Search Results

Search found 7685 results on 308 pages for 'job scheduler'.

Page 47/308 | < Previous Page | 43 44 45 46 47 48 49 50 51 52 53 54  | Next Page >

  • Is changing my job now a wise decision? [closed]

    - by FlaminPhoenix
    First a little background about myself. I am a javascript programmer with 3.8 years of experience. I joined my current company a year and 3 months ago, and I was recruited as a javascript programmer. I was under the impression I was a programmer in a programming team but this was not the case. No one else except me and my manager knows anything about programming in my team. The other two teammates, copy paste stuff from websites into excel sheets. I was told I was being recruited for a new project, and it was true. The only problem was that the server side language they were using was PHP. They were using a popular library with PHP, and I had never worked with PHP before. Nevertheless, I learnt it well enough to get things working, and received high praise from my boss's boss on whichever project I worked on. Words like "wow" , "This looks great, the clients gonna be impressed with this." were sprinkled every now and then on reviewing my work. They even managed to sell my work to a couple of clients and as I understand, both of my projects are going to fetch them a pretty buck. The problem: I was asked to move into a project which my manager was handling. I asked them for training on the project which never came, and sure enough I couldnt complete my first task on the new project without shortcomings. I told my manager there were things I didnt know how to get done in the new project due to lack of training. His project had 0 documentation. I was told he would "take care" of everything relating to those shortcomings. In the meantime, I was asked to switch to another project. My manager made the necessary changes and later told me that the build had "broken" on the production server and that I needed to "test" my changes before saying things were done. I never deployed it on the production server. He did. I never saw / had the opportunity to see the final build before it went to production. He called me for a separate meeting and started pointing fingers at me, but I took full responsibility even if I didnt have to. He later on got on a call with his boss, in my presence, and gave him the impression that it was all my fault. I did not confront him about this so far. I have worked late / done overtime without them asking a lot, but last week, I just got home from work, and I got calls asking me to solve an issue which till then they had kept quiet about even though they were informed about it. I asked my manager why I hadnt been tasked with this when I was in office. He started telling me which statements to put where, as if to mock me, and that this "is hardly an overtime issue" and this pissed me off. Also, during the previous meeting, he was constantly talking highly about his work, at the same time trying to demean mine. In the meantime, I have attended an interview with another MNC, and the interviewers there were fully respectful of my decision to leave my current company. Its a software company, so I can expect my colleagues to know a lot more than me. Im told I can expect their offer anytime this week. My questions: Is my anger towards my manager justified? While leaving, do I tell him that its because of his actions that Im leaving? Do I erupt in anger and tell him that he shouldnt have put the blame on me since he was the one doing the deployment? This is going to be my second resignation to this company. The first time I wanted to resign, I was asked to stay back and my manager promised a lot of changes, a couple of which were made. How do I keep myself from getting into such situations with my employers in the future?

    Read the article

  • Don't speak to the DBA while he/she is doing the job?!

    - by Uri Dimant
    Our DBA was very busy today, he helped out our developers to write efficient code,explained to the programmer how to launch the old DTS package on SQL Server 2005 and etc. You know how it is, someone comes in and asking the question and you answer the question at the same time you are busy to do something. So  today answering one of such questions he deleted by mistake very ctitical database. Fortunately, we had zero data loss,thanks to our backup/recovery strategy. I think that is acceptable to say that you are busy right now ,please ask the question later on, what do you think? How do you respond if someone asks you a queston while you are doing something on the server/database and etc.?   Share this post: email it! | bookmark it! | digg it! | reddit! | kick it! | live it!

    Read the article

  • What is the purpose of a logic question test in an IT Job Interview? [closed]

    - by KPO
    I went to interview a week ago for an IT position pertaining to tech support at Ameriprise. I applied and they liked my resume and experience. They then asked me to come in for the "first base." I went in and they gave me 20 logic questions out of which I got 9 correct. After that he told me that they will call me to let me know in 1 week. Does getting 9/20 right on a test like that means I will be rejected OR is it a way for them to know how I think? Please let me know. Thanks!

    Read the article

  • Ubuntu's garbage collection cron job for PHP sessions takes 25 minutes to run, why?

    - by Lamah
    Ubuntu has a cron job set up which looks for and deletes old PHP sessions: # Look for and purge old sessions every 30 minutes 09,39 * * * * root [ -x /usr/lib/php5/maxlifetime ] \ && [ -d /var/lib/php5 ] && find /var/lib/php5/ -depth -mindepth 1 \ -maxdepth 1 -type f -cmin +$(/usr/lib/php5/maxlifetime) ! -execdir \ fuser -s {} 2> /dev/null \; -delete My problem is that this process is taking a very long time to run, with lots of disk IO. Here's my CPU usage graph: The cleanup running is represented by the teal spikes. At the beginning of the period, PHP's cleanup jobs were scheduled at the default 09 and 39 minutes times. At 15:00 I removed the 39 minute time from cron, so a cleanup job twice the size runs half as often (you can see the peaks get twice as wide and half as frequent). Here are the corresponding graphs for IO time: And disk operations: At the peak where there were about 14,000 sessions active, the cleanup can be seen to run for a full 25 minutes, apparently using 100% of one core of the CPU and what seems to be 100% of the disk IO for the entire period. Why is it so resource intensive? An ls of the session directory /var/lib/php5 takes just a fraction of a second. So why does it take a full 25 minutes to trim old sessions? Is there anything I can do to speed this up? The filesystem for this device is currently ext4, running on Ubuntu Precise 12.04 64-bit. EDIT: I suspect that the load is due to the unusual process "fuser" (since I expect a simple rm to be a damn sight faster than the performance I'm seeing). I'm going to remove the use of fuser and see what happens.

    Read the article

  • When did you know it was time to leave your job?

    - by Jeremy Michael Cantrell
    Every job has its ups and downs, but sometimes it just isn't worth it to stick around. I'm currently in one of the "down" points with my current job and debating whether or not to start testing the waters for something else. What are your experiences? How did you know it was time to leave? Do you ultimately feel like it was the right decision?

    Read the article

  • Running bundle install fails trying to remote fetch from rubygems.org/quick/Marshal...

    - by dreeves
    I'm getting a strange error when doing bundle install: $ bundle install Fetching source index for http://rubygems.org/ rvm/rubies/ree-1.8.7-2010.02/lib/ruby/site_ruby/1.8/rubygems/remote_fetcher.rb:304 :in `open_uri_or_path': bad response Not Found 404 (http://rubygems.org/quick/Marshal.4.8/resque-scheduler-1.09.7.gemspec.rz) (Gem::RemoteFetcher::FetchError) I've tried bundle update, gem source -c, gem update --system, gem cleanup, etc etc. Nothing seems to solve this. I notice that the URL beginning with http://rubygems.org/quick does seem to be a 404 -- I don't think that's any problem with my network, though if that's reachable for anyone else then that would be a simple explanation for my problem. More hints: If I just gem install resque-scheduler it works fine: $ gem install resque-scheduler Successfully installed resque-scheduler-1.9.7 1 gem installed Installing ri documentation for resque-scheduler-1.9.7... Installing RDoc documentation for resque-scheduler-1.9.7... And here's my Gemfile: source 'http://rubygems.org' gem 'json' gem 'rails', '>=3.0.0' gem 'mongo' gem 'mongo_mapper', :git => 'git://github.com/jnunemaker/mongomapper', :branch => 'rails3' gem 'bson_ext', '1.1' gem 'bson', '1.1' gem 'mm-multi-parameter-attributes', :git=>'git://github.com/rlivsey/mm-multi-parameter-attributes.git' gem 'devise', '~>1.1.3' gem 'devise_invitable', '~> 0.3.4' gem 'devise-mongo_mapper', :git => 'git://github.com/collectiveidea/devise-mongo_mapper' gem 'carrierwave', :git => 'git://github.com/rsofaer/carrierwave.git' , :branch => 'master' gem 'mini_magick' gem 'jquery-rails', '>= 0.2.6' gem 'resque' gem 'resque-scheduler' gem 'SystemTimer' gem 'capistrano' gem 'will_paginate', '3.0.pre2' gem 'twitter', '~> 1.0.0' gem 'oauth', '~> 0.4.4'

    Read the article

  • Java library class to handle scheduled execution of "callbacks"?

    - by Hanno Fietz
    My program has a component - dubbed the Scheduler - that lets other components register points in time at which they want to be called back. This should work much like the Unix cron service, i. e. you tell the Scheduler "notify me at ten minutes past every full hour". I realize there are no real callbacks in Java. Here's my approach, is there a library which already does this stuff? Feel free to suggest improvements, too. Register call to Scheduler passes: a time specification containing hour, minute, second, year month, dom, dow, where each item may be unspecified, meaning "execute it every hour / minute etc." (just like crontabs) an object containing data that will tell the calling object what to do when it is notified by the Scheduler. The Scheduler does not process this data, just stores it and passes it back upon notification. a reference to the calling object Upon startup, or after a new registration request, the Scheduler starts with a Calendar object of the current system time and checks if there are any entries in the database that match this point in time. If there are, they are executed and the process starts over. If there aren't, the time in the Calendar object is incremented by one second and the entreis are rechecked. This repeats until there is one entry or more that match(es). (Discrete Event Simulation) The Scheduler will then remember that timestamp, sleep and wake every second to check if it is already there. If it happens to wake up and the time has already passed, it starts over, likewise if the time has come and the jobs have been executed. Edit: Thanks for pointing me to Quartz. I'm looking for something much smaller, however.

    Read the article

  • Reducer getting fewer records than expected

    - by sathishs
    We have a scenario of generating unique key for every single row in a file. we have a timestamp column but the are multiple rows available for a same timestamp in few scenarios. We decided unique values to be timestamp appended with their respective count as mentioned in the below program. Mapper will just emit the timestamp as key and the entire row as its value, and in reducer the key is generated. Problem is Map outputs about 236 rows, of which only 230 records are fed as an input for reducer which outputs the same 230 records. public class UniqueKeyGenerator extends Configured implements Tool { private static final String SEPERATOR = "\t"; private static final int TIME_INDEX = 10; private static final String COUNT_FORMAT_DIGITS = "%010d"; public static class Map extends Mapper<LongWritable, Text, Text, Text> { @Override protected void map(LongWritable key, Text row, Context context) throws IOException, InterruptedException { String input = row.toString(); String[] vals = input.split(SEPERATOR); if (vals != null && vals.length >= TIME_INDEX) { context.write(new Text(vals[TIME_INDEX - 1]), row); } } } public static class Reduce extends Reducer<Text, Text, NullWritable, Text> { @Override protected void reduce(Text eventTimeKey, Iterable<Text> timeGroupedRows, Context context) throws IOException, InterruptedException { int cnt = 1; final String eventTime = eventTimeKey.toString(); for (Text val : timeGroupedRows) { final String res = SEPERATOR.concat(getDate( Long.valueOf(eventTime)).concat( String.format(COUNT_FORMAT_DIGITS, cnt))); val.append(res.getBytes(), 0, res.length()); cnt++; context.write(NullWritable.get(), val); } } } public static String getDate(long time) { SimpleDateFormat utcSdf = new SimpleDateFormat("yyyyMMddhhmmss"); utcSdf.setTimeZone(TimeZone.getTimeZone("America/Los_Angeles")); return utcSdf.format(new Date(time)); } public int run(String[] args) throws Exception { conf(args); return 0; } public static void main(String[] args) throws Exception { conf(args); } private static void conf(String[] args) throws IOException, InterruptedException, ClassNotFoundException { Configuration conf = new Configuration(); Job job = new Job(conf, "uniquekeygen"); job.setJarByClass(UniqueKeyGenerator.class); job.setOutputKeyClass(Text.class); job.setOutputValueClass(Text.class); job.setMapperClass(Map.class); job.setReducerClass(Reduce.class); job.setInputFormatClass(TextInputFormat.class); job.setOutputFormatClass(TextOutputFormat.class); // job.setNumReduceTasks(400); FileInputFormat.addInputPath(job, new Path(args[0])); FileOutputFormat.setOutputPath(job, new Path(args[1])); job.waitForCompletion(true); } } It is consistent for higher no of lines and the difference is as huge as 208969 records for an input of 20855982 lines. what might be the reason for reduced inputs to reducer?

    Read the article

  • java: addScheduledJobAfterDelay() - can I force a scheduled job to start ?

    - by ufk
    Hiya. I'm making a poker game, and on the betting stage i created a scheduledjob that will run every 8 seconds, on each 8 seconds it forwards to the next player to place a bet. now if the user placed a bet before the 8 seconds are over, i want to manually force the next scheduled job to start. Is there a way to force the scheduled job to start immediately when required ? thanks

    Read the article

  • Any experiences with the big three online job sites?

    - by Tommy
    My company is preparing to post some job postings for a programmer (or two) and am curious as to what experiences any of you have had with the big three job posting providers (Monster, CareerBuilder, HotJobs). Are there others out there that we don't know about that might be better? Any thoughts/insights would be appreciated!

    Read the article

  • Where is the -j (select job) option when using p4 submit?

    - by Marius
    When submitting changelists in Perforce I need to allocate a job. The jobs which I am supposed to associate with my changelist are not allocated to me and does not show up in the list of available jobs when I invoke "p4 submit". I know the job number which I am going to use, but can't find a way to specify it. Basically, I want to do something like: p4 submit -j But there is no -j option...

    Read the article

  • Looking for a real-world example illustrating that composition can be superior to inheritance

    - by Job
    I watched a bunch of lectures on Clojure and functional programming by Rich Hickey as well as some of the SICP lectures, and I am sold on many concepts of functional programming. I incorporated some of them into my C# code at a previous job, and luckily it was easy to write C# code in a more functional style. At my new job we use Python and multiple inheritance is all the rage. My co-workers are very smart but they have to produce code fast given the nature of the company. I am learning both the tools and the codebase, but the architecture itself slows me down as well. I have not written the existing class hierarchy (neither would I be able to remember everything about it), and so, when I started adding a fairly small feature, I realized that I had to read a lot of code in the process. At the surface the code is neatly organized and split into small functions/methods and not copy-paste-repetitive, but the flip side of being not repetitive is that there is some magic functionality hidden somewhere in the hierarchy chain that magically glues things together and does work on my behalf, but it is very hard to find and follow. I had to fire up a profiler and run it through several examples and plot the execution graph as well as step through a debugger a few times, search the code for some substring and just read pages at the time. I am pretty sure that once I am done, my resulting code will be short and neatly organized, and yet not very readable. What I write feels declarative, as if I was writing an XML file that drives some other magic engine, except that there is no clear documentation on what the XML should look like and what the engine does except for the existing examples that I can read as well as the source code for the 'engine'. There has got to be a better way. IMO using composition over inheritance can help quite a bit. That way the computation will be linear rather than jumping all over the hierarchy tree. Whenever the functionality does not quite fit into an inheritance model, it will need to be mangled to fit in, or the entire inheritance hierarchy will need to be refactored/rebalanced, sort of like an unbalanced binary tree needs reshuffling from time to time in order to improve the average seek time. As I mentioned before, my co-workers are very smart; they just have been doing things a certain way and probably have an ability to hold a lot of unrelated crap in their head at once. I want to convince them to give composition and functional as opposed to OOP approach a try. To do that, I need to find some very good material. I do not think that a SCIP lecture or one by Rich Hickey will do - I am afraid it will be flagged down as too academic. Then, simple examples of Dog and Frog and AddressBook classes do not really connivence one way or the other - they show how inheritance can be converted to composition but not why it is truly and objectively better. What I am looking for is some real-world example of code that has been written with a lot of inheritance, then hit a wall and re-written in a different style that uses composition. Perhaps there is a blog or a chapter. I am looking for something that can summarize and illustrate the sort of pain that I am going through. I already have been throwing the phrase "composition over inheritance" around, but it was not received as enthusiastically as I had hoped. I do not want to be perceived as a new guy who likes to complain and bash existing code while looking for a perfect approach while not contributing fast enough. At the same time, my gut is convinced that inheritance is often the instrument of evil and I want to show a better way in a near future. Have you stumbled upon any great resources that can help me?

    Read the article

  • How print multiple independent pages in one print job?

    - by C.W.Holeman II
    How can I combine multiple single page prints into a single print job? For example, using Firefox on Linux one can print a web page such that each sheet of paper has four pages printed upon it. I would like to combine several separate web pages so that for example, web-page-a, web-page-b and web-page-c (each less than one print page long) are printed on a single sheet of paper. I would like to do this without having to use some for of image editor to combine them.

    Read the article

  • Anyone know a good mind mapper that works with a scheduler?

    - by GLycan
    TL;DR: Mind mapping tasks to be processed into a schedule based on task metadata. I have all sorts of ideas about what to invest resources (mainly time) in, but when I actually have time to do something I useually end up browsing reddit for not knowing what do to, and the frequancy with which I forget deadlines scares me. I'd love to bring order and structure into my mind, and always know what to do next. So, I want a mind mapping app, where I'd give each branch (types and subtypes of things I want to do) a importance score (if there were two branches, and one had 60 while the other 40, they would respectivily get 60% and 40% of the parent's importance, with the root being 100) and a how soon that branch should be revised/updated (an hobby I want to try out might be checked, say, once a week, while a school subject should be checked once a day) and give each leaf (something I want/need to do) how much time it takes, deadline (if any), and optionally an absolute importance, reoccurrence (guitar practice might repeat once a week), and prerequisites (reading something requires that book (although that could be brought somewhere), coding requires a box, jogging requires being outside) and maybe some other flags, like if it's enjoyable or not. It should either be packaged or working with a schedular app, to which I'd say, look, my day works this way (completely busy from 8 to 9:15, then 15 minutes of being inside with nothing, ..., two hours with box and possibility to go outside, etc), saying that such-and-such pattern is school and happens ever weekday except such-and-such days. The output should be of the form of a schedule, fit for printing or, when I finally get an android, mobile viewing, that schedules tasks with regards to availability of resources and importance (importance being derived from the leaf-task's parent branches), and the set of flags (all work and no play makes me a dull boy). One of these tasks should be reviewing anything that should be updated on that day, including future day layouts (e.g, if the time slots of future days have changed. This should be done every day.) Does anyone know some collection of preferably open-source (or free, or pirateable) tools, or better yet a single one, that accomplishes this task? I know python pretty well, and should be able to write any necessary glue.

    Read the article

< Previous Page | 43 44 45 46 47 48 49 50 51 52 53 54  | Next Page >