Search Results

Search found 28957 results on 1159 pages for 'single instance'.

Page 557/1159 | < Previous Page | 553 554 555 556 557 558 559 560 561 562 563 564  | Next Page >

  • SAP PI 7.1 Runtime Workbench error: Domain ??? (domain.null)

    - by Techboy
    Within the Runtime Workbench screen of my SAP PI 7.1 system I have the error: Domain ??? (domain.null) Integration Server Integration Engines Non-Central Adapter Engines J2SE Adapter Tools The SLD CIM instance, class XI Domain shows: CreationClassName: SAP_XIDomain Name: domain.null Caption: Domain null With the associations: XI Contained Integration Repository XI Contained Integration Server XI Contained Integration Server If I do this: Move these associations to the correct SAP_XIDomain Delete the SAP_XIDomain 'Domain null' Restart the SLD Restart the SAP PI system it all appears okay (i.e. the 'Domain null') issue does not appear. The 'Domain null' issue re-appears as soon as I go into the SAP Runtime Workbench. Please can you tell me why it says domain.null and how to resolve it?

    Read the article

  • Data transfer between "main" site and secured virtual subsite

    - by Emma Burrows
    I am currently working on a C# ASP.Net 3.5 website I wrote some years ago which consists of a "main" public site, and a sub-site which is our customer management application, using forms-based authentication. The sub-site is set up as a virtual folder in IIS and though it's a subfolder of "main", it functions as a separate web app which handles CRUD access to our customer database and is only accessible by our staff. The main site currently includes a form for new leads to fill in, which generates an email to our sales staff so they can contact them and convince them to become customers. If that process is successful, the staff manually enter the information from the email into the database. Not surprisingly, I now have a new requirement to feed the data from the new lead form directly into the database so staff can just check a box for instance to turn the lead into a customer. My question therefore is how to go about doing this? Possible options I've thought of: Move the new lead form into the customer database subsite (with authentication turned off). Add database handling code to the main site. (No, not seriously considering this duplication of effort! :) Design some mechanism (via REST?) so a webpage outside the customer database subsite can feed data into the customer database How to organise the code for this situation, preferably with extensibility in mind, and particularly are there any options I haven't thought of?

    Read the article

  • Add registry entries for all users

    - by George02
    I've installed a software on my windows 8 computer which writes entries in my registry. How can I modify this registry entries for all users ? For example what I need to modify is values from this key but this key only refers to a single user: [HKEY_USERS\S-1-5-21-543895283-3741240661-2983116896-500\Software\IvoSoft\ClassicStartMenu\Settings] But "S-1-5-21-543895283-3741240661-2983116896-500" is different depending on the user name. How can I change that key for all users ? I've tried to work with this key but is not possible. [HKEY_USERS\S-1-5-21-*\Software\IvoSoft\ClassicStartMenu\Settings]

    Read the article

  • Keyboard Typing Problem

    - by Wietse G
    Hello all, When i got home from work yesterday i couldn't logg in on my account on my desktop pc (Acer Aspire M5620). The reason for this was that when i was typing, more diggets would appear than i pressed. After logging on an account that required no password (my Dad's) i found out that some of my key bindings were messed up. For instance when typing: W --- qwe would appear q --- qw + right mouse e --- we a --- as s --- asd d --- sd z --- zx x --- zxc c --- xc Moreover pressing: 1 --- 12 2 --- 123 3 --- 23 I am typing this from my Dad's laptop (which is working like a charm). I was wondering if anyone has seen this problem before and thus knows a way to fix it. I'm not the brainy type when it comes to computers. Ps: I apologise for any mistakes in my English, for it is not my native tongue. I'm from the Netherlands

    Read the article

  • Replicate GAE Datastore On A Server LAN in Java

    - by Franz Noel
    There may be instances wherein one Company Client may not have internet connection on their vicinity. Either their Internet Service Provider currently experience a down time or there are some other problems involving the network, but not their LAN. GAE seems to be needing a connection at all times in the internet. I only need GAE Datastore. I'm thinking about a different application. Creating a Java Swing Client, for instance, and connecting to the Office Server via HRD of GAE Datastore. When I tried to check on the solutions for Java, it does not say anything about uploading all data and I do not need the App. I just need the GAE Datastore. In Java GAE, only indexes can be able to be manipulated. So, is there any tricks/ideas that you can use HRD with GAE Datastore on Java with an Internal Office Server combined? This way, it may provide service even during network down times. (Can somebody create me a tag of gae-datastore, please.)

    Read the article

  • Tomcat memory usage grows until crash with no GC run

    - by Phil
    I'm administrating a server running Tomcat that is getting a lot of traffic lately. If I monitor memory usage in Task Manager I can see the memory usage growing and eventually tomcat crashes around the 1GB mark. Here's the memory relevent bits I've set in Tomcat Properties (this is a Windows Server): Intial memory pool: 1024 MB Maximum memory pool: 1024 MB -XX:MaxPermSize=256M The weird thing is since these problems arose I've deployed Lambda Probe to the Tomcat instance and the memory usage values I see there are much lower, for example Task Manager might show 467MB used while the "Total" used in Probe is 212 MB. Also, the Maximum Total listed in Probe is 1.29GB, when I would have expected 1GB, the maximum memory set above. If I force the garbage collector to run using Probe, I can keep Tomcat from crashing for a while (indefinitely, AFAIK). So why doesn't the GC run automatically and stop Tomcat from crashing? Thanks.

    Read the article

  • Web-based (intranet / non-hosted) timesheet / project tracking tools

    - by warren
    I realize some similar questions have been asked along these lines before, but from reading-through them today, it appears they don't match my use case. I am looking for a web-based, non-hosted time and project tracking tool. I've downloaded Collabtive so far, but am looking for other suggestions, too. My list of requirements: runs on standard LAMP stack non-hosted (ie, there is an option to download and run it on a local server) not a desktop/single-user application easy-to-use - my audience is a mix of technical and non-technical folks easy to maintain - when time for upgrading comes, I'd really like to not have to rebuild the app (a la ./configure ; make ; make install) needs to support multiple users free-form project additions: we don't have a central project management authority (users should be able to add whatever they're working on, not merely from a drop-down) Does anyone here have experience with such tools? It doesn't have to be free.. but free is always nice :)

    Read the article

  • SQL query duplicating results [on hold]

    - by Ben
    I have written a query that results in data being retrieved for the top 5 customers in my table per account manager. Here is the query: SELECT account_manager_id, mgap_ska_id, total FROM (SELECT account_manager_id, mgap_ska_id, mgap_growth + mgap_recovery AS total, @grp_rank := IF(@current_accmanid = account_manager_id, @grp_rank + 1, 1) AS grp_rank, @current_accmanid := account_manager_id FROM mgap_orders ORDER BY total DESC ) ranked WHERE grp_rank <= 5 and here is the result of the query: account_manager_id mgap_ska_id total 159840 5062352 61569.21 159840 5062352 61569.21 159840 5062352 61569.21 159840 5062352 61569.21 159840 5062352 61569.21 160023 5024546 52244.29 160023 5024546 52244.29 160023 5024546 52244.29 160023 5024546 52244.29 160023 5024546 52244.29 159669 5323292 50126.38 159669 5323292 50126.38 159669 5323292 50126.38 159669 5323292 50126.38 159669 5323292 50126.38 As you can see the query is partially working as needed, except Im getting duplicates for mgap_ska_id whereas it should be five individual mgap_ska_id numbers. and here is a sample of my data: mgap_ska_id account_manager_id mgap_growth mgap_recovery 5057810 64154 0 1160.78 5178114 24456 0 5773.42 5292421 160338 0 5146.04 5414091 24408 0 104.14 5057810 64154 0 1160.78 Can anyone see where Ive gone wrong in my query and how/where I might correct the error so I get the 5 top individual customers (mgap_ska_id) instead of the duplicated top single customer?

    Read the article

  • Reverting problems caused by checkinstall with gcc build

    - by slavik262
    I recently downloaded the GCC 4.6.2 source in order to play around a bit with C++11. Having been told about checkinstall and its usefulness in installing programs from source, I created a Debian package from the install using sudo checkinstall -D make install. Wanting to see how well the newly created package worked, I removed it using Synaptic Package Manager. As it turns out, the package checkinstall created from make install tried to remove every single file the installation process touched, including shared gcc libraries like /lib64/libgcc_s.so. Despite not being able to run a bunch of programs due to this missing dependency, I was able to restore my system back to normal by reinstalling the package from command line using dpkg. At this point I want to remove the package from the package manager since it's so dangerous, but not remove the installed files. I was looking around in /var/lib/dpkg and found that the package manager seems to be based on text files which list packages and such - can I just remove all mention of the package from the files in /var/lib/dpkg, or is there a safer way to go about this?

    Read the article

  • jQuery "Auto Post-back" Select/Drop-Down List

    - by Doug Lampe
    I have one common piece of jQuery code which I use to submit a form any time the selection changes on a drop-down list (HTML select tag).  This is similar to setting AutoPostBack = true in ASP.Net.  I use a single CSS class (autoSubmit) to annotate that I want the drop-down to force the form to submit on change so the HTML looks something like this: <select id="myAutoSubmitDropDown" name="myAutoSubmitDropDown" class="autoSubmit">     <option value="1">Option 1</option>     <option value="2">Option 2</option> </select> Then the following jQuery will look for any element with this CSS class and submit the parent form when the value is changed: function wireUpAutoSubmit() {   $(".autoSubmit").each(function (index) {     $(this).change(function () {       $(this).closest('form').submit();     })   }); } I put this in a separate function since I might need to wire this up explicitly after an ajax call.  Therefore I use the following code to set this method to fire when the DOM is loaded: $(document).ready(function () {   wireUpAutoSubmit(); });

    Read the article

  • Way to update / refresh / reschedule project plan after adding a vacation / changing calendar

    - by CodeCanvas
    I had created a project plan using MS-Project 2010 (not server). I had set the task schedule mode to "Auto Scheduled" and entered the necessary tasks. Since it is a single person project I also added one person to the Resource of the file and assigned that resource to all the tasks and leveled the project. After the plan was put in and tasks were leveled I figured the calendar was not correctly set (in UAE the weekend is Friday and Saturday instead of Saturday and Sunday). So, I updated the default calendar (Standard) of the project by going to Project-Change Working Time-Work Weeks and changed them as needed. But after doing this, the tasks are still scheduled over Friday and Saturday even though I have marked them as nonworking days in the standard calendar. I tried the following for the tasks to refresh, but I was not successful: Updated all tasks to use the "Standard" calendar in the project Selected option so that tasks do not ignore resource calendars Added a constraint "As Soon As Possible" Executed "Level All" Any help on solving this issue would be much appreciated, thanks in advance.

    Read the article

  • What is "2LUN" mode in connection with RAID?

    - by naxa
    I've came across RAID products that also list JBOD (just a bunch of disks) mode and 2LUN mode. What the heck is 2LUN mode? I could not find a description; the closest thing seems to be LUN 'logical unit number' but I don't get the 2LUN thing. UPDATE 1 This is what Wikipedia has to say about JBOD: JBOD (derived from "just a bunch of disks"): an architecture involving multiple hard drives, while making them accessible either as independent hard drives, or as a combined (spanned) single logical volume with no actual RAID functionality. So JBOD can actually mean two different (albeit related) things. Answer of Guest says 2LUN means no spanning. Does this suggest that 2LUN would simply mean the JBOD-variant with no span?

    Read the article

  • Static "LoD" hack opinions

    - by David Lively
    I've been playing with implementing dynamic level of detail for rendering a very large mesh in XNA. It occurred to me that (duh) the whole point of this is to generate small triangles close to the camera, and larger ones far away. Given that, rather than constantly modifying or swapping index buffers based on a feature's rendered size or distance from the camera, it would be a lot easier (and potentially quite a bit faster), to render a single "fan" or flat wedge/frustum-shaped planar mesh that is tessellated into small triangles close to the near or small end of the frustum and larger ones at the far end, sort of like this (overhead view) (Pardon the gap in the middle - I drew one side and mirrored it) The triangle sizes are chosen so that all are approximately the same size when projected. Then, that mesh would be transformed to track the camera so that the Z axis (center vertical in this image) is always aligned with the view direction projected into the XZ plane. The vertex shader would then read terrain heights from a height texture and adjust the Y coordinate of the mesh to match a height field that defines the terrain. This eliminates the need for culling (since the mesh is generated to match the viewport dimensions) and the need to modify the index and/or vertex buffers when drawing the terrain. Obviously this doesn't address terrain with overhangs, etc, but that could be handled to a certain extent by including a second mesh that defines a sort of "ceiling" via a different texture. The other LoD schemes I've seen aren't particularly difficult to implement and, in some cases, are a lot more flexible, but this seemed like a decent quick-and-dirty way to handle height map-based terrain without getting into geometry manipulation. Has anyone tried this? Opinions?

    Read the article

  • Corporate IM with video that actually works, suggestions?

    - by Erik P. Skaalerud
    Hi. Does anyone here have a suggestion for a cross-platform IM solution wich will work with voip/video on both Windows (XP and 7) and Mac OS X from 10.4 and upwards? Right now were in a kind of mixed enviroment, with some Mac users using iChat server since they need video support (conference across several offices over VPN), but it wont't work on windows clients. The rest of us are happily using Openfire+Spark, but there's no VoIP or video avaible from what i've found, unless you want to add in several 3rd party software (like red5 and asterisk). Requirements: As said before; must work on both Windows and Mac Internal server (no Skype etc) File transfer between platforms SSO (Single Sign-On) via Active Directory authentication Some sort of screen sharing would be a plus, like switching over to a screen capture (powerpoint, software training etc) We can afford to buy software if that's needed to get this working without any hiccups across platforms. Pre-thanks to anyone who gives suggestions.

    Read the article

  • How to "translate" interdependent object states in code?

    - by Earl Grey
    I have the following problem. My UI interace contains several buttons, labels, and other visual information. I am able to describe every possible workflow scenario that should be be allowed on that UI. That means I can describe it like this - when button A is pressed, the following should follow - In the case of that A button, there are three independent factors that influence the possible result when pushing the A button. The state of the session (blank, single, multi, multi special), the actual work that is being done by the system at the moment of pressing the A button (nothing was happening, work was being done, work was paused) and a separate UI element that has two states (on , off)..This gives me a 3 dimensional cube with 24 possible outcomes. I could write code for this using if cycles, switch cycles etc....but the problem is, I have another 7 buttons on that ui, I can enter this UI from different states..some buttons change the state, some change parameters... To sum up, the combinations are mindbogling and I am not able come up with a methodology that scales and is systematically reliable. I am able to describe EVERY workflow with words, I am sure my description is complete and without logical errors. But I am not able to translate that into code. I was trying to draw flowcharts but it soon became visually too complicated due to too many if "emafors". Can you advice how to proceeed?

    Read the article

  • Windows 7 randomly installs an "Unknown Device"

    - by Amazed
    Rarely (several days to weeks between occurrences,) and seemingly at random, I get a balloon notification from Windows 7 (x64 SP1 Home Premium) that it is installing hardware for me. However, no new hardware has been installed or plugged in! When I click the balloon it doesn't give me any useful information: Looking in the event log, I find this entry: Event ID: 20001 Source: UserPnp Task Category: 7005 Message: Driver Management concluded the process to install driver FileRepository\usb.inf_amd64_neutral_153b489118ee37b8\usb.inf for Device Instance ID USB\VID_0000&PID_0000\6&3AF9A177&0&0060&&02 with the following status: 0x0. It appears to be USB related. My motherboard has both USB 2.0 and 3.0 controllers. My keyboard and mouse are plugged into the 2.0 slots and the data/recharge cable for a tablet (but not the tablet itself) was plugged in to the 3.0 slot. No other USB devices have been attached for several days/reboots. Why is Windows doing this?

    Read the article

  • Is there a special way to set up Garry's Mod for Mac? [closed]

    - by credford
    I just downloaded Garry's Mod from Steam and every time I try to play Single Player on the first map, it crashes on the Loading Resources section of the progress bar. Here is some of the exception information the system prints out: Exception Type: EXC_BAD_ACCESS (SIGBUS) Exception Codes: KERN_PROTECTION_FAILURE at 0x000000001acec4d0 Crashed Thread: 4 When I ran it on the Windows side (Bootcamp), Windows 7 required me to give Garry's Mod some permissions. I wasn't asked to do this on the Mac side. Maybe that's it? Is there some kind of special setup for the Mac?

    Read the article

  • Managing Social Relationships for the Enterprise – Part 1

    - by Michael Hylton
    By Reggie Bradford, Senior Vice President, Oracle  Today, Mark Hurd, President of Oracle, Thomas Kurian, Executive Vice President of Oracle and I discussed the strategic importance of how social media is impacting the enterprise and how it is changing the way customers, prospects employees and investors interact with brands worldwide.  Oracle understands that the consumer is in control and as such, brands must evolve and change to meet growing needs. In addition, according to social media thought leader and Analyst from Altimeter Group, Jeremiah Owyang, companies now average 178 corporate-owned social media accounts. When Oracle added leading social marketing, listening analytics and development tools from Vitrue, Collective Intellect and Involver to its Oracle’s Cloud Services Suite we went beyond providing a single set of tools. We developed an entire framework to include a comprehensive social relationship management suite to help companies move beyond the social enterprise and achieve the social-enabled enterprise.  The fundamental shift from transaction to engagement means that enterprises need not only a social strategy, but should also ensure that the information and data received from social initiatives flow back to marketing, sales, support and service. Doing so enables companies to deliver a proactive and compelling experience and provides analytics to turn engagement into opportunity – and ultimately that opportunity into revenue.  On September 13, 2012, I am delighted to sit down with Jeremiah to further the discussion about how enterprises are addressing social media strategies and managing content.  In addition, we will be taking your questions after the webinar via Twitter (@Oracle, @ReggieBradford, @cfinn, @jowyang). Use #oracle and #socbiz to submit questions and follow the conversation. I look forward to speaking with you and answering your questions online.  For more information about becoming a social-enabled enterprise, visit www.oracle.com/social. And don’t miss the insights of other social business thought leaders at www.oracle.com/goto/socialbusiness.

    Read the article

  • Using Excel data in Microsoft Publisher

    - by TK
    I have never worked in Microsoft Publisher. To build the presentation we're having to input the same information from a microsoft excel master. For instance- My excel has these columns: Item Title, Item Description, Item Dimensions, Notes, Created Date From there, I'm having the RE-type the information underneath a picture of the item in powerpoint (or publisher) in order to present to the client. So I'm retyping the item name, description, dimensions, etc. I'm also reformatting slides each time I do this. I know there's a way to streamline this process, to build a powerpoint and/or something in publisher that will bring in the data needed based on a merge (or maybe macro), but I haven't been able to figure out how. Any suggestions?

    Read the article

  • Given a database table where multiple rows have the same values and only the most recent record is to be returned

    - by Jim Lahman
    I have a table where there are multiple records with the same value but varying creation dates.  A sample of the database columns is shown here:   1: select lot_num, to_char(creation_dts,'DD-MON-YYYY HH24:MI:SS') as creation_date 2: from coil_setup 3: order by lot_num   LOT_NUM                        CREATION_DATE        ------------------------------ -------------------- 1435718.002                    24-NOV-2010 11:45:54 1440026.002                    17-NOV-2010 06:50:16 1440026.002                    08-NOV-2010 23:28:24 1526564.002                    01-DEC-2010 13:14:04 1526564.002                    08-NOV-2010 22:39:01 1526564.002                    01-NOV-2010 17:04:30 1605920.003                    29-DEC-2010 10:01:24 1945352.003                    14-DEC-2010 01:50:37 1945352.003                    09-DEC-2010 04:44:22 1952718.002                    25-OCT-2010 09:33:19 1953866.002                    20-OCT-2010 18:38:31 1953866.002                    18-OCT-2010 16:15:25   Notice that there are multiple instances of of the same lot number as shown in bold. To only return the most recent instance, issue this SQL statement: 1: select lot_num, to_char(creation_date,'DD-MON-YYYY HH24:MI:SS') as creation_date 2: from 3: ( 4: select rownum r, lot_num, max(creation_dts) as creation_date 5: from coil_setup group by rownum, lot_num 6: order by lot_num 7: ) 8: where r < 100  LOT_NUM                        CREATION_DATE        ------------------------------ -------------------- 2019416.002                    01-JUL-2010 00:01:24 2022336.003                    06-OCT-2010 15:25:01 2067230.002                    01-JUL-2010 00:36:48 2093114.003                    02-JUL-2010 20:10:51 2093982.002                    02-JUL-2010 14:46:11 2093984.002                    02-JUL-2010 14:43:18 2094466.003                    02-JUL-2010 20:04:48 2101074.003                    11-JUL-2010 09:02:16 2103746.002                    02-JUL-2010 15:07:48 2103758.003                    11-JUL-2010 09:02:13 2104636.002                    02-JUL-2010 15:11:25 2106688.003                    02-JUL-2010 13:55:27 2106882.003                    02-JUL-2010 13:48:47 2107258.002                    02-JUL-2010 12:59:48 2109372.003                    02-JUL-2010 20:49:12 2110182.003                    02-JUL-2010 19:59:19 2110184.003                    02-JUL-2010 20:01:03

    Read the article

  • Game-a-Week One

    - by Matt Christian
    Anyone who chats with me on a semi-regular basis knows I am absolutely horrible at completing something from beginnning to end.  Often times I'll begin something, lose interest at some point, and end up moving onto the next thing.  For example, I have 1/2 a full game created, 1/3 of a novel written, and half of a model set created.  Needless to say, unless I have some sort of pressure to finish something I don't stick to it. Recently however one of my online buddies challenged me to create a simple game.  The start date was last Thursday and the final game needed to be delivered by this next Sunday (giving me just over a week).  However, I am going out of town this Friday so will need to deliver it by Thursday, giving me exactly 1 week to develop a game.  Here is what the game needed to include: The player should be able to shoot Shooting things should score points Sounds very simple, but given a single week to produce all art assets plus the game isn't an easy task.  So far I've developed: An animated Main Menu that loads via script files, allows the user to start a new game or exit the game The game is 3D and the player can move around the play area with an 'over-the-shoulder' camera HUD elements are drawn to display the player's current score When the player presses Esc they are shown a pause menu where they can resume the game by pressing Esc again, or quit the game by pressing Space There are also 2 items implemented that don't work perfectly: JigLibX physics library implementation On the main menu there is an arrow symbol that rotates to always point at your mouse I've got 2 days of development left so hopefully I can get collision working, some of the art cleaned up, and some more of the camera functionality working.  Also, I'll need to take some time to package the game up which hopefully shouldn't take too long.

    Read the article

  • Assign PowerShell script to run at startup using PowerShell on Window Server 2012

    - by James Toyer
    I'm trying to write a PowerShell script that will run when a Windows 2012 instance is created on AWS using the configuration tools provided by AWS. My problem is that I want to change the name of the machine once it has started up, restart the machine and carry on set up process after. The main reason for this is that one of the applications, Boundary, installed in the set up process takes the name of the server when first installed. It is then doesn't seem possible to change it's name in their portal. Ideally I would have two PowerShell scripts, one to start the set up process, initialised through AWS and another that runs the first time the machine restarts. This second script would ideally be queued to run on the next start by the initial set up script. So I guess my question are: Is this possible? How would I go about doing this. My Google foo is letting me down here so any answers would be appreciated.

    Read the article

  • Search SSIS packages for table/column references

    - by Nigel Rivett
    A lot of companies now use TFS or some other system and keep all their packages in a single project. This means that a copy of all the packages will end up on your local disk. There is major failing with SSIS that it is sometimes quite difficult to find what a package is actually doing, what it accesses and what it affects. This is a simple dos script which will search through all packages in a folder for a string and write the names of found packages to an output file. Just copy the text to a .bat file (I use aaSearch.bat) in the folder with all the package scripts Change the output filename (twice), change the find string value and run it in a dos window. It works on any text file type so you can also search store procedure scripts – but there are easier ways of doing that. echo. > aaSearch_factSales.txt for /f “delims=” %%a in (‘dir /B /s *.dtsx’) do call :subr “%%a” goto:EOF :subr findstr “factSales” %1 if %ERRORLEVEL% NEQ 1 echo %1 >> aaSearch_factSales.txt goto:EOF

    Read the article

  • AWS Elastic load balancer doesn't decrease instances from Alarm Trigger

    - by jchysk
    I have a load balancer that I created an auto-scaling-group and launch-config for. I created the auto-scaling-group with a min-size of 1 and max size of 20. I have a scaledown policy: as-put-scaling-policy SBMScaleDownPolicy --auto-scaling-group SBMAutoScaleGroup --adjustment=-1 --type ChangeInCapacity --cooldown 300 Then I set up an alarm: mon-put-metric-alarm SBMLowCPUAlarm --comparison-operator LessThanThreshold --evaluation-periods 1 --metric-name CPUUtilization --namespace "AWS/EC2" --period 600 --statistic Average --threshold 35 --alarm-actions arn:aws:autoscaling:us-east-1:policystuffhere:autoScalingGroupName/SBMAutoScaleGroup:policyName/SBMScaleDownPolicy --dimensions "AutoScalingGroupName=SBMAutoScaleGroup" When average CPU usage over 10 minutes is under 35, in CloudFront the alarm shows up as "In Alarm State" but doesn't decrease the number of instances. Also, if there's only one instance running it'll spin up another to 2 even if a scale up alarm isn't hit. It seems like the default value is just set to 2 somehow. How can I change this?

    Read the article

  • Nginx routing script for NodeJS and Wordpress

    - by Nilay Parikh
    We are moving blogs and site from wordpress to nodejs and ready to move into production. However I'm not able to figure it out how to implement routing from front server (Nginx) to NodeJS (prefered web instance) and if data not synced yet into NodeJS website than (404 will throw by NodeJS) fall back to (using reverse proxy) to Wordpress and serve page, during the transformation period. Q1. Is the approach good for the scenario, or anyone can suggest better approach? Q2. Should NodeJS treat itself as Reverse proxy (using bouncy : https://github.com/substack/bouncy or similar package) in event of fall back or shoud stick with Nginx to do so using fastcgi approch. Both NodeJS and Wordpress are on single server only, In first scenario, /if resource available than serve directly User -> Nginx -> NodeJS (8080) \if resource not available then reverse query wordpress and serve content second scenario, /if resource available than serve directly User -> Nginx -> NodeJS (8080) \if resource not available then 404 to Nginx and Nginx script fallback to Wordpress (FastCGI PHP) Later we have plan to phase out Wordpress and PHP from the server environment completely. I'd like to see any examples of Nginx or Varnish scripts and/or NodeJS scripts if you have for me to refer. Thanks.

    Read the article

< Previous Page | 553 554 555 556 557 558 559 560 561 562 563 564  | Next Page >