Search Results

Search found 2049 results on 82 pages for 'tfs alerts'.

Page 4/82 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • How can I replace email alerts for system events with something more scalable?

    - by Dave Forgac
    I have a number of systems and services that send email alerts when some sort of event takes place. This works fine for a small number of systems but as the number of alerts grows the important message become less visible among the informational notices. Email filtering can only be effective to a point. What sort of solution can I use in place of emails that will allow me to send arbitrary alerts from various services and that will scale easily as the number of services grows?

    Read the article

  • TFS and Forms Authentication

    - by George
    I don't know squat about TFS, other than as a user who has performed simple check in/outs. I just installed it locally and would like to do joint development with a friend. I was having trouble making my TFS web site on port 8080 visible (the whole scoop is here if your interested) and I wonder if it could be related to the fact that TFS is probably using Windows Authentication to identify the user. Can TFS be set up to use forms authentication? We probably need to set up a VPN, though that's a learning curve too. To use TFS, do our machines have to belong to a domain? We're not admin types, though he is better than me, though I would be interested in any feedback or advice on which path is likely to pan out the best. I already got AxoSoft OneTime working in this type of an environment and it suits us well, but I am tempted at all the bells & whistles with TFS and the ability to tie tracked bug items to code changes. As far as finding a good way to share code, do sites like SourceForge allow one to keep code secure among members only?

    Read the article

  • TFS, G.I. Joe and Under-doing

    If I were to rank the most consistently irritating parts of my work day, using TFS would come in first by a wide margin. Even repeated network outages this week seem like a pleasant reprieve from this monolithic beast. This is not a reflexive anti-Microsoft feeling, that attitude just wouldnt work for a consultant who does .NET development. It is also not an utter dismissal of TFS as worthless; Ive seen people use it effectively on several projects. So why? Ill start with a laundry list of shortcomings. An out of the box UI for work items that is insultingly bad, a source control system that is confoundingly fragile when handling merges, folder renames and long file names, the arcane XML wizardry necessary to customize a template and a build system that adds an extra layer of oddness on top of msbuild. Im sure my legion of readers will soon point out to me how I can work around all these issues, how this is fixed in TFS 2010 or with this add-in, and how once you have everything set up, youre fine. And theyd be right, any one of these problems could be worked around. If not dirty laundry, what else? I thought about it for a while, and came to the conclusion that TFS is so irritating to me because it represents a vision of software development that I find unappealing. To expand upon this, lets start with some wisdom from those great PSAs at the end of the G.I. Joe cartoons of the 80s: Now you know, and knowing is half the battle. In software development, Id go further and say knowing is more than half the battle. Understanding the dimensions of the problem you are trying to solve, the needs of the users, the value that your software can provide are more than half the battle. Implementation of this understanding is not easy, but it is not even possible without this knowledge. Assuming we have a fixed amount of time and mental energy for any project, why does this spell trouble for TFS? If you think about what TFS is doing, its offering you a huge array of options to track the day to day implementation of your project. From tasks, to code churn, to test coverage. All valuable metrics, but only in exchange for valuable time to get it all working. In addition, when you have a shiny toy like TFS, the temptation is to feel obligated to use it. So the push from TFS is to encourage a project manager and team to focus on process and metrics around process. You can get great visibility, and graphs to show your project stakeholders, but none of that is important if you are not implementing the right product. Not just unimportant, these activities can be harmful as they drain your time and sap your creativity away from the rest of the project. To be more concrete, lets suppose your organization has invested the time to create a template for your projects and trained people in how to use it, so there is no longer a big investment of time for each project to get up and running. First, Id challenge if that template could be specific enough to be full featured and still applicable for any project. Second, the very existence of this template would be a indication to a project manager that the success of their project was somehow directly related to fitting management of that project into this format. Again, while the capabilities are wonderful, the mirage is there; just get everything into TFS and your project will run smoothly. Ill close the loop on this first topic by proposing a thought experiment. Think of the projects youve worked on. How many times have you been chagrined to discover youve implemented the wrong feature, misunderstood how a feature should work or just plain spent too much time on a screen that nobody uses? That sounds like a really worthwhile area to invest time in improving. How about going back to these projects and thinking about how many times you wished you had optimized the state change flow of your tasks or been embarrassed to not have a code churn report linked back to the latest changeset? With thanks to the Real American Heroes, Ill move on to a more current influence, that of the developers at 37signals, and their philosophy towards software development. This philosophy, fully detailed in the books Getting Real and Rework, is a vision of software that under does the competition. This is software that is deliberately limited in functionality in order to concentrate fully on making sure ever feature that is there is awesome and needed. Why is this relevant? Well, in one of those fun seeming paradoxes in life, constraints can be a spark for creativity. Think Twitter, the small screen of an iPhone, the limitations of HTML for applications, the low memory limits of older or embedded system. As long as there is some freedom within those constraints, amazing things emerge. For project management, some of the most respected people in the industry recommend using just index cards, pens and tape. They argue that with change the constant in software development, your process should be as limited (yet rigorous) as possible. Looking at TFS, this is not a system designed to under do anybody. It is a big jumble of components and options, with every feature you could think of. Predictably this means many basic functions are hard to use. For task management, many people just use an Excel spreadsheet linked up to TFS. Not a stirring endorsement of the tooling there. TFS as a whole would be far more appealing to me if there was less of it, but better. Id cut 50% of the features to make the other half really amaze and inspire me. And thats really the heart of the matter. TFS has great promise and I want to believe it can work better. But ultimately it focuses your attention on a lot of stuff that doesnt really matter and then clamps down your creativity in a mess of forms and dialogs obscuring what does.   --- Relevant Links --- All those great G.I. Joe PSAs are on YouTube, including lots of mashed up versions. A simple Google search will get you on the right track.Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • TFS and Sharepoint integration

    - by pho3nix
    I using a Sharepoint 2007 and TFS 2010. I installed all with reports sharepoint integration but when i try create a TeamProject Collections always return this warning: Server was unable to process request. --- TF250029: No user was found within the context of a Web site. Verify that the site does not allow anonymous access. And in sharepoint web applications tfs console window when check my sharepoint portal /sites return a error saying is blocked by firewall or server extensions is not installed, but i have all ok. Anyone can helpme, please.

    Read the article

  • Connecting Visual Studio 2008 SP1 to TFS 2010

    - by Enrique Lima
    Introduction You have installed Team Foundation Server 2010, you are ready to go.  Your client is Visual Studio 2008 SP1, and need to connect to TFS 2010. Here is the story, the steps to configure Team Explorer are almost the same … meaning, you will open Visual Studio, then go to Team Explorer.  At that point you will Add an Existing Project, this where we connect to TFS.  Except, we get this: Now what?!?  We need to install the Visual Studio Team System 2008 Service Pack 1 Forward Compatibility Update for Team Foundation Server 2010.  Where to get it from? TFS 2010 installation media Microsoft’s Download Center Update Installation We arrive at the Welcome Screen for the Update, click Next Next comes the license screen, accept the license, by selecting the checkbox, then click next. The installation process will start at that point. Once it completes, click on Finish. Second Try Time to attempt to connect again. We are back to working with Team Explorer, and Adding an existing project.  There is a formula to be successful with this. protocol://servername:port/tfs/<name of collection> protocol = http or https servername = your tfs 2010 server port = 8080 by default, or the custom port you are using /tfs = I am assuming the default too /<name of collection = the name of the collection that was provisioned. Once the values are provided, click OK, then close. At this point you should see a listing of Projects available within the TFS 2010 collection. Select the project and click OK.  You will now see this listed in Team Explorer.

    Read the article

  • How to use TFS as a query tracking system?

    - by deostroll
    We already use tfs for managing defects in code etc, etc. We additionally need a way to "understand the domain & requirements of the products". Normally, without tfs we exchange emails with the consultants and have the questions/queries answered. If it is a feature implementation we sometimes "find" conflicts in the implementation itself. And when that happens the userstory is modified and the enhancement/bug as per that is raised in TFS. Sometimes it is critical we come back to decisions we made or questions we wanted answers to. Hence we need to be able to track how that "requirement idea" or that "query in concern" evolved. Hence how is it that we can use TFS to track all of this? Do we raise an "issue" item for this? Or do we raise a "bug" item? The main things we'd ideally look in a query tracking system are as follows: Area: Can be a module, submodule, domain. Sometimes this may be "General" - to address domain related stuff, or, event more granular to address modules, sub-modules. Take the case for the latter, if we were tracking this in excel sheets, we'd just write module1,submodule2; i.e. in a comma separated fashion. The things I would like here is to be able search for all queries relating to submodule2 sometime in the future. Responses: This is a record of conversations between the consultant and any other stakeholder. For a simple case, it would just be paragraphs. Each para would start with a name and date enclosed in brackets and the response following that...each para would be like a thread - much like a forum thread Action taken: We'd want to know how the query was closed, what was the input given, what were the changes that took place because of that, etc etc. These are fields I think I would need in such a system apart from some obvious ones like status, address to, resovled by, etc. I am open for any other fields which are sort of important. To summarise my question: how can we manage "queries" in the system? Where should we ideally store data pertaining to those three fields I have mentioned above (for e.g. is it wise to store responses in the history tag assuming we are opening a bug for the query)?

    Read the article

  • Upgrading Team Foundation Server 2008 to 2010

    - by Martin Hinshelwood
    I am sure you will have seen my posts on upgrading our internal Team Foundation Server from TFS2008 to TFS2010 Beta 2, RC and RTM, but what about a fresh upgrade of TFS2008 to TFS2010 using the RTM version of TFS. One of our clients is taking the plunge with TFS2010, so I have the job of doing the upgrade. It is sometimes very useful to have a team member that starts work when most of the Sydney workers are heading home as I can do the upgrade without impacting them. The down side is that if you have any blockers then you can be pretty sure that everyone that can deal with your problem is asleep I am starting with an existing blank installation of TFS 2010, but Adam Cogan let slip that he was the one that did the install so I thought it prudent to make sure that it was OK. Verifying Team Foundation Server 2010 We need to check that TFS 2010 has been installed correctly. First, check the Admin console and have a root about for any errors. Figure: Even the SQL Setup looks good. I don’t know how Adam did it! Backing up the Team Foundation Server 2008 Databases As we are moving from one server to another (recommended method) we will be taking a backup of our TFS2008 databases and resorting them to the SQL Server for the new TFS2010 Server. Do not just detach and reattach. This will cause problems with the version of the database. If you are running a test migration you just need to create a backup of the TFS 2008 databases, but if you are doing the live migration then you should stop IIS on the TFS 2008 server before you backup the databases. This will stop any inadvertent check-ins or changes to TFS 2008. Figure: Stop IIS before you take a backup to prevent any TFS 2008 changes being written to the database. It is good to leave a little time between taking the TFS 2008 server offline and commencing the upgrade as there is always one developer who has not finished and starts screaming. This time it was John Liu that needed 10 more minutes to make his changes and check-in, so I always give it 30 minutes and see if anyone screams. John Liu [SSW] said:   are you doing something to TFS :-O MrHinsh [SSW UK][VS ALM MVP] said:   I have stopped TFS 2008 as per my emails John Liu [SSW] said:   haven't finish check in @_@   can we have it for 10mins? :) MrHinsh [SSW UK][VS ALM MVP] said:   TFS 2008 has been started John Liu [SSW] said:   I love you! -IM conversation at TFS Upgrade +25 minutes After John confirmed that he had everything done I turned IIS off again and made a cup of tea. There were no more screams so the upgrade can continue. Figure: Backup all of the databases for TFS and include the Reporting Services, just in case.   Figure: Check that all the backups have been taken Once you have your backups, you need to copy them to your new TFS2010 server and restore them. This is a good way to proceed as if we have any problems, or just plain run out of time, then you just turn the TFS 2008 server back on and all you have lost is one upgrade day, and not 10 developer days. As per the rules, you should record the number of files and the total number of areas and iterations before the upgrade so you have something to compare to: TFS2008 File count: Type Count 1 1845 2 15770 Areas & Iterations: 139 You can use this to verify that the upgrade was successful. it should however be noted that the numbers in TFS 2010 will be bigger. This is due to some of the sorting out that TFS does during the upgrade process. Restore Team Foundation Server 2008 Databases Restoring the databases is much more time consuming than just attaching them as you need to do them one at a time. But you may be taking a backup of an operational database and need to restore all your databases to a particular point in time instead of to the latest. I am doing latest unless I encounter any problems. Figure: Restore each of the databases to either a latest or specific point in time.     Figure: Restore all of the required databases Now that all of your databases are restored you now need to upgrade them to Team Foundation Server 2010. Upgrade Team Foundation Server 2008 Databases This is probably the easiest part of the process. You need to call a fire and forget command that will go off to the database specified, find the TFS 2008 databases and upgrade them to 2010. During this process all of the 6 main TFS 2008 databases are merged into the TfsVersionControl database, upgraded and then the database is renamed to TFS_[CollectionName]. The rename is only the database and not the physical files, so it is worth going back and renaming the physical file as well. This keeps everything neat and tidy. If you plan to keep the old TFS 2008 server around, for example if you are doing a test migration first, then you will need to change the TFS GUID. This GUID is unique to each TFS instance and is preserved when you upgrade. This GUID is used by the clients and they can get a little confused if there are two servers with the same one. To kick of the upgrade you need to open a command prompt and change the path to “C:\Program Files\Microsoft Team Foundation Server 2010\Tools” and run the “import” command in  “tfsconfig”. TfsConfig import /sqlinstance:<Previous TFS Data Tier>                  /collectionName:<Collection Name>                  /confirmed Imports a TFS 2005 or 2008 data tier as a new project collection. Important: This command should only be executed after adequate backups have been performed. After you import, you will need to configure portal and reporting settings via the administration console. EXAMPLES -------- TfsConfig import /sqlinstance:tfs2008sql /collectionName:imported /confirmed TfsConfig import /sqlinstance:tfs2008sql\Instance /collectionName:imported /confirmed OPTIONS: -------- sqlinstance         The sql instance of the TFS 2005 or 2008 data tier. The TFS databases at that location will be modified directly and will no longer be usable as previous version databases.  Ensure you have back-ups. collectionName      The name of the new Team Project Collection. confirmed           Confirm that you have backed-up databases before importing. This command will automatically look for the TfsIntegration database and verify that all the other required databases exist. In this case it took around 5 minutes to complete the upgrade as the total database size was under 700MB. This was unlike the upgrade of SSW’s production database with over 17GB of data which took a few hours. At the end of the process you should get no errors and no warnings. The Upgrade operation on the ApplicationTier feature has completed. There were 0 errors and 0 warnings. As this is a new server and not a pure upgrade there should not be a problem with the GUID. If you think at any point you will be doing this more than once, for example doing a test migration, or merging many TFS 2008 instances into a single one, then you should go back and rename the physical TfsVersionControl.mdf file to the same as the new collection. This will avoid confusion later down the line. To do this, detach the new collection from the server and rename the physical files. Then reattach and change the physical file locations to match the new name. You can follow http://www.mssqltips.com/tip.asp?tip=1122 for a more detailed explanation of how to do this. Figure: Stop the collection so TFS does not take a wobbly when we detach the database. When you try to start the new collection again you will get a conflict with project names and will require to remove the Test Upgrade collection. This is fine and it just needs detached. Figure: Detaching the test upgrade from the new Team Foundation Server 2010 so we can start the new Collection again. You will now be able to start the new upgraded collection and you are ready for testing. Do you remember the stats we took off the TFS 2008 server? TFS2008 File count: Type Count 1 1845 2 15770 Areas & Iterations: 139 Well, now we need to compare them to the TFS 2010 stats, remembering that there will probably be more files under source control. TFS2010 File count: Type Count 1 19288 Areas & Iterations: 139 Lovely, the number of iterations are the same, and the number of files is bigger. Just what we were looking for. Testing the upgraded Team Foundation Server 2010 Project Collection Can we connect to the new collection and project? Figure: We can connect to the new collection and project.   Figure: make sure you can connect to The upgraded projects and that you can see all of the files. Figure: Team Web Access is there and working. Note that for Team Web Access you now use the same port and URL as for TFS 2010. So in this case as I am running on the local box you need to use http://localhost:8080/tfs which will redirect you to http://localhost:8080/tfs/web for the web access. If you need to connect with a Visual Studio 2008 client you will need to use the full path of the new collection, http://[servername]/tfs/[collectionname] and this will work with all of your collections. With Visual Studio 2005 you will only be able to connect to the Default collection and in both VS2008 and VS2005 you will need to install the forward compatibility updates. Visual Studio Team System 2005 Service Pack 1 Forward Compatibility Update for Team Foundation Server 2010 Visual Studio Team System 2008 Service Pack 1 Forward Compatibility Update for Team Foundation Server 2010 To make sure that you have everything up to date, make sure that you run SSW Diagnostics and get all green ticks. Upgrade Done! At this point you can send out a notice to everyone that the upgrade is complete and and give them the connection details. You need to remember that at this stage we have 2008 project upgraded to run under TFS 2010 but it is still running under that same process template that it was running before. You can only “enable” 2010 features in a process template you can’t upgrade. So what to do? Well, you need to create a new project and migrate things you want to keep across. Souse code is easy, you can move or Branch, but Work Items are more difficult as you can’t move them between projects. This instance is complicated more as the old project uses the Conchango/EMC Scrum for Team System template and I will need to write a script/application to get the work items across with their attachments in tact. That is my next task! Technorati Tags: TFS 2010,TFS 2008,VS ALM

    Read the article

  • Guide to reduce TFS database growth using the Test Attachment Cleaner

    - by terje
    Recently there has been several reports on TFS databases growing too fast and growing too big.  Notable this has been observed when one has started to use more features of the Testing system.  Also, the TFS 2010 handles test results differently from TFS 2008, and this leads to more data stored in the TFS databases. As a consequence of this there has been released some tools to remove unneeded data in the database, and also some fixes to correct for bugs which has been found and corrected during this process.  Further some preventive practices and maintenance rules should be adopted. A lot of people have blogged about this, among these are: Anu’s very important blog post here describes both the problem and solutions to handle it.  She describes both the Test Attachment Cleaner tool, and also some QFE/CU releases to fix some underlying bugs which prevented the tool from being fully effective. Brian Harry’s blog post here describes the problem too This forum thread describes the problem with some solution hints. Ravi Shanker’s blog post here describes best practices on solving this (TBP) Grant Holidays blogpost here describes strategies to use the Test Attachment Cleaner both to detect space problems and how to rectify them.   The problem can be divided into the following areas: Publishing of test results from builds Publishing of manual test results and their attachments in particular Publishing of deployment binaries for use during a test run Bugs in SQL server preventing total cleanup of data (All the published data above is published into the TFS database as attachments.) The test results will include all data being collected during the run.  Some of this data can grow rather large, like IntelliTrace logs and video recordings.   Also the pushing of binaries which happen for automated test runs, including tests run during a build using code coverage which will include all the files in the deployment folder, contributes a lot to the size of the attached data.   In order to handle this systematically, I have set up a 3-stage process: Find out if you have a database space issue Set up your TFS server to minimize potential database issues If you have the “problem”, clean up the database and otherwise keep it clean   Analyze the data Are your database( s) growing ?  Are unused test results growing out of proportion ? To find out about this you need to query your TFS database for some of the information, and use the Test Attachment Cleaner (TAC) to obtain some  more detailed information. If you don’t have too many databases you can use the SQL Server reports from within the Management Studio to analyze the database and table sizes. Or, you can use a set of queries . I find queries often faster to use because I can tweak them the way I want them.  But be aware that these queries are non-documented and non-supported and may change when the product team wants to change them. If you have multiple Project Collections, find out which might have problems: (Disclaimer: The queries below work on TFS 2010. They will not work on Dev-11, since the table structure have been changed.  I will try to update them for Dev-11 when it is released.) Open a SQL Management Studio session onto the SQL Server where you have your TFS Databases. Use the query below to find the Project Collection databases and their sizes, in descending size order.  use master select DB_NAME(database_id) AS DBName, (size/128) SizeInMB FROM sys.master_files where type=0 and substring(db_name(database_id),1,4)='Tfs_' and DB_NAME(database_id)<>'Tfs_Configuration' order by size desc Doing this on one of our SQL servers gives the following results: It is pretty easy to see on which collection to start the work   Find out which tables are possibly too large Keep a special watch out for the Tfs_Attachment table. Use the script at the bottom of Grant’s blog to find the table sizes in descending size order. In our case we got this result: From Grant’s blog we learnt that the tbl_Content is in the Version Control category, so the major only big issue we have here is the tbl_AttachmentContent.   Find out which team projects have possibly too large attachments In order to use the TAC to find and eventually delete attachment data we need to find out which team projects have these attachments. The team project is a required parameter to the TAC. Use the following query to find this, replace the collection database name with whatever applies in your case:   use Tfs_DefaultCollection select p.projectname, sum(a.compressedlength)/1024/1024 as sizeInMB from dbo.tbl_Attachment as a inner join tbl_testrun as tr on a.testrunid=tr.testrunid inner join tbl_project as p on p.projectid=tr.projectid group by p.projectname order by sum(a.compressedlength) desc In our case we got this result (had to remove some names), out of more than 100 team projects accumulated over quite some years: As can be seen here it is pretty obvious the “Byggtjeneste – Projects” are the main team project to take care of, with the ones on lines 2-4 as the next ones.  Check which attachment types takes up the most space It can be nice to know which attachment types takes up the space, so run the following query: use Tfs_DefaultCollection select a.attachmenttype, sum(a.compressedlength)/1024/1024 as sizeInMB from dbo.tbl_Attachment as a inner join tbl_testrun as tr on a.testrunid=tr.testrunid inner join tbl_project as p on p.projectid=tr.projectid group by a.attachmenttype order by sum(a.compressedlength) desc We then got this result: From this it is pretty obvious that the problem here is the binary files, as also mentioned in Anu’s blog. Check which file types, by their extension, takes up the most space Run the following query use Tfs_DefaultCollection select SUBSTRING(filename,len(filename)-CHARINDEX('.',REVERSE(filename))+2,999)as Extension, sum(compressedlength)/1024 as SizeInKB from tbl_Attachment group by SUBSTRING(filename,len(filename)-CHARINDEX('.',REVERSE(filename))+2,999) order by sum(compressedlength) desc This gives a result like this:   Now you should have collected enough information to tell you what to do – if you got to do something, and some of the information you need in order to set up your TAC settings file, both for a cleanup and for scheduled maintenance later.    Get your TFS server and environment properly set up Even if you have got the problem or if have yet not got the problem, you should ensure the TFS server is set up so that the risk of getting into this problem is minimized.  To ensure this you should install the following set of updates and components. The assumption is that your TFS Server is at SP1 level. Install the QFE for KB2608743 – which also contains detailed instructions on its use, download from here. The QFE changes the default settings to not upload deployed binaries, which are used in automated test runs. Binaries will still be uploaded if: Code coverage is enabled in the test settings. You change the UploadDeploymentItem to true in the testsettings file. Be aware that this might be reset back to false by another user which haven't installed this QFE. The hotfix should be installed to The build servers (the build agents) The machine hosting the Test Controller Local development computers (Visual Studio) Local test computers (MTM) It is not required to install it to the TFS Server, test agents or the build controller – it has no effect on these programs. If you use the SQL Server 2008 R2 you should also install the CU 10 (or later).  This CU fixes a potential problem of hanging “ghost” files.  This seems to happen only in certain trigger situations, but to ensure it doesn’t bite you, it is better to make sure this CU is installed. There is no such CU for SQL Server 2008 pre-R2 Work around:  If you suspect hanging ghost files, they can be – with some mental effort, deduced from the ghost counters using the following SQL query: use master SELECT DB_NAME(database_id) as 'database',OBJECT_NAME(object_id) as 'objectname', index_type_desc,ghost_record_count,version_ghost_record_count,record_count,avg_record_size_in_bytes FROM sys.dm_db_index_physical_stats (DB_ID(N'<DatabaseName>'), OBJECT_ID(N'<TableName>'), NULL, NULL , 'DETAILED') The problem is a stalled ghost cleanup process.  Restarting the SQL server after having stopped all components that depends on it, like the TFS Server and SPS services – that is all applications that connect to the SQL server. Then restart the SQL server, and finally start up all dependent processes again.  (I would guess a complete server reboot would do the trick too.) After this the ghost cleanup process will run properly again. The fix will come in the next CU cycle for SQL Server R2 SP1.  The R2 pre-SP1 and R2 SP1 have separate maintenance cycles, and are maintained individually. Each have its own set of CU’s. When it comes I will add the link here to that CU. The "hanging ghost file” issue came up after one have run the TAC, and deleted enourmes amount of data.  The SQL Server can get into this hanging state (without the QFE) in certain cases due to this. And of course, install and set up the Test Attachment Cleaner command line power tool.  This should be done following some guidelines from Ravi Shanker: “When you run TAC, ensure that you are deleting small chunks of data at regular intervals (say run TAC every night at 3AM to delete data that is between age 730 to 731 days) – this will ensure that small amounts of data are being deleted and SQL ghosted record cleanup can catch up with the number of deletes performed. “ This rule minimizes the risk of the ghosted hang problem to occur, and further makes it easier for the SQL server ghosting process to work smoothly. “Run DBCC SHRINKDB post the ghosted records are cleaned up to physically reclaim the space on the file system” This is the last step in a 3 step process of removing SQL server data. First they are logically deleted. Then they are cleaned out by the ghosting process, and finally removed using the shrinkdb command. Cleaning out the attachments The TAC is run from the command line using a set of parameters and controlled by a settingsfile.  The parameters point out a server uri including the team project collection and also point at a specific team project. So in order to run this for multiple team projects regularly one has to set up a script to run the TAC multiple times, once for each team project.  When you install the TAC there is a very useful readme file in the same directory. When the deployment binaries are published to the TFS server, ALL items are published up from the deployment folder. That often means much more files than you would assume are necessary. This is a brute force technique. It works, but you need to take care when cleaning up. Grant has shown how their settings file looks in his blog post, removing all attachments older than 180 days , as long as there are no active workitems connected to them. This setting can be useful to clean out all items, both in a clean-up once operation, and in a general There are two scenarios we need to consider: Cleaning up an existing overgrown database Maintaining a server to avoid an overgrown database using scheduled TAC   1. Cleaning up a database which has grown too big due to these attachments. This job is a “Once” job.  We do this once and then move on to make sure it won’t happen again, by taking the actions in 2) below.  In this scenario you should only consider the large files. Your goal should be to simply reduce the size, and don’t bother about  the smaller stuff. That can be left a scheduled TAC cleanup ( 2 below). Here you can use a very general settings file, and just remove the large attachments, or you can choose to remove any old items.  Grant’s settings file is an example of the last one.  A settings file to remove only large attachments could look like this: <!-- Scenario : Remove large files --> <DeletionCriteria> <TestRun /> <Attachment> <SizeInMB GreaterThan="10" /> </Attachment> </DeletionCriteria> Or like this: If you want only to remove dll’s and pdb’s about that size, add an Extensions-section.  Without that section, all extensions will be deleted. <!-- Scenario : Remove large files of type dll's and pdb's --> <DeletionCriteria> <TestRun /> <Attachment> <SizeInMB GreaterThan="10" /> <Extensions> <Include value="dll" /> <Include value="pdb" /> </Extensions> </Attachment> </DeletionCriteria> Before you start up your scheduled maintenance, you should clear out all older items. 2. Scheduled maintenance using the TAC If you run a schedule every night, and remove old items, and also remove them in small batches.  It is important to run this often, like every night, in order to keep the number of deleted items low. That way the SQL ghost process works better. One approach could be to delete all items older than some number of days, let’s say 180 days. This could be combined with restricting it to keep attachments with active or resolved bugs.  Doing this every night ensures that only small amounts of data is deleted. <!-- Scenario : Remove old items except if they have active or resolved bugs --> <DeletionCriteria> <TestRun> <AgeInDays OlderThan="180" /> </TestRun> <Attachment /> <LinkedBugs> <Exclude state="Active" /> <Exclude state="Resolved"/> </LinkedBugs> </DeletionCriteria> In my experience there are projects which are left with active or resolved workitems, akthough no further work is done.  It can be wise to have a cleanup process with no restrictions on linked bugs at all. Note that you then have to remove the whole LinkedBugs section. A approach which could work better here is to do a two step approach, use the schedule above to with no LinkedBugs as a sweeper cleaning task taking away all data older than you could care about.  Then have another scheduled TAC task to take out more specifically attachments that you are not likely to use. This task could be much more specific, and based on your analysis clean out what you know is troublesome data. <!-- Scenario : Remove specific files early --> <DeletionCriteria> <TestRun > <AgeInDays OlderThan="30" /> </TestRun> <Attachment> <SizeInMB GreaterThan="10" /> <Extensions> <Include value="iTrace"/> <Include value="dll"/> <Include value="pdb"/> <Include value="wmv"/> </Extensions> </Attachment> <LinkedBugs> <Exclude state="Active" /> <Exclude state="Resolved" /> </LinkedBugs> </DeletionCriteria> The readme document for the TAC says that it recognizes “internal” extensions, but it does recognize any extension. To run the tool do the following command: tcmpt attachmentcleanup /collection:your_tfs_collection_url /teamproject:your_team_project /settingsfile:path_to_settingsfile /outputfile:%temp%/teamproject.tcmpt.log /mode:delete   Shrinking the database You could run a shrink database command after the TAC has run in cases where there are a lot of data being deleted.  In this case you SHOULD do it, to free up all that space.  But, after the shrink operation you should do a rebuild indexes, since the shrink operation will leave the database in a very fragmented state, which will reduce performance. Note that you need to rebuild indexes, reorganizing is not enough. For smaller amounts of data you should NOT shrink the database, since the data will be reused by the SQL server when it need to add more records.  In fact, it is regarded as a bad practice to shrink the database regularly.  So on a daily maintenance schedule you should NOT shrink the database. To shrink the database you do a DBCC SHRINKDATABASE command, and then follow up with a DBCC INDEXDEFRAG afterwards.  I find the easiest way to do this is to create a SQL Maintenance plan including the Shrink Database Task and the Rebuild Index Task and just execute it when you need to do this.

    Read the article

  • Bringing Alerts and Operators together with Notifications

    - by fatherjack
    I have covered SQL Server Alerts (Alerts are good, arent they?) on this blog before and I more recently did a post regarding Notifications (Are your Jobs talking to you) and how they should be configured. Now we need to check that these things are linked up so that when an Alert condition is met that you get the appropriate Notifications sent to Operators. Straight into the code we need and then a review of what it does ... DECLARE @ChosenOperator SYSNAME DECLARE @FailSafeOp TABLE ...(read more)

    Read the article

  • Migrating test cases & defects from Quality Center to TFS 2008/2010

    - by stackoverflowuser
    Tool that can be used to migrate (or even better..synchronize) test cases and bugs between: TFS 2008 and Quality Center 9.2 (or later) TFS 2010 and Quality Center 9.2 (or later) I am aware of the following tools: Test Case Migrator (Excel/MHT) Tool TFS Bug Item Synchronizer 2.2 for Quality Center Also shai raiten mentions on his blog about QC 2 Team System 2010 migration tool that he has been working on and its done. But could not find any link for downloading the tool. http://blogs.microsoft.co.il/blogs/shair/archive/2009/12/31/quality-center-migration-to-team-system-2010-done.aspx Before jumping on coding with TFS SDK and QC components to come up with my own tool I need some inputs from the stackoverflow community.

    Read the article

  • TFS and working with multiple solutions

    - by RandomEngy
    How do people generally deal with TFS when you've got to work with multiple solution files? If you've got one instance it's easy because you can always go to that window for the source control explorer, pending changes, check on builds or work items. But when you have 4-5 solutions, it becomes tricky to deal with. You might expand some folders or check some pending items on one VS instance but you have to remember which one you did it on. Having a separate instance dedicated just to TFS tasks is tempting, but there's only one window state for the whole program. If that instance is closed last, all instances will come up with all the TFS windows open. How do other people deal with this? Can you use separate profiles somehow and cordon off a "TFS" instance of Visual Studio?

    Read the article

  • Problem with Hyperic monitoring on CloudFoundry - frequent alerts

    - by Pavel P
    Hi, I'm running single instance CloudFoundry configuration with one web application. I turned on Hyperic monitoring with notification for case of web app unavailability. Now I randomly receive alert emails (Subject "An alert has been triggered - Deployment myapp - context unavailable") that the application is not running, but it obviously is running fine. In access log of Apache I see two requests every 15 seconds: 127.0.0.1 - - [17/Mar/2010:15:37:33 +0100] "GET /server-status?auto HTTP/1.1" 200 438 "-" "Jakarta Commons-HttpClient/3.1" 127.0.0.1 - - [17/Mar/2010:15:37:33 +0100] "GET /myapp HTTP/1.1" 200 - "-" "Jakarta Commons-HttpClient/3.1" At the time when I get the alert emails, everything in log still seems to be fine - two requests. Do you have idea what could be wrong? Did anybody have this kind of problem and solve it? Thanks, P

    Read the article

  • What is the best folder stucture in TFS for reporting service projects

    - by Dave
    Hi, I'm looking for some help on deciding a useful folder stucture strategy for reporting service projects in TFS. Does any one have some suggestions on which way I should stucture TFS? Should it be a project per report or should it be one Reporting project with multiple folders under the main that contain all the report projects? i.e. Senario 1 (separate projects for each report project) $ReportProject1 $ReportProject2 $ReportProject3 Senario 2 (Main report project in TFS and subfolders with report projects) $ReportingServices ------Src ---------Project1 -----------ReportProject1 files ---------Project2 -----------ReportProject2 files ---------Project3 -----------ReportProject3 files

    Read the article

  • TFS serverside project alerts

    - by bitbonk
    It is our policy that the owner of a bug MUST be notified about bugs he owns, regardlessly of if he subscibed or forgot to subscribe. Is there a way project alerts can be configured on the server side or something without having to rely on the team member to subscribe manually? (TFS2010, TFS2008).

    Read the article

  • TFS Client APIs for creating workitem templates?

    - by amazedsaint
    Of course, it is pretty possible to create work items, get a list of work items etc in TFS. In addition to this, we need to have the functionality of allowing our users to create their own work item templates, for various file types. Whether the TFS Client APIs are capable of uploading work item templates to TFS server?

    Read the article

  • TeamCity with TFS - workspace problems

    - by Tom
    Hi, We have been using CC.NET as our CI server for a month or so now, which has worked ok with TFS. In the config we were able to specify the TFS server, username, password, project and workspace which is all good. Now we are moving over to TeamCity mainly because it just seams more solid and is much nicer to use. The problem is getting it work with TFS. For the purpose of this, both the workspace and machine name are "BuildMachine", username is "BuildUser" TFS project is "$/Project/Dev/Website" I seam to have set it up correctly, I think, as when testing the connection it is successful. When I run a build I get a TFS error: "RunBuildException when running build stage UpdateSourcesFromServer." It goes on to say: "No matched workspaces were found. Will recreate workspace and perofming clean checkout." It then tries to create a new workspace something like this: TeamCity-S-sqa9qe2aulx22gz4rzkogl5kr/BuildUser It tries to set up some mappings and then fails because: "The working folder C:\ is already in use by the workspace BuildMachine;BuildUser on computer BuildMachine". This seams ok as this is the workspace that CC.net was using, and c:\project\dev\website is the path to the project. The problem is, why didn't TeamCity pick this up and use this workspace? Why does it try to create its own new one? Any idea how I can fix this? Thanks

    Read the article

  • How do I merge a local branch into TFS

    - by Johnny
    hi, I did a stupid thing and branched my project on my local disk instead of doing it on the TFS. So now I have two projects on my disk: the old one which has TFS bindings and the new, which doesn't. I want to merge those changes back into the TFS project. How would I go about doing that? I can't do Compare because my local branch has no TFS bindings. There should be some way to compare the differences between the two projects locally and then meld the differences into the old project and check-in, but I can't find an easy way of doing that. Any other solutions?

    Read the article

  • TFS Project Organization

    - by pm_2
    I'm relatively new to TFS and am wondering other people deal with organising TFS where there are many projects? For example, does anyone know if it's possible to put TFS projects inside folders or do people use prefixes / suffixes?

    Read the article

  • Adding Sharepoint 2007/2010 ontop of TFS 2010

    - by Doug
    So i finally have everything up and running and everyone is mostly happy - TFS 2010 rocks! However i now want to add office sharepoint, i didn't want to have it installed first because i was worried that it would stuff with things and i wanted to look back on the TFS installation, once i knew how portals were created. So what is the best way to now add sharepoint to the installation without stuffing things up? i have a 2 server environment, with TFS on one and the database on another.

    Read the article

  • Authenticating on TFS 2010

    - by keynan21
    Hi, I'm having trouble authenticating as a specific user on MS Team Foundation Server. In older versions it would look like: teamFoundationCredential = new System.Net.NetworkCredential("<USERNAME>", "<PASSWORD>", "<DOMAIN>"); TeamFoundationServer tfs = new TeamFoundationServer("http://mars:8080/", teamFoundationCredential); Can some one tell me the equivilent for the 2010 version. So far I have: ICredentialsProvider cred = null; tfs = TfsTeamProjectCollectionFactory.GetTeamProjectCollection(new Uri("http://asebeast.cpsc.ucalgar.ca:8080/tfs/DefualtCollection")); tfs.EnsureAuthenticated(); Thanks

    Read the article

  • Setting Up TFS Server outside of a domain

    - by Ben
    Hi Im trying to set up TFS 2010 on a machine that is connected to a network, but not on the domain. I am trying to connect this to a SQL Server that is also connected to the network and also not on the domain. When I run through the TFS configuration Wizard and try to connect to the SQL Server, it fails with a message "A connection can not be made...." which looks like it cant see the Server. However when i connect through SQL Management Studio it works when i use SQL Authentication (not Windows Auth). I beleive its failing because TFS needs to connect using Windows Authetication (please correct me if im wrong). I can not add the Windows Authentication for my TFS machine onto the SQL machine becuase they are on different domains (again, pleas correct me if I'm wrong). Does anyone have any suggestions? Thanks.

    Read the article

  • TFS 2008 ignores team project check-in settings

    - by JoshEarl
    I'm trying to set up our TFS 2008 instance to require that projects build before they can be checked in. I have created a check-in policy using the out of the box "Builds" policy, but I'm still able to check broken projects in after mangling the code and attempting to build the project. We're a small shop, and TFS was originally set up with our team's Active Directory group listed as TFS admins. Is this the problem? Do check-in policies apply to TFS admins? Any other suggestions?

    Read the article

  • does TFS easily allow you to share testresults with people who don't have TFS?

    - by jcollum
    I'd like to publish a set of test results to a place where team members who don't have TFS can see the results. Does TFS do anything like this easily? I see that that test results do get published, but without a TFS license I don't see any way for people to view them. I think I can do this easily by pulling the XML from the test results and then pushing that out to a central location, but I was wondering if there's anything like an "official" way to do this. TFS is hard to work with when you have some people who have access to it and others who don't... I really wish there was some sort of read-only access to the server (let people get files but not check them out for instance).

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >