Search Results

Search found 1378 results on 56 pages for 'martin ks'.

Page 7/56 | < Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >

  • Configuring UCM cache to check for external Content Server changes

    - by Martin Deh
    Recently, I was involved in a customer scenario where they were modifying the Content Server's contributor data files directly through Content Server.  This operation of course is completely supported.  However, since the contributor data file was modified through the "backdoor", a running WebCenter Spaces page, which also used the same data file, would not get the updates immediately.  This was due to two reasons.  The first reason is that the Spaces page was using Content Presenter to display the contents of the data file. The second reason is that the Spaces application was using the "cached" version of the data file.  Fortunately, there is a way to configure cache so backdoor changes can be picked up more quickly and automatically. First a brief overview of Content Presenter.  The Content Presenter task flow enables WebCenter Spaces users with Page-Edit permissions to precisely customize the selection and presentation of content in a WebCenter Spaces application.  With Content Presenter, you can select a single item of content, contents under a folder, a list of items, or query for content, and then select a Content Presenter based template to render the content on a page in a Spaces application.  In addition to displaying the folders and the files in a Content Server, Content Presenter integrates with Oracle Site Studio to allow you to create, access, edit, and display Site Studio contributor data files (Content Server Document) in either a Site Studio region template or in a custom Content Presenter display template.  More information about creating Content Presenter Display Template can be found in the OFM Developers Guide for WebCenter Portal. The easiest way to configure the cache is to modify the WebCenter Spaces Content Server service connection setting through Enterprise Manager.  From here, under the Cache Details, there is a section to set the Cache Invalidation Interval.  Basically, this enables the cache to be monitored by the cache "sweeper" utility.  The cache sweeper queries for changes in the Content Server, and then "marks" the object in cache as "dirty".  This causes the application in turn to get a new copy of the document from the Content Server that replaces the cached version.  By default the initial value for the Cache Invalidation Interval is set to 0 (minutes).  This basically means that the sweeper is OFF.  To turn the sweeper ON, just set a value (in minutes).  The mininal value that can be set is 2 (minutes): Just a note.  In some instances, once the value of the Cache Invalidation Interval has been set (and saved) in the Enterprise Manager UI, it becomes "sticky" and the interval value cannot be set back to 0.  The good news is that this value can also be updated throught a WLST command.   The WLST command to run is as follows: setJCRContentServerConnection(appName, name, [socketType, url, serverHost, serverPort, keystoreLocation, keystorePassword, privateKeyAlias, privateKeyPassword, webContextRoot, clientSecurityPolicy, cacheInvalidationInterval, binaryCacheMaxEntrySize, adminUsername, adminPassword, extAppId, timeout, isPrimary, server, applicationVersion]) One way to get the required information for executing the command is to use the listJCRContentServerConnections('webcenter',verbose=true) command.  For example, this is the sample output from the execution: ------------------ UCM ------------------ Connection Name: UCM Connection Type: JCR External Appliction ID: Timeout: (not set) CIS Socket Type: socket CIS Server Hostname: webcenter.oracle.local CIS Server Port: 4444 CIS Keystore Location: CIS Private Key Alias: CIS Web URL: Web Server Context Root: /cs Client Security Policy: Admin User Name: sysadmin Cache Invalidation Interval: 2 Binary Cache Maximum Entry Size: 1024 The Documents primary connection is "UCM" From this information, the completed  setJCRContentServerConnection would be: setJCRContentServerConnection(appName='webcenter',name='UCM', socketType='socket', serverHost='webcenter.oracle.local', serverPort='4444', webContextRoot='/cs', cacheInvalidationInterval='0', binaryCacheMaxEntrySize='1024',adminUsername='sysadmin',isPrimary=1) Note: The Spaces managed server must be restarted for the change to take effect. More information about using WLST for WebCenter can be found here. Once the sweeper is turned ON, only cache objects that have been changed will be invalidated.  To test this out, I will go through a simple scenario.  The first thing to do is configure the Content Server so it can monitor and report on events.  Log into the Content Server console application, and under the Administration menu item, select System Audit Information.  Note: If your console is using the left menu display option, the Administration link will be located there. Under the Tracing Sections Information, add in only "system" and "requestaudit" in the Active Sections.  Check Full Verbose Tracing, check Save, then click the Update button.  Once this is done, select the View Server Output menu option.  This will change the browser view to display the log.  This is all that is needed to configure the Content Server. For example, the following is the View Server Output with the cache invalidation interval set to 2(minutes) Note the time stamp: requestaudit/6 08.30 09:52:26.001  IdcServer-68    GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.016933999955654144(secs) requestaudit/6 08.30 09:52:26.010  IdcServer-69    GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.006134999915957451(secs) requestaudit/6 08.30 09:52:26.014  IdcServer-70    GET_DOCUMENT_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.004271999932825565(secs) ... other trace info ... requestaudit/6 08.30 09:54:26.002  IdcServer-71    GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.020323999226093292(secs) requestaudit/6 08.30 09:54:26.011  IdcServer-72    GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.017928000539541245(secs) requestaudit/6 08.30 09:54:26.017  IdcServer-73    GET_DOCUMENT_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.010185999795794487(secs) Now that the tracing logs are reporting correctly, the next step is set up the Spaces app to test the sweeper. I will use 2 different pages that will use Content Presenter task flows.  Each task flow will use a different custom Content Presenter display template, and will be assign 2 different contributor data files (document that will be in the cache).  The pages at run time appear as follows: Initially, when the Space pages containing the content is loaded in the browser for the first time, you can see the tracing information in the Content Server output viewer. requestaudit/6 08.30 11:51:12.030 IdcServer-129 CLEAR_SERVER_OUTPUT [dUser=weblogic] 0.029171999543905258(secs) requestaudit/6 08.30 11:51:12.101 IdcServer-130 GET_SERVER_OUTPUT [dUser=weblogic] 0.025721000507473946(secs) requestaudit/6 08.30 11:51:26.592 IdcServer-131 VCR_GET_DOCUMENT_BY_NAME [dID=919][dDocName=DF_UCMCACHETESTER][dDocTitle=DF_UCMCacheTester][dUser=weblogic][RevisionSelectionMethod=LatestReleased][IsJava=1] 0.21525299549102783(secs) requestaudit/6 08.30 11:51:27.117 IdcServer-132 VCR_GET_CONTENT_TYPES [dUser=sysadmin][IsJava=1] 0.5059549808502197(secs) requestaudit/6 08.30 11:51:27.146 IdcServer-133 VCR_GET_CONTENT_TYPE [dUser=sysadmin][IsJava=1] 0.03360399976372719(secs) requestaudit/6 08.30 11:51:27.169 IdcServer-134 VCR_GET_CONTENT_TYPE [dUser=sysadmin][IsJava=1] 0.008806000463664532(secs) requestaudit/6 08.30 11:51:27.204 IdcServer-135 VCR_GET_CONTENT_TYPE [dUser=sysadmin][IsJava=1] 0.013265999965369701(secs) requestaudit/6 08.30 11:51:27.384 IdcServer-136 VCR_GET_CONTENT_TYPE [dUser=sysadmin][IsJava=1] 0.18119299411773682(secs) requestaudit/6 08.30 11:51:27.533 IdcServer-137 VCR_GET_CONTENT_TYPE [dUser=sysadmin][IsJava=1] 0.1519480049610138(secs) requestaudit/6 08.30 11:51:27.634 IdcServer-138 VCR_GET_CONTENT_TYPE [dUser=sysadmin][IsJava=1] 0.10827399790287018(secs) requestaudit/6 08.30 11:51:27.687 IdcServer-139 VCR_GET_CONTENT_TYPE [dUser=sysadmin][IsJava=1] 0.059702999889850616(secs) requestaudit/6 08.30 11:51:28.271 IdcServer-140 GET_USER_PERMISSIONS [dUser=weblogic][IsJava=1] 0.006703000050038099(secs) requestaudit/6 08.30 11:51:28.285 IdcServer-141 GET_ENVIRONMENT [dUser=sysadmin][IsJava=1] 0.010893999598920345(secs) requestaudit/6 08.30 11:51:30.433 IdcServer-142 GET_SERVER_OUTPUT [dUser=weblogic] 0.017318999394774437(secs) requestaudit/6 08.30 11:51:41.837 IdcServer-143 VCR_GET_DOCUMENT_BY_NAME [dID=508][dDocName=113_ES][dDocTitle=Landing Home][dUser=weblogic][RevisionSelectionMethod=LatestReleased][IsJava=1] 0.15937699377536774(secs) requestaudit/6 08.30 11:51:42.781 IdcServer-144 GET_FILE [dID=326][dDocName=WEBCENTERORACL000315][dDocTitle=Duke][dUser=anonymous][RevisionSelectionMethod=LatestReleased][dSecurityGroup=Public][xCollectionID=0] 0.16288499534130096(secs) The highlighted sections show where the 2 data files DF_UCMCACHETESTER (P1 page) and 113_ES (P2 page) were called by the (Spaces) VCR connection to the Content Server. The most important line to notice is the VCR_GET_DOCUMENT_BY_NAME invocation.  On subsequent refreshes of these 2 pages, you will notice (after you refresh the Content Server's View Server Output) that there are no further traces of the same VCR_GET_DOCUMENT_BY_NAME invocations.  This is because the pages are getting the documents from the cache. The next step is to go through the "backdoor" and change one of the documents through the Content Server console.  This operation can be done by first locating the data file document, and from the Content Information page, select Edit Data File menu option.   This invokes the Site Studio Contributor, where the modifications can be made. Refreshing the Content Server View Server Output, the tracing displays the operations perform on the document.  requestaudit/6 08.30 11:56:59.972 IdcServer-255 SS_CHECKOUT_BY_NAME [dID=922][dDocName=DF_UCMCACHETESTER][dUser=weblogic][dSecurityGroup=Public] 0.05558200180530548(secs) requestaudit/6 08.30 11:57:00.065 IdcServer-256 SS_GET_CONTRIBUTOR_CONFIG [dID=922][dDocName=DF_UCMCACHETESTER][dDocTitle=DF_UCMCacheTester][dUser=weblogic][dSecurityGroup=Public][xCollectionID=0] 0.08632399886846542(secs) requestaudit/6 08.30 11:57:00.470 IdcServer-259 DOC_INFO_BY_NAME [dID=922][dDocName=DF_UCMCACHETESTER][dDocTitle=DF_UCMCacheTester][dUser=weblogic][dSecurityGroup=Public][xCollectionID=0] 0.02268899977207184(secs) requestaudit/6 08.30 11:57:10.177 IdcServer-264 GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.007652000058442354(secs) requestaudit/6 08.30 11:57:10.181 IdcServer-263 GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.01868399977684021(secs) requestaudit/6 08.30 11:57:10.187 IdcServer-265 GET_DOCUMENT_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.009367000311613083(secs) (internal)/6 08.30 11:57:26.118 IdcServer-266 File to be removed: /oracle/app/admin/domains/webcenter/ucm/cs/vault/~temp/703253295.xml (internal)/6 08.30 11:57:26.121 IdcServer-266 File to be removed: /oracle/app/admin/domains/webcenter/ucm/cs/vault/~temp/703253295.xml requestaudit/6 08.30 11:57:26.122 IdcServer-266 SS_SET_ELEMENT_DATA [dID=923][dDocName=DF_UCMCACHETESTER][dDocTitle=DF_UCMCacheTester][dUser=weblogic][dSecurityGroup=Public][xCollectionID=0][StatusCode=0][StatusMessage=Successfully checked in content item 'DF_UCMCACHETESTER'.] 0.3765290081501007(secs) requestaudit/6 08.30 11:57:30.710 IdcServer-267 DOC_INFO_BY_NAME [dID=923][dDocName=DF_UCMCACHETESTER][dDocTitle=DF_UCMCacheTester][dUser=weblogic][dSecurityGroup=Public][xCollectionID=0] 0.07942699640989304(secs) requestaudit/6 08.30 11:57:30.733 IdcServer-268 SS_GET_CONTRIBUTOR_STRINGS [dUser=weblogic] 0.0044570001773536205(secs) After a few moments and refreshing the P1 page, the updates has been applied. Note: The refresh time may very, since the Cache Invalidation Interval (set to 2 minutes) is not determined by when changes happened.  The sweeper just runs every 2 minutes. Refreshing the Content Server View Server Output, the tracing displays the important information. requestaudit/6 08.30 11:59:10.171 IdcServer-270 GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.00952600035816431(secs) requestaudit/6 08.30 11:59:10.179 IdcServer-271 GET_FOLDER_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.011118999682366848(secs) requestaudit/6 08.30 11:59:10.182 IdcServer-272 GET_DOCUMENT_HISTORY_REPORT [dUser=sysadmin][IsJava=1] 0.007447000127285719(secs) requestaudit/6 08.30 11:59:16.885 IdcServer-273 VCR_GET_DOCUMENT_BY_NAME [dID=923][dDocName=DF_UCMCACHETESTER][dDocTitle=DF_UCMCacheTester][dUser=weblogic][RevisionSelectionMethod=LatestReleased][IsJava=1] 0.0786449983716011(secs) After the specifed interval time the sweeper is invoked, which is noted by the GET_ ... calls.  Since the history has noted the change, the next call is to the VCR_GET_DOCUMENT_BY_NAME to retrieve the new version of the (modifed) data file.  Navigating back to the P2 page, and viewing the server output, there are no further VCR_GET_DOCUMENT_BY_NAME to retrieve the data file.  This simply means that this data file was just retrieved from the cache.   Upon further review of the server output, we can see that there was only 1 request for the VCR_GET_DOCUMENT_BY_NAME: requestaudit/6 08.30 12:08:00.021 Audit Request Monitor Request Audit Report over the last 120 Seconds for server webcenteroraclelocal16200****  requestaudit/6 08.30 12:08:00.021 Audit Request Monitor -Num Requests 8 Errors 0 Reqs/sec. 0.06666944175958633 Avg. Latency (secs) 0.02762500010430813 Max Thread Count 2  requestaudit/6 08.30 12:08:00.021 Audit Request Monitor 1 Service VCR_GET_DOCUMENT_BY_NAME Total Elapsed Time (secs) 0.09200000017881393 Num requests 1 Num errors 0 Avg. Latency (secs) 0.09200000017881393  requestaudit/6 08.30 12:08:00.021 Audit Request Monitor 2 Service GET_PERSONALIZED_JAVASCRIPT Total Elapsed Time (secs) 0.054999999701976776 Num requests 1 Num errors 0 Avg. Latency (secs) 0.054999999701976776  requestaudit/6 08.30 12:08:00.021 Audit Request Monitor 3 Service GET_FOLDER_HISTORY_REPORT Total Elapsed Time (secs) 0.028999999165534973 Num requests 2 Num errors 0 Avg. Latency (secs) 0.014499999582767487  requestaudit/6 08.30 12:08:00.021 Audit Request Monitor 4 Service GET_SERVER_OUTPUT Total Elapsed Time (secs) 0.017999999225139618 Num requests 1 Num errors 0 Avg. Latency (secs) 0.017999999225139618  requestaudit/6 08.30 12:08:00.021 Audit Request Monitor 5 Service GET_FILE Total Elapsed Time (secs) 0.013000000268220901 Num requests 1 Num errors 0 Avg. Latency (secs) 0.013000000268220901  requestaudit/6 08.30 12:08:00.021 Audit Request Monitor ****End Audit Report*****  

    Read the article

  • Upgrading Team Foundation Server 2008 to 2010

    - by Martin Hinshelwood
    I am sure you will have seen my posts on upgrading our internal Team Foundation Server from TFS2008 to TFS2010 Beta 2, RC and RTM, but what about a fresh upgrade of TFS2008 to TFS2010 using the RTM version of TFS. One of our clients is taking the plunge with TFS2010, so I have the job of doing the upgrade. It is sometimes very useful to have a team member that starts work when most of the Sydney workers are heading home as I can do the upgrade without impacting them. The down side is that if you have any blockers then you can be pretty sure that everyone that can deal with your problem is asleep I am starting with an existing blank installation of TFS 2010, but Adam Cogan let slip that he was the one that did the install so I thought it prudent to make sure that it was OK. Verifying Team Foundation Server 2010 We need to check that TFS 2010 has been installed correctly. First, check the Admin console and have a root about for any errors. Figure: Even the SQL Setup looks good. I don’t know how Adam did it! Backing up the Team Foundation Server 2008 Databases As we are moving from one server to another (recommended method) we will be taking a backup of our TFS2008 databases and resorting them to the SQL Server for the new TFS2010 Server. Do not just detach and reattach. This will cause problems with the version of the database. If you are running a test migration you just need to create a backup of the TFS 2008 databases, but if you are doing the live migration then you should stop IIS on the TFS 2008 server before you backup the databases. This will stop any inadvertent check-ins or changes to TFS 2008. Figure: Stop IIS before you take a backup to prevent any TFS 2008 changes being written to the database. It is good to leave a little time between taking the TFS 2008 server offline and commencing the upgrade as there is always one developer who has not finished and starts screaming. This time it was John Liu that needed 10 more minutes to make his changes and check-in, so I always give it 30 minutes and see if anyone screams. John Liu [SSW] said:   are you doing something to TFS :-O MrHinsh [SSW UK][VS ALM MVP] said:   I have stopped TFS 2008 as per my emails John Liu [SSW] said:   haven't finish check in @_@   can we have it for 10mins? :) MrHinsh [SSW UK][VS ALM MVP] said:   TFS 2008 has been started John Liu [SSW] said:   I love you! -IM conversation at TFS Upgrade +25 minutes After John confirmed that he had everything done I turned IIS off again and made a cup of tea. There were no more screams so the upgrade can continue. Figure: Backup all of the databases for TFS and include the Reporting Services, just in case.   Figure: Check that all the backups have been taken Once you have your backups, you need to copy them to your new TFS2010 server and restore them. This is a good way to proceed as if we have any problems, or just plain run out of time, then you just turn the TFS 2008 server back on and all you have lost is one upgrade day, and not 10 developer days. As per the rules, you should record the number of files and the total number of areas and iterations before the upgrade so you have something to compare to: TFS2008 File count: Type Count 1 1845 2 15770 Areas & Iterations: 139 You can use this to verify that the upgrade was successful. it should however be noted that the numbers in TFS 2010 will be bigger. This is due to some of the sorting out that TFS does during the upgrade process. Restore Team Foundation Server 2008 Databases Restoring the databases is much more time consuming than just attaching them as you need to do them one at a time. But you may be taking a backup of an operational database and need to restore all your databases to a particular point in time instead of to the latest. I am doing latest unless I encounter any problems. Figure: Restore each of the databases to either a latest or specific point in time.     Figure: Restore all of the required databases Now that all of your databases are restored you now need to upgrade them to Team Foundation Server 2010. Upgrade Team Foundation Server 2008 Databases This is probably the easiest part of the process. You need to call a fire and forget command that will go off to the database specified, find the TFS 2008 databases and upgrade them to 2010. During this process all of the 6 main TFS 2008 databases are merged into the TfsVersionControl database, upgraded and then the database is renamed to TFS_[CollectionName]. The rename is only the database and not the physical files, so it is worth going back and renaming the physical file as well. This keeps everything neat and tidy. If you plan to keep the old TFS 2008 server around, for example if you are doing a test migration first, then you will need to change the TFS GUID. This GUID is unique to each TFS instance and is preserved when you upgrade. This GUID is used by the clients and they can get a little confused if there are two servers with the same one. To kick of the upgrade you need to open a command prompt and change the path to “C:\Program Files\Microsoft Team Foundation Server 2010\Tools” and run the “import” command in  “tfsconfig”. TfsConfig import /sqlinstance:<Previous TFS Data Tier>                  /collectionName:<Collection Name>                  /confirmed Imports a TFS 2005 or 2008 data tier as a new project collection. Important: This command should only be executed after adequate backups have been performed. After you import, you will need to configure portal and reporting settings via the administration console. EXAMPLES -------- TfsConfig import /sqlinstance:tfs2008sql /collectionName:imported /confirmed TfsConfig import /sqlinstance:tfs2008sql\Instance /collectionName:imported /confirmed OPTIONS: -------- sqlinstance         The sql instance of the TFS 2005 or 2008 data tier. The TFS databases at that location will be modified directly and will no longer be usable as previous version databases.  Ensure you have back-ups. collectionName      The name of the new Team Project Collection. confirmed           Confirm that you have backed-up databases before importing. This command will automatically look for the TfsIntegration database and verify that all the other required databases exist. In this case it took around 5 minutes to complete the upgrade as the total database size was under 700MB. This was unlike the upgrade of SSW’s production database with over 17GB of data which took a few hours. At the end of the process you should get no errors and no warnings. The Upgrade operation on the ApplicationTier feature has completed. There were 0 errors and 0 warnings. As this is a new server and not a pure upgrade there should not be a problem with the GUID. If you think at any point you will be doing this more than once, for example doing a test migration, or merging many TFS 2008 instances into a single one, then you should go back and rename the physical TfsVersionControl.mdf file to the same as the new collection. This will avoid confusion later down the line. To do this, detach the new collection from the server and rename the physical files. Then reattach and change the physical file locations to match the new name. You can follow http://www.mssqltips.com/tip.asp?tip=1122 for a more detailed explanation of how to do this. Figure: Stop the collection so TFS does not take a wobbly when we detach the database. When you try to start the new collection again you will get a conflict with project names and will require to remove the Test Upgrade collection. This is fine and it just needs detached. Figure: Detaching the test upgrade from the new Team Foundation Server 2010 so we can start the new Collection again. You will now be able to start the new upgraded collection and you are ready for testing. Do you remember the stats we took off the TFS 2008 server? TFS2008 File count: Type Count 1 1845 2 15770 Areas & Iterations: 139 Well, now we need to compare them to the TFS 2010 stats, remembering that there will probably be more files under source control. TFS2010 File count: Type Count 1 19288 Areas & Iterations: 139 Lovely, the number of iterations are the same, and the number of files is bigger. Just what we were looking for. Testing the upgraded Team Foundation Server 2010 Project Collection Can we connect to the new collection and project? Figure: We can connect to the new collection and project.   Figure: make sure you can connect to The upgraded projects and that you can see all of the files. Figure: Team Web Access is there and working. Note that for Team Web Access you now use the same port and URL as for TFS 2010. So in this case as I am running on the local box you need to use http://localhost:8080/tfs which will redirect you to http://localhost:8080/tfs/web for the web access. If you need to connect with a Visual Studio 2008 client you will need to use the full path of the new collection, http://[servername]/tfs/[collectionname] and this will work with all of your collections. With Visual Studio 2005 you will only be able to connect to the Default collection and in both VS2008 and VS2005 you will need to install the forward compatibility updates. Visual Studio Team System 2005 Service Pack 1 Forward Compatibility Update for Team Foundation Server 2010 Visual Studio Team System 2008 Service Pack 1 Forward Compatibility Update for Team Foundation Server 2010 To make sure that you have everything up to date, make sure that you run SSW Diagnostics and get all green ticks. Upgrade Done! At this point you can send out a notice to everyone that the upgrade is complete and and give them the connection details. You need to remember that at this stage we have 2008 project upgraded to run under TFS 2010 but it is still running under that same process template that it was running before. You can only “enable” 2010 features in a process template you can’t upgrade. So what to do? Well, you need to create a new project and migrate things you want to keep across. Souse code is easy, you can move or Branch, but Work Items are more difficult as you can’t move them between projects. This instance is complicated more as the old project uses the Conchango/EMC Scrum for Team System template and I will need to write a script/application to get the work items across with their attachments in tact. That is my next task! Technorati Tags: TFS 2010,TFS 2008,VS ALM

    Read the article

  • 12.04 Unity 3D Not working where as Unity 2D works fine

    - by Stephen Martin
    I updated from 11.10 to 12.04 using the distribution upgrade, after that I couldn't log into using the Unity 3D desktop after logging in I would either never get unity's launcher or I would get the launcher and once I tried to do anything the windows lost their decoration and nothing would respond. If I use Unity 2D it works fine and in fact I'm using it to type this. I managed to get some info out of dmesg that looks like it's the route of whats happening. dmesg: [ 109.160165] [drm:i915_hangcheck_elapsed] *ERROR* Hangcheck timer elapsed... GPU hung [ 109.160180] [drm] capturing error event; look for more information in /debug/dri/0/i915_error_state [ 109.167587] [drm:i915_wait_request] *ERROR* i915_wait_request returns -11 (awaiting 1226 at 1218, next 1227) [ 109.672273] [drm:i915_reset] *ERROR* Failed to reset chip. output of lspci | grep vga 00:02.0 VGA compatible controller: Intel Corporation Mobile 4 Series Chipset Integrated Graphics Controller (rev 07) output of /usr/lib/nux/unity_support_test -p IN 12.04 OpenGL vendor string: VMware, Inc. OpenGL renderer string: Gallium 0.4 on llvmpipe (LLVM 0x300) OpenGL version string: 2.1 Mesa 8.0.2 Not software rendered: no Not blacklisted: yes GLX fbconfig: yes GLX texture from pixmap: yes GL npot or rect textures: yes GL vertex program: yes GL fragment program: yes GL vertex buffer object: yes GL framebuffer object: yes GL version is 1.4+: yes Unity 3D supported: no The same command in 11.10: stephenm@mcr-ubu1:~$ /usr/lib/nux/unity_support_test -p OpenGL vendor string: Tungsten Graphics, Inc OpenGL renderer string: Mesa DRI Mobile Intel® GM45 Express Chipset OpenGL version string: 2.1 Mesa 7.11 Not software rendered: yes Not blacklisted: yes GLX fbconfig: yes GLX texture from pixmap: yes GL npot or rect textures: yes GL vertex program: yes GL fragment program: yes GL vertex buffer object: yes GL framebuffer object: yes GL version is 1.4+: yes Unity 3D supported: yes stephenm@mcr-ubu1:~$ output of /var/log/Xorg.0.log [ 11.971] (II) intel(0): EDID vendor "LPL", prod id 307 [ 11.971] (II) intel(0): Printing DDC gathered Modelines: [ 11.971] (II) intel(0): Modeline "1280x800"x0.0 69.30 1280 1328 1360 1405 800 803 809 822 -hsync -vsync (49.3 kHz) [ 12.770] (II) intel(0): Allocated new frame buffer 2176x800 stride 8704, tiled [ 15.087] (II) intel(0): EDID vendor "LPL", prod id 307 [ 15.087] (II) intel(0): Printing DDC gathered Modelines: [ 15.087] (II) intel(0): Modeline "1280x800"x0.0 69.30 1280 1328 1360 1405 800 803 809 822 -hsync -vsync (49.3 kHz) [ 33.310] (II) XKB: reuse xkmfile /var/lib/xkb/server-93A39E9580D1D5B855D779F4595485C2CC66E0CF.xkm [ 34.900] (WW) intel(0): flip queue failed: Invalid argument [ 34.900] (WW) intel(0): Page flip failed: Invalid argument [ 34.900] (WW) intel(0): flip queue failed: Invalid argument [ 34.900] (WW) intel(0): Page flip failed: Invalid argument [ 34.913] (WW) intel(0): flip queue failed: Invalid argument [ 34.913] (WW) intel(0): Page flip failed: Invalid argument [ 34.913] (WW) intel(0): flip queue failed: Invalid argument [ 34.913] (WW) intel(0): Page flip failed: Invalid argument [ 34.926] (WW) intel(0): flip queue failed: Invalid argument [ 34.926] (WW) intel(0): Page flip failed: Invalid argument [ 34.926] (WW) intel(0): flip queue failed: Invalid argument [ 34.926] (WW) intel(0): Page flip failed: Invalid argument [ 35.501] (WW) intel(0): flip queue failed: Invalid argument [ 35.501] (WW) intel(0): Page flip failed: Invalid argument [ 35.501] (WW) intel(0): flip queue failed: Invalid argument [ 35.501] (WW) intel(0): Page flip failed: Invalid argument [ 41.519] [mi] Increasing EQ size to 512 to prevent dropped events. [ 42.079] (EE) intel(0): Detected a hung GPU, disabling acceleration. [ 42.079] (EE) intel(0): When reporting this, please include i915_error_state from debugfs and the full dmesg. [ 42.598] (II) intel(0): EDID vendor "LPL", prod id 307 [ 42.598] (II) intel(0): Printing DDC gathered Modelines: [ 42.598] (II) intel(0): Modeline "1280x800"x0.0 69.30 1280 1328 1360 1405 800 803 809 822 -hsync -vsync (49.3 kHz) [ 51.052] (II) AIGLX: Suspending AIGLX clients for VT switch I know im using the beta version so I'm not expecting it to work but does any one know what the problem may be or even why they Unity compatibility test is describing my video card as vmware when its an intel i915 and Ubuntu is running on the metal not virtualised. Unity 3D worked fine in 11.10

    Read the article

  • Unity 3D Not working where as Unity 2D works fine [closed]

    - by Stephen Martin
    I updated from 11.10 to 12.04 using the distribution upgrade, after that I couldn't log into using the Unity 3D desktop after logging in I would either never get unity's launcher or I would get the launcher and once I tried to do anything the windows lost their decoration and nothing would respond. If I use Unity 2D it works fine and in fact I'm using it to type this. I managed to get some info out of dmesg that looks like it's the route of whats happening. dmesg: [ 109.160165] [drm:i915_hangcheck_elapsed] *ERROR* Hangcheck timer elapsed... GPU hung [ 109.160180] [drm] capturing error event; look for more information in /debug/dri/0/i915_error_state [ 109.167587] [drm:i915_wait_request] *ERROR* i915_wait_request returns -11 (awaiting 1226 at 1218, next 1227) [ 109.672273] [drm:i915_reset] *ERROR* Failed to reset chip. output of lspci | grep vga 00:02.0 VGA compatible controller: Intel Corporation Mobile 4 Series Chipset Integrated Graphics Controller (rev 07) output of /usr/lib/nux/unity_support_test -p IN 12.04 OpenGL vendor string: VMware, Inc. OpenGL renderer string: Gallium 0.4 on llvmpipe (LLVM 0x300) OpenGL version string: 2.1 Mesa 8.0.2 Not software rendered: no Not blacklisted: yes GLX fbconfig: yes GLX texture from pixmap: yes GL npot or rect textures: yes GL vertex program: yes GL fragment program: yes GL vertex buffer object: yes GL framebuffer object: yes GL version is 1.4+: yes Unity 3D supported: no The same command in 11.10: stephenm@mcr-ubu1:~$ /usr/lib/nux/unity_support_test -p OpenGL vendor string: Tungsten Graphics, Inc OpenGL renderer string: Mesa DRI Mobile Intel® GM45 Express Chipset OpenGL version string: 2.1 Mesa 7.11 Not software rendered: yes Not blacklisted: yes GLX fbconfig: yes GLX texture from pixmap: yes GL npot or rect textures: yes GL vertex program: yes GL fragment program: yes GL vertex buffer object: yes GL framebuffer object: yes GL version is 1.4+: yes Unity 3D supported: yes stephenm@mcr-ubu1:~$ output of /var/log/Xorg.0.log [ 11.971] (II) intel(0): EDID vendor "LPL", prod id 307 [ 11.971] (II) intel(0): Printing DDC gathered Modelines: [ 11.971] (II) intel(0): Modeline "1280x800"x0.0 69.30 1280 1328 1360 1405 800 803 809 822 -hsync -vsync (49.3 kHz) [ 12.770] (II) intel(0): Allocated new frame buffer 2176x800 stride 8704, tiled [ 15.087] (II) intel(0): EDID vendor "LPL", prod id 307 [ 15.087] (II) intel(0): Printing DDC gathered Modelines: [ 15.087] (II) intel(0): Modeline "1280x800"x0.0 69.30 1280 1328 1360 1405 800 803 809 822 -hsync -vsync (49.3 kHz) [ 33.310] (II) XKB: reuse xkmfile /var/lib/xkb/server-93A39E9580D1D5B855D779F4595485C2CC66E0CF.xkm [ 34.900] (WW) intel(0): flip queue failed: Invalid argument [ 34.900] (WW) intel(0): Page flip failed: Invalid argument [ 34.900] (WW) intel(0): flip queue failed: Invalid argument [ 34.900] (WW) intel(0): Page flip failed: Invalid argument [ 34.913] (WW) intel(0): flip queue failed: Invalid argument [ 34.913] (WW) intel(0): Page flip failed: Invalid argument [ 34.913] (WW) intel(0): flip queue failed: Invalid argument [ 34.913] (WW) intel(0): Page flip failed: Invalid argument [ 34.926] (WW) intel(0): flip queue failed: Invalid argument [ 34.926] (WW) intel(0): Page flip failed: Invalid argument [ 34.926] (WW) intel(0): flip queue failed: Invalid argument [ 34.926] (WW) intel(0): Page flip failed: Invalid argument [ 35.501] (WW) intel(0): flip queue failed: Invalid argument [ 35.501] (WW) intel(0): Page flip failed: Invalid argument [ 35.501] (WW) intel(0): flip queue failed: Invalid argument [ 35.501] (WW) intel(0): Page flip failed: Invalid argument [ 41.519] [mi] Increasing EQ size to 512 to prevent dropped events. [ 42.079] (EE) intel(0): Detected a hung GPU, disabling acceleration. [ 42.079] (EE) intel(0): When reporting this, please include i915_error_state from debugfs and the full dmesg. [ 42.598] (II) intel(0): EDID vendor "LPL", prod id 307 [ 42.598] (II) intel(0): Printing DDC gathered Modelines: [ 42.598] (II) intel(0): Modeline "1280x800"x0.0 69.30 1280 1328 1360 1405 800 803 809 822 -hsync -vsync (49.3 kHz) [ 51.052] (II) AIGLX: Suspending AIGLX clients for VT switch I know im using the beta version so I'm not expecting it to work but does any one know what the problem may be or even why they Unity compatibility test is describing my video card as vmware when its an intel i915 and Ubuntu is running on the metal not virtualised. Unity 3D worked fine in 11.10

    Read the article

  • GLSL - one-pass gaussian blur

    - by martin pilch
    It is possible to implement fragment shader to do one-pass gaussian blur? I have found lot of implementation of two-pass blur (gaussian and box blur): http://callumhay.blogspot.com/2010/09/gaussian-blur-shader-glsl.html http://www.gamerendering.com/2008/10/11/gaussian-blur-filter-shader/ http://www.geeks3d.com/20100909/shader-library-gaussian-blur-post-processing-filter-in-glsl/ and so on. I have been thinking of implementing gaussian blur as convolution (in fact, it is the convolution, the examples above are just aproximations): http://en.wikipedia.org/wiki/Gaussian_blur

    Read the article

  • OpenGL ES 2/3 vs OpenGL 3 (and 4)

    - by Martin Perry
    I have migrated my code from OpenGL ES 2/3 to OpenGL 3 (I added bunch of defines and abstract classes to encapsulate both versions, so I have both in one project and compile only one or another). All I need to change was context initialization and glClearDepth. I dont have any errors. This was kind of strange to me. Even shaders are working correctly (some of them are GL ES 3 - with #version 300 es in their header) Is this a kind of good solution, or should I rewrite something more, before I start adding another functionality like geometry shaders, performance tools etc ?

    Read the article

  • Microsoft, please help me diagnose TFS Administration permission issues!

    - by Martin Hinshelwood
    I recently had a fun time trying to debug a permission issue I ran into using TFS 2010’s TfsConfig. Update 5th March 2010 – In its style of true excellence my company has added rant to its “Suggestions for Better TFS”. <rant> I was trying to run the TfsConfig tool and I kept getting the message: “TF55038: You don't have sufficient privileges to run this tool. Contact your Team Foundation system administrator." This message made me think that it was something to do with the Install permissions as it is always recommended to use a single account to do every install of TFS. I did not install the original TFS on our network and my account was not used to do the TFS2010 install. But I did do the upgrade from 2010 beta 2 to 2010 RC with my current account. So I proceeded to do some checking: Am I in the administrators group on the server? Figure: Yes, I am in the administrators group on the server Am I in the Administration Console users list? Figure: Yes, I am in the Administration Console users list Have I reapplied the permissions in the Administration Console users list ticking all the options? Figure: Make sure you check all of the boxed if you want to have all the admin options Figure: Yes, I have made sure that all my options are correct. Am I in the Team Foundation administrators group? Figure: Yes, I am in the Team Foundation Administrators group Is my account explicitly SysAdmin on the Database server? Figure: Yes, I do have explicit SysAdmin on the database Can you guess what the problem was? The command line window was not running as the administrator! As with most other applications there should be an explicit error message that states: "You are not currently running in administrator mode; please restart the command line with elevated privileges!" This would have saved me 30 minutes, although I agree that I should change my name to Muppet and just be done with it. </rant>   Technorati Tags: Visual Studio ALM,Administration,Team Foundation Server Admin Console,TFS Admin Console

    Read the article

  • When should I use Areas in TFS instead of Team Projects

    - by Martin Hinshelwood
    Well, it depends…. If you are a small company that creates a finite number of internal projects then you will find it easier to create a single project for each of your products and have TFS do the heavy lifting with reporting, SharePoint sites and Version Control. But what if you are not… Update 9th March 2010 Michael Fourie gave me some feedback which I have integrated. Ed Blankenship via @edblankenship offered encouragement and a nice quote. Ewald Hofman gave me a couple of Cons, and maybe a few more soon. Ewald’s company, Avanade, currently uses Areas, but it looks like the manual management is getting too much and the project is getting cluttered. What if you are likely to have hundreds of projects, possibly with a multitude of internal and external projects? You might have 1 project for a customer or 10. This is the situation that most consultancies find themselves in and thus they need a more sustainable and maintainable option. What I am advocating is that we should have 1 “Team Project” per customer, and use areas to create “sub projects” within that single “Team Project”. "What you describe is what we generally do internally and what we recommend. We make very heavy use of area path to categorize the work within a larger project." - Brian Harry, Microsoft Technical Fellow & Product Unit Manager for Team Foundation Server   "We tend to use areas to segregate multiple projects in the same team project and it works well." - Tiago Pascoal, Visual Studio ALM MVP   "In general, I believe this approach provides consistency [to multi-product engagements] and lowers the administration and maintenance costs. All good." - Michael Fourie, Visual Studio ALM MVP   “@MrHinsh BTW, I'm very much a fan of very large, if not huge, team projects in TFS. Just FYI :) Use Areas & Iterations.” Ed Blankenship, Visual Studio ALM MVP   This would mean that SSW would have a single Team Project called “SSW” that contains all of our internal projects and consequently all of the Areas and Iteration move down one hierarchy to accommodate this. Where we would have had “\SSW\Sprint 1” we now have “\SSW\SqlDeploy\Sprint1” with “SqlDeploy” being our internal project. At the moment SSW has over 70 internal projects and more than 170 total projects in TFS. This method has long term benefits that help to simplify the support model for companies that often have limited internal support time and many projects. But, there are implications as TFS does not provide this model “out-of-the-box”. These implications stretch across Areas, Iterations, Queries, Project Portal and Version Control. Michael made a good comment, he said: I agree with your approach, assuming that in a multi-product engagement with a client, they are happy to adopt the same process template across all products. If they are not, then it’ll either be easy to convince them or there is a valid reason for having a different template - Michael Fourie, Visual Studio ALM MVP   At SSW we have a standard template that we use and this is applied across the board, to all of our projects. We even apply any changes to the core process template to all of our existing projects as well. If you have multiple projects for the same clients on multiple templates and you want to keep it that way, then this approach will not work for you. However, if you want to standardise as we have at SSW then this approach may benefit you as well. Implications around Areas Areas should be used for topological classification/isolation of work items. You can think of this as architecture areas, organisational areas or even the main features of your application. In our scenario there is an additional top level item that represents the Project / Product that we want to chop our Team Project into. Figure: Creating a sub area to represent a product/project is easy. <teamproject> <teamproject>\<Functional Area/module whatever> Becomes: <teamproject> <teamproject>\<ProjectName>\ <teamproject>\<ProjectName>\<Functional Area/module whatever> Implications around Iterations Iterations should be used for chronological classification/isolation of work items. This could include isolated time boxes, milestones or release timelines and really depends on the logical flow of your project or projects. Due to the new level in Area we need to add the same level to Iteration. This is primarily because it is unlikely that the sprints in each of your projects/products will start and end at the same time. This is just a reality of managing multiple projects. Figure: Adding the same Area value to Iteration as the top level item adds flexibility to Iteration. <teamproject>\Sprint 1 Or <teamproject>\Release 1\Sprint 1 Becomes: <teamproject>\<ProjectName>\Sprint 1 Or <teamproject>\<ProjectName>\Release 1\Sprint 1 Implications around Queries Queries are used to filter your work items based on a specified level of granularity. There are a number of queries that are built into a project created using the MSF Agile 5.0 template, but we now have multiple projects and it would be a pain to have to edit all of the work items every time we changed project, and that would only allow one team to work on one project at a time.   Figure: The Queries that are created in a normal MSF Agile 5.0 project do not quite suit our new needs. In order for project contributors to be able to query based on their project we need a couple of things. The first thing I did was to create an “_Area Template” folder that has a copy of the project layout with all the queries setup to filter based on the “_Area Template” Area and the “_Sprint template” you can see in the Area and Iteration views. Figure: The template is currently easily drag and drop, but you then need to edit the queries to point at the right Area and Iteration. This needs a tool. I then created an “Areas” folder to hold all of the area specific queries. So, when you go to create a new TFS Sub-Project you just drag “_Area Template” while holding “Ctrl” and drop it onto “Areas”. There is a little setup here. That said I managed it in around 10 minutes which is not so bad, and I can imagine it being quite easy to build a tool to create these queries Figure: These new queries can be configured in around 10 minutes, which includes setting up the Area and Iteration as well. Version Control What about your source code? Well, that is the easiest of the lot. Just create a sub folder for each of your projects/products.   Figure: Creating sub folders in source control is easy as “Right click | Create new folder”. <teamproject>\DEV\Main\ Becomes: <teamproject>\<ProjectName>\DEV\Main\ Conclusion I think it is up to each company to make a call on how you want to configure your Team Projects and it depends completely on how many projects/products you are going to have for each customer including yourself. If we decide to utilise this route it will require some configuration to get our 170+ projects into this format, and I will probably be writing some tools to help. Pros You only have one project to upgrade when a process template changes – After going through an upgrade of over 170 project prior to the changes in the RC I can tell you that that many projects is no fun. Standardises your Process Template – You will always have the same Process implementation across projects/products without exception You get tighter control over the permissions – Yes, you can do this on a standard Team Project, but it gets a lot easier with practice. You can “move” work items from one “product” to another – Have we not always wanted to do that. You can rename your projects – Wahoo: everyone wants to do this, now you can. One set of Reporting Services reports to manage – You set an area and iteration to run reports anyway, so you may as well set both. Simplified Check-In Policies– There is only one set of check-in policies per client. This simplifies administration of policies. Simplified Alerts – As alerts are applied across multiple projects this simplifies your alert rules as per client. Cons All of these cons could be mitigated by a custom tool that helps automate creation of “Sub-projects” within Team Projects. This custom tool could create areas, Iteration, permissions, SharePoint and queries. It just does not exist yet :) You need to configure the Areas and Iterations You need to configure the permissions You may need to configure sub sites for SharePoint (depends on your requirement) – If you have two projects/products in the same Team Project then you will not see the burn down for each one out-of-the-box, but rather a cumulative for the Team Project. This is not really that much of a problem as you would have to configure your burndown graphs for your current iteration anyway. note: When you create a sub site to a TFS linked portal it will inherit the settings of its parent site :) This is fantastic as it means that you can easily create sub sites and then set the Area and Iteration path in each of the reports to be the correct one. Every team wants their own customization (via Ewald Hofman) - small teams of 2 persons against teams of 30 – or even outsourcing – need their own process, you cannot allow that because everybody gets the same work item types. note: Luckily at SSW this is not a problem as our template is standardised across all projects and customers. Large list of builds (via Ewald Hofman) – As the build list in Team Explorer is just a flat list it can get very cluttered. note: I would mitigate this by removing any build that has not been run in over 30 days. The build template and workflow will still be available in version control, but it will clean the list. Feedback Now that I have explained this method, what do you think? What other pros and cons can you see? What do you think of this approach? Will you be using it? What tools would you like to support you?   Technorati Tags: Visual Studio ALM,TFS Administration,TFS,Team Foundation Server,Project Planning,TFS Customisation

    Read the article

  • Guidance: A Branching strategy for Scrum Teams

    - by Martin Hinshelwood
    Having a good branching strategy will save your bacon, or at least your code. Be careful when deviating from your branching strategy because if you do, you may be worse off than when you started! This is one possible branching strategy for Scrum teams and I will not be going in depth with Scrum but you can find out more about Scrum by reading the Scrum Guide and you can even assess your Scrum knowledge by having a go at the Scrum Open Assessment. You can also read SSW’s Rules to Better Scrum using TFS which have been developed during our own Scrum implementations. Acknowledgements Bill Heys – Bill offered some good feedback on this post and helped soften the language. Note: Bill is a VS ALM Ranger and co-wrote the Branching Guidance for TFS 2010 Willy-Peter Schaub – Willy-Peter is an ex Visual Studio ALM MVP turned blue badge and has been involved in most of the guidance including the Branching Guidance for TFS 2010 Chris Birmele – Chris wrote some of the early TFS Branching and Merging Guidance. Dr Paul Neumeyer, Ph.D Parallel Processes, ScrumMaster and SSW Solution Architect – Paul wanted to have feature branches coming from the release branch as well. We agreed that this is really a spin-off that needs own project, backlog, budget and Team. Scenario: A product is developed RTM 1.0 is released and gets great sales.  Extra features are demanded but the new version will have double to price to pay to recover costs, work is approved by the guys with budget and a few sprints later RTM 2.0 is released.  Sales a very low due to the pricing strategy. There are lots of clients on RTM 1.0 calling out for patches. As I keep getting Reverse Integration and Forward Integration mixed up and Bill keeps slapping my wrists I thought I should have a reminder: You still seemed to use reverse and/or forward integration in the wrong context. I would recommend reviewing your document at the end to ensure that it agrees with the common understanding of these terms merge (forward integration) from parent to child (same direction as the branch), and merge  (reverse integration) from child to parent (the reverse direction of the branch). - one of my many slaps on the wrist from Bill Heys.   As I mentioned previously we are using a single feature branching strategy in our current project. The single biggest mistake developers make is developing against the “Main” or “Trunk” line. This ultimately leads to messy code as things are added and never finished. Your only alternative is to NEVER check in unless your code is 100%, but this does not work in practice, even with a single developer. Your ADD will kick in and your half-finished code will be finished enough to pass the build and the tests. You do use builds don’t you? Sadly, this is a very common scenario and I have had people argue that branching merely adds complexity. Then again I have seen the other side of the universe ... branching  structures from he... We should somehow convince everyone that there is a happy between no-branching and too-much-branching. - Willy-Peter Schaub, VS ALM Ranger, Microsoft   A key benefit of branching for development is to isolate changes from the stable Main branch. Branching adds sanity more than it adds complexity. We do try to stress in our guidance that it is important to justify a branch, by doing a cost benefit analysis. The primary cost is the effort to do merges and resolve conflicts. A key benefit is that you have a stable code base in Main and accept changes into Main only after they pass quality gates, etc. - Bill Heys, VS ALM Ranger & TFS Branching Lead, Microsoft The second biggest mistake developers make is branching anything other than the WHOLE “Main” line. If you branch parts of your code and not others it gets out of sync and can make integration a nightmare. You should have your Source, Assets, Build scripts deployment scripts and dependencies inside the “Main” folder and branch the whole thing. Some departments within MSFT even go as far as to add the environments used to develop the product in there as well; although I would not recommend that unless you have a massive SQL cluster to house your source code. We tried the “add environment” back in South-Africa and while it was “phenomenal”, especially when having to switch between environments, the disk storage and processing requirements killed us. We opted for virtualization to skin this cat of keeping a ready-to-go environment handy. - Willy-Peter Schaub, VS ALM Ranger, Microsoft   I think people often think that you should have separate branches for separate environments (e.g. Dev, Test, Integration Test, QA, etc.). I prefer to think of deploying to environments (such as from Main to QA) rather than branching for QA). - Bill Heys, VS ALM Ranger & TFS Branching Lead, Microsoft   You can read about SSW’s Rules to better Source Control for some additional information on what Source Control to use and how to use it. There are also a number of branching Anti-Patterns that should be avoided at all costs: You know you are on the wrong track if you experience one or more of the following symptoms in your development environment: Merge Paranoia—avoiding merging at all cost, usually because of a fear of the consequences. Merge Mania—spending too much time merging software assets instead of developing them. Big Bang Merge—deferring branch merging to the end of the development effort and attempting to merge all branches simultaneously. Never-Ending Merge—continuous merging activity because there is always more to merge. Wrong-Way Merge—merging a software asset version with an earlier version. Branch Mania—creating many branches for no apparent reason. Cascading Branches—branching but never merging back to the main line. Mysterious Branches—branching for no apparent reason. Temporary Branches—branching for changing reasons, so the branch becomes a permanent temporary workspace. Volatile Branches—branching with unstable software assets shared by other branches or merged into another branch. Note   Branches are volatile most of the time while they exist as independent branches. That is the point of having them. The difference is that you should not share or merge branches while they are in an unstable state. Development Freeze—stopping all development activities while branching, merging, and building new base lines. Berlin Wall—using branches to divide the development team members, instead of dividing the work they are performing. -Branching and Merging Primer by Chris Birmele - Developer Tools Technical Specialist at Microsoft Pty Ltd in Australia   In fact, this can result in a merge exercise no-one wants to be involved in, merging hundreds of thousands of change sets and trying to get a consolidated build. Again, we need to find a happy medium. - Willy-Peter Schaub on Merge Paranoia Merge conflicts are generally the result of making changes to the same file in both the target and source branch. If you create merge conflicts, you will eventually need to resolve them. Often the resolution is manual. Merging more frequently allows you to resolve these conflicts close to when they happen, making the resolution clearer. Waiting weeks or months to resolve them, the Big Bang approach, means you are more likely to resolve conflicts incorrectly. - Bill Heys, VS ALM Ranger & TFS Branching Lead, Microsoft   Figure: Main line, this is where your stable code lives and where any build has known entities, always passes and has a happy test that passes as well? Many development projects consist of, a single “Main” line of source and artifacts. This is good; at least there is source control . There are however a couple of issues that need to be considered. What happens if: you and your team are working on a new set of features and the customer wants a change to his current version? you are working on two features and the customer decides to abandon one of them? you have two teams working on different feature sets and their changes start interfering with each other? I just use labels instead of branches? That's a lot of “what if’s”, but there is a simple way of preventing this. Branching… In TFS, labels are not immutable. This does not mean they are not useful. But labels do not provide a very good development isolation mechanism. Branching allows separate code sets to evolve separately (e.g. Current with hotfixes, and vNext with new development). I don’t see how labels work here. - Bill Heys, VS ALM Ranger & TFS Branching Lead, Microsoft   Figure: Creating a single feature branch means you can isolate the development work on that branch.   Its standard practice for large projects with lots of developers to use Feature branching and you can check the Branching Guidance for the latest recommendations from the Visual Studio ALM Rangers for other methods. In the diagram above you can see my recommendation for branching when using Scrum development with TFS 2010. It consists of a single Sprint branch to contain all the changes for the current sprint. The main branch has the permissions changes so contributors to the project can only Branch and Merge with “Main”. This will prevent accidental check-ins or checkouts of the “Main” line that would contaminate the code. The developers continue to develop on sprint one until the completion of the sprint. Note: In the real world, starting a new Greenfield project, this process starts at Sprint 2 as at the start of Sprint 1 you would have artifacts in version control and no need for isolation.   Figure: Once the sprint is complete the Sprint 1 code can then be merged back into the Main line. There are always good practices to follow, and one is to always do a Forward Integration from Main into Sprint 1 before you do a Reverse Integration from Sprint 1 back into Main. In this case it may seem superfluous, but this builds good muscle memory into your developer’s work ethic and means that no bad habits are learned that would interfere with additional Scrum Teams being added to the Product. The process of completing your sprint development: The Team completes their work according to their definition of done. Merge from “Main” into “Sprint1” (Forward Integration) Stabilize your code with any changes coming from other Scrum Teams working on the same product. If you have one Scrum Team this should be quick, but there may have been bug fixes in the Release branches. (we will talk about release branches later) Merge from “Sprint1” into “Main” to commit your changes. (Reverse Integration) Check-in Delete the Sprint1 branch Note: The Sprint 1 branch is no longer required as its useful life has been concluded. Check-in Done But you are not yet done with the Sprint. The goal in Scrum is to have a “potentially shippable product” at the end of every Sprint, and we do not have that yet, we only have finished code.   Figure: With Sprint 1 merged you can create a Release branch and run your final packaging and testing In 99% of all projects I have been involved in or watched, a “shippable product” only happens towards the end of the overall lifecycle, especially when sprints are short. The in-between releases are great demonstration releases, but not shippable. Perhaps it comes from my 80’s brain washing that we only ship when we reach the agreed quality and business feature bar. - Willy-Peter Schaub, VS ALM Ranger, Microsoft Although you should have been testing and packaging your code all the way through your Sprint 1 development, preferably using an automated process, you still need to test and package with stable unchanging code. This is where you do what at SSW we call a “Test Please”. This is first an internal test of the product to make sure it meets the needs of the customer and you generally use a resource external to your Team. Then a “Test Please” is conducted with the Product Owner to make sure he is happy with the output. You can read about how to conduct a Test Please on our Rules to Successful Projects: Do you conduct an internal "test please" prior to releasing a version to a client?   Figure: If you find a deviation from the expected result you fix it on the Release branch. If during your final testing or your “Test Please” you find there are issues or bugs then you should fix them on the release branch. If you can’t fix them within the time box of your Sprint, then you will need to create a Bug and put it onto the backlog for prioritization by the Product owner. Make sure you leave plenty of time between your merge from the development branch to find and fix any problems that are uncovered. This process is commonly called Stabilization and should always be conducted once you have completed all of your User Stories and integrated all of your branches. Even once you have stabilized and released, you should not delete the release branch as you would with the Sprint branch. It has a usefulness for servicing that may extend well beyond the limited life you expect of it. Note: Don't get forced by the business into adding features into a Release branch instead that indicates the unspoken requirement is that they are asking for a product spin-off. In this case you can create a new Team Project and branch from the required Release branch to create a new Main branch for that product. And you create a whole new backlog to work from.   Figure: When the Team decides it is happy with the product you can create a RTM branch. Once you have fixed all the bugs you can, and added any you can’t to the Product Backlog, and you Team is happy with the result you can create a Release. This would consist of doing the final Build and Packaging it up ready for your Sprint Review meeting. You would then create a read-only branch that represents the code you “shipped”. This is really an Audit trail branch that is optional, but is good practice. You could use a Label, but Labels are not Auditable and if a dispute was raised by the customer you can produce a verifiable version of the source code for an independent party to check. Rare I know, but you do not want to be at the wrong end of a legal battle. Like the Release branch the RTM branch should never be deleted, or only deleted according to your companies legal policy, which in the UK is usually 7 years.   Figure: If you have made any changes in the Release you will need to merge back up to Main in order to finalise the changes. Nothing is really ever done until it is in Main. The same rules apply when merging any fixes in the Release branch back into Main and you should do a reverse merge before a forward merge, again for the muscle memory more than necessity at this stage. Your Sprint is now nearly complete, and you can have a Sprint Review meeting knowing that you have made every effort and taken every precaution to protect your customer’s investment. Note: In order to really achieve protection for both you and your client you would add Automated Builds, Automated Tests, Automated Acceptance tests, Acceptance test tracking, Unit Tests, Load tests, Web test and all the other good engineering practices that help produce reliable software.     Figure: After the Sprint Planning meeting the process begins again. Where the Sprint Review and Retrospective meetings mark the end of the Sprint, the Sprint Planning meeting marks the beginning. After you have completed your Sprint Planning and you know what you are trying to achieve in Sprint 2 you can create your new Branch to develop in. How do we handle a bug(s) in production that can’t wait? Although in Scrum the only work done should be on the backlog there should be a little buffer added to the Sprint Planning for contingencies. One of these contingencies is a bug in the current release that can’t wait for the Sprint to finish. But how do you handle that? Willy-Peter Schaub asked an excellent question on the release activities: In reality Sprint 2 starts when sprint 1 ends + weekend. Should we not cater for a possible parallelism between Sprint 2 and the release activities of sprint 1? It would introduce FI’s from main to sprint 2, I guess. Your “Figure: Merging print 2 back into Main.” covers, what I tend to believe to be reality in most cases. - Willy-Peter Schaub, VS ALM Ranger, Microsoft I agree, and if you have a single Scrum team then your resources are limited. The Scrum Team is responsible for packaging and release, so at least one run at stabilization, package and release should be included in the Sprint time box. If more are needed on the current production release during the Sprint 2 time box then resource needs to be pulled from Sprint 2. The Product Owner and the Team have four choices (in order of disruption/cost): Backlog: Add the bug to the backlog and fix it in the next Sprint Buffer Time: Use any buffer time included in the current Sprint to fix the bug quickly Make time: Remove a Story from the current Sprint that is of equal value to the time lost fixing the bug(s) and releasing. Note: The Team must agree that it can still meet the Sprint Goal. Cancel Sprint: Cancel the sprint and concentrate all resource on fixing the bug(s) Note: This can be a very costly if the current sprint has already had a lot of work completed as it will be lost. The choice will depend on the complexity and severity of the bug(s) and both the Product Owner and the Team need to agree. In this case we will go with option #2 or #3 as they are uncomplicated but severe bugs. Figure: Real world issue where a bug needs fixed in the current release. If the bug(s) is urgent enough then then your only option is to fix it in place. You can edit the release branch to find and fix the bug, hopefully creating a test so it can’t happen again. Follow the prior process and conduct an internal and customer “Test Please” before releasing. You can read about how to conduct a Test Please on our Rules to Successful Projects: Do you conduct an internal "test please" prior to releasing a version to a client?   Figure: After you have fixed the bug you need to ship again. You then need to again create an RTM branch to hold the version of the code you released in escrow.   Figure: Main is now out of sync with your Release. We now need to get these new changes back up into the Main branch. Do a reverse and then forward merge again to get the new code into Main. But what about the branch, are developers not working on Sprint 2? Does Sprint 2 now have changes that are not in Main and Main now have changes that are not in Sprint 2? Well, yes… and this is part of the hit you take doing branching. But would this scenario even have been possible without branching?   Figure: Getting the changes in Main into Sprint 2 is very important. The Team now needs to do a Forward Integration merge into their Sprint and resolve any conflicts that occur. Maybe the bug has already been fixed in Sprint 2, maybe the bug no longer exists! This needs to be identified and resolved by the developers before they continue to get further out of Sync with Main. Note: Avoid the “Big bang merge” at all costs.   Figure: Merging Sprint 2 back into Main, the Forward Integration, and R0 terminates. Sprint 2 now merges (Reverse Integration) back into Main following the procedures we have already established.   Figure: The logical conclusion. This then allows the creation of the next release. By now you should be getting the big picture and hopefully you learned something useful from this post. I know I have enjoyed writing it as I find these exploratory posts coupled with real world experience really help harden my understanding.  Branching is a tool; it is not a silver bullet. Don’t over use it, and avoid “Anti-Patterns” where possible. Although the diagram above looks complicated I hope showing you how it is formed simplifies it as much as possible.   Technorati Tags: Branching,Scrum,VS ALM,TFS 2010,VS2010

    Read the article

  • Installing Visual Studio Team Foundation Server Service Pack 1

    - by Martin Hinshelwood
    As has become customary when the product team releases a new patch, SP or version I like to document the install. Although I had no errors on my main computer, my netbook did have problems. Although I am not ready to call it a Service Pack problem just yet! Update 2011-03-10 – Running the Team Foundation Server 2010 Service Pack 1 install a second time worked As per Brian's post I am installing the Team Foundation Server Service Pack first and indeed as this is a single server local deployment I need to install both. If I only install one it will leave the other product broken. This however does not affect you if you are running Visual Studio and Team Foundation Server on separate computers as is normal in a production deployment. Main workhorse I will be installing the service pack first on my main computer as I want to actually use it here. Figure: My main workhorse I will also be installing this on my netbook which is obviously of significantly lower spec, but I will do that one after. Although, as always I had my fingers crossed, I was not really worried. Figure: KB2182621 Compared to Visual Studio there are not really a lot of components to update. Figure: TFS 2010 and SQL 2008 are the main things to update There is no “web” installer for the Team Foundation Server 2010 Service Pack, but that is ok as most people will be installing it on a production server and will want to have everything local. I would have liked a Web installer, but the added complexity for the product team is not work the capability for a 500mb patch. Figure: There is currently no way to roll SP1 and RTM together Figure: No problems with the file verification, phew Figure: Although the install took a while, it progressed smoothly   Figure: I always like a success screen Well, as far as the install is concerned everything is OK, but what about TFS? Can I still connect and can I still administer it. Figure: Service Pack 1 is reflected correctly in the Administration Console I am confident that there are no major problems with TFS on my system and that it has been updated to SP1. I can do all of the things that I used before with ease, and with the new features detailed by Brian I think I will be happy. Netbook The great god Murphy has stuck, and my poor wee laptop spat the Team Foundation Server 2010 Service Pack 1 out so fast it hit me on the back of the head. That will teach me for not looking… Figure: “Installation did not succeed” I am pretty sure should not be all caps! On examining the file I found that everything worked, except the actual Team Foundation Server 2010 serving step. Action: System Requirement Checks... Action complete Action: Downloading and/or Verifying Items c:\757fe6efe9f065130d4838081911\VS10-KB2182621.msp: Verifying signature for VS10-KB2182621.msp c:\757fe6efe9f065130d4838081911\VS10-KB2182621.msp Signature verified successfully for VS10-KB2182621.msp c:\757fe6efe9f065130d4838081911\DACFramework_enu.msi: Verifying signature for DACFramework_enu.msi c:\757fe6efe9f065130d4838081911\DACFramework_enu.msi Signature verified successfully for DACFramework_enu.msi c:\757fe6efe9f065130d4838081911\DACProjectSystemSetup_enu.msi: Verifying signature for DACProjectSystemSetup_enu.msi Exists: evaluating Exists evaluated to false c:\757fe6efe9f065130d4838081911\DACProjectSystemSetup_enu.msi Signature verified successfully for DACProjectSystemSetup_enu.msi c:\757fe6efe9f065130d4838081911\TSqlLanguageService_enu.msi: Verifying signature for TSqlLanguageService_enu.msi c:\757fe6efe9f065130d4838081911\TSqlLanguageService_enu.msi Signature verified successfully for TSqlLanguageService_enu.msi c:\757fe6efe9f065130d4838081911\SharedManagementObjects_x86_enu.msi: Verifying signature for SharedManagementObjects_x86_enu.msi c:\757fe6efe9f065130d4838081911\SharedManagementObjects_x86_enu.msi Signature verified successfully for SharedManagementObjects_x86_enu.msi c:\757fe6efe9f065130d4838081911\SharedManagementObjects_amd64_enu.msi: Verifying signature for SharedManagementObjects_amd64_enu.msi c:\757fe6efe9f065130d4838081911\SharedManagementObjects_amd64_enu.msi Signature verified successfully for SharedManagementObjects_amd64_enu.msi c:\757fe6efe9f065130d4838081911\SQLSysClrTypes_x86_enu.msi: Verifying signature for SQLSysClrTypes_x86_enu.msi c:\757fe6efe9f065130d4838081911\SQLSysClrTypes_x86_enu.msi Signature verified successfully for SQLSysClrTypes_x86_enu.msi c:\757fe6efe9f065130d4838081911\SQLSysClrTypes_amd64_enu.msi: Verifying signature for SQLSysClrTypes_amd64_enu.msi c:\757fe6efe9f065130d4838081911\SQLSysClrTypes_amd64_enu.msi Signature verified successfully for SQLSysClrTypes_amd64_enu.msi c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x86.cab: Verifying signature for vcruntime\Vc_runtime_x86.cab c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x86.cab Signature verified successfully for vcruntime\Vc_runtime_x86.cab c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x86.msi: Verifying signature for vcruntime\Vc_runtime_x86.msi c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x86.msi Signature verified successfully for vcruntime\Vc_runtime_x86.msi c:\757fe6efe9f065130d4838081911\SetupUtility.exe: Verifying signature for SetupUtility.exe c:\757fe6efe9f065130d4838081911\SetupUtility.exe Signature verified successfully for SetupUtility.exe c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x64.cab: Verifying signature for vcruntime\Vc_runtime_x64.cab c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x64.cab Signature verified successfully for vcruntime\Vc_runtime_x64.cab c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x64.msi: Verifying signature for vcruntime\Vc_runtime_x64.msi c:\757fe6efe9f065130d4838081911\vcruntime\Vc_runtime_x64.msi Signature verified successfully for vcruntime\Vc_runtime_x64.msi c:\757fe6efe9f065130d4838081911\NDP40-KB2468871.exe: Verifying signature for NDP40-KB2468871.exe c:\757fe6efe9f065130d4838081911\NDP40-KB2468871.exe Signature verified successfully for NDP40-KB2468871.exe Action complete Action: Performing actions on all Items Entering Function: BaseMspInstallerT >::PerformAction Action: Performing Install on MSP: c:\757fe6efe9f065130d4838081911\VS10-KB2182621.msp targetting Product: Microsoft Team Foundation Server 2010 - ENU Returning IDOK. INSTALLMESSAGE_ERROR [Error 1935.An error occurred during the installation of assembly 'Microsoft.TeamFoundation.WebAccess.WorkItemTracking,version="10.0.0.0",publicKeyToken="b03f5f7f11d50a3a",processorArchitecture="MSIL",fileVersion="10.0.40219.1",culture="neutral"'. Please refer to Help and Support for more information. HRESULT: 0x80070005. ] Returning IDOK. INSTALLMESSAGE_ERROR [Error 1712.One or more of the files required to restore your computer to its previous state could not be found. Restoration will not be possible.] Patch (c:\757fe6efe9f065130d4838081911\VS10-KB2182621.msp) Install failed on product (Microsoft Team Foundation Server 2010 - ENU). Msi Log: MSI returned 0x643 Entering Function: MspInstallerT >::Rollback Action Rollback changes PerformMsiOperation returned 0x643 PerformMsiOperation returned 0x643 OnFailureBehavior for this item is to Rollback. Action complete Final Result: Installation failed with error code: (0x80070643), "Fatal error during installation. " (Elapsed time: 0 00:14:09). Figure: Error log for Team Foundation Server 2010 install shows a failure As there is really no information in this log as to why the installation failed so I checked the event log on that box. Figure: There are hundreds of errors and it actually looks like there are more problems than a failed Service Pack I am going to just run it again and see if it was because the netbook was slow to catch on to the update. Hears hoping, but even if it fails, I would question the installation of Windows (PDC laptop original install) before I question the Service Pack Figure: Second run through was successful I don’t know if the laptop was just slow, or what… Did you get this error? If you did I will push this to the product team as a problem, but unless more people have this sort of error, I will just look to write this off as a corrupted install of Windows and reinstall.

    Read the article

  • Kaiden and the Arachnoid Cyst

    - by Martin Hinshelwood
    Some of you may remember when my son Kaiden was born I posted pictures of him and his sister. Kaiden is now 15 months old and is progressing perfectly in every area except that and we had been worried that he was not walking yet. We were only really concerned as his sister was walking at 8 months. Figure: Kai as his usual self   Jadie and I were concerned over that and that he had a rather large head (noggin) so we talked to various GP’s and our health visitor who immediately dismissed our concerns every time. That was until about two months ago when we happened to get a GP whose daughter had Hyper Mobility and she recognised the symptoms immediately. We were referred to the Southbank clinic who were lovely and the paediatrician confirmed that he had Hyper Mobility after testing all of his faculties. This just means that his joints are overly mobile and would need a little physiotherapy to help him out. At the end the paediatrician remarked offhand that he has a rather large head and wanted to measure it. Sure enough he was a good margin above the highest percentile mark for his height and weight. The paediatrician showed the measurements to a paediatric consultant who, as a precautionary measure, referred us for an MRI at Yorkhill Children's hospital. Now, Yorkhill has always been fantastic to us, and this was no exception. You know we have NEVER had a correct diagnosis for the kids (with the exception of the above) from a GP and indeed twice have been proscribed incorrect medication that made the kids sicker! We now always go strait to Yorkhill to save them having to fix GP mistakes as well. Monday 24th May, 7pm The scan went fantastically, with Kaiden sleeping in the MRI machine for all but 5 minutes at the end where he waited patiently for it to finish. We were not expecting anything to be wrong as this was just a precautionary scan to make sure that nothing in his head was affecting his gross motor skills. After the scan we were told to expect a call towards the end of the week… Tuesday 25th May, 12pm The very next day we got a call from Southbank who said that they has found an Arachnoid Cyst and could we come in the next day to see a Consultant and that Kai would need an operation. Wednesday 26th May, 12:30pm We went into the Southbank clinic and spoke to the paediatric consultant who assured us that it was operable but that it was taking up considerable space in Kai’s head. Cerebrospinal fluid is building up as a cyst is blocking the channels it uses to drain. Thankfully they told us that prospects were good and that Kai would expect to make a full recovery before showing us the MRI pictures. Figure: Normal brain MRI cross section. This normal scan shows the spaces in the middle of the brain that contain and produce the Cerebrospinal fluid. Figure: Normal Cerebrospinal Flow This fluid is needed by the brain but is drained in the middle down the spinal column. Figure: Kai’s cyst blocking the four channels. I do not think that I need to explain the difference between the healthy picture and Kai’s picture. However you can see in this first picture the faint outline of the cyst in the middle that is blocking the four channels from draining. After seeing the scans a Neurosurgeon has decided that he is not acute, but needs an operation to unblock the flow. Figure: OMFG! You can see in the second picture the effect of the build up of fluid. If I was not horrified by the first picture I was seriously horrified by this one. What next? Kai is not presenting the symptoms of vomiting or listlessness that would show an immediate problem and as such we will get an appointment to see the Paediatric Neurosurgeon at the Southern General hospital in about 4 weeks. This timescale is based on the Neurosurgeon seeing the scans. After that Kai will need an operation to release the pressure and either remove the cyst completely or put in a permanent shunt (tube from brain to stomach) to bypass the blockage. We have updated his notes for the referral with additional recent information on top of the scan that the consultant things will help improve the timescales, but that is just a guess.   All we can do now is wait and see, and be watchful for tell tail signs of listlessness, eye problems and vomiting that would signify a worsening of his condition.   Technorati Tags: Personal

    Read the article

  • Protecting a WebCenter app with OAM 11g - the Webcenter side

    - by Martin Deh
    Recently, there was a customer requirment to enable a WebCenter custom portal application to have multiple login-type pages and have the authentication be handle through Oracle Access Manager (OAM) As my security colleagues would tell me, this is fully supported through OAM.  Basically, all that would have to be done is to define in OAM individual resources (directories, URLS , .etc) that needed to be secured. Once that was done, OAM would handle the rest and the user would typically then be prompted by a login page, which was provided by OAM.  I am not going to discuss talking about OAM security in this blog.  In addition, my colleague Chris Johnson (ATEAM security) has already blogged his side of the story here:  http://fusionsecurity.blogspot.com/2012/06/protecting-webcenter-app-with-oam-11g.html .  What I am going to cover is what was done on the WebCenter/ADF side of things. In the test application, basically the structure of pages defined in the pages.xml are as follows:  In this screenshot, notice that "Delegated Security" has been selected, and of the absence for the anonymous-role for the "secured" page (A - B is the same)  This essentially in the WebCenter world means that each of these pages are protected, and only accessible by those define by the applications "role".  For more information on how WebCenter handles security, which by the way extends from ADF security, please refer to the documentation.  The (default) navigation model was configured.  You can see that with this set up, a user will be able to view the "links", where the links define navigation to the respective page:   Note from this dialog, you could also set some security on each link via the "visible" property.  However, the recommended best practice is to set the permissions through the page hierarchy (pages.xml).  Now based on this set up, the expected behavior is that I could only see the link for secured A page only if I was already authenticated (logged in).  But, this is not the use case of the requirement, since any user (anonymous) should be able to view (and click on the link).  So how is this accomplished?  There is now a patch that enables this.  In addition, the portal application's web.xml will need an additional context parameter: <context-param>     <param-name>oracle.webcenter.navigationframework.SECURITY_LEVEL</param-name>     <param-value>public</param-value>  </context-param>  As Chris mentions in his part of the blog, the code that is responsible for displaying the "links" is based upon the retrieval of the navigation model "node" prettyURL.  The prettyURL is a generated URL that also includes the adf.ctrl-state token, which is very important to the ADF framework runtime.  URLs that are void of this token, get new tokens from the ADF runtime.  This can lead to potential memory issues.  <af:forEach var="node" varStatus="vs"    items="#{navigationContext.defaultNavigationModel.listModel['startNode=/,includeStartNode=false']}">                 <af:spacer width="10" height="10" id="s1"/>                 <af:panelGroupLayout id="pgl2" layout="vertical"                                      inlineStyle="border:blue solid 1px">                   <af:goLink id="pt_gl1" text="#{node.title}"                              destination="#{node.goLinkPrettyUrl}"                              targetFrame="#{node.attributes['Target']}"                              inlineStyle="font-size:large;#{node.selected ? 'font-weight:bold;' : ''}"/>                   <af:spacer width="10" height="10" id="s2"/>                   <af:outputText value="#{node.goLinkPrettyUrl}" id="ot2"                                  inlineStyle="font-size:medium; font-weight:bold;"/>                 </af:panelGroupLayout>               </af:forEach>  So now that the links are visible to all, clicking on a secure link will be intercepted by OAM.  Since the OAM can also configure in the Authentication Scheme, the challenging URL (the login page(s)) can also come from anywhere.  In this case the each login page have been defined in the custom portal application.  This was another requirement as well, since this login page also needed to have ADF based content.  This would not be possible if the login page came from OAM.  The following is the example login page: <?xml version='1.0' encoding='UTF-8'?> <jsp:root xmlns:jsp="http://java.sun.com/JSP/Page" version="2.1"           xmlns:f="http://java.sun.com/jsf/core"           xmlns:h="http://java.sun.com/jsf/html"           xmlns:af="http://xmlns.oracle.com/adf/faces/rich">   <jsp:directive.page contentType="text/html;charset=UTF-8"/>   <f:view>     <af:document title="Settings" id="d1">       <af:panelGroupLayout id="pgl1" layout="vertical"/>       <af:outputText value="LOGIN FORM FOR A" id="ot1"/>       <form id="loginform" name="loginform" method="POST"             action="XXXXXXXX:14100/oam/server/auth_cred_submit">         <table>           <tr>             <td align="right">username:</td>             <td align="left">               <input name="username" type="text"/>             </td>           </tr>                      <tr>             <td align="right">password:</td>             <td align="left">               <input name="password" type="password"/>             </td>           </tr>                      <tr>             <td colspan="2" align="center">               <input value=" login " type="submit"/>             </td>           </tr>         </table>         <input name="request_id" type="hidden" value="${param['request_id']}"                id="itsss"/>       </form>     </af:document>   </f:view> </jsp:root> As you can see the code is pretty straight forward.  The most important section is in the form tag, where the submit is a POST to the OAM server.  This example page is mostly HTML, however, it is valid to have adf tags mixed in as well.  As a side note, this solution is really to tailored for a specific requirement.  Normally, there would be only one login page (or dialog/popup), and the OAM challenge resource would be /adfAuthentication.  This maps to the adfAuthentication servlet.  Please see the documentation for more about ADF security here. 

    Read the article

  • Scott Guthrie in Glasgow

    - by Martin Hinshelwood
    Last week Scott Guthrie was in Glasgow for his new Guathon tour, which was a roaring success. Scott did talks on the new features in Visual Studio 2010, Silverlight 4, ASP.NET MVC 2 and Windows Phone 7. Scott talked from 10am till 4pm, so this can only contain what I remember and I am sure lots of things he discussed just went in one ear and out another, however I have tried to capture at least all of my Ohh’s and Ahh’s. Visual Studio 2010 Right now you can download and install Visual Studio 2010 Candidate Release, but soon we will have the final product in our hands. With it there are some amazing improvements, and not just in the IDE. New versions of VB and C# come out of the box as well as Silverlight 4 and SharePoint 2010 integration. The new Intellisense features allow inline support for Types and Dictionaries as well as being able to type just part of a name and have the list filter accordingly. Even better, and my personal favourite is one that Scott did not mention, and that is that it is not case sensitive so I can actually find things in C# with its reasonless case sensitivity (Scott, can we please have an option to turn that off.) Another nice feature is the Routing engine that was created for ASP.NET MVC is now available for WebForms which is good news for all those that just imported the MVC DLL’s to get at it anyway. Another fantastic feature that will need some exploring is the ability to add validation rules to your entities and have them validated automatically on the front end. This removes the need to add your own validators and means that you can control an objects validation rules from a single location, the object. A simple command “GridView.EnableDynamicData(gettype(product))“ will enable this feature on controls. What was not clear was wither there would be support for this in WPF and WinForms as well. If there is, we can write our validation rules once and use everywhere. I was disappointed to here that there would be no inbuilt support for the Dynamic Language Runtime (DLR) with VS2010, but I think it will be there for .vNext. Because I have been concentrating on the Visual Studio ALM enhancements to VS2010 I found this section invaluable as I now know at least some of what I missed. Silverlight 4 I am not a big fan of Silverlight. There I said it, and I will probably get lynched for it. My big problem with Silverlight is that most of the really useful things I leaned from WPF do not work. I am only going to mention one thing and that is “x:Type”. If you are a WPF developer you will know how much power these 6 little letters provide; the ability to target templates at object types being the the most magical and useful. But, and this is a massive but, if you are developing applications that MUST run on platforms other than windows then Silverlight is your only choice (well that and Flash, but lets just not go there). And Silverlight has a huge install base as well.. 60% of all internet connected devices have Silverlight. Can Adobe say that? Even though I am not a fan of it my current project is a Silverlight one. If you start your XAML experience with Silverlight you will not be disappointed and neither will the users of the applications you build. Scott showed us a fantastic application called “Silverface” that is a Silverlight 4 Out of Browser application. I have looked for a link and can’t find one, but true to form, here is a fantastic WPF version called Fish Bowl from Microsoft. ASP.NET MVC 2 ASP.NET MVC is something I have played with but never used in anger. It is definitely the way forward, but WebForms is not dead yet. there are still circumstances when WebForms are better. If you are starting from greenfield and you are using TDD, then MVC is ultimately the only way you can go. New in version 2 are Dynamic Scaffolding helpers that let you control how data is presented in the UI from the Entities. Adding validation rules and other options that make sense there can help improve the overall ease of developing the UI. Also the Microsoft team have heard the cries of help from the larger site builders and provided “Areas” which allow a level of categorisation to your Controllers and Views. These work just like add-ins and have their own folder, but also have sub Controllers and Views. Areas are totally pluggable and can be dropped onto existing sites giving the ability to have boxed products in MVC, although what you do with all of those views is anyone's guess. They have been listening to everyone again with the new option to encapsulate UI using the Html.Action or Html.ActionRender. This uses the existing  .ascx functionality in ASP.NET to render partial views to the screen in certain areas. While this was possible before, it makes the method official thereby opening it up to the masses and making it a standard. At the end of the session Scott pulled out some IIS goodies including the IIS SEO Toolkit which can be used to verify your own site is “good” for search engine consumption. Better yet he suggested that you run it against your friends sites and shame them with how bad they are. note: make sure you have fixed yours first. Windows Phone 7 Series I had already seen the new UI for WP7 and heard about the developer story, but Scott brought that home by building a twitter application in about 20 minutes using the emulator. Scott’s only mistake was loading @plip’s tweets into the app… And guess what, it was written in Silverlight. When Windows Phone 7 launches you will be able to use about 90% of the codebase of your existing Silverlight application and use it on the phone! There are two downsides to the new WP7 architecture: No, your existing application WILL NOT work without being converted to either a Silverlight or XNA UI. NO, you will not be able to get your applications onto the phone any other way but through the Marketplace. Do I think these are problems? No, not even slightly. This phone is aimed at consumers who have probably never tried to install an application directly onto a device. There will be support for enterprise apps in the future, but for now enterprises should stay on Windows Phone 6.5.x devices. Post Event drinks At the after event drinks gathering Scott was checking out my HTC HD2 (released to the US this month on T-Mobile) and liked the Windows Phone 6.5.5 build I have on it. We discussed why Microsoft were not going to allow Windows Phone 7 Series onto it with my understanding being that it had 5 buttons and not 3, while Scott was sure that there was more to it from a hardware standpoint. I think he is right, and although the HTC HD2 has a DX9 compatible processor, it was never built with WP7 in mind. However, as if by magic Saturday brought fantastic news for all those that have already bought an HD2: Yes, this appears to be Windows Phone 7 running on a HTC HD2. The HD2 itself won't be getting an official upgrade to Windows Phone 7 Series, so all eyes are on the ROM chefs at the moment. The rather massive photos have been posted by Tom Codon on HTCPedia and they've apparently got WiFi, GPS, Bluetooth and other bits working. The ROM isn't online yet but according to the post there's a beta version coming soon. Leigh Geary - http://www.coolsmartphone.com/news5648.html  What was Scott working on on his flight back to the US?   Technorati Tags: VS2010,MVC2,WP7S,WP7 Follow: @CAMURPHY, @ColinMackay, @plip and of course @ScottGu

    Read the article

  • Objective-C or C++ for iOS games?

    - by Martin Wickman
    I'm pretty confident programming in Objective-C and C++, but I find Objective-C to be somewhat easier to use and more flexible and dynamic in nature. What would be the pros and cons when using C++ instead of Obj-C for writing games in iOS? Or rather, are there any known problems with using Obj-C as compared to C++? For instance, I suspect there might be performance issues with Obj-C compared to code written in C/C++.

    Read the article

  • Do abstractions have to reduce code readability?

    - by Martin Blore
    A good developer I work with told me recently about some difficulty he had in implementing a feature in some code we had inherited; he said the problem was that the code was difficult to follow. From that, I looked deeper into the product and realised how difficult it was to see the code path. It used so many interfaces and abstract layers, that trying to understand where things began and ended was quite difficult. It got me thinking about the times I had looked at past projects (before I was so aware of clean code principles) and found it extremely difficult to get around in the project, mainly because my code navigation tools would always land me at an interface. It would take a lot of extra effort to find the concrete implementation or where something was wired up in some plugin type architecture. I know some developers strictly turn down dependency injection containers for this very reason. It confuses the path of the software so much that the difficulty of code navigation is exponentially increased. My question is: when a framework or pattern introduces so much overhead like this, is it worth it? Is it a symptom of a poorly implemented pattern? I guess a developer should look to the bigger picture of what that abstractions brings to the project to help them get through the frustration. Usually though, it's difficult to make them see that big picture. I know I've failed to sell the needs of IOC and DI with TDD. For those developers, use of those tools just cramps code readability far too much.

    Read the article

  • Scottish Visual Studio 2010 Launch event with Jason Zander

    - by Martin Hinshelwood
    Microsoft are hosting a launch event for Visual Studio 2010 on Friday 16th April in Edinburgh. The have managed to convince one of the head honchos from the Visual Studio product team to come to Scotland. With Scott Guthrie last week in Glasgow and now Jason Zander, Global General Manager for Visual Studio will be arriving in Edinburgh for the Launch event. There will be two speakers for the event, Jason will be up first and will be doing a session on Windows, Web, Cloud and Windows Phone 7 development with Visual Studio 2010. Second up is Giles Davis the UK’s Technical Specialist for Visual Studio ALM (formally Visual Studio Team System) who will be introducing the new Visual Studio 2010 Developer and tester collaboration features. LAUNCH AGENDA: 9.30am – 10.00am Arrival 10.00am - 11.30am Keynote & Q&A - Jason Zander, Global GM for Visual Studio 11.30am - 12.00pm Break 12.00pm - 1.00pm Developer & Tester Collaboration with Visual Studio 2010 - Giles Davies, Technical Specialist 1.00pm - 1.30pm Lunch DATE:              Friday, 16th April 2010 LOCATION: Microsoft Edinburgh, Waverley Gate, 2-4 Waterloo Place, Edinburgh, EH1 3EG I think Jason will be hanging out for the afternoon to answer questions and meet everyone. f you would like to attend, please email Nathan Davies on [email protected] with your name, company and email address   Technorati Tags: VS2010,TFS2010,Visual Studio,Visual Studio 2010

    Read the article

  • How can I sync with an iPod Nano 6G?

    - by Martin
    I'm having no luck at all with this iPod Nano. I've tried the following software: Banshee - The iPod shows up and files seem to be copied, but they don't show up on the iPod. Rhythmbox - Same as Banshee. Claims to sync but no files available on the iPod gPodder - At first it wouldn't even recognize the device even though I set the mount point and device type. After syncing one file to the iPod from iTunes on my mac it now behaves as Banshee and Rythmbox. gtkpod - Again: Copies the files but they are inacessible on the iPod. Hipo - Doesn't even recognize the iPod Amarok - What is this, I don't even... So to summarize: After some fiddling I can get most of these apps to recognize the iPod and copy files to it, but they are not accessible on the iPod which sort of defeats the whole purpose. Help me out here. My continued harmonic love life depends on it. (Yes, it's the girlfriends iPod and laptop)

    Read the article

  • Finding the problem on a partially succeeded build

    - by Martin Hinshelwood
    Now that I have the Build failing because of a genuine bug and not just because of a test framework failure, lets see if we can trace through to finding why the first test in our new application failed. Lets look at the build and see if we can see why there is a red cross on it. First, lets open that build list. On Team Explorer Expand your Team Project Collection | Team Project and then Builds. Double click the offending build. Figure: Opening the Build list is a key way to see what the current state of your software is.   Figure: A test is failing, but we can now view the Test Results to find the problem      Figure: You can quite clearly see that the test has failed with “The device is not ready”. To me the “The Device is not ready” smacks of a System.IO exception, but it passed on my local computer, so why not on the build server? Its a FaultException so it is most likely coming from the Service and not the client, so lets take a look at the client method that the test is calling: bool IProfileService.SaveDefaultProjectFile(string strComputerName) { ProjectFile file = new ProjectFile() { ProjectFileName = strComputerName + "_" + System.DateTime.Now.ToString("yyyyMMddhhmmsss") + ".xml", ConnectionString = "persist security info=False; pooling=False; data source=(local); application name=SSW.SQLDeploy.vshost.exe; integrated security=SSPI; initial catalog=SSWSQLDeployNorthwindSample", DateCreated = System.DateTime.Now, DateUpdated = System.DateTime.Now, FolderPath = @"C:\Program Files\SSW SQL Deploy\SampleData\", IsComplete=false, Version = "1.3", NewDatabase = true, TimeOut = 5, TurnOnMSDE = false, Mode="AutomaticMode" }; string strFolderPath = "D:\\"; //LocalSettings.ProjectFileBasePath; string strFileName = strFolderPath + file.ProjectFileName; try { using (FileStream fs = new FileStream(strFileName, FileMode.Create)) { DataContractSerializer serializer = new DataContractSerializer(typeof(ProjectFile)); using (XmlDictionaryWriter writer = XmlDictionaryWriter.CreateTextWriter(fs)) { serializer.WriteObject(writer, file); } } } catch (Exception ex) { //TODO: Log the exception throw ex; return false; } return true; } Figure: You can see on lines 9 and 18 that there are calls being made to specific folders and disks. What is wrong with this code? What assumptions mistakes could the developer have made to make this look OK: That every install would be to “C:\Program Files\SSW SQL Deploy” That every computer would have a “D:\\” That checking in code at 6pm because the had to go home was a good idea. lets solve each of these problems: We are in a web service… lets store data within the web root. So we can call “Server.MapPath(“~/App_Data/SSW SQL Deploy\SampleData”) instead. Never reference an explicit path. If you need some storage for your application use IsolatedStorage. Shelve your code instead. What else could have been done? Code review before check-in – The developer should have shelved their code and asked another dev to look at it. Use Defensive programming – Make sure that any code that has the possibility of failing has checks. Any more options? Let me know and I will add them. What do we do? The correct things to do is to add a Bug to the backlog, but as this is probably going to be fixed in sprint, I will add it directly to the sprint backlog. Right click on the failing test Select “Create Work Item | Bug” Figure: Create an associated bug to add to the backlog. Set the values for the Bug making sure that it goes into the right sprint and Area. Make your steps to reproduce as explicit as possible, but “See test” is valid under these circumstances.   Figure: Add it to the correct Area and set the Iteration to the Area name or the Sprint if you think it will be fixed in Sprint and make sure you bring it up at the next Scrum Meeting. Note: make sure you leave the “Assigned To” field blank as in Scrum team members sign up for work, you do not give it to them. The developer who broke the test will most likely either sign up for the bug, or say that they are stuck and need help. Note: Visual Studio has taken care of associating the failing test with the Bug. Save… Technorati Tags: WCF,MSTest,MSBuild,Team Build 2010,Team Test 2010,Team Build,Team Test

    Read the article

  • Flashing your Windows Phone Dummies

    - by Martin Hinshelwood
    The rate at which vendors release new updates for the HD2 is ridiculously slow. You have to wait for Microsoft to release the new OS, then you wait for HTC to build it into a ROM, and then you have to wait up to 6 months for your operator to badly customise it for their network. Once Windows Phone 7 is released this problem should go away as Microsoft is likely to be able to update the phone over the air, but what do we do until then? I want Windows Mobile 6.5.5 now!   I’m an early adopter. If there is a new version of something then that’s the version I want. As long as you accept that you are using something on a “let the early adopter beware” and accept that there may be bugs, sometimes serious crippling bugs the go for it. Note that I won't be responsible if you end up bricking your phone, unlocking or flashing your radio or ROM can be risky. If you follow the instructions then you should be fine, I've flashed my phones (SPV, M300, M1000, M2000, M3100, TyTN, TyTN 2, HD2) hundreds of times without any problems! I have been using Windows Mobile 6.5.5 before it was called 6.5.5 and for long enough that I don’t even remember when I first started using it. I was using it on my HTC TyTN 2 before I got an HD2 a couple of months before Christmas, and the first custom ROM’s for the HD2 were a couple of months after that. I always update to the latest ROM that I like, and occasionally I go back to the stock ROM’s to have a look see, but I am always disappointed. Terms: Soft Reset: Same as pulling out the battery, but is like a reboot for your phone Hard Reset: Reinstalls the Operating system from the Image that is stored on it ROM: This is Image that is loaded onto your phone and it is used to reinstall your phone whenever you do a “hard reset”. Stock ROM: A ROM from the original vendor… So HTC Cook a ROM: Referring to Cooking a ROM is the process a ROM developer goes through to take all of the parts (OS, Drivers and Applications) that make up a running phone and compiling them into a ROM. ROM Kitchen: A place where you get an SDK and all the component parts of the phone: OD, Drivers and Application. There are usually lots of Tools for making it easier to compile and build the image. Flashing: The process of updating one of the layers of your phone with a new layer Bricked: This is what happens when flashing goes wrong. Your phone is now good for only one thing… stopping paper blowing away in a windy place. You can “cook” you own ROM using one of the many good “ROM Kitchens” or you can use a ROM built and tested by someone else. I have cooked my own ROM before, and while the tutorials are good, it is a lot of hassle. You can only Flash new ROM’s that are specifically for your phone only so find a ROM for your phone and XDA Developers is the best place to look. It has a forum based structure and you can find your phone quite easily. XDA Developer Forum Installing a new ROM does have its risks. In the past there have been stories about phones being “bricked” but I have not heard of a bricked phone for quite some years. if you follow the instructions carefully you should not have any problems. note: Most of the tools are written by people for whom English is not their first language to you will need concentrate hard to understand some of the instructions. Have you ever read a manual that was just literally translated from another language? Enough said… There are a number of layers on your phone that you will need to know about: SPL: This is the lowest level, like a BIOS on a PC and is the Operating Systems gateway to the hardware Radio: I think of this as the hardware drivers, and you will need a different Radio for CDMA than GSM networks ROM: This is like your Windows CD, but it is stored internally to the Phone. Flashing your phone consists of replacing one Image with another and then wiping your phone and automatically reinstall from the Image. Sometimes when you download an Image wither it is for a Radio or for ROM you only get a file called *.nbh. What do you do with this? Well you need an RUU application to push that Image to your phone. The RUU’s are different per phone, but there is a CustomRUU for the HD2 that will update your phone with any *.nbh placed in the same directory. Download and Instructions for CustomRUU #1 Flash HardSPL An SPL is kind of like a BIOS, and the default one has checks to make sure that you are only installing a signed ROM. This would prevent you from installing one that comes from any other source but the vendor. NOTE: Installing a HARD SPL invalidates your warranty so remember to Flash your phone with a “stock” vendor ROM before trying to send your phone in for repairs. Is the warranty reinstated when you go back to a stock ROM? I don’t know… Updating your SPL to a HardSPL effectively unlocks your phone so you can install anything you like. I would recommend the HardSPL2. Download and Instructions for HardSPL2 #2 Task29 One of the problems that has been seen on the HD2 when flashing new ROM’s is that things are left over from the old ROM. For a while the recommendation was to Flash a stock ROM first, but some clever cookies have come up with “Task29” which formats your phone first. After running this your phone will be blank and will only boot to the white HTC logo and no further. You should follow the instructions and reboot (remove battery) and hold down the “volume down” button while turning you HD2 on to enter the bootloader. From here you can run CustomRUU once the USB message appears. Download and Instructions for Task29 #2 Flash Radio You may need to play around with this one, there is no good and bad version and the latest is not always the best. You know that annoying thing when you hit “end call” on your phone and nothing happens? Well that's down to the Radio. Get this version right for you and you may even be able to make calls. From a Windows Mobile as well Download There are no instructions here, but they are the same as th ROM, but you use this *.nbh file. #3 Flash ROM If you have gotten this far then you are probably a pro by now Just download the latest ROM below and Flash to your phone. I have been really impressed by the Artemis line of ROM’s but it is no way the only choice. I like this one as the developer builds them as close to the stock ROM as possible while updating to the latest of everything. Download and Instructions for  Artemis HD2 vXX Conclusion While updating your ROM is not for the faint hearted it provides more options than the Stock ROM’s and quicker feature updates than waiting… Technorati Tags: WM6

    Read the article

  • How would i down-sample a .wav file then reconstruct it using nyquist? - in matlab [closed]

    - by martin
    This is all done in MatLab 2010 My objective is to show the results of: undersampling, nyquist rate/ oversampling First i need to downsample the .wav file to get an incomplete/ or impartial data stream that i can then reconstuct. Heres the flow chart of what im going to be doing So the flow is analog signal - sampling analog filter - ADC - resample down - resample up - DAC - reconstruction analog filter what needs to be achieved: F= Frequency F(Hz=1/s) E.x. 100Hz = 1000 (Cyc/sec) F(s)= 1/(2f) Example problem: 1000 hz = Highest frequency 1/2(1000hz) = 1/2000 = 5x10(-3) sec/cyc or a sampling rate of 5ms This is my first signal processing project using matlab. what i have so far. % Fs = frequency sampled (44100hz or the sampling frequency of a cd) [test,fs]=wavread('test.wav'); % loads the .wav file left=test(:,1); % Plot of the .wav signal time vs. strength time=(1/44100)*length(left); t=linspace(0,time,length(left)); plot(t,left) xlabel('time (sec)'); ylabel('relative signal strength') **%this is were i would need to sample it at the different frequecys (both above and below and at) nyquist frequency.*I think.*** soundsc(left,fs) % shows the resaultant audio file , which is the same as original ( only at or above nyquist frequency however) Can anyone tell me how to make it better, and how to do the various sampling at different frequencies?

    Read the article

  • How to sync with iPod Nano 6G?

    - by Martin
    I'm having no luck at all with this iPod Nano. I've tried the following software: Banshee - The iPod shows up and files seem to be copied, but they don't show up on the iPod. Rythmbox - Same as Banshee. Claims to sync but no files available on the iPod gPodder - At first it wouldn't even recognize the device even though I set the mount point and device type. After syncing one file to the iPod from iTunes on my mac it now behaves as Banshee and Rythmbox. gtkpod - Again: Copies the files but they are inacessible on the iPod. Hipo - Doesn't even recognize the iPod Amarok - What is this, I don't even... So to summarize: After some fiddling I can get most of these apps to recognize the iPod and copy files to it, but they are not accessible on the iPod which sort of defeats the whole purpose. Help me out here. My continued harmonic love life depends on it. (Yes, it's the girlfriends iPod and laptop)

    Read the article

  • Professional Scrum Developer (.NET) Training in London

    - by Martin Hinshelwood
    On the 26th - 30th July in Microsoft’s offices in London Adam Cogan from SSW will be presenting the first Professional Scrum Developer course in the UK. I will be teaching this course along side Adam and it is a fantastic experience. You are split into teams and go head-to-head to deliver units of potentially shippable work in four two hour sprints. The Professional Scrum Developer course is the only course endorsed by both Microsoft and Ken Schwaber and they have worked together very effectively in brining this course to fruition. This course is the brain child of Richard Hundhausen, a Microsoft Regional Director, and both Adam and I attending the Trainer Prep in Sydney when he was there earlier this year. He is a fantastic trainer and no matter where you do this course you can be safe in the knowledge that he has trained and vetted all of the teachers. A tools version of Ken if you will Find a course and register Download this syllabus Download the Scrum Guide What is the Professional Scrum Developer course all about? Professional Scrum Developer course is a unique and intensive five-day experience for software developers. The course guides teams on how to turn product requirements into potentially shippable increments of software using the Scrum framework, Visual Studio 2010, and modern software engineering practices. Attendees will work in self-organizing, self-managing teams using a common instance of Team Foundation Server 2010. Who should attend this course? This course is suitable for any member of a software development team – architect, programmer, database developer, tester, etc. Entire teams are encouraged to attend and experience the course together, but individuals are welcome too. Attendees will self-organize to form cross-functional Scrum teams. These teams require an aggregate of skills specific to the selected case study. Please see the last page of this document for specific details. Product Owners, ScrumMasters, and other stakeholders are welcome too, but keep in mind that everyone who attends will be expected to commit to work and pull their weight on a Scrum team. What should you know by the end of the course? Scrum will be experienced through a combination of lecture, demonstration, discussion, and hands-on exercises. Attendees will learn how to do Scrum correctly while being coached and critiqued by the instructor, in the following topic areas: Form effective teams Explore and understand legacy “Brownfield” architecture Define quality attributes, acceptance criteria, and “done” Create automated builds How to handle software hotfixes Verify that bugs are identified and eliminated Plan releases and sprints Estimate product backlog items Create and manage a sprint backlog Hold an effective sprint review Improve your process by using retrospectives Use emergent architecture to avoid technical debt Use Test Driven Development as a design tool Setup and leverage continuous integration Use Test Impact Analysis to decrease testing times Manage SQL Server development in an Agile way Use .NET and T-SQL refactoring effectively Build, deploy, and test SQL Server databases Create and manage test plans and cases Create, run, record, and play back manual tests Setup a branching strategy and branch code Write more maintainable code Identify and eliminate people and process dysfunctions Inspect and improve your team’s software development process What does the week look like? This course is a mix of lecture, demonstration, group discussion, simulation, and hands-on software development. The bulk of the course will be spent working as a team on a case study application delivering increments of new functionality in mini-sprints. Here is the week at a glance: Monday morning and most of the day Friday will be spent with the computers powered off, so you can focus on sharpening your game of Scrum and avoiding the common pitfalls when implementing it. The Sprints Timeboxing is a critical concept in Scrum as well as in this course. We expect each team and student to understand and obey all of the timeboxes. The timebox duration will always be clearly displayed during each activity. Expect the instructor to enforce it. Each of the ½ day sprints will roughly follow this schedule: Component Description Minutes Instruction Presentation and demonstration of new and relevant tools & practices 60 Sprint planning meeting Product owner presents backlog; each team commits to delivering functionality 10 Sprint planning meeting Each team determines how to build the functionality 10 The Sprint The team self-organizes and self-manages to complete their tasks 120 Sprint Review meeting Each team will present their increment of functionality to the other teams = 30 Sprint Retrospective A group retrospective meeting will be held to inspect and adapt 10 Each team is expected to self-organize and manage their own work during the sprint. Pairing is highly encouraged. The instructor/product owner will be available if there are questions or impediments, but will be hands-off by default. You should be prepared to communicate and work with your team members in order to achieve your sprint goal. If you have development-related questions or get stuck, your partner or team should be your first level of support. Module 1: INTRODUCTION This module provides a chance for the attendees to get to know the instructors as well as each other. The Professional Scrum Developer program, as well as the day by day agenda, will be explained. Finally, the Scrum team will be selected and assembled so that the forming, storming, norming, and performing can begin. Trainer and student introductions Professional Scrum Developer program Agenda Logistics Team formation Retrospective Module 2: SCRUMDAMENTALS This module provides a level-setting understanding of the Scrum framework including the roles, timeboxes, and artifacts. The team will then experience Scrum firsthand by simulating a multi-day sprint of product development, including planning, review, and retrospective meetings. Scrum overview Scrum roles Scrum timeboxes (ceremonies) Scrum artifacts Simulation Retrospective It’s required that you read Ken Schwaber’s Scrum Guide in preparation for this module and course. MODULE 3: IMPLEMENTING SCRUM IN VISUAL STUDIO 2010 This module demonstrates how to implement Scrum in Visual Studio 2010 using a Scrum process template*. The team will learn the mapping between the Scrum concepts and how they are implemented in the tool. After connecting to the shared Team Foundation Server, the team members will then return to the simulation – this time using Visual Studio to manage their product development. Mapping Scrum to Visual Studio 2010 User Story work items Task work items Bug work items Demonstration Simulation Retrospective Module 4: THE CASE STUDY In this module the team is introduced to their problem domain for the week. A kickoff meeting by the Product Owner (the instructor) will set the stage for the why and what that will take during the upcoming sprints. The team will then define the quality attributes of the project and their definition of “done.” The legacy application code will be downloaded, built, and explored, so that any bugs can be discovered and reported. Introduction to the case study Download the source code, build, and explore the application Define the quality attributes for the project Define “done” How to file effective bugs in Visual Studio 2010 Retrospective Module 5: HOTFIX This module drops the team directly into a Brownfield (legacy) experience by forcing them to analyze the existing application’s architecture and code in order to locate and fix the Product Owner’s high-priority bug(s). The team will learn best practices around finding, testing, fixing, validating, and closing a bug. How to use Architecture Explorer to visualize and explore Create a unit test to validate the existence of a bug Find and fix the bug Validate and close the bug Retrospective Module 6: PLANNING This short module introduces the team to release and sprint planning within Visual Studio 2010. The team will define and capture their goals as well as other important planning information. Release vs. Sprint planning Release planning and the Product Backlog Product Backlog prioritization Acceptance criteria and tests Sprint planning and the Sprint Backlog Creating and linking Sprint tasks Retrospective At this point the team will have the knowledge of Scrum, Visual Studio 2010, and the case study application to begin developing increments of potentially shippable functionality that meet their definition of done. Module 7: EMERGENT ARCHITECTURE This module introduces the architectural practices and tools a team can use to develop a valid design on which to develop new functionality. The teams will learn how Scrum supports good architecture and design practices. After the discussion, the teams will be presented with the product owner’s prioritized backlog so that they may select and commit to the functionality they can deliver in this sprint. Architecture and Scrum Emergent architecture Principles, patterns, and practices Visual Studio 2010 modeling tools UML and layer diagrams SPRINT 1 Retrospective Module 8: TEST DRIVEN DEVELOPMENT This module introduces Test Driven Development as a design tool and how to implement it using Visual Studio 2010. To maximize productivity and quality, a Scrum team should setup Continuous Integration to regularly build every team member’s code changes and run regression tests. Refactoring will also be defined and demonstrated in combination with Visual Studio’s Test Impact Analysis to efficiently re-run just those tests which were impacted by refactoring. Continuous integration Team Foundation Build Test Driven Development (TDD) Refactoring Test Impact Analysis SPRINT 2 Retrospective Module 9: AGILE DATABASE DEVELOPMENT This module lets the SQL Server database developers in on a little secret – they can be agile too. By using the database projects in Visual Studio 2010, the database developers can join the rest of the team. The students will see how to apply Agile database techniques within Visual Studio to support the SQL Server 2005/2008/2008R2 development lifecycle. Agile database development Visual Studio database projects Importing schema and scripts Building and deploying Generating data Unit testing SPRINT 3 Retrospective Module 10: SHIP IT Teams need to know that just because they like the functionality doesn’t mean the Product Owner will. This module revisits acceptance criteria as it pertains to acceptance testing. By refining acceptance criteria into manual test steps, team members can execute the tests, recording the results and reporting bugs in a number of ways. Manual tests will be defined and executed using the Microsoft Test Manager tool. As the Sprint completes and an increment of functionality is delivered, the team will also learn why and when they should create a branch of the codeline. Acceptance criteria Testing in Visual Studio 2010 Microsoft Test Manager Writing and running manual tests Branching SPRINT 4 Retrospective Module 11: OVERCOMING DYSFUNCTION This module introduces the many types of people, process, and tool dysfunctions that teams face in the real world. Many dysfunctions and scenarios will be identified, along with ideas and discussion for how a team might mitigate them. This module will enable you and your team to move toward independence and improve your game of Scrum when you depart class. Scrum-butts and flaccid Scrum Best practices working as a team Team challenges ScrumMaster challenges Product Owner challenges Stakeholder challenges Course Retrospective What will be expected of you and you team? This is a unique course in that it’s technically-focused, team-based, and employs timeboxes. It demands that the members of the teams self-organize and self-manage their own work to collaboratively develop increments of software. All attendees must commit to: Pay attention to all lectures and demonstrations Participate in team and group discussions Work collaboratively with other team members Obey the timebox for each activity Commit to work and do your best to deliver All teams should have these skills: Understanding of Scrum Familiarity with Visual Studio 201 C#, .NET 4.0 & ASP.NET 4.0 experience*  SQL Server 2008 development experience Software testing experience * Check with the instructor ahead of time for the exact technologies Self-organising teams Another unique attribute of this course is that it’s a technical training class being delivered to teams of developers, not pairs, and not individuals. Ideally, your actual software development team will attend the training to ensure that all necessary skills are covered. However, if you wish to attend an open enrolment course alone or with just a couple of colleagues, realize that you may be placed on a team with other attendees. The instructor will do his or her best to ensure that each team is cross-functional to tackle the case study, but there are no guarantees. You may be required to try a new role, learn a new skill, or pair with somebody unfamiliar to you. This is just good Scrum! Who should NOT take this course? Because of the nature of this course, as explained above, certain types of people should probably not attend this course: Students requiring command and control style instruction – there are no prescriptive/step-by-step (think traditional Microsoft Learning) labs in this course Students who are unwilling to work within a timebox Students who are unwilling to work collaboratively on a team Students who don’t have any skill in any of the software development disciplines Students who are unable to commit fully to their team – not only will this diminish the student’s learning experience, but it will also impact their team’s learning experience Find a course and register Download this syllabus Download the Scrum Guide Technorati Tags: Scrum,SSW,Pro Scrum Dev

    Read the article

  • Rights Expiry Options in IRM 11g

    - by martin.abrahams
    Among the many enhancements in IRM 11g, we have introduced a couple of new rights expiry options that may be applied to any role. These options were supported in previous versions, but fell into the "advanced configuration" category. In 11g, the options can be applied simply by selecting a check-box in the properties of a role, as shown by the rather extreme example below, where the role allows access for just two minutes after they are sealed. The new options are: To define a role that expires automatically some period after it is assigned To define a role that evaluates expiry relative to the time that each document is sealed These options supplement the familiar options to allow open-ended access (limited by offline access and the ever-present option to revoke rights at any time) and the option to define time windows with specific start dates and end dates. The value of these options is easiest to illustrate with some publishing examples: You might define a role with a one year expiry to be assigned to users who purchase a one year subscription. For each individual user, the year would be calculated from the time that the role was assigned to them. You might define a role that allows documents to be accessed only for 24 hours from the time that they are published - perhaps as a preview mechanism designed to tempt users to sign up for a full subscription. Upon payment of a full fee, users can simply be reassigned a role that gives them greater access to exactly the same documents. In a corporate environment, you might use such roles for fixed term contractors or for workflows that involve information with a short lifespan, or perhaps as part of a compliance process that requires rights to be formally re-approved at intervals. Being role-based, the time constraints apply to any number of documents - including documents that have not yet been created. For example, a user with a one year subscription would have access to all documents published in the relevant classification during the year without any further configuration. Crucially, unlike other solutions, it is not the documents that expire, but the rights of particular users. Whereas some solutions make documents completely inaccessible for all users after expiry, Oracle IRM can allow some users to continue using documents while other users lose access. Equally crucially, a user whose rights have expired can always be granted fresh rights at any time - for example, because they renew their subscription or because a manager confirms that they still need the rights as part of a corporate compliance process. By applying expiry to rights rather than to documents, Oracle IRM avoids the risk of locking an organization out of its own information.

    Read the article

  • Who broke the build?

    - by Martin Hinshelwood
    I recently sent round a list of broken builds at SSW and asked for them to be fixed or deleted if they are not being used. My colleague Peter came back with a couple of questions which I love as it tells me that at least one person reads my email I think first we need to answer a couple of other questions related to builds in general.   Why do we want the build to pass? Any developer can pick up a project and build it Standards can be enforced Constant quality is maintained Problems in code are identified early What could a failed build signify? Developers have not built and tested their code properly before checking in. Something added depends on a local resource that is not under version control or does not exist on the target computer. Developers are not writing tests to cover common problems. There are not enough tests to cover problems. Now we know why, lets answer Peters questions: Where is this list? (can we see it somehow) You can normally only see the builds listed for each project. But, you have a little application called “Build Notifications” on your computer. It is installed when you install Visual Studio 2010. Figure: Staring the build notification application on Windows 7. Once you have it open (it may disappear into your system tray) you should click “Options” and select all the projects you are involved in. This application only lists projects that have builds, so don’t worry if it is not listed. This just means you are about to setup a build, right? I just selected ALL projects that have builds. Figure: All builds are listed here In addition to seeing the list you will also get toast notification of build failure’s. How can we get more info on what broke the build? (who is interesting too, to point the finger but more important is what) The only thing worse than breaking the build, is continuing to develop on a broken build! Figure: I have highlighted the users who either are bad for braking the build, or very bad for not fixing it. To find out what is wrong with a build you need to open the build definition. You can open a web version by double clicking the build in the image above, or you can open it from “Team Explorer”. Just connect to your project and open out the “Builds” tree. Then Open the build by double clicking on it. Figure: Opening a build is easy, but double click it and then open a build run from the list. Figure: Good example, the build and tests have passed Figure: Bad example, there are 133 errors preventing POK from being built on the build server. For identifying failures see: Solution: Getting Silverlight to build on Team Build 2010 RC Solution: Testing Web Services with MSTest on Team Build Finding the problem on a partially succeeded build So, Peter asked about blame, let’s have a look and see: Figure: The build has been broken for so long I have no idea when it was broken, but everyone on this list is to blame (I am there too) The rest of the history is lost in the sands of time, there is no way to tell when the build was originally broken, or by whom, or even if it ever worked in the first place. Build should be protected by the team that uses them and the only way to do that is to have them own them. It is fine for me to go in and setup a build, but the ownership for a build should always reside with the person who broke it last. Conclusion This is an example of a pointless build. Lets be honest, if you have a system like TFS in place and builds are constantly left broken, or not added to projects then your developers don’t yet understand the value. I have found that adding a Gated Check-in helps instil that understanding of value. If you prevent them from checking in without passing that basic quality gate of “your code builds on another computer” then it makes them look more closely at why they can’t check-in. I have had builds fail because one developer had a “d” drive, but the build server did not. That is what they are there to catch.   If you want to know what builds to create and why I wrote a post on “Do you know the minimum builds to create on any branch?”   Technorati Tags: TFS2010,Gated Check-in,Builds,Build Failure,Broken Build

    Read the article

  • Combining Scrum, TFS2010 and Email to keep everyone in the loop

    - by Martin Hinshelwood
    Often you will receive rich information from your Product Owner (Customer) about tasks. That information can be in the form of Word documents, HTML Emails and Pictures, but you generally receive them in the context of an Email. You need to keep these so your Team can refer to it later, and so you can send a “done” when the task has been completed. This preserves the “history” of the task and allows you to keep relevant partied included in any future conversation. At SSW we keep the original email so that we can reply Done and delete the email. But keeping it in your email does not help other members of the team if they complete the task and need to send the “done”. Worse yet, the description field in Team Foundation Server 2010 (TFS 2010) does not support HTML and images, nor does the default task template support an “interested parties” or CC field. You can attach this content manually, but it can be time consuming. Figure: Description only supports plain text, and History supports HTML with no images   What should we do? At SSW we always follow the rules, and it just so happened that we have rules to both achieve this, and to make it easier. You should follow the existing Rules to Better Project Management  and attach the email to your task so you can refer to and reply to it later when you close the task: Do you know what Outlook add-ins you need? Describe the work item request in an email Use Outlook Add-in to move the email to a TFS Work Item When replying to an email with “done” you should follow: Do you update Team Companion template, so the email "subject" doesn't change? Do you update Team Companion template, so you can generate a proper "done" mail? Following these simple rules will help your Product Owner understand you better, and allow your team to more effectively collaborate with each other. An added bonus is that as we are keeping the email history in sync with TFS. When you “reply all” to the email all of the interested partied to the Task are also included. This notified those that may have been blocked by your task to keep up to date with its status. This has been published as Do you know to ensure that relevant emails are attached to tasks in our Rules to Better Scrum using TFS. What could we do better? I would like to see this process automated so that we capture the information correctly in the task without the need to use email. This would require a change to the process template in Team Foundation Server to add an “Interested Parties” field. Each reply to the email would need to be automatically processed into a Work Item. This could be done by adding a task identifier as the first item in the “Relates to” email header, and copying in an email address that you watch. This would then parse out the relevant information and add the new message to the history, update the “Interested parties” field and attach the Images. Upon reflection, it may even be possible, but more difficult to do this using ONLY the History field and including some of the header information in there to the build a done email with history. This would not currently deal with email “forks” well, but I think it would be adequate for our needs. It would be nice if we could find time to implement this, but currently it is but a pipe dream. Maybe Microsoft could implement something in the next version of Team Foundation Server, and in the mean time we have a process that works well. Technorati Tags: Scrum,SSW Rules,TFS 2010,TFS 2008

    Read the article

< Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >