Search Results

Search found 6232 results on 250 pages for 'excel 2013'.

Page 56/250 | < Previous Page | 52 53 54 55 56 57 58 59 60 61 62 63  | Next Page >

  • Excel: link value once, then prevent change

    - by user1832164
    For some budgeting spreadsheets I'm working on, I'd like to link each month to a value (in this case, a percentage). However, if the original percentage is changed I ONLY want to change values going forward. For example, let's say item one is budgeted at 10%, so each month reflects 10% of the total (which changes every month). If I decide to change that to 12% going forward, I don't want the previously linked values to also change from 10 to 12% (and throw off lots of other numbers). My thought was to have a check box where if I placed an x, the values would be locked to the value at the time of placing the x and no longer change. Is this possible? I know there are options for doing a paste special, but I'm creating this spreadsheet for someone who is not very Excel savvy, so I want it to be as seamless as possible. Many thanks.

    Read the article

  • Excel Countif external date

    - by Duall
    I am making an Excel 2010 spreadsheet to log support calls, services, and installations that each member would fill out. Due to being paid by job rather than by hour, there is a need for it to count each of these ("Call", "Service", "Install") there is in any given time span. The entry of the data itself would be in Sheet 1, and then a 'splash screen' of sorts would be in Sheet 2. Here I would like to be able to put a date range and it would display how many of each there is. I already can do the COUNTIF statement, =COUNTIF(Activity!$B:$B,"Call") but I don't know how to: a) Add in the prerequisite for a date so it only gets "Calls" within a certain time frame. b) Take the date it looks for from a cell on the splash screen.

    Read the article

  • How can i lock images to a cell in excel 2010

    - by Jamie
    Ok, so i am using microsoft excel 2010 and have a set up currently where i have 2 views expanded and deflated using the Group or +/- function. My problem is that ui have images on the workbook too. The images are over the cells which are to be "hidden" when the - button is pressed and i would like the images to disappear with them. This is not curently happening instead they are moving to the next visible cell. I have included an example below incase i wasn't clear. I wish to hide Columns M:AU and the images are in various cells suchas N5 and O5. When i colapse (hide) the column range all of the images move to "AV5" the next row along that isn't hidden. This means the workbooks is looking messy when colapsed which is the oposite of what i was trying to do. Can anyone advise on a way around this?

    Read the article

  • Prevent Excel Chart Data Labels overlapping

    - by Nicholas
    I have an Excel dashboard with line charts containing data labels. Specifically, we are only using the data labels at the rightmost end of the lines, and the labels consist of the Series name and final value. By changing a dropdown, the dashboard is automatically updated to give 19 different dashboards. The problem is that we can't work out any way of preventing the labels overlapping. Everything else on the dashboard can be made to automatically update nicely, except for this. Can anybody think of a way to do this? E.g. plugin or macro.

    Read the article

  • Traspose matrix-style table to 3 columns in Excel

    - by polarbear2k
    I have a matrix-style table in excel where B1:Z1 are column headings and A2:A99 are row headings. I would like to convert this table to a 3 column table (column heading, row heading, cell value). It does not matter in what order the new table is. A B C D A B C A B C 1 H1 H2 H3 1 H1 R1 V1 1 H1 R1 V1 2 R1 V1 V2 V3 => 2 H1 R2 V4 or 2 H2 R1 V2 3 R2 V4 V5 V6 3 H1 R3 V7 3 H3 R1 V3 4 R3 V7 V8 V9 4 H2 R1 V2 4 H1 R2 V4 5 H2 R2 V5 5 H2 R2 V5 6 H2 R3 V8 6 H3 R2 V6 7 H3 R1 V3 7 H1 R3 V7 8 H3 R2 V6 8 H2 R3 V8 9 H3 R3 V9 9 H3 R3 V8 I've been playing around with the OFFSET function to create the whole table but I feel like a combination of TRANSPOSE and V/HLOOKUP is required. Thanks

    Read the article

  • Excel Single column into rows, VBA script insight

    - by Sanityvoid
    Okay, so much similiar to the below link but mine is a bit different. Paginate Rows into Columns in Excel I have a lot of data in column A, I want to take every 14 to 15 rows and make them a new row with multiple columns. I'm trying to get it into a format where SQL can intake the data. I figured the best way was to get them into rows then make a CSV with the data. So it would like like below: (wow, the format totally didn't stick when posting) column A column B C D etc 1 1 2 3 x 2 16 17 a b 3 x y z 15 16 17 a b c I can clarify if needed, but I'm stumped on how to get the data out of the single column with so many rows in the column. Thanks for the help!!!

    Read the article

  • Create shortcut key to insert new row using Excel 2010

    - by Dave Jarvis
    Tried to create a macro in Excel to insert a row: Sub InsertRow() ' ' InsertRow Macro ' ' Keyboard Shortcut: Ctrl+Shift+I ' Selection.EntireRow.Insert End Sub However, this does not insert a new row without first manually selecting a row. Every solution I've found requires that a row be highlighted before inserting a new row. See also: http://www.shortcutworld.com/en/win/Excel_2010.html How would you create a shortcut key (e.g., Ctrl+Shift+J) to highlight the current row and insert a new row? Thank you! Update Looks like Shift+Space highlights the current row.

    Read the article

  • Excel, Lookup special characters and spaces.

    - by Sisyphus
    I have an excel, spreadsheet that has multiple sheets. The first sheet is an index of files, I am using the following forumla to look up a value in column A, references against the index sheet, if it matches then it copies the value from column B from the index sheet. The forumla is: =IF($A3="", "", (LOOKUP($A3, INDEX!$A$3:$A$26, INEDEX!B$3:B$26))) It works for data that has no spaces and special characters, anybody have any ideas why it doesn't work and how I can make it work? Thanks in advance.

    Read the article

  • excel autocomplete combo-box with on-selection event

    - by IttayD
    I have an excel sheet for groceries. One column is the name, another is whether to buy it or not (checkbox) and another is the amount. I'd like to have a widget in the top row so that I start typing an item's name and it shows a list of matching items that I can select from, or if I continue to type and there's only one item, completes its name. When the last item is selected, other widgets show the amount, which I can edit and clicking 'check' will check the item in the list. I know this is kind of very specific, but am hoping someone can at least get me started. Thank you, Ittay

    Read the article

  • Excel - Reuse a trend line to apply to other data

    - by milko
    I've obtained a trend line from a particular set of data. What I'd like to do now is to reuse this trend line to predict values from a given pair (x,y) of coordinates. To put it another way, I have one pair (x,y) that I know is correct for sure. I don't know any other point. Let's assume the behavior of this new set is similar to the one I've got the trend line from. Is there any way Excel could compute other points following this trend line?

    Read the article

  • How to convert excel individual cell values to percentage change values over time

    - by cgalloway
    I have two years of excel data showing daily share prices of a particular stock. I want to change those values to show percentage change (on a daily basis) from the zero date (ie the first day of the two year period). I know that the formula for showing daily percentage change would be (second day/first day -1) and that I can click and drag on that formula to extend over the rest of the two-year time period. The formula I want would be, basically, (each day/first day-1). Is there an easy way to automate the script so I dont have to type it out 730 times?

    Read the article

  • How do I assign a new keyboard shortcut in Excel 2010

    - by PatZ
    I need a keyboard shortcut for Merge & Center. I'd like it to be Ctrl+Shift+M. I am unfamiliar with Macros as was suggested in another answer and when I go to Options, I can't find shortcuts...I tried to follow the Help info, but as was already answered the Excel Customize Ribbon doesn't have the same options that Word 2010 does. So, how do I go about it step by step? I know this is for superuser...and I'm not one...but I hope to be one some day. Please help me on the way. Thanks.

    Read the article

  • Excel: Find a specific cell and paste the value from a control cell into it

    - by G-Edinburgh
    I have two columns one containing the room number, e.g. B-CL102, the other containing a varying integer. I want to enter a different, manually determined, integer in a third column. Whether by macro or native Excel, is there a way to use two control cells at the top of the sheet, type the room number into one and the different integer matching that room into another. I have minimal experience with macros essentially just the basics. I tried to use a V-Lookup formula to look at the two control cells (Range) and then fill in the new column, however I don't know how to then fix that value so that it doesn't change when I change the values in the control cells.

    Read the article

  • Parsing out known strings from Excel spreadsheet

    - by user1631862
    I have an Excel spreadsheet that has a list of names in column A. What I'd like to do is parse out all the names in the column that I don't know and their rows. For example, in a spreadsheet of 100 names, let's say I know 39 of them and their row data. I don't need to see them in the spreadsheet - what I need to see are the remaining 61 that I don't know and their rows. Hope that makes sense, and that something like this is possible! Thanks!

    Read the article

  • Cloud Based Load Testing Using TF Service &amp; VS 2013

    - by Tarun Arora [Microsoft MVP]
    Originally posted on: http://geekswithblogs.net/TarunArora/archive/2013/06/30/cloud-based-load-testing-using-tf-service-amp-vs-2013.aspx One of the new features announced as part of the Visual Studio 2013 Ultimate Preview is ‘Cloud Based Load Testing’. In this blog post I’ll walk you through, What is Cloud Based Load Testing? How have I been using this feature? – Success story! Where can you find more resources on this feature? What is Cloud Based Load Testing? It goes without saying that performance testing your application not only gives you the confidence that the application will work under heavy levels of stress but also gives you the ability to test how scalable the architecture of your application is. It is important to know how much is too much for your application! Working with various clients in the industry I have realized that the biggest barriers in Load Testing & Performance Testing adoption are, High infrastructure and administration cost that comes with this phase of testing Time taken to procure & set up the test infrastructure Finding use for this infrastructure investment after completion of testing Is cloud the answer? 100% Visual Studio Compatible Scalable and Realistic Start testing in < 2 minutes Intuitive Pay only for what you need Use existing on premise tests on cloud There are a lot of vendors out there offering Cloud Based Load Testing, to name a few, Load Storm Soasta Blaze Meter Blitz And others… The question you may want to ask is, why should you go with Microsoft’s Cloud based Load Test offering. If you are a Microsoft shop or already have investments in Microsoft technologies, you’ll see great benefit in the natural integration this offers with existing Microsoft products such as Visual Studio and Windows Azure. For example, your existing Web tests authored in Visual Studio 2010 or Visual Studio 2012 will run on the cloud without requiring any modifications what so ever. Microsoft’s cloud test rig also supports API based testing, for example, if you are building a WPF application which consumes WCF services, you can write unit tests to invoke the WCF service, these tests can be run on the cloud test rig and loaded with ‘N’ concurrent users for performance testing. If you have your assets already hosted in the Azure and possibly in the same data centre as the Cloud test rig, your Azure app will not incur a usage cost because of the generated traffic since the traffic is coming from the same data centre. The licensing or pricing information on Microsoft’s cloud based Load test service is yet to be announced, but I would expect this to be priced attractively to match the market competition.   The only additional configuration required for running load tests on Microsoft Cloud based Load Tests service is to select the Test run location as Run tests using Visual Studio Team Foundation Service, How have I been using Microsoft’s Cloud based Load Test Service? I have been part of the Microsoft Cloud Based Load Test Service advisory council for the last 7 months. This gave the opportunity to see the product shape up from concept to working solution. I was also the first person outside of Microsoft to try this offering out. This gave me the opportunity to test real world application at various clients using the Microsoft Load Test Service and provide real world feedback to the Microsoft product team. One of the most recent systems I tested using the Load Test Service has been an insurance quote generation engine. This insurance quote generation engine is,   hosted in Windows Azure expected to get quote requests from across the globe expected to handle 5 Million quote requests in a day (not clear how this load will be distributed across the day) There was no way, I could simulate such kind of load from on premise without standing up additional hardware. But Microsoft’s Cloud based Load Test service allowed me to test my key performance testing scenarios, i.e. Simulate expected Load, Endurance Testing, Threshold Testing and Testing for Latency. Simulating expected load: approach to devising a load pattern My approach to devising a load test pattern has been to run the test scenario with 1 user to figure out the response time. Then work out how many users are required to reach the target load. So, for example, to invoke 1 quote from the quote engine software takes 0.5 seconds. Now if you do the math,   1 quote request by 1 user = 0.5 seconds   quotes generated by 1 user in 24 hour = 1 * (((2 * 60) * 60) * 24) = 172,800   quotes generated by 30 users in 24 hours = 172,800 * 30 =  5,184,000 This was a very simple example, if your application requires more concurrent users to test scenario’s such as caching, etc then you can devise your own load pattern, some examples of load test patterns can be found here.  Endurance Testing To test for endurance, I loaded the quote generation engine with an expected fixed user load and ran the test for very long duration such as over 48 hours and observed the affect of the long running test on the Azure infrastructure. Currently Microsoft Load Test service does not support metrics from the machine under test. I used Azure diagnostics to begin with, but later started using Cerebrata Azure Diagnostics Manager to capture the metrics of the machine under test. Threshold Testing To figure out how much user load the application could cope with before falling on its belly, I opted to step load the quote generation engine by incrementing user load with different variations of incremental user load per minute till the application crashed out and forced an IIS reset. Testing for Latency Currently the Microsoft Load Test service does not support generating geographically distributed load, I however, deployed the insurance quote generation engine in different Azure data centres and ran the same set of performance tests to measure for latency. Because I could compare load test results from different runs by exporting the results to excel (this feature is provided out of the box right from Visual Studio 2010) I could see the different in response times. More resources on Microsoft Cloud based Load Test Service A few important links to get you started, Download Visual Studio Ultimate 2013 Preview Getting started guide for load testing using Team Foundation Service Troubleshooting guide for FAQs and known issues Team Foundation Service forum for questions and support Detailed demo and presentation (link to Tech-Ed session recording) Detailed demo and presentation (link to Build session recording) There a few limits on the usage of Microsoft Cloud based Load Test service that you can read about here. If you have any feedback on Microsoft Cloud based Load Test service, feel free to share it with the product team via the Visual Studio User Voice forum. I hope you found this useful. Thank you for taking the time out and reading this blog post. If you enjoyed the post, remember to subscribe to http://feeds.feedburner.com/TarunArora. Stay tuned!

    Read the article

  • Excel VBA creating a new column with formula

    - by Amatya
    I have an excel file with a column which has date data. I want the user to input a date of their choosing and then I want to create a new column that lists the difference in days between the two dates. The Macro that I have is working but I have a few questions and I would like to make it better. Link to MWE small data file is here. The user input date was 9/30/2013, which I stored in H20 Macro: Sub Date_play() Dim x As Date Dim x2 As Date Dim y As Variant x = InputBox(Prompt:="Please enter the Folder Report Date. The following formats are acceptable: 4 1 2013 or April 1 2013 or 4/1/2013") x2 = Range("E2") y = DateDiff("D", x2, x) MsgBox y 'Used DateDiff above and it works but I don't know how to use it to fill a column or indeed a cell. Range("H20").FormulaR1C1 = x Range("H1").FormulaR1C1 = "Diff" Range("H2").Formula = "=DATEDIF(E2,$H$20,""D"")" Range("H2").AutoFill Destination:=Range("H2:H17") Range("H2:H17").Select End Sub Now, could I have done this without storing the user input date in a particular cell? I would've preferred to use the variable "x" in the formula but it wasn't working for me. I had to store the user input in H20 and then use $H$20. What's the difference between the function Datedif and the procedure DateDiff? I am able to use the procedure DateDiff in my macro but I don't know how to use it to fill out my column. Is one method better than the other? Is there a better way to add columns to the existing sheet, where the columns include some calculations involving existing data on the sheet and some user inputs? There are tons of more complicated calculations I want to do next. Thanks

    Read the article

  • Register the &quot;OneCode &amp; OneScript&quot; session at MVP Global Summit November 2013

    - by Jialiang
    Originally posted on: http://geekswithblogs.net/Jialiang/archive/2013/11/04/register-the-quotonecode-amp-onescriptquot-session-at-mvp-global-summit.aspxThe yearly Microsoft MVP Global Summit will lift its curtain on Nov 17th in Bellevue, WA.  This year, we have prepared three new apps and many new samples in response to MVPs’ feedbacks last year.  If you are attending this year’s Microsoft MVP Global Summit, you will have the privilege to kiss or bite their development team   Sample Browser Windows Phone app – with 6000+ MSDN code samples which will be at your fingertips anytime and anywhere. Script Explorer for PowerShell ISE – with 8000+ script sample which will be at your fingertips when you are writing scripts in PowerShell ISE. PowerShell checkin policy for TFS – automatically checks your PowerShell script code against best practices of PowerShell. Interested?  Please open your Schedule Builder for the MVP Summit 2013, and register for the event called “OneCode & OneScript” on Nov 17th.  We look forward to seeing you and learning your feedback.

    Read the article

  • Timeline chart in Excel

    - by Axarydax
    Hi, I'd like to see a timeline of events from a database in a "timeline chart", that should look like this: http://i46.tinypic.com/sw3dj5.png - I've made me a small c# program that paints this onto a Bitmap, but that isn't the way to go. I have input data that has 3 fields: StartX EndX Y 2596 15008 1 5438 6783 2 5450 5453 4 5456 5459 4 5462 5466 4 5470 5474 4 5477 5657 5 5662 5665 4 5668 5671 4 As the picture shows, for each line I'd like to have a line from StartX to EndX with a Y value of Y. Stacked bar chart almost solves my problem, but I don't want to have a new line on the chart for every row, I have thousands of rows and I'd like to have X axis as the time axis, and view which events (Y is the type of the event) happened simultaneously. The image ( http://i46.tinypic.com/sw3dj5.png) I've generated with a simple C# program shows that the event SYSTEM was active all the time, and the events TECH and BREAK were almost exclusive, but had some overlaps. I'd like to at least know the correct direction which I should take; I'm lost in the multitude of Excel chart types. Thanks.

    Read the article

  • How to export SSIS to Microsoft Excel without additional software?

    - by Dr. Zim
    This question is long winded because I have been updating the question over a very long time trying to get SSIS to properly export Excel data. I managed to solve this issue, although not correctly. Aside from someone providing a correct answer, the solution listed in this question is not terrible. The only answer I found was to create a single row named range wide enough for my columns. In the named range put sample data and hide it. SSIS appends the data and reads metadata from the single row (that is close enough for it to drop stuff in it). The data takes the format of the hidden single row. This allows headers, etc. WOW what a pain in the butt. It will take over 450 days of exports to recover the time lost. However, I still love SSIS and will continue to use it because it is still way better than Filemaker LOL. My next attempt will be doing the same thing in the report server. Original question notes: If you are in Sql Server Integrations Services designer and want to export data to an Excel file starting on something other than the first line, lets say the forth line, how do you specify this? I tried going in to the Excel Destination of the Data Flow, changed the AccessMode to OpenRowSet from Variable, then set the variable to "YPlatters$A4:I20000" This fails saying it cannot find the sheet. The sheet is called YPlatters. I thought you could specify (Sheet$)(Starting Cell):(Ending Cell)? Update Apparently in Excel you can select a set of cells and name them with the name box. This allows you to select the name instead of the sheet without the $ dollar sign. Oddly enough, whatever the range you specify, it appends the data to the next row after the range. Oddly, as you add data, it increases the named selection's row count. Another odd thing is the data takes the format of the last line of the range specified. My header rows are bold. If I specify a range that ends with the header row, the data appends to the row below, and makes all the entries bold. if you specify one row lower, it puts a blank line between the header row and the data, but the data is not bold. Another update No matter what I try, SSIS samples the "first row" of the file and sets the metadata according to what it finds. However, if you have sample data that has a value of zero but is formatted as the first row, it treats that column as text and inserts numeric values with a single quote in front ('123.34). I also tried headers that do not reflect the data types of the columns. I tried changing the metadata of the Excel destination, but it always changes it back when I run the project, then fails saying it will truncate data. If I tell it to ignore errors, it imports everything except that column. Several days of several hours a piece later... Another update I tried every combination. A mostly working example is to create the named range starting with the column headers. Format your column headers as you want the data to look as the data takes on this format. In my example, these exist from A4 to E4, which is my defined range. SSIS appends to the row after the defined range, so defining A4 to E68 appends the rows starting at A69. You define the Connection as having the first row contains the field names. It takes on the metadata of the header row, oddly, not the second row, and it guesses at the data type, not the formatted data type of the column, i.e., headers are text, so all my metadata is text. If your headers are bold, so is all of your data. I even tried making a sample data row without success... I don't think anyone actually uses Excel with the default MS SSIS export. If you could define the "insert range" (A5 to E5) with no header row and format those columns (currency, not bold, etc.) without it skipping a row in Excel, this would be very helpful. From what I gather, noone uses SSIS to export Excel without a third party connection manager. Any ideas on how to set this up properly so that data is formatted correctly, i.e., the metadata read from Excel is proper to the real data, and formatting inherits from the first row of data, not the headers in Excel? One last update (July 17, 2009) I got this to work very well. One thing I added to Excel was the IMEX=1 in the Excel connection string: "Excel 8.0;HDR=Yes;IMEX=1". This forces Excel (I think) to look at all rows to see what kind of data is in it. Generally, this does not drop information, say for instance if you have a zip code then about 9 rows down you have a zip+4, Excel without this blanks that field entirely without error. With IMEX=1, it recognizes that Zip is actually a character field instead of numeric. And of course, one more update (August 27, 2009) The IMEX=1 will succeed importing data with missing contents in the first 8 rows, but it will fail exporting data where no data exists. So, have it on your import connection string, but not your export Excel connection string. I have to say, after so much fiddling, it works pretty well.

    Read the article

  • Useful Excel keyboard shortcuts

    - by Ben Lings
    What keyboard shortcuts do you use in Excel? Things I've discovered recently and found very useful are: Shift + Space - select the current row Ctrl + Space - select the current column Ctrl + Shift + Space - select the block of contiguous cell Ctrl + + - Insert (as in the context menu). If the current row is selected, will insert a new row. Ctrl + - - Delete (as in the context menu). If the current row is selected, will delete entire row. What (apart from the normal cut, copy, paste, etc) do you use? Ctrl + 1 to open the Format dialog. Shift + F2 to add/edit a cell comment. Shift + F2, followed by Esc to select the current cell comment, which can then be moved around with the arrow keys (????) or deleted by pressing Del. Ctrl + ???? to move to the last non-blank cell in a series. This is usually the edge of a table, but not if you have blank cells in the path. Pressing End followed by an arrow key does the same thing. Alt + F11 to open the VBA editor. Alt + = to start a SUM() formula and go straight to selecting cells to be summed. Ctrl + G or F5 to jump to a cell by typing its coordinates (e.g. C3) Ctrl + Home to jump to the top left, usually A1 unless you you are in a frozen split view, in which case it will jump to the top left of the "data" area. Ctrl + ; and Ctrl + Shift + ; to insert the current date and time, respectively. I know Ben Lings already posted this one, but I find it indispensable.

    Read the article

  • Split Excel worksheet into multiple worksheets based on a column with VBA (Redux)

    - by Ceeder
    I'm rather new to VBA and I've been working with the code generously displayed and explained by Nixda: Split Excel Worksheet... My only challenge is I've been trying desperately to find a way to include the top 3 rows as a title bu it seems to only allow for one. Here's the code have: Dim Titlesheet As Worksheet iCol = 23 '### Define your criteria column strOutputFolder = (Sheets("Operations").Range("D4")) '### <--Define your path of output folder Set ws = ThisWorkbook.ActiveSheet Set rngLast = Columns(iCol).Find("*", Cells(3, iCol), , , xlByColumns, xlPrevious) Set Titlesheet = Sheets("Input") ws.Columns(iCol).AdvancedFilter Action:=xlFilterInPlace, Unique:=True Set rngUnique = Range(Cells(4, iCol), rngLast).SpecialCells(xlCellTypeVisible) If Dir(strOutputFolder, vbDirectory) = vbNullString Then MkDir strOutputFolder For Each strItem In rngUnique If strItem < "" Then Sheets("Input").Select Range("A1:V3").Select Selection.Copy ws.UsedRange.AutoFilter Field:=iCol, Criteria1:=strItem.Value Workbooks.Add Sheets("Sheet1").Select ActiveSheet.PasteSpecial ws.UsedRange.SpecialCells(xlCellTypeVisible).Copy Destination:=[A4] strFilename = strOutputFolder & "\" & strItem ActiveWorkbook.SaveAs Filename:=strFilename, FileFormat:=xlWorkbookNormal ActiveWorkbook.Close savechanges:=False End If Next ws.ShowAllData Is there something I can change to include these lines? Thanks so much, this code provided by Nixda has taught me a great deal!

    Read the article

  • Pasting formatted Excel range into Outlook message

    - by Steph
    Hi everyone, I am using Office 2007 and I would like to use VBA to paste a range of formatted Excel cells into an Outlook message and then mail the message. In the following code (that I lifted from various sources), it runs without error and then sends an empty message... the paste does not work. Can anyone see the problem and better yet, help with a solution? Thanks, -Steph Sub SendMessage(SubjectText As String, Importance As OlImportance) Dim objOutlook As Outlook.Application Dim objOutlookMsg As Outlook.MailItem Dim objOutlookRecip As Outlook.Recipient Dim objOutlookAttach As Outlook.Attachment Dim iAddr As Integer, Col As Integer, SendLink As Boolean 'Dim Doc As Word.Document, wdRn As Word.Range Dim Doc As Object, wdRn As Object ' Create the Outlook session. Set objOutlook = CreateObject("Outlook.Application") ' Create the message. Set objOutlookMsg = objOutlook.CreateItem(olMailItem) Set Doc = objOutlookMsg.GetInspector.WordEditor 'Set Doc = objOutlookMsg.ActiveInspector.WordEditor Set wdRn = Doc.Range wdRn.Paste Set objOutlookRecip = objOutlookMsg.Recipients.Add("[email protected]") objOutlookRecip.Type = 1 objOutlookMsg.Subject = SubjectText objOutlookMsg.Importance = Importance With objOutlookMsg For Each objOutlookRecip In .Recipients objOutlookRecip.Resolve ' Set the Subject, Body, and Importance of the message. '.Subject = "Coverage Requests" 'objDrafts.GetFromClipboard Next .Send End With Set objOutlookMsg = Nothing Set objOutlook = Nothing End Sub

    Read the article

  • Neophyte question about using Subtotal and CountIf in Excel

    - by Andrew
    Hi, I'm using Excel and having some problems with Countif and I don't understand how it works differently from SubTotal. I used the GUI to subtotal stuff and all the subtotals are right. Then I attempted to use the Countif to see how many requirements passed. That worked for the first subtotal only. It's easy to see why. When I look at the box for the subtotal, it says: =SUBTOTAL(3,C286:C292) When I look at my formula for passed requirements, I have: =IF(ISTEXT(A285),COUNTIF(C286:C338,"=Passed"),"") Notice that the last column is wrong. How did the Subtotal manage to keep this correct? I typed in the formula for passed requirements and dragged it down the page. Everything behaved as expected (even the bit about ISTEXT dutifully figured out which row was which), but it got the last row wrong. Any ideas? SRS Maintenance Count 7 44 SRS Maintenance Passed SRS Maintenance Passed SRS Maintenance Passed SRS Maintenance Passed SRS Maintenance Passed SRS Maintenance Passed SRS Maintenance Passed SRS Reports Count 12 43 SRS Reports Passed SRS Reports Passed SRS Reports Passed SRS Reports Passed SRS Reports Failed SRS Reports Passed SRS Reports Passed SRS Reports Failed SRS Reports Passed SRS Reports Passed SRS Reports Failed

    Read the article

  • Transpose matrix-style table to 3 columns in Excel

    - by polarbear2k
    I have a matrix-style table in excel where B1:Z1 are column headings and A2:A99 are row headings. I would like to convert this table to a 3 column table (column heading, row heading, cell value). It does not matter in what order the new table is. A B C D A B C A B C 1 H1 H2 H3 1 H1 R1 V1 1 H1 R1 V1 2 R1 V1 V2 V3 => 2 H1 R2 V4 or 2 H2 R1 V2 3 R2 V4 V5 V6 3 H1 R3 V7 3 H3 R1 V3 4 R3 V7 V8 V9 4 H2 R1 V2 4 H1 R2 V4 5 H2 R2 V5 5 H2 R2 V5 6 H2 R3 V8 6 H3 R2 V6 7 H3 R1 V3 7 H1 R3 V7 8 H3 R2 V6 8 H2 R3 V8 9 H3 R3 V9 9 H3 R3 V8 I've been playing around with the OFFSET function to create the whole table but I feel like a combination of TRANSPOSE and V/HLOOKUP is required. Thanks EDIT I have managed to come up with the correct formulas. If the data is in Sheet1 like in my example above, the formulas go in Sheet2: [A1] =IF(ROW() <= COUNTA(Sheet1!$B$1:$Z$1)*COUNTA(Sheet1!$A$2:$A$99), OFFSET(Sheet1!$A$1,0,IF(MOD(ROW(),COUNTA(Sheet1!$B$1:$Z$1))=0,COUNTA(Sheet1!$B$1:$Z$1),MOD(ROW(),COUNTA(Sheet1!$B$1:$Z$1)))),"") [B1] =IF(ROW() <= COUNTA(Sheet1!$B$1:$Z$1)*COUNTA(Sheet1!$A$2:$A$99),OFFSET(Sheet1!$A$1,IF(MOD(ROW(),COUNTA(Sheet1!$A$2:$A$99))=0,COUNTA(Sheet1!$A$2:$A$99),MOD(ROW(),COUNTA(Sheet1!$A$2:$A$99))),0),"") [C1] =IF(ROW() <= COUNTA(Sheet1!$B$1:$Z$1)*COUNTA(Sheet1!$A$2:$A$99),OFFSET(Sheet1!$A$1,IF(MOD(ROW(),COUNTA(Sheet1!$A$2:$A$99))=0,COUNTA(Sheet1!$A$2:$A$99),MOD(ROW(),COUNTA(Sheet1!$A$2:$A$99))),IF(MOD(ROW(),COUNTA(Sheet1!$B$1:$Z$1))=0,COUNTA(Sheet1!$B$1:$Z$1),MOD(ROW(),COUNTA(Sheet1!$B$1:$Z$1)))),"") The formulas are limited to B1:Z1 for the headings and A2:A99 for the rows (these can be increased to their maximums if required). The COUNTA() formula returns the number of cells that actually have values, which limits the number of rows returned to headings*rows. Otherwise the formulas would could go on for infinity because of the MOD function.

    Read the article

  • How to read an Excel file, get and set the information using POI

    - by user1399713
    I'm using Java to read a form that is in an Excel spreadsheet that the user fills in with information about geometric shape. Ex: Shape :_________ Color :_________ Area: _________ Perimeter:________ So far the code I have can I can read what I want in the form and print out the values of Shape, Color, Area, Perimeter. public class RangeSetter { /** * @param args * @throws IOException */ public static void main(String[] args) throws IOException { FileInputStream file = new FileInputStream(new File("test2.xls")); //C:\Users\Yo\Documents // Setup code String cname = "Shape"; HSSFWorkbook wb = new HSSFWorkbook(file); // retrieve workbook // Retrieve the named range // Will be something like "$C$10,$D$12:$D$14"; int namedCellIdx = wb.getNameIndex(cname); Name aNamedCell = wb.getNameAt(namedCellIdx); // Retrieve the cell at the named range and test its contents // Will get back one AreaReference for C10, and // another for D12 to D14 AreaReference[] arefs = AreaReference.generateContiguous(aNamedCell.getRefersToFormula()); for (int i=0; i<arefs.length; i++) { // Only get the corners of the Area // (use arefs[i].getAllReferencedCells() to get all cells) CellReference[] crefs = arefs[i].getAllReferencedCells(); for (int j=0; j<crefs.length; j++) { // Check it turns into real stuff Sheet s = wb.getSheet(crefs[j].getSheetName()); Row r = s.getRow(crefs[j].getRow()); Cell c = r.getCell(crefs[j].getCol()); if (c!= null ){ switch(c.getCellType()){ case Cell.CELL_TYPE_STRING: System.out.println(c.getStringCellValue()); } } } } What I want to do is to create a method that gets the that information and another that sets it. So far I can only print to the console

    Read the article

< Previous Page | 52 53 54 55 56 57 58 59 60 61 62 63  | Next Page >