Search Results

Search found 10741 results on 430 pages for 'linton day'.

Page 106/430 | < Previous Page | 102 103 104 105 106 107 108 109 110 111 112 113  | Next Page >

  • Cocoa - Localized string from NSDate, NSCalendarDate...

    - by SirRatty
    I'm using NSDate to get a string such as "18 Jun 09", with code: NSDate *theDate = [NSDate date]; NSString *dateString = [theDate descriptionWithCalendarFormat:@"%d %b %y" timeZone:nil locale: nil]; This works, but only results in an English output. I need the output to be localized in the user's default language. Does Cocoa (Mac OS X 10.4, 10.5 in this case) provide a facility for this localization or do I have to manually localize for each case of day and & month names my self? (I have provided a locale, but although that does provide a locale-specific ordering of the date, it does not appear to do any localization of day-month names.)

    Read the article

  • Oracle: delete suddenly taking a long time

    - by Damo
    Hi We have a feed process which runs every day of the year. As part of that we delete every row from a table (approx 1 million rows) every day, repopulate it using 5 different stored procedures and then commit the transaction. This is the only commit statement that we call. All of a sudden the delete has started takign about 2 hours to complete. The delete is also very simple (delete from T_PROFILE_WORK) This has worked perfectly well for the past year, but in the past week i have noticed this issue. Any help on this is greatly appreciated Thanks Damien

    Read the article

  • Is this possible with Sql 2005 CTE?

    - by aenima1982
    I have been working on a query that will return a suggested start date for a manufacturing line based on due date and the number of minutes needed to complete the task. There is a calendar table(LINE_ID, CALENDAR_DATE, SCHEDULED_MINUTES) that displays per manufacturing line, the number of minutes scheduled for that day. Example: (Usually 3 shifts worth of time scheduled per day, no weekends but can vary) 1, 06/8/2010 00:00:00.000, 1440 1, 06/7/2010 00:00:00.000, 1440 1, 06/6/2010 00:00:00.000, 0 1, 06/5/2010 00:00:00.000, 0 1, 06/4/2010 00:00:00.000, 1440 In order to get the suggested start date, I need to start with the due date and iterate downward through the days until i have accumulated enough time to complete the task. My Question can something like this be done with CTE, or is this something that should be handled by a cursor. Or... am i just going about this the wrong way completely??

    Read the article

  • How to limit the number of connections to a SQL Server server from my tomcat deployed java applicati

    - by CJ
    I have an application that is deployed on tomcat on server A and sends queries to a huge variety of SQL Server databases on an server B. I am concerned that my application could overload this SQL Server database server and would like some way to preventing it making requests to connect to any database on that server if some arbitrary number of connections were already in existence and unclosed. I am looking at using connection pooling but am under the impression that this will only pool connections to a specific database on the SQL Server server, I want to control the total of these combined connections that will occur to many different databases (incidentally I can only find out the names of individual db's dynamically as they change day to day). Will connection pooling take care of this for me, are am I looking at this from the wrong perspective? I have no access to the configuration of the SQL Server server. Links to tutorials or working examples of your suggested solution are most welcome!

    Read the article

  • Cloud HUGE data storage options?

    - by ToughPal
    Hi, Does anyone have a good suggestion on how to do video recording? We have a camera that can record and then stream live video to a server. So this means we can have 1000's of cameras sending data 24X7 for recording. We will store data for over 7 / 14 / 30 days depending on the package. Per day if a camera is sending data to the server then it will store 1.5GB. So that means there is a traffic of 1.5GB / day / camera Total monthly 45GB / month / camera (Data + bandwidth for one camera) Please let me know the most cost effective way to get this data stored? Thanks!

    Read the article

  • Compute rolling window covariance matrix

    - by user1665355
    I am trying to compute a rolling window (shifting by 1 day) covariance matrix for a number of assets. Say my df looks like this: df <- data.frame(x = 0:4, y = 5:9,z=1:5,u=4:8) How would a possible for loop look like if I want to calculate a covariance matrix on a rolling basis by shifting the rolling window by 1 day? Or should I use some apply family function? What time series class would be preferrable if I want to create a time series object for the loop above? I simply can't get it... Best Regards

    Read the article

  • Union All Won't work in stored procedure

    - by MyHeadHurts
    ALTER PROCEDURE [dbo].[MyStoredProcedure1] @YearToGet int AS Select Division, SDESCR, DYYYY, Sum(APRICE) ASofSales, Sum(PARTY) AS ASofPAX, Sum(NetAmount) ASofNetSales, Sum(InsAmount) ASofInsSales, Sum(CancelRevenue) ASofCXSales, Sum(OtherAmount) ASofOtherSales, Sum(CXVALUE) ASofCXValue From dbo.B101BookingsDetails Where Booked <= CONVERT(int,DateAdd(year, @YearToGet - Year(getdate()), DateAdd(day, DateDiff(day, 1, getdate()), 0) ) ) and (DYYYY = @YearToGet) Group By SDESCR, DYYYY, Division Having (DYYYY = @YearToGet) Order By Division, SDESCR, DYYYY union all SELECT DIVISION, SDESCR, DYYYY, SUM(APRICE) AS YESales, SUM(PARTY) AS YEPAX, SUM(NetAmount) AS YENetSales, SUM(InsAmount) AS YEInsSales, SUM(CancelRevenue) AS YECXSales, SUM(OtherAmount) AS YEOtherSales, SUM(CXVALUE) AS YECXValue FROM dbo.B101BookingsDetails Where (DYYYY=@YearToGet) GROUP BY SDESCR, DYYYY, DIVISION ORDER BY DIVISION, SDESCR, DYYYY The error I am getting is Msg 156, Level 15, State 1, Procedure MyStoredProcedure1, Line 36 Incorrect syntax near the keyword 'union'. But my goal here is the user inputs a year for example 2009, my first query will get all the sales made in 2009 to the same date it is was yesterday 12/23/2009, while the second query is getting 2009 totals up to dec 31 2009. I want the columns to be side by side not in one column

    Read the article

  • Conditional SELECT MySQL

    - by user188693
    Don't know if this is possible, but I'd like to select records based on the field value of recur_type, where the 'm' is the day of the week. If it's a weekly recurring event, I need to make sure this is a day it recurs on, otherwise, I want to return all days. however, I'm getting an empty result set: SELECT * FROM wp_fun_bec_events WHERE start_date <= '2009-10-12' AND ( end_date >= '2009-10-12' OR (recur_end > '0' AND recur_end >= '2009-10-12' ) ) AND ('m' IN ( CASE WHEN 'recur_type' = 'weekly' THEN recur_days ELSE 's/m/t/w/r/f/a' END ) ) ORDER BY start_date, start_time Any ideas??

    Read the article

  • What are the best blogs for staying up to date on C#, ASP.NET, LINQ, SQL, C++, Ruby, Java, Python?

    - by Arj
    Apologies if this repeats another - but I couldn't fine one like it. My day to day programming spans a fair number of technologies: C#, ASP.NET, LINQ / SQL, C++, Ruby, Java, Python in approximately that order. It's a struggle to keep up to date on any of best practices, new ideas, innovation and improvements, let alone all. Therefore, what would your top 1 blog be in each of these technologies and which technology do you find easiest to stay up to date with? I'd have a bias towards blogs with broad and high level rather than narrow and detailed content / solutions / examples.

    Read the article

  • Running applictions via ruby and multi-core support? (OSX)

    - by Nick Faraday
    Hi All, I'm looking for some tutorials/resources/tips that will show me how to run applications via a ruby script. I have several small tools that we use in our day to day operations that I want to manage their tasks in one ruby script. Basically what I'm trying to do is: run app via ruby script. (wait for result) get result code (success, or error msg) if ok, start the app on its next task. Also each of the tasks are independent so I'd like to take advantage of the 8 cores on my MacPro and run 8 instances at a time. Any resources you could point me towards would be greatly appreciated!

    Read the article

  • How to remove a single event in a recuring event

    - by albertos
    hi all. I' m having an issue with fullCalendar. I created a script that, adds an event to fullCalendar, along a day range, and set a unique id in order to have this event recur. let say for example that i have a recuring event from 1/1/10 till 10/1/10. i create 10 single event Objects with the same id, and place then on fullCalendar. my question is, that i want to exclude a single day over this recuring event. (for example 3/1/10). i found out, that if i remove that particural event from the sources table and then update the event its fine. but how can i get on runtime the actucal index of this eventObj on sources table? Note that, i add the events on the fullCalendar using the .fullCalendar("renderEvent") method. Thanks.

    Read the article

  • Auto-fill the current date if the previous row was empty

    - by replax
    I have a spreadsheet sorted by dates. Everyday, I enter new data into it. After each day, I leave one row empty before starting the next day. Example: 20.09.12 XXXXX XXXXX XXXXX XXXX XXXXX XXXX XXXXX XX XX XXXXX XX XXXX 21.09.12 XXX XXXXX XXX XXXX X XXXX XXXX XXX 22.09.12 XXXX XX XXXX XXXX So I want excel to always fill in the current date whenever I enter data after one blank row, but obviously the dates shall stay the same - not be updated to the current date whenever I open excel. I am using Excel 2007 and while non vba ideas are preferred, vba is not a problem either!

    Read the article

  • How can a string timestamp with hours 0 to 24 be parsed

    - by user897052
    I am trying to parse a string timestamp of format "yyyyMMddHHmmss" with DateTime.ParseExact(). The catch is I must allow for an hour value of "24" (i.e. hours can be from 0 to 24; Note: I can't control the input values.) and, of course, that results in an exception. Are there any settings/properties I can set instead of manually parsing/using regex's? If not, any efficient parsing ideas? ex. DateTime.ParseExact("20120911240000", "yyyyMMddHHmmss", System.Globalization.CultureInfo.InvariantCulture); hour 24 means hour 0 of next day (so day + 1, hour = 0)

    Read the article

  • Can't fill a column of NULLs with actual values by making an association to the proper values in the

    - by UkraineTrain
    I have a table with separate columns for months, days and a varchar column for 6 hour increments for each day ('12AM', '6AM', '12PM', '6PM'). There's also a column that's supposed to have calculated numeric values for each of those 6 hour increments. These calculated values come from some reference table. This reference table contains values for each day for several months broken down by hour where each hour has its own column. So, basically, I have to add the values for each 6 hour increment. I have no idea how to associate the correct values in the reference table to those 6 hour increments. I will really appreciate any help on this.

    Read the article

  • rspec mocking object property assignment

    - by charlielee
    I have a rspec mocked object, a value is assign to is property. I am struggleing to have that expectation met in my rspec test. Just wondering what the sytax is? The code: def create @new_campaign = AdCampaign.new(params[:new_campaign]) @new_campaign.creationDate = "#{Time.now.year}/#{Time.now.mon}/#{Time.now.day}" if @new_campaign.save flash[:status] = "Success" else flash[:status] = "Failed" end end The test it "should able to create new campaign when form is submitted" do campaign_model = mock_model(AdCampaign) AdCampaign.should_receive(:new).with(params[:new_campaign]).and_return(campaign_model) campaign_model.should_receive(:creationDate).with("#{Time.now.year}/#{Time.now.mon}/#{Time.now.day}")campaign_model.should_receive(:save).and_return(true) post :create flash[:status].should == 'Success' response.should render_template('create') end The problem is I am getting this error: Spec::Mocks::MockExpectationError in 'CampaignController new campaigns should able to create new campaign when form is submitted' Mock "AdCampaign_1002" received unexpected message :creationDate= with ("2010/5/7") So how do i set a expectation for object property assignment? Thanks

    Read the article

  • user specific persistent cck types in drupal

    - by Fion
    Is there a way to do the following. We need to have a few basic cck types that will allow users to track their chosen parameters over a length of time. For example, one cck type may be called "numeric tracker" It would have a field for labeling the type and a field for entering a number. User A might label one numeric tracker "miles driven". Then each day user A would use this type to enter a number. User B might label a numeric tracker "hours slept". Each day user B would enter a number. Is there a way to use cck in this way?

    Read the article

  • How to change the date format in JavaScript?

    - by Nitz
    Hey Guys I am using one jquery date picker, with using picker i am getting date in like this format Friday, May 21, 2010 Now i want to add one day in this date so i think, i can only do if i change the date in exact format like 21/5/2010 I want to only convert that bcz i want to add one day to the particular date. So what do u suggest me? How can I do that? Can i do without converting it ? thanks in advance....

    Read the article

  • Setting a ViewController's properties after instantiation

    - by Craig
    I'm creating an instance of a viewController, and then trying to set the text on of it's properties, a UILabel. BoyController *boyViewController = [[BoyController alloc] initWithNibName:@"BoyView" bundle:nil]; NSString *newText = [astrology getSignWithMonth:month withDay:day]; boyViewController.sign.text = newText; NSLog(@" the boyviewcontroller.sign.text is now set to: %@", boyViewController.sign.text); [newText release]; I tried this, but it didn't work... So I tried the following: BoyController *boyViewController = [[BoyController alloc] initWithNibName:@"BoyView" bundle:nil]; UILabel *newUILabel = [[UILabel alloc] init]; newUILabel.text = [astrology getSignWithMonth:month withDay:day]; boyViewController.sign = newUILabel; NSLog(@" the boyviewcontroller.sign.text is now set to: %@", newUILabel.text); [newUILabel release]; But no avail.. I'm not sure why I can't set the text property of the UILabel "sign" in boyViewController..

    Read the article

  • How to handle date difference between client and server?

    - by daydreamer
    I have an API which looks like /summary/yyyy/mm Which returns the summary of their data for the year and month requested. One of the things it returns the number of days left if this is current year and month. For example: days_left: 9 for 2013 and 10 and current date on server is 21 Oct 2013 How I calculate remaining days? This is implemented in python as def current_financial_month_details(self): time_from, time_to = self \ .get_start_end_time_current_financial_month() today = datetime.today() from_time = datetime(year=today.year, month=today.month, day=today.day) return { 'time_from': time_from, 'time_to': time_to, 'remaining_days': (time_to - from_time).days } The problem? The server is in east coast and the client(me with browser) is on pacific time zone When its 9PM PST the time changes in east coast, so if I run hit /summary/2013/10 and if it is Oct 21 2013 for me on PST, the date has already changed on EST, so days_left: 8 which is incorrect on client end. right? How do I handle this situation?

    Read the article

  • Does deleting temporary symlinks interrupt current downloads/access to that symlink?

    - by Joe
    I am using symlinks generated in PHP. They are generated when someone requests a download, and I want them to expire at the end of each day. The problem is, what if someone starts downloading a symlink 1 minute before the end of the day and then I delete the symlink while they are downloading it... My question is, to your knowledge will that individual downloading the symlink, right before I delete it, still be able to "download" the file? I am not worried about "resumable download" capability.. but will it make their download stop or break in some way?

    Read the article

  • Eclipse + CVS use custom commit

    - by WizKiranPuttur
    Hi All, My admin has set up the "cvs commit" in a very non traditional way, instead of typing "cvs commit" I use the admin provided "scriptname modified file" to checkin the file to CVS. I am using Eclipse to my day to day work and till now I am using the Eclipse CVS Plugin to checkout the repo,update,compare,etc and use the command line to checkin. I am getting annoyed by having to go to command line to do the commit, is there any way I can make Eclipse accept when I say commit it invokes the admin script instead of "cvs commit" ? I spoke to Admin and moving the under the cvs pre-commit hooks is not an option. What can I do ? I know fair amount of "Java" I am willing to do some changes to CVS plugin if I know how and where. Thanks

    Read the article

  • Jsoup to get data on <b> block

    - by Poh Sun
    I'm new to JSoup on Java and would like to enquire few questions. Given the HTML code of the page I would like to get is this <td width="70%" class="row1"> <b>4</b> <br />( 0 posts per day / 0.00% of total forum posts ) </td> My question here is I want to get the data 4 but the output I get is 4 ( 0 posts per day / 0.00% of total forum posts ) Here is my Java code Iterator <Element> element = totalPost.select("td[width=70%][class=row1]").iterator(); System.out.println(element.next().text()); Sorry if my question is not clear enough.

    Read the article

  • Why is 1942/4/3 00:00:00 an illegal date in java.util.Calendar?

    - by Aleksi
    Is there something special in the date 3rd of April 1942? For some reason the the hour of day 0 (12:00 am) is illegal for this specific date. The date is accepted when a lenient calendar is used but the hour of day is incremented to 1 (1:00 am). Relevant code java.util.Calendar calendar = java.util.Calendar.getInstance(); calendar.clear(); calendar.setLenient(false); calendar.set(1942, 3, 3, 0, 0, 0); calendar.getTimeInMillis(); Exception java.lang.IllegalArgumentException: HOUR_OF_DAY at java.util.GregorianCalendar.computeTime(Unknown Source) at java.util.Calendar.updateTime(Unknown Source) at java.util.Calendar.getTimeInMillis(Unknown Source) I'd really prefer is the dates were not lenient as I don't want to accept impossible dates.

    Read the article

  • Ruby on Rails - Calendar Display

    - by user335725
    We want to create a calendar view in a room scheduling application. The outcome we want is to have hours open (variable depending on day) across the top of the grid and the names of the rooms down the left side of the grid. The body would be populated with bookings for that day. The visual we're seeking is similar to the "Weekly Builder" plugin for Rails (http://dmix.ca/2009/06/weeklybuilder-a-weekly-calendar-plugin-for-rails/). We've tried using CSS to create variably-sized images, but this isn't working out. Are there any plugins available or other ways anyone can think of to accomplish this kind of visual? Thanks

    Read the article

< Previous Page | 102 103 104 105 106 107 108 109 110 111 112 113  | Next Page >