Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 343/1407 | < Previous Page | 339 340 341 342 343 344 345 346 347 348 349 350  | Next Page >

  • Saucy upgrade causes menu problem in Eclipse

    - by Ralph Rassweiler
    Has anyone been through this: Using Ubuntu 13.10 (with JDK 1.7.0_45). Download and uncompress Eclipse Kepler for Java EE Developers. The software menus are messed up. I didn't notice similar problems in other software. When I click any menu of eclipse, the drop-down seems to be "cut". Sometimes the drop-down shows, but the options are invisible. I tried Eclipse Indigo, but the same problem occurs.

    Read the article

  • Waterfall Model (SDLC) vs. Prototyping Model

    The characters in the fable of the Tortoise and the Hare can easily be used to demonstrate the similarities and differences between the Waterfall and Prototyping software development models. This children fable is about a race between a consistently slow moving but steadfast turtle and an extremely fast but unreliable rabbit. After closely comparing each character’s attributes in correlation with both software development models, a trend seems to appear in that the Waterfall closely resembles the Tortoise in that Waterfall Model is typically a slow moving process that is broken up in to multiple sequential steps that must be executed in a standard linear pattern. The Tortoise can be quoted several times in the story saying “Slow and steady wins the race.” This is the perfect mantra for the Waterfall Model in that this model is seen as a cumbersome and slow moving. Waterfall Model Phases Requirement Analysis & Definition This phase focuses on defining requirements for a project that is to be developed and determining if the project is even feasible. Requirements are collected by analyzing existing systems and functionality in correlation with the needs of the business and the desires of the end users. The desired output for this phase is a list of specific requirements from the business that are to be designed and implemented in the subsequent steps. In addition this phase is used to determine if any value will be gained by completing the project. System Design This phase focuses primarily on the actual architectural design of a system, and how it will interact within itself and with other existing applications. Projects at this level should be viewed at a high level so that actual implementation details are decided in the implementation phase. However major environmental decision like hardware and platform decision are typically decided in this phase. Furthermore the basic goal of this phase is to design an application at the system level in those classes, interfaces, and interactions are defined. Additionally decisions about scalability, distribution and reliability should also be considered for all decisions. The desired output for this phase is a functional  design document that states all of the architectural decisions that have been made in regards to the project as well as a diagrams like a sequence and class diagrams. Software Design This phase focuses primarily on the refining of the decisions found in the functional design document. Classes and interfaces are further broken down in to logical modules based on the interfaces and interactions previously indicated. The output of this phase is a formal design document. Implementation / Coding This phase focuses primarily on implementing the previously defined modules in to units of code. These units are developed independently are intergraded as the system is put together as part of a whole system. Software Integration & Verification This phase primarily focuses on testing each of the units of code developed as well as testing the system as a whole. There are basic types of testing at this phase and they include: Unit Test and Integration Test. Unit Test are built to test the functionality of a code unit to ensure that it preforms its desired task. Integration testing test the system as a whole because it focuses on results of combining specific units of code and validating it against expected results. The output of this phase is a test plan that includes test with expected results and actual results. System Verification This phase primarily focuses on testing the system as a whole in regards to the list of project requirements and desired operating environment. Operation & Maintenance his phase primarily focuses on handing off the competed project over to the customer so that they can verify that all of their requirements have been met based on their original requirements. This phase will also validate the correctness of their requirements and if any changed need to be made. In addition, any problems not resolved in the previous phase will be handled in this section. The Waterfall Model’s linear and sequential methodology does offer a project certain advantages and disadvantages. Advantages of the Waterfall Model Simplistic to implement and execute for projects and/or company wide Limited demand on resources Large emphasis on documentation Disadvantages of the Waterfall Model Completed phases cannot be revisited regardless if issues arise within a project Accurate requirement are never gather prior to the completion of the requirement phase due to the lack of clarification in regards to client’s desires. Small changes or errors that arise in applications may cause additional problems The client cannot change any requirements once the requirements phase has been completed leaving them no options for changes as they see their requirements changes as the customers desires change. Excess documentation Phases are cumbersome and slow moving Learn more about the Major Process in the Sofware Development Life Cycle and Waterfall Model. Conversely, the Hare shares similar traits with the prototyping software development model in that ideas are rapidly converted to basic working examples and subsequent changes are made to quickly align the project with customers desires as they are formulated and as software strays from the customers vision. The basic concept of prototyping is to eliminate the use of well-defined project requirements. Projects are allowed to grow as the customer needs and request grow. Projects are initially designed according to basic requirements and are refined as requirement become more refined. This process allows customer to feel their way around the application to ensure that they are developing exactly what they want in the application This model also works well for determining the feasibility of certain approaches in regards to an application. Prototypes allow for quickly developing examples of implementing specific functionality based on certain techniques. Advantages of Prototyping Active participation from users and customers Allows customers to change their mind in specifying requirements Customers get a better understanding of the system as it is developed Earlier bug/error detection Promotes communication with customers Prototype could be used as final production Reduced time needed to develop applications compared to the Waterfall method Disadvantages of Prototyping Promotes constantly redefining project requirements that cause major system rewrites Potential for increased complexity of a system as scope of the system expands Customer could believe the prototype as the working version. Implementation compromises could increase the complexity when applying updates and or application fixes When companies trying to decide between the Waterfall model and Prototype model they need to evaluate the benefits and disadvantages for both models. Typically smaller companies or projects that have major time constraints typically head for more of a Prototype model approach because it can reduce the time needed to complete the project because there is more of a focus on building a project and less on defining requirements and scope prior to the start of a project. On the other hand, Companies with well-defined requirements and time allowed to generate proper documentation should steer towards more of a waterfall model because they are in a position to obtain clarified requirements and have to design and optimal solution prior to the start of coding on a project.

    Read the article

  • .NET licenses and project worths millions

    - by Ivan Tanasijevic
    I have a question about. NET licenses. I heard that in the case when project becomes worth millions, Microsoft have rights on great percent of this amount. If this is true, then how are things with social network which is built with ASP.NET MVC. Is this the same situation as in the case of the profit coming from selling software, because in this situation profit comes from marketing not from direct selling software.

    Read the article

  • Apache 'You don't have permission to access / on this server'

    - by Dying
    I just install apache2 on ubuntu,the default www directory is /var/www/ ,I use ln to link it to '/media/Software/Program Files/wamp/www/' at the windows directory,but the apache shows 'You don't have permission to access / on this server',Then I use 'sudo chmod -R 777 /media/Software/Program\ Files/wamp/www/' to set the permission,but it didn't work,and nothing changed when I saw the permission in the preporties of the '.../wamp/www' folder.So I want to know How can I change the www directory to '.../wamp/www' as I also need to access this diretory in windows.

    Read the article

  • How to make scripts run in Guake terminal instead of normal terminal

    - by Nirmik
    I have installed Guake terminal and I find it amazing. I have many scripts added as .desktop files in launcher. Now I want these scripts to run in the Guake terminal instead of opening in the normal Gnome terminal. How can I achieve this? Thanx :) Edit- The .desktop file is such- [Desktop Entry] Type=Application Terminal=true Icon=/path/to/icon/icon.svg Name=app-name Exec=/path/to/file/mount-unmount.sh Name=app-name

    Read the article

  • 10 Weeks of Gift Ideas – All Offers Good Through January 19, 2012

    - by TATWORTH
    O'Reilly are offering a series of good offers through to Jan 19, 2012. The main page is at http://shop.oreilly.com/category/deals/hd-10-weeks.do Already available are: JavaScript path to Mastery set at http://shop.oreilly.com/category/deals/hd-javascript-path.do I recommend JavaScript: The Definitive Guide, 6th Edition- PDF is 50% off at http://shop.oreilly.com/product/9780596805531.do HTML 5 Programming set at http://shop.oreilly.com/category/deals/hd-html5.do Again the PDF's are 50% off.

    Read the article

  • Package Installation Failure

    - by mahima
    Whenever I try to install any new package or upgrade a package, it fails with below mentioned error: Setting up install-info (4.13a.dfsg.1-5ubuntu1) ... /etc/environment: line 1: PATH=/usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin:/usr/games: No such file or directory dpkg: error processing install-info (--configure): subprocess installed post-installation script returned error exit status 1 No apport report written because MaxReports is reached already Errors were encountered while processing: install-info E: Sub-process /usr/bin/dpkg returned an error code (1) I checked all the directories mentioned in PATH variable exists.

    Read the article

  • How to install JavaFx in Ubuntu 12.04?

    - by Ant's
    I download JavaFx from here. I placed it in my home directory(anto) under the name javafx. Then I did something like this : vi ~/.bashrc and added the following lines: javaFx_home=/anto/javafx/rt/lib/jfxrt.jar export PATH=$PATH:$javaFx_home But after providing the classpath, I tried running : groovy MyProgram (which depends on the JavaFx classpath). But that throws me an error. Where I went wrong?

    Read the article

  • Primary Advantages Of asp.net

    ASP.NET, another revolutionized web development language from the software giant Microsoft, recently has become highly popular among majority of the web developers and software professionals worldwid... [Author: Mark Warne - Web Design and Development - April 07, 2010]

    Read the article

  • Installing MOSS 2007 on Windows 2008 R2

    - by Manesh Karunakaran
    When you try to install MOSS 2007 on Windows 2008 R2, if you are using an installation media that is older than SP2, you would get the following error, saying that “This program is blocked due to compatibility issues”    All is not lost though, all you need to do is to slip stream the SP2 updates to the MOSS 2007 Setup. Here’s a nice how to on how to do that. http://blogs.technet.com/seanearp/archive/2009/05/20/slipstreaming-sp2-into-sharepoint-server-2007.aspx Once you slipstream the SP2 updates, you would be able to continue with the installation with out the above error. HTH.   You may already read from blogs about April Cumulative Update for separate components in SharePoint. Now, the server-packages (also known as “Uber” packages) of April Cumulative Update for Microsoft Office SharePoint Server 2007 and Windows SharePoint Services 3.0 are ready for download. Download Information Windows SharePoint Services 3.0 April cumulative update package http://support.microsoft.com/hotfix/KBHotfix.aspx?kbnum=968850 Office SharePoint Server 2007 April cumulative update package http://support.microsoft.com/hotfix/KBHotfix.aspx?kbnum=968851 Detail Description Description of the Windows SharePoint Services 3.0 April cumulative update package http://support.microsoft.com/kb/968850 Description of the Office SharePoint Server 2007 April cumulative update package http://support.microsoft.com/kb/968851 Installation Recommendation for a fresh SharePoint Server To keep all files in a SharePoint installation up-to-date, the following sequence is recommended. Service Pack 2 for Windows SharePoint Services 3.0 Service Pack 2 for Office SharePoint Server 2007 April Cumulative Update package for Windows SharePoint Services 3.0 April Cumulative Update package for Office SharePoint Server 2007 Please note: Start from April Cumulative Update, the packages will no longer install on a farm without a service pack installed. You must have installed either Service Pack 1 (SP1) or SP2 prior to the installation of the cumulative updates. After applying the preceding updates, run the SharePoint Products and Technologies Configuration Wizard or “psconfig –cmd upgrade –inplace b2b -wait” in command line. This needs to be done on every server in the farm with SharePoint installed.  The version of content databases should be 12.0.6504.5000 after successfully applying these updates. For more in-depth guidance for the update process, we recommend that customers refer to the following articles. These articles provide a correct way to deploy updates, identify known issues (and resolutions), and provide information about creating slipstream builds. Deploy software updates for Windows SharePoint Services 3.0 http://technet.microsoft.com/en-us/library/cc288269.aspx Deploy software updates for Office SharePoint Server 2007 http://technet.microsoft.com/en-us/library/cc263467.aspx Create an installation source that includes software updates (Windows SharePoint Services 3.0) http://technet.microsoft.com/en-us/library/cc287882.aspx Create an installation source that includes software updates (Office SharePoint Server 2007) http://technet.microsoft.com/en-us/library/cc261890.aspx

    Read the article

  • Real World Nuget

    - by JoshReuben
    Why Nuget A higher level of granularity for managing references When you have solutions of many projects that depend on solutions of many projects etc à escape from Solution Hell. Links · Using A GUI (Package Explorer) to build packages - http://docs.nuget.org/docs/creating-packages/using-a-gui-to-build-packages · Creating a Nuspec File - http://msdn.microsoft.com/en-us/vs2010trainingcourse_aspnetmvcnuget_topic2.aspx · consuming a Nuget Package - http://msdn.microsoft.com/en-us/vs2010trainingcourse_aspnetmvcnuget_topic3 · Nuspec reference - http://docs.nuget.org/docs/reference/nuspec-reference · updating packages - http://nuget.codeplex.com/wikipage?title=Updating%20All%20Packages · versioning - http://docs.nuget.org/docs/reference/versioning POC Folder Structure POC Setup Steps · Install package explorer · Source o Create a source solution – configure output directory for projects (Project > Properties > Build > Output Path) · Package o Add assemblies to package from output directory (D&D)- add net folder o File > Export – save .nuspec files and lib contents <?xml version="1.0" encoding="utf-16"?> <package > <metadata> <id>MyPackage</id> <version>1.0.0.3</version> <title /> <authors>josh-r</authors> <owners /> <requireLicenseAcceptance>false</requireLicenseAcceptance> <description>My package description.</description> <summary /> </metadata> </package> o File > Save – saves .nupkg file · Create Target Solution o In Tools > Options: Configure package source & Add package Select projects: Output from package manager (powershell console) ------- Installing...MyPackage 1.0.0 ------- Added file 'NugetSource.AssemblyA.dll' to folder 'MyPackage.1.0.0\lib'. Added file 'NugetSource.AssemblyA.pdb' to folder 'MyPackage.1.0.0\lib'. Added file 'NugetSource.AssemblyB.dll' to folder 'MyPackage.1.0.0\lib'. Added file 'NugetSource.AssemblyB.pdb' to folder 'MyPackage.1.0.0\lib'. Added file 'MyPackage.1.0.0.nupkg' to folder 'MyPackage.1.0.0'. Successfully installed 'MyPackage 1.0.0'. Added reference 'NugetSource.AssemblyA' to project 'AssemblyX' Added reference 'NugetSource.AssemblyB' to project 'AssemblyX' Added file 'packages.config'. Added file 'packages.config' to project 'AssemblyX' Added file 'repositories.config'. Successfully added 'MyPackage 1.0.0' to AssemblyX. ============================== o Packages folder created at solution level o Packages.config file generated in each project: <?xml version="1.0" encoding="utf-8"?> <packages>   <package id="MyPackage" version="1.0.0" targetFramework="net40" /> </packages> A local Packages folder is created for package versions installed: Each folder contains the downloaded .nupkg file and its unpacked contents – eg of dlls that the project references Note: this folder is not checked in UpdatePackages o Configure Package Manager to automatically check for updates o Browse packages - It automatically picked up the updates Update Procedure · Modify source · Change source version in assembly info · Build source · Open last package in package explorer · Increment package version number and re-add assemblies · Save package with new version number and export its definition · In target solution – Tools > Manage Nuget Packages – click on All to trigger refresh , then click on recent packages to see updates · If problematic, delete packages folder Versioning uninstall-package mypackage install-package mypackage –version 1.0.0.3 uninstall-package mypackage install-package mypackage –version 1.0.0.4 Dependencies · <?xml version="1.0" encoding="utf-16"?> <package xmlns="http://schemas.microsoft.com/packaging/2012/06/nuspec.xsd"> <metadata> <id>MyDependentPackage</id> <version>1.0.0</version> <title /> <authors>josh-r</authors> <owners /> <requireLicenseAcceptance>false</requireLicenseAcceptance> <description>My package description.</description> <dependencies> <group targetFramework=".NETFramework4.0"> <dependency id="MyPackage" version="1.0.0.4" /> </group> </dependencies> </metadata> </package> Using NuGet without committing packages to source control http://docs.nuget.org/docs/workflows/using-nuget-without-committing-packages Right click on the Solution node in Solution Explorer and select Enable NuGet Package Restore. — Recall that packages folder is not part of solution If you get downloading package ‘Nuget.build’ failed, config proxy to support certificate for https://nuget.org/api/v2/ & allow unrestricted access to packages.nuget.org To test connectivity: get-package –listavailable To test Nuget Package Restore – delete packages folder and open vs as admin. In nugget msbuild: <Import Project="$(SolutionDir)\.nuget\nuget.targets" /> TFSBuild Integration Modify Nuget.Targets file <RestorePackages Condition="  '$(RestorePackages)' == '' "> True </RestorePackages> … <PackageSource Include="\\IL-CV-004-W7D\Packages" /> Add System Environment variable EnableNuGetPackageRestore=true & restart the “visual studio team foundation build service host” service. Important: Ensure Network Service has access to Packages folder Nugetter TFS Build integration Add Nugetter build process templates to TFS source control For Build Controller - Specify location of custom assemblies Generate .nuspec file from Package Explorer: File > Export Edit the file elements – remove path info from src and target attributes <?xml version="1.0" encoding="utf-16"?> <package xmlns="http://schemas.microsoft.com/packaging/2012/06/nuspec.xsd">     <metadata>         <id>Common</id>         <version>1.0.0</version>         <title />         <authors>josh-r</authors>         <owners />         <requireLicenseAcceptance>false</requireLicenseAcceptance>         <description>My package description.</description>         <dependencies>             <group targetFramework=".NETFramework3.5" />         </dependencies>     </metadata>     <files>         <file src="CommonTypes.dll" target="CommonTypes.dll" />         <file src="CommonTypes.pdb" target="CommonTypes.pdb" /> … Add .nuspec file to solution so that it is available for build: Dev\NovaNuget\Common\NuSpec\common.1.0.0.nuspec Add a Build Process Definition based on the Nugetter build process template: Configure the build process – specify: · .sln to build · Base path (output directory) · Nuget.exe file path · .nuspec file path Copy DLLs to a binary folder 1) Set copy local for an assembly reference to false 2)  MSBuild Copy Task – modify .csproj file: http://msdn.microsoft.com/en-us/library/3e54c37h.aspx <ItemGroup>     <MySourceFiles Include="$(MSBuildProjectDirectory)\..\SourceAssemblies\**\*.*" />   </ItemGroup>     <Target Name="BeforeBuild">     <Copy SourceFiles="@(MySourceFiles)" DestinationFolder="bin\debug\SourceAssemblies" />   </Target> 3) Set Probing assembly search path from app.config - http://msdn.microsoft.com/en-us/library/823z9h8w(v=vs.80).aspx -                 <?xml version="1.0" encoding="utf-8" ?> <configuration>   <runtime>     <assemblyBinding xmlns="urn:schemas-microsoft-com:asm.v1">       <probing privatePath="SourceAssemblies"/>     </assemblyBinding>   </runtime> </configuration> Forcing 'copy local = false' The following generic powershell script was added to the packages install.ps1: param($installPath, $toolsPath, $package, $project) if( $project.Object.Project.Name -ne "CopyPackages") { $asms = $package.AssemblyReferences | %{$_.Name} foreach ($reference in $project.Object.References) { if ($asms -contains $reference.Name + ".dll") { $reference.CopyLocal = $false; } } } An empty project named "CopyPackages" was added to the solution - it references all the packages and is the only one set to CopyLocal="true". No MSBuild knowledge required.

    Read the article

  • Rewriting code under BSD license

    - by Frank
    I am currently studding OpengGL with OpenGL Supebible 5th edition. I've found interested for me some C++ code that is distributed with the book (see also on google code). That code is under New BSD License. I am writing my software on C# with SharpGL wrapper and I'd like to know following things: Can I rewrite that C++ to C#? edid: I'am interesting in using such things like GLBatch, GLShaderManager and some other thing from GLTools. Problem is that library is on C++, but I use C#. How do I have to mark my source code if I put it somewhere like to my github account? What disclaimer should be? Original disclaimer looks like: /* GLShaderManager.h Copyright (c) 2009, Richard S. Wright Jr. All rights reserved. Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. Neither the name of Richard S. Wright Jr. nor the names of other contributors may be used to endorse or promote products derived from this software without specific prior written permission. THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. */ Edit: Should my copyright looks like after rewriting something like that? Copyright (c) 2014, My Name Copyright (c) 2009, Richard S. Wright Jr. All rights reserved. Redistribution...................

    Read the article

  • Get your TFS 2012 task board demo ready in under 1 minute

    - by Tarun Arora
    Release Notes – http://tfsdemosetup.codeplex.com/  | Download | Source Code | Report a Bug | Ideas In this blog post, I’ll show you how to use the ‘TfsDemoSetup’ application to configure and setup the TFS 2012 task board for a demo in well less than 1 minute Step 1 – Note what you get with a newly created Team Project Create a new Team Project on TFS Preview         2. Click Create Project         3. The project creation has completed        4. Open the team web access and have a look at the home page Note – Since I created the project I am the only Team Member       A default Team by the name AdventureWorks Team has been created       A few sprints have been assigned to the default team but no dates for sprint start and end have been specified        A default Area Path for the team is missing       Step 2. Download the TFS Demo Setup Console application from Codeplex 1. Navigate to the TFS Demo Setup project on codeplex https://tfsdemosetup.codeplex.com/       2. Download Instructions and TFSDemo_<version>      3. Follow the steps in the Instructions.txt file      4. Unzip TFSDemo_<version> and open the target folder. Two important files in this folder, DemoDictionary.xml – This file contains the settings using which the demo environment will be setup SetupTfsDemo.exe – This will run the TFS demo environment setup application       Step 3 – Configure the setup (i.e. team name, members, sprint dates, etc) 1. Open up DemoDictionary.xml      2. Walkthrough DemoDictionary.xml             a. Basic Team Details         <Name> – Specify the name of the team         <Description> – Specify a description to go with the team         <SetAsDefaultTeam> – This accepts a value “true/false” when set to true, the newly created team will be set as the default team in the project         <BacklogIterationPath> – Specify a backlog iteration path for the team     b. Iterations – The iterations you specify here will be set as the Teams iterations        <Iterations> – Accepts multiple <Iteration> nodes.        <Iteration> – This is the most granular level of an Iteration        <Path> – The path to the sprint, sample values, Release 1\Sprint 1 or Release 2\Sprint 2        <StartDate> – The sprint start date, this accepts the format yyyy-MM-dd        <FinishDate> – The sprint finish date, this accepts the format yyyy-MM-dd     c. Team Members – Team Members that need to be added to the newly created team will be added under this section         <TeamMembers> – Accepts multiple <TeamMember> nodes.         <TeamMember> – This is the most granular level of a Team Member         <User> – This accepts the username, if you are running this against TFSPreview then the live id of the user will need to be passed. If you are running this against TFS Server then the user id i.e. Domain\UserName will need to be passed          <Team> – Specify the name of the team that you want the user to be assigned to.     d. WorkItems – This section will allow you to add work items (product backlog Items and linked tasks) to the current sprint of the team         <WorkItems> – Accepts multiple <WorkItem> nodes.         <WorkItem> – Accepts one <ProductBacklogItem> and multiple <Task> nodes         <ProductBacklogItem> – Used to create a Product Backlog Item type work item               <Title> – The title of the Product Backlog Item               <Description> – The description of the Product Backlog Type Work Item               <AssignedTo> – Used to assign the work item to a team member. The team member name or email address can be passed.               <Effort> – The total effort required to complete the Product Backlog Item         <Task> – Used to create a linked task to the Product Backlog type work item               <Title> – The title of the task type work item               <Description> – The description of the Task Type Work Item               <AssignedTo> – Used to assign the work item to a team member. The team member name or email address can be passed.               <RemainingWork> – The remaining effort to complete the task type work item Step 4 – Setup the demo environment against the newly created Team Project 1. Run SetupTfsDemo.exe    2. Enter Y or y on the prompt to continue setting up TFS Demo setup.     3. Select the newly created Team project, for this blogpost I had created the Team Project – AdventureWorks, so that is what I’ll select in the Connect to TFS Server pop up    3. Click Connect and follow the messages that are written to the console application       Step 5 – Validate that the Demo environment is set up as per the configuration 1. The team web access is all lit up You have a Sprint, a burn down chart, team members…    2. The team Demo has been added and has been set up as the default team    3. The Sprint Backlog Iteration path, Sprints and Sprint start and finish dates have been set    4. The default area path has been setup    5. Taskboard – Backlog items view    6. Taskboard – Team members view      Step 6 – Exception Handling! 1. This solution has been tested against TFS 2012 Service/Server for the Scrum 2.1 process template. 2. You are likely to run into an exception if you mess up the config file 3. If the team already exists and you run the console app to set up the team (with the same name) you will run into exceptions. Please remember this is just an alpha release, if you have any feedback please leave a comment! Didn’t I say that it would just take 1 minute, Enjoy!

    Read the article

  • Dependency Checker/ Installer With Java/Ant

    - by jsn
    I need some kind of software to easily roll out code on new servers. I use Apache Ant for builds. However, say I want to set-up a new server fast and my Java program depends on GhostScript, if there any software that can automatically check the computer for it (and then maybe the PATH) and add it if is not there? I have already looked at Maven and Apache Ivy, however, I think these are only for .jar files (from what I saw). Thanks for any help.

    Read the article

  • How to get Linux in your office

    <b>Tux Radar:</b> "And with Linux and free software making a name for itself in the world of big business, many more people are testing the feasibility of switching small and home office software to their open source equivalents."

    Read the article

  • Has any hobbyist attempted to make a simple VGA-graphics based operating system in machine code?

    - by Bigyellow Bastion
    I mean real bare bones, bare machine here(no Linux kernel, pre-existing kernel, or any bootloader). I mean honestly write the bootloading software in direct microarchitecture-specific machine opcode, host the operating system, interrupts, I/O, services, and graphical software and all hardware interaction, computation, and design entirely in binary. I know this is quite the leap here, but I was thinking to practice first in x86 assembly (not binary) 16-bit style. Any ideas?

    Read the article

  • Tidbits

    From time to time I am going to post a few thoughts that come up which are longer than a tweet but shorter than a post.Software Architecture booksI recently got a question from Jon :I am wanting to make the leap from senior engineer/team lead to software architect, can you recommend any good books or [...]...Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • PowerShell - grabbing values out of the registry and running them

    - by Rob Farley
    So I closed an application that runs when Windows starts up, but it doesn’t have a Start Menu entry, and I was trying to find it. Ok, I could’ve run regedit.exe, navigated through the tree and found the list of things that run when Windows starts up, but I thought I’d use PowerShell instead. PowerShell presents the registry as if it’s a volume on a disk, and you can navigate around it using commands like cd and dir. It wasn’t hard to find the folder I knew I was after – tab completion (starting the word and then hitting the Tab key) was a friend here. But unfortunately dir doesn’t list values, only subkeys (which look like folders). PS C:\Windows\system32> dir HKLM:\SOFTWARE\Microsoft\Windows\CurrentVersion\Run PS C:\Windows\system32> Instead, I needed to use Get-Item to fetch the ‘Run’ key, and use its Property property. This listed the values in there for me, as an array of strings (I could work this out using Get-Member). PS C:\Windows\system32> (Get-Item HKLM:\SOFTWARE\Microsoft\Windows\CurrentVersion\Run).Property QuickSet SynTPEnh Zune Launcher PS C:\Windows\system32> Ok, so the thing I wanted wasn’t in there (an app called PureText, whicih lets me Paste As Text using Windows+V). That’s ok – a simple change to use HKCU instead of HKLM (Current User instead of Local Machine), and I found it. Now to fetch the details of the application itself, using the RegistryKey method GetValue PS C:\Windows\system32> (Get-Item HKCU:\SOFTWARE\Microsoft\Windows\CurrentVersion\Run).GetValue('PureText') "C:\Users\Rob\Utilities\PureText.exe" PS C:\Windows\system32> And finally, surrounding it in a bit of code to execute that command. That needs an ampersand and the Invoke-Expression cmdlet. PS C:\Windows\system32> '& ' + (Get-Item HKCU:\SOFTWARE\Microsoft\Windows\CurrentVersion\Run).GetValue('PureText') | Invoke-Expression A simple bit of exploring PowerShell which will makes for a much easier way of finding and running those apps which start with Windows.

    Read the article

  • Create Automated Blogs Rapidly

    Automated blogs simplify the content management job of webmasters, but this is not possible without the required product. Carty Studio's .NET based Auto Blogging Software helps you create automated blogs without much extra work as it grabs content from the relevant RSS Feeds automatically. After reading Anand's review you will understand the usefulness of the software.

    Read the article

  • Create Automated Blogs Rapidly

    Automated blogs simplify the content management job of webmasters, but this is not possible without the required product. Carty Studio's .NET based Auto Blogging Software helps you create automated blogs without much extra work as it grabs content from the relevant RSS Feeds automatically. After reading Anand's review you will understand the usefulness of the software.Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • How do I install root-cern?

    - by Rick Turd
    Cern's ROOT environment installs fine on 10.10, and is even available in the Software Center, but it will not install or compile on Natty because the x11 directories are in new locations. I can redefine the paths, but then I get compile errors because only gcc 4.3 is supported through ROOT and Natty uses 4.5. I've given up and gone back to 10.10, but my question is, after installing ROOT on Maverick, if I upgrade back to Natty, will my old software still work with these new directory paths?

    Read the article

  • Free Document/Content Management System Using SharePoint 2010

    - by KunaalKapoor
    That’s right, it’s true. You can use the free version of SharePoint 2010 to meet your document and content management needs and even run your public facing website or an internal knowledge bank.  SharePoint Foundation 2010 is free. It may not have all the features that you get in the enterprise license but it still has enough to cater to your needs to build a document management system and replace age old file shares or folders. I’ve built a dozen content management sites for internal and public use exploiting SharePoint. There are hundreds of web content management systems out there (see CMS Matrix).  On one hand we have commercial platforms like SharePoint, SiteCore, and Ektron etc. which are the most frequently used and on the other hand there are free options like WordPress, Drupal, Joomla, and Plone etc. which are pretty common popular as well. But I would be very surprised if anyone was able to find a single CMS platform that is all things to all people. Infact not a lot of people consider SharePoint’s free version under the free CMS side but its high time organizations benefit from this. Through this blog post I wanted to present SharePoint Foundation as an option for running a FREE CMS platform. Even if you knew that there is a free version of SharePoint, what most people don’t realize is that SharePoint Foundation is a great option for running web sites of all kinds – not just team sites. It is a great option for many reasons, but in reality it is supported by Microsoft, and above all it is FREE (yay!), and it is extremely easy to get started.  From a functionality perspective – it’s hard to beat SharePoint. Even the free version, SharePoint Foundation, offers simple data connectivity (through BCS), cross browser support, accessibility, support for Office Web Apps, blogs, wikis, templates, document support, health analyzer, support for presence, and MUCH more.I often get asked: “Can I use SharePoint 2010 as a document management system?” The answer really depends on ·          What are your specific requirements? ·          What systems you currently have in place for managing documents. ·          And of course how much money you have J Benefits? Not many large organizations have benefited from SharePoint yet. For some it has been an IT project to see what they can achieve with it, for others it has been used as a collaborative platform or in many cases an extended intranet. SharePoint 2010 has changed the game slightly as the improvements that Microsoft have made have been noted by organizations, and we are seeing a lot of companies starting to build specific business applications using SharePoint as the basis, and nearly every business process will require documents at some stage. If you require a document management system and have SharePoint in place then it can be a relatively straight forward decision to use SharePoint, as long as you have reviewed the considerations just discussed. The collaborative nature of SharePoint 2010 is also a massive advantage, as specific departmental or project sites can be created quickly and easily that allow workers to interact in a variety of different ways using one source of information.  This also benefits an organization with regards to how they manage the knowledge that they have, as if all of their information is in one source then it is naturally easier to search and manage. Is SharePoint right for your organization? As just discussed, this can only be determined after defining your requirements and also planning a longer term strategy for how you will manage your documents and information. A key factor to look at is how the users would interact with the system and how much value would it get for your organization. The amount of data and documents that organizations are creating is increasing rapidly each year. Therefore the ability to archive this information, whilst keeping the ability to know what you have and where it is, is vital to any organizations management of their information life cycle. SharePoint is best used for the initial life of business documents where they need to be referenced and accessed after time. It is often beneficial to archive these to overcome for storage and performance issues. FREE CMS – SharePoint, Really? In order to show some of the completely of what comes with this free version of SharePoint 2010, I thought it would make sense to use Wikipedia (since every one trusts it as a credible source). Wikipedia shows that a web content management system typically has the following components: Document Management:   -       CMS software may provide a means of managing the life cycle of a document from initial creation time, through revisions, publication, archive, and document destruction. SharePoint is king when it comes to document management.  Version history, exclusive check-out, security, publication, workflow, and so much more.  Content Virtualization:   -       CMS software may provide a means of allowing each user to work within a virtual copy of the entire Web site, document set, and/or code base. This enables changes to multiple interdependent resources to be viewed and/or executed in-context prior to submission. Through the use of versioning, each content manager can preview, publish, and roll-back content of pages, wiki entries, blog posts, documents, or any other type of content stored in SharePoint.  The idea of each user having an entire copy of the website virtualized is a bit odd to me – not sure why anyone would need that for anything but the simplest of websites. Automated Templates:   -       Create standard output templates that can be automatically applied to new and existing content, allowing the appearance of all content to be changed from one central place. Through the use of Master Pages and Themes, SharePoint provides the ability to change the entire look and feel of site.  Of course, the older brother version of SharePoint – SharePoint Server 2010 – also introduces the concept of Page Layouts which allows page template level customization and even switching the layout of an individual page using different page templates.  I think many organizations really think they want this but rarely end up using this bit of functionality.  Easy Edits:   -       Once content is separated from the visual presentation of a site, it usually becomes much easier and quicker to edit and manipulate. Most WCMS software includes WYSIWYG editing tools allowing non-technical individuals to create and edit content. This is probably easier described with a screen cap of a vanilla SharePoint Foundation page in edit mode.  Notice the page editing toolbar, the multiple layout options…  It’s actually easier to use than Microsoft Word. Workflow management: -       Workflow is the process of creating cycles of sequential and parallel tasks that must be accomplished in the CMS. For example, a content creator can submit a story, but it is not published until the copy editor cleans it up and the editor-in-chief approves it. Workflow, it’s in there. In fact, the same workflow engine is running under SharePoint Foundation that is running under the other versions of SharePoint.  The primary difference is that with SharePoint Foundation – you need to configure the workflows yourself.   Web Standards: -       Active WCMS software usually receives regular updates that include new feature sets and keep the system up to current web standards. SharePoint is in the fourth major iteration under Microsoft with the 2010 release.  In addition to the innovation that Microsoft continuously adds, you have the entire global ecosystem available. Scalable Expansion:   -       Available in most modern WCMSs is the ability to expand a single implementation (one installation on one server) across multiple domains. SharePoint Foundation can run multiple sites using multiple URLs on a single server install.  Even more powerful, SharePoint Foundation is scalable and can be part of a multi-server farm to ensure that it will handle any amount of traffic that can be thrown at it. Delegation & Security:  -       Some CMS software allows for various user groups to have limited privileges over specific content on the website, spreading out the responsibility of content management. SharePoint Foundation provides very granular security capabilities. Read @ http://msdn.microsoft.com/en-us/library/ee537811.aspx Content Syndication:  -       CMS software often assists in content distribution by generating RSS and Atom data feeds to other systems. They may also e-mail users when updates are available as part of the workflow process. SharePoint Foundation nails it.  With RSS syndication and email alerts available out of the box, content syndication is already in the platform. Multilingual Support: -       Ability to display content in multiple languages. SharePoint Foundation 2010 supports more than 40 languages. Read More Read more @ http://msdn.microsoft.com/en-us/library/dd776256(v=office.12).aspxYou can download the free version from http://www.microsoft.com/en-us/download/details.aspx?id=5970

    Read the article

  • Is verification and validation part of testing process?

    - by user970696
    Based on many sources I do not believe the simple definition that aim of testing is to find as many bugs as possible - we test to ensure that it works or that it does not. E.g. followint are goals of testing form ISTQB: Determine that (software products) satisfy specified requirements ( I think its verificication) Demonstrate that (software products) are fit for purpose (I think that is validation) Detect defects I would agree that testing is verification, validation and defect detection. Is that correct?

    Read the article

  • Opensource, noncommercial License ?

    - by nick-russler
    Hey, i want to publish my software under a opensource license with the following conditions: you are allowed to: Share — to copy, distribute and transmit the work use a modified version of the code in your application you are not allowed to: publish modified versions of the code use the code in anything commercial is there a software license out there that fits my needs ? (crosspost: http://stackoverflow.com/questions/4558546/opensource-noncommercial-license)

    Read the article

  • Dependency not satisfiable - Offline deb package install

    - by catia
    I have a new installation that has no chance of an internet connection. Since I want to add a few development software packages, I downloaded a few *.deb files. The problem is that for every package I try to install I get the same error: "Dependency not satisfiable...." Also downloaded other versions of that software (the deb files) but it didn't work. I've researched other questions in here and Google and I haven't been able to solve this yet.

    Read the article

< Previous Page | 339 340 341 342 343 344 345 346 347 348 349 350  | Next Page >