Search Results

Search found 1554 results on 63 pages for 'sas macro'.

Page 23/63 | < Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >

  • Dell Poweredge R410 replace PERC S100 with PERC 6i

    - by Robe Eleckers
    I want to replace the PERC S100 RAID Controller with a PERC6i to be able to use 4 SAS harddrives instead of only SATA drives. What exactly do I need for this, what I've got so far: PERC6i PCIe x8 card. 4 x SAS 300GB 15000rpm drives Some questions I have Do I need a different backplane to accomodate the SAS disks? If so, what kind of backplane? Do I need a special cable to hookup the PERC6i with the backplane? If so, what kind of cable? Thanks.

    Read the article

  • Dell OpenManage Causing Periodic Slowness

    - by Zorlack
    Today we diagnosed the cause of a Periodic slowness issue: see here. Dell OpenManage Server Administrator seems to have been causing hourly slowness. It would occasionally peg one of the CPUs for upwards of two minutes. Disabling it drastically improved the performance of the SQL Server. The server hardware: Dell R710 Dual Quad Core 2.9GHz Processors 96GB Memory 2 Disk RAID 1 SAS System Disk (Internal) 4 Disk RAID 10 SAS Log Disk (Internal) 14 Disk RAID 10 SAS Data Disk (External DAS MD1000) Windows 2008 Enterprise R2 x64 We installed the OS using Dell OpenManage Server Assistant, so I assume that it was correctly configured. For now we have disabled OMSA to alleviate the performance issues it was causing, but I'd like to be able to re-enable it. Has anyone had a similar experience that can shed a little light on the nature of this problem?

    Read the article

  • Zero-channel RAID for High Performance MySQL Server (IBM ServeRAID 8k) : Any Experience/Recommendati

    - by prs563
    We are getting this IBM rack mount server and it has this IBM ServeRAID8k storage controller with Zero-Channel RAID and 256MB battery backed cache. It can support RAID 10 which we need for our high performance MySQL server which will have 4 x 15000K RPM 300GB SAS HDD. This is mission-critical and we want as much bandwidth and performance. Is this a good card or should we replace with another IBM RAID card? IBM ServeRAID 8k SAS Controller option provides 256 MB of battery backed 533 MHz DDR2 standard power memory in a fixed mounting arrangement. The device attaches directly to IBM planar which can provide full RAID capability. Manufacturer IBM Manufacturer Part # 25R8064 Cost Central Item # 10025907 Product Description IBM ServeRAID 8k SAS - Storage controller (zero-channel RAID) - RAID 0, 1, 5, 6, 10, 1E Device Type Storage controller (zero-channel RAID) - plug-in module Buffer Size 256 MB Supported Devices Disk array (RAID) Max Storage Devices Qty 8 RAID Level RAID 0, RAID 1, RAID 5, RAID 6, RAID 10, RAID 1E Manufacturer Warranty 1 year warranty

    Read the article

  • Libgdx actor bounds are wrong

    - by Undume
    The Actor's boundaries are not centered at the ButtonText but I used the setBounds() method. The higher the Y position is, the less centered is the boundary. The weird thing is that i only created and added to the Stage one button but the screen shows two. When i click the top button, the bottom one is the one highlighted. How can i fix that? import com.badlogic.gdx.Game; import com.badlogic.gdx.Gdx; import com.badlogic.gdx.files.FileHandle; import com.badlogic.gdx.scenes.scene2d.Stage; import com.badlogic.gdx.scenes.scene2d.ui.Skin; import com.badlogic.gdx.scenes.scene2d.ui.TextButton; public class MyGame extends Game { Stage stage; @Override public void create() { stage=new Stage(); FileHandle skinFile = new FileHandle("data/resources/uiskin/uiskin.json"); Skin skin = new Skin(skinFile); TextButton sas=new TextButton("dd",skin); sas.setBounds(0, 500, 100, 100); stage.addActor(sas); Gdx.input.setInputProcessor(stage); } @Override public void dispose() { super.dispose(); } @Override public void render() { super.render(); stage.act(Gdx.graphics.getDeltaTime()); stage.draw(); } @Override public void resize(int width, int height) { super.resize(width, height); } @Override public void pause() { super.pause(); } @Override public void resume() { super.resume(); } }

    Read the article

  • S.M.A.R.T - Predictive Failure Count

    - by Bastien974
    I'm monitoring my IBM ServeRAID M5015 controller for RAID status with MegaCLI, I have this on one of the disk : Enclosure Device ID: 252 Slot Number: 6 Enclosure position: 0 Device Id: 14 Sequence Number: 2 Media Error Count: 32 Other Error Count: 0 Predictive Failure Count: 18 Last Predictive Failure Event Seq Number: 8119 PD Type: SAS Raw Size: 279.396 GB [0x22ecb25c Sectors] Non Coerced Size: 278.896 GB [0x22dcb25c Sectors] Coerced Size: 278.464 GB [0x22cee000 Sectors] Firmware state: Online, Spun Up SAS Address(0): 0x5000c50042c319c9 SAS Address(1): 0x0 Connected Port Number: 5(path0) Inquiry Data: IBM-ESXSST9300653SS B6336XN04HC10525B633 IBM FRU/CRU: 81Y9671 FDE Capable: Not Capable FDE Enable: Disable Secured: Unsecured Locked: Unlocked Needs EKM Attention: No Foreign State: None Device Speed: 6.0Gb/s Link Speed: 6.0Gb/s Media Type: Hard Disk Device Drive: Not Certified Drive Temperature :33 Celsius What does this mean exactly ? I can't find an exact description, is there a way to have more details ? The RAID array has the Optimal state. Media Error Count: 32 Predictive Failure Count: 18 Is there a way through the CLI to power-on the front LED so I physically know which disk I need to replace ?

    Read the article

  • Zero-channel RAID for High Performance MySQL Server (IBM ServeRAID 8k) : Any Experience/Recommendation?

    - by prs563
    We are getting this IBM rack mount server and it has this IBM ServeRAID8k storage controller with Zero-Channel RAID and 256MB battery backed cache. It can support RAID 10 which we need for our high performance MySQL server which will have 4 x 15000K RPM 300GB SAS HDD. This is mission-critical and we want as much bandwidth and performance. Is this a good card or should we replace with another IBM RAID card? IBM ServeRAID 8k SAS Controller option provides 256 MB of battery backed 533 MHz DDR2 standard power memory in a fixed mounting arrangement. The device attaches directly to IBM planar which can provide full RAID capability. Manufacturer IBM Manufacturer Part # 25R8064 Cost Central Item # 10025907 Product Description IBM ServeRAID 8k SAS - Storage controller (zero-channel RAID) - RAID 0, 1, 5, 6, 10, 1E Device Type Storage controller (zero-channel RAID) - plug-in module Buffer Size 256 MB Supported Devices Disk array (RAID) Max Storage Devices Qty 8 RAID Level RAID 0, RAID 1, RAID 5, RAID 6, RAID 10, RAID 1E Manufacturer Warranty 1 year warranty

    Read the article

  • Open Office APIs e Migração de Macros - 23/Fev/11

    - by Paulo Folgado
    AGENDAIntroduction on Oracle Open Office/OpenOffice.org API Oracle Open Office Basic IDE Hallo World and more Oracle Open Office dialog Programming Integrating Macros in Oracle Open Office Appetizer - Using JavaMicrosoft Office Macro MigrationEstimation Macro Migration effortMigrating Macros Migration pitfallsOs participantes deverão ter conhecimentos sólidos de Microsoft Office e de programação VBA.

    Read the article

  • Investment scheme for a PC game the project

    - by Alex Kamen
    Good day everyone, I am working on a PC game project that has 3 phases planned, micro, macro and mmo versions [if confused, see a brief description at the bottom]. I have found a potential investor for the micro version of the game, but naturally, he requested a detailed plan of how the game will pay back. And the problem is that micro version itself is not supposed to be monetized much, other than some ads and limited in-game currency utilization. The idea is that with this combat demo already at hand, it should be possible to get a really large enough investment (millions of dollars) and use it to pay back the initial small one (thousands of dollars) and take the project into macro phase, which will really make profit. This way, everybody is going to win, provided that I can deliver the end-product. Yet while I am confident of that both the conception of the macro and the real game-play of the micro versions are going to be appealing, I don’t know how to obtain any guarantee of that I will be able to get funded once I have the prototype ready. And without that, I won’t receive the funds for the prototype in the first place! To summarize, my question is: how to figure out my future possibilities of getting funded once I have combat demo out, basically “whom to write to and what”. Ideally, I would like some sort of a preliminary agreement with a game publisher, something that would basically state “If the developer provides the product in time and in quality corresponding to the specifications given, the publisher guarantees to allocate funds for distribution and further development, thereby acquiring the right to X part of all future profits”. Does this sound sane? It’s just that I don’t want to sell all of my rights out straight away by taking a big outside investment while the project is in such early stage. I would appreciate if you would share your thoughts on this kind of scheme, and be sure to ask questions as I am sure I must have forgotten to mention a ton of important things, like the fact that initial funds are going to be spent on outsourcing (living in Siberia is really just great). [here’s a brief outline of what each version will feature] [micro] 1) turn based tactical combat rules 2) character development 3) arena/tournament system [macro] 4) ai-ruled dynamic interactive worlds 5) global map adventuring 6) strategic rpg + god simulator gameplay [mmo] 7) Persistent worlds system 8) Social structures system (“guilds/clans”) 9) god-simulation on the mmo scale P.S. Obviously, these features are incremental, so that mmo version has all 9.

    Read the article

  • Server drives: 2.5" SCSI less reliable than 3.5" ?

    - by Bill
    Just had an HP 2.5" SAS 10k drive fail on a RAID5 array after about 2.5 years. It made me wonder if this was a fluke or an indication that 2.5" drives are less reliable than 3.5" SAS drives. I've had many 3.5" SAS drives running for many years without any issues (knock on wood). I would think that smaller drives would generate less heat and therefore be more reliable, but couldn't find any evidence of this. I realize all drives will eventually fail and that it's a crap shoot with any particular model, but was hoping someone could point out some related studies or comment on the SCSI drive sizes they've found to be most reliable in servers. Thanks.

    Read the article

  • Excel 2010: dynamic update of drop down list based upon datasource validation worksheet changes

    - by hornetbzz
    I have one worksheet for setting up the data sources of multiple data validation lists. in other words, I'm using this worksheet to provide drop down lists to multiple other worksheets. I need to dynamically update all worksheets upon any of a single or several changes on the data source worksheet. I may understand this should come with event macro over the entire workbook. My question is how to achieve this keeping the "OFFSET" formula across the whole workbook ? Thx To support my question, I put the piece of code that I'm trying to get it working : Provided the following informations : I'm using such a formula for a pseudo dynamic update of the drop down lists, for example : =OFFSET(MyDataSourceSheet!$O$2;0;0;COUNTA(MyDataSourceSheet!O:O)-1) I looked into the pearson book event chapter but I'm too noob for this. I understand this macro and implemented it successfully as a test with the drop down list on the same worksheet as the data source. My point is that I don't know how to deploy this over a complete workbook. Macro related to the datasource worksheet : Option Explicit Private Sub Worksheet_Change(ByVal Target As Range) ' Macro to update all worksheets with drop down list referenced upon ' this data source worksheet, base on ref names Dim cell As Range Dim isect As Range Dim vOldValue As Variant, vNewValue As Variant Dim dvLists(1 To 6) As String 'data validation area Dim OneValidationListName As Variant dvLists(1) = "mylist1" dvLists(2) = "mylist2" dvLists(3) = "mylist3" dvLists(4) = "mylist4" dvLists(5) = "mylist5" dvLists(6) = "mylist6" On Error GoTo errorHandler For Each OneValidationListName In dvLists 'Set isect = Application.Intersect(Target, ThisWorkbook.Names("STEP").RefersToRange) Set isect = Application.Intersect(Target, ThisWorkbook.Names(OneValidationListName).RefersToRange) ' If a change occured in the source data sheet If Not isect Is Nothing Then ' Prevent infinite loops Application.EnableEvents = False ' Get previous value of this cell With Target vNewValue = .Value Application.Undo vOldValue = .Value .Value = vNewValue End With ' LOCAL dropdown lists : For every cell with validation For Each cell In Me.UsedRange.SpecialCells(xlCellTypeAllValidation) With cell ' If it has list validation AND the validation formula matches AND the value is the old value If .Validation.Type = 3 And .Validation.Formula1 = "=" & OneValidationListName And .Value = vOldValue Then ' Debug ' MsgBox "Address: " & Target.Address ' Change the cell value cell.Value = vNewValue End If End With Next cell ' Call to other worksheets update macros Call Sheets(5).UpdateDropDownList(vOldValue, vNewValue) ' GoTo NowGetOut Application.EnableEvents = True End If Next OneValidationListName NowGetOut: Application.EnableEvents = True Exit Sub errorHandler: MsgBox "Err " & Err.Number & " : " & Err.Description Resume NowGetOut End Sub Macro UpdateDropDownList related to the destination worksheet : Sub UpdateDropDownList(Optional vOldValue As Variant, Optional vNewValue As Variant) ' Debug MsgBox "Received info for update : " & vNewValue ' For every cell with validation For Each cell In Me.UsedRange.SpecialCells(xlCellTypeAllValidation) With cell ' If it has list validation AND the validation formula matches AND the value is the old value ' If .Validation.Type = 3 And .Value = vOldValue Then If .Validation.Type = 3 And .Value = vOldValue Then ' Change the cell value cell.Value = vNewValue End If End With Next cell End Sub

    Read the article

  • IBM WebSphere Host On-Demand (HoD): Cannot run program with "runprogram" command. What can I do?

    - by kokbira
    I access a system that uses an IBM Host on Demand client. I am tryig to create a macro to do a hard task (more than 90,000 keys must be pressed to complete it), but to do it easier I need to call some "external" aplications using "runprogram" tag. But I don't know why it does not function (following IBM help - http://publib.boulder.ibm.com/infocenter/hodhelp/v11r0/index.jsp?topic=/com.ibm.hod.doc/doc/macro/macro.html - did not help...). I am running in Firefox 3.6 and my Java version is jdk1.6.0_20. Below, an example of macro that should function, but didn't. <HAScript name="TEST4" description="" timeout="60000" pausetime="300" promptall="true" blockinput="false" author="wingman" creationdate="05/05/2011 16:14:31" supressclearevents="false" usevars="false" ignorepauseforenhancedtn="true" delayifnotenhancedtn="0" ignorepausetimeforenhancedtn="true"> <vars> <create name="$intReturn$" type="integer" value="0" /> </vars> <screen name="Tela1" entryscreen="true" exitscreen="false" transient="false"> <description > <oia status="NOTINHIBITED" optional="false" invertmatch="false" /> </description> <actions> <runprogram exe= "'c:\\Program Files\\Windows NT\\Accessories\\Wordpad.exe'" param="'c:\\a.txt'" wait="true" assignexitvalue="$intReturn$" /> <message title="" value="'Return value is '+$intReturn$" /> </actions> <nextscreens timeout="0" > </nextscreens> </screen> </HAScript>

    Read the article

  • The enterprise vendor con - connecting SSD's using SATA 2 (3Gbits) thus limiting there performance

    - by tonyrogerson
    When comparing SSD against Hard drive performance it really makes me cross when folk think comparing an array of SSD running on 3GBits/sec to hard drives running on 6GBits/second is somehow valid. In a paper from DELL (http://www.dell.com/downloads/global/products/pvaul/en/PowerEdge-PowerVaultH800-CacheCade-final.pdf) on increasing database performance using the DELL PERC H800 with Solid State Drives they compare four SSD drives connected at 3Gbits/sec against ten 10Krpm drives connected at 6Gbits [Tony slaps forehead while shouting DOH!]. It is true in the case of hard drives it probably doesn’t make much difference 3Gbit or 6Gbit because SAS and SATA are both end to end protocols rather than shared bus architecture like SCSI, so the hard drive doesn’t share bandwidth and probably can’t get near the 600MiBytes/second throughput that 6Gbit gives unless you are doing contiguous reads, in my own tests on a single 15Krpm SAS disk using IOMeter (8 worker threads, queue depth of 16 with a stripe size of 64KiB, an 8KiB transfer size on a drive formatted with an allocation size of 8KiB for a 100% sequential read test) I only get 347MiBytes per second sustained throughput at an average latency of 2.87ms per IO equating to 44.5K IOps, ok, if that was 3GBits it would be less – around 280MiBytes per second, oh, but wait a minute [...fingers tap desk] You’ll struggle to find in the commodity space an SSD that doesn’t have the SATA 3 (6GBits) interface, SSD’s are fast not only low latency and high IOps but they also offer a very large sustained transfer rate, consider the OCZ Agility 3 it so happens that in my masters dissertation I did the same test but on a difference box, I got 374MiBytes per second at an average latency of 2.67ms per IO equating to 47.9K IOps – cost of an 240GB Agility 3 is £174.24 (http://www.scan.co.uk/products/240gb-ocz-agility-3-ssd-25-sata-6gb-s-sandforce-2281-read-525mb-s-write-500mb-s-85k-iops), but that same drive set in a box connected with SATA 2 (3Gbits) would only yield around 280MiBytes per second thus losing almost 100MiBytes per second throughput and a ton of IOps too. So why the hell are “enterprise” vendors still only connecting SSD’s at 3GBits? Well, my conspiracy states that they have no interest in you moving to SSD because they’ll lose so much money, the argument that they use SATA 2 doesn’t wash, SATA 3 has been out for some time now and all the commodity stuff you buy uses it now. Consider the cost, not in terms of price per GB but price per IOps, SSD absolutely thrash Hard Drives on that, it was true that the opposite was also true that Hard Drives thrashed SSD’s on price per GB, but is that true now, I’m not so sure – a 300GByte 2.5” 15Krpm SAS drive costs £329.76 ex VAT (http://www.scan.co.uk/products/300gb-seagate-st9300653ss-savvio-15k3-25-hdd-sas-6gb-s-15000rpm-64mb-cache-27ms) which equates to £1.09 per GB compared to a 480GB OCZ Agility 3 costing £422.10 ex VAT (http://www.scan.co.uk/products/480gb-ocz-agility-3-ssd-25-sata-6gb-s-sandforce-2281-read-525mb-s-write-410mb-s-30k-iops) which equates to £0.88 per GB. Ok, I compared an “enterprise” hard drive with a “commodity” SSD, ok, so things get a little more complicated here, most “enterprise” SSD’s are SLC and most commodity are MLC, SLC gives more performance and wear, I’ll talk about that another day. For now though, don’t get sucked in by vendor marketing, SATA 2 (3Gbit) just doesn’t cut it, SSD need 6Gbit to breath and even that SSD’s are pushing. Alas, SSD’s are connected using SATA so all the controllers I’ve seen thus far from HP and DELL only do SATA 2 – deliberate? Well, I’ll let you decide on that one.

    Read the article

  • Logical Domain Modeling Made Simple

    - by Knut Vatsendvik
    How can logical domain modeling be made simple and collaborative? Many non-technical end-users, managers and business domain experts find it difficult to understand the visual models offered by many UML tools. This creates trouble in capturing and verifying the information that goes into a logical domain model. The tools are also too advanced and complex for a non-technical user to learn and use. We have therefore, in our current project, ended up with using Confluence as tool for designing the logical domain model with the help of a few very useful plugins. Big thanks to Ole Nymoen and Per Spilling for their expertise in this field that made this posting possible. Confluence Plugins Here is a list of Confluence plugins used in this solution. Install these before trying out the macros used below. Plugin Description Copy Space Allows a space administrator to copy a space, including the pages within the space Metadata Supports adding metadata to Wiki pages Label Manages labeling of pages Linking Contains macros for linking to templates, the dashboard and other Table Enhances the table capability in Confluence Creating a Confluence Space First we need to create a new confluence space for the domain model. Click the link Create a Space located below the list of spaces on the Dashboard. Please contact your Confluence administrator is you do not have permissions to do this.   For illustrative purpose all attributes and entities in this posting are based on my imaginary project manager domain model. When a logical domain model is good enough for being implemented, do a copy of the Confluence Space (see Copy Space plugin). In this way you create a stable version of the logical domain model while further design can continue with the new copied space. Typical will the implementation phase result in a database design and/or a XSD schema design. Add Space Templates Go to the Home page of your Confluence Space. Navigate to the Browse drop-down menu and click on Advanced. Then click the Templates option in the left navigation panel. Click Add New Space Template to add the following three templates. Name: attribute {metadata-list} || Name | | || Type | | || Format | | || Description | | {metadata-list} {add-label:attribute} Name: primary-type {metadata-list} || Name | || || Type | || || Format | || || Description | || {metadata-list} {add-label:primary-type} Name: complex-type {metadata-list} || Name | || || Description |  || {metadata-list} h3. Attributes || Name || Type || Format || Description || | [name] | {metadata-from:name|Type} | {metadata-from:name|Format} | {metadata-from:name|Description} | {add-label:complex-type,entity} The metadata-list macro (see Metadata plugin) will save a list of metadata values to the page. The add-label macro (see Label plugin) will automatically label the page. Primary Types Page Our first page to add will act as container for our primary types. Switch to Wiki markup when adding the following content to the page. | (+) {add-page:template=primary-type|parent=@self}Add new primary type{add-page} | {metadata-report:Name,Type,Format,Description|sort=Name|root=@self|pages=@descendents} Once the page is created, click the Add new primary type (create-page macro) to start creating a new pages. Here is an example of input to the LocalDate page. Embrace the LocalDate with square brackets [] to make the page linkable. Again switch to Wiki markup before editing. {metadata-list} || Name | [LocalDate] || || Type | Date || || Format | YYYY-MM-DD || || Description | Date in local time zone. YYYY = year, MM = month and DD = day || {metadata-list} {add-label:primary-type} The metadata-report macro will show a tabular report of all child pages.   Attributes Page The next page will act as container for all of our attributes. | (+) {add-page:template=attribute|parent=@self|title=attribute}Add new attribute{add-page} | {metadata-report:Name,Type,Format,Description|sort=Name|pages=@descendants} Here is an example of input to the startDate page. {metadata-list} || Name | [startDate] || || Type | [LocalDate] || || Format | {metadata-from:LocalDate|Format} || || Description | The projects start date || {metadata-list} {add-label:attribute} Using the metadata-from macro we fetch the text from the previously created LocalDate page. Complex Types Page The last page in this example shows how attributes can be combined together to form more complex types.   h3. Intro Overview of complex types in the domain model. | (+) {add-page:template=complex-type|parent=@self}Add a new complex type{add-page}\\ | {metadata-report:Name,Description|sort=Name|root=@self|pages=@descendents} Here is an example of input to the ProjectType page. {metadata-list} || Name | [ProjectType] || || Description | Represents a project || {metadata-list} h3. Attributes || Name || Type || Format || Description || | [projectId] | {metadata-from:projectId|Type} | {metadata-from:projectId|Format} | {metadata-from:projectId|Description} | | [name] | {metadata-from:name|Type} | {metadata-from:name|Format} | {metadata-from:name|Description} | | [description] | {metadata-from:description|Type} | {metadata-from:description|Format} | {metadata-from:description|Description} | | [startDate] | {metadata-from:startDate|Type} | {metadata-from:startDate|Format} | {metadata-from:startDate|Description} | {add-label:complex-type,entity} Gives us this Conclusion Using a web-based corporate Wiki like Confluence to create a logical domain model increases the collaboration between people with different roles in the enterprise. It’s my believe that this helps the domain model to be more accurate, and better documented. In our real project we have more pages than illustrated here to complete the documentation. We do also still use UML tools to create different types of diagrams that Confluence do not support. As a last tip, an ImageMap plugin can make those diagrams clickable when used in pages. Enjoy!

    Read the article

  • Excel Help: Userforms

    - by B-Ballerl
    I have developed a macro that does a whole bunch of things for me based on a few things. (Importing files). The file names are dated dd_mm_yyyy and right now I enter them into a sheet where the macro can call the information. Not really wanting this I designed a userform where the user could enter the "dd", "mm", "yyyy" and how many consecutive days of files there were. Ex. Say 28_06_2011.txt 29_06_2011.txt there would be one consecutive day. I want to be able to call the information entered in the user-form (day, month, year, and consecutive days) to use in the macro and have been unsuccessful because I don't know how to call that information. Is it similar to referring to a range in a worksheet? Thanks in Advance for any Help.

    Read the article

  • Excel Smart Find and Replace only specific characters

    - by Asim
    I want to change INT to INTERNATIONAL and NA to NATIONAL ASSEMBLY in whole excel workbook through an excel Macro or Find and Replace dialogue box. But when I run the macro or change it through Find and Replace dialogue box it also replace NA from CHINA last 2 characters and it became CHINATIONAL ASSEMBLY and INTERIOR to INTERNATIONALERIOR. Now, I want that Excel should only smartly find the character NA in the workbook which is not included with any other character likewise character INT which is not attach to any other character. I would be grateful if anyone give any formula, Excel Macro or anything else to overcome this issue. Thanks,

    Read the article

  • C language preprocessor behavior

    - by khanna_param
    There are different kind of macros in C language, nested macro is one of them. Considering a program with the following macro #define HYPE(x,y) (SQUR(x)+SQUR(y)) #define SQUR(x) (x*x) Using this we can successfully compile to get the result. As we all know the C preprocessor replaces all the occurrence of the identifiers with the replacement-string. Considering the above example I would like to know how many times the C preprocessor traverses the program to replace the macro with the replacement values. I assume it cannot be done in one go.

    Read the article

  • I noticed the answer to the Aug 2009 question of using VBA to set Custom Flag values

    - by Gary
    We are actively using the Follow Up mail feature to assign users to particular mail follow up items. Although mail item follow ups are generally the province of the individual user, by changing the flag value from "Follow Up" to "User name", we can see each other's follow up tasks and group on responsible party. Currently we accomplish the Flag value change manually. My sense is the easiest way to perfect the process is a separate macro for each user. Along the lines of the macro to change the star/end due date to end of month, please define the macro to re-assign the Flag value for each highlighted mail item (previously assigned by default). Thank you very much.

    Read the article

  • Excel cutting out down over 1024 characters

    - by Zeno
    I am using Excel 2003 to save a large file as a CSV. But when saving cells that contain over 1024 characters, it cuts out the characters beyond 1024. Per a previous question, I am using this official macro to save: http://support.microsoft.com/default.aspx?scid=kb;en-us;291296&Product=xlw This macro in question is probably causing it, since I'm not using the normal Save As (in order to put quotes around every field). It may not be 1024 characters, but long cells are getting cut off. What in this macro is causing that?

    Read the article

  • Simplification of Apache+Subversion multidirectory configuration

    - by Reinderien
    Hello. With your excellent advice, I've finally pieced together this functional Apache configuration for my Subversion service: # Macro to make an SVN repo set <Macro SVNDir $user> <Location /svn/$user> # Mandatory HTTPS, log in using Active Domain SSLRequireSSL AuthPAM_Enabled on AuthType Basic AuthBasicAuthoritative off AuthName "PAM" Require user AD\$user # Needed to squash spurious error messages AuthUserFile /dev/null # SVN stuff DAV svn SVNParentPath /var/www/svn/$user </Location> </Macro> # List of accounts Use SVNDir user1 Use SVNDir user2 # ... It works, but it isn't optimal. I'd like to somehow redo this so that it can just scan the list of directories in /var/www/svn and automatically do this for each of them. Is that possible? Thanks.

    Read the article

  • C Language preprocessing doubt

    - by khanna_param
    Hi, There are different kind of macros in C language, nested macro is one of them. Considering a program with the following macro define HYPE(x,y) (SQUR(x)+SQUR(y)) define SQUR(x) (x*x) using this we can successfully complile to get the result. My question:- As we all know the C preprocessor replaces all the occurrence of the identifiers with the replacement-string. Considering the above example i would like to know how many times the C compiler traverses the program to replace the macro with the replacement values. I assume it cannot be done in one go. Thanks.

    Read the article

  • asterisk Dial-plan?

    - by Rev
    Hi I want to make a dial plan for asterisk to do this: for incoming-call check the caller-id and if caller id is equal with specific number (for example 666) then hangup that call.(this dial-plan also known as anti ex-girlfriend ) also I wrote this dial-plan for doing this but it doesn't work well.(don't hangup then incoming call from 666 and go to queue macro) [macro-queue] exten => s, 2, Queue(${ARG1}) [default] exten => s, 1, Answer exten => s/666, 2 ,Hangup exten => s, 2, BackGround(welcome) exten => s, 3, Macro(queue,operator)

    Read the article

  • Disk performance below expectations

    - by paulH
    this is a follow-up to a previous question that I asked (Two servers with inconsistent disk speed). I have a PowerEdge R510 server with a PERC H700 integrated RAID controller (call this Server B) that was built using eight disks with 3Gb/s bandwidth that I was comparing with an almost identical server (call this Server A) that was built using four disks with 6Gb/s bandwidth. Server A had much better I/O rates than Server B. Once I discovered the difference with the disks, I had Server A rebuilt with faster 6Gbps disks. Unfortunately this resulted in no increase in the performance of the disks. Expecting that there must be some other configuration difference between the servers, we took the 6Gbps disks out of Server A and put them in Server B. This also resulted in no increase in the performance of the disks. We now have two identical servers built, with the exception that one is built with six 6Gbps disks and the other with eight 3Gbps disks, and the I/O rates of the disks is pretty much identical. This suggests that there is some bottleneck other than the disks, but I cannot understand how Server B originally had better I/O that has subsequently been 'lost'. Comparative I/O information below, as measured by SQLIO. The same parameters were used for each test. It's not the actual numbers that are significant but rather the variations between systems. In each case D: is a 2 disk RAID 1 volume, and E: is a 4 disk RAID 10 volume (apart from the original Server A, where E: was a 2 disk RAID 0 volume). Server A (original setup with 6Gpbs disks) D: Read (MB/s) 63 MB/s D: Write (MB/s) 170 MB/s E: Read (MB/s) 68 MB/s E: Write (MB/s) 320 MB/s Server B (original setup with 3Gpbs disks) D: Read (MB/s) 52 MB/s D: Write (MB/s) 88 MB/s E: Read (MB/s) 112 MB/s E: Write (MB/s) 130 MB/s Server A (new setup with 3Gpbs disks) D: Read (MB/s) 55 MB/s D: Write (MB/s) 85 MB/s E: Read (MB/s) 67 MB/s E: Write (MB/s) 180 MB/s Server B (new setup with 6Gpbs disks) D: Read (MB/s) 61 MB/s D: Write (MB/s) 95 MB/s E: Read (MB/s) 69 MB/s E: Write (MB/s) 180 MB/s Can anybody suggest any ideas what is going on here? The drives in use are as follows: Dell Seagate F617N ST3300657SS 300GB 15K RPM SAS Dell Hitachi HUS156030VLS600 300GB 3.5 inch 15000rpm 6GB SAS Hitachi Hus153030vls300 300GB Server SAS Dell ST3146855SS Seagate 3.5 inch 146GB 15K SAS

    Read the article

  • I/O intensive MySql server on Amazon AWS

    - by rhossi
    We recently moved from a traditional Data Center to cloud computing on AWS. We are developing a product in partnership with another company, and we need to create a database server for the product we'll release. I have been using Amazon Web Services for the past 3 years, but this is the first time I received a spec with this very specific hardware configuration. I know there are trade-offs and that real hardware will always be faster than virtual machines, and knowing that fact forehand, what would you recommend? 1) Amazon EC2? 2) Amazon RDS? 3) Something else? 4) Forget it baby, stick to the real hardware Here is the hardware requirements This server will be focused on I/O and MySQL for the statistics, memory size and disk space for the images hosting. Server 1 I/O The very main part on this server will be I/O processing, FusionIO cards have proven themselves extremely efficient, this is currently the best you can have in this domain. o Fusion ioDrive2 MLC 365GB (http://www.fusionio.com/load/-media-/1m66wu/docsLibrary/FIO_ioDrive2_Datasheet.pdf) CPU MySQL will use less CPU cores than Apache but it will use them very hard, the E7 family has 30M Cache L3 wichi provide boost performance : o 1x Intel E7-2870 will be ok. Storage SAS will be good enough in terms of performance, especially considering the space required. o RAID 10 of 4 x SAS 10k or 15k for a total available space of 512 GB. Memory o 64 GB minimum is required on this server considering the size of the statistics database. Warning: the statistics database will grow quickly, if possible consider starting with 128 GB directly, it will help. This server will be focused on I/O and MySQL for the statistics, memory size and disk space for the images hosting. Server 2 I/O The very main part on this server will be I/O processing, FusionIO cards have proven themselves extremely efficient, this is currently the best you can have in this domain. o Fusion ioDrive2 MLC 365GB (http://www.fusionio.com/load/-media-/1m66wu/docsLibrary/FIO_ioDrive2_Datasheet.pdf) CPU MySQL will use less CPU cores than Apache but it will use them very hard, the E7 family has 30M Cache L3 wichi provide boost performance : o 1x Intel E7-2870 will be ok. Storage SAS will be good enough in terms of performance, especially considering the space required. o RAID 10 of 4 x SAS 10k or 15k for a total available space of 512 GB. Memory o 64 GB minimum is required on this server considering the size of the statistics database. Warning: the statistics database will grow quickly, if possible consider starting with 128 GB directly, it will help. Thanks in advance. Best,

    Read the article

  • How to address a recurring low temperature error seen at every boot-up?

    - by GregC
    After updating to latest controller firmware, I started receiving the following error messages: LSI 2208 ROC: Temperature sensor below error threshold on enclosure 1 Sensors 5 thru 7 Is this something I should worry about, or is it a Red Herring? Details: I have a Sans Digital NexentaSTOR 24-disk JBOD enclosure connected to LSI 9286-8e RAID-on-Chip controller with two SAS cables. Seagate ES.2 3TB SAS hard drives populate every bay in the enclosure.

    Read the article

  • Java replacement for C macros

    - by thkala
    Recently I refactored the code of a 3rd party hash function from C++ to C. The process was relatively painless, with only a few changes of note. Now I want to write the same function in Java and I came upon a slight issue. In the C/C++ code there is a C preprocessor macro that takes a few integer variables names as arguments and performs a bunch of bitwise operations with their contents and a few constants. That macro is used in several different places, therefore its presence avoids a fair bit of code duplication. In Java, however, there is no equivalent for the C preprocessor. There is also no way to affect any basic type passed as an argument to a method - even autoboxing produces immutable objects. Coupled with the fact that Java methods return a single value, I can't seem to find a simple way to rewrite the macro. Avenues that I considered: Expand the macro by hand everywhere: It would work, but the code duplication could make things interesting in the long run. Write a method that returns an array: This would also work, but it would repeatedly result into code like this: long tmp[] = bitops(k, l, m, x, y, z); k = tmp[0]; l = tmp[1]; m = tmp[2]; x = tmp[3]; y = tmp[4]; z = tmp[5]; Write a method that takes an array as an argument: This would mean that all variable names would be reduced to array element references - it would be rather hard to keep track of which index corresponds to which variable. Create a separate class e.g. State with public fields of the appropriate type and use that as an argument to a method: This is my current solution. It allows the method to alter the variables, while still keeping their names. It has the disadvantage, however, that the State class will get more and more complex, as more macros and variables are added, in order to avoid copying values back and forth among different State objects. How would you rewrite such a C macro in Java? Is there a more appropriate way to deal with this, using the facilities provided by the standard Java 6 Development Kit (i.e. without 3rd party libraries or a separate preprocessor)?

    Read the article

< Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >