Search Results

Search found 9662 results on 387 pages for 'sales and operations plan'.

Page 140/387 | < Previous Page | 136 137 138 139 140 141 142 143 144 145 146 147  | Next Page >

  • Organization &amp; Architecture UNISA Studies &ndash; Chap 5

    - by MarkPearl
    Learning Outcomes Describe the operation of a memory cell Explain the difference between DRAM and SRAM Discuss the different types of ROM Explain the concepts of a hard failure and a soft error respectively Describe SDRAM organization Semiconductor Main Memory The two traditional forms of RAM used in computers are DRAM and SRAM DRAM (Dynamic RAM) Divided into two technologies… Dynamic Static Dynamic RAM is made with cells that store data as charge on capacitors. The presence or absence of charge in a capacitor is interpreted as a binary 1 or 0. Because capacitors have natural tendency to discharge, dynamic RAM requires periodic charge refreshing to maintain data storage. The term dynamic refers to the tendency of the stored charge to leak away, even with power continuously applied. Although the DRAM cell is used to store a single bit (0 or 1), it is essentially an analogue device. The capacitor can store any charge value within a range, a threshold value determines whether the charge is interpreted as a 1 or 0. SRAM (Static RAM) SRAM is a digital device that uses the same logic elements used in the processor. In SRAM, binary values are stored using traditional flip flop logic configurations. SRAM will hold its data as along as power is supplied to it. Unlike DRAM, no refresh is required to retain data. SRAM vs. DRAM DRAM is simpler and smaller than SRAM. Thus it is more dense and less expensive than SRAM. The cost of the refreshing circuitry for DRAM needs to be considered, but if the machine requires a large amount of memory, DRAM turns out to be cheaper than SRAM. SRAMS are somewhat faster than DRAM, thus SRAM is generally used for cache memory and DRAM is used for main memory. Types of ROM Read Only Memory (ROM) contains a permanent pattern of data that cannot be changed. ROM is non volatile meaning no power source is required to maintain the bit values in memory. While it is possible to read a ROM, it is not possible to write new data into it. An important application of ROM is microprogramming, other applications include library subroutines for frequently wanted functions, System programs, Function tables. A ROM is created like any other integrated circuit chip, with the data actually wired into the chip as part of the fabrication process. To reduce costs of fabrication, we have PROMS. PROMS are… Written only once Non-volatile Written after fabrication Another variation of ROM is the read-mostly memory, which is useful for applications in which read operations are far more frequent than write operations, but for which non volatile storage is required. There are three common forms of read-mostly memory, namely… EPROM EEPROM Flash memory Error Correction Semiconductor memory is subject to errors, which can be classed into two categories… Hard failure – Permanent physical defect so that the memory cell or cells cannot reliably store data Soft failure – Random error that alters the contents of one or more memory cells without damaging the memory (common cause includes power supply issues, etc.) Most modern main memory systems include logic for both detecting and correcting errors. Error detection works as follows… When data is to be read into memory, a calculation is performed on the data to produce a code Both the code and the data are stored When the previously stored word is read out, the code is used to detect and possibly correct errors The error checking provides one of 3 possible results… No errors are detected – the fetched data bits are sent out An error is detected, and it is possible to correct the error. The data bits plus error correction bits are fed into a corrector, which produces a corrected set of bits to be sent out An error is detected, but it is not possible to correct it. This condition is reported Hamming Code See wiki for detailed explanation. We will probably need to know how to do a hemming code – refer to the textbook (pg. 188 – 189) Advanced DRAM organization One of the most critical system bottlenecks when using high-performance processors is the interface to main memory. This interface is the most important pathway in the entire computer system. The basic building block of main memory remains the DRAM chip. In recent years a number of enhancements to the basic DRAM architecture have been explored, and some of these are now on the market including… SDRAM (Synchronous DRAM) DDR-DRAM RDRAM SDRAM (Synchronous DRAM) SDRAM exchanges data with the processor synchronized to an external clock signal and running at the full speed of the processor/memory bus without imposing wait states. SDRAM employs a burst mode to eliminate the address setup time and row and column line precharge time after the first access In burst mode a series of data bits can be clocked out rapidly after the first bit has been accessed SDRAM has a multiple bank internal architecture that improves opportunities for on chip parallelism SDRAM performs best when it is transferring large blocks of data serially There is now an enhanced version of SDRAM known as double data rate SDRAM or DDR-SDRAM that overcomes the once-per-cycle limitation of SDRAM

    Read the article

  • 15 Oracle Winners at Progressive Manufacturing 100 Awards Event

    - by [email protected]
    Oracle is pleased to congratulate its 15 winners for the PM100 awards program at the Breakers Hotel in Palm Beach Florida, May 3-5, 2010.  The Progressive Manufacturing Summit is where today's top manufacturing executives  come together and share their strategies, experiences and best practices on becoming more competitive in today's global market. The format is extremely interactive, providing the rarest of opportunities to participate in a high level conversation with leaders in supply chain and manufacturing. Attendees walk away with new insights and strategies on growing and moving their business forward, new contacts and a tangible action plan to address a tough. For more information. Event: http://www.managingautomation.com/summit/index.aspx Winners: http://www.managingautomation.com/awards/winners.aspx  

    Read the article

  • App Fabric Service Bus and Access Control Pricing

    - by kaleidoscope
    The Service Bus costs $3.99 per Connection-month on a consumption basis for individually provisioned connections. Data transfers charges would also apply. Or, if you are able to forecast your needs ahead of time, you can purchase “Packs” of Connections. For example: $9.95 for a pack of 5 Connections, $49.75 for a pack of 25, $199.00 for a pack of 100, or $995 for a pack of 500, plus data transfer charges. Connection Packs represent an effective rate of $1.99 per Connection-month. Access Control will be priced at $1.99 per 100,000 Transactions, which includes token requests and management operations, plus associated data transfer. Typically, Service Bus developers depend on Access Control to secure their Connections. More Information: http://azurefeeds.com/post/865/Announcing_Windows_Azure_platform_commercial_offer_availability_and_updated_AppFabric_pricing.aspx   Amit, S

    Read the article

  • What's a good data structure solution for a scene manager in XNA?

    - by tunnuz
    Hello, I'm playing with XNA for a game project of myself, I had previous exposure to OpenGL and worked a bit with Ogre, so I'm trying to get the same concepts working on XNA. Specifically I'm trying to add to XNA a scene manager to handle hierarchical transforms, frustum (maybe even occlusion) culling and transparency object sorting. My plan was to build a tree scene manager to handle hierarchical transforms and lighting, and then use an Octree for frustum culling and object sorting. The problem is how to do geometry sorting to support transparencies correctly. I know that sorting is very expensive if done on a per-polygon basis, so expensive that it is not even managed by Ogre. But still images from Ogre look right. Any ideas on how to do it and which data structures to use and their capabilities? I know people around is using: Octrees Kd-trees (someone on GameDev forum said that these are far better than Octrees) BSP (which should handle per-polygon ordering but are very expensive) BVH (but just for frustum and occlusion culling) Thank you Tunnuz

    Read the article

  • Closing the gap between strategy and execution with Oracle Business Intelligence 11g

    - by manan.goel(at)oracle.com
    Wikipedia defines strategy as a plan of action designed to achieve a particular goal. An example of this is General Electric's acquisitions and divestiture strategy (plan) designed to propel GE to number 1 or 2 place (goal) in every business segment that it operated in. Execution on the other hand can be defined as the actions taken to getting things done. In GE's case execution will be steps followed for mergers/acquisitions or divestiture. Business press has written extensively about the importance of both strategy and execution in achieving desired business objectives. Perhaps the quote from Thomas Edison says it best - "vision without execution is hallucination". Conversely, it can be said that "execution without vision" is well may be "wishful thinking". Research overwhelmingly point towards the wide gap between strategy and execution. According to a published study, 49% of surveyed executives perceive a gap between their organizations' ability to develop and communicate sound strategies and their ability to implement those strategies. Further, of these respondents, 64% don't have full confidence that their companies will be able to close the gap. Having established the severity and importance of the problem let's talk about the reasons for the strategy-execution gap. The common reasons include: -        Lack of clearly defined goals -        Lack of consistent measure of success -        Lack of ownership -        Lack of alignment -        Lack of communication -        Lack of proper execution -        Lack of monitoring       There are multiple approaches to solving the problem including organizational development practices, technology enablement etc. In most cases a combination of approaches is required to achieve the desired result. For the purposes of this discussion, I'll focus on technology.  Imagine an integrated closed loop technology platform that automates the entire management cycle from defining strategy to assigning ownership to communicating goals to achieving alignment to collaboration to taking actions to monitoring progress and achieving mid course corrections. Besides, for best ROI and lowest TCO such a system should also have characteristics like:  Complete -        Full functionality -        Rich end user access Open -        Any data source -        Any business application -        Any technology stack  Integrated -        Common metadata -        Common security -        Common system management From a capabilities perspective the system should provide the following capabilities: Define -        Strategy -        Objectives -        Ownership -        KPI's Communicate -        Pervasive -        Collaborative -        Role based -        Secure Execute -        Integrated -        Intuitive -        Secure -        Ubiquitous Monitor -        Multiple styles and formats -        Exception based -        Push & Pull Having talked about the business problem and outlined the blueprint for a technology solution, let's talk about how Oracle Business Intelligence 11g can help. Oracle Business Intelligence is a comprehensive business intelligence solution for reporting, ad hoc query and analysis, OLAP, dashboards and scorecards. Oracle's best in class BI platform is based on an architecturally integrated technology foundation that provides a unified end user experience and features a Common Enterprise Information Model, with common security, query request generation and optimization, and system management. The BI platform is ·         Complete - meaning it delivers all modes and styles of BI including reporting, ad hoc query and analysis, OLAP, dashboards and scorecards with a rich end user experience that includes visualization, collaboration, alerts and notifications, search and mobile access. ·         Open - meaning the BI platform integrates with any data source, ETL tool, business application, application server, security infrastructure, portal technology as well as any ODBC compliant third party analytical tool. The suite accesses data from multiple heterogeneous sources--including popular relational and multidimensional data sources and major ERP and CRM applications from Oracle and SAP. ·         Integrated - meaning the BI platform is based on an architecturally integrated technology foundation built on an open, standards based service oriented architecture.  The platform features a common enterprise information model, common security model and a common configuration, deployment and systems management framework. To summarize, Oracle Business Intelligence is a comprehensive, integrated BI platform that lets you define strategy, identify objectives, assign ownership, define KPI's, collaborate, take action, monitor, report and do course corrections all form a single interface and a single system. The platform's integrated metadata model and task based design ensures that the entire workflow from defining strategy to execution to monitoring is completely integrated delivering end to end visibility, transparency and agility. Click here to learn more about Oracle BI 11g. 

    Read the article

  • modifying openssl library code

    - by Nouar Ismail
    I am ordered to check the availability to customize an encryption algorithm the IPsec protocol use in Ubuntu, if anyone have any suggestion about this point?. I've read that the encryption operation occur in libcrypto in openssl. when I tried to compile and install OpenSSL from source ..I had everything ok with the installation, but when to check the version installed on the system, with "dpkg -s openssl", it didn't seem that it's the version i had already installed, maybe it had been installed successfully, but the question is: would it be the version the system use for encryption operations? would it overwrite the old version? and would my changes in code have effects ? any help please? thank you in advance.

    Read the article

  • Business Logic Layer in MVC Application

    - by Subin Jacob
    In my ASP MVC application I decided to add another Business Layer and made the model only to have properties. All other functionality like save to db, get from db is done on this new Business layer. So now the controller will be calling this business layer and model for various operations. Is it a good approach to design like this? I decided not to use model for this purpose because I would need a number of models for different actions. (for eg, one for edit and other for create)

    Read the article

  • Do certain corporations hold more weight on a resume?

    - by Ryan
    Would a developer/tester position at Google, Apple, Microsoft, etc. (any large tech. company of which most people have heard) be more valuable on a resume than working as a developer/tester somewhere where tech. isn't the main objective (shipping company, restaurant chain, insurance company, etc.)? Let's say you have two offers, and you only plan to stay with whichever company for 5 years, before trying to get a better position at a different company. One at Google that has a starting salary of $60,000, and one at some insurance company that has a starting salary of $80,000. I guess what I'm trying to say is... with university's, if someone graduates from MIT or Carnegie Mellon, they can pretty much get a job anywhere. Does someone seem more valuable after having worked at a company like Google, Apple, Microsoft, etc.? In other words, would taking the lower paying job be better in the long run since it's at Google, or would it be better to take the higher paying job at the insurance company?

    Read the article

  • How do I go about hosting facebook apps that are picking speed?

    - by Karthik
    My situation is this. I coded in php and built a facebook app. After 3 days it has 13,000 users. I have my own server at hostmonster. It is a regular plan costing me about $70 per year. It has unlimited bandwidth. I did not anticipate hosting apps or that it could pick up so many users. Already 1 Gb of data was transferred in the last few days. I am planning to build a few more apps(around 10 - 20) and reach atleast a million users in total. Should I continue hosting on the same server or move to a VPS? I am a student and I don't have too much of a disposable income. So I want to move only if it is necessary. Right now it shows 1 Gb/infinity in data transfer. Any help/suggestions highly appreciated.

    Read the article

  • "Search Friendly" domain names

    - by Ben
    We bought a few search friendly domain names for the CPA site that I manage. Each of the domains we bought has the name of a nearby city and the word cpa in front of, or behind the city name. The plan is to create a landing page for each of these domains with useful information about business filings, ect. specific to that city, as well as directions to our office from that city. The question is how to best utilize these new domains: Should each domain be set to a 301 redirect to mainsite.com/city ? Should each domain be it's own single page mini-site that links to mainsite.com ? What other options are there and what are the pros/cons? Remember the goal is to be more relevant in searches that use a nearby city name in their search for CPA/accounting services.

    Read the article

  • alternative to environment variables

    - by tonyl7126
    The amount of servers and the complexity of our application is growing and we now have servers in different regions (hosted on AWS). Certain database operations require low latency so we have stuck a database in each region (which is basically a user cache) to keep the network latency low. The way the application server currently knows which user cache/database to make its call to depends on an environemnt variable set in it. This has been working fine, but it seems hacky and not optimal. Is there any way for this to be done automatically? I was considering using a package like fping and pinging each database when the app server reloads (or caching it the first time) and using the corresponding latencies to decide which database has the lowest latency for each app server. Not sure if this is the best idea though.

    Read the article

  • How to Export Email "Sent" Folder?

    - by user249493
    A client had her web site and email hosted at "company A". She was switching to "company B" but didn't want to lose her email. I set up a Gmail account, POPed into her webmail account, and pulled the entire inbox into Gmail (for later transfer to her new host). But I forgot about the "sent" folder. Although the hosting plan is still up and running, she changed her domain record to point to the new host. So I can't access the old webmail account via POP or IMAP because the email address needed for authentication now resolves to the new host. Is there any way I can get the contents of the sent folder without having to do a "forward" one message at a time (there are hundreds)?

    Read the article

  • Run fstrim from LiveCD

    - by CharlesW
    A few years ago I installed Ubuntu 10.04 with LVM + LUKS on a system with SSD, TRIM was not enabled. Now I want to install Ubuntu 12.04 on the same SSD. I have found a guide explaining how to enable TRIM on Ubuntu 12.04 with LVM + LUKS, but before installing the new system, I want to clean out all the "marked for deletion" data generated under Ubuntu 10.04, to make the disk fast as new. My plan is to boot a Ubuntu 12.04 LiveCD and create a new ext4 filesystem on the SSD, then mount the filesystem and run fstrim on it. After rebooting the LiveCD I will install the system as normal, and enable TRIM. Can anybody say if this will work?

    Read the article

  • Gnome Classic U 11.04 trash not working, can't find my trash dir

    - by Bruce Salem
    I did an upgrade from U 10.10 to U 11.04. I can't upgrade further because Upgrade Manager says that there are unsupported packages. How do I find them? A more immediate problem is that trash stopped working even though "/.share/local/Trash is getting files removed by the file manager. The trash icon on the lower panel fails after having done the upgrade from Gnome 2 to Unity and using Gnome Classic, says "No Such File or Directory". File Operations says it is looking at "/". How do I reconfigure the trash icon to use my local trash dir? The trash dir is there, has the right permissons, I can "rm" the dir tree there, and recreate it by moving files to the trash from the file manager.

    Read the article

  • Error when setting Piwik analytics

    - by bertran
    I've uploaded the latest version of Piwik unto my web server, which is hosted by go daddy.com, on a linux hosting plan. I'm setting it up (accessing it from my browser as instructed) and I have the "Piwikinstallation" page open on step 3 (database set-up ) of 9. I don't know what to imput in the field "database server"... the default is the number 127.0.0.1 When I leave that input as is, and click "Next" leaving the gives the error: "Error when trying to connect to database server: SQLSTATE[HY000] [2013] Lost connection to MySQL server at 'reading initial communication packet', system error: 111" and changing that input to "localhost" gives me another error: "Error when trying to connect to database server:SQLSTATE[HY000] [2002] Can't connect to local MySQL server through socket '/var/lib/mysql/mysql.sock' (2)"

    Read the article

  • Simulating simultaneous entities

    - by Steven Jeuris
    Consider the need to simulate a set of entitities in an accurate way. All entities exist in an artificial timeline. Within 'steps' of this timeline, all entities can do certain operations. It is imperative that timed events, are handled accurately, and not in processing order. So simple threading isn't a proper simulation, nor is procedurally walking across all entities. Processing may be slow, accuracy is key here. I have some ideas how to implement this myself, but most likely something like this has been done before. Are there any frameworks available for these purposes? Is there any particular paradigm more suitable?

    Read the article

  • Building a custom Xsession with VNC access

    - by Disco
    I have a small project where I'll need to build a very minimal X11 environnement for a cyber coffee kind shop. My idea is to have a simple server which will create a dozen of VNC Daemon listening on a different port (each port = one client). The server is working, i can connect using vnc to different port. Now i'm looking for a solution to create a customized desktop for each client; with a bare minimum of apps which i want to be able to add for each user. Like user1 will have app1 and app2, user2 will have app1 only etc. I plan to use openbox as a WM but no clue on 'how' to add custom icons on the desktop of it. Any clue, starting point would be interesting.

    Read the article

  • How do you balance documentation requirements with Agile developments

    - by Jeremy
    In our development group there is currently discussions around agile and waterfal methodology. No-one has any practical experience with agile, but we are doing some reading. The agile manifesto lists 4 values: Individuals and interactions over processes and tools Working software over comprehensive documentation Customer collaboration over contract negotiation Responding to change over following a plan We are an internal development group developing applications for the consumption of other units in our enterprise. A team of 10 developers builds and releases multiple projects simultanously, typically with 1 - maybe 2 (rarely) developer on each project. It seems to be that from a supportability perspective the organization needs to put some real value on documentation - as without it, there are serious risks with resourcing changes. With agile favouring interactions, and software deliverables over processes and documentation, how do you balance that with the requirements of supportable systems and maintaining knowledge and understanding of how those systems work? With a waterfall approach which favours documentation (requirements before design, design specs before construction) it is easy to build a process that meets some of the organizational requirements - how do we do this with an agile approach?

    Read the article

  • How Estimates Became Quotes

    - by Lee Brandt
    It’s our fault. Well, not completely, but we haven’t helped the situation any. All of what follows comes from my own experiences which, from talking to lots of other developers about it, seems to be pretty much par for the course. Where We Started When we first started estimating, we estimated pretty clearly. We would try to imagine something we’d done that was similar to the project being estimated and we’d toss it about in our heads a bit and see how much bigger or smaller we thought this new thing was, and add or subtract accordingly. We wouldn’t spend too much time on it, because we wanted to get to writing the software. Eventually, we’d come across some huge problem that there was now way we could’ve known about ahead of time. Either we didn’t see this thing or, we didn’t realize that this particular version of a problem would be so… problematic. We usually call this “not knowing what we don’t know”. It’s unavoidable. We just can’t know. Until we wade in and start putting some code together, there are just some things we won’t know… and some things we don’t even know that we don’t know. Y’know? So what happens? We go over budget. Project managers scream and dance the dance of the stressed-out project manager, and there is nothing we can do (or could’ve done) about it. We didn’t know. We thought about it for a bit and we didn’t see this herculean task sitting in the middle of our nice quiet project, and it has bitten us in the rear end. We now know how to handle this in the future, though. We will take some more time to pick around the requirements and discover all those things we don’t know. We’ll do some prototyping, we’ll read some blogs about similar projects, we’ll really grill the customer with questions during the requirements gathering phase. We’ll keeping asking “what else?” until the shove us down the stairs. We’ll take our time and uncover it all. We Learned, But Good The next time comes, and you know what happens? We do it. We grill the customer for weeks and prototype and read and research and we estimate everything down to the last button on the last form. Know what that gets us? It gets us three months of wasted time, and our estimate will still be off. Possibly off by a factor of four. WTF, mate? No way we could be surprised by something! We uncovered every particle. We turned every stone. How is it we still came across unknowns? Because we STILL didn’t know what we didn’t know. How could we? We didn’t know to ask. The worst part is, we’ve now convinced the product that this is NOT an estimate. It is a solid number based on massive research and an endless number of questions that they answered. There is absolutely now way you don’t know everything there is to know about this project now. No way there is anything you haven’t uncovered. And their faith in that “Esti-Quote” goes through the roof. When the project goes over this time, they might even begin to question whether or not you know what you’re doing. Who could blame them? You drilled them for weeks about every little thing, and when they complained about all the questions, you told them you wanted to uncover everything so there would be no surprises. SO we set them up to faile Guess, Then Plan We had a chance. At the beginning we could have just said, “That’s just a gut-feeling estimate, based on my past experience with similar projects. There could still be surprises.” If we spend SOME time doing SOME discovery and then bounce that against our own past experiences, we can come up with a fairly healthy estimate. We can then help the product owner understand that an estimate is a guess. Sure, it’s an educated guess, but it is still a guess. If we get it right it will be almost completely luck. Then, we help them to plan the development by taking that guess (yes, they still need the guess for planning purposes) and start measuring early and often to see if we still think we are right. We should adjust the estimate and alert the product owner as soon as we see problems (bad news does not age well) and we should be able to see any problems immediately if we are constantly measuring our pace. In lean software, we start with that guess and begin measuring cycle times immediately. Then we can make projections based on those cycle times and compare them to our estimate. This constant feedback is the best way to ensure that there are no surprises at the END of the project. There sill still be surprises, but we’ll see them sooner and have a better understanding of how they will affect our overall timeline. What do you think?

    Read the article

  • Drawing shapes dynamically on an image through web browser

    - by Tom Beech
    We have a scenario where we create floor plans of locations when we visit. The floor plan is finally shown on the web. It's come to the point now where we want to show floor plans but have a key with various items on them, when an item on the key is clicked, the image should highlight all the areas of the floorplan that have that specific item. I guess we're looking for some sort of open standard javascript lib to deal with SVG (has to work pre IE9 so pure SVG wont cut it) and the floor plans have to be able to be created through a .net application to be deployed on the web. I'd rather stay away from flash if at all possible to be honest. Below are a few conceptual images of what we're trying to achieve.

    Read the article

  • Project development without experience

    - by Raven13
    I'm a web developer who is part of a three-man team that has been tasked with a rather large and complex development project. Other than some direction and impetus from management, we're pretty much on our own to develop the new website. None of us have any project management experience nor do my two coworkers seem like they would be interested in taking on that role, so I feel like it's up to me to implement some kind of structure to the development process in order to avoid issues down the road. My question is: what can I do as a developer without project managment experience to ensure that our project gets developed successfully and avoid the pitfalls of developing a project without a plan?

    Read the article

  • MSR Issue on 12.1 Enterprise Controllers

    - by Owen Allen
    We've noticed a problem with MSR initialization and synchronization on Enterprise Controllers that are using Java 7u45. If you're running into the issue, these jobs fail with Java errors. Java 7u45 is bundled with Oracle Solaris 11.1 SRU 12, so if you're using that version or if you plan to use it, you should be aware of this issue. There's a simple fix. You can do the fix before upgrading to SRU 12, but you can't do it before you install the Enterprise Controller. First, log on to the Enterprise Controller system and stop the EC using the ecadm command. This command is in the /opt/SUNWxvmoc/bin directory on Oracle Solaris systems and in the /opt/sun/xvmoc/bin directory on Linux systems: ecadm stop -w Then run this command to fix the issue: cacaoadm set-param java-flags=`cacaoadm get-param -v java-flags -i oem-ec | sed 's/Xss256k/Xss384k/'` -i oem-ec And then restart the EC: ecadm start -w Once you apply this fix, you should be set.

    Read the article

  • Benchmarking CPU processing power

    - by Federico Zancan
    Provided that many tools for computers benchmarking are available already, I'd like to write my own, starting with processing power measurement. I'd like to write it in C under Linux, but other language alternatives are welcome. I thought starting from floating point operations per second, but it is just a hint. I also thought it'd be correct to keep track of CPU number of cores, RAM amount and the like, to more consistently associate results with CPU architecture. How would you proceed to the task of measuring CPU computing power? And on top of that: I would worry about a properly minimum workload induced by concurrently running services; is it correct to run benchmarking as a standalone (and possibly avulsed from the OS environment) process?

    Read the article

  • What is the best Video Conference integrated solution for Us? [closed]

    - by Andrei B
    we are trying to integrate a simple Video Conferencing (open source) solution into our existing application which is written in C++ and it runs on Linux. I am currently looking at using Ekiga (formely known as GnomeMeeting) or Homer Conferencing (short: Homer). My plan is to "integrate" an existing Video Conferencing client into our existing software. Please give me recommendation on which 3rd party application or library to use to add video conferencing feature to our application. PS: Please don't close this question. I asked it on StackOverflow and it got closed, so where am I supposed to ask this question? If not here, then whats the point of asking lol.

    Read the article

  • Task Management - How important it is for a entry level developer?

    - by Naveen Kumar
    I hold masters in CS & now I'm mobile apps developer (Entry Level) , I always start to plan things when starting or doing any project both at work & projects i do at Home (for passion) - as I can deliver the project on time but sometimes i m running out of time like 10 tasks a day vs my time forecast will take 2 on that day? As I'm beginner level, I want your suggestions on How important is Task Management for a person like me & for achieving my goals? My target for the next 3 year will be a Project Manager or Similiar Role - i belive which these time managing skills will be a needed quality.

    Read the article

< Previous Page | 136 137 138 139 140 141 142 143 144 145 146 147  | Next Page >