Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 336/1407 | < Previous Page | 332 333 334 335 336 337 338 339 340 341 342 343  | Next Page >

  • Flash builder 4 - change output filename using external build-config.xml (not Ant)

    - by Casey
    I'm trying to change the output filename with a config file loaded via the compiler option -load-config. It looks like this in my compiler arguments: -load-config+=build-config.xml. I've tried the following: <flex-config> <o>absolute/path/to/filename</o> </flex-config> and <flex-config> <output>absolute/path/to/filename</output> </flex-config> and <flex-config> <compiler> <o>absolute/path/to/filename</o> </compiler> </flex-config> and <flex-config> <compiler> <output>absolute/path/to/filename</output> </compiler> </flex-config> but none have worked. I'm on a PC using Flash Builder 4. Has anyone else done this? Also, ideally, I want to use a relative path instead of absolute. I can't get this to work either, even if I do so in the "additional compiler arguments" field of the Project configuration. Thanks in advance!

    Read the article

  • Avoid existing files being overwritten when newer version is installed.

    - by constant learner
    Hello I have a VS2008 windows application project (WinProject) which is deployed by the installation project (InstallationProject) which inturn has the property RemovePreviousVersions set to True. In my app for each configuration made by an user, the winapp writes the configurations into an xml file (stored in C:\Application Name\Files\ folder) which also includes the path where the config was saved. Now when I build new versions of the installer,This folder and the files are overwritten since i the flag AlwaysCreate is set to True. My question is how can i avoid these older files from being overwritten and at the same time shall get the updated file from the installer. Ex: Contents of the file <PriceFiles> <Name>arr</Name> <Path>C:\NewTool\arr.xml</Path> <UserDefined>true</UserDefined> </PriceFiles> <ReferenceProjects> <Name>studio</Name> <Path>C:\NewTool\ReferenceProjects\6cd3a9e9-ad65-475e-953b-128915a496cd.xml</Path> <UserDefined>true</UserDefined> <CreatedBy>Admin</CreatedBy> </ReferenceProjects> Thanks in advance

    Read the article

  • custom grid style in silverlight 4

    - by Archie
    Hello, I want to set background of a grid using a style. I style I'm setting the Background Property of the grid. But I have a border filled with LinearGradientFill and a Path which also has LinearGradientFill in it. But I'm not able to combine both. Below is sample code. I want to create it as a style. <Grid> <Border BorderBrush="Black" BorderThickness="2"> <Border.Background> <LinearGradientBrush EndPoint="1,0.5" StartPoint="0,0.5"> <GradientStop Color="Black" Offset="0.953" /> <GradientStop Color="White" Offset="0" /> </LinearGradientBrush> </Border.Background> </Border> <Path Data="M 0,0 C 0,620 10,10 560,0" Height="60" VerticalAlignment="Top"> <Path.Fill> <LinearGradientBrush EndPoint="1,0.5" StartPoint="0,0.5"> <GradientStop Color="Black" Offset="0" /> <GradientStop Color="White" Offset="0.779" /> </LinearGradientBrush> </Path.Fill> </Path> </Grid> It gives me an error as The Property 'Value' is set more than once. Can anyone help me with it? Thanks.

    Read the article

  • Find all paths from root to leaves of tree in Scheme

    - by grifaton
    Given a tree, I want to find the paths from the root to each leaf. So, for this tree: D / B / \ A E \ C-F-G has the following paths from root (A) to leaves (D, E, G): (A B D), (A B E), (A C F G) If I represent the tree above as (A (B D E) (C (F G))) then the function g does the trick: (define (g tree) (cond ((empty? tree) '()) ((pair? tree) (map (lambda (path) (if (pair? path) (cons (car tree) path) (cons (car tree) (list path)))) (map2 g (cdr tree)))) (else (list tree)))) (define (map2 fn lst) (if (empty? lst) '() (append (fn (car lst)) (map2 fn (cdr lst))))) But this looks all wrong. I've not had to do this kind of thinking for a while, but I feel there should be a neater way of doing it. Any ideas for a better solution (in any language) would be appreciated.

    Read the article

  • Remove Trailing Slash From Batch File Input

    - by Brook
    I have a batch file that I want to improve. Instead of requiring a user to provide a folder path without a trailing slash, is there an easy way for me to just remove the last character from the path if there is a slash on the end? :START @echo What folder do you want to process? (Provide a path without a closing backslash) set /p datapath= ::Is string empty? IF X%datapath% == X GOTO:START ::Does string have a trailing slash? IF %datapath:~-1%==\ GOTO:START

    Read the article

  • Rails: render a partial from a plugin

    - by Sam
    I'm getting a missing template error after I try rendering a partial from a plugin. I have included the files with the following: %w{ models controllers helpers views }.each do |dir| path = File.join(File.dirname(__FILE__), 'app', dir) $LOAD_PATH << path ActiveSupport::Dependencies.load_paths << path ActiveSupport::Dependencies.load_once_paths.delete(path) end The Models are getting loaded, but as for other things I'm not sure what's going on. The helpers are not getting loaded too because I just copied the contents of the partial from the plugin instead of the render :partial = and then it came up with a helper error. Question is how to be able to :render :partial = from the views folder in my plugin

    Read the article

  • Error while building Struts2 Application by Ant

    - by Jeeva
    I'm following Rose India Hello World Tutorial for Struts2 development, I'm Getting, Buildfile: D:\Program Files\Apache Software Foundation\Tomcat 6.0\webapps\struts2tutorial\WEB-INF\src\build.xml clean: [delete] Deleting directory D:\Program Files\Apache Software Foundation\Tomcat 6.0\webapps\struts2tutorial\WEB-INF\classes [mkdir] Created dir: D:\Program Files\Apache Software Foundation\Tomcat 6.0\webapps\struts2tutorial\WEB-INF\classes prepare: BUILD FAILED

    Read the article

  • [PHP] Weird problem with dynamic method invocation

    - by Rolf
    Hi everyone, this time, I'm facing a really weird problem. I've the following code: $xml = simplexml_load_file($this->interception_file); foreach($xml->children() as $class) { $path = str_replace('__CLASS_DIR__',CLASS_DIR,$class['path']); if(!is_file($path)) { throw new Exception('Bad configuration: file '.$path.' not found'); } $className = pathinfo($path,PATHINFO_FILENAME); foreach($class as $method) { $method_name = $method['name']; $obj = new $className(); var_dump(in_array($method_name,get_class_methods($className)));exit; echo $obj->$method_name();### not a method ??? } } As you can see, I get the class name and method name from an XML file. I can create an instance of the class without any problem. The var_dump at the end returns true, that means $method_name (which has 2 optional parameters) is a method of $className. BUT, and I am pretty sure the syntax is correct, when I try: $obj-$method_name() I get: Fatal error: Method name must be a string If you have any ideas, pleaaaaase tell me :) Thanks in advance, Rolf

    Read the article

  • how to develop domain specific language on top of another language ?

    - by sofreakinghigh
    say i found a good open source software/library written in python. i want to wrap some of the functions or methods that i have created into easy to understand language of my own. do porter_stemm(DOC) (the DSL) would be equivalent to the function or series of methods written in python. i want to create a DSL that is easy to learn, but need this DSL translated into the original open source software software. im not sure if i am clear here but my intention is: create an easy to learn code language that users can use to solve a problem in a certain niche. this simple language needs to be translated or compiled or interpretated via some middleware into the original open source software's language (python).

    Read the article

  • How can I make this if's work in Bash ?

    - by Dragos
    In bash how can I make a construction like this to work: if (cp /folder/path /to/path) && (cp /anotherfolder/path /to/anotherpath) then echo "Succeeded" else echo "Failed" fi The if should test for the $? return code of each command and tie them with &&. How can I make this in Bash ?

    Read the article

  • "Android Create" call fails in windows 7 - missing JDK

    - by reuscam
    I'm having a problem getting my android dev environment setup in Windows 7. I follow the instructions here, as well as several environment sublinks. I am using Eclipse with the Android plugin. I have installed the Java JDK several times, in various locations (jdk-6u20-windows-i586.exe) - but I am obviously missing something. Every time I run "android create avd --target 2 --name my_avd" I get an error: C:\Users\andrew>android create avd --target 2 --name my_avd WARNING: Java not found in your path. Checking it it's installed in C:\Program Files\Java instead. ERROR: No suitable Java found. In order to properly use the Android Developer Tools, you need a suitable version of Java installed on your system. We recommend that you install the JDK version of JavaSE, available here: http://java.sun.com/javase/downloads/ You can find the complete Android SDK requirements here: http://developer.android.com/sdk/requirements.html This error message is the reason for me installing the JDK several times over. First I tried installing to a location on my e: drive. I then moved it to the default loc (program files (x86)\java\jdk.6.something. I also tried forcing it to go into the program files\ path, but it still automatically installs into the (x86) path. I have added the install path to my path environment variable every single time, yet I still continue to get this error. My suspicion is that windows 7 and the android tools are not playing together well in terms of finding the JDK, but who knows, it may be something entirely different. If you have seen this error before, I would appreciate a hint.

    Read the article

  • Does this introduce security vulnerabilities?

    - by mcmt
    I don't think I'm missing anything. Then again I'm kind of a newbie. def GET(self, filename): name = urllib.unquote(filename) full = path.abspath(path.join(STATIC_PATH, filename)) #Make sure request is not tricksy and tries to get out of #the directory, e.g. filename = "../.ssh/id_rsa". GET OUTTA HERE assert full[:len(STATIC_PATH)] == STATIC_PATH, "bad path" return open(full).read()

    Read the article

  • PyQt4 Need to move DLLs to package root

    - by Xavier
    Hi Guys, I've used the new installers from http://www.riverbankcomputing.co.uk/software/pyqt/download for Python 2.6 x86_64 and I've a small problem importing PyQt4 in one particular application. Here's the traceback: # ERROR : Traceback (most recent call last): # File "<Script Block >", line 2, in <module> # from PyQt4 import QtCore # ImportError: DLL load failed: The specified procedure could not be found. # - [line 2] This might look familiar. Fun thing is that in a previous version of the 3d software it does work (and from a standard command line), but not in the new software version. I inspected the sys.path (within the app) in order to see if this path was there: C:\Python26\Lib\site-packages\PyQt4\bin In both application this path is present. Finally managed to make it works by copying the DLLs from C:\Python26\Lib\site-packages\PyQt4\bin to C:\Python26\Lib\site-packages\PyQt4 Is there any known reason for this? I've a hard time debugging this thing further (making sure everything is 64 bit, path are correct, etc) Thanks for your help

    Read the article

  • Licensing Android Apache Commons Math

    - by stefple
    I am about to release my first commercial software ever. I didnt study something related to programming so i am facing a problem here, which is licensing. I am not native english speaking, so i have a little bit of a problem when i read the Apache Commons License. In my software i use the Apache Commons Math library. If i understand their FAQ i just may distribute my software if i add this (the text will come up at my "info" screen inside the app): [...] \nCopyright 2012 xxxstefplexxxx \n\n This software uses Apache Commons Math Library \nThe license can be found here: \nhttp://www.apache.org/licenses/LICENSE-2.0 \n

    Read the article

  • Any simple way to "resize" an NSBezierPath?

    - by d11wtq
    I have an NSBezierPath that I'm filling and stroking. I'd like to add some inner glow to the path (a light stroke, just inside of the outer stroke), and the thing that comes to mind is to use the same path shrunk by 1 pixel (the size of the line that is already )stroked. Is there a way to do this? Alternatively, is there some sort of pattern I can use when applying both a border (stroke) and a glow to a bezier path? Example, the (extremely subtle) inner glow on the Google Chrome tabs:

    Read the article

  • Is it possible to have Ant print out the classpath for a particular target? If so, how?

    - by Daryl Spitzer
    I'm trying to get a target to build that has quite a long list of <pathelement location="${xxx}"/> and <path refid="foo.class.path"/> elements in its <path id="bar.class.path"> element (in the build.xml file). I keep getting "package com.somecompany.somepackage does not exist" errors, and I'm having a hard time chasing down these packages and making sure I've synced them from our repository. I'm new to this team so I'm unfamiliar with the build, but I would prefer to figure this out myself if possible (so I don't bother the other very busy team members). I have very limited experience with Ant. I think it would save me quite a bit of time if I could have Ant print out the classpath for the target I'm trying to build.

    Read the article

  • Tail recursion and memoization with C#

    - by Jay
    I'm writing a function that finds the full path of a directory based on a database table of entries. Each record contains a key, the directory's name, and the key of the parent directory (it's the Directory table in an MSI if you're familiar). I had an iterative solution, but it started looking a little nasty. I thought I could write an elegant tail recursive solution, but I'm not sure anymore. I'll show you my code and then explain the issues I'm facing. Dictionary<string, string> m_directoryKeyToFullPathDictionary = new Dictionary<string, string>(); ... private string ExpandDirectoryKey(Database database, string directoryKey) { // check for terminating condition string fullPath; if (m_directoryKeyToFullPathDictionary.TryGetValue(directoryKey, out fullPath)) { return fullPath; } // inductive step Record record = ExecuteQuery(database, "SELECT DefaultDir, Directory_Parent FROM Directory where Directory.Directory='{0}'", directoryKey); // null check string directoryName = record.GetString("DefaultDir"); string parentDirectoryKey = record.GetString("Directory_Parent"); return Path.Combine(ExpandDirectoryKey(database, parentDirectoryKey), directoryName); } This is how the code looked when I realized I had a problem (with some minor validation/massaging removed). I want to use memoization to short circuit whenever possible, but that requires me to make a function call to the dictionary to store the output of the recursive ExpandDirectoryKey call. I realize that I also have a Path.Combine call there, but I think that can be circumvented with a ... + Path.DirectorySeparatorChar + .... I thought about using a helper method that would memoize the directory and return the value so that I could call it like this at the end of the function above: return MemoizeHelper( m_directoryKeyToFullPathDictionary, Path.Combine(ExpandDirectoryKey(database, parentDirectoryKey)), directoryName); But I feel like that's cheating and not going to be optimized as tail recursion. Any ideas? Should I be using a completely different strategy? This doesn't need to be a super efficient algorithm at all, I'm just really curious. I'm using .NET 4.0, btw. Thanks!

    Read the article

  • zip -j command, what does the -j option mean?

    - by Simon Guo
    Wondering what is the -j option mean in the zip command. I found the explanation as following: -j Store just the name of a saved file (junk the path), and do not store directory names. By default, zip will store the full path (relative to the current path). But not quite sure what it is exact mean? Can anyone explain it using the following command as an example? C:\programs\zip -j myzipfile file1 file2 file3 Thank you.

    Read the article

  • How to deploy a Java Swing application with an embedded JavaDB database?

    - by Jonas
    I have implemented an Java Swing application that uses an embedded JavaDB database. The database need to be stored somewhere and the database tables need to be created at the first run. What is the preferred way to do these procedures? Should I always create the database in the local directory, and first check if the database file exist, and if it doesn't exist let the user create the tables (or at least show a message that the tables will be created). Or should I let the user choose a path? but then I have to save the path somewhere. Should I save the path with Preferences.systemRoot();, and check if that variable is set on startup? If the user choses a path and save it in the Preferences, can I get any problems with user permissions? or should it be safe wherever the user store the database? Or how do I handle this? Any other suggestions for this procedure?

    Read the article

  • How do I set a property to the output of a command in msbuild/xbuild

    - by Nils
    In msbuild/xbuild I'd like to have a "libPath" property which can be ovveridden on the commandline using /p:libpath="/path/to/all/libs". But when this property is undefined I want to call pkg-config --retrieve-Path somePackage to get the current systems path. I thought like here I need the output of a command to be stored in a Property. The command always returns one line of output. I have tryied something like <PropertyGroup> <LibPath /> </PropertyGroup> <Task ....> <Exec Command="pkg-config --retrieve-Path somePackage" Condition="$(LibPath)' == ''"> <OutputTaskParameter="output" PropertyName="LibPath" /> </Exec> </Task> But that didn't work.

    Read the article

  • Mocking imported modules in Python

    - by Evgenyt
    I'm trying to implement unit tests for function that uses imported external objects. For example helpers.py is: import os import pylons def some_func(arg): ... var1 = os.path.exist(...) var2 = os.path.getmtime(...) var3 = pylons.request.environ['HTTP_HOST'] ... So when I'm creating unit test for it I do some mocking (minimock in my case) and replacing references to pylons.request and os.path: import helpers def test_some_func(): helpers.pylons.request = minimock.Mock("pylons.request") helpers.pylons.request.environ = { 'HTTP_HOST': "localhost" } helpers.os.path = minimock.Mock(....) ... some_func(...) # assert ... This does not look good for me. Is there any other better way or strategy to substitute imported function/objects in Python?

    Read the article

  • Is there an Open Source licence matrix?

    - by tobsen
    I am trying to find a simple matrix overview of the various licenses around open source software but can't find anything useful. I would like to know whether software under a certain licence can be used in commercial closed source software, if there has to be the original source code included, if the licence has to be redistirbuted, etc. I know this is a difficult topic because I guess only the minority of programmers are also moonlighting lawyers - neither am I.

    Read the article

  • Change default java installation

    - by user1501700
    I have many Java versions installed on a Windows 7 machine. Some of them are 32 bits, some are 64 bits. Now as default it starts one of those last versions (1.7 64 bits). How do I tell my Windows 7 machine to use another version of Java? One of the reasons is that I'm developing a JNI project from Microsoft Visual Studio C++ - it uses also java 1.7 64 bits. Best regards, Andrej I have set: User variable: JAVA_HOME=C:\j2sdk1.4.2_04 PATH=%JAVA_HOME%\bin;%PATH% and system variable: JAVA_HOME=C:\j2sdk1.4.2_04 PATH=...a_lot_of_paths...;%JAVA_HOME%\bin;%PATH% I had no idea which is better to set - for user or system settings. Done both. System restart. And...it didn't helped :( When I run "java -version" from cmd i have java 1.7, but not java 1.4 like defined in PATH. after run C:where java I got two results: C:\Windows\System32\java.exe C:\j2sdk1.4.2_04\bin\java.exe Who let Java go to my windows directory ???!!! How to deal with that?

    Read the article

  • Pass logger instance to class

    - by mridang
    Hi Guys, I'm using a open-source Python library in my project. This library logs a lot of information using the logging class. ...but I can't see the output or log it to file. I know that i would have to create a logger instance and add a file-handler or a console-handler to it but how can i pass this logger instance to the class? Here's the init snippet of the class that I'm going to be using. class Periscope: ''' Main Periscope class''' def __init__(self): self.config = ConfigParser.SafeConfigParser({"lang": "en"}) if is_local: self.config_file = os.path.join(bd.xdg_config_home, "periscope", "config") if not os.path.exists(self.config_file): folder = os.path.dirname(self.config_file) if not os.path.exists(folder): logging.info("Creating folder %s" %folder) os.mkdir(folder) logging.info("Creating config file") configfile = open(self.config_file, "w") self.config.write(configfile) configfile.close() else: #Load it self.config.read(self.config_file) self.pluginNames = self.listExistingPlugins() self._preferedLanguages = None Any help? Thanks guys.

    Read the article

< Previous Page | 332 333 334 335 336 337 338 339 340 341 342 343  | Next Page >