Search Results

Search found 18335 results on 734 pages for 'microsoft'.

Page 20/734 | < Previous Page | 16 17 18 19 20 21 22 23 24 25 26 27  | Next Page >

  • Importing tab based outline txt file into Word outline

    - by Bernard Vander Beken
    Given a text file containing and outline with tabs to indent each level, I would like to import this into a Word 2007 document so that the each indentation level is converted to a H1, H2, etc heading level. I tried copy pasting the text into the outline view and opening the text file via File, Open. Both did not give the expected result. Level 1 Level 2 Level 3 Level 1 Level 2 Note: I am using spaces instead of tabs to indent this sample.

    Read the article

  • My powerpoint seems working in right-to-left

    - by Pavel Radzivilovsky
    I don't seem to find a way to switch it off. See picture. There seems to be no way to say the paragraph is not RTL. There are addable RTL buttons in the customize ribbon dialog, but they are grayed in ribbon cfg view, even though buttons that are actually there are also grayed in the same way. Looks like there's no way to get some other buttons shown on the office ribbon. I already found how to do it with VBA, but I find no way of doing it from UI and I spent much time searching and trying. Am I senile?

    Read the article

  • Why is my own e-mail address not listed in the To field?

    - by Sammy
    I have received a suspicious e-mail. I am not affiliated with the company mentioned in the e-mail body, or the signer. However, I have been using the app they mention in the e-mail. They are inviting me to a Beta test. But the e-mail is not by the original author of the app. But I'm thinking they might have hired an external company to do this version of the app. There is a link to a TestFlight page. So I'm not sure what to make of this. Now this is what mainly arose my attention. From: Anders Bergman <[email protected]> To: Bon Support Cc: Subject: Test av nya BBK för Android This is how it shows up in Outlook 2010. The "To" field is addressed to "Bon Support" and when I double-click on that I see [email protected]. I can assure you that none of these are my e-mail addresses. So where the heck is my own e-mail address? How could I have received this if it was addressed to someone else? If not spammers and skimmers and other criminals, who else is using this practice and why? And how can I tell now to what e-mail account I received this? I have more than one account set up in Outlook.

    Read the article

  • Word 2010 not printing body text on pages with images

    - by Oesor
    I've got a document exhibiting bizarre behavior -- when I print, the body text style is only displayed on pages without images. Headings, header and footer, and captions are printing on the page, along with any graphics such as border styles applied to the style, but the text itself doesn't print -- except for en dashes. The text is pretty basic -- a justified Calibri style. Images are their own style, a centered paragraph item. There's no floating image boxes or text boxes going on, everything's a paragraph style. It's not a print driver issue. I get identical behavior on both a HP and Brother laser printer. It's also not a paragraph-level style issue; I've inserted enough dummy text to move a printing paragraph on a page with no images to the next page, which has an image, and the paragraph does not print on the next page. Has anyone run into an issue like this and knows the solution?

    Read the article

  • How to use a Macro command button in mac excel 2011

    - by user21255
    Im using Mac excel 2011 and I can't seem to get Macro to work. What I am trying to do is that in Worksheet (1st) I am trying to get all of the data entered in the Cases Table at the bottom to all be automatically inserted into the table in the "Cases" worksheet when I click on the "Update" button. But instead I keep getting a pop up saying runtime error and then it asks if I want to End, debug or something else. I just don't know if it is because I am not using Mac Excel correctly as I am used to using windows because I believe my code is correct in the VBA editor to get the button working. Anone who is able to use Mac excel 11 can they check to see if they can use the file provided to see i the button works? If anyone has windows excel then please feel free to check to see if it works on there as well. If it is a coding problem then can you please let me know. My question is simply how to run and stop a Macro in Mac excel 2011. The file can be accessed below: http://ge.tt/76qNwIx/v/0 Thanks

    Read the article

  • Excel how to get an average for column for rows that meet multiple criteria

    - by Jess
    I would like to know the average days between open and close dates for an item with a close date in a particular month. So from the below example in Jan 2013 items 2,5 and 6 were closed (Closed can be RESOLVED or CANCELLED status), each were open for 26, 9 and 6 days respectivly. So of the jobs that have a closed date in Jan 2013 (between 01/01/2013 and 13/02/13) they have an average open time (between open and close date) of 13.67 days to 2dp. I have tried a few ways to get this to work and i think the issue I am having is with the AVERAGE function. First time using a forum so apologies if my question is unclear. Was unable to post image to have this comma seperated below Item_ID,Open_Date,Status,Close_Date 1,1/06/2012,RESOLVED,16/07/2012 2,20/12/2012,RESOLVED,16/01/2013 3,2/01/2013,IN PROGRESS, 4,3/01/2013,CANCELLED,7/05/2013 5,3/01/2013,RESOLVED,12/01/2013 6,4/01/2013,RESOLVED,10/01/2013 7,1/02/2013,RESOLVED,15/02/2013 8,2/02/2013,OPEN, 9,7/02/2013,CANCELLED,26/02/2013

    Read the article

  • Export Outlook Express XP into Outlook 2007 Windows 7

    - by Jason Moore
    I've searched the forum and it seems my need is a little different than the posts which have already been made. I have an old XP laptop which I was using Outlook Express for one of my mail accounts (a work account). I also ran regular Outlook for another (personal). I want to have both of these accounts on my new PC. My new PC is running Windows 7 wiht Office 2007. I used the Windows transfer cable and things worked failry well. My regular Outlook files all came over well, but nothing for Outlook Express. I really would like to take this time to somehow export my OE files into my Outlook 2007. I would really like to keep the account which imported in on Outlook seperate. Question 1: Is there a way to import my OE files into Outlook 2007? Question 2: Is there a way to have two seperate email accounts in Outlook without combining them? Basically I want to have a work email and a personal and keep them seperate. If I can't have two seperate emails with Outlook, can anyone suggest something which would allow me to export my old Outlook (the old personal emails) into another program so that I can at least use my work email on Outlook 2007? Hopefully this isn't too confusing.

    Read the article

  • Move to next selection in Word 2007

    - by Arthur Ward
    When I have multiple selections in a Word 2007 document, such as after selecting all instances of a style, how can I move from one selection to the next? When you issue the select all instances command, the view snaps to the next instance of the style, but how can I find the other instances? Any cursor key will unselect everything. Using the mouse to scroll through the document is not feasible for large documents, plus the selection could be a single character -- very easy to miss!

    Read the article

  • Outlook activesync not pushing changes to devices

    - by Ryan Peters
    I recently set up my account outlook.com account and connected Outlook 2013 to it using ActiveSync. For a while, it was pushing changes I made, for example, from the web client to my phone and my Outlook when an email was deleted, moved, etc. The change was instant. Now all of a sudden, I have to manually refresh to see changes on either device. What happened? I just set up my wife's email account and it works fine, though she has no emails in it yet. I have several hundred. Why is mine not pushing sync changes and hers is? Thanks.

    Read the article

  • MS Word 2007 Mail Merge fails on ZIP codes with leading Zeros (eg. 01234)

    - by Pretzel
    I have an Excel Spreadsheet with a ZIP code column. For some dumb reason the original spreadsheet I got had all the zip codes stored as numbers, so a ZIP code like 01234 was stored as 1234. Easy to fix with "Format Column" as "Special = ZIP Code". All values like 1234, show up as 01234. Great! When I import it into Word via Mail Merge (to print address labels), the ZIP codes on all the addresses starting with a leading zero (like 01234) revert to their old form (1234). How do I fix this?

    Read the article

  • Handling inconcistent resource availability in Project 2007

    - by Lachlan McDonald
    Afternoon all, I have four resources; a project manager, and three developers. The project manager can work anywhere from 9 to 5pm each day, but only for a total of 10 hours per week. It doesn't matter when he works, as long as he isn't over-allocated 10 hours per week. The developers on the other hand can only work up to 2 hours per day, for a total of 10 hours per week. If they work more than 2 hours in a day, they are over-allocated. How do I best configure Project to handle this kind of scheduling requirement?

    Read the article

  • How to convert a string to a binary, then hex, value?

    - by Wuschelbeutel Kartoffelhuhn
    In one column I have a bitstring encoded as a string type. In a different column I wish to have the same bits (potentially starting with a leading 0), but as a binary value type. Ultimately, I want to have it in hex representation (string or hex type, doesn't matter) in a third column. How is this done? Do I have to program something for it or is there a faster way? Input cell contains the following string: 00000100100011000100100011 I wish to obtain the string: 0123123

    Read the article

  • Easiest way to open CSV with commas in Excel

    - by Borek
    CSV files are automatically associated with Excel but when I open them, all the rows are basically in the first column, like this: It's probably because when Excel thinks "comma-separated values", it actually searches for some other delimiter (I think it's semicolon but it's not important). Now when I have already opened this file in Excel, is there a button or something to tell it "reopen this file and use comma as a delimiter"? I know I can import the data into a new worksheet etc. but I'm asking specifically for a help with situation where I already have a CSV file with commas in it and I want to open it in Excel without creating new workbook or transforming the original file.

    Read the article

  • Macro keeps crashing need to speed it up or rewrite it, excel vba 50,000 lines of data

    - by Joel
    Trying to speed up a macro that runs over 50,000 lines ! I have two ways of performing the same vba macro Sub deleteCommonValue() Dim aRow, bRow As Long Dim colB_MoreFirst, colB_LessFirst, colB_Second, colC_MoreFirst, colC_LessFirst, colC_Second As Integer Dim colD_First, colD_Second As Integer Application.ScreenUpdating = False Application.DisplayStatusBar = False Application.Calculation = xlCalculationManual Application.EnableEvents = False aRow = 2 bRow = 3 colB_MoreFirst = Range("B" & aRow).Value + 0.05 colB_LessFirst = Range("B" & aRow).Value - 0.05 colB_Second = Range("B" & bRow).Value colC_MoreFirst = Range("C" & aRow).Value + 0.05 colC_LessFirst = Range("C" & aRow).Value - 0.05 colC_Second = Range("C" & bRow).Value colD_First = Range("D" & aRow).Value colD_Second = Range("D" & bRow).Value Do If colB_Second <= colB_MoreFirst And colB_Second >= colB_LessFirst Then If colC_Second <= colC_MoreFirst And colC_Second >= colC_LessFirst Then If colD_Second = colD_First Or colD_Second > colD_First Then Range(bRow & ":" & bRow).Delete 'bRow delete, assign new value to bRow colB_Second = Range("B" & bRow).Value colC_Second = Range("C" & bRow).Value colD_Second = Range("D" & bRow).Value '----------------------------------------------------- Else Range(aRow & ":" & aRow).Delete bRow = aRow + 1 'aRow value deleted, assign new value to aRow and bRow colB_MoreFirst = Range("B" & aRow).Value + 0.05 colB_LessFirst = Range("B" & aRow).Value - 0.05 colB_Second = Range("B" & bRow).Value colC_MoreFirst = Range("C" & aRow).Value + 0.05 colC_LessFirst = Range("C" & aRow).Value - 0.05 colC_Second = Range("C" & bRow).Value colD_First = Range("D" & aRow).Value colD_Second = Range("D" & bRow).Value '----------------------------------------------------- End If Else bRow = bRow + 1 'Assign new value to bRow colB_Second = Range("B" & bRow).Value colC_Second = Range("C" & bRow).Value colD_Second = Range("D" & bRow).Value '----------------------------------------------------- End If Else bRow = bRow + 1 'Assign new value to bRow colB_Second = Range("B" & bRow).Value colC_Second = Range("C" & bRow).Value colD_Second = Range("D" & bRow).Value '----------------------------------------------------- End If If IsEmpty(Range("D" & bRow).Value) = True Then aRow = aRow + 1 bRow = aRow + 1 'finish compare aRow, assign new value to aRow and bRow colB_MoreFirst = Range("B" & aRow).Value + 0.05 colB_LessFirst = Range("B" & aRow).Value - 0.05 colB_Second = Range("B" & bRow).Value colC_MoreFirst = Range("C" & aRow).Value + 0.05 colC_LessFirst = Range("C" & aRow).Value - 0.05 colC_Second = Range("C" & bRow).Value colD_First = Range("D" & aRow).Value colD_Second = Range("D" & bRow).Value '----------------------------------------------------- End If Loop Until IsEmpty(Range("D" & aRow).Value) = True Application.ScreenUpdating = False Application.DisplayStatusBar = False Application.Calculation = xlCalculationAutomatic Application.EnableEvents = False End Sub or Sub deleteCommonValue() Dim aRow, bRow As Long Application.ScreenUpdating = False aRow = 2 bRow = 3 Do If Range("B" & bRow).Value <= (Range("B" & aRow).Value + 0.05) _ And Range("B" & bRow).Value >= (Range("B" & aRow).Value - 0.05) Then If Range("C" & bRow).Value <= (Range("C" & aRow).Value + 0.05) _ And Range("C" & bRow).Value >= (Range("C" & aRow).Value - 0.05) Then If Range("D" & bRow).Value = (Range("D" & aRow).Value) _ Or Range("D" & bRow).Value > (Range("D" & aRow).Value) Then Range(bRow & ":" & bRow).Delete Else Range(aRow & ":" & aRow).Delete bRow = aRow + 1 Range("A" & aRow).Select End If Else bRow = bRow + 1 Range("A" & bRow).Select End If Else bRow = bRow + 1 Range("A" & bRow).Select End If If IsEmpty(Range("D" & bRow).Value) = True Then aRow = aRow + 1 bRow = aRow + 1 End If Loop Until IsEmpty(Range("D" & aRow).Value) = True End Sub I dont know if my best option will be to split the rows into multiple sheets?

    Read the article

  • Word 2007 - Pasted Text Not Spellchecked??

    - by synapse88
    My Word 2007 spell-check seems to work fine, except that when I paste in text from somewhere else, it won't detect any misspellings in that pasted text...no matter what I try. If it makes any difference, when I paste in text, the formatting is preserved (size color etc). I've tried doing a past-special and trying the different options there, but it's still bringing the formatting over. Any ideas on what to try?

    Read the article

  • How to generate weekly dates from bi-weekly pay period in Excel

    - by A_Pointar
    I'm trying to convert bi-weekly pay period to weekly dates. Lets say I have 3/2/2012, 3/16/2012, 3/30/2012 and some gaps and then again biweekly dates. generate 3/9/2012, 3/16/2012, 3/23/2012, 3/30/2012 and so on...I was trying to use INDEX and MATCH but it would give me biweekly again. The perfect way would be to match and generate weeks from my randomized biweekly dates. Here is an example of my worksheet:

    Read the article

  • How quickly toggle smart quotes in Word 2010?

    - by KnowItAllWannabe
    I'm working on a long technical document that contains numerous displays of computer code. In running text, I want my quotation marks to be curly, which means that Word's "smart quotes" autoformatting-as-I-type feature is one I want on. But in code displays, curly quotes are incorrect, so in these cases, I want smart-quotes-as-I-type disabled. Is there a fast way to toggle this setting? Or is there a way I can tie it to the paragraph style I'm in? (I use a distinct style for code displays.) Currently, to toggle the setting, I have to click FileOptionsProofingAutoCorrect Options..."Straight quotes" with "smart quotes"OKOK, which is seven mouse clicks. Toggling it back is another seven mouse clicks. Isn't there a faster way? A keyhboard shortcut to do the toggling or a toolbar button that would toggle it with a single click would be great. Having the setting depend on the paragraph style I was in would be even better.

    Read the article

  • Excel 2013: Is it possible to collapse rows only in a specific column?

    - by h7u9i
    In my spreadsheet, I'm trying to figure out a way to collapse rows in a specific column. Right now, if I do Data - Group - Group... - Rows, it'll collapse the entire row. I want to collapse rows only in a specific column. Example: |---------|----------| | hi | + data | |---------|----------| | hello | + data2 | |---------|----------| | | | |---------|----------| | | | And opening data 1 would turn into: |---------|----------| | hi | - data1 | |---------|----------| | hello | point1 | |---------|----------| | | point2 | |---------|----------| | | + data2 | |---------|----------| | | | |---------|----------| | | | Is this possible to do in Excel?

    Read the article

  • Assigning resources to MS Project 2007

    - by adam
    Hi, I'm planning a redesign of a site in Project 2007. I have three developers to hand, all with the same skills. There are about 80 templates to be rendered as part of the redesign, and each template has been added as a project task. Each of these tasks can be done by any of the 3 devs, and each will take a day (with a few exceptions). There is no order in which the tasks must be completed, so there are no predecessor rules. I'd like to be able to assign tasks to a 'Developer' resource group, and for Project to see that three tasks can be done at once (as the group has three resources members) and queue the tasks as such. Googling leads me to Team Assignment, but that appears to be part of Project Server. Surely I can do this in standalone Project? Thanks, Adam

    Read the article

  • Assembling Word Doc using Data from Excel- MS Office 2010

    - by Sascha
    I have a questionnaire that users complete. It is in Excel. After users complete the questionnaire I would like to be able to generate a Word document that contains their answers. For example "The answer to your question was [answer from Excel Questionnaire cell A49 ]" I have seen that this is possible with Sharepoint. However, I don't have Sharepoint. I am working on MS Office 2010. I also have visual Studio Express 2010. What is the best way to achieve the above, pretty please? Thanks.

    Read the article

< Previous Page | 16 17 18 19 20 21 22 23 24 25 26 27  | Next Page >