties-common akonadi-backend-mysql libakonadiprotocolinternals1 akonadi-server firefox-locale-en firefox flashplugin-installer libqapt2 libqapt2-runtime thunderbird openjdk-7-jre-headless thunderbird-locale-en kubuntu-driver-manager qapt-deb-installer openjdk-7-jre qapt-batch icedtea-7-jre-jamvm libelf1 dpkg dpkg-dev libdpkg-perl libjbig0 gettext-base libgettextpo-dev libssl1.0.0 libgettextpo0 libasprintf-dev linux-headers-3.13.0-24 gettext libasprintf0c2 linux-headers-3.13.0-24-generic openssl linux-libc-dev gstreamer0.10-qapt kubuntu-desktop linux-image-extra-3.13.0-24-generic linux-image-3.13.0-24-generic I would appreciate any help with this.

    Read the article

  • Java Spotlight Episode 138: Paul Perrone on Life Saving Embedded Java

    - by Roger Brinkley
    Interview with Paul Perrone, founder and CEO of Perrone Robotics, on using Java Embedded to test autonomous vehicle operations for the Insurance Institute for Highway Safety that will save lives. Right-click or Control-click to download this MP3 file. You can also subscribe to the Java Spotlight Podcast Feed to get the latest podcast automatically. If you use iTunes you can open iTunes and subscribe with this link: Java Spotlight Podcast in iTunes. Show Notes News JDK 8 is Feature Complete Java SE 7 Update 25 Released What should the JCP be doing? 2013 Duke's Choice Award Nominations Another Quick update to Code Signing Article on OTN Events June 24, Austin JUG, Austin, TX June 25, Virtual Developer Day - Java, EMEA, 10AM CEST Jul 16-19, Uberconf, Denver, USA Jul 22-24, JavaOne Shanghai, China Jul 29-31, JVM Summit Language, Santa Clara Sep 11-12, JavaZone, Oslo, Norway Sep 19-20, Strange Loop, St. Louis Sep 22-26 JavaOne San Francisco 2013, USA Feature Interview Paul J. Perrone is founder/CEO of Perrone Robotics. Paul architected the Java-based general-purpose robotics and automation software platform known as “MAX”. Paul has overseen MAX’s application to rapidly field self-driving robotic cars, unmanned air vehicles, factory and road-side automation applications, and a wide range of advanced robots and automaton applications. He fielded a self-driving autonomous robotic dune buggy in the historic 2005 Grand Challenge race across the Mojave desert and a self-driving autonomous car in the 2007 Urban Challenge through a city landscape. His work has been featured in numerous televised and print media including the Discovery Channel, a theatrical documentary, scientific journals, trade magazines, and international press. Since 2008, Paul has also been working as the chief software engineer, CTO, and roboticist automating rock star Neil Young’s LincVolt, a 1959 Lincoln Continental retro-fitted as a fully autonomous extended range electric vehicle. Paul has been an engineer, author of books and articles on Java, frequent speaker on Java, and entrepreneur in the robotics and software space for over 20 years. He is a member of the Java Champions program, recipient of three Duke Awards including a Gold Duke and Lifetime Achievement Award, has showcased Java-based robots at five JavaOne keynotes, and is a frequent JavaOne speaker and show floor participant. He holds a B.S.E.E. from Rutgers University and an M.S.E.E. from the University of Virginia. What’s Cool Shenandoah: A pauseless GC for OpenJDK

    Read the article

  • Oracle Unbreakable Enterprise Kernel and Emulex HBA Eliminate Silent Data Corruption

    - by sergio.leunissen
    Yesterday, Emulex announced that it has added support for T10 Protection Information (T10-PI), formerly called T10-DIF, to a number of its HBAs. When used with Oracle's Unbreakable Enterprise Kernel, this will prevent silent data corruption and help ensure the integrity and regulatory compliance of user data as it is transferred from the application to the SAN From the press release: Traditionally, protecting the integrity of customers' data has been done with multiple discrete solutions, including Error Correcting Code (ECC) and Cyclic Redundancy Check (CRC), but there have been coverage gaps across the I/O path from the operating system to the storage. The implementation of the T10-PI standard via Emulex's BlockGuard feature, in conjunction with other industry player's implementations, ensures that data is validated as it moves through the data path, from the application, to the HBA, to storage, enabling seamless end-to-end integrity. Read the white paper and don't miss the live webcast on eliminating silent data corruption on December 16th!

    Read the article

  • HTG Explains: Are You Using IPv6 Yet? Should You Even Care?

    - by Chris Hoffman
    IPv6 is extremely important for the long-term health of the Internet. But is your Internet service provider providing IPv6 connectivity yet? Does your home network support it? Should you even care if you’re using IPv6 yet? Switching from IPv4 to IPv6 will give the Internet a much larger pool of IP addresses. It should also allow every device to have its own public IP address, rather than be hidden behind a NAT router. IPv6 is Important Long-Term IPv6 is very important for the long-term health of the Internet. There are only about 3.7 billion public IPv4 addresses. This may sound like a lot, but it isn’t even one IP address for each person on the planet. Considering people have more and more Internet-connected devices — everything from light bulbs to thermostats are starting to become network-connected — the lack of IP addresses is already proving to be a serious problem. This may not affect those of us in well-off developed countries just yet, but developing countries are already running out of IPv4 addresses. So, if you work at an Internet service provider, manage Internet-connected servers, or develop software or hardware — yes, you should care about IPv6! You should be deploying it and ensuring your software and hardware works properly with it. It’s important to prepare for the future before the current IPv4 situation becomes completely unworkable. But, if you’re just typical user or even a typical geek with a home Internet connection and a home network, should you really care about your home network just yet? Probably not. What You Need to Use IPv6 To use IPv6, you’ll need three things: An IPv6-Compatible Operating System: Your operating system’s software must be capable of using IPv6. All modern desktop operating systems should be compatible — Windows Vista and newer versions of Windows, as well as modern versions of Mac OS X and Linux. Windows XP doesn’t have IPv6 support installed by default, but you shouldn’t be using Windows XP anymore, anyway. A Router With IPv6 Support: Many — maybe even most — consumer routers in the wild don’t support IPv6. Check your router’s specifications details to see if it supports IPv6 if you’re curious. If you’re going to buy a new router, you’ll probably want to get one with IPv6 support to future-proof yourself. If you don’t have an IPv6-enabled router yet, you don’t need to buy a new one just to get it. An ISP With IPv6 Enabled:  Your Internet service provider must also have IPv6 set up on their end. Even if you have modern software and hardware on your end, your ISP has to provide an IPv6 connection for you to use it. IPv6 is rolling out steadily, but slowly — there’s a good chance your ISP hasn’t enabled it for you yet. How to Tell If You’re Using IPv6 The easiest way to tell if you have IPv6 connectivity is to visit a website like testmyipv6.com. This website allows you to connect to it in different ways — click the links near the top to see if you can connect to the website via different types of connections. If you can’t connect via IPv6, it’s either because your operating system is too old (unlikely), your router doesn’t support IPv6 (very possible), or because your ISP hasn’t enabled it for you yet (very likely). Now What? If you can connect to the test website above via IPv6, congratulations! Everything is working as it should. Your ISP is doing a good job of rolling out IPv6 rather than dragging its feet. There’s a good chance you won’t have IPv6 working properly, however. So what should you do about this — should you head to Amazon and buy a new IPv6-enabled router or switch to an ISP that offers IPv6? Should you use a “tunnel broker,” as the test site recommends, to tunnel into IPv6 via your IPv4 connection? Well, probably not. Typical users shouldn’t have to worry about this yet. Connecting to the Internet via IPv6 shouldn’t be perceptibly faster, for example. It’s important for operating system vendors, hardware companies, and Internet service providers to prepare for the future and get IPv6 working, but you don’t need to worry about this on your home network. IPv6 is all about future-proofing. You shouldn’t be racing to implement this at home yet or worrying about it too much — but, when you need to buy a new router, try to buy one that supports IPv6. Image Credit: Adobe of Chaos on Flickr, hisperati on Flickr, Vox Efx on Flickr     

    Read the article

  • Dell XPS 15 (L502x) sound problem

    - by lauramolenaar
    I have a problem with my sound on my Dell XPS 15. First, when I had Windows 7, my sound was pretty good (I have a JBL 2.1 speaker system with Waves Maxx audio), but since I installed Ubuntu 12.04 it sounded very cheap and as if I put my laptop in a tin can. I've already tried installing alsa-hda-dkms from the alsa-daily ppa (http://ppa.launchpad.net/ubuntu-audio-dev/alsa-daily) This is my audio controller: laura@laura-XPS-L502X:~$ lspci -v | grep -A7 -i audio 00:1b.0 Audio device: Intel Corporation 6 Series/C200 Series Chipset Family High Definition Audio Controller (rev 05) Subsystem: Dell Device 04b6 Flags: bus master, fast devsel, latency 0, IRQ 51 Memory at f1c00000 (64-bit, non-prefetchable) [size=16K] Capabilities: <access denied> Kernel driver in use: snd_hda_intel Kernel modules: snd-hda-intel I hope you can help me, and you can always ask me for more information. Result of aplay -l: **** List of PLAYBACK Hardware Devices **** card 0: PCH [HDA Intel PCH], device 0: ALC665 Analog [ALC665 Analog] Subdevices: 0/1 Subdevice #0: subdevice #0 card 0: PCH [HDA Intel PCH], device 1: ALC665 Digital [ALC665 Digital] Subdevices: 1/1 Subdevice #0: subdevice #0 card 0: PCH [HDA Intel PCH], device 3: HDMI 0 [HDMI 0] Subdevices: 1/1 Subdevice #0: subdevice #0 Result of aplay -L: default Playback/recording through the PulseAudio sound server sysdefault:CARD=PCH HDA Intel PCH, ALC665 Analog Default Audio Device front:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog Front speakers surround40:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog 4.0 Surround output to Front and Rear speakers surround41:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog 4.1 Surround output to Front, Rear and Subwoofer speakers surround50:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog 5.0 Surround output to Front, Center and Rear speakers surround51:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog 5.1 Surround output to Front, Center, Rear and Subwoofer speakers surround71:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog 7.1 Surround output to Front, Center, Side, Rear and Woofer speakers iec958:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Digital IEC958 (S/PDIF) Digital Audio Output hdmi:CARD=PCH,DEV=0 HDA Intel PCH, HDMI 0 HDMI Audio Output dmix:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog Direct sample mixing device dmix:CARD=PCH,DEV=1 HDA Intel PCH, ALC665 Digital Direct sample mixing device dmix:CARD=PCH,DEV=3 HDA Intel PCH, HDMI 0 Direct sample mixing device dsnoop:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog Direct sample snooping device dsnoop:CARD=PCH,DEV=1 HDA Intel PCH, ALC665 Digital Direct sample snooping device dsnoop:CARD=PCH,DEV=3 HDA Intel PCH, HDMI 0 Direct sample snooping device hw:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog Direct hardware device without any conversions hw:CARD=PCH,DEV=1 HDA Intel PCH, ALC665 Digital Direct hardware device without any conversions hw:CARD=PCH,DEV=3 HDA Intel PCH, HDMI 0 Direct hardware device without any conversions plughw:CARD=PCH,DEV=0 HDA Intel PCH, ALC665 Analog Hardware device with all software conversions plughw:CARD=PCH,DEV=1 HDA Intel PCH, ALC665 Digital Hardware device with all software conversions plughw:CARD=PCH,DEV=3 HDA Intel PCH, HDMI 0 Hardware device with all software conversions

    Read the article

  • What Agile Model do you use at Work?

    - by Kyle Rozendo
    I am looking to start pushing for more Agile processes to be brought into play in the work place and do my best to outlaw cowboy coding as much as possible. I understand many of the different models and am just looking to see which model has the higher uptake (or which parts of the model as well), and in what industry it is being used. Extreme Programming (XP) Adaptive Software Development (ASD) Scrum Dynamic Systems Development Model (DSDM) Crystal Feature Driven Development (FDD) Lean Software Development (LSD) Agile Modelling (AM) Agile Unified Process (AUP) Kanban If you care to add to your answer with comments about what you don't like, do like or have tried and it hadn't worked, that would also be appreciated.

    Read the article

  • CodePlex Daily Summary for Friday, October 04, 2013

    CodePlex Daily Summary for Friday, October 04, 2013Popular ReleasesMoreTerra (Terraria World Viewer): Version 1.11: Release Notes Release 1.11 =========== =Bug Fixes= =========== Now works with Terraria 1.2 wld files. =============== =Known Issues= =============== Not all tiles and items are accounted for. Missing tiles just show up as pink. This is actively being worked on but wanted to get a build out that works with 1.2VG-Ripper & PG-Ripper: PG-Ripper 1.4.19: NEW: Added Option to login as Guest NEW: Added Support for "ImageTeam.org linksStyleMVVM: 3.1.4: This release has virtually no code change but adds multiple new Item templates for the Windows Phone 8 platformSystem Center Orchestrator Community Project: Orchestrator Visio and Word Generator 1.5: This tool lets you export Orchestrator runbooks as a Visio diagram, and you can also generate an optional Word file as well. Components exported as of v1.5 are : - Title of the runbook - Activities and their names/thumbnails/description (description is displayed as a callout in the Visio diagram, attached to the shape of the activity) - Links and their names/colors - Looping and their interval Thumbnails and activities are grouped in the Visio diagram, for easy manipulation of the diagra...State of Decay Save Manager: Version 1.0.4: Add version at bottom of formDNN® Form and List: DNN Form and List 06.00.07: DotNetNuke Form and List 06.00.06 Changes to 6.0.7•Fixed an error in datatypes.config that caused calculated fields to be missing in 6.0.6 Changes to 6.0.6•Add in Sql to remove 'text on row' setting for UserDefinedTable to make SQL Azure compatible. •Add new azureCompatible element to manifest. •Added a fix for importing templates. Changes to 6.0.2•Fix: MakeThumbnail was broken if the application pool was configured to .Net 4 •Change: Data is now stored in nvarchar(max) instead of ntext C...SimpleExcelReportMaker: Serm 0.03: SourceCode and Sample .Net Framework 3.5 AnyCPU compile.RDFSharp - Start playing with RDF!: RDFSharp-0.6.6: GENERAL (NEW) Introduction of INT64 hashing engine (codenamed "Greta"); QUERY (FIX) Incorrect query evaluation due to faulty detection of optional patterns (v0.6.5 regression); (FIX) Missing update of PatternGroupID information after adding patterns and filters to a pattern group; (FIX) Ensure Context information of a pattern is not null before trying to collect it as variable; (MISC) Changed semantics of Context information of a pattern: if not provided, it will be ignored; (MISC...Application Architecture Guidelines: App Architecture Guidelines 3.0.8: This document is an overview of software qualities, principles, patterns, practices, tools and libraries.C# Intellisense for Notepad++: Release v1.0.7.2: - smart indentation - document formatting To avoid the DLLs getting locked by OS use MSI file for the installation.BlackJumboDog: Ver5.9.6: 2013.09.30 Ver5.9.6 (1)SMTP???????、???????????????? (2)WinAPI??????? (3)Web???????CGI???????????????????????Microsoft Ajax Minifier: Microsoft Ajax Minifier 5.2: Mostly internal code tweaks. added -nosize switch to turn off the size- and gzip-calculations done after minification. removed the comments in the build targets script for the old AjaxMin build task (discussion #458831). Fixed an issue with extended Unicode characters encoded inside a string literal with adjacent \uHHHH\uHHHH sequences. Fixed an IndexOutOfRange exception when encountering a CSS identifier that's a single underscore character (_). In previous builds, the net35 and net20...AJAX Control Toolkit: September 2013 Release: AJAX Control Toolkit Release Notes - September 2013 Release (Updated) Version 7.1002September 2013 release of the AJAX Control Toolkit. AJAX Control Toolkit .NET 4.5 – AJAX Control Toolkit for .NET 4.5 and sample site (Recommended). AJAX Control Toolkit .NET 4 – AJAX Control Toolkit for .NET 4 and sample site (Recommended). AJAX Control Toolkit .NET 3.5 – AJAX Control Toolkit for .NET 3.5 and sample site (Recommended). Important UpdateThis release has been updated to fix two issues: Upda...WDTVHubGen - Adds Metadata, thumbnails and subtitles to WDTV Live Hubs: WDTVHubGen.v2.1.4.apifix-alpha: WDTVHubGen.v2.1.4.apifix-alpha is for testers to figure out if we got the NEW api plugged in ok. thanksVisual Log Parser: VisualLogParser: Portable Visual Log Parser for Dotnet 4.0AudioWordsDownloader: AudioWordsDownloader 1.1 build 88: New features list of words (mp3 files) is available upon typing when a download path is defined list of download paths is added paths history settings added Bug fixed case mismatch in word search field fixed path not exist bug fixed when history has been used path, when filled from dialog, not stored refresh autocomplete list after path change word sought is deleted when path is changed at the end sought word list is deleted word list not refreshed download ends. word lis...Wsus Package Publisher: Release v1.3.1309.28: Fix a bug, where WPP crash when running on a computer where Windows was installed in another language than Fr, En or De, and launching the Update Creation Wizard. Fix a bug, where WPP crash if some Multi-Thread job are launch with more than 64 items. Add a button to abort "Install This Update" wizard. Allow WPP to remember which columns are shown last time. Make URL clickable on the Update Information Tab. Add a new feature, when Double-Clicking on an update, the default action exec...Tweetinvi a friendly Twitter C# API: Alpha 0.8.3.0: Version 0.8.3.0 emphasis on the FIlteredStream and ease how to manage Exceptions that can occur due to the network or any other issue you might encounter. Will be available through nuget the 29/09/2013. FilteredStream Features provided by the Twitter Stream API - Ability to track specific keywords - Ability to track specific users - Ability to track specific locations Additional features - Detect the reasons the tweet has been retrieved from the Filtered API. You have access to both the ma...WPF Extended DataGrid: WPF Extended DataGrid 2.0.0.4 binaries: Improved performance of GroupByAcDown?????: AcDown????? v4.5: ??●AcDown??????????、??、??、???????。????,????,?????????????????????????。???????????Acfun、????(Bilibili)、??、??、YouTube、??、???、??????、SF????、????????????。 ●??????AcPlay?????,??????、????????????????。 ● AcDown???????C#??,????.NET Framework 2.0??。?????"Acfun?????"。 ??v4.5 ???? AcPlay????????v3.5 ????????,???????????30% ?? ???????GoodManga.net???? ?? ?????????? ?? ??Acfun?????????? ??Bilibili??????????? ?????????flvcd???????? ??SfAcg????????????? ???????????? ???????????????? ????32...New ProjectsAnalysis Services Activity Viewer 2012: This project was created from a blog post I wrote back in February 2013 http://redphoenix.me/2013/08/22/upgrade-activity-viewer-2008-to-sql-server-2012/ARYSTA SYSTEM: Notebook System A/R Sales * Sales Order * Delivery * Sales Invoice * Sales Return * A/R Credit Memo * A/R Debit Memo A/P Purchasing * Purchase Order BEWELL SYSTEM: This system is design for Bewell-C Incorporated. Project Manager: Ben Penafiel System Engineer: Jhay Camba Report Designer: William Damasco Caching IOC: Caching IOC Container This will cache any Interface return results making it really easy to introduce caching to your solution.Grupo Anclita: Trabajo Final Laboratorio 4Halcyonic Skin by HTML5-UP - for DNN: This skin was converted for use in DNN by Michael Doxsey. Original HTML template designed and built by HTML5-UP: http://html5up.net/halcyonic/ ProPro: project about other projectsS3Unlock: Unlocks S3 agents that are stuck installing.sdfsdlfsdlkj01: dsfdffsdSerendipity - Responsive Skin for DNN: This is an HTML Template by Elemis, converted for use in DNN. Elemis URL: http://elemisfreebies.com/premium-themes/ Free for personal use and ed. purposes only.SmartSystemMenu: Smart system menu for you.SP 2013 Custom MultiTenant Adminstration: This Project creates a custom SP 2013 Tenant Admin site template covering limitations of existing tenant admin site.Telephasic Skin by HTML5-UP - for DNN: This skin was converted for use in DNN by Michael Doxsey. Original HTML template designed and built by HTML5-UP: http://html5up.net/telephasic/TelerikedIn: Social web app trying to look and feel like the famous LinkedInTerra 2: Generador de personajes para el juego de rol Terra2tsydev01: TextLineUpdateVds2465 Parser: This Project is about implementing a Parser for the Vds2465 protocol. It includes parsing and generating Vds2465 telegram bytes.Your Appliances: Empresa De ElectrodomesticosZeroFour by HTML5-UP - for DNN: This skin was converted for use in DNN by Michael Doxsey. Original HTML template designed and built by HTML5-UP: http://html5up.net/zerofour.

    Read the article

  • Packages are not available for installation

    - by Alex Farber
    Changing some Software Update settings I possibly corrupted something, and now I don't see many packages in the list. For example: alex@u120464:~$ sudo apt-get install codeblocks [sudo] password for alex: Reading package lists... Done Building dependency tree Reading state information... Done E: Unable to locate package codeblocks I checked all options in the Software Sources dialog, but packages are still not available. How can I fix this? OS: Ubuntu 12.04, 64 bit. Additional information. alex@u120464:~$ sudo apt-get update [sudo] password for alex: Ign http://extras.ubuntu.com precise InRelease Ign http://security.ubuntu.com precise-security InRelease Ign http://archive.canonical.com precise InRelease Ign http://archive.ubuntu.com precise InRelease Ign http://archive.ubuntu.com precise-updates InRelease ... It looks like most Ubuntu repositories are not searched, how can I restore default update behaviour?

    Read the article

  • Ubuntu 14.04 Failed to load module udlfb

    - by jar276705
    DisplayLink doesn't load and run. The adapter is recognized and /dev/FB1 is created. USB bus info: Bus 001 Device 006: ID 17e9:0198 DisplayLink Xorg.0.log: X.Org X Server 1.15.1 Release Date: 2014-04-13 [ 44708.386] X Protocol Version 11, Revision 0 [ 44708.389] Build Operating System: Linux 3.2.0-37-generic i686 Ubuntu [ 44708.392] Current Operating System: Linux rrl 3.13.0-24-generic #46-Ubuntu SMP Thu Apr 10 19:08:14 UTC 2014 i686 [ 44708.392] Kernel command line: BOOT_IMAGE=/boot/vmlinuz-3.13.0-24-generic root=UUID=6b719a77-29e0-4668-8f16-57d0d3a73a3f ro quiet splash vt.handoff=7 [ 44708.399] Build Date: 16 April 2014 01:40:08PM [ 44708.402] xorg-server 2:1.15.1-0ubuntu2 (For technical support please see http://www.ubuntu.com/support) [ 44708.405] Current version of pixman: 0.30.2 [ 44708.412] Before reporting problems, check http://wiki.x.org to make sure that you have the latest version. [ 44708.412] Markers: (--) probed, (**) from config file, (==) default setting, (++) from command line, (!!) notice, (II) informational, (WW) warning, (EE) error, (NI) not implemented, (??) unknown. [ 44708.427] (==) Log file: "/var/log/Xorg.0.log", Time: Thu May 1 09:38:27 2014 [ 44708.431] (==) Using config file: "/etc/X11/xorg.conf" [ 44708.434] (==) Using system config directory "/usr/share/X11/xorg.conf.d" [ 44708.435] (==) ServerLayout "X.org Configured" [ 44708.435] (**) |-->Screen "DisplayLinkScreen" (0) [ 44708.435] (**) | |-->Monitor "DisplayLinkMonitor" [ 44708.435] (**) | |-->Device "DisplayLinkDevice" [ 44708.435] (**) |-->Screen "Screen0" (1) [ 44708.435] (**) | |-->Monitor "Monitor0" [ 44708.435] (**) | |-->Device "Card0" [ 44708.435] (**) |-->Input Device "Mouse0" [ 44708.435] (**) |-->Input Device "Keyboard0" [ 44708.435] (==) Automatically adding devices [ 44708.435] (==) Automatically enabling devices [ 44708.435] (==) Automatically adding GPU devices [ 44708.435] (WW) The directory "/usr/share/fonts/X11/cyrillic" does not exist. [ 44708.435] Entry deleted from font path. [ 44708.435] (WW) The directory "/usr/share/fonts/X11/75dpi/" does not exist. [ 44708.435] Entry deleted from font path. [ 44708.435] (WW) The directory "/usr/share/fonts/X11/75dpi" does not exist. [ 44708.435] Entry deleted from font path. [ 44708.435] (WW) The directory "/usr/share/fonts/X11/cyrillic" does not exist. [ 44708.435] Entry deleted from font path. [ 44708.435] (WW) The directory "/usr/share/fonts/X11/75dpi/" does not exist. [ 44708.435] Entry deleted from font path. [ 44708.435] (WW) The directory "/usr/share/fonts/X11/75dpi" does not exist. [ 44708.435] Entry deleted from font path. [ 44708.435] (**) FontPath set to: /usr/share/fonts/X11/misc, /usr/share/fonts/X11/100dpi/:unscaled, /usr/share/fonts/X11/Type1, /usr/share/fonts/X11/100dpi, built-ins, /usr/share/fonts/X11/misc, /usr/share/fonts/X11/100dpi/:unscaled, /usr/share/fonts/X11/Type1, /usr/share/fonts/X11/100dpi, built-ins [ 44708.435] (**) ModulePath set to "/usr/lib/xorg/modules" [ 44708.435] (WW) Hotplugging is on, devices using drivers 'kbd', 'mouse' or 'vmmouse' will be disabled. [ 44708.435] (WW) Disabling Mouse0 [ 44708.435] (WW) Disabling Keyboard0 [ 44708.435] (II) Loader magic: 0xb77106c0 [ 44708.435] (II) Module ABI versions: [ 44708.435] X.Org ANSI C Emulation: 0.4 [ 44708.435] X.Org Video Driver: 15.0 [ 44708.435] X.Org XInput driver : 20.0 [ 44708.435] X.Org Server Extension : 8.0 [ 44708.436] (II) xfree86: Adding drm device (/dev/dri/card0) [ 44708.436] (II) xfree86: Adding drm device (/dev/dri/card1) [ 44708.437] (--) PCI:*(0:1:5:0) 1002:9616:105b:0e26 rev 0, Mem @ 0xf0000000/134217728, 0xfeae0000/65536, 0xfe900000/1048576, I/O @ 0x0000b000/256 [ 44708.441] Initializing built-in extension Generic Event Extension [ 44708.444] Initializing built-in extension SHAPE [ 44708.448] Initializing built-in extension MIT-SHM [ 44708.452] Initializing built-in extension XInputExtension [ 44708.456] Initializing built-in extension XTEST [ 44708.460] Initializing built-in extension BIG-REQUESTS [ 44708.464] Initializing built-in extension SYNC [ 44708.468] Initializing built-in extension XKEYBOARD [ 44708.471] Initializing built-in extension XC-MISC [ 44708.475] Initializing built-in extension SECURITY [ 44708.479] Initializing built-in extension XINERAMA [ 44708.483] Initializing built-in extension XFIXES [ 44708.487] Initializing built-in extension RENDER [ 44708.491] Initializing built-in extension RANDR [ 44708.494] Initializing built-in extension COMPOSITE [ 44708.498] Initializing built-in extension DAMAGE [ 44708.502] Initializing built-in extension MIT-SCREEN-SAVER [ 44708.506] Initializing built-in extension DOUBLE-BUFFER [ 44708.510] Initializing built-in extension RECORD [ 44708.513] Initializing built-in extension DPMS [ 44708.517] Initializing built-in extension Present [ 44708.521] Initializing built-in extension DRI3 [ 44708.525] Initializing built-in extension X-Resource [ 44708.528] Initializing built-in extension XVideo [ 44708.532] Initializing built-in extension XVideo-MotionCompensation [ 44708.535] Initializing built-in extension SELinux [ 44708.539] Initializing built-in extension XFree86-VidModeExtension [ 44708.542] Initializing built-in extension XFree86-DGA [ 44708.546] Initializing built-in extension XFree86-DRI [ 44708.549] Initializing built-in extension DRI2 [ 44708.549] (II) "glx" will be loaded. This was enabled by default and also specified in the config file. [ 44708.549] (WW) "xmir" is not to be loaded by default. Skipping. [ 44708.549] (II) LoadModule: "glx" [ 44708.549] (II) Loading /usr/lib/xorg/modules/extensions/libglx.so [ 44708.550] (II) Module glx: vendor="X.Org Foundation" [ 44708.550] compiled for 1.15.1, module version = 1.0.0 [ 44708.550] ABI class: X.Org Server Extension, version 8.0 [ 44708.550] (==) AIGLX enabled [ 44708.553] Loading extension GLX [ 44708.553] (II) LoadModule: "udlfb" [ 44708.554] (WW) Warning, couldn't open module udlfb [ 44708.554] (II) UnloadModule: "udlfb" [ 44708.554] (II) Unloading udlfb [ 44708.554] (EE) Failed to load module "udlfb" (module does not exist, 0) [ 44708.554] (II) LoadModule: "modesetting" [ 44708.554] (II) Loading /usr/lib/xorg/modules/drivers/modesetting_drv.so [ 44708.554] (II) Module modesetting: vendor="X.Org Foundation" [ 44708.554] compiled for 1.15.0, module version = 0.8.1 [ 44708.554] Module class: X.Org Video Driver [ 44708.554] ABI class: X.Org Video Driver, version 15.0 [ 44708.554] (==) Matched fglrx as autoconfigured driver 0 [ 44708.554] (==) Matched ati as autoconfigured driver 1 [ 44708.554] (==) Matched fglrx as autoconfigured driver 2 [ 44708.554] (==) Matched ati as autoconfigured driver 3 [ 44708.554] (==) Matched modesetting as autoconfigured driver 4 [ 44708.554] (==) Matched fbdev as autoconfigured driver 5 [ 44708.554] (==) Matched vesa as autoconfigured driver 6 [ 44708.554] (==) Assigned the driver to the xf86ConfigLayout [ 44708.554] (II) LoadModule: "fglrx" [ 44708.554] (WW) Warning, couldn't open module fglrx [ 44708.554] (II) UnloadModule: "fglrx" [ 44708.554] (II) Unloading fglrx [ 44708.554] (EE) Failed to load module "fglrx" (module does not exist, 0) [ 44708.554] (II) LoadModule: "ati" [ 44708.554] (II) Loading /usr/lib/xorg/modules/drivers/ati_drv.so [ 44708.554] (II) Module ati: vendor="X.Org Foundation" [ 44708.554] compiled for 1.15.0, module version = 7.3.0 [ 44708.554] Module class: X.Org Video Driver [ 44708.554] ABI class: X.Org Video Driver, version 15.0 [ 44708.554] (II) LoadModule: "radeon" [ 44708.555] (II) Loading /usr/lib/xorg/modules/drivers/radeon_drv.so [ 44708.555] (II) Module radeon: vendor="X.Org Foundation" [ 44708.555] compiled for 1.15.0, module version = 7.3.0 [ 44708.555] Module class: X.Org Video Driver [ 44708.555] ABI class: X.Org Video Driver, version 15.0 [ 44708.555] (II) LoadModule: "modesetting" [ 44708.555] (II) Loading /usr/lib/xorg/modules/drivers/modesetting_drv.so [ 44708.555] (II) Module modesetting: vendor="X.Org Foundation" [ 44708.555] compiled for 1.15.0, module version = 0.8.1 [ 44708.555] Module class: X.Org Video Driver [ 44708.555] ABI class: X.Org Video Driver, version 15.0 [ 44708.555] (II) UnloadModule: "modesetting" [ 44708.555] (II) Unloading modesetting [ 44708.555] (II) Failed to load module "modesetting" (already loaded, 0) [ 44708.555] (II) LoadModule: "fbdev" [ 44708.555] (II) Loading /usr/lib/xorg/modules/drivers/fbdev_drv.so [ 44708.555] (II) Module fbdev: vendor="X.Org Foundation" [ 44708.555] compiled for 1.15.0, module version = 0.4.4 [ 44708.555] Module class: X.Org Video Driver [ 44708.555] ABI class: X.Org Video Driver, version 15.0 [ 44708.555] (II) LoadModule: "vesa" [ 44708.555] (II) Loading /usr/lib/xorg/modules/drivers/vesa_drv.so [ 44708.555] (II) Module vesa: vendor="X.Org Foundation" [ 44708.555] compiled for 1.15.0, module version = 2.3.3 [ 44708.555] Module class: X.Org Video Driver [ 44708.555] ABI class: X.Org Video Driver, version 15.0 [ 44708.555] (II) modesetting: Driver for Modesetting Kernel Drivers: kms [ 44708.555] (II) RADEON: Driver for ATI Radeon chipsets: [ 44708.560] (II) FBDEV: driver for framebuffer: fbdev [ 44708.560] (II) VESA: driver for VESA chipsets: vesa [ 44708.560] (--) using VT number 7 [ 44708.578] (II) modesetting(0): using drv /dev/dri/card0 [ 44708.578] (II) modesetting(G0): using drv /dev/dri/card1 [ 44708.578] (WW) Falling back to old probe method for fbdev [ 44708.578] (II) Loading sub module "fbdevhw" [ 44708.578] (II) LoadModule: "fbdevhw" [ 44708.578] (II) Loading /usr/lib/xorg/modules/libfbdevhw.so [ 44708.578] (II) Module fbdevhw: vendor="X.Org Foundation" [ 44708.578] compiled for 1.15.1, module version = 0.0.2 [ 44708.578] ABI class: X.Org Video Driver, version 15.0 [ 44708.578] (WW) Falling back to old probe method for vesa [ 44708.578] (**) modesetting(0): Depth 16, (--) framebuffer bpp 16 [ 44708.578] (==) modesetting(0): RGB weight 565 [ 44708.578] (==) modesetting(0): Default visual is TrueColor [ 44708.578] (II) modesetting(0): ShadowFB: preferred YES, enabled YES [ 44708.608] (II) modesetting(0): Output VGA-0 using monitor section DisplayLinkMonitor [ 44708.610] (II) modesetting(0): Output DVI-0 has no monitor section [ 44708.640] (II) modesetting(0): EDID for output VGA-0 [ 44708.640] (II) modesetting(0): Manufacturer: ACR Model: 74 Serial#: 2483090993 [ 44708.640] (II) modesetting(0): Year: 2009 Week: 40 [ 44708.640] (II) modesetting(0): EDID Version: 1.3 [ 44708.640] (II) modesetting(0): Analog Display Input, Input Voltage Level: 0.700/0.700 V [ 44708.640] (II) modesetting(0): Sync: Separate [ 44708.640] (II) modesetting(0): Max Image Size [cm]: horiz.: 53 vert.: 29 [ 44708.640] (II) modesetting(0): Gamma: 2.20 [ 44708.640] (II) modesetting(0): DPMS capabilities: StandBy Suspend Off; RGB/Color Display [ 44708.641] (II) modesetting(0): First detailed timing is preferred mode [ 44708.641] (II) modesetting(0): redX: 0.649 redY: 0.338 greenX: 0.289 greenY: 0.609 [ 44708.641] (II) modesetting(0): blueX: 0.146 blueY: 0.070 whiteX: 0.313 whiteY: 0.329 [ 44708.641] (II) modesetting(0): Supported established timings: [ 44708.641] (II) modesetting(0): 720x400@70Hz [ 44708.641] (II) modesetting(0): 640x480@60Hz [ 44708.641] (II) modesetting(0): 640x480@72Hz [ 44708.641] (II) modesetting(0): 640x480@75Hz [ 44708.641] (II) modesetting(0): 800x600@56Hz [ 44708.641] (II) modesetting(0): 800x600@60Hz [ 44708.641] (II) modesetting(0): 800x600@72Hz [ 44708.641] (II) modesetting(0): 800x600@75Hz [ 44708.641] (II) modesetting(0): 1024x768@60Hz [ 44708.641] (II) modesetting(0): 1024x768@70Hz [ 44708.641] (II) modesetting(0): 1024x768@75Hz [ 44708.641] (II) modesetting(0): 1280x1024@75Hz [ 44708.641] (II) modesetting(0): Manufacturer's mask: 0 [ 44708.641] (II) modesetting(0): Supported standard timings: [ 44708.641] (II) modesetting(0): #0: hsize: 1280 vsize 1024 refresh: 60 vid: 32897 [ 44708.641] (II) modesetting(0): #1: hsize: 1152 vsize 864 refresh: 75 vid: 20337 [ 44708.641] (II) modesetting(0): #2: hsize: 1440 vsize 900 refresh: 60 vid: 149 [ 44708.641] (II) modesetting(0): #3: hsize: 1440 vsize 900 refresh: 75 vid: 3989 [ 44708.641] (II) modesetting(0): #4: hsize: 1600 vsize 1200 refresh: 60 vid: 16553 [ 44708.641] (II) modesetting(0): #5: hsize: 1680 vsize 1050 refresh: 60 vid: 179 [ 44708.641] (II) modesetting(0): Supported detailed timing: [ 44708.641] (II) modesetting(0): clock: 138.5 MHz Image Size: 531 x 298 mm [ 44708.641] (II) modesetting(0): h_active: 1920 h_sync: 1968 h_sync_end 2000 h_blank_end 2080 h_border: 0 [ 44708.641] (II) modesetting(0): v_active: 1080 v_sync: 1083 v_sync_end 1088 v_blanking: 1111 v_border: 0 [ 44708.641] (II) modesetting(0): Monitor name: H243H [ 44708.641] (II) modesetting(0): Ranges: V min: 56 V max: 76 Hz, H min: 31 H max: 83 kHz, PixClock max 185 MHz [ 44708.641] (II) modesetting(0): Serial No: LEW0C0044002 [ 44708.641] (II) modesetting(0): EDID (in hex): [ 44708.641] (II) modesetting(0): 00ffffffffffff000472740031f60094 [ 44708.641] (II) modesetting(0): 2813010368351d78ea6085a6564a9c25 [ 44708.641] (II) modesetting(0): 125054afcf008180714f9500950fa940 [ 44708.641] (II) modesetting(0): b300010101011a3680a070381f403020 [ 44708.641] (II) modesetting(0): 3500132a2100001a000000fc00483234 [ 44708.642] (II) modesetting(0): 33480a20202020202020000000fd0038 [ 44708.642] (II) modesetting(0): 4c1f5312000a202020202020000000ff [ 44708.642] (II) modesetting(0): 004c45573043303034343030320a003c [ 44708.642] (II) modesetting(0): Printing probed modes for output VGA-0 [ 44708.642] (II) modesetting(0): Modeline "1280x1024"x75.0 135.00 1280 1296 1440 1688 1024 1025 1028 1066 +hsync +vsync (80.0 kHz UeP) [ 44708.642] (II) modesetting(0): Modeline "1920x1080"x59.9 138.50 1920 1968 2000 2080 1080 1083 1088 1111 +hsync -vsync (66.6 kHz eP) [ 44708.642] (II) modesetting(0): Modeline "1600x1200"x60.0 162.00 1600 1664 1856 2160 1200 1201 1204 1250 +hsync +vsync (75.0 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1680x1050"x60.0 146.25 1680 1784 1960 2240 1050 1053 1059 1089 -hsync +vsync (65.3 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1280x1024"x60.0 108.00 1280 1328 1440 1688 1024 1025 1028 1066 +hsync +vsync (64.0 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1440x900"x75.0 136.75 1440 1536 1688 1936 900 903 909 942 -hsync +vsync (70.6 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1440x900"x59.9 106.50 1440 1520 1672 1904 900 903 909 934 -hsync +vsync (55.9 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1152x864"x75.0 108.00 1152 1216 1344 1600 864 865 868 900 +hsync +vsync (67.5 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1024x768"x75.1 78.80 1024 1040 1136 1312 768 769 772 800 +hsync +vsync (60.1 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1024x768"x70.1 75.00 1024 1048 1184 1328 768 771 777 806 -hsync -vsync (56.5 kHz e) [ 44708.642] (II) modesetting(0): Modeline "1024x768"x60.0 65.00 1024 1048 1184 1344 768 771 777 806 -hsync -vsync (48.4 kHz e) [ 44708.642] (II) modesetting(0): Modeline "800x600"x72.2 50.00 800 856 976 1040 600 637 643 666 +hsync +vsync (48.1 kHz e) [ 44708.642] (II) modesetting(0): Modeline "800x600"x75.0 49.50 800 816 896 1056 600 601 604 625 +hsync +vsync (46.9 kHz e) [ 44708.642] (II) modesetting(0): Modeline "800x600"x60.3 40.00 800 840 968 1056 600 601 605 628 +hsync +vsync (37.9 kHz e) [ 44708.642] (II) modesetting(0): Modeline "800x600"x56.2 36.00 800 824 896 1024 600 601 603 625 +hsync +vsync (35.2 kHz e) [ 44708.642] (II) modesetting(0): Modeline "640x480"x75.0 31.50 640 656 720 840 480 481 484 500 -hsync -vsync (37.5 kHz e) [ 44708.642] (II) modesetting(0): Modeline "640x480"x72.8 31.50 640 664 704 832 480 489 491 520 -hsync -vsync (37.9 kHz e) [ 44708.642] (II) modesetting(0): Modeline "640x480"x60.0 25.20 640 656 752 800 480 490 492 525 -hsync -vsync (31.5 kHz e) [ 44708.642] (II) modesetting(0): Modeline "720x400"x70.1 28.32 720 738 846 900 400 412 414 449 -hsync +vsync (31.5 kHz e) [ 44708.645] (II) modesetting(0): EDID for output DVI-0 [ 44708.645] (II) modesetting(0): Output VGA-0 connected [ 44708.645] (II) modesetting(0): Output DVI-0 disconnected [ 44708.645] (II) modesetting(0): Using user preference for initial modes [ 44708.645] (II) modesetting(0): Output VGA-0 using initial mode 1280x1024 [ 44708.645] (II) modesetting(0): Using default gamma of (1.0, 1.0, 1.0) unless otherwise stated. [ 44708.645] (==) modesetting(0): DPI set to (96, 96) [ 44708.645] (II) Loading sub module "fb" [ 44708.645] (II) LoadModule: "fb" [ 44708.645] (II) Loading /usr/lib/xorg/modules/libfb.so [ 44708.645] (II) Module fb: vendor="X.Org Foundation" [ 44708.645] compiled for 1.15.1, module version = 1.0.0 [ 44708.645] ABI class: X.Org ANSI C Emulation, version 0.4 [ 44708.645] (II) Loading sub module "shadow" [ 44708.645] (II) LoadModule: "shadow" [ 44708.646] (II) Loading /usr/lib/xorg/modules/libshadow.so [ 44708.646] (II) Module shadow: vendor="X.Org Foundation" [ 44708.646] compiled for 1.15.1, module version = 1.1.0 [ 44708.646] ABI class: X.Org ANSI C Emulation, version 0.4 [ 44708.646] (**) modesetting(G0): Depth 16, (--) framebuffer bpp 16 [ 44708.646] (==) modesetting(G0): RGB weight 565 [ 44708.646] (==) modesetting(G0): Default visual is TrueColor [ 44708.646] (II) modesetting(G0): ShadowFB: preferred NO, enabled NO [ 44708.727] (II) modesetting(G0): Output DVI-1-0 using monitor section DisplayLinkMonitor [ 44708.808] (II) modesetting(G0): EDID for output DVI-1-0 [ 44708.808] (II) modesetting(G0): Manufacturer: WDE Model: 1702 Serial#: 0 [ 44708.808] (II) modesetting(G0): Year: 2005 Week: 14 [ 44708.808] (II) modesetting(G0): EDID Version: 1.3 [ 44708.808] (II) modesetting(G0): Analog Display Input, Input Voltage Level: 0.700/0.700 V [ 44708.808] (II) modesetting(G0): Sync: Separate [ 44708.808] (II) modesetting(G0): Max Image Size [cm]: horiz.: 34 vert.: 27 [ 44708.808] (II) modesetting(G0): Gamma: 2.20 [ 44708.808] (II) modesetting(G0): DPMS capabilities: StandBy Suspend Off; RGB/Color Display [ 44708.808] (II) modesetting(G0): Default color space is primary color space [ 44708.808] (II) modesetting(G0): First detailed timing is preferred mode [ 44708.808] (II) modesetting(G0): GTF timings supported [ 44708.808] (II) modesetting(G0): redX: 0.643 redY: 0.352 greenX: 0.283 greenY: 0.608 [ 44708.808] (II) modesetting(G0): blueX: 0.147 blueY: 0.102 whiteX: 0.313 whiteY: 0.329 [ 44708.808] (II) modesetting(G0): Supported established timings: [ 44708.808] (II) modesetting(G0): 720x400@70Hz [ 44708.808] (II) modesetting(G0): 640x480@60Hz [ 44708.808] (II) modesetting(G0): 640x480@67Hz [ 44708.808] (II) modesetting(G0): 640x480@72Hz [ 44708.808] (II) modesetting(G0): 640x480@75Hz [ 44708.808] (II) modesetting(G0): 800x600@56Hz [ 44708.808] (II) modesetting(G0): 800x600@60Hz [ 44708.808] (II) modesetting(G0): 800x600@72Hz [ 44708.808] (II) modesetting(G0): 800x600@75Hz [ 44708.808] (II) modesetting(G0): 832x624@75Hz [ 44708.808] (II) modesetting(G0): 1024x768@60Hz [ 44708.808] (II) modesetting(G0): 1024x768@70Hz [ 44708.808] (II) modesetting(G0): 1024x768@75Hz [ 44708.809] (II) modesetting(G0): 1280x1024@75Hz [ 44708.809] (II) modesetting(G0): Manufacturer's mask: 0 [ 44708.809] (II) modesetting(G0): Supported standard timings: [ 44708.809] (II) modesetting(G0): #0: hsize: 1280 vsize 1024 refresh: 60 vid: 32897 [ 44708.809] (II) modesetting(G0): #1: hsize: 1152 vsize 864 refresh: 75 vid: 20337 [ 44708.809] (II) modesetting(G0): Supported detailed timing: [ 44708.809] (II) modesetting(G0): clock: 108.0 MHz Image Size: 338 x 270 mm [ 44708.809] (II) modesetting(G0): h_active: 1280 h_sync: 1328 h_sync_end 1440 h_blank_end 1688 h_border: 0 [ 44708.809] (II) modesetting(G0): v_active: 1024 v_sync: 1025 v_sync_end 1028 v_blanking: 1066 v_border: 0 [ 44708.809] (II) modesetting(G0): Ranges: V min: 50 V max: 75 Hz, H min: 30 H max: 82 kHz, PixClock max 145 MHz [ 44708.809] (II) modesetting(G0): Monitor name: WDE LCM-17v2 [ 44708.809] (II) modesetting(G0): Serial No: 0 [ 44708.809] (II) modesetting(G0): EDID (in hex): [ 44708.809] (II) modesetting(G0): 00ffffffffffff005c85021700000000 [ 44708.809] (II) modesetting(G0): 0e0f010368221b78ef8bc5a45a489b25 [ 44708.809] (II) modesetting(G0): 1a5054bfef008180714f010101010101 [ 44708.809] (II) modesetting(G0): 010101010101302a009851002a403070 [ 44708.809] (II) modesetting(G0): 1300520e1100001e000000fd00324b1e [ 44708.809] (II) modesetting(G0): 520e000a202020202020000000fc0057 [ 44708.809] (II) modesetting(G0): 4445204c434d2d313776320a000000ff [ 44708.809] (II) modesetting(G0): 00300a202020202020202020202000e7 [ 44708.809] (II) modesetting(G0): Printing probed modes for output DVI-1-0 [ 44708.809] (II) modesetting(G0): Modeline "1280x1024"x60.0 108.00 1280 1328 1440 1688 1024 1025 1028 1066 +hsync +vsync (64.0 kHz UeP) [ 44708.809] (II) modesetting(G0): Modeline "1280x1024"x75.0 135.00 1280 1296 1440 1688 1024 1025 1028 1066 +hsync +vsync (80.0 kHz e) [ 44708.809] (II) modesetting(G0): Modeline "1280x960"x60.0 108.00 1280 1376 1488 1800 960 961 964 1000 +hsync +vsync (60.0 kHz e) [ 44708.809] (II) modesetting(G0): Modeline "1280x800"x74.9 106.50 1280 1360 1488 1696 800 803 809 838 -hsync +vsync (62.8 kHz e) [ 44708.809] (II) modesetting(G0): Modeline "1280x800"x59.8 83.50 1280 1352 1480 1680 800 803 809 831 +hsync -vsync (49.7 kHz e) [ 44708.809] (II) modesetting(G0): Modeline "1152x864"x75.0 108.00 1152 1216 1344 1600 864 865 868 900 +hsync +vsync (67.5 kHz e) [ 44708.809] (II) modesetting(G0): Modeline "1280x768"x74.9 102.25 1280 1360 1488 1696 768 771 778 805 +hsync -vsync (60.3 kHz e) [ 44708.809] (II) modesetting(G0): Modeline "1280x768"x59.9 79.50 1280 1344 1472 1664 768 771 778 798 -hsync +vsync (47.8 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "1024x768"x75.1 78.80 1024 1040 1136 1312 768 769 772 800 +hsync +vsync (60.1 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "1024x768"x70.1 75.00 1024 1048 1184 1328 768 771 777 806 -hsync -vsync (56.5 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "1024x768"x60.0 65.00 1024 1048 1184 1344 768 771 777 806 -hsync -vsync (48.4 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "1024x576"x60.0 46.97 1024 1064 1168 1312 576 577 580 597 -hsync +vsync (35.8 kHz) [ 44708.810] (II) modesetting(G0): Modeline "832x624"x74.6 57.28 832 864 928 1152 624 625 628 667 -hsync -vsync (49.7 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "800x600"x72.2 50.00 800 856 976 1040 600 637 643 666 +hsync +vsync (48.1 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "800x600"x75.0 49.50 800 816 896 1056 600 601 604 625 +hsync +vsync (46.9 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "800x600"x60.3 40.00 800 840 968 1056 600 601 605 628 +hsync +vsync (37.9 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "800x600"x56.2 36.00 800 824 896 1024 600 601 603 625 +hsync +vsync (35.2 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "848x480"x60.0 33.75 848 864 976 1088 480 486 494 517 +hsync +vsync (31.0 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "640x480"x75.0 31.50 640 656 720 840 480 481 484 500 -hsync -vsync (37.5 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "640x480"x72.8 31.50 640 664 704 832 480 489 491 520 -hsync -vsync (37.9 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "640x480"x66.7 30.24 640 704 768 864 480 483 486 525 -hsync -vsync (35.0 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "640x480"x60.0 25.20 640 656 752 800 480 490 492 525 -hsync -vsync (31.5 kHz e) [ 44708.810] (II) modesetting(G0): Modeline "720x400"x70.1 28.32 720 738 846 900 400 412 414 449 -hsync +vsync (31.5 kHz e) [ 44708.810] (II) modesetting(G0): Using default gamma of (1.0, 1.0, 1.0) unless otherwise stated. [ 44708.810] (==) modesetting(G0): DPI set to (96, 96) [ 44708.810] (II) Loading sub module "fb" [ 44708.810] (II) LoadModule: "fb" [ 44708.810] (II) Loading /usr/lib/xorg/modules/libfb.so [ 44708.810] (II) Module fb: vendor="X.Org Foundation" [ 44708.810] compiled for 1.15.1, module version = 1.0.0 [ 44708.811] ABI class: X.Org ANSI C Emulation, version 0.4 [ 44708.811] (II) UnloadModule: "radeon" [ 44708.811] (II) Unloading radeon [ 44708.811] (II) UnloadModule: "fbdev" [ 44708.811] (II) Unloading fbdev [ 44708.811] (II) UnloadSubModule: "fbdevhw" [ 44708.811] (II) Unloading fbdevhw [ 44708.811] (II) UnloadModule: "vesa" [ 44708.811] (II) Unloading vesa [ 44708.811] (==) modesetting(G0): Backing store enabled [ 44708.811] (==) modesetting(G0): Silken mouse enabled [ 44708.812] (II) modesetting(G0): RandR 1.2 enabled, ignore the following RandR disabled message. [ 44708.812] (==) modesetting(G0): DPMS enabled [ 44708.812] (WW) modesetting(G0): Option "fbdev" is not used [ 44708.812] (==) modesetting(0): Backing store enabled [ 44708.812] (==) modesetting(0): Silken mouse enabled [ 44708.812] (II) modesetting(0): RandR 1.2 enabled, ignore the following RandR disabled message. [ 44708.812] (==) modesetting(0): DPMS enabled [ 44708.812] (WW) modesetting(0): Option "fbdev" is not used [ 44708.856] (--) RandR disabled [ 44708.867] (II) SELinux: Disabled on system [ 44708.868] (II) AIGLX: Screen 0 is not DRI2 capable [ 44708.868] (EE) AIGLX: reverting to software rendering [ 44708.878] (II) AIGLX: Loaded and initialized swrast [ 44708.878] (II) GLX: Initialized DRISWRAST GL provider for screen 0 [ 44708.879] (II) modesetting(G0): Damage tracking initialized [ 44708.879] (II) modesetting(0): Damage tracking initialized [ 44708.879] (II) modesetting(0): Setting screen physical size to 338 x 270 [ 44708.900] (II) XKB: generating xkmfile /tmp/server-B20D7FC79C7F597315E3E501AEF10E0D866E8E92.xkm [ 44708.918] (II) config/udev: Adding input device Power Button (/dev/input/event1) [ 44708.918] (**) Power Button: Applying InputClass "evdev keyboard catchall" [ 44708.918] (II) LoadModule: "evdev" [ 44708.918] (II) Loading /usr/lib/xorg/modules/input/evdev_drv.so [ 44708.918] (II) Module evdev: vendor="X.Org Foundation" [ 44708.918] compiled for 1.15.0, module version = 2.8.2 [ 44708.918] Module class: X.Org XInput Driver [ 44708.918] ABI class: X.Org XInput driver, version 20.0 [ 44708.918] (II) Using input driver 'evdev' for 'Power Button' [ 44708.918] (**) Power Button: always reports core events [ 44708.918] (**) evdev: Power Button: Device: "/dev/input/event1" [ 44708.918] (--) evdev: Power Button: Vendor 0 Product 0x1 [ 44708.918] (--) evdev: Power Button: Found keys [ 44708.918] (II) evdev: Power Button: Configuring as keyboard [ 44708.918] (**) Option "config_info" "udev:/sys/devices/LNXSYSTM:00/LNXPWRBN:00/input/input1/event1" [ 44708.918] (II) XINPUT: Adding extended input device "Power Button" (type: KEYBOARD, id 6) [ 44708.918] (**) Option "xkb_rules" "evdev" [ 44708.918] (**) Option "xkb_model" "pc105" [ 44708.918] (**) Option "xkb_layout" "us" [ 44708.919] (II) config/udev: Adding input device Power Button (/dev/input/event0) [ 44708.919] (**) Power Button: Applying InputClass "evdev keyboard catchall" [ 44708.919] (II) Using input driver 'evdev' for 'Power Button' [ 44708.919] (**) Power Button: always reports core events [ 44708.919] (**) evdev: Power Button: Device: "/dev/input/event0" [ 44708.919] (--) evdev: Power Button: Vendor 0 Product 0x1 [ 44708.919] (--) evdev: Power Button: Found keys [ 44708.919] (II) evdev: Power Button: Configuring as keyboard [ 44708.919] (**) Option "config_info" "udev:/sys/devices/LNXSYSTM:00/device:00/PNP0C0C:00/input/input0/event0" Is there anything I can do to fix this problem.

    Read the article

  • Determining if you&rsquo;re running on the build server with MSBuild &ndash; Easy way

    - by ParadigmShift
    When you're customizing MSBuild in building a visual studio project, it often becomes important to determine if the build is running on the build server or your development environment. This information can change the way you set up path variables and other Conditional tasks.I've found many different answers online. It seems like they all only worked under certain conditions, so none of them were guaranteed to be consistent.So here's the simplest way I've found that has not failed me yet. <PropertyGroup> <!-- Determine if the current build is running on the build server --> <IsBuildServer>false</IsBuildServer> <IsBuildServer Condition="'$(BuildUri)' != ''">true</IsBuildServer> </PropertyGroup>   Shahzad Qureshi is a Software Engineer and Consultant in Salt Lake City, Utah, USAHis certifications include:Microsoft Certified System Engineer 3CX Certified Partner Global Information Assurance Certification – Secure Software Programmer – .NETHe is the owner of Utah VoIP Store at www.UtahVoIPStore.com and SWS Development at www.swsdev.com and publishes windows apps under the name Blue Voice.

    Read the article

  • ls -l freezes terminal locally and remotely

    - by Jakobud
    I've been reading other SF threads regarding ls not returning results or freezing and stalling terminal sessions and it appears they usually the fault of network problems. My problem however, occurs both over remote SSH sessions but also if I am physically at the server itself... I just installed CentOS 5.4 on one of our servers. I'm setting up some rdiff-backup scripts and when I downloaded librsync and untared it, thats when I started seeing some weird behavior with ls -l. wget http://sourceforge.net/projects/librsync/files/librsync/0.9.7/librsync-0.9.7.tar.gz/download /tmp cd /tmp tar -xzf librsync-0.9.7.tar.gz Simple enough. To view the files in this directory I did this: ls results: librsync-0.9.7 librsync-0.9.7.tar.gz Now, if I ls -l, my terminal freezes. I have to re-ssh in to keep going. After reading SF threads, I thought it was network related. So I was extremely surprised to go sit down at the server itself and see the exact same thing happen... So its obviously not a network issues. Even if I ls /tmp/librsync-0.9.7, my terminal freezes just the same... Next I did an strace and got this (warning: wall of text coming....): strace ls -l /tmp execve("/bin/ls", ["ls", "-l", "/tmp"], [/* 21 vars */]) = 0 brk(0) = 0x1c521000 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cc0000 uname({sys="Linux", node="massive.answeron.com", ...}) = 0 access("/etc/ld.so.preload", R_OK) = -1 ENOENT (No such file or directory) open("/etc/ld.so.cache", O_RDONLY) = 3 fstat(3, {st_mode=S_IFREG|0644, st_size=71746, ...}) = 0 mmap(NULL, 71746, PROT_READ, MAP_PRIVATE, 3, 0) = 0x2b8582cc1000 close(3) = 0 open("/lib64/librt.so.1", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0 \"\200\2730\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=53448, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cd3000 mmap(0x30bb800000, 2132936, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30bb800000 mprotect(0x30bb807000, 2097152, PROT_NONE) = 0 mmap(0x30bba07000, 8192, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x7000) = 0x30bba07000 close(3) = 0 open("/lib64/libacl.so.1", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\0\31@\2740\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=28008, ...}) = 0 mmap(0x30bc400000, 2120992, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30bc400000 mprotect(0x30bc406000, 2093056, PROT_NONE) = 0 mmap(0x30bc605000, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x5000) = 0x30bc605000 close(3) = 0 open("/lib64/libselinux.so.1", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0`E\300\2730\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=95464, ...}) = 0 mmap(0x30bbc00000, 2192784, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30bbc00000 mprotect(0x30bbc15000, 2097152, PROT_NONE) = 0 mmap(0x30bbe15000, 8192, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x15000) = 0x30bbe15000 mmap(0x30bbe17000, 1424, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_ANONYMOUS, -1, 0) = 0x30bbe17000 close(3) = 0 open("/lib64/libc.so.6", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\220\332\201\2720\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=1717800, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cd4000 mmap(0x30ba800000, 3498328, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30ba800000 mprotect(0x30ba94d000, 2097152, PROT_NONE) = 0 mmap(0x30bab4d000, 20480, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x14d000) = 0x30bab4d000 mmap(0x30bab52000, 16728, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_ANONYMOUS, -1, 0) = 0x30bab52000 close(3) = 0 open("/lib64/libpthread.so.0", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\220W\0\2730\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=145824, ...}) = 0 mmap(0x30bb000000, 2204528, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30bb000000 mprotect(0x30bb016000, 2093056, PROT_NONE) = 0 mmap(0x30bb215000, 8192, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x15000) = 0x30bb215000 mmap(0x30bb217000, 13168, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_ANONYMOUS, -1, 0) = 0x30bb217000 close(3) = 0 open("/lib64/libattr.so.1", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\320\17\300\2750\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=17888, ...}) = 0 mmap(0x30bdc00000, 2110728, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30bdc00000 mprotect(0x30bdc04000, 2093056, PROT_NONE) = 0 mmap(0x30bde03000, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x3000) = 0x30bde03000 close(3) = 0 open("/lib64/libdl.so.2", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\20\16\300\2720\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=23360, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cd5000 mmap(0x30bac00000, 2109696, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30bac00000 mprotect(0x30bac02000, 2097152, PROT_NONE) = 0 mmap(0x30bae02000, 8192, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x2000) = 0x30bae02000 close(3) = 0 open("/lib64/libsepol.so.1", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\0=\0\2740\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=247496, ...}) = 0 mmap(0x30bc000000, 2383136, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x30bc000000 mprotect(0x30bc03b000, 2097152, PROT_NONE) = 0 mmap(0x30bc23b000, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x3b000) = 0x30bc23b000 mmap(0x30bc23c000, 40224, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_ANONYMOUS, -1, 0) = 0x30bc23c000 close(3) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cd6000 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cd7000 arch_prctl(ARCH_SET_FS, 0x2b8582cd6c50) = 0 mprotect(0x30bba07000, 4096, PROT_READ) = 0 mprotect(0x30bab4d000, 16384, PROT_READ) = 0 mprotect(0x30bb215000, 4096, PROT_READ) = 0 mprotect(0x30ba61b000, 4096, PROT_READ) = 0 mprotect(0x30bae02000, 4096, PROT_READ) = 0 munmap(0x2b8582cc1000, 71746) = 0 set_tid_address(0x2b8582cd6ce0) = 24102 set_robust_list(0x2b8582cd6cf0, 0x18) = 0 futex(0x7fff72d02d6c, FUTEX_WAKE_PRIVATE, 1) = 0 rt_sigaction(SIGRTMIN, {0x30bb005370, [], SA_RESTORER|SA_SIGINFO, 0x30bb00e7c0}, NULL, 8) = 0 rt_sigaction(SIGRT_1, {0x30bb0052b0, [], SA_RESTORER|SA_RESTART|SA_SIGINFO, 0x30bb00e7c0}, NULL, 8) = 0 rt_sigprocmask(SIG_UNBLOCK, [RTMIN RT_1], NULL, 8) = 0 getrlimit(RLIMIT_STACK, {rlim_cur=10240*1024, rlim_max=RLIM_INFINITY}) = 0 access("/etc/selinux/", F_OK) = 0 brk(0) = 0x1c521000 brk(0x1c542000) = 0x1c542000 open("/etc/selinux/config", O_RDONLY) = 3 fstat(3, {st_mode=S_IFREG|0644, st_size=448, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cc1000 read(3, "# This file controls the state o"..., 4096) = 448 read(3, "", 4096) = 0 close(3) = 0 munmap(0x2b8582cc1000, 4096) = 0 open("/proc/mounts", O_RDONLY) = 3 fstat(3, {st_mode=S_IFREG|0444, st_size=0, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b8582cc1000 read(3, "rootfs / rootfs rw 0 0\n/dev/root"..., 4096) = 577 close(3) = 0 munmap(0x2b8582cc1000, 4096) = 0 open("/selinux/mls", O_RDONLY) = 3 read(3, "1", 19) = 1 close(3) = 0 socket(PF_FILE, SOCK_STREAM, 0) = 3 connect(3, {sa_family=AF_FILE, path="/var/run/setrans/.setrans-unix"...}, 110) = 0 sendmsg(3, {msg_name(0)=NULL, msg_iov(5)=[{"\1\0\0\0", 4}, {"\1\0\0\0", 4}, {"\1\0\0\0", 4}, {"\0", 1}, {"\0", 1}], msg_controllen=0, msg_flags=0}, MSG_NOSIGNAL) = 14 readv(3, [{"\1\0\0\0", 4}, {"\1\0\0\0", 4}, {"\0\0\0\0", 4}], 3) = 12 readv(3, [{"\0", 1}], 1) = 1 close(3) = 0 open("/usr/lib/locale/locale-archive", O_RDONLY) = 3 fstat(3, {st_mode=S_IFREG|0644, st_size=56413824, ...}) = 0 mmap(NULL, 56413824, PROT_READ, MAP_PRIVATE, 3, 0) = 0x2b8582cd8000 close(3) = 0 ioctl(1, SNDCTL_TMR_TIMEBASE or TCGETS, {B38400 opost isig icanon echo ...}) = 0 ioctl(1, TIOCGWINSZ, {ws_row=65, ws_col=137, ws_xpixel=0, ws_ypixel=0}) = 0 open("/usr/share/locale/locale.alias", O_RDONLY) = 3 fstat(3, {st_mode=S_IFREG|0644, st_size=2528, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(3, "# Locale name alias data base.\n#"..., 4096) = 2528 read(3, "", 4096) = 0 close(3) = 0 munmap(0x2b85862a5000, 4096) = 0 open("/usr/share/locale/en_US.UTF-8/LC_TIME/coreutils.mo", O_RDONLY) = -1 ENOENT (No such file or directory) open("/usr/share/locale/en_US.utf8/LC_TIME/coreutils.mo", O_RDONLY) = -1 ENOENT (No such file or directory) open("/usr/share/locale/en_US/LC_TIME/coreutils.mo", O_RDONLY) = -1 ENOENT (No such file or directory) open("/usr/share/locale/en.UTF-8/LC_TIME/coreutils.mo", O_RDONLY) = -1 ENOENT (No such file or directory) open("/usr/share/locale/en.utf8/LC_TIME/coreutils.mo", O_RDONLY) = -1 ENOENT (No such file or directory) open("/usr/share/locale/en/LC_TIME/coreutils.mo", O_RDONLY) = -1 ENOENT (No such file or directory) lstat("/tmp", {st_mode=S_IFDIR|S_ISVTX|0777, st_size=4096, ...}) = 0 getxattr("/tmp", "system.posix_acl_access", 0x0, 0) = -1 ENODATA (No data available) getxattr("/tmp", "system.posix_acl_default", 0x0, 0) = -1 ENODATA (No data available) socket(PF_FILE, SOCK_STREAM, 0) = 3 fcntl(3, F_SETFL, O_RDWR|O_NONBLOCK) = 0 connect(3, {sa_family=AF_FILE, path="/var/run/nscd/socket"...}, 110) = -1 ENOENT (No such file or directory) close(3) = 0 socket(PF_FILE, SOCK_STREAM, 0) = 3 fcntl(3, F_SETFL, O_RDWR|O_NONBLOCK) = 0 connect(3, {sa_family=AF_FILE, path="/var/run/nscd/socket"...}, 110) = -1 ENOENT (No such file or directory) close(3) = 0 open("/etc/nsswitch.conf", O_RDONLY) = 3 fstat(3, {st_mode=S_IFREG|0644, st_size=1711, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(3, "#\n# /etc/nsswitch.conf\n#\n# An ex"..., 4096) = 1711 read(3, "", 4096) = 0 close(3) = 0 munmap(0x2b85862a5000, 4096) = 0 open("/etc/ld.so.cache", O_RDONLY) = 3 fstat(3, {st_mode=S_IFREG|0644, st_size=71746, ...}) = 0 mmap(NULL, 71746, PROT_READ, MAP_PRIVATE, 3, 0) = 0x2b85862a5000 close(3) = 0 open("/lib64/libnss_files.so.2", O_RDONLY) = 3 read(3, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\340\37\0\0\0\0\0\0"..., 832) = 832 fstat(3, {st_mode=S_IFREG|0755, st_size=53880, ...}) = 0 mmap(NULL, 2139432, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 3, 0) = 0x2b85862b7000 mprotect(0x2b85862c1000, 2093056, PROT_NONE) = 0 mmap(0x2b85864c0000, 8192, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 3, 0x9000) = 0x2b85864c0000 close(3) = 0 mprotect(0x2b85864c0000, 4096, PROT_READ) = 0 munmap(0x2b85862a5000, 71746) = 0 open("/etc/passwd", O_RDONLY) = 3 fcntl(3, F_GETFD) = 0 fcntl(3, F_SETFD, FD_CLOEXEC) = 0 fstat(3, {st_mode=S_IFREG|0644, st_size=1823, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(3, "root:x:0:0:root:/root:/bin/bash\n"..., 4096) = 1823 close(3) = 0 munmap(0x2b85862a5000, 4096) = 0 socket(PF_FILE, SOCK_STREAM, 0) = 3 fcntl(3, F_SETFL, O_RDWR|O_NONBLOCK) = 0 connect(3, {sa_family=AF_FILE, path="/var/run/nscd/socket"...}, 110) = -1 ENOENT (No such file or directory) close(3) = 0 socket(PF_FILE, SOCK_STREAM, 0) = 3 fcntl(3, F_SETFL, O_RDWR|O_NONBLOCK) = 0 connect(3, {sa_family=AF_FILE, path="/var/run/nscd/socket"...}, 110) = -1 ENOENT (No such file or directory) close(3) = 0 open("/etc/group", O_RDONLY) = 3 fcntl(3, F_GETFD) = 0 fcntl(3, F_SETFD, FD_CLOEXEC) = 0 fstat(3, {st_mode=S_IFREG|0644, st_size=743, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(3, "root:x:0:root\nbin:x:1:root,bin,d"..., 4096) = 743 close(3) = 0 munmap(0x2b85862a5000, 4096) = 0 open("/tmp", O_RDONLY|O_NONBLOCK|O_DIRECTORY) = 3 fcntl(3, F_SETFD, FD_CLOEXEC) = 0 getdents(3, /* 8 entries */, 32768) = 264 lstat("/tmp/librsync-0.9.7.tar.gz", {st_mode=S_IFREG|0644, st_size=453802, ...}) = 0 getxattr("/tmp/librsync-0.9.7.tar.gz", "system.posix_acl_access", 0x0, 0) = -1 ENODATA (No data available) getxattr("/tmp/librsync-0.9.7.tar.gz", "system.posix_acl_default", 0x0, 0) = -1 ENODATA (No data available) lstat("/tmp/librsync-0.9.7", {st_mode=S_IFDIR|0777, st_size=4096, ...}) = 0 getxattr("/tmp/librsync-0.9.7", "system.posix_acl_access", 0x0, 0) = -1 ENODATA (No data available) getxattr("/tmp/librsync-0.9.7", "system.posix_acl_default", 0x0, 0) = -1 ENODATA (No data available) open("/etc/passwd", O_RDONLY) = 4 fcntl(4, F_GETFD) = 0 fcntl(4, F_SETFD, FD_CLOEXEC) = 0 fstat(4, {st_mode=S_IFREG|0644, st_size=1823, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "root:x:0:0:root:/root:/bin/bash\n"..., 4096) = 1823 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 open("/etc/ld.so.cache", O_RDONLY) = 4 fstat(4, {st_mode=S_IFREG|0644, st_size=71746, ...}) = 0 mmap(NULL, 71746, PROT_READ, MAP_PRIVATE, 4, 0) = 0x2b85862a5000 close(4) = 0 open("/lib64/libnss_ldap.so.2", O_RDONLY) = 4 read(4, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\300r\4\0\0\0\0\0"..., 832) = 832 fstat(4, {st_mode=S_IFREG|0755, st_size=3169960, ...}) = 0 mmap(NULL, 5329912, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 4, 0) = 0x2b85864c2000 mprotect(0x2b858679e000, 2093056, PROT_NONE) = 0 mmap(0x2b858699d000, 176128, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 4, 0x2db000) = 0x2b858699d000 mmap(0x2b85869c8000, 62456, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_ANONYMOUS, -1, 0) = 0x2b85869c8000 close(4) = 0 open("/lib64/libcom_err.so.2", O_RDONLY) = 4 read(4, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\320\n\300\2770\0\0\0"..., 832) = 832 fstat(4, {st_mode=S_IFREG|0755, st_size=10000, ...}) = 0 mmap(0x30bfc00000, 2103048, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 4, 0) = 0x30bfc00000 mprotect(0x30bfc02000, 2093056, PROT_NONE) = 0 mmap(0x30bfe01000, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 4, 0x1000) = 0x30bfe01000 close(4) = 0 open("/lib64/libkeyutils.so.1", O_RDONLY) = 4 read(4, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0`\n@\2760\0\0\0"..., 832) = 832 fstat(4, {st_mode=S_IFREG|0755, st_size=9472, ...}) = 0 mmap(0x30be400000, 2102416, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 4, 0) = 0x30be400000 mprotect(0x30be402000, 2093056, PROT_NONE) = 0 mmap(0x30be601000, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 4, 0x1000) = 0x30be601000 close(4) = 0 open("/lib64/libresolv.so.2", O_RDONLY) = 4 read(4, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\2402\0\2760\0\0\0"..., 832) = 832 fstat(4, {st_mode=S_IFREG|0755, st_size=92736, ...}) = 0 mmap(0x30be000000, 2181864, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 4, 0) = 0x30be000000 mprotect(0x30be011000, 2097152, PROT_NONE) = 0 mmap(0x30be211000, 8192, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 4, 0x11000) = 0x30be211000 mmap(0x30be213000, 6888, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_ANONYMOUS, -1, 0) = 0x30be213000 close(4) = 0 mprotect(0x30be211000, 4096, PROT_READ) = 0 munmap(0x2b85862a5000, 71746) = 0 rt_sigaction(SIGPIPE, {0x1, [], SA_RESTORER, 0x30ba8302d0}, {SIG_DFL, [], 0}, 8) = 0 geteuid() = 0 futex(0x2b85869c7708, FUTEX_WAKE_PRIVATE, 2147483647) = 0 open("/etc/ldap.conf", O_RDONLY) = 4 fstat(4, {st_mode=S_IFREG|0644, st_size=9119, ...}) = 0 fstat(4, {st_mode=S_IFREG|0644, st_size=9119, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "# @(#)$Id: ldap.conf,v 1.38 2006"..., 4096) = 4096 read(4, "Use the OpenLDAP password change"..., 4096) = 4096 read(4, " OpenLDAP 2.0 and earlier is \"no"..., 4096) = 927 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 uname({sys="Linux", node="massive.answeron.com", ...}) = 0 open("/etc/resolv.conf", O_RDONLY) = 4 fstat(4, {st_mode=S_IFREG|0644, st_size=107, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "; generated by /sbin/dhclient-sc"..., 4096) = 107 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 socket(PF_FILE, SOCK_STREAM, 0) = 4 fcntl(4, F_SETFL, O_RDWR|O_NONBLOCK) = 0 connect(4, {sa_family=AF_FILE, path="/var/run/nscd/socket"...}, 110) = -1 ENOENT (No such file or directory) close(4) = 0 socket(PF_FILE, SOCK_STREAM, 0) = 4 fcntl(4, F_SETFL, O_RDWR|O_NONBLOCK) = 0 connect(4, {sa_family=AF_FILE, path="/var/run/nscd/socket"...}, 110) = -1 ENOENT (No such file or directory) close(4) = 0 open("/etc/host.conf", O_RDONLY) = 4 fstat(4, {st_mode=S_IFREG|0644, st_size=17, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "order hosts,bind\n", 4096) = 17 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 futex(0x30bab54d44, FUTEX_WAKE_PRIVATE, 2147483647) = 0 open("/etc/hosts", O_RDONLY) = 4 fcntl(4, F_GETFD) = 0 fcntl(4, F_SETFD, FD_CLOEXEC) = 0 fstat(4, {st_mode=S_IFREG|0644, st_size=187, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "# Do not remove the following li"..., 4096) = 187 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 open("/etc/ld.so.cache", O_RDONLY) = 4 fstat(4, {st_mode=S_IFREG|0644, st_size=71746, ...}) = 0 mmap(NULL, 71746, PROT_READ, MAP_PRIVATE, 4, 0) = 0x2b85862a5000 close(4) = 0 open("/lib64/libnss_dns.so.2", O_RDONLY) = 4 read(4, "\177ELF\2\1\1\0\0\0\0\0\0\0\0\0\3\0>\0\1\0\0\0\340\17\0\0\0\0\0\0"..., 832) = 832 fstat(4, {st_mode=S_IFREG|0755, st_size=23736, ...}) = 0 mmap(NULL, 2113792, PROT_READ|PROT_EXEC, MAP_PRIVATE|MAP_DENYWRITE, 4, 0) = 0x2b85869d8000 mprotect(0x2b85869dc000, 2093056, PROT_NONE) = 0 mmap(0x2b8586bdb000, 8192, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_FIXED|MAP_DENYWRITE, 4, 0x3000) = 0x2b8586bdb000 close(4) = 0 mprotect(0x2b8586bdb000, 4096, PROT_READ) = 0 munmap(0x2b85862a5000, 71746) = 0 socket(PF_INET, SOCK_DGRAM, IPPROTO_IP) = 4 connect(4, {sa_family=AF_INET, sin_port=htons(53), sin_addr=inet_addr("192.168.10.20")}, 28) = 0 fcntl(4, F_GETFL) = 0x2 (flags O_RDWR) fcntl(4, F_SETFL, O_RDWR|O_NONBLOCK) = 0 gettimeofday({1276265920, 823870}, NULL) = 0 poll([{fd=4, events=POLLOUT}], 1, 0) = 1 ([{fd=4, revents=POLLOUT}]) sendto(4, "C\v\1\0\0\1\0\0\0\0\0\0\7massive\10answeron\3co"..., 38, MSG_NOSIGNAL, NULL, 0) = 38 poll([{fd=4, events=POLLIN}], 1, 5000) = 1 ([{fd=4, revents=POLLIN}]) ioctl(4, FIONREAD, [122]) = 0 recvfrom(4, "C\v\205\200\0\1\0\1\0\2\0\2\7massive\10answeron\3co"..., 1024, 0, {sa_family=AF_INET, sin_port=htons(53), sin_addr=inet_addr("192.168.10.20")}, [16]) = 122 close(4) = 0 open("/etc/openldap/ldap.conf", O_RDONLY) = 4 fstat(4, {st_mode=S_IFREG|0644, st_size=335, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "#\n# LDAP Defaults\n#\n\n# See ldap."..., 4096) = 335 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 getuid() = 0 geteuid() = 0 getgid() = 0 getegid() = 0 open("/root/ldaprc", O_RDONLY) = -1 ENOENT (No such file or directory) open("/root/.ldaprc", O_RDONLY) = -1 ENOENT (No such file or directory) stat("/etc/ldap.conf", {st_mode=S_IFREG|0644, st_size=9119, ...}) = 0 geteuid() = 0 brk(0x1c566000) = 0x1c566000 open("/etc/hosts", O_RDONLY) = 4 fcntl(4, F_GETFD) = 0 fcntl(4, F_SETFD, FD_CLOEXEC) = 0 fstat(4, {st_mode=S_IFREG|0644, st_size=187, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "# Do not remove the following li"..., 4096) = 187 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 open("/etc/hosts", O_RDONLY) = 4 fcntl(4, F_GETFD) = 0 fcntl(4, F_SETFD, FD_CLOEXEC) = 0 fstat(4, {st_mode=S_IFREG|0644, st_size=187, ...}) = 0 mmap(NULL, 4096, PROT_READ|PROT_WRITE, MAP_PRIVATE|MAP_ANONYMOUS, -1, 0) = 0x2b85862a5000 read(4, "# Do not remove the following li"..., 4096) = 187 read(4, "", 4096) = 0 close(4) = 0 munmap(0x2b85862a5000, 4096) = 0 socket(PF_INET, SOCK_DGRAM, IPPROTO_IP) = 4 connect(4, {sa_family=AF_INET, sin_port=htons(53), sin_addr=inet_addr("192.168.10.20")}, 28) = 0 fcntl(4, F_GETFL) = 0x2 (flags O_RDWR) fcntl(4, F_SETFL, O_RDWR|O_NONBLOCK) = 0 gettimeofday({1276265920, 855948}, NULL) = 0 poll([{fd=4, events=POLLOUT}], 1, 0) = 1 ([{fd=4, revents=POLLOUT}]) sendto(4, "\32 \1\0\0\1\0\0\0\0\0\0\4ldap\10answeron\3com\0\0"..., 35, MSG_NOSIGNAL, NULL, 0) = 35 poll([{fd=4, events=POLLIN}], 1, 5000) = 1 ([{fd=4, revents=POLLIN}]) ioctl(4, FIONREAD, [104]) = 0 recvfrom(4, "\32 \205\200\0\1\0\1\0\1\0\0\4ldap\10answeron\3com\0\0"..., 1024, 0, {sa_family=AF_INET, sin_port=htons(53), sin_addr=inet_addr("192.168.10.20")}, [16]) = 104 close(4) = 0 socket(PF_INET, SOCK_DGRAM, IPPROTO_IP) = 4 connect(4, {sa_family=AF_INET, sin_port=htons(53), sin_addr=inet_addr("192.168.10.20")}, 28) = 0 fcntl(4, F_GETFL) = 0x2 (flags O_RDWR) fcntl(4, F_SETFL, O_RDWR|O_NONBLOCK) = 0 gettimeofday({1276265920, 858536}, NULL) = 0 poll([{fd=4, events=POLLOUT}], 1, 0) = 1 ([{fd=4, revents=POLLOUT}]) sendto(4, "I\375\1\0\0\1\0\0\0\0\0\0\4ldap\10answeron\3com\0\0"..., 35, MSG_NOSIGNAL, NULL, 0) = 35 poll([{fd=4, events=POLLIN}], 1, 5000) = 1 ([{fd=4, revents=POLLIN}]) ioctl(4, FIONREAD, [139]) = 0 recvfrom(4, "I\375\205\200\0\1\0\2\0\2\0\2\4ldap\10answeron\3com\0\0"..., 1024, 0, {sa_family=AF_INET, sin_port=htons(53), sin_addr=inet_addr("192.168.10.20")}, [16]) = 139 close(4) = 0 socket(PF_INET, SOCK_STREAM, IPPROTO_IP) = 4 fcntl(4, F_SETFD, FD_CLOEXEC) = 0 setsockopt(4, SOL_SOCKET, SO_KEEPALIVE, [1], 4) = 0 setsockopt(4, SOL_TCP, TCP_NODELAY, [1], 4) = 0 fcntl(4, F_GETFL) = 0x2 (flags O_RDWR) fcntl(4, F_SETFL, O_RDWR|O_NONBLOCK) = 0 connect(4, {sa_family=AF_INET, sin_port=htons(389), sin_addr=inet_addr("10.20.0.30")}, 16) = -1 EINPROGRESS (Operation now in progress) poll([{fd=4, events=POLLOUT|POLLERR|POLLHUP}], 1, 120000 And thats where it stops, right there after that last 120000.... Using strace, I can obviously CTRL+C to keep going. But like I said, normally the terminal completely freezes. Anyone have any clues?

    Read the article

  • Get More From Your Kindle: Tips, Tricks, Hacks, and Free Books

    - by Jason Fitzpatrick
    If you have an ebook reader chances are it’s a Kindle. Today we’re taking a look at ways you can get more from your Kindle using built-in tools, experimental features, and third party software. Read on to supercharge your Kindle experience. You might have bought your Kindle, used it to buy some titles from the Kindle store, and thought that’s all there was to Kindle ownership. Millions of Kindle owners are perfectly happy with that arrangement but you can squeeze much more life and enjoyment out of your Kindle by digging into the device, employing third party hacks and software bundles, and more. How To Easily Access Your Home Network From Anywhere With DDNSHow To Recover After Your Email Password Is CompromisedHow to Clean Your Filthy Keyboard in the Dishwasher (Without Ruining it)

    Read the article

  • MSCC: Purpose and benefits of Version Control Systems (VCS)

    Unfortunately, there was no monthly meetup during May. Which means that it was even more important and interesting to go forward with a great topic for this month. Earlier this year I already spoke to Nayar Joolfoo about doing a presentation on version control systems (VCS), and he gladly agreed since then. It was just about finding the right date for the action. Furthermore, it was also a great coincidence that Avinash Meetoo announced on social media networks that Knowledge 7 is about to have a new training on "Effective git" - which correlates to a book title Avinash is currently working on - all the best with your approach on this and reach out to our MSCC craftsmen for recessions. Once again a big Thank you to Orange Ebene Accelerator on providing the venue for us, and the MSCC members involved on securing the time slot for our event. Unfortunately, it's kind of tough to get an early confirmation for our meetups these days. I'll keep you posted on that one as there are some interesting and exciting options coming up soon. Okay, let's talk about the meeting and version control systems again. As usual, I'm going to put my first impression of the meetup: "Absolutely great topic, questions and discussions on version control systems, like git or VSO. I was also highly pleased by the number of first timers and female IT geeks. Hopefully, we will be able to keep this trend for future get-togethers." And I really have to emphasise the amount of fresh blood coming to our gathering. Also, during the initial phase it was surprising to see that exactly those first-timers, most of them students at various campuses here on the island, had absolutely no idea about version control systems. More about further down... Reactions of other attendees If I counted correctly, we had a total of 17 attendees this month, and I'd like to give you feedback from some of them: "Inspiring. Helped me understand more about GIT." -- Sean on event comments "Joined the meetup today with literally no idea what is a version control system. I have several reasons why I should be starting to use VCS as from NOW in my projects. Thanks Nayar, Jochen and other participants :)" -- Yudish on event comments "Was present today and I'm very satisfied.I was not aware if there was a such tool like git available. Thanks to those who contributed for this meetup.It was great. Learned a lot from this meetup!!" -- Leonardo on event comments "Seriously, I can see how it’s going to ease my task and help me save time. Gone are the issues with files backups.  And since I’ll be doing my dissertation this year, using Git would help me a lot for my backups and I’m grateful to Nayar for the great explanation." -- Swan-Iyah on MSCC meetup : Version Controls Hopefully, I'll be able to get some other sources - personal blogs preferred - on our meeting. Geeks, thank you so much for those encouraging comments. It's really great to experience that we, all members of the MSCC, are doing the right thing to get more IT information out, and to help each other to improve and evolve in our professional careers. Our agenda of the day Honestly, we had a bumpy start... First, I was battling a little bit with the movable room divider in order to maximize the space. I mean, we had 24 RSVPs and usually there might additional people coming along. Then, for what ever reason, we were facing power outages - actually twice in short periods. Not too good for the projector after all, but hey it went smooth for the rest of the time being. And last but not least... our first speaker Nayar got stuck somewhere on the road. ;-) Anyway, not a real show-stopper and we used the time until Nayar's arrival to introduce ourselves a little bit. It is always important for me to get to know the "newbies" a little bit, and as a result we had lots of students of university - first year, second year and recent graduates - among them. Surprisingly, none of them was ever in contact with version control systems at all. I mean, this is a shocking discovery! Similar to the ability of touch-typing I'd say that being able to use (and master) any kind of version control system is compulsory in any job in the IT industry. Seriously, I'm wondering what is being taught during the classes on the campus. All of them have to work on semester assessments or final projects, even in small teams of 2-4 people. That's the perfect occasion to get started with VCS. Already in this phase, we had great input from more experienced VCS users, like Sean, Avinash and myself. git - a modern approach to VCS - Nayar What a tour! Nayar gave us the full round of git from start to finish, even touching some more advanced techniques. First, he started to explain about the importance of version control systems as an essential tool for software developers, even working alone on a project, and the ability to have a kind of "time machine" that allows you to inspect and revert to a previous version of source code at any time. Then he showed how easy it is to install git on an Ubuntu based system but also mentioned that git is literally available for any operating system, like Windows, Mac OS X and of course other Linux distributions. Next, he showed us how to set the initial configuration values of user name and email address which simplifies the daily usage of the git client while working with your repositories. Then he initialised and added a new repository for some local development of a blogging software. All commands were done using the command line interface (CLI) so that they can be repeated on any system as reference. The syntax and the procedure is always the same, and Nayar clearly mentioned this to the attendees. Now, having a git repository in place it was about time to work on some "important" changes on the blogging software - just for the sake of demonstrating the ease of use and power of git. One interesting question came very early: "How many commands do we have to learn? It looks quite difficult at the moment" - Well, rest assured that during daily development circles you will need less than 10 git commands on a regular base: git add, commit, push, pull, checkout, and merge And Nayar demo'd all of them. Much to the delight of everyone he also showed gitk which is the git repository browser. It's an UI tool to display changes in a repository or a selected set of commits. This includes visualizing the commit graph, showing information related to each commit, and the files in the trees of each revision. Using gitk to display and browse information of a local git repository And last but not least, we took advantage of the internet connectivity and reached out to various online portals offering git hosting for free. Nayar showed us how to push the local repository into a remote system on github. Showing the web-based git browser and history handling, and then also explained and demo'd on how to connect to existing online repositories in order to get access to either your own source code or other people's open source projects. Next to github, we also spoke about bitbucket and gitlab as potential online platforms for your projects. Have a look at the conditions and details about their free service packages and what you can get additionally as a paying customer. Usually, you already get a lot of services for up to five users for free but there might be other important aspects that might have an impact on your decision. Anyways, moving git-based repositories between systems is a piece of cake, and changing online platforms is possible at any stage of your development. Visual Studio Online (VSO) - Jochen Well, Nayar literally covered all elements of working with git during his session, including the use of external online platforms. So, what would be the advantage of talking about Visual Studio Online (VSO)? First of all, VSO is "just another" online platform for hosting and managing git repositories on remote systems, equivalent to github, bitbucket, or any other web site. At the moment (of writing), Microsoft also provides a free package of up to five users / developers on a git repository but there is more in that package. Of course, it is related to software development on the Windows systems and the bonds are tightened towards the use of Visual Studio but out of experience you are absolutely not restricted to that. Connecting a Linux or Mac OS X machine with a git client or an integrated development environment (IDE) like Eclipse or Xcode works as smooth as expected. So, why should one opt in for VSO? Well, one of the main aspects that I would like to mention here is that VSO integrates the Application Life Cycle Methodology (ALM) of Microsoft in their platform. Meaning that you get agile project management with Backlogs, Sprints, Burn-down charts as well as the ability to track tasks, bug reports and work items next to collaborative team chats. It's the whole package of agile development you'll get. And, something I mentioned briefly during the begin of our meeting, VSO gives you the possibility of an automated continuous integrated (CI) process which builds and can run tests of your source code after each commit of changes. Having a proper CI strategy is also part of the Clean Code Developer practices - on Level Green actually -, and not only simplifies your life as a software developer but also reduces the sources of potential errors. Seamless integration and automated deployment between Microsoft Azure Web Sites and git repository But my favourite feature is the seamless continuous deployment to Microsoft Azure. Especially, while working on web projects it's absolutely astounishing that as soon as you commit your chances it just takes a couple of seconds until your modifications are deployed and available on your Azure-hosted web sites. Upcoming Events and networking Due to the adjusted times, everybody was kind of hungry and we didn't follow up on networking or upcoming events - very unfortunate to my opinion and this will have an impact on future planning of our meetups. Because I rather would like to see more conversations during and at the end of our meetings than everyone just packing their laptops, bags and accessories and rush off to grab some food. I was hoping to get some information regarding this year's Code Challenge - supposedly to be organised during July? Maybe someone could leave a comment on that - but I couldn't get any updates. Well, I'll keep digging... In case that you would like to get more into git and how to use it effectively, please check out Knowledge 7's upcoming course on "Effective git". Thanks Avinash for your vital input into today's conversation and I'm looking forward to get a grip on your book title very soon. My resume of the day Do not work in IT without any kind of version control system! Seriously, without a VCS in place you're doing it wrong. It's like driving a car without seat belts attached or riding your bike without safety helmet. You don't do that! End of discussion. ;-) Nowadays, having access to free (as in cost) tools to install on your machine and numerous online platforms to host your source code for free for up to five users it's a no-brainer to get yourself familiar with VCS. Today's sessions gave a good overview on how to start using git and how to connect to various remote services like github or VSO.

    Read the article

  • TSAM 11gR1

    - by todd.little
    The Tuxedo System and Application Monitor (TSAM) 11gR1 release provides powerful new application monitoring capabilities, as well as significant improvements in ease of use. The first thing users will notice is the completely redesigned user interface in the TSAM console. Based on Oracle ADF, the console is much easier to navigate, provides a Web 2.0 style interface with dynamically updating panels, and a look and feel familiar to those that have used Oracle Enterprise Manager. Monitoring data can be viewed in both tabular and graphical form and exported to Excel for further analysis. A number of new metrics are collected and displayed in this release. Call path monitoring now displays CPU time, message size, total transport time, and client address giving even more end-to-end information about a specific Tuxedo request. As well the call path display has been completely revamped to make it much easier to see the branches of the call path. The call pattern display now provides statistics on successful vs failed calls, system and application failures, and end-to-end average elapsed time. Service monitoring now displays minimum and maximum message size, CPU usage, and client address. System server monitoring now includes monitoring the SALT gateway servers to provide detailed performance metrics about those servers. Perhaps the most significant new feature is the consolidation of alert definitions and policy management. In previous versions of TSAM, some alerts were defined and checked on the monitored systems while others were defined and checked in the console. Policy management could be performed on both the monitored node via environment variable or command, as well as from the console. Now all alert definitions and policy definitions are only made using the console. For alerts this means that regardless of where the alert is evaluated it is defined in one and only one place. Thus the plug-in alert mechanism of previous releases can now be managed using the TSAM console, making SLA alert definition much easier and cleaner. Finally there is support in TSAM for monitoring rehosted mainframe applications. The newly announced Oracle Tuxedo Application Runtime for CICS and Batch can be monitored in the TSAM console using traditional mainframe views of the application such as regions. Look for a future blog entry with more details on this as well as some entries providing a glimpse of the console. TSAM gives users a single point for monitoring the performance of all of their Tuxedo applications.

    Read the article

  • How can I troubleshoot flash player/hardware conflict?

    - by sparthikas
    OBJECTIVE: Have a web browser on my Ubuntu install that can play youtube and hulu videos. Also would like to understand problem so that I can fix it again if I change software. Workarounds welcome, technical understanding and solution preferable. SYMPTOMS: Flash does not run - cannot make the right-click menu appear, an empty box is where video should be, changes to black box when hovering over other links. The "The Adobe Flash plugin has crashed" message does not appear with its sad lego face. cannot activate proprietary graphics driver - causes system to reboot to a prompt. SOLUTIONS TRIED: Replaced OS (tried slackware 13.37, fedora 17, linuxmint 13 maya, gentoo, lubuntu, and even winXP. lubuntu confirmed to work, don't remember how much tweaking, if any, this required. Slack, fedora, mint, and gentoo all failed to run flash just like ubuntu) many reinstalls of flash player via different methods, including cleaning up old installs first, also tried gnash and lightspark. replaced graphics card (replaced HIS IceQ Radeon HD 4670 AGP with older GeForce 5700 LE no change in problem) flash does successfully work on winXP installation with Catalyst AGP hotfix driver applied, however I consider windows wholly unacceptable for web browsing due to lack of security. Lubuntu install also works, however I do not want to be tied down to just using Lubuntu on this computer. SYSINFO: Have latest versions of Ubuntu, Firefox, and Flash on fresh Ubuntu install. Using Gigabyte 7s748 motherboard with Athlon XP 2800+ and 3 GB of RAM with Radeon HD 4670 AGP card, also a Dell soundblaster live series sound card (due to malfunction of onboard sound on motherboard) Wired internet connection, Maxtor 6Y120L3 HDD, Sony DVD RW AW-Q170A, Dell M993s monitor. NOTES: I do not know if the graphics driver issue and the flash troubles are linked. Substitution of older graphics card having same flash troubles seems to suggest they aren't. My troubleshooting method is rather reductionist, consisting mainly of "replace things until you find out what was causing the error by process of elimination" only it seems that this must be a conflict which arises when software decides how to configure itself on my hardware. That is, I know the hardware can run Flash, and I know that on other systems the same software can too, but somehow the combination fails. Consequently I feel out of my depth. I will keep trying things off and on, but I have spent probably about 30 man-hours in the last 4 months working on this problem with no joy other than the lubuntu workaround. Any help will be appreciated, I will be checking back and posting updates. Any pertinent questions regarding me or my computer will be answered, outputs from config files can be accessed and posted (IDK which ones or what parts to post).

    Read the article

  • Solaris 11 pkg fix is my new friend

    - by user12611829
    While putting together some examples of the Solaris 11 Automated Installer (AI), I managed to really mess up my system, to the point where AI was completely unusable. This was my fault as a combination of unfortunate incidents left some remnants that were causing problems, so I tried to clean things up. Unsuccessfully. Perhaps that was a bad idea (OK, it was a terrible idea), but this is Solaris 11 and there are a few more tricks in the sysadmin toolbox. Here's what I did. # rm -rf /install/* # rm -rf /var/ai # installadm create-service -n solaris11-x86 --imagepath /install/solaris11-x86 \ -s [email protected] Warning: Service svc:/network/dns/multicast:default is not online. Installation services will not be advertised via multicast DNS. Creating service from: [email protected] DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 130/130 264.4/264.4 0B/s PHASE ITEMS Installing new actions 284/284 Updating package state database Done Updating image state Done Creating fast lookup database Done Reading search index Done Updating search index 1/1 Creating i386 service: solaris11-x86 Image path: /install/solaris11-x86 So far so good. Then comes an oops..... setup-service[168]: cd: /var/ai//service/.conf-templ: [No such file or directory] ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ This is where you generally say a few things to yourself, and then promise to quit deleting configuration files and directories when you don't know what you are doing. Then you recall that the new Solaris 11 packaging system has some ability to correct common mistakes (like the one I just made). Let's give it a try. # pkg fix installadm Verifying: pkg://solaris/install/installadm ERROR dir: var/ai Group: 'root (0)' should be 'sys (3)' dir: var/ai/ai-webserver Missing: directory does not exist dir: var/ai/ai-webserver/compatibility-configuration Missing: directory does not exist dir: var/ai/ai-webserver/conf.d Missing: directory does not exist dir: var/ai/image-server Group: 'root (0)' should be 'sys (3)' dir: var/ai/image-server/cgi-bin Missing: directory does not exist dir: var/ai/image-server/images Group: 'root (0)' should be 'sys (3)' dir: var/ai/image-server/logs Missing: directory does not exist dir: var/ai/profile Missing: directory does not exist dir: var/ai/service Group: 'root (0)' should be 'sys (3)' dir: var/ai/service/.conf-templ Missing: directory does not exist dir: var/ai/service/.conf-templ/AI_data Missing: directory does not exist dir: var/ai/service/.conf-templ/AI_files Missing: directory does not exist file: var/ai/ai-webserver/ai-httpd-templ.conf Missing: regular file does not exist file: var/ai/service/.conf-templ/AI.db Missing: regular file does not exist file: var/ai/image-server/cgi-bin/cgi_get_manifest.py Missing: regular file does not exist Created ZFS snapshot: 2012-12-11-21:09:53 Repairing: pkg://solaris/install/installadm Creating Plan (Evaluating mediators): | DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 3/3 0.0/0.0 0B/s PHASE ITEMS Updating modified actions 16/16 Updating image state Done Creating fast lookup database Done In just a few moments, IPS found the missing files and incorrect ownerships/permissions. Instead of reinstalling the system, or falling back to an earlier Live Upgrade boot environment, I was able to create my AI services and now all is well. # installadm create-service -n solaris11-x86 --imagepath /install/solaris11-x86 \ -s [email protected] Warning: Service svc:/network/dns/multicast:default is not online. Installation services will not be advertised via multicast DNS. Creating service from: [email protected] DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 130/130 264.4/264.4 0B/s PHASE ITEMS Installing new actions 284/284 Updating package state database Done Updating image state Done Creating fast lookup database Done Reading search index Done Updating search index 1/1 Creating i386 service: solaris11-x86 Image path: /install/solaris11-x86 Refreshing install services Warning: mDNS registry of service solaris11-x86 could not be verified. Creating default-i386 alias Setting the default PXE bootfile(s) in the local DHCP configuration to: bios clients (arch 00:00): default-i386/boot/grub/pxegrub Refreshing install services Warning: mDNS registry of service default-i386 could not be verified. # installadm create-service -n solaris11u1-x86 --imagepath /install/solaris11u1-x86 \ -s [email protected] Warning: Service svc:/network/dns/multicast:default is not online. Installation services will not be advertised via multicast DNS. Creating service from: [email protected] DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 514/514 292.3/292.3 0B/s PHASE ITEMS Installing new actions 661/661 Updating package state database Done Updating image state Done Creating fast lookup database Done Reading search index Done Updating search index 1/1 Creating i386 service: solaris11u1-x86 Image path: /install/solaris11u1-x86 Refreshing install services Warning: mDNS registry of service solaris11u1-x86 could not be verified. # installadm list Service Name Alias Of Status Arch Image Path ------------ -------- ------ ---- ---------- default-i386 solaris11-x86 on i386 /install/solaris11-x86 solaris11-x86 - on i386 /install/solaris11-x86 solaris11u1-x86 - on i386 /install/solaris11u1-x86 This is way way better than pkgchk -f in Solaris 10. I'm really beginning to like this new IPS packaging system.

    Read the article

  • Future of Active FoxPro Pages - secured

    Finally some official news about Active FoxPro Pages, aka AFP. The German company BvL Bürosysteme Vertriebs GmbH bought all rights of Active FoxPro Pages from the insolvency stock. Being a former customer and intensive user of AFP since version 2.0 BvL has own interest in the continuation of AFP on current and future web servers. Together with their partners Christof Wollenhaupt (Foxpert Software Development & Consulting) and Jochen Kirstätter (IOS Indian Ocean Software Ltd) BvL will continue with development, support and marketing of AFP in the upcoming weeks. There will be an updated version of AFP, the relaunch of the website, re-enabling of activation server, re-establishment of support channel, and much more... Personally, I am relieved that this superb product made its way out of the dust of the past years. And of course, to be involved (again) in the development and support of Active FoxPro Pages gives me a big smile. Rest assured that there will be more articles on AFP soon! Here is the original announcement of 27th September 2010 from the online forum of German FoxPro Usergroup (dFPUG) - section Active FoxPro Pages: Liebe AFP Anwender, liebe FoxPro Gemeinde, nach den Insolvenzen der ProLib Software GmbH und der ProLib Tools GmbH gab es einige Verunsicherung über die Zukunft der Active FoxPro Pages. Wir können euch nun mitteilen, dass eine für alle Beteiligten positive Lösung gefunden wurde. Wir, die BvL Bürosysteme Vertriebs GmbH aus Berlin, haben sämtliche Rechte an der AFP aus der Insolvenzmasse vom Insolvenzverwalter abgekauft. Bereits 1987 wurde die BvL Bürosysteme Vertriebs GmbH gegründet und hat sich seit dem erfolgreich im Markt bewährt. Wir gehören auch schon seit Foxpro2.0 zur Foxpro-Gemeinde und auch mit der AFP2.0 haben wir unseren Einstieg in die AFP-Gemeinde vollzogen. Wir wollen die AFP nicht in irgendeine Schublade packen, sondern unser Ziel ist es, die AFP weiterzuentwickeln, speziell auch auf die kommenden Serverversionen. Unter der Homepage www.active-foxpro-pages.de wird es demnächst einen neuen Auftritt geben. An den Preisen soll sich nichts groß verändern, das Handbuch soll anständig aufgelegt werden und selbstverständlich soll der Support und die Weiterentwicklung eine große Aufmerksamkeit bekommen. Mit Christof Wollenhaupt und Jochen Kirstätter haben wir zwei Partner an Bord, die sich um den Support und die Weiterentwicklung kümmern werden. Christof Wollenhaupt wird maßgeblich und federführend an der Weiterentwicklung beteiligt sein. Über Christof Wollenhaupt können auch ab sofort Lizenzen gekauft werden, Christof Wollenhaupt ist für den Online-Vertrieb zuständig, der gerade aufgebaut wird. Sollte ein AFP Server aktiviert werden müssen, können sich alle bisherigen Lizenzinhaber auch direkt an Christof Wollenhaupt wenden. In den nächsten Wochen werden wir die AFP wieder auf Touren bringen. Eine aktuelle Version, eine neue Webseite, der Aktivierungsserver, ein Überblick über das leicht geänderte Lizensierungsmodell, und vieles mehr ist gerade in Arbeit. Die Zukunft und die Weiterentwicklung der AFP sind jetzt gesichert! Mit freundlichen Grüßen Ralph-Norman von Loesch Source: http://forum.dfpug.de/bodyframe.afp?msgid=728069

    Read the article

< Previous Page | 403 404 405 406 407 408 409 410 411 412 413 414  | Next Page >