Search Results

Search found 2049 results on 82 pages for 'tfs alerts'.

Page 5/82 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • SQL Monitor’s data repository: Alerts

    - by Chris Lambrou
    In my previous post, I introduced the SQL Monitor data repository, and described how the monitored objects are stored in a hierarchy in the data schema, in a series of tables with a _Keys suffix. In this post I had planned to describe how the actual data for the monitored objects is stored in corresponding tables with _StableSamples and _UnstableSamples suffixes. However, I’m going to postpone that until my next post, as I’ve had a request from a SQL Monitor user to explain how alerts are stored. In the SQL Monitor data repository, alerts are stored in tables belonging to the alert schema, which contains the following five tables: alert.Alert alert.Alert_Cleared alert.Alert_Comment alert.Alert_Severity alert.Alert_Type In this post, I’m only going to cover the alert.Alert and alert.Alert_Type tables. I may cover the other three tables in a later post. The most important table in this schema is alert.Alert, as each row in this table corresponds to a single alert. So let’s have a look at it. SELECT TOP 100 AlertId, AlertType, TargetObject, [Read], SubType FROM alert.Alert ORDER BY AlertId DESC;  AlertIdAlertTypeTargetObjectReadSubType 165550397:Cluster,1,4:Name,s29:srp-mr03.testnet.red-gate.com,9:SqlServer,1,4:Name,s0:,10 265549387:Cluster,1,4:Name,s29:srp-mr03.testnet.red-gate.com,7:Machine,1,4:Name,s0:,10 365548187:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s15:FavouriteThings,00 465547157:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s15:FavouriteThings,00 565546147:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s15:FavouriteThings,00 665545187:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s14:SqlMonitorData,00 765544157:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s14:SqlMonitorData,00 865543147:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s14:SqlMonitorData,00 965542187:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s4:msdb,00 1065541147:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s4:msdb,00 11…     So what are we seeing here, then? Well, AlertId is an auto-incrementing identity column, so ORDER BY AlertId DESC ensures that we see the most recent alerts first. AlertType indicates the type of each alert, such as Job failed (6), Backup overdue (14) or Long-running query (12). The TargetObject column indicates which monitored object the alert is associated with. The Read column acts as a flag to indicate whether or not the alert has been read. And finally the SubType column is used in the case of a Custom metric (40) alert, to indicate which custom metric the alert pertains to. Okay, now lets look at some of those columns in more detail. The AlertType column is an easy one to start with, and it brings use nicely to the next table, data.Alert_Type. Let’s have a look at what’s in this table: SELECT AlertType, Event, Monitoring, Name, Description FROM alert.Alert_Type ORDER BY AlertType;  AlertTypeEventMonitoringNameDescription 1100Processor utilizationProcessor utilization (CPU) on a host machine stays above a threshold percentage for longer than a specified duration 2210SQL Server error log entryAn error is written to the SQL Server error log with a severity level above a specified value. 3310Cluster failoverThe active cluster node fails, causing the SQL Server instance to switch nodes. 4410DeadlockSQL deadlock occurs. 5500Processor under-utilizationProcessor utilization (CPU) on a host machine remains below a threshold percentage for longer than a specified duration 6610Job failedA job does not complete successfully (the job returns an error code). 7700Machine unreachableHost machine (Windows server) cannot be contacted on the network. 8800SQL Server instance unreachableThe SQL Server instance is not running or cannot be contacted on the network. 9900Disk spaceDisk space used on a logical disk drive is above a defined threshold for longer than a specified duration. 101000Physical memoryPhysical memory (RAM) used on the host machine stays above a threshold percentage for longer than a specified duration. 111100Blocked processSQL process is blocked for longer than a specified duration. 121200Long-running queryA SQL query runs for longer than a specified duration. 131400Backup overdueNo full backup exists, or the last full backup is older than a specified time. 141500Log backup overdueNo log backup exists, or the last log backup is older than a specified time. 151600Database unavailableDatabase changes from Online to any other state. 161700Page verificationTorn Page Detection or Page Checksum is not enabled for a database. 171800Integrity check overdueNo entry for an integrity check (DBCC DBINFO returns no date for dbi_dbccLastKnownGood field), or the last check is older than a specified time. 181900Fragmented indexesFragmentation level of one or more indexes is above a threshold percentage. 192400Job duration unusualThe duration of a SQL job duration deviates from its baseline duration by more than a threshold percentage. 202501Clock skewSystem clock time on the Base Monitor computer differs from the system clock time on a monitored SQL Server host machine by a specified number of seconds. 212700SQL Server Agent Service statusThe SQL Server Agent Service status matches the status specified. 222800SQL Server Reporting Service statusThe SQL Server Reporting Service status matches the status specified. 232900SQL Server Full Text Search Service statusThe SQL Server Full Text Search Service status matches the status specified. 243000SQL Server Analysis Service statusThe SQL Server Analysis Service status matches the status specified. 253100SQL Server Integration Service statusThe SQL Server Integration Service status matches the status specified. 263300SQL Server Browser Service statusThe SQL Server Browser Service status matches the status specified. 273400SQL Server VSS Writer Service statusThe SQL Server VSS Writer status matches the status specified. 283501Deadlock trace flag disabledThe monitored SQL Server’s trace flag cannot be enabled. 293600Monitoring stopped (host machine credentials)SQL Monitor cannot contact the host machine because authentication failed. 303700Monitoring stopped (SQL Server credentials)SQL Monitor cannot contact the SQL Server instance because authentication failed. 313800Monitoring error (host machine data collection)SQL Monitor cannot collect data from the host machine. 323900Monitoring error (SQL Server data collection)SQL Monitor cannot collect data from the SQL Server instance. 334000Custom metricThe custom metric value has passed an alert threshold. 344100Custom metric collection errorSQL Monitor cannot collect custom metric data from the target object. Basically, alert.Alert_Type is just a big reference table containing information about the 34 different alert types supported by SQL Monitor (note that the largest id is 41, not 34 – some alert types have been retired since SQL Monitor was first developed). The Name and Description columns are self evident, and I’m going to skip over the Event and Monitoring columns as they’re not very interesting. The AlertId column is the primary key, and is referenced by AlertId in the alert.Alert table. As such, we can rewrite our earlier query to join these two tables, in order to provide a more readable view of the alerts: SELECT TOP 100 AlertId, Name, TargetObject, [Read], SubType FROM alert.Alert a JOIN alert.Alert_Type at ON a.AlertType = at.AlertType ORDER BY AlertId DESC;  AlertIdNameTargetObjectReadSubType 165550Monitoring error (SQL Server data collection)7:Cluster,1,4:Name,s29:srp-mr03.testnet.red-gate.com,9:SqlServer,1,4:Name,s0:,00 265549Monitoring error (host machine data collection)7:Cluster,1,4:Name,s29:srp-mr03.testnet.red-gate.com,7:Machine,1,4:Name,s0:,00 365548Integrity check overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s15:FavouriteThings,00 465547Log backup overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s15:FavouriteThings,00 565546Backup overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s15:FavouriteThings,00 665545Integrity check overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s14:SqlMonitorData,00 765544Log backup overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s14:SqlMonitorData,00 865543Backup overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s14:SqlMonitorData,00 965542Integrity check overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s4:msdb,00 1065541Backup overdue7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s4:msdb,00 Okay, the next column to discuss in the alert.Alert table is TargetObject. Oh boy, this one’s a bit tricky! The TargetObject of an alert is a serialized string representation of the position in the monitored object hierarchy of the object to which the alert pertains. The serialization format is somewhat convenient for parsing in the C# source code of SQL Monitor, and has some helpful characteristics, but it’s probably very awkward to manipulate in T-SQL. I could document the serialization format here, but it would be very dry reading, so perhaps it’s best to consider an example from the table above. Have a look at the alert with an AlertID of 65543. It’s a Backup overdue alert for the SqlMonitorData database running on the default instance of granger, my laptop. Each different alert type is associated with a specific type of monitored object in the object hierarchy (I described the hierarchy in my previous post). The Backup overdue alert is associated with databases, whose position in the object hierarchy is root → Cluster → SqlServer → Database. The TargetObject value identifies the target object by specifying the key properties at each level in the hierarchy, thus: Cluster: Name = "granger" SqlServer: Name = "" (an empty string, denoting the default instance) Database: Name = "SqlMonitorData" Well, look at the actual TargetObject value for this alert: "7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s14:SqlMonitorData,". It is indeed composed of three parts, one for each level in the hierarchy: Cluster: "7:Cluster,1,4:Name,s7:granger," SqlServer: "9:SqlServer,1,4:Name,s0:," Database: "8:Database,1,4:Name,s14:SqlMonitorData," Each part is handled in exactly the same way, so let’s concentrate on the first part, "7:Cluster,1,4:Name,s7:granger,". It comprises the following: "7:Cluster," – This identifies the level in the hierarchy. "1," – This indicates how many different key properties there are to uniquely identify a cluster (we saw in my last post that each cluster is identified by a single property, its Name). "4:Name,s14:SqlMonitorData," – This represents the Name property, and its corresponding value, SqlMonitorData. It’s split up like this: "4:Name," – Indicates the name of the key property. "s" – Indicates the type of the key property, in this case, it’s a string. "14:SqlMonitorData," – Indicates the value of the property. At this point, you might be wondering about the format of some of these strings. Why is the string "Cluster" stored as "7:Cluster,"? Well an encoding scheme is used, which consists of the following: "7" – This is the length of the string "Cluster" ":" – This is a delimiter between the length of the string and the actual string’s contents. "Cluster" – This is the string itself. 7 characters. "," – This is a final terminating character that indicates the end of the encoded string. You can see that "4:Name,", "8:Database," and "14:SqlMonitorData," also conform to the same encoding scheme. In the example above, the "s" character is used to indicate that the value of the Name property is a string. If you explore the TargetObject property of alerts in your own SQL Monitor data repository, you might find other characters used for other non-string key property values. The different value types you might possibly encounter are as follows: "I" – Denotes a bigint value. For example, "I65432,". "g" – Denotes a GUID value. For example, "g32116732-63ae-4ab5-bd34-7dfdfb084c18,". "d" – Denotes a datetime value. For example, "d634815384796832438,". The value is stored as a bigint, rather than a native SQL datetime value. I’ll describe how datetime values are handled in the SQL Monitor data repostory in a future post. I suggest you have a look at the alerts in your own SQL Monitor data repository for further examples, so you can see how the TargetObject values are composed for each of the different types of alert. Let me give one further example, though, that represents a Custom metric alert, as this will help in describing the final column of interest in the alert.Alert table, SubType. Let me show you the alert I’m interested in: SELECT AlertId, a.AlertType, Name, TargetObject, [Read], SubType FROM alert.Alert a JOIN alert.Alert_Type at ON a.AlertType = at.AlertType WHERE AlertId = 65769;  AlertIdAlertTypeNameTargetObjectReadSubType 16576940Custom metric7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s6:master,12:CustomMetric,1,8:MetricId,I2,02 An AlertType value of 40 corresponds to the Custom metric alert type. The Name taken from the alert.Alert_Type table is simply Custom metric, but this doesn’t tell us anything about the specific custom metric that this alert pertains to. That’s where the SubType value comes in. For custom metric alerts, this provides us with the Id of the specific custom alert definition that can be found in the settings.CustomAlertDefinitions table. I don’t really want to delve into custom alert definitions yet (maybe in a later post), but an extra join in the previous query shows us that this alert pertains to the CPU pressure (avg runnable task count) custom metric alert. SELECT AlertId, a.AlertType, at.Name, cad.Name AS CustomAlertName, TargetObject, [Read], SubType FROM alert.Alert a JOIN alert.Alert_Type at ON a.AlertType = at.AlertType JOIN settings.CustomAlertDefinitions cad ON a.SubType = cad.Id WHERE AlertId = 65769;  AlertIdAlertTypeNameCustomAlertNameTargetObjectReadSubType 16576940Custom metricCPU pressure (avg runnable task count)7:Cluster,1,4:Name,s7:granger,9:SqlServer,1,4:Name,s0:,8:Database,1,4:Name,s6:master,12:CustomMetric,1,8:MetricId,I2,02 The TargetObject value in this case breaks down like this: "7:Cluster,1,4:Name,s7:granger," – Cluster named "granger". "9:SqlServer,1,4:Name,s0:," – SqlServer named "" (the default instance). "8:Database,1,4:Name,s6:master," – Database named "master". "12:CustomMetric,1,8:MetricId,I2," – Custom metric with an Id of 2. Note that the hierarchy for a custom metric is slightly different compared to the earlier Backup overdue alert. It’s root → Cluster → SqlServer → Database → CustomMetric. Also notice that, unlike Cluster, SqlServer and Database, the key property for CustomMetric is called MetricId (not Name), and the value is a bigint (not a string). Finally, delving into the custom metric tables is beyond the scope of this post, but for the sake of avoiding any future confusion, I’d like to point out that whilst the SubType references a custom alert definition, the MetricID value embedded in the TargetObject value references a custom metric definition. Although in this case both the custom metric definition and custom alert definition share the same Id value of 2, this is not generally the case. Okay, that’s enough for now, not least because as I’m typing this, it’s almost 2am, I have to go to work tomorrow, and my alarm is set for 6am – eek! In my next post, I’ll either cover the remaining three tables in the alert schema, or I’ll delve into the way SQL Monitor stores its monitoring data, as I’d originally planned to cover in this post.

    Read the article

  • Accounts in Work Items after migration to TFS 2010 and to new domain

    - by Clara Oscura
    Lately I’ve been doing some tests on migrating our TFS 2008 installation to TFS 2010, coupled with a machine and domain change. One particular topic that was tricky is user accounts. We installed first a new machine with TFS 2010 and then migrated the projects in the old server. The work items were migrated with the projects. Great, but if I try to edit one of the old work items I cannot save it anymore because some fields contain old user names (ex. OLDDOMAIN\user) which are not known in the new domain (it should be NEWDOMAIN\user). The errors look like this: When I correct the ‘Assigned To’ field value, I get another error regarding another field: Before TFS 2010, we had TFSUsers power tool. It allow you to map an old user name to a new user name. This is not available anymore because WI fields with user accounts are now synchronized with AD display names changes (explained here). The correct way to go about this in TFS 2010 is to use TFSConfig Identities before adding the new domain accounts into the TFS groups (documented here). So, too late for us. I’ve found a (tedious) workaround to change those old account in work items in order to allow people to keep working with them. 1. Install TFS 2010 power tools 2. Export WIT from your project (VS | Tools | Process Editor | Work Item Types). Save the definition, for example: Original_MyProject_Task.xml 3. Copy the xml (NoReadOnly_MyProject_Task.xml) and edit it. From the field definition of ‘Activated By’, ‘Closed By’ and ‘Resolved By’, remove the following:        <WHENNOTCHANGED field="System.State">           <READONLY />         </WHENNOTCHANGED> 4. Import WIT in VS. Choose the new file (NoReadOnly_MyProject_Task.xml) and import it in MyProject 5. Open all tasks in Excel (flat list). Display the following columns: Asssigned To Activated By Closed By Resolved By Change the user accounts to the new ones (I usually sort each column alphabetically to make it easier). 6. Publish. If you get a conflict on a field, tough luck. You will have to manually choose “Local version” for each work item. I told you it was a tedious process. 7. Import original WIT (Original_MyProject_Task.xml) in MyProject. We only changed the WI definition so that we could change some fields. The original definition should be put back. And what about these other fields? Created By Authorized As These fields are not editable by definition (VS | Tools | Process Editor | Work Item Fields Explorer), even if they are not marked as read-only in the WIT. You can leave the old values. It doesn’t seem to matter to TFS. The other four fields are editable by definition, so only the WIT readonly rule prevents us from changing them. Technorati Tags: TFS,Team Foundation Server 2010,Work Item,Domain change

    Read the article

  • OSSEC : send alerts true gmail? how?

    - by Rubytastic
    Try to setup OSSEC to use google gmail to send my alerts like so: <email_notification>yes</email_notification> <email_to>[email protected]</email_to> <smtp_server>smtp.gmail.com</smtp_server> <email_from>ossec@host</email_from> Then I set email alerts value to 3 and restart ossec. This does not trigger email alert. how to correctly send alerts with gmail? better way to test if mails are sending out?

    Read the article

  • iPhone/iPad: Get Alerts When Paid Apps Go Free

    - by Gopinath
    iPhone users has thousands of cool applications to choose. These apps are either paid or absolutely free. Many of the paid applications goes free for either a limited time or forever depending on the mood of their developers. Will it not be cool to get alerts whenever a paid app goes free? Yeah, it will be great. Free App Alert is a handy website that checks iTunes store regularly and sends alerts to it’s subscribers about the apps that have gone from paid to free. You can receive the alerts by following them on twitter, facebook or subscribing to the traditional RSS feeds(yeah RSS is a traditional technology). The home page of this website shows the apps that have gone free today and you can browse through the previous day free apps listing with the help of links available at the bottom. Free App Alert is definitely a cool site to check out for iPhone/iPod/iPad users and certainly easier than scrolling through iTunes store and checking prices. Tip: Immediately download the app that have gone from paid to free as many apps are free for limited time. You can see many free apps going back to paid version if you go through the previous pages the website. Join us on Facebook to read all our stories right inside your Facebook news feed.

    Read the article

  • TFS vs. Star Team comparison

    - by ryanabr
    I have a sales call today in which the person that I am talking to is interested in what TFS would give them over Star Team, The first thing I believe that I can say is that TFS is cheaper! Especially if you are doing MSFT development already and your team members have MSDN subscriptions as the CALs for TFS are covered in the MSDN subscription. The other thing that I noticed about Star Team was all of the references to ‘readiness’ and ‘integration’. While that is great, that means that other tools will be needed to provide the features that are already bundled with TFS like, SharePoint integration, as well as Analysis Services and Reporting Services to provide visibility on the web with reports on project health, and team velocity. Below is a quick table that I was able to throw together to answer some high level questions: Feature TFS Star Team Work Items X X Work Item custom Queries X X Customizable Work Items X Web Portal View X X Reporting X Integration Version Control X X Build Management X Integration Integrated Test Suite X Integration Cost Free for first 5 / MSDN Sub covers others $7500 / seat

    Read the article

  • 11.10 desktop alerts (volume change and terminal bell) stopped working but all other audio still works

    - by FlabbergastedPickle
    All, My sound works just fine in 11.10 64-bit install on HP dm1-4050 Sandy Bridge notebook (e.g. audio works in Banshee, flash, games, browser, Thunderbird email notification, etc.), but the core desktop notifications (e.g. pressing a tab in a terminal where there is more than one option should trigger a terminal bell, or changing volume using volume keys should be accompanied with the supporting "quack" that the volume app makes) do not work. I've intentionally disabled login sound as explained here on ask ubuntu but even enabling it back makes no difference. These notifications did work before just fine and I am not sure when did the actually stop working but it must've been fairly recently. Only things I did were trying to install some ppa edge xorg drivers for my intel card (a separate issue) but also reverted them all with ppa-purge once I discovered they did not improve anything. Other thing I did was check volume settings with alsamixer and did alsactl store for the soundcard after I did some experimenting with volume settings for PCM (on my laptop PCM at 100% crackles so I had to lower it and make pulseaudio ignore its setting as per ask ubuntu's page). That said, neither of these should have any bearing on the said notifications since the volume is up and they clearly work everywhere else but the core desktop events. The system ready drum sound when Ubuntu boots and user reaches the login screen also does not work. The guest login behaves exactly same as mine. Audio works (including the login sound since I've not disabled it for the guest account), but no quacks when changing the volume or terminal bell sounds... I've tried copying ubuntu sounds to /usr/share/sounds/ as suggested on ask ubuntu and that did not work. I also tried using dconf-editor to check sound theme settings and tried both freedesktop (which is what it was set to) and ubuntu, as suggested on ask ubuntu. This did not work either. I tried purging the ~/.pulse folder and the /tmp/*pulse* entries, rebooting and restarting pulseaudio with -D flag. While audio came back on and behaved just fine in all aspects (e.g. one can adjust volume levels, play music, games, in-browser sound stuff, and other app alerts) except for the system ready drum sound (at the login screen), and any system event (terminal bell and volume change quack sound). It is interesting that the quack sound works inside system settings-sound when adjusting levels there, but it does not when volume is changed via top bar's volume settings... I do recall that at one point yesterday when I was restarting pulseaudio the quacks that accompany volume change did start working but I have no idea what caused that. This was also when I first realized those alerts were not working. After rebooting it was again gone. I did compile my own 3.0.14-rt31 kernel a little while ago as instructed on one of the wiki's for the 11.10 rt kernel. Everything works as before except for the said sound alerts. I am not sure if this began happening since I started using the rt kernel though and yesterday's momentary ability to hear those quacks while changing the volume make me believe that the kernel is not one responsible for this problem. One more thing I can think of is that I used alsoft-conf tool to configure buffering on the OpenAL (due to TA Spring's choppy audio) and changed in there default audio device to ALSA. I also tried reverting it to Pulseaudio as the only allowed output but the bottom part of the Backend tab always reverts to ALSA even when I select Pulseaudio. The pulseaudio does remain as the only active choice on top. This, however, once again does not make any sense in terms of preventing desktop audio alerts when everything else including OpenAL games plays sound just fine... So, there you have it, as verbose as I could make it :-). I tried all I could find on this issue and had no luck so far... Any ideas?

    Read the article

  • Can I configure a visual difference view with the notifications provided by TFS?

    - by John Kaster
    I have TFS sending me alerts whenever someone on my team checks in code. (I had to create notification rules for every project, but that's just a sidebar complaint in this question.) These alerts provided some information on who checked in the files when, and what files have changed, with urls to view details in a browser. The thing that baffles me is that I can't just click on the source file and see a visual diff of the changes. There's no link that will auto-launch a diff in Visual Studio (using a custom protocol) from there either. Is there a way to configure TFS to provide a visual diff of the changes to the file that was checked in via this notification UI?

    Read the article

  • Version Assemblies with TFS 2010 Continuous Integration

    - by Steve Michelotti
    When I first heard that TFS 2010 had moved to Workflow Foundation for Team Build, I was *extremely* skeptical. I’ve loved MSBuild and didn’t quite understand the reasons for this change. In fact, given that I’ve been exclusively using Cruise Control for Continuous Integration (CI) for the last 5+ years of my career, I was skeptical of TFS for CI in general. However, after going through the learning process for TFS 2010 recently, I’m starting to become a believer. I’m also starting to see some of the benefits with Workflow Foundation for the overall processing because it gives you constructs not available in MSBuild such as parallel tasks, better control flow constructs, and a slightly better customization story. The first customization I had to make to the build process was to version the assemblies of my solution. This is not new. In fact, I’d recommend reading Mike Fourie’s well known post on Versioning Code in TFS before you get started. This post describes several foundational aspects of versioning assemblies regardless of your version of TFS. The main points are: 1) don’t use source control operations for your version file, 2) use a schema like <Major>.<Minor>.<IncrementalNumber>.0, and 3) do not keep AssemblyVersion and AssemblyFileVersion in sync. To do this in TFS 2010, the best post I’ve found has been Jim Lamb’s post of building a custom TFS 2010 workflow activity. Overall, this post is excellent but the primary issue I have with it is that the assembly version numbers produced are based in a date and look like this: “2010.5.15.1”. This is definitely not what I want. I want to be able to communicate to the developers and stakeholders that we are producing the “1.1 release” or “1.2 release” – which would have an assembly version number of “1.1.317.0” for example. In this post, I’ll walk through the process of customizing the assembly version number based on this method – customizing the concepts in Lamb’s post to suit my needs. I’ll also be combining this with the concepts of Fourie’s post – particularly with regards to the standards around how to version the assemblies. The first thing I’ll do is add a file called SolutionAssemblyVersionInfo.cs to the root of my solution that looks like this: 1: using System; 2: using System.Reflection; 3: [assembly: AssemblyVersion("1.1.0.0")] 4: [assembly: AssemblyFileVersion("1.1.0.0")] I’ll then add that file as a Visual Studio link file to each project in my solution by right-clicking the project, “Add – Existing Item…” then when I click the SolutionAssemblyVersionInfo.cs file, making sure I “Add As Link”: Now the Solution Explorer will show our file. We can see that it’s a “link” file because of the black arrow in the icon within all our projects. Of course you’ll need to remove the AssemblyVersion and AssemblyFileVersion attributes from the AssemblyInfo.cs files to avoid the duplicate attributes since they now leave in the SolutionAssemblyVersionInfo.cs file. This is an extremely common technique so that all the projects in our solution can be versioned as a unit. At this point, we’re ready to write our custom activity. The primary consideration is that I want the developer and/or tech lead to be able to easily be in control of the Major.Minor and then I want the CI process to add the third number with a unique incremental number. We’ll leave the fourth position always “0” for now – it’s held in reserve in case the day ever comes where we need to do an emergency patch to Production based on a branched version.   Writing the Custom Workflow Activity Similar to Lamb’s post, I’m going to write two custom workflow activities. The “outer” activity (a xaml activity) will be pretty straight forward. It will check if the solution version file exists in the solution root and, if so, delegate the replacement of version to the AssemblyVersionInfo activity which is a CodeActivity highlighted in red below:   Notice that the arguments of this activity are the “solutionVersionFile” and “tfsBuildNumber” which will be passed in. The tfsBuildNumber passed in will look something like this: “CI_MyApplication.4” and we’ll need to grab the “4” (i.e., the incremental revision number) and put that in the third position. Then we’ll need to honor whatever was specified for Major.Minor in the SolutionAssemblyVersionInfo.cs file. For example, if the SolutionAssemblyVersionInfo.cs file had “1.1.0.0” for the AssemblyVersion (as shown in the first code block near the beginning of this post), then we want to resulting file to have “1.1.4.0”. Before we do anything, let’s put together a unit test for all this so we can know if we get it right: 1: [TestMethod] 2: public void Assembly_version_should_be_parsed_correctly_from_build_name() 3: { 4: // arrange 5: const string versionFile = "SolutionAssemblyVersionInfo.cs"; 6: WriteTestVersionFile(versionFile); 7: var activity = new VersionAssemblies(); 8: var arguments = new Dictionary<string, object> { 9: { "tfsBuildNumber", "CI_MyApplication.4"}, 10: { "solutionVersionFile", versionFile} 11: }; 12:   13: // act 14: var result = WorkflowInvoker.Invoke(activity, arguments); 15:   16: // assert 17: Assert.AreEqual("1.2.4.0", (string)result["newAssemblyFileVersion"]); 18: var lines = File.ReadAllLines(versionFile); 19: Assert.IsTrue(lines.Contains("[assembly: AssemblyVersion(\"1.2.0.0\")]")); 20: Assert.IsTrue(lines.Contains("[assembly: AssemblyFileVersion(\"1.2.4.0\")]")); 21: } 22: 23: private void WriteTestVersionFile(string versionFile) 24: { 25: var fileContents = "using System.Reflection;\n" + 26: "[assembly: AssemblyVersion(\"1.2.0.0\")]\n" + 27: "[assembly: AssemblyFileVersion(\"1.2.0.0\")]"; 28: File.WriteAllText(versionFile, fileContents); 29: }   At this point, the code for our AssemblyVersion activity is pretty straight forward: 1: [BuildActivity(HostEnvironmentOption.Agent)] 2: public class AssemblyVersionInfo : CodeActivity 3: { 4: [RequiredArgument] 5: public InArgument<string> FileName { get; set; } 6:   7: [RequiredArgument] 8: public InArgument<string> TfsBuildNumber { get; set; } 9:   10: public OutArgument<string> NewAssemblyFileVersion { get; set; } 11:   12: protected override void Execute(CodeActivityContext context) 13: { 14: var solutionVersionFile = this.FileName.Get(context); 15: 16: // Ensure that the file is writeable 17: var fileAttributes = File.GetAttributes(solutionVersionFile); 18: File.SetAttributes(solutionVersionFile, fileAttributes & ~FileAttributes.ReadOnly); 19:   20: // Prepare assembly versions 21: var majorMinor = GetAssemblyMajorMinorVersionBasedOnExisting(solutionVersionFile); 22: var newBuildNumber = GetNewBuildNumber(this.TfsBuildNumber.Get(context)); 23: var newAssemblyVersion = string.Format("{0}.{1}.0.0", majorMinor.Item1, majorMinor.Item2); 24: var newAssemblyFileVersion = string.Format("{0}.{1}.{2}.0", majorMinor.Item1, majorMinor.Item2, newBuildNumber); 25: this.NewAssemblyFileVersion.Set(context, newAssemblyFileVersion); 26:   27: // Perform the actual replacement 28: var contents = this.GetFileContents(newAssemblyVersion, newAssemblyFileVersion); 29: File.WriteAllText(solutionVersionFile, contents); 30:   31: // Restore the file's original attributes 32: File.SetAttributes(solutionVersionFile, fileAttributes); 33: } 34:   35: #region Private Methods 36:   37: private string GetFileContents(string newAssemblyVersion, string newAssemblyFileVersion) 38: { 39: var cs = new StringBuilder(); 40: cs.AppendLine("using System.Reflection;"); 41: cs.AppendFormat("[assembly: AssemblyVersion(\"{0}\")]", newAssemblyVersion); 42: cs.AppendLine(); 43: cs.AppendFormat("[assembly: AssemblyFileVersion(\"{0}\")]", newAssemblyFileVersion); 44: return cs.ToString(); 45: } 46:   47: private Tuple<string, string> GetAssemblyMajorMinorVersionBasedOnExisting(string filePath) 48: { 49: var lines = File.ReadAllLines(filePath); 50: var versionLine = lines.Where(x => x.Contains("AssemblyVersion")).FirstOrDefault(); 51:   52: if (versionLine == null) 53: { 54: throw new InvalidOperationException("File does not contain [assembly: AssemblyVersion] attribute"); 55: } 56:   57: return ExtractMajorMinor(versionLine); 58: } 59:   60: private static Tuple<string, string> ExtractMajorMinor(string versionLine) 61: { 62: var firstQuote = versionLine.IndexOf('"') + 1; 63: var secondQuote = versionLine.IndexOf('"', firstQuote); 64: var version = versionLine.Substring(firstQuote, secondQuote - firstQuote); 65: var versionParts = version.Split('.'); 66: return new Tuple<string, string>(versionParts[0], versionParts[1]); 67: } 68:   69: private string GetNewBuildNumber(string buildName) 70: { 71: return buildName.Substring(buildName.LastIndexOf(".") + 1); 72: } 73:   74: #endregion 75: }   At this point the final step is to incorporate this activity into the overall build template. Make a copy of the DefaultTempate.xaml – we’ll call it DefaultTemplateWithVersioning.xaml. Before the build and labeling happens, drag the VersionAssemblies activity in. Then set the LabelName variable to “BuildDetail.BuildDefinition.Name + "-" + newAssemblyFileVersion since the newAssemblyFileVersion was produced by our activity.   Configuring CI Once you add your solution to source control, you can configure CI with the build definition window as shown here. The main difference is that we’ll change the Process tab to reflect a different build number format and choose our custom build process file:   When the build completes, we’ll see the name of our project with the unique revision number:   If we look at the detailed build log for the latest build, we’ll see the label being created with our custom task:     We can now look at the history labels in TFS and see the project name with the labels (the Assignment activity I added to the workflow):   Finally, if we look at the physical assemblies that are produced, we can right-click on any assembly in Windows Explorer and see the assembly version in its properties:   Full Traceability We now have full traceability for our code. There will never be a question of what code was deployed to Production. You can always see the assembly version in the properties of the physical assembly. That can be traced back to a label in TFS where the unique revision number matches. The label in TFS gives you the complete snapshot of the code in your source control repository at the time the code was built. This type of process for full traceability has been used for many years for CI – in fact, I’ve done similar things with CCNet and SVN for quite some time. This is simply the TFS implementation of that pattern. The new features that TFS 2010 give you to make these types of customizations in your build process are quite easy once you get over the initial curve.

    Read the article

  • Community TFS Build Manager available for Visual Studio 2012 RC

    - by Jakob Ehn
    I finally got around to push out a version of the Community TFS Build Manager that is compatible with Visual Studio 2012 RC. Unfortunately I had to do this as a separate extension, it references different versions of the TFS assemblies and also some properties and methods that the 2010 version uses are now obsolete in the TFS 2012 API. To download it, just open the Extension Manager, select Online and search for TFS Build:   You can also download it from this link: http://visualstudiogallery.msdn.microsoft.com/cfdb84b4-285e-4eeb-9fa9-dad9bfe2cd10 The functionality is identical to the 2010 version, the only difference is that you can’t start it from the Team Explorer Builds node (since the TE has been completely rewritten and the extension API’s are not yet published). So, to start it you must use the Tools menu: We will continue shipping updates to both versions in the future, as long as it functionality that is compatible with both TFS 2010 and TFS 2012. You might also note that the color scheme used for the build manager doesn’t look as good with the VS2012 theme….   Hope you will enjoy the tool in Visual Studio 2012 as well. I want to thank all the people who have downloaded and used the 2010 version! For feedback, feature requests, bug reports please post this to the CodePlex site: http://tfsbuildextensions.codeplex.com

    Read the article

  • Issues with duplicating TFS 2005 to a virtual server

    - by Hitchhiker
    We have a problem with our current TFS installation. For some reason, which I won't get into, the Sharepoint DBs (sts_content, sts_config) were upgraded to WSS 3 (MOSS). So now, none of our team-project sites work, we have no access to our documents and can't create new team projects. We can still work with the version control, though. We wanted to "play" with the server and try to fix it, without affecting the users. So we used p2v for VmWare, to duplicate the server to a virtual one. We now continued and changed all of the relevant configuration to point to the new server, as explained in the MSDN article. The step of rebuilding the warehouse (with setupwarehouse) failed. Also, we can't access the VersionControl web service (ourserver:8080/VersionControl/v1.0/repository.asmx). We are seeing errors in the EventLog: TF53002: Unable to obtain registration data for application Build. TF53005: Unable to retrieve the Team Foundation Server installed UI culture. TF53002: Unable to obtain registration data for application VersionControl. TF30040: The database is not correctly configured. Contact your Team Foundation Server administrator. The solutions suggested in this blog post did not assist. So now we're kind of stuck. Any assistance will be appreciated.

    Read the article

  • Problems referencing build output from TFS Build and Visual Studio

    - by pmdarrow
    Here's what I'm trying to do: I have two solutions - one for my main application and its associated projects and another for my database (VS .dbproj) and its associated projects. What I'd like to do is include the output from the database project (a .dbschema and some SQL scripts) in my WiX installer (which exists in the main application solution.) This involves having TFS build the DB solution immediately before the main application solution. I've got that part working properly, but I'm having trouble referencing the output of the DB solution from my installer. I'm using relative paths to reference the DB project output in my WiX installer (e.g. <?define DBProjectOutputDir = "..\..\MyDatabaseSolution\MyDatabaseProject\sql\"?>) which works fine locally, but fails when building via TFS build. This is because TFS Build apparently changes the output dir of each project to one common location. Instead of the path to my database project being ..\..\MyDatabaseSolution\MyDatabaseProject\sql\ like it is when building locally, it gets set to something like ..\..\..\Binaries\Release\. How can I get around this and have a consistent output location to reference from my installer project? I'm using TFS 2005 and VS 2008.

    Read the article

  • TFS How does merging work?

    - by Johannes Rudolph
    I have a release branch (RB, starting at C5) and a changeset on trunk (C10) that I now want to merge onto RB. The file has changes at C3 (common to both), one in CS 7 on RB, and one in C9 (trunk) and one in C10). So the history for my changed file looks like this: RB: C5 -> C7 Trunk: C3 -> C9 -> C10 When I merge C10 from trunk to RB, I'd expect to see a merge window showing me C10 | C3 | C7 since C3 is the common ancestor revision and C10 and C7 are the tips of my two branches respectively. However, my merge tool shows me C10 | C9 | C7. My merge tool is configured to show %1(OriginalFile)|%3(BaseFile)|%2(Modified File), so this tells me TFS chose C9 as the base revision. This is totally unexpected and completely contrary to the way I'm used to merges working in Mercurial or Git. Did I get something wrong or is TFS trying to drive me nuts with merging? Is this the default TFS Merge behavior? If so, can you provide insight into why they chose to implement it this way? I'm using TFS 2008 with VS2010 as a Client.

    Read the article

  • TFS Rant *WARNING* negative opinions are being expressed.

    - by ryanabr
    It has happened several times now where I end up installing TFS "over the shoulder" of the system admin guy whose job it will be to "own" the server when I am gone. TFS is challenging enough to stand up when doing it myself on a completely open platform, but at these locations, networks are locked down, machines are locked down, and the unexpected always seems to pop up. I personally have the tolerance for these things as a software developer, but as we are installing I have to listen to all of 'colorful' remarks being made about: "why is it like this" or "this is a piece of crap". Generally the issues center around SharePoint integration. TFS on it's own is straightforward, but the last flavor in everyone's mouth is the SharePoint piece. As a product I like SharePoint, but installation is a nightmare. In this particular case, we are going to use WSS since the customer would like this separate from their corp SharePoint 2010 installations since there dev team is really small (1 developer) and it is being used as a VSS replacement, more than a full blown ALM tool. The server where it is being installed as a Cisco Security Agent on it that seems to block 'suspicious' activity, and as far as I can tell is preventing WSS from installing properly. The most confounding thing we can find no meaningful log entries to help diagnose the issue. it didn't help matters that when we tried to contact Microsoft for support, because we mentioned TFS in the list of things that we were trying to install, that after waiting 2 hours that we got a TFS support person NOT the SharePoint person that we really needed, so after another 2 hours the SharePoint support that we did get managed to corrupt the registry sufficiently with his 'tools' that we ended up starting over from scratch the next day anyway after going home at midnight. My point to this is: The System Administrator who is going to own this, now thinks it is a piece of crap because SharePoint wouldn't install properly. Perception is everything.  Everyone today is conditioned that software installs and works in a very simple matter. When looking at the different options to install TFS with the different "modes" there is inconsistency in the information being presented which leads to choices that causes headaches and this bad perception before the product is even installed. I am highlighting this because I love TFS as a product, but I HATE installing it, and would like it to install as simply and elegantly as the product operates once it is installed.

    Read the article

  • Updated article "Agent Alerts Management Pack"

    - by TiborKaraszi
    I've just updated the "Agent Alerts Management Pack" found here . I realize that some don't feel confident in reading and executing T-SQL code and they instead prefer to point & click in SSMS instead. So I added two tables with my suggestion on the severity levels and error numbers to define alerts for. Share this post: email it! | bookmark it! | digg it! | reddit! | kick it! | live it!...(read more)

    Read the article

  • What are the ways to get included in Google Alerts mails

    - by stacker
    There is a news website / blog - I'll call it the Site from now on. The site mention a keyword in one of its articles. I add a Google Alerts for the keyword, but I do not get any alert for the word from The Site. Furthermore, searching the keyword in the news section don't getting any results from The Site. The Site has a sitemap, that indexed by Google every x minutes. And in the main search, searching for a news title bring the item on the top. What are the best ways to get included in Google Alerts mails?

    Read the article

  • Standalone GUI client for TFS 2010 Source Control

    - by Seth Reno
    I'm looking for a TFS 2010 GUI client that I can use outside of an IDE. I'm only looking to use the source control features in this case. I'm not talking about work items or build management. Ideally it would be a complete client that can be used on a machine where Visual Studio is not installed. Options I know about and why I'm not satisfied with them: TFS Power Tools - Windows Shell Extension Must have a working copy to use... see chicken or the egg Missing features: view history, branch / merge, revert SvnBridge TFS 2010 not yet supported Are there others that I don't know about?

    Read the article

  • Safely delete a TFS branch project

    - by Codesleuth
    I'm currently reorganising our TFS source control for a very large set of solutions, and I've done this successfully so far. I have a problem at the moment where I need to delete a legacy "Release Branch" TFS project that was branched for the old structure, and is no-longer required since I now host a release branch within the new structure. This is an example of how the source control now looks after moving everything: $/Source Project /Trunk /[Projects] /Release /[Projects] $/Release Branch Project /[Projects] /[Other legacy stuff] So far I've found information that says: tf delete /lock:checkout /recursive TestMain to delete a branch. TfsDeleteProject to delete a project tf delete seems to be only relevant when I need to delete a branch that is within the same project as the trunk, and TfsDeleteProject doesn't seem like it will delete the branch association from the source project (I hope I'm wrong, see below). Can someone tell me if the above will work, and in what order I should perform them in, to successfully delete the TFS $/Release Branch Project while also deleting the branch association (from right-click $/Source Project - Properties - Branches)?

    Read the article

  • How to automaticaly backup TFS 2010

    - by Julien Ferraro
    Hello, I'm evaluating Team Foundation Server 2010. I would like to know if there is some command line to backup my TFS data. I currently have a folder sent to the cloud. This backup contains all the data I need to back up (like MySql databases, word documents, ...) What I want is a way to automatically backup my TFS collections (and any other important TFS data) in one (or more) file in this directory. A command line would be perfect. Many thanks Julien

    Read the article

  • VSS to TFS Migration - Persist User on check-in actions

    - by Adam Jenkin
    I am using the VSSConveter.exe tool to import from VSS6 (using 2005 ide) to TFS2008. I have run analyze (no errors) and migrate WITH a user mapping file (containg the vss/domain user mappings) I would like to persist in tfs the check-in user of the file, currently the check-in user for all versions of file shows as admin (the account im running the import with), the origional check-in user is appended to the check-in comment. For example:- TestFile.aspx in VSS Check in ver: 1 - User:Adam - Comment:TEST1 Check in ver: 2 - User:James - Comment:TEST2 Check in ver: 3 - User:Joel - Comment:TEST2 After import into TFS Check in ver: 1 - User:mydomain\Admin - Comment:TEST1 (Commited by Adam) Check in ver: 2 - User:mydomain\Admin - Comment:TEST2 (Commited by James) Check in ver: 3 - User:mydomain\Admin - Comment:TEST2 (Commited by Joel) In TFS I want the user to show as the correct domain user as configured in my user mapping file. Is this possible, or is this just how the VSSConverter program works?

    Read the article

  • TFS Database Edition doesn't seem to Script Logins

    - by Jaco Pretorius
    I'm trying to put all our databases in TFS. For this purpose we're using TFS Database edition - I've seen some of the other Dev teams use it and it seems pretty good. Problem is that it doesn't seem to script the logins - the users are linked to logins which now break due to the logins not being scripted. As far as I can tell I can't get around this - the Schemas need the users which in turn need the logins. How do you handle logins in TFS Database Projects? This is SQL Server 2008.

    Read the article

  • TFS Build Configuration Vs Test Manager

    - by Ben
    Hi, I have been tasked with setting up TFS 2010 for my company. After setting up TFS and configuring the basics (New collection, project, adding solution to souce control), i thought i would try out some unit testing with it. I configured the Build Controller and Agent for my solution and added in some basic unit tests. These ran ok and did exactly what i would expect (i broke the build then ran the Build Definition, and it showed me where the errors were). My question is, what advantages (apart from the "Black box call stack logger") does Test Manager have over the TFS builds? Is it worth the extra effort of setting that up and configuring it? Only knowing the basics of what Test Manager is, that may be a very naive question to ask, and i appoligise if it is. Thanks

    Read the article

  • Integrating TFS and MySQL

    - by user294043
    We are developing an application with Visual Studio 2008 and TFS. Our database is a MySQL DB. As we develop we keep the new queries that need to be applied to the database of our new release as the New Version Update Queries. Right now I'm keeping them in a simple text file (which is a painful task!). I know that TFS integrates with MSSQL and makes this job very easy. I've already asked our consultant from Microsoft if there is any way to integrate TFS and MySQL, and his answer was "NO". So I was wondering if anyone knows any smart way of handling this issue?

    Read the article

  • TFS Automated Builds to Code Packages

    - by Adam Jenkin
    I would like to hear the best practices or know how people perform the following task in TFS 2008. I am intending on using TFS for building and storing web applications projects. Sometimes these projects can contain 100's of files (*.cs, *.acsx etc) During the lifetime of the website, a small bug will get raised resulting in say a stylesheet change, and a change to default.aspx.cs for example. On checking in these changes to TFS, and automated build would be triggered (great!), however for deploying the changes to the target production machine, I only need to deploy for example: style.css default.asx MyWebApplications.dll So my question is, can MSBuild be customized to generate a "code pack" of only the files which require deploying to the production server based on the changeset which cause the re-build?

    Read the article

  • TFS Continuous Developement major project update

    - by mamu
    We are using TFS Continuous Development model Main Trunk - Various Development branches - Various Release branches All merging back to main trunk Now we need some major changes to our folder structure and solutions How do you handle folder restructure in above model of TFS usage? do i need to draw line and create new structure from latest Main trunk and lock all branches and do updates then creates branches with restructured new trunk. Or am i underestimating TFS, would be able to handle major folder structure updates and propagate over to branches. As long as i know if we move around folders in branch or trunk it don't like it.

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >