Search Results

Search found 20631 results on 826 pages for 'release management'.

Page 90/826 | < Previous Page | 86 87 88 89 90 91 92 93 94 95 96 97  | Next Page >

  • How do I prevent an external monitor from shutting off when closing my laptop lid?

    - by Thom
    I've seen this issue on previous versions of Ubuntu, but not on 12.04 and some of those are resolved bugs, so I'm asking again. I've set up power management so that, when plugged in, my laptop does nothing when the lid is closed. I do this so that I can use as a desktop with my external monitor with the screen closed and the laptop scurried away from my desktop. I tried turning off the laptop monitor to see if that made a difference, but it doesn't. The problem is that closing the lid still shuts off my external monitor. What can I do to prevent this?

    Read the article

  • How to make a great functional specification

    - by sfrj
    I am going to start a little side project very soon, but this time i want to do not just the little UML domain model and case diagrams i often do before programming, i thought about making a full functional specification. Is there anybody that has experience writing functional specifications that could recommend me what i need to add to it? How would be the best way to start preparing it? Here i will write down the topics that i think are more relevant: Purpose Functional Overview Context Diagram Critical Project Success Factors Scope (In & Out) Assumptions Actors (Data Sources, System Actors) Use Case Diagram Process Flow Diagram Activity Diagram Security Requirements Performance Requirements Special Requirements Business Rules Domain Model (Data model) Flow Scenarios (Success, alternate…) Time Schedule (Task Management) Goals System Requirements Expected Expenses What do you think about those topics? Shall i add something else? or maybe remove something?

    Read the article

  • Hard Disk Spins Down as long as Battery is in Laptop

    - by Brock Dute
    Hi, I just figured out today that as long as the battery is in my laptop, it doesn't matter if it's fully charged while plugged in, Ubuntu always spins down my hard drive. I noticed this because there was a huge difference in speed when I removed the batteries. My settings for power management is basically: on AC power, don't spin down harddrive, dont suspend or anything on battery power, basically save as much power as possible I assumed that if I plug in my laptop, it'll use the On AC Power settings no matter what but apparently, this isn't so. Is there a way to "fix" this?

    Read the article

  • New Thinking for Supply Chain Analytics. PLM for Process. And Untangling Services Complexity.

    - by David Hope-Ross
    The first edition of the quarterly Oracle Information InDepth Value Chain and Procurement Transformation newsletter has just been published. It’s a solid round-up of news and analysis from the fast-moving world of global supply chains and supply management.  As the title of this post implies, the latest edition covers a wide array of great topics. But the story on supply chain analytics from Endeca is especially interesting. Without giving away the ending, it explores new ways of thinking about the value of information and how to exploit it for supply chain improvement. If you enjoy this edition, think about opting-in via the subscription link. It is an easy way to keep up with the latest and greatest.

    Read the article

  • ESSO Webcast Replay with Live Q&A

    - by B Shashikumar
    In our ESSO webcast on Oct 19th, we discussed how Oracle Enterprise Single-Sign On Suite can not only eliminate your password reset and helpdesk headaches but also offers a healthy ROI which enterprises just cannot overlook. In our webcast we discussed how Oracle ESSO Suite can deliver an ROI of 140% within the first year of deployment. Due to popular demand, we are now doing a re-broadcast of this webcast in the European time zone. The webcast will be followed by live Q&A. Matt Berzinski, Product Manager for Oracle ESSO Suite will be on air to answer all of your ESSO and Identity Management questions.  Join us on this webcast to find out how Oracle ESSO Suite Plus can deliver quick wins for your organization. Register here for this webcast.

    Read the article

  • What is (are) the most useful technique/visualization for overall project status?

    - by Wayne Werner
    For reasons "above my pay grade", we're developing an issue/project tracking system where I work (similar to Trac, FogBugz, etc). The managers want a useful tool to be able to track the overall health of the project (e.g. How much time left, how are we performing vs estimates) and one of the features that has been requested is some type of critical path support and visualization. The logic explained to me is that they want to be sure that at least the most important pieces of the project are currently being worked on. The initial idea was that we would create task-based dependencies. My understanding of project management tells me that this kind of granular approach is unnecessary - having milestones with specific deadlines/dependencies is much more useful. I would like to know what are the most useful techniques and "pretty pictures" you've seen/used for project development. Having objective data would be best, but somewhat subjective data is helpful too.

    Read the article

  • New Video: How Innovation Happens Today

    - by Kerrie Jordan
    How do you make innovation happen at your organization? If whiteboards, spreadsheets, point solutions or complicated systems are involved, you'll want to watch this new video!  See how Oracle Innovation Management can make it easier to know which ideas to pursue.  Remove guesswork and turn innovation into a structured, consistent and effective business process.  Become an innovation hero!  Watch in HD for supreme viewing experience, and learn how you can build your innovation discipline into a scaleable, repeatable, and strategic business process.

    Read the article

  • ICAM Webcast Replay and slides

    - by Darin Pendergraft
    On October 10, 2012 Derrick Harcey and I co-presented on how Oracle IDM helps customers address the guidelines of Identity Credential Access Management, from a Federal (FICAM) and a State (SICAM) perspective. If you missed the webcast, here is a link to the replay:  webcast replay link. Derrick did a nice job reviewing the various ICAM components and architectures, and then invited me to provide additional detail on the Oracle technology stack.  He then closed by mapping the ICAM architectures to various components of the Oracle IDM platform. Icam oracle-webcast-2012-10-10 from OracleIDM The next webcast in the Secure Government Training Series, Safeguarding Government Cyberspace will be held Wednesday, November 28th.

    Read the article

  • Managing time for success in the industry? [closed]

    - by nvillec
    So about a year ago I decided to pursue programming, specifically game development, as a career. I've always been a pretty avid gamer, from chucking turnips at Shy Guys' faces in the 90s, to downing Heroic Deathwing last week. Just recently though, I've been spending a LOT of time playing games and it's starting to show in my programming classes. Yesterday after a discouraging exam, I put my foot down and vowed to myself to keep the gaming:coding ratio in favor of the one that will hopefully pay the bills later on. I realize that knowing games well is a key part of being a good developer, but as I've been recently shown, there's a threshold of pixelated indulgence that must not be crossed if I'm ever going to land my dream job. I'm assuming many of you are quite enthusiastic about games as well. What advice would you give an aspiring programmer regarding time management? Thanks!! (Also, I'm brand new to Stack Exchange...if this belongs somewhere else, I'm happy to move it)

    Read the article

  • What issues carry the highest risk in a software project?

    - by Mehrdad
    Clearly, software projects are different from other industries in terms of many things like for instance, quality assurance, project progress measurement, and many other things. Unique characteristics of software projects also makes the risk management process unique. Lots of issues in a project might lead it to unacceptable delay or failure to deliver business value. They might even make a complete disaster in the project. What are the deadliest risk factors in a software project? How to analyze, prevent and handle them? Particularly, I'm interested in the issues that you can detect from the beginning and you should keep an eye on (for example, you might be told about a third-party API that the current application uses and lacks documentation). Please share your experiences if they are relevant.

    Read the article

  • Lenovo Thinkpad R500 having problems resuming

    - by Nicolas Raoul
    Yesterday I installed Ubuntu 11.04 from scratch on my Thinkpad R500, leaving the default power management settings. Yesterday I closed the lid, and this morning when I opened it the laptop resumed correctly. Today during lunch the laptop went to sleep without me closing the lid, and there was no way to wake it up by typing ESC or moving the mouse or TrackPoint. No disk activity at all. When I briefly pushed the POWER button, the laptop rebooted completely, losing my opened applications. Is it a known problem with Natty/Lenovo Thinkpad R500/ATI? Any idea what could fix the problem?

    Read the article

  • Cannot install build essential from the CD?

    - by munir
    After a fresh installation of Ubuntu 10.10 I tried to install build-essential from the Ubuntu installation CD. I put the cd in the cdrom and in the software repositories i checked the box install from cd(Ubuntu 10.10 release Maverick Meerkat). Then I reloaded the software repositories. The synaptic manager then tried to download some repository related files but failed to do so as i didn't have internet connection. Then I open a terminal and wrote sudo apt-get install build-essential. It prompted me if I want to install build essential y/N. I typed y but the terminal showed some errors and was not installed. I also tried to add the CD in the software repositories. I clicked add and it prompted me to insert a CD while the CD was still inside the cdrom. I clicked "ok" then and it showed it could not find any cd. What is wrong?

    Read the article

  • Letting go of a project

    - by SkyOrg
    I've been the sole developer of a niche product for my company for nearly 6 years. I've grown quite attached to the project and I enjoy working on it. However, it was the decision of management to take the project out of my hands and move it under the wings of another team. Unfortunately, I'm having a hard time letting go of the project. I'm sad to see it leave my hands since I've put so much time into it and enjoyed working on it, but it also allows me to work on new things. I've even caught myself being a bit hostile to the other team, which is poor on my part. How can I convince myself to just let it go?

    Read the article

  • What issues carry the highest risk in a software project?

    - by Mehrdad
    Clearly, software projects are different from other industries in terms of many things like for instance, quality assurance, project progress measurement, and many other things. Unique characteristics of software projects also makes the risk management process unique. Lots of issues in a project might lead it to unacceptable delay or failure to deliver business value. They might even make a complete disaster in the project. What are the deadliest risk factors in a software project? How to analyze, prevent and handle them? Particularly, I'm interested in the issues that you can detect from the beginning and you should keep an eye on (for example, you might be told about a third-party API that the current application uses and lacks documentation). Please share your experiences if they are relevant.

    Read the article

  • Which specific programming activities do women, on average, perform better than men? [closed]

    - by blueberryfields
    Following a recent discussion with female associates in hiring positions for software development/engineering positions, I found out that this kind of information would be incredibly useful to helping make sure that the workforce shows a gender balance. So I went looking. I've found various literature speaking about risk-taking behaviour and patterns, and other statistical differences between men and women when it comes to work performance. See for example this article related to hedge fund management. I have yet to see any such comparison in the computing field. To restate the question: Which specific programming activities do women, on average, perform better than men? Please back up your answers with specific details, preferably by linking to relevant research or, failing that, explaining what you're basing the information on.

    Read the article

  • Is it save to configure "Shutdown" on "When laptop lid is closed" ?

    - by Takkat
    To setup a laptop owned by a complete PC novice any settings that may become hard to tackle remotely need to be avoided. The laptop will be administrated via SSH. One thing in my list are problems arising from improper wake-ups from suspend or hibernate as they may also affect network accessibility. This is why I thought setting up power management to "shutdown" on closing the laptop lid could be a good idea. However I am not sure if this is a safe way to do. What problems in addition to software not closing properly (and thus not saving their data) could I be faced if I proceeded as planned?

    Read the article

  • Need a really simple client manage script to deliver graphics and revisions, please help?

    - by Mark R
    I am looking for a very simple client management script. The process flow of the script should be: Client orders (paypal etc) while giving specs on what they need given login details and thanked for their order backend for them consists of a 2 way communication. They ask questions we answer. We also upload the graphics here where they either accept them or as for revision. process complete. Now I cannot for the life of me find something as simple as this. It seems all the scripts out there are way too complicated. Does anyone know of one I can use to do this?

    Read the article

  • How can you plan long range resources and budgets when using Agile methodology?

    - by Mystere Man
    Agile does not encourage a lot of up-front design. This is good from a requirements management and software development standpoint, and allows the project to adapt to changing business needs. However, how does one do any long range planning of resources if you don't really know what you're going to build when you start? Oh sure, you have a conceptual model of what you're going to build, but you don't have any measurable detail from which to gague how many resources you will need to complete the project, or how much it will cost. Does anyone have any suggestions on how to go about long range planning in an agile environment?

    Read the article

  • Telerik announces native controls for Silverlight 4 Release Candidate.

    Right after the official release of Silverlight 4 Release Candidate (at MIX) Telerik has prepared for you a native build of RadControls for Silverlight that are built on the latest platforms release. The download can be found under the users accounts or as part of the Latest Internal Build. The download files are clearly marked with RadControls for Silverlight 4 RC. We will keep on updating the files with each Latest Internal Build. The RadControls for Silverlight 4 RC is still a preview version of RadControls for Silverlight 4 that will become official as soon as Microsoft announces the RTW version of Silverlight 4. Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • Is it safe to configure "Shutdown" on "When laptop lid is closed" ?

    - by Takkat
    To setup a laptop owned by a complete PC novice any settings that may become hard to tackle remotely need to be avoided. The laptop will be administrated via SSH. One thing in my list are problems arising from improper wake-ups from suspend or hibernate as they may also affect network accessibility. This is why I thought setting up power management to "shutdown" on closing the laptop lid could be a good idea. However I am not sure if this is a safe way to do. What problems in addition to software not closing properly (and thus not saving their data) could I be faced if I proceeded as planned?

    Read the article

  • S&OP best practices that can help your organization be more responsive and effective

    - by user717691
    If you want to increase revenue by quickly responding to market changes or want to ensure that your operating plans drive towards corporate financial goals, you need real-time sales and operations planning.Watch the replay of our recent Webcast to hear Christopher Neff from NCR Corporation discuss how NCR Corporation is leveraging Oracle's Real-Time Sales and Operations Planning solutions. Learn best practices that can help your organization be more responsive and effective. Discover how Oracle's comprehensive suite of best-in-class capabilities can: Synchronize plans and actions across the extended enterprise Maximize profits with the ability to sense, influence, and fulfill demand with industry leading demand management and real-time sales & operations Drive tactical decisions into operational planning and execution, while monitoring performance Profitably balance supply, demand, and budgets Move planning processes from periodic and reactive to real-time, iterative and proactive Register now for the on demand Webcast! http://www.oracle.com/webapps/dialogue/ns/dlgwelcome.jsp?p_ext=Y&p_dlg_id=8664804&src=6811174&Act=99NCR Corporation is a leader in Self Service Solution such as POS Solutions, Payment and Imaging Systems.

    Read the article

  • What to do when there are no logical user stories but separate development tasks?

    - by Alex. S.
    We need to generate a release in 3 weeks, and for the planning we are doing today we don't have coherent logical user stories from the backlog tasks. Is valid to match say each development task is equivalent to an user story? Methodologically what is the correct way of handling this?, because anyway we are going to have standup meetings and we are going to control the progress of the project against those development tasks. For example, we have things like: . Adapt ETL to process numeric lists . Adjust licensing component . Remove DTC and so on. So, for the planning poker and iteration planning is valid to use those tasks? if not, what is the alternative?

    Read the article

  • How to implement Scrum in a company with three similar web-based products

    - by user1909034
    I am somewhat familiar with the concepts and benefits of Scrum. With that in mind, I am trying to improve the failing Scrum product management structure of a company I'm now working for that has three separate B2C products, catering to the same demographic and accessible on the same website. Each product has a product owner and a unique development team (5 - 9 people in each) behind it. Given that the target audiences are similar (not sure if it should matter) and the 3 web products are similar in nature, what are the potential benefits/risks associated with merging the teams and having just one product owner/scrum master/dev team? Some questions that come to mind are: does it make sense to have 3 product owners and three distinct backlogs if your website has three distinct products? Also, if you only have one product owner, what is the best metric off which to choose who that will be?

    Read the article

  • Oracle Enterprise Manager Cloud Control 12c Release 2 (12.1.0.2) ist da!

    - by Ralf Durben (DBA Community)
    Das zweite Release von Oracle Enterprise Manager Cloud Control 12c ist jetzt verfügbar und zwar für alle Plattformen, auf denen auch das Vorgängerrelease genutzt werden konnte. Das gab es bei Enterprise Manager noch nie: Alle Plattformen haben die gleiche Priorität! In dem neuen Release wurde die Stabilität nochmals verbessert und einige Wünsche unserer Kunden verwirklicht. Auch einige neue Funktionalitäten, wie zum Beispiel "Java as a Service" stehen nun zur Verfügung. Neben dem Cloud Control Framework wurden auch einige Plug-Ins erneuert. Cloud Control 12.1.0.2 ist ein komplettes Release und der Download enthält alles für die Installation des OMS und Agenten. Damit kann mit der Software eine komplette Neuinstallation oder ein Upgrade von EM 10.2.0.5, 11.1 oder 12.1.0.1 (auch ohne Bundle Patch 1) vorgenommen werden. Eine Übersicht über die Neuerungen finden Sie im Oracle Enterprise Manager Cloud Control Introduction Document.

    Read the article

  • How to handle "porting" software that's still in development

    - by BAM
    My company is building an iOS version of an Android app that our client is developing (but has not yet released). We have access to the latest builds and source, however since the software is frequently re-structured and refactored, we're doing a lot of unnecessary re-work. In addition, the due date on the contract will likely be passed before the client's application is even ready for release. In other words, we're supposed to build the iOS version before the original Android version is even complete. Luckily the client tossed out the original deadline, but now we may have to renegotiate pricing... never a fun situation. Are we handling this incorrectly? How are "ports" (especially between mobile platforms) normally done? Is there a correct way to pipeline development for multiple platforms without so much re-work? Thanks in advance! :)

    Read the article

< Previous Page | 86 87 88 89 90 91 92 93 94 95 96 97  | Next Page >