Search Results

Search found 5335 results on 214 pages for 'agile processes'.

Page 44/214 | < Previous Page | 40 41 42 43 44 45 46 47 48 49 50 51  | Next Page >

  • How to synchronize two (or n) replication processes for MS SQL databases?

    - by Yauheni Sivukha
    There are two master databases and two read-only copies updated by standard transactional replication. It is needed to map some entity from both read-only databases, lets say that A databases contains orders and B databases contains lines. The problem is that replication to one database can lag behind replication of second database, and at the moment of mapping R-databases will have inconsistent data. For example. We stored 2 orders with lines at 19:00 and 19:03. Mapping process started at 19:05, but to the moment of mapping A database replication processed all changes up to 19:03, but B database replication processed only changes up to 19:00. After mapping we will have order entity with order as of 19:03 and lines as of 19:00. The troubles are guaranteed:) In my particular case both databases have temporal model, so it is possible to fetch data for every time slice, but the problem is to identify time of latest replication. Question: How to synchronize replication processes for several databases to avoid situation described above?

    Read the article

  • Scaling a ruby script by launching multiple processes instead of using threads.

    - by Zombies
    I want to increase the throughput of a script which does net I/O (a scraper). Instead of making it multithreaded in ruby (I use the default 1.9.1 interpreter), I want to launch multiple processes. So, is there a system for doing this to where I can track when one finishes to re-launch it again so that I have X number running at any time. ALso some will run with different command args. I was thinking of writing a bash script but it sounds like a potentially bad idea if there already exists a method for doing something like this on linux.

    Read the article

  • Method for SharePoint list/item locking across processes/machines?

    - by Steve
    In general, is there a decent way in SharePoint to control race conditions due to two processes or even two machines in the farm operating on the same list or list item at the same time? That is, is there any mechanism either built in or that can be fabricated via the Object Model for doing cross-process or cross-machine locking of individual list items? I want to write a timer job that performs a bunch of manipulations on a list. This list is written to by the SharePoint UI and then read by the UI. I want to be able to make sure that the UI doesn't either write to or read from the list when it is in an inconsistent state due to the timer job being in the middle of a manipulation. Is there any way to do this? Also, I want to allow for multiple instances of the timer job to run simultaneously. This, again, will require a lock to be sure that the two jobs don't attempt to operate on the same list/item at the same time. TIA for any help!

    Read the article

  • How to run node.js app on port 80? Are processes blocking my port?

    - by Lucas
    I believe the port 80 on my remote instance is blocked, and I am trying to run a node.js app using port 80. I have experimented with ports 3000 and 3002, and both ports are working fine, but I get an error when running on port 80. I suspect port 80 is blocked from my output of netstat -an below, but how can I find the process id's of the addresses that are blocking port 80 below? [lucas@ecoinstance]~/node/nodetest1$ netstat -an Active Internet connections (servers and established) Proto Recv-Q Send-Q Local Address Foreign Address State tcp 0 0 127.0.0.1:27017 0.0.0.0:* LISTEN tcp 0 0 0.0.0.0:22 0.0.0.0:* LISTEN tcp 0 0 0.0.0.0:3002 0.0.0.0:* LISTEN tcp 0 0 127.0.0.1:27017 127.0.0.1:51108 ESTABLISHED tcp 0 0 127.0.0.1:51106 127.0.0.1:27017 ESTABLISHED tcp 0 0 127.0.0.1:27017 127.0.0.1:51106 ESTABLISHED tcp 0 0 127.0.0.1:51107 127.0.0.1:27017 ESTABLISHED tcp 0 0 10.240.241.116:3002 174.61.171.61:36583 TIME_WAIT tcp 0 0 127.0.0.1:27017 127.0.0.1:51109 ESTABLISHED tcp 0 0 10.240.241.116:42423 169.254.169.254:80 ESTABLISHED tcp 0 0 127.0.0.1:51108 127.0.0.1:27017 ESTABLISHED tcp 0 532 10.240.241.116:22 174.61.171.61:56824 ESTABLISHED tcp 0 0 127.0.0.1:27017 127.0.0.1:51107 ESTABLISHED tcp 0 0 10.240.241.116:42412 169.254.169.254:80 ESTABLISHED tcp 0 0 127.0.0.1:51109 127.0.0.1:27017 ESTABLISHED tcp 0 0 127.0.0.1:51105 127.0.0.1:27017 ESTABLISHED tcp 0 0 10.240.241.116:42422 169.254.169.254:80 TIME_WAIT tcp 0 0 127.0.0.1:27017 127.0.0.1:51105 ESTABLISHED tcp6 0 0 :::22 :::* LISTEN udp 0 0 0.0.0.0:49948 0.0.0.0:* udp 0 0 0.0.0.0:68 0.0.0.0:* udp 0 0 10.240.241.116:123 0.0.0.0:* udp 0 0 127.0.0.1:123 0.0.0.0:* udp 0 0 0.0.0.0:123 0.0.0.0:* udp6 0 0 :::12151 :::* udp6 0 0 :::123 :::* Active UNIX domain sockets (servers and established) Proto RefCnt Flags Type State I-Node Path unix 2 [ ACC ] STREAM LISTENING 405680 /tmp/ssh-KdkxJfFLpKTC/agent.22 813 unix 2 [ ACC ] STREAM LISTENING 408230 /tmp/ssh-ofUeNNEwAqtP/agent.22 243 unix 2 [ ACC ] STREAM LISTENING 416227 /tmp/mongodb-27017.sock unix 2 [ ACC ] SEQPACKET LISTENING 3692 /run/udev/control unix 7 [ ] DGRAM 5286 /dev/log unix 2 [ ACC ] STREAM LISTENING 5318 /var/run/acpid.socket unix 2 [ ACC ] STREAM LISTENING 16170 /tmp//tmux-1000/default unix 2 [ ACC ] STREAM LISTENING 414450 /var/run/dbus/system_bus_socke And here is the log when trying to run on port 80 with node.js: [lucas@ecoinstance]~/node/nodetest1$ npm start > [email protected] start /home/lucas/node/nodetest1 > node ./bin/www events.js:72 throw er; // Unhandled 'error' event ^ Error: listen EACCES at errnoException (net.js:904:11) at Server._listen2 (net.js:1023:19) at listen (net.js:1064:10) at Server.listen (net.js:1138:5) at Function.app.listen (/home/lucas/node/nodetest1/node_modules/express/lib/applicati on.js:532:24) at Object.<anonymous> (/home/lucas/node/nodetest1/bin/www:7:18) at Module._compile (module.js:456:26) at Object.Module._extensions..js (module.js:474:10) at Module.load (module.js:356:32) at Function.Module._load (module.js:312:12) npm ERR! [email protected] start: `node ./bin/www` npm ERR! Exit status 8 npm ERR! npm ERR! Failed at the [email protected] start script. npm ERR! This is most likely a problem with the nodetest1 package, npm ERR! not with npm itself. npm ERR! Tell the author that this fails on your system: npm ERR! node ./bin/www npm ERR! You can get their info via: npm ERR! npm owner ls nodetest1 npm ERR! There is likely additional logging output above. npm ERR! System Linux 3.13-0.bpo.1-amd64 npm ERR! command "/usr/local/bin/node" "/usr/local/bin/npm" "start" npm ERR! cwd /home/lucas/node/nodetest1 npm ERR! node -v v0.10.28 npm ERR! npm -v 1.4.9 npm ERR! code ELIFECYCLE npm ERR! npm ERR! Additional logging details can be found in: npm ERR! /home/lucas/node/nodetest1/npm-debug.log npm ERR! not ok code 0 And sudo netstat -lnp does not return any matching port 80's: [lucas@ecoinstance]~/node/nodetest1$ sudo netstat -lnp [48/648] Active Internet connections (only servers) Proto Recv-Q Send-Q Local Address Foreign Address State PID/Progr am name tcp 0 0 127.0.0.1:27017 0.0.0.0:* LISTEN 29160/mon god tcp 0 0 0.0.0.0:22 0.0.0.0:* LISTEN 1976/sshd tcp6 0 0 :::22 :::* LISTEN 1976/sshd udp 0 0 0.0.0.0:49948 0.0.0.0:* 1604/dhcl ient udp 0 0 0.0.0.0:68 0.0.0.0:* 1604/dhcl ient udp 0 0 10.240.241.116:123 0.0.0.0:* 2076/ntpd udp 0 0 127.0.0.1:123 0.0.0.0:* 2076/ntpd udp 0 0 0.0.0.0:123 0.0.0.0:* 2076/ntpd udp6 0 0 :::12151 :::* 1604/dhcl ient udp6 0 0 :::123 :::* 2076/ntpd Active UNIX domain sockets (only servers) Proto RefCnt Flags Type State I-Node PID/Program name Path unix 2 [ ACC ] STREAM LISTENING 405680 22814/ssh-agent /tmp/ssh-K dkxJfFLpKTC/agent.22813 unix 2 [ ACC ] STREAM LISTENING 408230 24049/ssh-agent /tmp/ssh-o fUeNNEwAqtP/agent.22243 unix 2 [ ACC ] STREAM LISTENING 416227 29160/mongod /tmp/mongo db-27017.sock unix 2 [ ACC ] SEQPACKET LISTENING 3692 284/udevd /run/udev/ control unix 2 [ ACC ] STREAM LISTENING 5318 1798/acpid /var/run/a cpid.socket unix 2 [ ACC ] STREAM LISTENING 16170 5177/tmux /tmp//tmux -1000/default unix 2 [ ACC ] STREAM LISTENING 414450 28213/dbus-daemon /var/run/d bus/system_bus_socket unix 2 [ ACC ] STREAM LISTENING 404225 22324/1 /tmp/ssh-9 TlDmu4bjl/agent.22324

    Read the article

  • APACHE2.2/WIN2003(32-bit)/PHP: How do I configure Apache to Run Background PHP Processes on Win 2003

    - by Captain Obvious
    I have a script, testforeground.php, that kicks off a background script, testbackground.php, then returns while the background script continues to run until it's finished. Both the foreground and background scripts write to the output file correctly when I run the foreground script from the command line using php-cgi: C:\>php-cgi testforeground.php The above command starts a php-cgi.exe process, then a php-win.exe process, then closes the php-cgi.exe almost immediately, while the php-win.exe continues until it's finished. The same script runs correctly but does not have permission to write to the output file when I run it from the command line using plain php: C:\>php testforeground.php AND when I run the same script from the browser, instead of php-cgi.exe, a single cmd.exe process opens and closes almost instantly, only the foreground script writes to the output file, and it doesn't appear that the 2nd process starts: http://XXX/testforeground.php Here is the server info: OS: Win 2003 32-bit HTTP: Apache 2.2.11 PHP: 5.2.13 Loaded Modules: core mod_win32 mpm_winnt http_core mod_so mod_actions mod_alias mod_asis mod_auth_basic mod_authn_default mod_authn_file mod_authz_default mod_authz_groupfile mod_authz_host mod_authz_user mod_autoindex mod_cgi mod_dir mod_env mod_include mod_isapi mod_log_config mod_mime mod_negotiation mod_setenvif mod_userdir mod_php5 Here's the foreground script: <?php ini_set("display_errors",1); error_reporting(E_ALL); echo "<pre>loading page</pre>"; function run_background_process() { file_put_contents("0testprocesses.txt","foreground start time = " . time() . "\n"); echo "<pre> foreground start time = " . time() . "</pre>"; $command = "start /B \"{$_SERVER['CMS_PHP_HOMEPATH']}\php-cgi.exe\" {$_SERVER['CMS_HOMEPATH']}/testbackground.php"; $rp = popen($command, 'r'); if(isset($rp)) { pclose($rp); } echo "<pre> foreground end time = " . time() . "</pre>"; file_put_contents("0testprocesses.txt","foreground end time = " . time() . "\n", FILE_APPEND); return true; } echo "<pre>calling run_background_process</pre>"; $output = run_background_process(); echo "<pre>output = $output</pre>"; echo "<pre>end of page</pre>"; ?> And the background script: <?php $start = "background start time = " . time() . "\n"; file_put_contents("0testprocesses.txt",$start, FILE_APPEND); sleep(10); $end = "background end time = " . time() . "\n"; file_put_contents("0testprocesses.txt", $end, FILE_APPEND); ?> I've confirmed that the above scripts work correctly using Apache 2.2.3 on Linux. I'm sure I just need to change some Apache and/or PHP config settings, but I'm not sure which ones. I've been muddling over this for too long already, so any help would be appreciated.

    Read the article

  • How do I configure Apache 2.2 to Run Background PHP Processes on Win 2003?

    - by Captain Obvious
    I have a script, testforeground.php, that kicks off a background script, testbackground.php, then returns while the background script continues to run until it's finished. Both the foreground and background scripts write to the output file correctly when I run the foreground script from the command line using php-cgi: C:\>php-cgi testforeground.php The above command starts a php-cgi.exe process, then a php-win.exe process, then closes the php-cgi.exe almost immediately, while the php-win.exe continues until it's finished. The same script runs correctly but does not have permission to write to the output file when I run it from the command line using plain php: C:\>php testforeground.php AND when I run the same script from the browser, instead of php-cgi.exe, a single cmd.exe process opens and closes almost instantly, only the foreground script writes to the output file, and it doesn't appear that the 2nd process starts: http://XXX/testforeground.php Here is the server info: OS: Win 2003 32-bit HTTP: Apache 2.2.11 PHP: 5.2.13 Loaded Modules: core mod_win32 mpm_winnt http_core mod_so mod_actions mod_alias mod_asis mod_auth_basic mod_authn_default mod_authn_file mod_authz_default mod_authz_groupfile mod_authz_host mod_authz_user mod_autoindex mod_cgi mod_dir mod_env mod_include mod_isapi mod_log_config mod_mime mod_negotiation mod_setenvif mod_userdir mod_php5 Here's the foreground script: <?php ini_set("display_errors",1); error_reporting(E_ALL); echo "<pre>loading page</pre>"; function run_background_process() { file_put_contents("0testprocesses.txt","foreground start time = " . time() . "\n"); echo "<pre> foreground start time = " . time() . "</pre>"; $command = "start /B \"{$_SERVER['CMS_PHP_HOMEPATH']}\php-cgi.exe\" {$_SERVER['CMS_HOMEPATH']}/testbackground.php"; $rp = popen($command, 'r'); if(isset($rp)) { pclose($rp); } echo "<pre> foreground end time = " . time() . "</pre>"; file_put_contents("0testprocesses.txt","foreground end time = " . time() . "\n", FILE_APPEND); return true; } echo "<pre>calling run_background_process</pre>"; $output = run_background_process(); echo "<pre>output = $output</pre>"; echo "<pre>end of page</pre>"; ?> And the background script: <?php $start = "background start time = " . time() . "\n"; file_put_contents("0testprocesses.txt",$start, FILE_APPEND); sleep(10); $end = "background end time = " . time() . "\n"; file_put_contents("0testprocesses.txt", $end, FILE_APPEND); ?> I've confirmed that the above scripts work correctly using Apache 2.2.3 on Linux. I'm sure I just need to change some Apache and/or PHP config settings, but I'm not sure which ones. I've been muddling over this for too long already, so any help would be appreciated.

    Read the article

  • How to kill user processes from the same user?

    - by Grey
    I opened a VNC server and my VNC session is suddenly dead. I have lot of xterms open. When I ssh to the machine. and type users I see a bunch of users – my user accounts, like: userA UserA UserA UserA UserA UserA UserA I know I can use pkill -u usersname Since I can only log in as userA, every time I run pkill-u UserA, it will just kill my current session. but other userAs are still there What can I do?

    Read the article

  • NGINX: How do I calculate an optimal no. of worker processes and worker connections?

    - by bodacious
    Our web app is running on a Linode 2048 server at the moment (~ 2048 GB of RAM) The MYSQL database is on another linode of it's own so this server is really only handling NGINX and and the Rails application. The application itself uses about 185976 of memory per instance (RSS). Our traffic is < 1000 per day and the pages are mostly cached so there are fewer hits to the rails app itself. My question is - how can I calculate optimal NGINX config settings for my app? Below is the current config: worker_processes 1; # pid of nginx master process pid /var/run/nginx.pid; events { worker_connections 1024; } http { access_log /var/log/nginx/access.log; error_log /var/log/nginx/error.log; passenger_root /home/user/.rvm/gems/ree-1.8.7-2011.01@URTV/gems/passenger-3.0.3; passenger_ruby /home/user/.rvm/rubies/ree-1.8.7-2011.01/bin/ruby; include mime.types; default_type application/octet-stream; sendfile on; tcp_nopush on; tcp_nodelay on; # gzip settings gzip on; gzip_http_version 1.0; gzip_comp_level 2; gzip_vary on; gzip_proxied any; gzip_types text/css application/x-javascript text/xml application/xml application/xml+rss text/javascript; # load extra modules from the vhosts directory include /opt/nginx/vhosts/*.conf; } Any advice would be appreciated! :)

    Read the article

  • What processes would make the selling of a hard drive that previously held sensitive data justifiable? [closed]

    - by user12583188
    Possible Duplicate: Securely erasing all data from a hard drive In my personal collection are an increasing number of relatively new drives, only put on the shelf due to upgrades; in the past I have never sold hard drives with used machines for fear of having the encrypted password databases that have been stored on them compromised, but as their numbers increase I find myself more tempted to do so (due to the $$$ I know they're worth on the used market). What tools then exist to make the recovery of data from said drives difficult to the extent that selling them could be justified? Another way of saying this would be: what tools/method exist for making the attempts at recovery of any data previously stored on a certain drive impractical? I assume that it is always possible to recover data from a drive that is in working order. I assume also there are some methods for preventing recovery of data due a program called dban, and one particular feature in macOSX that deals with permanently deleting data from a disk.

    Read the article

  • New 64 bit linux system has regular processes (ps, grep etc) taking up way too much VIRT mem

    - by user42980
    We just moved from a 32-bit machine to a 64-bit machine. We have quickly ran out of memory despite the new boxes have twice as much ram as the old boxes. Running a simple ps command will illustrate the problem. New machine: 132 prod-Charlotte1-node1 ~/public_html/rearch/cgi-bin ps aux | grep ps root 293 0.0 0.0 0 0 ? S< May09 0:00 [kpsmoused] xamine 2267 1.0 0.0 63728 928 pts/3 R+ 16:50 0:00 ps aux xamine 2268 0.0 0.0 61172 752 pts/3 S+ 16:50 0:00 grep ps Old machine: 132 prod-116431-node1:/home/xamine ps aux | grep ps xamine 23191 0.0 0.0 2332 768 pts/6 R+ 15:41 0:00 ps aux xamine 23192 0.0 0.0 3668 692 pts/6 S+ 15:41 0:00 grep ps Notice that the ps process is using 63M of VIRT mem vs 2 on the old machine. New Machine: Enterprise Linux Enterprise Linux Server release 5.4 (Carthage) Red Hat Enterprise Linux Server release 5.4 (Tikanga) Old Machine: Red Hat Enterprise Linux ES release 4 (Nahant Update 4) Thanks for any thoughts you have!

    Read the article

  • What causes "system call failed" and there are hanging ie processes?

    - by TecBrat
    System: Windows 7 Home Premium IE: 11.0.9600.17107 When I have had many, many apps and windows open, sometimes I'll try to access a folder and get a dialog that says "System Call Failed". I have found the fix for it is to open the task manager and End Process Tree on iexplore.exe and iexplore.exe *32. Often times there will be several of these even when I have closed all my browser windows. Does anyone have any experience with this error?

    Read the article

  • What Counts For a DBA: Simplicity

    - by Louis Davidson
    Too many computer processes do an apparently simple task in a bizarrely complex way. They remind me of this strip by one of my favorite artists: Rube Goldberg. In order to keep the boss from knowing one was late, a process is devised whereby the cuckoo clock kisses a live cuckoo bird, who then pulls a string, which triggers a hat flinging, which in turn lands on a rod that removes a typewriter cover…and so on. We rely on creating automated processes to keep on top of tasks. DBAs have a lot of tasks to perform: backups, performance tuning, data movement, system monitoring, and of course, avoiding being noticed.  Every day, there are many steps to perform to maintain the database infrastructure, including: checking physical structures, re-indexing tables where needed, backing up the databases, checking those backups, running the ETL, and preparing the daily reports and yes, all of these processes have to complete before you can call it a day, and probably before many others have started that same day. Some of these tasks are just naturally complicated on their own. Other tasks become complicated because the database architecture is excessively rigid, and we often discover during “production testing” that certain processes need to be changed because the written requirements barely resembled the actual customer requirements.   Then, with no time to change that rigid structure, we are forced to heap layer upon layer of code onto the problematic processes. Instead of a slight table change and a new index, we end up with 4 new ETL processes, 20 temp tables, 30 extra queries, and 1000 lines of SQL code.  Report writers then need to build reports and make magical numbers appear from those toxic data structures that are overly complex and probably filled with inconsistent data. What starts out as a collection of fairly simple tasks turns into a Goldbergian nightmare of daily processes that are likely to cause your dinner to be interrupted by the smartphone doing the vibration dance that signifies trouble at the mill. So what to do? Well, if it is at all possible, simplify the problem by either going into the code and refactoring the complex code to simple, or taking all of the processes and simplifying them into small, independent, easily-tested steps.  The former approach usually requires an agreement on changing underlying structures that requires countless mind-numbing meetings; while the latter can generally be done to any complex process without the same frustration or anger, though it will still leave you with lots of steps to complete, the ability to test each step independently will definitely increase the quality of the overall process (and with each step reporting status back, finding an actual problem within the process will be definitely less unpleasant.) We all know the principle behind simplifying a sequence of processes because we learned it in math classes in our early years of attending school, starting with elementary school. In my 4 years (ok, 9 years) of undergraduate work, I remember pretty much one thing from my many math classes that I apply daily to my career as a data architect, data programmer, and as an occasional indentured DBA: “show your work”. This process of showing your work was my first lesson in simplification. Each step in the process was in fact, far simpler than the entire process.  When you were working an equation that took both sides of 4 sheets of paper, showing your work was important because the teacher could see every step, judge it, and mark it accordingly.  So often I would make an error in the first few lines of a problem which meant that the rest of the work was actually moving me closer to a very wrong answer, no matter how correct the math was in the subsequent steps. Yet, when I got my grade back, I would sometimes be pleasantly surprised. I passed, yet missed every problem on the test. But why? While I got the fact that 1+1=2 wrong in every problem, the teacher could see that I was using the right process. In a computer process, the process is very similar. We take complex processes, show our work by storing intermediate values, and test each step independently. When a process has 100 steps, each step becomes a simple step that is tested and verified, such that there will be 100 places where data is stored, validated, and can be checked off as complete. If you get step 1 of 100 wrong, you can fix it and be confident (that if you did your job of testing the other steps better than the one you had to repair,) that the rest of the process works. If you have 100 steps, and store the state of the process exactly once, the resulting testable chunk of code will be far more complex and finding the error will require checking all 100 steps as one, and usually it would be easier to find a specific needle in a stack of similarly shaped needles.  The goal is to strive for simplicity either in the solution, or at least by simplifying every process down to as many, independent, testable, simple tasks as possible.  For the tasks that really can’t be done completely independently, minimally take those tasks and break them down into simpler steps that can be tested independently.  Like working out division problems longhand, have each step of the larger problem verified and tested.

    Read the article

  • ISO, Six Sigma, SEI-CMM, etc., in Fortune 500 companies

    - by CMR
    Do large corporations and product companies follow any standard quality models/processes at all? For example, I have seen that many large organizations have proprietary processes in IT and software development. Back in the days (even before Motorola's Iridium project,) I remember many IT companies scampering for SEI-CMM certification. Do any of the Fortune 500 company try to adopt these quality processes? In my limited experience I have not seen them undergoing audits for adherence to processes. Most of the audits are either financial, or issues pertaining to legalities. Am I just being ignorant, or is this true? If true, how stringently do the companies adhere to the processes?

    Read the article

  • Excessive httpd processes to stack up on my Rails + Apache2 + Passenger production setup?

    - by LeoAlmighty
    I have a Rails + Apache2 + Postgres + Passenger application running in production mode in OSX Snow Leopard. The application serves as a data warehouse for another application in the cloud so I'm constantly getting API calls to my OSX production build. After a recent reboot, I'm finding a ton of httpd processes stacking up and eventually requiring an apache reboot. I haven't changed any settings, everything was running fine before. Any ideas on the best way to troubleshoot this? $ ps -ef|grep httpd 0 6203 1 0 0:00.20 ?? 0:00.47 /usr/sbin/httpd -D FOREGROUND 70 6222 6203 0 0:00.05 ?? 0:00.11 /usr/sbin/httpd -D FOREGROUND 70 6224 6203 0 0:00.31 ?? 0:00.50 /usr/sbin/httpd -D FOREGROUND 70 6233 6203 0 0:00.05 ?? 0:00.10 /usr/sbin/httpd -D FOREGROUND 70 6234 6203 0 0:00.43 ?? 0:00.64 /usr/sbin/httpd -D FOREGROUND 70 6243 6203 0 0:00.02 ?? 0:00.03 /usr/sbin/httpd -D FOREGROUND 70 6319 6203 0 0:00.08 ?? 0:00.16 /usr/sbin/httpd -D FOREGROUND 70 6334 6203 0 0:00.02 ?? 0:00.05 /usr/sbin/httpd -D FOREGROUND 70 6469 6203 0 0:00.04 ?? 0:00.08 /usr/sbin/httpd -D FOREGROUND 70 6487 6203 0 0:00.36 ?? 0:00.48 /usr/sbin/httpd -D FOREGROUND 70 6593 6203 0 0:00.36 ?? 0:00.48 /usr/sbin/httpd -D FOREGROUND 70 6709 6203 0 0:00.04 ?? 0:00.08 /usr/sbin/httpd -D FOREGROUND 70 6718 6203 0 0:00.04 ?? 0:00.10 /usr/sbin/httpd -D FOREGROUND 70 6834 6203 0 0:00.01 ?? 0:00.03 /usr/sbin/httpd -D FOREGROUND 70 6852 6203 0 0:00.00 ?? 0:00.00 /usr/sbin/httpd -D FOREGROUND 70 6853 6203 0 0:00.01 ?? 0:00.02 /usr/sbin/httpd -D FOREGROUND

    Read the article

  • How to synchronize two (or n) replication processes for SQL Server databases?

    - by Yauheni Sivukha
    There are two master databases and two read-only copies updated by standard transactional replication. It is needed to map some entity from both read-only databases, lets say that A databases contains orders and B databases contains lines. The problem is that replication to one database can lag behind replication of second database, and at the moment of mapping R-databases will have inconsistent data. For example. We stored 2 orders with lines at 19:00 and 19:03. Mapping process started at 19:05, but to the moment of mapping A database replication processed all changes up to 19:03, but B database replication processed only changes up to 19:00. After mapping we will have order entity with order as of 19:03 and lines as of 19:00. The troubles are guaranteed:) In my particular case both databases have temporal model, so it is possible to fetch data for every time slice, but the problem is to identify time of latest replication. Question: How to synchronize replication processes for several databases to avoid situation described above? Or, in other words, how to compare last time of replication in each database? UPD: The only way I see to synchronize is to continuously write timestamps into service tables in each database and to check these timestamps on replicated servers. Is that acceptable solution?

    Read the article

  • Oracle's Global Single Schema

    - by david.butler(at)oracle.com
    Maximizing business process efficiencies in a heterogeneous environment is very difficult. The difficulty stems from the fact that the various applications across the Information Technology (IT) landscape employ different integration standards, different message passing strategies, and different workflow engines. Vendors such as Oracle and others are delivering tools to help IT organizations manage the complexities introduced by these differences. But the one remaining intractable problem impacting efficient operations is the fact that these applications have different definitions for the same business data. Business data is your business information codified for computer programs to use. A good data model will represent the way your organization does business. The computer applications your organization deploys to improve operational efficiency are built to operate on the business data organized into this schema.  If the schema does not represent how you do business, the applications on that schema cannot provide the features you need to achieve the desired efficiencies. Business processes span these applications. Data problems break these processes rendering them far less efficient than they need to be to achieve organization goals. Thus, the expected return on the investment in these applications is never realized. The success of all business processes depends on the availability of accurate master data.  Clearly, the solution to this problem is to consolidate all the master data an organization uses to run its business. Then clean it up, augment it, govern it, and connect it back to the applications that need it. Until now, this obvious solution has been difficult to achieve because no one had defined a data model sufficiently broad, deep and flexible enough to support transaction processing on all key business entities and serve as a master superset to all other operational data models deployed in heterogeneous IT environments. Today, the situation has changed. Oracle has created an operational data model (aka schema) that can support accurate and consistent master data across heterogeneous IT systems. This is foundational for providing a way to consolidate and integrate master data without having to replace investments in existing applications. This Global Single Schema (GSS) represents a revolutionary breakthrough that allows for true master data consolidation. Oracle has deep knowledge of applications dating back to the early 1990s.  It developed applications in the areas of Supply Chain Management (SCM), Product Lifecycle Management (PLM), Enterprise Resource Planning (ERP), Customer Relationship Management (CRM), Human Capital Management (HCM), Financials and Manufacturing. In addition, Oracle applications were delivered for key industries such as Communications, Financial Services, Retail, Public Sector, High Tech Manufacturing (HTM) and more. Expertise in all these areas drove requirements for GSS. The following figure illustrates Oracle's unique position that enabled the creation of the Global Single Schema. GSS Requirements Gathering GSS defines all the key business entities and attributes including Customers, Contacts, Suppliers, Accounts, Products, Services, Materials, Employees, Installed Base, Sites, Assets, and Inventory to name just a few. In addition, Oracle delivers GSS pre-integrated with a wide variety of operational applications.  Business Process Automation EBusiness is about maximizing operational efficiency. At the highest level, these 'operations' span all that you do as an organization.  The following figure illustrates some of these high-level business processes. Enterprise Business Processes Supplies are procured. Assets are maintained. Materials are stored. Inventory is accumulated. Products and Services are engineered, produced and sold. Customers are serviced. And across this entire spectrum, Employees do the procuring, supporting, engineering, producing, selling and servicing. Not shown, but not to be overlooked, are the accounting and the financial processes associated with all this procuring, manufacturing, and selling activity. Supporting all these applications is the master data. When this data is fragmented and inconsistent, the business processes fail and inefficiencies multiply. But imagine having all the data under these operational business processes in one place. ·            The same accurate and timely customer data will be provided to all your operational applications from the call center to the point of sale. ·            The same accurate and timely supplier data will be provided to all your operational applications from supply chain planning to procurement. ·            The same accurate and timely product information will be available to all your operational applications from demand chain planning to marketing. You would have a single version of the truth about your assets, financial information, customers, suppliers, employees, products and services to support your business automation processes as they flow across your business applications. All company and partner personnel will access the same exact data entity across all your channels and across all your lines of business. Oracle's Global Single Schema enables this vision of a single version of the truth across the heterogeneous operational applications supporting the entire enterprise. Global Single Schema Oracle's Global Single Schema organizes hundreds of thousands of attributes into 165 major schema objects supporting over 180 business application modules. It is designed for international operations, and extensibility.  The schema is delivered with a full set of public Application Programming Interfaces (APIs) and an Integration Repository with modern Service Oriented Architecture interfaces to make data available as a services (DaaS) to business processes and enable operations in heterogeneous IT environments. ·         Key tables can be extended with unlimited numbers of additional attributes and attribute groups for maximum flexibility.  o    This enables model extensions that reflect business entities unique to your organization's operations. ·         The schema is multi-organization enabled so data manipulation can be controlled along organizational boundaries. ·         It uses variable byte Unicode to support over 31 languages. ·         The schema encodes flexible date and flexible address formats for easy localizations. No matter how complex your business is, Oracle's Global Single Schema can hold your business objects and support your global operations. Oracle's Global Single Schema identifies and defines the business objects an enterprise needs within the context of its business operations. The interrelationships between the business objects are also contained within the GSS data model. Their presence expresses fundamental business rules for the interaction between business entities. The following figure illustrates some of these connections.   Interconnected Business Entities Interconnecte business processes require interconnected business data. No other MDM vendor has this capability. Everyone else has either one entity they can master or separate disconnected models for various business entities. Higher level integrations are made available, but that is a weak architectural alternative to data level integration in this critically important aspect of Master Data Management.    

    Read the article

  • Find out when all processes in (void) is done?

    - by Emil
    Hey. I need to know how you can find out when all processes (loaded) from a - (void) are done, if it's possible. Why? I'm loading in data for a UITableView, and I need to know when a Loading... view can be replaced with the UITableView, and when I can start creating the cells. This is my code: - (void) reloadData { NSAutoreleasePool *releasePool = [[NSAutoreleasePool alloc] init]; NSLog(@"Reloading data."); NSURL *urlPosts = [NSURL URLWithString:[NSString stringWithFormat:@"%@", URL]]; NSError *lookupError = nil; NSString *data = [[NSString alloc] initWithContentsOfURL:urlPosts encoding:NSUTF8StringEncoding error:&lookupError]; postsData = [data componentsSeparatedByString:@"~"]; [data release], data = nil; urlPosts = nil; self.numberOfPosts = [[postsData objectAtIndex:0] intValue]; self.postsArrayID = [[postsData objectAtIndex:1] componentsSeparatedByString:@"#"]; self.postsArrayDate = [[postsData objectAtIndex:2] componentsSeparatedByString:@"#"]; self.postsArrayTitle = [[postsData objectAtIndex:3] componentsSeparatedByString:@"#"]; self.postsArrayComments = [[postsData objectAtIndex:4] componentsSeparatedByString:@"#"]; self.postsArrayImgSrc = [[postsData objectAtIndex:5] componentsSeparatedByString:@"#"]; NSMutableArray *writeToPlist = [NSMutableArray array]; NSMutableArray *writeToNoImagePlist = [NSMutableArray array]; NSMutableArray *imagesStored = [NSMutableArray arrayWithContentsOfFile:[rootPath stringByAppendingPathComponent:@"imagesStored.plist"]]; int loop = 0; for (NSString *postID in postsArrayID) { if ([imagesStored containsObject:[NSString stringWithFormat:@"%@.png", postID]]){ NSLog(@"Allready stored, jump to next. ID: %@", postID); continue; } NSLog(@"%@.png", postID); NSData *imageData = [NSData dataWithContentsOfURL:[NSURL URLWithString:[postsArrayImgSrc objectAtIndex:loop]]]; // If image contains anything, set cellImage to image. If image is empty, try one more time or use noImage.png, set in IB if (imageData == nil){ NSLog(@"imageData is empty before trying .jpeg"); // If image == nil, try to replace .jpg with .jpeg, and if that worked, set cellImage to that image. If that is also nil, use noImage.png, set in IB. imageData = [NSData dataWithContentsOfURL:[NSURL URLWithString:[[postsArrayImgSrc objectAtIndex:loop] stringByReplacingOccurrencesOfString:@".jpg" withString:@".jpeg"]]]; } if (imageData != nil){ NSLog(@"imageData is NOT empty when creating file"); [fileManager createFileAtPath:[rootPath stringByAppendingPathComponent:[NSString stringWithFormat:@"images/%@.png", postID]] contents:imageData attributes:nil]; [writeToPlist addObject:[NSString stringWithFormat:@"%@.png", postID]]; } else { [writeToNoImagePlist addObject:[NSString stringWithFormat:@"%@", postID]]; } imageData = nil; loop++; NSLog(@"imagePlist: %@\nnoImagePlist: %@", writeToPlist, writeToNoImagePlist); } NSMutableArray *writeToAllPlist = [NSMutableArray arrayWithArray:writeToPlist]; [writeToPlist addObjectsFromArray:[NSArray arrayWithContentsOfFile:nowPlist]]; [writeToAllPlist addObjectsFromArray:[NSArray arrayWithContentsOfFile:[rootPath stringByAppendingPathComponent:@"imagesStored.plist"]]]; [writeToNoImagePlist addObjectsFromArray:[NSArray arrayWithContentsOfFile:[rootPath stringByAppendingPathComponent:@"noImage.plist"]]]; [writeToPlist writeToFile:nowPlist atomically:YES]; [writeToAllPlist writeToFile:[rootPath stringByAppendingPathComponent:@"imagesStored.plist"] atomically:YES]; [writeToNoImagePlist writeToFile:[rootPath stringByAppendingPathComponent:@"noImage.plist"] atomically:YES]; [releasePool release]; }

    Read the article

  • Node.js MMO - process and/or map division

    - by Gipsy King
    I am in the phase of designing a mmo browser based game (certainly not massive, but all connected players are in the same universe), and I am struggling with finding a good solution to the problem of distributing players across processes. I'm using node.js with socket.io. I have read this helpful article, but I would like some advice since I am also concerned with different processes. Solution 1: Tie a process to a map location (like a map-cell), connect players to the process corresponding to their location. When a player performs an action, transmit it to all other players in this process. When a player moves away, he will eventually have to connect to another process (automatically). Pros: Easier to implement Cons: Must divide map into zones Player reconnection when moving into a different zone is probably annoying If one zone/process is always busy (has players in it), it doesn't really load-balance, unless I split the zone which may not be always viable There shouldn't be any visible borders Solution 1b: Same as 1, but connect processes of bordering cells, so that players on the other side of the border are visible and such. Maybe even let them interact. Solution 2: Spawn processes on demand, unrelated to a location. Have one special process to keep track of all connected player handles, their location, and the process they're connected to. Then when a player performs an action, the process finds all other nearby players (from the special player-process-location tracking node), and instructs their matching processes to relay the action. Pros: Easy load balancing: spawn more processes Avoids player reconnecting / borders between zones Cons: Harder to implement and test Additional steps of finding players, and relaying event/action to another process If the player-location-process tracking process fails, all other fail too I would like to hear if I'm missing something, or completely off track.

    Read the article

  • Partition Wise Joins II

    - by jean-pierre.dijcks
    One of the things that I did not talk about in the initial partition wise join post was the effect it has on resource allocation on the database server. When Oracle applies a different join method - e.g. not PWJ - what you will see in SQL Monitor (in Enterprise Manager) or in an Explain Plan is a set of producers and a set of consumers. The producers scan the tables in the the join. If there are two tables the producers first scan one table, then the other. The producers thus provide data to the consumers, and when the consumers have the data from both scans they do the join and give the data to the query coordinator. Now that behavior means that if you choose a degree of parallelism of 4 to run such query with, Oracle will allocate 8 parallel processes. Of these 8 processes 4 are producers and 4 are consumers. The consumers only actually do work once the producers are fully done with scanning both sides of the join. In the plan above you can see that the producers access table SALES [line 11] and then do a PX SEND [line 9]. That is the producer set of processes working. The consumers receive that data [line 8] and twiddle their thumbs while the producers go on and scan CUSTOMERS. The producers send that data to the consumer indicated by PX SEND [line 5]. After receiving that data [line 4] the consumers do the actual join [line 3] and give the data to the QC [line 2]. BTW, the myth that you see twice the number of processes due to the setting PARALLEL_THREADS_PER_CPU=2 is obviously not true. The above is why you will see 2 times the processes of the DOP. In a PWJ plan the consumers are not present. Instead of producing rows and giving those to different processes, a PWJ only uses a single set of processes. Each process reads its piece of the join across the two tables and performs the join. The plan here is notably different from the initial plan. First of all the hash join is done right on top of both table scans [line 8]. This query is a little more complex than the previous so there is a bit of noise above that bit of info, but for this post, lets ignore that (sort stuff). The important piece here is that the PWJ plan typically will be faster and from a PX process number / resources typically cheaper. You may want to look out for those plans and try to get those to appear a lot... CREDITS: credits for the plans and some of the info on the plans go to Maria, as she actually produced these plans and is the expert on plans in general... You can see her talk about explaining the explain plan and other optimizer stuff over here: ODTUG in Washington DC, June 27 - July 1 On the Optimizer blog At OpenWorld in San Francisco, September 19 - 23 Happy joining and hope to see you all at ODTUG and OOW...

    Read the article

  • Why Healthcare Today Needs BPM and SOA by Avio

    - by JuergenKress
    Within the past couple years, the Patient Protection and Affordable Care Act has led to significant changes in the healthcare industry. A highly-complex supply chain between patients, providers, buyers and insurance companies has led to a lack of overall collaboration when it comes to processes. The first open enrollment deadline for products on the Health Insurance Exchange has passed. So what now? Let’s take a brief look at how things have changed and what organizations can do to stay in (and ahead of) the game. New requirements, new processes Organizations that have not adapted processes to meet new regulatory requirements will fall further behind. New regulatory requirements effectively make some legacy applications obsolete, require batch process to move to real-time, and more. Business Process Management (BPM) can help organizations bring data processes in line while helping IT redesign processes rather than change code or replace existing applications. BPM fills in application gaps and links critical information systems for a more visible, efficient and auditable organization. Social and mobile solutions BPM technology also facilitates social and mobile solutions that can help meet new needs. Patients are dependent on a network of doctors, pharmacists, families and others. Social solutions can connect members of the patient’s community in ways never seen before - enabling real-time, relevant communication. Likewise, mobile technology supports social solutions, and BPM is the most efficient way to make processes simple and role-based. It unties medical professionals from their offices by enabling them to access timely information and alerts anywhere. Why SOA is also needed Integrating BPM with Service-Oriented Architecture (SOA) also plays a critical role in the development of healthcare solutions that work. SOA can create a single end-to-end process, integrate applications and move them into a common workflow. While SOA enables the reutilization of existing IT infrastructure, BPM supports the process optimization, monitoring and social aspects. SOA and BPM applications support business analysts as they model, create and monitor processes - providing real-time insight and a unified workflow of process activities. Read “New” Solutions for a New Healthcare Landscape on our blog to learn more. SOA & BPM Partner Community For regular information on Oracle SOA Suite become a member in the SOA & BPM Partner Community for registration please visit www.oracle.com/goto/emea/soa (OPN account required) If you need support with your account please contact the Oracle Partner Business Center. Blog Twitter LinkedIn Facebook Wiki Technorati Tags: Avio,Healthcare,SOA Community,Oracle SOA,Oracle BPM,Community,OPN,Jürgen Kress

    Read the article

  • The Business of Winning Innovation: An Exclusive Blog Series

    - by Kerrie Foy
    "The Business of Winning Innovation” is a series of articles authored by Oracle Agile PLM experts on what it takes to make innovation a successful and lucrative competitive advantage. Our customers have proven Agile PLM applications to be enormously flexible and comprehensive, so we’ve launched this article series to showcase some of the most fascinating, value-packed use cases. In this article by Keith Colonna, we kick-off the series by taking a look at the science side of innovation within the Consumer Products industry and how PLM can help companies innovate faster, cheaper, smarter. This article will review how innovation has become the lifeline for growth within consumer products companies and how certain companies are “winning” by creating a competitive advantage for themselves by taking a more enterprise-wide,systematic approach to “innovation”.   Managing the Science of Innovation within the Consumer Products Industry By: Keith Colonna, Value Chain Solution Manager, Oracle The consumer products (CP) industry is very mature and competitive. Most companies within this industry have saturated North America (NA) with their products thus maximizing their NA growth potential. Future growth is expected to come from either expansion outside of North America and/or by way of new ideas and products. Innovation plays an integral role in both of these strategies, whether you’re innovating business processes or the products themselves, and may cause several challenges for the typical CP company, Becoming more innovative is both an art and a science. Most CP companies are very good at the art of coming up with new innovative ideas, but many struggle with perfecting the science aspect that involves the best practice processes that help companies quickly turn ideas into sellable products and services. Symptoms and Causes of Business Pain Struggles associated with the science of innovation show up in a variety of ways, like: · Establishing and storing innovative product ideas and data · Funneling these ideas to the chosen few · Time to market cycle time and on-time launch rates · Success rates, or how often the best idea gets chosen · Imperfect decision making (i.e. the ability to kill projects that are not projected to be winners) · Achieving financial goals · Return on R&D investment · Communicating internally and externally as more outsource partners are added globally · Knowing your new product pipeline and project status These challenges (and others) can be consolidated into three root causes: A lack of visibility Poor data with limited access The inability to truly collaborate enterprise-wide throughout your extended value chain Choose the Right Remedy Product Lifecycle Management (PLM) solutions are uniquely designed to help companies solve these types challenges and their root causes. However, PLM solutions can vary widely in terms of configurability, functionality, time-to-value, etc. Business leaders should evaluate PLM solution in terms of their own business drivers and long-term vision to determine the right fit. Many of these solutions are point solutions that can help you cure only one or two business pains in the short term. Others have been designed to serve other industries with different needs. Then there are those solutions that demo well but are owned by companies that are either unable or unwilling to continuously improve their solution to stay abreast of the ever changing needs of the CP industry to grow through innovation. What the Right PLM Solution Should Do for You Based on more than twenty years working in the CP industry, I recommend investing in a single solution that can help you solve all of the issues associated with the science of innovation in a totally integrated fashion. By integration I mean the (1) integration of the all of the processes associated with the development, maintenance and delivery of your product data, and (2) the integration, or harmonization of this product data with other downstream sources, like ERP, product catalogues and the GS1 Global Data Synchronization Network (or GDSN, which is now a CP industry requirement for doing business with most retailers). The right PLM solution should help you: Increase Revenue. A best practice PLM solution should help a company grow its revenues by consolidating product development cycle-time and helping companies get new and improved products to market sooner. PLM should also eliminate many of the root causes for a product being returned, refused and/or reclaimed (which takes away from top-line growth) by creating an enterprise-wide, collaborative, workflow-driven environment. Reduce Costs. A strong PLM solution should help shave many unnecessary costs that companies typically take for granted. Rationalizing SKU’s, components (ingredients and packaging) and suppliers is a major opportunity at most companies that PLM should help address. A natural outcome of this rationalization is lower direct material spend and a reduction of inventory. Another cost cutting opportunity comes with PLM when it helps companies avoid certain costs associated with process inefficiencies that lead to scrap, rework, excess and obsolete inventory, poor end of life administration, higher cost of quality and regulatory and increased expediting. Mitigate Risk. Risks are the hardest to quantify but can be the most costly to a company. Food safety, recalls, line shutdowns, customer dissatisfaction and, worst of all, the potential tarnishing of your brands are a few of the debilitating risks that CP companies deal with on a daily basis. These risks are so uniquely severe that they require an enterprise PLM solution specifically designed for the CP industry that safeguards product information and processes while still allowing the art of innovation to flourish. Many CP companies have already created a winning advantage by leveraging a single, best practice PLM solution to establish an enterprise-wide, systematic approach to innovation. Oracle’s Answer for the Consumer Products Industry Oracle is dedicated to solving the growth and innovation challenges facing the CP industry. Oracle’s Agile Product Lifecycle Management for Process solution was originally developed with and for CP companies and is driven by a specialized development staff solely focused on maintaining and continuously improving the solution per the latest industry requirements. Agile PLM for Process helps CP companies handle all of the processes associated with managing the science of the innovation process, including: specification management, new product development/project and portfolio management, formulation optimization, supplier management, and quality and regulatory compliance to name a few. And as I mentioned earlier, integration is absolutely critical. Many Oracle CP customers, both with Oracle ERP systems and non-Oracle ERP systems, report benefits from Oracle’s Agile PLM for Process. In future articles we will explain in greater detail how both existing Oracle customers (like Gallo, Smuckers, Land-O-Lakes and Starbucks) and new Oracle customers (like ConAgra, Tyson, McDonalds and Heinz) have all realized the benefits of Agile PLM for Process and its integration to their ERP systems. More to Come Stay tuned for more articles in our blog series “The Business of Winning Innovation.” While we will also feature articles focused on other industries, look forward to more on how Agile PLM for Process addresses innovation challenges facing the CP industry. Additional topics include: Innovation Data Management (IDM), New Product Development (NPD), Product Quality Management (PQM), Menu Management,Private Label Management, and more! . Watch this video for more info about Agile PLM for Process

    Read the article

  • The Best BPM Journey: More Exciting Destinations with Process Accelerators

    - by Cesare Rotundo
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Oracle Open World (OOW) earlier this month has been a great occasion to discuss with our BPM customers. It was interesting to hear definite patterns emerging from those conversations: “BPM is a journey”, “experiences to share”, “our organization now understands what BPM is”, and my favorite (with some caveats): “BPM is like wine tasting, once you start, you want to try more”. These customers have started their journey, climbed up the learning curve, and reached a vantage point that allows them to see their next BPM destination. They see the next few processes they are going to tackle and improve with BPM. These processes/destinations target both horizontal processes where BPM replaces or coordinates manual activities, and critical industry processes that the company needs to improve to compete and deliver increasing value. Each new destination generates value, allowing the organization to reduce the cost of manual processes that were not supported by apps/custom development, and increase efficiency of end-to-end processes partially covered by apps/custom dev. The question we wanted to answer is how to help organizations experience deeper success with BPM, by increasing their awareness of the potential for reaching new targets, and equipping them with the right tools. We decided that we needed to identify destinations, and plot routes to show the fastest path to those destinations. In the end we want to enable customers to reach “Process Excellence”: continuously set new targets and consistently and efficiently reach them. The result is Oracle Process Accelerators (PA), solutions built using the rich functionality in Oracle BPM Suite. PAs offers a rapidly expanding list of exciting destinations. Our launch of the latest installment of Process Accelerators at Oracle Open World includes new Industry-focused solutions such as Public Sector Incident Reporting and Financial Services Loan Origination, and improved other horizontal PAs, including Travel Request Management, Document Routing and Approval, and Internal Service Requests. Just before OOW we had extended the Oracle deployment of Travel Request Management, riding the enthusiastic response from early adopters among travelers (employees), management and support (approvers). “Getting there first” means being among the first to extract value from the PA approach, while acquiring deeper insights into the customers’ perspective. This is especially noteworthy when it comes to PAs, a set of solutions designed to be quickly deployed and iteratively improved by customers. The OOW launch has generated immediate feedback from customers, non-customers, analysts, and partners. They all confirmed that both Business and IT at organizations benefit from PAs when it comes to exploring the potential for BPM to improve their business processes. PAs help customers visualize what can be done with BPM, and PAs are made to be extended: you can see your destination, change the path to fit your needs, and deploy. We're discovering new destinations/processes that the market wants us to support, generic enough across industries and within industries. We'll keep on building sets of requirements, deliver functional design, construct solutions using Oracle BPM, and test them not only functionally but for performance, scalability, clustering, making them robust, product-quality. Delivering BPM solutions with product-grade quality is the equivalent of following a tried-and-tested path on a map. Do you know of existing destinations in your industry? If yes, we can draw a path to innovative processes together.

    Read the article

  • background jobs and ssh connections

    - by petrelharp
    This question has come up quite a lot (really a lot), but I'm finding the answers to be generally incomplete. The general question is "Why does/doesn't my job get killed when I exit/kill ssh?", and here's what I've found. The first question is: How general is the following information? The following seems to be true for modern Debian linux, but I am missing some bits; and what do others need to know? All child processes, backgrounded or not of a shell opened over an ssh connection are killed with SIGHUP when the ssh connection is closed only if the huponexit option is set: run shopt huponexit to see if this is true. If huponexit is true, then you can use nohup or disown to dissociate the process from the shell so it does not get killed when you exit. If huponexit is false, which is the default on at least some linuxes these days, then backgrounded jobs will not be killed on normal logout. But even if huponexit is false, then if the ssh connection gets killed, or drops (different than normal logout), then backgrounded processes will still get killed. This can be avoided by disown or nohup as in (2). There is some distinction between (a) processes whose parent process is the terminal and (b) processes that have stdin, stdout, or stderr connected to the terminal. I don't know what happens to processes that are (a) and not (b), or vice versa. Final question: How can I avoid behavior (3)? In other words, by default in Debian backgrounded processes run along merrily by themselves after logout but not after the ssh connection is killed. I'd like the same thing to happen to processes regardless of whether the connection was closed normally or killed. Or, is this a bad idea?

    Read the article

< Previous Page | 40 41 42 43 44 45 46 47 48 49 50 51  | Next Page >