Search Results

Search found 6 results on 1 pages for 'louism'.

Page 1/1 | 1 

  • client problems - misaligned expectations & not following SDLC protocols

    - by louism
    hi guys, im having some serious problems with a client on a project - i could use some advice please the short version i have been working with this client now for almost 6 months without any problems (a classified website project in the range of 500 hours) over the last few days things have drastically deteriorated to the point where ive had to place the project on-hold whilst i work-out what to do (this has pissed the client off even more) to be simplistic, the root cause of the issue is this: the client doesnt read the specs i make for him, i code the feature, he than wants to change things, i tell him its not to the agreed spec and that that change will have to be postponed and possibly charged for, he gets upset and rants saying 'hes paid for the feature' and im not keeping to the agreement (<- misalignment of expectations) i think the root cause of the root cause is my clients failure to take my SDLC protocols seriously. i have a bug tracking system in place which he practically refuses to use (he still emails me bugs), he doesnt seem to care to much for the protocols i use for dealing with scope creep and change control the whole situation came to a head recently where he 'cracked it' (an aussie term for being fed-up). the more terms like 'postponed for post-launch implementation', 'costed feature addition', and 'not to agreed spec' i kept using, the worse it got finally, he began to bully me - basically insisting i shut-up and do the work im being paid for. i wrote a long-winded email explaining how wrong he was on all these different points, and explaining what all the SDLC protocols do to protect the success of the project. than i deleted that email and wrote a new one in the new email, i suggested as a solution i write up a list of grievances we both had. we than review the list and compromise on different points: he gets some things he wants, i get some things i want. sometimes youve got to give ground to get ground his response to this suggestion was flat-out refusal, and a restatement that i should just get on with the work ive been paid to do so there you have the very subjective short version. if you have the time and inclination, the long version may be a little less bias as it has the email communiques between me and my client the long version (with background) the long version works by me showing you the email communiques which lead to the situation coming to a head. so here it is, judge for yourself where the trouble started... 1. client asked me why something was missing from a feature i just uploaded, my response was to show him what was in the spec: it basically said the item he was looking for was never going to be included 2. [clients response...] Memo Louis, We are following your own title fields and keeping a consistent layout. Why the big fuss about not adding "Part". It simply replaces "model" and is consistent with your current title fields. 3. [my response...] hi [client], the 'part' field appeared to me as a redundancy / mistake. i requested clarification but never received any in a timely manner (about 2 weeks ago) the specification for this feature also indicated it wasnt going to be included: RE: "Why the big fuss about not adding "Part" " it may not appear so, but it would actually be a lot of work for me to now add a 'Part' field it could take me up to 15-20 minutes to properly explain why its such a big undertaking to do this, but i would prefer to use that time instead to work on completing your v1.1 features as a simplistic explanation - it connects to the change in paradigm from a 'generic classified ad' model to a 'specific attributes for specific categories' model basically, i am saying it is a big fuss, but i understand that it doesnt look that way - after all, it is just one ity-bitty field :) if you require a fuller explanation, please let me know and i will commit the time needed to write that out also, if you recall when we first started on the project, i said that with the effort/time required for features, you would likely not know off the top of your head. you may think something is really complex, but in reality its quite simple, you might think something is easy - but it could actually be a massive trauma to code (which is the case here with the 'Part' field). if you also recalled, i said the best course of action is to just ask, and i would let you know on a case-by-case basis 4. [email from me to client...] hi [client], the online catalogue page is now up live (see my email from a few days ago for information on how it works) note: the window of opportunity for input/revisions on what data the catalogue stores has now closed (as i have put the code up live now) RE: the UI/layout of the online catalogue page you may still do visual/ui tweaks to the page at the moment (this window for input/revisions will close in a couple of days time) 5. [email from client to me...] *(note: i had put up the feature & asked the client to review it, never heard back from them for a few days)* Memo Louis, Here you go again. CLOSED without a word of input from the customer. I don't think so. I will reply tomorrow regarding the content and functionality we require from this feature. 5. [from me to client...] hi [client]: RE: from my understanding, you are saying that the mini-sale yard control would change itself based on the fact someone was viewing for parts & accessories <- is that correct? this change is outside the scope of the v1.1 mini-spec and therefore will need to wait 'til post launch for costing/implementation 6. [email from client to me...] Memo Louis, Following your v1.1 mini-spec and all your time paid in full for the work selected. We need to make the situation clear. There will be no further items held for post-launch. Do not expect us to pay for any further items other than those we have agreed upon. You have undertaken to complete the Parts and accessories feature as follows. Obviously, as part of this process the "mini search" will be effected, and will require "adaption to make sense". 7. [email from me to client...] hi [client], RE: "There will be no further items held for post-launch. Do not expect us to pay for any further items other than those we have agreed upon." a few points to consider: 1) the specification for the 'parts & accessories' feature was as follows: (i.e. [what] "...we have agreed upon.") 2) you have received the 'parts & accessories' feature free of charge (you have paid $0 for it). ive spent two days coding that feature as a gesture of good will i would request that you please consider these two facts carefully and sincerely 8. [email from client to me...] Memo Louis, I don't see how you are giving us anything for free. From your original fee proposal you have deleted more than 30 hours of included features. Your title "shelved features". Further you have charged us twice by adding back into the site, at an addition cost, some of those "shelved features" features. See v1.1 mini-spec. Did include in your original fee proposal a change request budget but then charge without discussion items included in v1.1 mini-spec. Included a further Features test plan for a regression test, a fee of 10 hours that would not have been required if the "shelved features" were not left out of the agreed fee proposal. I have made every attempt to satisfy your your uneven business sense by offering you everything your heart desired, in the v1.1 mini-spec, to be left once again with your attitude of "its too hard, lets leave it for post launch". I am no longer accepting anything less than what we have contracted you to do. That is clearly defined in v1.1 mini-spec, and you are paid in advance for delivering those items as an acceptable function. a few notes about the above email... i had to cull features from the original spec because it didnt fit into the budget. i explained this to the client at the start of the project (he wanted more features than he had budget hours to do them all) nothing has been charged for twice, i didnt charge the client for culled features. im charging him to now do those culled features the draft version of the project schedule included a change request budget of 10 hours, but i had to remove that to meet the budget (the client may not have been aware of this to be fair to them) what the client refers to as my attitude of 'too hard/leave it for post-launch', i called a change request protocol and a method for keeping scope creep under control 9. [email from me to client...] hi [client], RE: "...all your grievances..." i had originally written out a long email response; it was fantastic, it had all these great points of how 'you were wrong' and 'i was right', you would of loved it (and by 'loved it', i mean it would of just infuriated you more) so, i decided to deleted it start over, for two reasons: 1) a long email is being disrespectful of your time (youre a busy businessman with things to do) 2) whos wrong or right gets us no closer to fixing the problems we are experiencing what i propose is this... i prepare a bullet point list of your grievances and my grievances (yes, im unhappy too about how things are going - and it has little to do with money) i submit this list to you for you to add to as necessary we then both take a good hard look at this list, and we decide which areas we are willing to give ground on as an example, the list may look something like this: "louis, you keep taking away features you said you would do" [your grievance 2] [your grievance 3] [your grievance ...] "[client], i feel you dont properly read the specs i prepare for you..." [my grievance 2] [my grievance 3] [my grievance ...] if you are willing to give this a try, let me know will it work? who knows. but if it doesnt, we can always go back to arguing some more :) obviously, this will only work if you are willing to give it a genuine try, and you can accept that you may have to 'give some ground to get some ground' what do you think? 10. [email from client to me ...] Memo Louis, Instead of wasting your time listing grievances, I would prefer you complete the items in v1.1 mini-spec, to a satisfactory conclusion. We almost had the website ready for launch until you brought the v1.1 mini-spec into the frame. Obviously I expected you could complete the v1.1 mini-spec in a two-week time frame as you indicated and give the site a more profession presentation. Most of the problems have been caused by you not following our instructions, but deciding to do what you feel like at the time. And then arguing with us how the missing information is not necessary. For instance "Parts and Accessories". Why on earth would you leave out the parts heading, when it ties-in with the fields you have already developed. It replaces "model" and is just as important in the context of information that appears in the "Details" panel. We are at a stage where the the v1.1 mini-spec needs to be completed without further time wasting and the site is complete (subject to all features working). We are on standby at this end to do just that. Let me know when you are back, working on the site and we will process and complete each v1.1 mini-spec, item by item, until the job is complete. 11. [last email from me to client...] hi [client], based on this reply, and your demonstrated unwillingness to compromise/give any ground on issues at hand, i have decided to place your project on-hold for the moment i will be considering further options on how to over-come our challenges over the next few days i will contact you by monday 17/may to discuss any new options i have come up with, and if i believe it is appropriate to restart work on your project at that point or not told you it was long... what do you think?

    Read the article

  • How the hell do you get clients to use your bug tracking system?

    - by louism
    on larger projects i use a simple bug tracking system thats designed to be used by clients i have a lot of trouble convincing clients to use it (they send bug reports via email) does anyone have any strategies they can suggested? also, i have been playing around with a theory as to why this is the case; it goes like this: asking a client to log a bug is like taking your car to a mechanic for a service, and the mechanic hands you the engine oil and says "here, pop that in". basically, the client has paid you to do the work, logging a bug sounds too much like work, so they want you to do it thoughts? -- LM

    Read the article

  • Have you ever turned-down morally questionable or unethical web work?

    - by louism
    i'm just wondering if you guys have ever had a situation where you were offered a web development project which you turned down because you felt it was unethical or morally questionable. i've only had this once. i was offered a contract to develop a website for a meat abattoir (i.e. slaughterhouse). what's the problem you may ask? i'm vegetarian. i know, it's not an egregious dilemma, but it just didn't seem right to me. i have a female graphic designer friend who declined to work on a sex toys website where she was working at the time. funny thing is, it wouldn't bother me to work on a porn site (as long as it wasn't anything shifty - e.g. dwarfs + donkeys, that sort of thing). anyone else ever had a similar experience?

    Read the article

  • How do you get clients to use your bug tracking system?

    - by louism
    on larger projects i use a simple bug tracking system that's designed to be used by clients i have a lot of trouble convincing clients to use it (they send bug reports via email) does anyone have any strategies they can suggested? also, i have been playing around with a theory as to why this is the case; it goes like this: asking a client to log a bug is like taking your car to a mechanic for a service, and the mechanic hands you the engine oil and says "here, pop that in". basically, the client has paid you to do the work, logging a bug sounds too much like work, so they want you to do it thoughts?

    Read the article

  • SEO Google - Navigation Title vs. Page Heading

    - by louism
    Hi, i was wondering if anyone knows if theres a connection between what a navigation item is named and the page heading it goes to - does this have an impact on SEO? so for example, if i had in my navigation menu an item called About Us, but when you click it you come to a page with the heading Learn Who We Are (i.e. wrapped in [h1] heading tags) because there isnt an exact one-to-one match, is that a bad thing in terms of SEO? thanks

    Read the article

  • Backbone.js routing without changing url

    - by louism
    I am migrating a single-page web application based on Backbone.js and jQuery to a Chrome extension. However, neither the pushState nor the hashbang-based router modes seem to play well with the environment within the extension. I've come to the conclusion that I'm better off just directly rendering views on user interactions, bypassing the window.location system altogether. However, I'm not too sure how to implement this without changing calls to Router.navigate in dozens of files. Is there a pluggable/modular way to keep the Backbone routing system but bypass any changes to the url?

    Read the article

1