Search Results

Search found 46070 results on 1843 pages for 'project management tools'.

Page 15/1843 | < Previous Page | 11 12 13 14 15 16 17 18 19 20 21 22  | Next Page >

  • Project Euler 4: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 4.  As always, any feedback is welcome. # Euler 4 # http://projecteuler.net/index.php?section=problems&id=4 # Find the largest palindrome made from the product of # two 3-digit numbers. A palindromic number reads the # same both ways. The largest palindrome made from the # product of two 2-digit numbers is 9009 = 91 x 99. # Find the largest palindrome made from the product of # two 3-digit numbers. import time start = time.time() def isPalindrome(s): return s == s[::-1] max = 0 for i in xrange(100, 999): for j in xrange(i, 999): n = i * j; if (isPalindrome(str(n))): if (n > max): max = n print max print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue')

    Read the article

  • Project Euler 6: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 6.  As always, any feedback is welcome. # Euler 6 # http://projecteuler.net/index.php?section=problems&id=6 # Find the difference between the sum of the squares of # the first one hundred natural numbers and the square # of the sum. import time start = time.time() square_of_sums = sum(range(1,101)) ** 2 sum_of_squares = reduce(lambda agg, i: agg+i**2, range(1,101)) print square_of_sums - sum_of_squares print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue')

    Read the article

  • Project Euler 20: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 20.  As always, any feedback is welcome. # Euler 20 # http://projecteuler.net/index.php?section=problems&id=20 # n! means n x (n - 1) x ... x 3 x 2 x 1 # Find the sum of digits in 100! import time start = time.time() def factorial(n): if n == 0: return 1 else: return n * factorial(n-1) print sum([int(i) for i in str(factorial(100))]) print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue')

    Read the article

  • Project Euler 1: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 1.  As always, any feedback is welcome. # Euler 1 # http://projecteuler.net/index.php?section=problems&amp;id=1 # If we list all the natural numbers below 10 that are # multiples of 3 or 5, we get 3, 5, 6 and 9. The sum of # these multiples is 23. Find the sum of all the multiples # of 3 or 5 below 1000. import time start = time.time() print sum([x for x in range(1000) if x % 3== 0 or x % 5== 0]) print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue') # Also cool def constraint(x): return x % 3 == 0 or x % 5 == 0 print sum(filter(constraint, range(1000)))

    Read the article

  • Project Euler 3: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 3.  As always, any feedback is welcome. # Euler 3 # http://projecteuler.net/index.php?section=problems&id=3 # The prime factors of 13195 are 5, 7, 13 and 29. # What is the largest prime factor of the number # 600851475143? import time start = time.time() def largest_prime_factor(n): max = n divisor = 2 while (n >= divisor ** 2): if n % divisor == 0: max, n = n, n / divisor else: divisor += 1 return max print largest_prime_factor(600851475143) print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue')

    Read the article

  • Motivating developers in a project perceived as **dull** ?

    - by Fanatic23
    As a manager, I can't always end up generating work that'd be cutting edge. Some of the projects do run on maintenance mode, and generate a healthy free cash flow for the company. As a developer what would it take for you to stick around in this project? I have been thinking of re-branding the work, but I could do with a lot of help here. Appreciate a single response per post. Please don't suggest an increased pay-packet, this creates more problems than it solves.

    Read the article

  • Updating and organizing class diagrams in a growing C++ project

    - by vanna
    I am working on a C++ project that is getting bigger and bigger. I do a lot of UML so it is not really hard to explain my work to co-workers. Lately though I implemented a lot of new features and I gave up updating by hand my Dia UML diagrams. I once used the class diagram of Visual Studio, which is my IDE but didn't get clear results. I need to show my work on a regular basis and I would like to be as clear as possible. Is there any tool that could generate a sort of organized map of my work (namespaces, classes, interactions, etc.) ?

    Read the article

  • Interacting with clients using project management systems

    - by Keyo
    I work in web development, that involves a lot of smaller custom projects rather than one large product. Requirements and specifications are always coming from outside the company. We've setup a ticket tracking system (Active Collab, which is rubbish compared to redmine btw) and given access to clients so they can submit issues. The idea being that less time is taken up with long phone conversations and emails. I think it can work really well if done right. However I'm not so sure it's always a good thing. Feature requests have gone up a lot on some projects. The system also needs to be friendly to non-developers while having the many features that developers use. Developers' tickets do not always map 1-to-1 with the tickets clients will create. So the requirements and broader tickets need to be separated from the more specific developer (specification) related tickets. Perhaps we could use two systems, one for clients to submit their requirements or describe a bug, and one for developers to create tickets like implement method x in class y. Maybe this can be achieved by structuring tickets into more appropriate categories or creating sub-tickets under a feature request ticket. I've briefly looked into Pivotal Tracker and it has a fundamentally different workflow. I would like to know how others are communicating with clients and keeping the technical workflow separate from the non-technical workflow. What tools do you use and how do you use them?

    Read the article

  • Release/Change management - best aproach

    - by Bob Rivers
    I asked this question an year ago in StackOverflow and never got a good answer. Since Programmers seems to be a better place to ask it, I'll give it a try... What is the better way to work with release management? More specifically what would be the best way to release packages? For example, assuming that you have a relatively stable system, a good quality assurance process (QA), etc. How do you prefer to release new versions? Let's assume that we are talking about a mid to large "centralized" web system (no clients), in-house development. This system can be considered "vital" for a corporate operations. I have a tendency to prefer to do this by releasing packets at regular intervals, not greater than 1 to 3 months. During this period, I will include into the package,fixes and improvements and make the implementation in production environment only once. But I've seen some people who prefer to place small changes in production, but with a greater frequency. The claim of these people is that by doing so, it is easier to identify bugs that have gone through the process of QA: in a package with 10 changes and another with only 1, it is much easier to know what caused the problem in the package with just one change... What is the opinion came from you?

    Read the article

  • Overwhelmed by complex C#/ASP.NET project in Visual Studio 2008

    - by Darren Cook
    I have been hired as a junior programmer to work on projects that extend existing functionality in a very large, complex solution. The code base consists of C#, ASP.NET, jQuery, javascript, html and xml. I have some knowledge of all these in addition to fair knowledge of object-oriented programming and its fundamental concepts of inheritance, abstraction, polymorphism and encapsulation. I can follow code up through its base classes, interfaces, abstract classes and understand a large part of the code that I read while doing this. However, this solution is so humongous and so many things get tied together whenever I navigate through the code that I feel absolutely overwhelmed. I often find myself unable to fully follow everything that is going on with objects being serialized, large amounts of C# and javascript operating on the same pages and methods being called from template files that consist mainly of markup. I love learning about code, but trying to deal with this really stresses me out. Additionally, I do know that a significant amount of unit testing has been done but I know nothing about unit testing or how to utilize it. Any advice anyone could offer me regarding dealing with a large code base while using Visual Studio 2008 would be greatly appreciated. Are there tools that I can use to help get a handle on what is going on? Perhaps there are things even in Visual Studio that I am not aware of. How can I follow the code to low level functionality in order to get a better grasp of what is going on at a high level?

    Read the article

  • SQL SERVER – Read Only Files and SQL Server Management Studio (SSMS)

    - by pinaldave
    Just like any other Developer or DBA SQL Server Management Studio is my favorite application. Any any moment of the time I have multiple instances of the same application are open and I am working on it. Recently, I have come across a very interesting feature in SSMS related to “Read Only” files. I believe it is a little unknown feature as well so decided to write a blog about the same. First create a read only SQL file. You can make any file read by Right Click >> Properties >> Select Attribute Read Only. Now open the same file in SQL Server Management Studio. You will find that besides the file name there is a small ‘lock’ icon. This small icon indicates that the file is read only. Now let us attempt to edit the read only file. It will let us edit the file any way we want, however when we attempt to save it, it gives following pop-up value. The options in the pop-up are self explanatory and I liked it. The goal of the read only file is to prevent users to make un-intended changes. However, when a user should have complete control over the user file. User should be aware that the file is read only but if he wants to edit the file or save as a new file the choices should be present in front of it and the pop-up menu precisely captures the same. Now let us check option related to this feature in SSMS. Go to Menu >> Options >> Environment >> Documents You will find the third option which is “Allow editing of read-only files; warn when attempt to save”. In the above scenario it was already checked. Let us uncheck the same and do the same exercise which we have done earlier. I closed all the earlier window to avoid confusion. With the new option selected when I attempt to even modify the Read Only file, it gives me totally different pop up screen. It gives me an option like “Edit In-Memory”, “Make Writeable” etc. When you select “Edit In-Memory” it allows you to edit the file and later you can save as new file – just like the earlier scenario which we have discussed. . If clicked on the Make Writeable it will remove the restriction of the Read Only and file can be edited as pleased. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: PostADay, SQL, SQL Authority, SQL Query, SQL Server, SQL Server Management Studio, SQL Tips and Tricks, T SQL, Technology

    Read the article

  • Ant: project dependencies in a flat project layout with ivy

    - by MH
    Hello, I have two (Eclipse-) projects. Project A depends on project B, but the projects aren't nested i.e. project A is not a subproject of project B. Apache Ivy is responsible for the dependency management. When I run the compile task in Project A, is there any way to trigger the compile task (in project B) automatically (for example if the jar file of project B doesn't exist)? Thanks a million in advance.

    Read the article

  • Project Euler 53: Ruby

    - by Ben Griswold
    In my attempt to learn Ruby out in the open, here’s my solution for Project Euler Problem 53.  I first attempted to solve this problem using the Ruby combinations libraries. That didn’t work out so well. With a second look at the problem, the provided formula ended up being just the thing to solve the problem effectively. As always, any feedback is welcome. # Euler 53 # http://projecteuler.net/index.php?section=problems&id=53 # There are exactly ten ways of selecting three from five, # 12345: 123, 124, 125, 134, 135, 145, 234, 235, 245, # and 345 # In combinatorics, we use the notation, 5C3 = 10. # In general, # # nCr = n! / r!(n-r)!,where r <= n, # n! = n(n1)...321, and 0! = 1. # # It is not until n = 23, that a value exceeds # one-million: 23C10 = 1144066. # In general: nCr # How many, not necessarily distinct, values of nCr, # for 1 <= n <= 100, are greater than one-million timer_start = Time.now # There's no factorial method in Ruby, I guess. class Integer # http://rosettacode.org/wiki/Factorial#Ruby def factorial (1..self).reduce(1, :*) end end def combinations(n, r) n.factorial / (r.factorial * (n-r).factorial) end answer = 0 100.downto(3) do |c| (2).upto(c-1) { |r| answer += 1 if combinations(c, r) > 1_000_000 } end puts answer puts "Elapsed Time: #{(Time.now - timer_start)*1000} milliseconds"

    Read the article

  • Project Euler 14: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 14.  As always, any feedback is welcome. # Euler 14 # http://projecteuler.net/index.php?section=problems&id=14 # The following iterative sequence is defined for the set # of positive integers: # n -> n/2 (n is even) # n -> 3n + 1 (n is odd) # Using the rule above and starting with 13, we generate # the following sequence: # 13 40 20 10 5 16 8 4 2 1 # It can be seen that this sequence (starting at 13 and # finishing at 1) contains 10 terms. Although it has not # been proved yet (Collatz Problem), it is thought that all # starting numbers finish at 1. Which starting number, # under one million, produces the longest chain? # NOTE: Once the chain starts the terms are allowed to go # above one million. import time start = time.time() def collatz_length(n): # 0 and 1 return self as length if n <= 1: return n length = 1 while (n != 1): if (n % 2 == 0): n /= 2 else: n = 3*n + 1 length += 1 return length starting_number, longest_chain = 1, 0 for x in xrange(1, 1000001): l = collatz_length(x) if l > longest_chain: starting_number, longest_chain = x, l print starting_number print longest_chain # Slow 31 seconds print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue')

    Read the article

  • Project Euler 12: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 12.  As always, any feedback is welcome. # Euler 12 # http://projecteuler.net/index.php?section=problems&id=12 # The sequence of triangle numbers is generated by adding # the natural numbers. So the 7th triangle number would be # 1 + 2 + 3 + 4 + 5 + 6 + 7 = 28. The first ten terms # would be: # 1, 3, 6, 10, 15, 21, 28, 36, 45, 55, ... # Let us list the factors of the first seven triangle # numbers: # 1: 1 # 3: 1,3 # 6: 1,2,3,6 # 10: 1,2,5,10 # 15: 1,3,5,15 # 21: 1,3,7,21 # 28: 1,2,4,7,14,28 # We can see that 28 is the first triangle number to have # over five divisors. What is the value of the first # triangle number to have over five hundred divisors? import time start = time.time() from math import sqrt def divisor_count(x): count = 2 # itself and 1 for i in xrange(2, int(sqrt(x)) + 1): if ((x % i) == 0): if (i != sqrt(x)): count += 2 else: count += 1 return count def triangle_generator(): i = 1 while True: yield int(0.5 * i * (i + 1)) i += 1 triangles = triangle_generator() answer = 0 while True: num = triangles.next() if (divisor_count(num) >= 501): answer = num break; print answer print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue')

    Read the article

  • Project Euler 19: (Iron)Python

    - by Ben Griswold
    In my attempt to learn (Iron)Python out in the open, here’s my solution for Project Euler Problem 19.  As always, any feedback is welcome. # Euler 19 # http://projecteuler.net/index.php?section=problems&id=19 # You are given the following information, but you may # prefer to do some research for yourself. # # - 1 Jan 1900 was a Monday. # - Thirty days has September, # April, June and November. # All the rest have thirty-one, # Saving February alone, # Which has twenty-eight, rain or shine. # And on leap years, twenty-nine. # - A leap year occurs on any year evenly divisible by 4, # but not on a century unless it is divisible by 400. # # How many Sundays fell on the first of the month during # the twentieth century (1 Jan 1901 to 31 Dec 2000)? import time start = time.time() import datetime sundays = 0 for y in range(1901,2001): for m in range(1,13): # monday == 0, sunday == 6 if datetime.datetime(y,m,1).weekday() == 6: sundays += 1 print sundays print "Elapsed Time:", (time.time() - start) * 1000, "millisecs" a=raw_input('Press return to continue')

    Read the article

  • Project Codenames - Yea or Nay?

    - by rmx
    Where I work, most of our projects have (or at least attempt) descriptive, useful names. However we have a few with names that make no sense: I found that an assembly named WiFi which actually has nothing whatsoever to do with wi-fi, but is a codename. When I asked why, I was told that it's to protect company secrets incase some intern has few too many at the pub on Friday and starts chatting about the brand new 'WiFi' project he's been working on. Its clear that some people find enjoyment in finding silly / amusing codenames for their projects (like in this question). My question is: is it really a good idea to use codenames for your projects or are you better off spending the time to decide upon a descriptive name? My opinion is that in the long-run its better to give your projects relevant names. My reasoning is that if you can't think of a decent name, perhaps you don't really know the requirements well enough. I think there are better ways to 'protect company secrets' and I find it quite confusing when the name does not correlate at all with the content. It's just common sense, surely?! So do you use codenames and what the your reasons for or against this seemingly common, yet annoying (to me at least) practice?

    Read the article

  • A project idea I've got...

    - by Mr Teeth
    Hi, Next year I will be doing a final year project at Uni. I've already thought of one and was wondering what you guys think of it. I want to create a University Information Search for prospective students who are trying to look for an affordable University to attend. It will depend on the student's family income and the grades they get. They enter in those two parameters (and some more) and it comes up with a list of suitable Unis based on their criteria. This is not about the price of tution fee. It's mostly to do with the cost of living. Stuff like: Rent (if living in a private flat). Student Accomadation. Cost of traveling to your home and back (for holidays). ...and some other stuff stuff I haven't thought about yet. It'll mostly be GUI driven with some textual information. I'm also thinking of using it as a website interface. What do you guys think? Can I program something like this Java? If there's any holes you see in my idea please tell me.

    Read the article

  • Project management with bug tracking integrated

    - by guytom
    Hi, Can someone recommend a hosted solution that answers the following requirements (I have seen other questions but none with these specific requests): Project management with tasks, wiki, milestones Bug tracking integrated Collaborative - suitable for working with external developers Subversion integration I know Jira but it seems to be too complex and lacks on the collaboration Thanks

    Read the article

  • Which Project Management Software is adequate for Software & Non-Software Projects?

    - by cusack
    PMS = (Project Management Software) I used trac for software development some time ago. Right now I'm searching for a new more powerful (scheduling, gantt charts, ...) free solution (as in free beer ;-) and free to install on my server) for my current software project. Besides the current software project, abstract project management features like issue-tracking & scheduling would be great for coordinating a group of volunteers for real-life projects as well. I would want one solution for both purposes, so that I have the hassle of installation, getting used to the system and administration only once. So I tried redmine but the problem is it seems to be designed for software projects only. I can't suggest such a solution for the volunteer-group if tickets/issues would have to be of type bug, feature, ... I shortlisted the following six PMS from the wikipedia comparison http://en.wikipedia.org/wiki/List_of_project_management_software Project.net Project-Open Redmine Trac Endeavour Software Project Management eGroupWare I guess they are all more or less fine for software development but would you consider any of these to be good for the non-software project as well? Cliff Notes: I would want a start page situation like in trac. The start-page is a wiki presenting the project and not the PMS. But you can log into the PMS from there. Feature-wish list: wiki, Issue tracking, revision control, scheduling & gantt charts, forums (least important) (Btw: I'm very aware that I can't expect everything to be perfect ;-) 1.)Do you know a suitable solution for software and real-life projects or a highly customizable PMS where I can easily remove sth. like "browse source"(trac) and rename things like ticket/issue-types "bug", "feature"? 2.)Any experience good/bad with the above mentioned six PMS? I would personally guess that "Redmine" and "Endeavour Software Project Management" are too focused on software projects.

    Read the article

  • How can you force the start and end date of a task in Microsoft Project to be on the same day?

    - by Hauke P.
    I have a task called "Interview person A about topic X". The task's duration is set to 2 hours. The start date of the task should automatically be calculated taking dependencies and resource availabilities into account. My question boils down to: How can I force this task to start and end on the same date? Background: In my case, Microsoft Project sets the start date to a Friday at 5pm. As my working hours are set to 8am to 12am and 1pm to 6pm (Mon-Fri), Microsoft Project "splits up" the task at 6pm on Friday and plans to continue it at 8am on the following Monday. However, it does not make any sense to stop the interview on a Friday and restart it on Monday. Therefore the automatic suggestion is not helpful in this case. That's why I'm looking for a way way to force the task to start and end on the very same day. (In my example, I'd like Microsoft Project to delay the start date of the task until Monday 8am as this is the first time slot in which the task "fits in completely".) By the way: I have lots of such cases... for that reason it would be really great if there was a solution that doesn't just deal with this single special case.)

    Read the article

  • How to force the start and end date of a task in Microsoft Project to be on the same day?

    - by Hauke P.
    I have a task called "Interview person A about topic X". The task's duration is set to 2 hours. The start date of the task should automatically be calculated taking dependencies and resource availabilities into account. My question boils down to: How can I force this task to start and end on the same date? Background: In my case, Microsoft Project sets the start date to a Friday at 5pm. As my working hours are set to 8am to 12am and 1pm to 6pm (Mon-Fri), Microsoft Project "splits up" the task at 6pm on Friday and plans to continue it at 8am on the following Monday. However, it does not make any sense to stop the interview on a Friday and restart it on Monday. Therefore the automatic suggestion is not helpful in this case. That's why I'm looking for a way way to force the task to start and end on the very same day. (In my example, I'd like Microsoft Project to delay the start date of the task until Monday 8am as this is the first time slot in which the task "fits in completely".) By the way: I have lots of such cases... for that reason it would be really great if there was a solution that doesn't just deal with this single special case.

    Read the article

  • SQL SERVER – Right Aligning Numerics in SQL Server Management Studio (SSMS)

    - by pinaldave
    SQL Server Management Studio is my most favorite tool and the comfort it provides to user is sometime very amazing. Recently I was retrieving numeric data in SSMS and I found it is very difficult to read them as they were all right aligned. Please pay attention to following image, you will notice that it is not easier to read the digits as we are used to read the numbers which are right aligned. I immediately thought before I go for any other tricks I should check the query properties. I right clicked on query properties and I found following option. I checked option Right align numeric values and it just worked fine. Do you have any other similar tricks which do you practice often. I prefer to also include column headers in the result set as it gives me proper perspective of which column I have selected. Sometime little tips like this helps a lot in productivity, I encourage you to share your tips. I will publish it with due credit. Reference: Pinal Dave (http://blog.sqlauthority.com) Filed under: PostADay, SQL, SQL Authority, SQL Query, SQL Server, SQL Server Management Studio, SQL Tips and Tricks, T SQL, Technology

    Read the article

  • Complex Release Vehicle Management

    - by Sharon
    I'm looking into improving our build and release system. We are a .Net/Windows shop, and I don't see any really good tools for Windows for generating the files that are to be dropped in patch or hotfix. We are currently using TFSBuild 2010 with Windows Workflows for our continuous integration builds as well as our daily full build which includes an Installshield package for deployment. What is a good way of generating the list of files to be included in a "patch" style release, where one does not redistribute all the files, but only those necessary to accomplish the necessary changes? Are there any open source tools that work well for this, or do teams usually roll their own? I have considered using Beyond Compare but I would prefer something open source. The file "patch" creation must be 100% automatable. Which release vehicles really ought to be patch style? And which releases should replace all system files related to our application? Assume we have a very large amount of resources necessary to maintain. Is there any established material that is trusted within the industry for strategies about this? I realize it is different for "enterprise" rather than with typical websites. I am looking more for "enterprise" strategies due to our product distribution style. tl;dr Looking for info on how to ship more reliable packages?

    Read the article

  • How can I justify software testing to management?

    - by Nate
    I work for a small company (less than 200 employees) whose software group only makes up a small part of our staff (4 employees, occasionally with a few contractors). The four of us have been making strides in transitioning to better practices, and one of the next logical steps is to improve our testing. As anyone who has done any meaningful tests knows, testing takes a lot of time - and at my company, it takes too much time to justify to management, so we generally do what little we do on the sly. I don't think this is serving us well, as we keep coming up against otherwise avoidable problems when we ship under-tested software. I would like to be able to come to management with a justification for hiring a dedicated software test engineer (someone who can both write automated tests and perform manual ones). Are there any good published studies that show the benefits of adding such a position to a small company? Where can I find information about costs associated with the position? I plan on doing a little number crunching on our own history, but having some external sources to point to would help bolster my case.

    Read the article

< Previous Page | 11 12 13 14 15 16 17 18 19 20 21 22  | Next Page >