Search Results

Search found 532 results on 22 pages for 'intervals'.

Page 2/22 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • My Internet Connection Keeps Disconnecting at regular intervals

    - by dhasu
    I have a Cable modem connected to a router (Linksys WRT54G) I use internet on my Desktop PC using a Wireless Adapter (NETGEAR WG111) I am using Windows Vista. I tried few things like Contacting the ISP changing USB port for adapter updating router firmware tryin out the connection on a laptop Connecting directly using a LAN cord Nothing worked.. Anyone with more solutions ??

    Read the article

  • 4.4.1 Timeout in 10 minute intervals SMTP on batch email jobs

    - by TEEKAY
    I am running a job that uses SMTP and it can run in excess of an hour, emailing the entire time. It's not my code but a workflow based app so I just get a form to configure the mail server, subj, msg, etc and can't see it's implementation. I know it is .NET and SmtpClient. I have been seeing 4.4.1 timeouts every 10 minutes being reported by the application as the response from the server. The # of emails in those 10 minute sessions are variable, between 100 and below 150 which leads me to ask about the 10 minute timeout time specifically. I have found there are several exchange properties (though I don't know what version they are running) that set timeout limits. (http://technet.microsoft.com/en-us/library/bb232205%28v=exchg.150%29.aspx) Would those values for ConnectionInactivityTimeOut and ConnectionTimeout be the controlling the timeouts? and finally I would like to ask if exchange considers the consistent connection(s) it kept receiving from the same source as one continuous connection and cause the timeout each 10 minutes and cause the timeout? I am using a static ip of the mail server. Thanks if anyone can shed any light on my problem. EDIT - It is my belief that the library is just keeping the connections around and isn't wrapped in any cleanup code or using statement. That said, I still haven't made any progress on this issue in the last year and just requeue the failed ones as I see them.

    Read the article

  • Group mysql query by 15 min intervals

    - by gsiener
    I've got a monitoring system that is collecting data every n seconds (n ~=10 but varies). I'd like to aggregate the collected data by 15 minute intervals. Is there a way to corral the timestamp column into 15 minute chunks to allow for grouping to work?

    Read the article

  • Merge overlapping date intervals

    - by leoinfo
    Is there a better way of merging overlapping date intervals? The solution I came up with is so simple that now I wonder if someone else has a better idea of how this could be done. /***** DATA EXAMPLE *****/ DECLARE @T TABLE (d1 DATETIME, d2 DATETIME) INSERT INTO @T (d1, d2) SELECT '2010-01-01','2010-03-31' UNION SELECT '2010-04-01','2010-05-31' UNION SELECT '2010-06-15','2010-06-25' UNION SELECT '2010-06-26','2010-07-10' UNION SELECT '2010-08-01','2010-08-05' UNION SELECT '2010-08-01','2010-08-09' UNION SELECT '2010-08-02','2010-08-07' UNION SELECT '2010-08-08','2010-08-08' UNION SELECT '2010-08-09','2010-08-12' UNION SELECT '2010-07-04','2010-08-16' UNION SELECT '2010-11-01','2010-12-31' UNION SELECT '2010-03-01','2010-06-13' /***** INTERVAL ANALYSIS *****/ WHILE (1=1) BEGIN UPDATE t1 SET t1.d2 = t2.d2 FROM @T AS t1 INNER JOIN @T AS t2 ON DATEADD(day, 1, t1.d2) BETWEEN t2.d1 AND t2.d2 -- AND t1.d2 <= t2.d2 /***** this condition is useless *****/ IF @@ROWCOUNT = 0 BREAK END /***** RESULT *****/ SELECT StartDate = MIN(d1) , EndDate = d2 FROM @T GROUP BY d2 ORDER BY StartDate, EndDate /***** OUTPUT *****/ /***** StartDate EndDate 2010-01-01 2010-06-13 2010-06-15 2010-08-16 2010-11-01 2010-12-31 *****/ EDIT: I realized that the t1.d2 <= t2.d2 condition is not really useful.

    Read the article

  • How do i plot a vertical axis with variable intervals (Flex Charts or any other)

    - by satish
    How do i plot a vertical axis with variable intervals? on a Flex Chart. I want to plot a data set that has values from 0.1 to 800. When I use a standard Numerical Axis, I have to define a interval. I tried using Log-Axis, but I am not sure how to plot the point values. Looks like something in lines of semi-log axis would be better. A axis with initial values in Numerical, but later shifting gears to a Log-Axis. Any ideas or pointers to implement this in Flex?

    Read the article

  • Linear regression confidence intervals in SQL

    - by Matt Howells
    I'm using some fairly straight-forward SQL code to calculate the coefficients of regression (intercept and slope) of some (x,y) data points, using least-squares. This gives me a nice best-fit line through the data. However we would like to be able to see the 95% and 5% confidence intervals for the line of best-fit (the curves below). What these mean is that the true line has 95% probability of being below the upper curve and 95% probability of being above the lower curve. How can I calculate these curves? I have already read wikipedia etc. and done some googling but I haven't found understandable mathematical equations to be able to calculate this. Edit: here is the essence of what I have right now. --sample data create table #lr (x real not null, y real not null) insert into #lr values (0,1) insert into #lr values (4,9) insert into #lr values (2,5) insert into #lr values (3,7) declare @slope real declare @intercept real --calculate slope and intercept select @slope = ((count(*) * sum(x*y)) - (sum(x)*sum(y)))/ ((count(*) * sum(Power(x,2)))-Power(Sum(x),2)), @intercept = avg(y) - ((count(*) * sum(x*y)) - (sum(x)*sum(y)))/ ((count(*) * sum(Power(x,2)))-Power(Sum(x),2)) * avg(x) from #lr Thank you in advance.

    Read the article

  • javascript switch using internals

    - by Fernando SBS
    Can I use intervals in a switch statement? Like switch (parseInt(troops[i])) { case <10: editbox.style.fontSize = "13px"; break; case <100: editbox.style.fontSize = "12px"; break; case <1000: editbox.style.fontSize = "8px"; editbox.size = 3; //editbox.style.width = "18px"; break; default: editbox.style.fontSize = "10px"; } ???

    Read the article

  • Auto load a specific link at various time intervals

    - by user228837
    Here's what I need to do. I'm using Google Chrome. I have page that auto-reloads every 5 seconds using a script: javascript: timeout=prompt("Set timeout [s]"); current=location.href; if(timeout>0) setTimeout('reload()',1000*timeout); else location.replace(current); function reload() { setTimeout('reload()',1000*timeout); fr4me='<frameset cols=\'*\'>\n<frame src=\''+current+'\'/>'; fr4me+='</frameset>'; with(document){write(fr4me);void(close())}; } I found that script by Googling. The reason why the page auto-reloads every 5 seconds is I'm waiting for a specific link or url to appear in the page. It appears at random times. Once I see the link I'm waiting for, I immediately click the link. That's fine. But I want more. What I want is the page will auto-reload and I want it to auto-detect the the link I'm waiting for. Once the script finds the link I'm waiting for, it automatically loads that link on a new tab or page. For example, I'm auto-reloading www.example.com. I'm waiting for a specific url "BUY NOW". When the page auto-reloads, it checks if there's a url "BUY NOW". If it sees one, it should automatically open that link. Thanks.

    Read the article

  • Getting a NullPointerException at seemingly random intervals, not sure why

    - by Miles
    I'm running an example from a Kinect library for Processing (http://www.shiffman.net/2010/11/14/kinect-and-processing/) and sometimes get a NullPointerException pointing to this line: int rawDepth = depth[offset]; The depth array is created in this line: int[] depth = kinect.getRawDepth(); I'm not exactly sure what a NullPointerException is, and much googling hasn't really helped. It seems odd to me that the code compiles 70% of the time and returns the error unpredictably. Could the hardware itself be affecting it? Here's the whole example if it helps: // Daniel Shiffman // Kinect Point Cloud example // http://www.shiffman.net // https://github.com/shiffman/libfreenect/tree/master/wrappers/java/processing import org.openkinect.*; import org.openkinect.processing.*; // Kinect Library object Kinect kinect; float a = 0; // Size of kinect image int w = 640; int h = 480; // We'll use a lookup table so that we don't have to repeat the math over and over float[] depthLookUp = new float[2048]; void setup() { size(800,600,P3D); kinect = new Kinect(this); kinect.start(); kinect.enableDepth(true); // We don't need the grayscale image in this example // so this makes it more efficient kinect.processDepthImage(false); // Lookup table for all possible depth values (0 - 2047) for (int i = 0; i < depthLookUp.length; i++) { depthLookUp[i] = rawDepthToMeters(i); } } void draw() { background(0); fill(255); textMode(SCREEN); text("Kinect FR: " + (int)kinect.getDepthFPS() + "\nProcessing FR: " + (int)frameRate,10,16); // Get the raw depth as array of integers int[] depth = kinect.getRawDepth(); // We're just going to calculate and draw every 4th pixel (equivalent of 160x120) int skip = 4; // Translate and rotate translate(width/2,height/2,-50); rotateY(a); for(int x=0; x<w; x+=skip) { for(int y=0; y<h; y+=skip) { int offset = x+y*w; // Convert kinect data to world xyz coordinate int rawDepth = depth[offset]; PVector v = depthToWorld(x,y,rawDepth); stroke(255); pushMatrix(); // Scale up by 200 float factor = 200; translate(v.x*factor,v.y*factor,factor-v.z*factor); // Draw a point point(0,0); popMatrix(); } } // Rotate a += 0.015f; } // These functions come from: http://graphics.stanford.edu/~mdfisher/Kinect.html float rawDepthToMeters(int depthValue) { if (depthValue < 2047) { return (float)(1.0 / ((double)(depthValue) * -0.0030711016 + 3.3309495161)); } return 0.0f; } PVector depthToWorld(int x, int y, int depthValue) { final double fx_d = 1.0 / 5.9421434211923247e+02; final double fy_d = 1.0 / 5.9104053696870778e+02; final double cx_d = 3.3930780975300314e+02; final double cy_d = 2.4273913761751615e+02; PVector result = new PVector(); double depth = depthLookUp[depthValue];//rawDepthToMeters(depthValue); result.x = (float)((x - cx_d) * depth * fx_d); result.y = (float)((y - cy_d) * depth * fy_d); result.z = (float)(depth); return result; } void stop() { kinect.quit(); super.stop(); } And here are the errors: processing.app.debug.RunnerException: NullPointerException at processing.app.Sketch.placeException(Sketch.java:1543) at processing.app.debug.Runner.findException(Runner.java:583) at processing.app.debug.Runner.reportException(Runner.java:558) at processing.app.debug.Runner.exception(Runner.java:498) at processing.app.debug.EventThread.exceptionEvent(EventThread.java:367) at processing.app.debug.EventThread.handleEvent(EventThread.java:255) at processing.app.debug.EventThread.run(EventThread.java:89) Exception in thread "Animation Thread" java.lang.NullPointerException at org.openkinect.processing.Kinect.enableDepth(Kinect.java:70) at PointCloud.setup(PointCloud.java:48) at processing.core.PApplet.handleDraw(PApplet.java:1583) at processing.core.PApplet.run(PApplet.java:1503) at java.lang.Thread.run(Thread.java:637)

    Read the article

  • Sending emails based on intervals using Ruby on Rails

    - by Angela
    Hi, I would like to be able to send a string of emails at a determined interval to different recipients. I assign to each Contact this series of Emails called a Campaign, where Campaign has Email1, Email2, etc. Each Contact has a Contact.start_date. Each Email has email.days which stores the number of days since a Contact's start-date to send the email. For example: Email1.days=5, Email2.days=7, Email3.days=11. Contact1.start_date = 4/10/2010; contact2.start_date = 4/08/2010 IF today is 4/15, then Contact1 receives Email 1 (4/15-4/10 = 5 days) IF today is 4/15, then Contact2 received Email 2 (4/15 - 4/8 = 7 days). What's a good action to run every day using a cron job that would then follow these rules to send out emails using ActionMailer? Thanks.

    Read the article

  • Why are gettimeofday() intervals occasionally negative?

    - by Andres Jaan Tack
    I have an experimental library whose performance I'm trying to measure. To do this, I've written the following: struct timeval begin; gettimeofday(&begin, NULL); { // Experiment! } struct timeval end; gettimeofday(&end, NULL); // Print the time it took! std::cout << "Time: " << 100000 * (end.tv_sec - begin.tv_sec) + (end.tv_usec - begin.tv_usec) << std::endl; Occasionally, my results include negative timings, some of which are nonsensical. For instance: Time: 226762 Time: 220222 Time: 210883 Time: -688976 What's going on?

    Read the article

  • Calculating intraday candlesticks by time intervals

    - by Sam
    This maybe an over asked question, but my mind draws blank at this moment. I know what a candlestick chart is and how to draw it daily. But how to draw it intraday at asked time periods. I have this server, written in Java, that gives me trade depth (each trade done since the start of the day). Its just a stream of raw data: price, shares, timestamp. How does one go about calculating candlestick data from that? Lets say, they want to have 5 min candlestick or 1min candlestick. Or is there a library that will do that for me if I feed it data? Any help is appreciated!

    Read the article

  • Call a javascript function at distinct time intervals

    - by Dkong
    I've created a stock ticker function and need to call it every 2 minutes. I've succeeded in doing this with the javascript setInterval function, but the problem is on the first call it waits 2 minutes before calling the function, whereas I want the first load to be called right away. function CallFunction() { setInterval("GetFeed()", 2000); }

    Read the article

  • Send PHP Mail in intervals

    - by iHeff
    I'm working on a simple text messaging service for my high school's student council and my hosting service only allows 19 PHP mail messages to be sent per minute, so is there a way I can set an interval to only send 15 emails, wait a minute, send another 15, wait, and do so until all the mail is sent? Below is some of my code, all you'll probably need to see is the "foreach" section. $subject = ""; $message = "Hey, $first! $messageget"; $header = 'From: Student Council<[email protected]>' . "\r\n" . 'Reply-To: [email protected]' . "\r\n" . 'X-Mailer: PHP/' . phpversion(); foreach($to as $value) { $result = mail($value, $subject, $message, $header); }

    Read the article

  • How to split strings at specific intervals to arrays in javascript

    - by t3st
    how to split strings at specific interveals to arrays in javascript for example: split this string into 4 characters (including space and characters) this is an example should be split,numbers(123),space,characters also included to this ------> 1st array is ------> 2nd array an ------> 3rd array exam ------> 4th array ple ------> 5th array shou ------> 6th array ............ etc till..... ..ed ------> last array

    Read the article

  • Vibration after regular intervals

    - by umar
    I have a beep system which gives you four beeps. One beep after a second for one second. However If its silent mode i want the vibrator to do the same, vibrate for 1 second 4 times after 1 second. This is the code I am using long[] pattern = new long[2]; pattern[0] = 10; pattern [1] = 30; switch (am.getRingerMode()) { case AudioManager.RINGER_MODE_VIBRATE: vibe.vibrate(pattern, 0); break; case AudioManager.RINGER_MODE_NORMAL: soundsOn(mp); break; Kindly how can i do what i want to do Best Regards

    Read the article

  • Interval arithmetic to correctly deal with end of month - Oracle SQL

    - by user2003974
    I need a function which will do interval arithmetic, dealing "correctly" with the different number of days in a month. For my version of "correctly" - see below! First try select to_date('31-May-2014') + interval '1' months from dual This returns an error, because there is no 31st June. I understand that this behaviour is expected due to the ANSI standard. Second try select add_months(to_date('31-May-2014'),1) from dual This correctly (in my use case) returns 30th June 2014, which is great. BUT select add_months(to_date('28-Feb-2014'),1) from dual returns 31st March 2014, when I want 28th March 2014. Background This has to do with legal deadlines. The deadlines are expressed in law as a number of months (say, 3) from a base date. If the base date is last day of the month and three months later the month is longer, then the deadline does NOT extend to the end of the longer month (as per the add_months function). However, if the base date is last day of the month and three months later the month is shorter, then the deadline expires on the last day of the shorter month. Question Is there a function that does what I need? I have intervals (year to month) stored in a table, so preferably the function would look like: add_interval_correctly(basedate DATE, intervaltoadd INTERVAL YEAR TO MONTH)

    Read the article

  • GeoCoordinateWatcher doesnt fire the event at given intervals

    - by krrishna
    I have the below code which fires the GeoCoordinateWatcher PositionChanged event for every 0.5 meteres .It might be less.But thats my requirement. The issue is when i am walking with phone doesnt fire the event at every 0.5 meters instead it fires the event after 0.5 meters randomly.And sometimes when i move fast it fires few events one after another immediately. Can anybody help me with how to ensure it fires the positionchanged event for every 0.5 meters accurately . watcher = new GeoCoordinateWatcher(GeoPositionAccuracy.Default); if (watcher.Permission == GeoPositionPermission.Granted) { watcher.MovementThreshold = 0.5;//in meters } watcher.PositionChanged += new EventHandler<GeoPositionChangedEventArgs<GeoCoordinate>>(watcher_PositionChanged); // PositionChanged events occur whenever your position changes watcher.StatusChanged += new EventHandler<GeoPositionStatusChangedEventArgs>(watcher_OnStatusChanged); watcher.Start();

    Read the article

  • Timestamps and Intervals: NUMTOYMINTERVAL SYSTDATE CALCULATION SQL QUERY

    - by MeachamRob
    I am working on a homework problem, I'm close but need some help with a data conversion I think. Or sysdate - start_date calculation The question is: Using the EX schema, write a SELECT statement that retrieves the date_id and start_date from the Date_Sample table (format below), followed by a column named Years_and_Months_Since_Start that uses an interval function to retrieve the number of years and months that have elapsed between the start_date and the sysdate. (Your values will vary based on the date you do this lab.) Display only the records with start dates having the month and day equal to Feb 28 (of any year). DATE_ID START_DATE YEARS_AND_MONTHS_SINCE_START 2 Sunday , February 28, 1999 13-8 4 Monday , February 28, 2005 7-8 5 Tuesday , February 28, 2006 6-8 Our EX schema that refers to this question is simply a Date_Sample Table with two columns: DATE_ID NUMBER NOT Null START_DATE DATE I Have written this code: SELECT date_id, TO_CHAR(start_date, 'Day, MONTH DD, YYYY') AS start_date , NUMTOYMINTERVAL((SYSDATE - start_date), 'YEAR') AS years_and_months_since_start FROM date_sample WHERE TO_CHAR(start_date, 'MM/DD') = '02/28'; But my Years and months since start column is not working properly. It's getting very high numbers for years and months when the date calculated is from 1999-ish. ie, it should be 13-8 and I'm getting 5027-2 so I know it's not correct. I used NUMTOYMINTERVAL, which should be correct, but don't think the sysdate-start_date is working. Data Type for start_date is simply date. I tried ROUND but maybe need some help to get it right. Something is wrong with my calculation and trying to figure out how to get the correct interval there. Not sure if I have provided enough information to everyone but I will let you know if I figure it out before you do. It's a question from Murach's Oracle and SQL/PL book, chapter 17 if anyone else is trying to learn that chapter. Page 559.

    Read the article

  • notification scheduling question

    - by sims
    Hi Stackers! I'm building an app that needs to send out notifications to users depending on user definable "notifications". So the notifications are not per event. They are arbitrary. A cron job should query the database and send out emails when it finds an event with matching criterion. The is a scheduling app. So naturally, one of the criterion is time. I think I've figured it out, but I'm sure there are better ideas out there as it seems to be a fairly common thing to do. I think I'll limit the users ability to "minutes before hand" to get notified as opposed to seconds or hours. So I have an eventA and notificationA. notificationA should be triggered if an event is due within 45 minutes. So eventA starts at 17:30. The user should be notified at 16:45. But the cron job might not run exactly at 00 seconds. So when the difference is not 45 minutes and 0 seconds it is, say, 45 minutes and 5 seconds. Notification time is past. Email doesn't get sent. User misses event. Shugar. We should also take into account that the cron job might take a long time to run. So maybe we should only trigger it every 5 minutes. So we need a bigger interval maybe. So then my guess would be to say that: if ((eventDueTime - now notificationTimeValue - interval) && (eventDueTime - now < notificationTimeValue + interval)) sendTheFrikinNotificationAlready(); It seems kind of risky if the there are thousands of notifications to send out. I guess I could make a thread for each notification and then a thread for each event that matches the criterion. That might help. Does that make sense? Any other ideas? Thanks!

    Read the article

  • Finding records within a 5 min time interval in SQL

    - by Mellonjollie
    I have a table with over 100,000 rows that contain the following columns: ID, Time, and Boolean. The time column tracks time down to the second. I need a query that will find all instances of Boolean = 1 for every 5 minute interval of time from the start of the table to the end, then group the count by time interval. The table represents 4 hours of data, so I should get 48 rows of results. I'm using MS SQL Server. I've tried a few approaches, but the time interval logic is giving me a hard time.

    Read the article

  • download and process a file by ftp at set intervals, with error handling, rescheduling and status messages

    - by compound eye
    I want to download a data file from a remote ftp server to my machine at regular intervals. Once the file is downloaded I want to call another script which will process the file. My development machine is mac os x, the eventual deployment environment is linux. What's would be the stock standard way to automate this? I know I can use cron to schedule curl to download and to run a script that will process the downloaded file at regular intervals, and I know could write a slightly more complex script or an application that would do this and add error handling, rescheduling and sending status emails. But one of my requirements for this project is to write as little custom code as possible, instead I should try to use standard, tried and true existing tools, and if I do have to write code, to try and write the most straightforward code possible. The reason for this is the code will potentially be installed on a large number of machines, all of which will need to be tweaked, customised and maintained by different people, long after I am gone from the project, so the intention is to use well documented, well supported tools as much as possible. This seems such a common task, there must be tools and scripts all over the internet, written by people who have carefully considered everything that could possibly go wrong when you need to download and process a file from a remote server at regular intervals, with error handling, rescheduling and sending status messages. Is that what Expect is for? What would you recommend? (the system will be downloading weather prediction data every six hours, so that the system can prepare in the event of bad weather warnings)

    Read the article

  • How do I get a chart in LibreOffice Calc to have regular time intervals when the data is not regular?

    - by Dave M G
    I have an area chart in LibreOffice Calc where I would like the X axis to be measured in one month intervals spaced evenly apart. The data going into the graph, however, is not regularly spaced at one month. There can be zero, one, or two entries in any given month. Right now, the chart is keeping the horizontal pacing of the data consistent and adjusting the X axis to accomodate, which is the reverse of what I want. In the example picture below, you can see that there is one data point in March, one in May, and two in June. Along the X axis, April is gone and June is taking up double the space. Instead of this, I'd like the months to stay the same spacing so there is April, May, and June, and for the data area of the chart to compress or extend horiozontally as necessary. I have tried editing the X axis and adjusting the time intervals, but this doesn't seem to do anything. Is what I'm after possible?

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >