Search Results

Search found 3469 results on 139 pages for 'progress indicator'.

Page 5/139 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • Removed Old Domain Trust. Now Progress (9.1D) can't open DB File

    - by RLH
    My company has an old server, running Progress 9.1D on a Windows 2000 VM, which was used by our company OS (Vantage 6 by Epicor.) Vantage was our primary OS for a very long time. About 2 years ago, we migrated to a larger, corporate OS and we cancelled our service contract with Epicor. Yesterday, we removed an AD trust between the corporate domain and our old AD domain we used in the days of Vantage. After restarting the virtual server, I have been able to start the ProService for 9.1D Windows service, however, I can not get Vantage to start back up. When I run the application, I get the error in the message listed below. Transcript: ** Could not connect to server for database [progress db file], errno 0. (1432) How can I fix this? FYI, I haven't had to work with Progress in years and even then I wouldn't have considered myself a "novice"-- I'm even less knowledgeable than that title would suggest. Vantage had a lot of internal tools and I recall that Epicor support managed to prevent .pf scripts from being executed. If there was a Progress specific patch that needed to be applied, you had to do it within the Vantage software OR they had to remote into the machine to fix this. I may not be able to run a .pf script but I do know that I can log into the console-based server application. (Yes, I can't even recall which utility that was called. It is sad.) It's been a long time and I never had to digg into Progress that much. Please help and feel free to ask questions. If you need more info, I'll update this post.

    Read the article

  • LINQ to SQL SubmitChangess() progress

    - by Emir
    I'm using LINQ to SQLto import old DBF files into MSSQL. I'm reading all rows and adding them to database using ctx.MyTable.InsertOnSubmit(row) After reading phase is completed I have around 100 000 pending inserts. ctx.SubmitChanges() naturally is taking a long time. Is there any way to track progress of the ctx.submitchanges()? Can ctx.Log somehow be used for this purpose? Update: Is it possible to use ctx.GetChangeSet().Inserts.Count and track insert statements using the Log? Dividing ctx.SubmitChanges() into smaller chunks is not working for me, because I need transaction, all or nothing. Update 2: I've found nice class ActionTextWriter using which I will try to count inserts. http://damieng.com/blog/2008/07/30/linq-to-sql-log-to-debug-window-file-memory-or-multiple-writers

    Read the article

  • eclise java internal webbrowser progress listener?

    - by deepthinker121
    Hi All, I need to open an internal web browser from a custom eclipse wizard I have created - and so I am using IWebBrowser webBrowser = browser.createBrowser (IWorkbenchBrowserSupport.LOCATION_BAR | IWorkbenchBrowserSupport.AS_EDITOR | IWorkbenchBrowserSupport.NAVIGATION_BAR | IWorkbenchBrowserSupport.STATUS, null,"TestBrowser", "TestBrowser"); URL url = new URL("http://localhost:8080/app"); webBrowser.openURL(url); Now the problem is - the openURL needs time to complete as it tries to load a page for a webapp and as I am not able to get the progress of the 'load page' operation of the URL - my wizard progressmonitor completes before the URL can be completely loaded . Is there any way to get the status of the page load operation - (to check if its complete or it failed) or add a listener to indicate completion of page load? It is okay for me to use some other implementations of internal web browsers - so please suggest some other approach we cannot add a listener to IWebBrowser.. Thanks for ur help !!

    Read the article

  • Show javascript execution progress

    - by Midhat
    I have some javascript functions that take about 1 to 3 seconds. (some loops or mooML templating code.) During this time, the browser is just frozen. I tried showing a "loading" animation (gif image) before starting the operation and hiding it afterwords. but it just doesnt work. The browser freezes before it could render the image and hides it immediately when the function ends. Is there anything I can do to tell the browser to update the screen before going into javascript execution., Something like Application.DoEvents or background worker threads. So any comments/suggestions about how to show javascript execution progress. My primary target browser is IE6, but should also work on all latest browsers

    Read the article

  • How to use length indicator in a C++ program

    - by cj
    I want to make a program in C++ that reads a file where each field will have a number before it that indicates how long it is. The problem is I read every record in object of a class; how do I make the attributes of the class dynamic? For example if the field is "john" it will read it in a 4 char array. I don't want to make an array of 1000 elements as minimum memory usage is very important.

    Read the article

  • How to report progress of a JavaScript function?

    - by LambyPie
    I have a JavaScript function which is quite long and performs a number of tasks, I would like to report progress to the user by updating the contents of a SPAN element with a message as I go. I tried adding document.getElementById('spnProgress').innerText = ... statements throughout the function code. However, whilst the function is executing the UI will not update and so you only ever see the last message written to the SPAN which is not very helpful. My current solution is to break the task up into a number of functions, at the end of each I set the SPAN message and then "trigger" the next one with a window.setTimeout call with a very short delay (say 10ms). This yields control and allows the browser to repaint the SPAN with the updated message before starting the next step. However I find this very messy and difficult to follow the code, I'm thinking there must be a better way. Does anyone have any suggestions? Is there any way to force the SPAN to repaint without having to leave the context of the function? Thanks

    Read the article

  • Powershell progress dialogs

    - by Norgean
    Creating nested progress dialogs in Powershell is easy. Let the code speak for itself: for ($i = 1; $i -le 2; $i++) {     Write-Progress -ID 1 -Activity "Outer loop" -Status "Tick $i" -percentComplete ($i / 2*100)     for ($j = 1; $j -le 3; $j++)     {         Write-Progress -ID 2 -Activity "Mid loop" -Status "Tick $j" -percentComplete ($j / 3*100)         for ($k = 1; $k -le 3; $k++)         {             Write-Progress -ID 3 -Activity "Inner loop" -Status "Tick $k" -percentComplete ($k / 3*100)             Sleep(1)         }     } } I.e. some text that explains what we're doing (Activity and Status), and ID numbers. Easy.

    Read the article

  • Is there a way to see any tar progress per file?

    - by Svish
    I have a couple of big files that I would like to compress. I can do this with for example tar cvfj big-files.tar.bz2 folder-with-big-files The problem is that I can't see any progress, so I don't have a clue how long it will take or anything like that. Using v I can at least see when each file is completed, but when the files are few and large this isn't the most helpful. Is there a way I can get tar to show more detailed progress? Like a percentage done or a progress bar or estimated time left or something. Either for each single file or all of them or both.

    Read the article

  • PyQt: How to Know Progress of a Process Running background

    - by krishnanunni
    Hello there. Im in real confusion with the ProgressBar mechanisms. However now i need help on this "Can we know the percentage completion or time remaining of completion of a Process, that has been initiated from a Qt interface like this ` self.process = QProcess() self.connect(self.process, SIGNAL("readyReadStdout()"), self.readOutput) self.connect(self.process, SIGNAL("readyReadStderr()"), self.readErrors) tarsourcepath="sudo tar xvpf "+ self.path1 self.process.setArguments(QStringList.split(" ",tarsourcepath)) self.textLabel3.setText(self.__tr("Extracting.....")) self.process.start()` slots readOUtput just implements the collection of data fron stdout and transferring it to a text browser. I need to know is there any way we could monitor the ongoing process, making to knowpercentage completion, so that i can manage a progressbar for this. Thanks Experts

    Read the article

  • How to manage long running background threads and report progress with DDD

    - by Mr Happy
    Title says most of it. I have found surprising little information about this. I have a long running operation of which the user wants to see the progress (as in, item x of y processed). I also need to be able to pause and stop the operation. (Stopping doesn't rollback the items already processed.) The thing is, it's not that each item takes a long time to get processed, it's that that there are usually a lot of items. And what I've read about so far is that it's somewhat of an anti-pattern to put something like a queue in the DB. I currently don't have any messaging system in place, and I've never worked with one either. Another thing I read somewhere is that progress reporting is something that belongs in the application layer, but it didn't go into the details. So having said all this, what I have in mind is the following. User request with list of items enters the application layer. Application layer gets some information from the domain needed to process the items. Application layer passes the items and the information off to some domain service (should the implementation of this service belong in the infrastructure layer?) This service spins up a worker thread with callbacks for both progress reporting and pausing/stopping it. This worker thread will process each item in it's own UoW. This means the domain information from earlier needs to be stored in some DTO. Since nothing is really persisted, the service should be singleton and thread safe Whenever a user requests a progress report or wants to pause/stop the operation, the application layer will ask the service. Would this be a correct solution? Or am I at least on the right track with this? Especially the singleton and thread safe part makes the whole thing feel icky.

    Read the article

  • Progress bar in Super Hexagon using OpenGL ES 2 (Android)

    - by user16547
    I'm wondering how the progress bar in Super Hexagon was made. (see image, top left) Actually I am not very sure how to implement a progress bar at all using OpenGL ES 2 on Android, but I am asking specifically about the one used in Super Hexagon because it seems to me less straightforward / obvious than others: the bar changes its colour during game play. I think one possibility is to use the built-in Android progress bar. I can see from some Stackoverflow questions that you can change the default blue colour to whatever you want, but I'm not sure whether you can update it during the game play. The other possibility I can think of for implementing a progress bar is to have a small texture that starts with a scale of 0 and that you keep scaling until it reaches the maximum size, representing 100%. But this suffers from the same problem as before: you'll not be able to update the colour of the texture during run-time. It's fixed. So what's the best way to approach this problem? *I'm assuming he didn't use a particular library, although if he did, it would be interesting to know. I'm interested in a pure OpenGL ES 2 + Android solution.

    Read the article

  • Updating a Progress Bar within the Status Bar [migrated]

    - by Muhnamana
    I'm trying to figure out how to incorporate a progress bar within the status bar to show how much processing is completed. Below is my example of updating the progress bar (not sure if this is the correct way or not) Private Sub Timer1_Tick(ByVal sender As System.Object, ByVal e As System.EventArgs) Handles Timer1.Tick ToolStripProgressBar1.Value = ToolStripProgressBar1.Value + 2 If ToolStripProgressBar1.Value = 100 Then ToolStripProgressBar1.Value = 0 ToolStripProgressBar1.Value = ToolStripProgressBar1.Value + 2 Timer1.Enabled = True End If End Sub Here is the code within the button. Private Sub Button1_Click(sender As System.Object, e As System.EventArgs) Handles Button1Run.Click ToolStripStatusLabel1.Text = "Processing..." Timer1.Enabled = True 'more code to be inserted here End Sub What I'm not sure is how to update the progress bar based on the amount of code you have and once the processing is complete, update the ToolStripStatusLabel1 to show "Processing...Complete!".

    Read the article

  • The battery indicator in Unity panel not showing up

    - by user61415
    I installed Ubuntu 12.04 with Wubi. Well after being completely dazzled with the amount of free content in the Software Centre, I decided to go deeper and start messing with settings. Well after changing the screen brightness the highest level I noticed that there wasn't an indicator for how much battery was left in my laptop. I looked up online on got 2 suggestions on how to fix: Right click on the Unity panel and add an indicator Set it to show in the power settings menu. Well I did both when I right click at the top menu nothing comes up and setting it to show does nothing either. Then I tried installing something in the Software Centre. I got something but when I activated it it said I had 0% power left even though I was charging and at %100 according the Light in the front of my laptop. So now I'm thinking that it doesn't even recognise my computer as a laptop which is weird because in the display settings it says my screen size is set to laptop. How can I install it? I don't know what version it is other then Ubuntu 12.04 and no matter what the icon does not appear with the

    Read the article

  • Using progress dialog in Visual Studio extensions

    - by Utkarsh Shigihalli
    Originally posted on: http://geekswithblogs.net/onlyutkarsh/archive/2014/05/23/using-progress-dialog-in-visual-studio-extensions.aspxAs a Visual Studio extension developer you are required to keep the aesthetics of Visual Studio in tact when you integrate your extension with Visual Studio. Your extension looks odd when you try to use windows controls and dialogs in your extensions. Visual Studio SDK exposes many interfaces so that your extension looks as integrated with Visual Studio as possible. When your extension is performing a long running task, you have many options to notify the progress to the user. One such option is through Visual Studio status bar. I have previously blogged about displaying progress through Visual Studio status bar. In this blog post I am going to highlight another way using IVsThreadedWaitDialog2 interface. One thing to note is, as the IVsThreadedWaitDialog2 interface name suggests it is a dialog hence user cannot perform any action when the dialog is being shown. So Visual Studio seems responsive to user, even when a task is being performed. Visual Studio itself makes use of this interface heavily. One example is when you are loading a solution (.sln) with lot of projects Visual Studio displays dialog implemented by this interface (screenshot below). So the first step is to get the instance of IVsThreadedWaitDialog2 interface using IServiceProvider interface. var dialogFactory = _serviceProvider.GetService(typeof(SVsThreadedWaitDialogFactory)) as IVsThreadedWaitDialogFactory; IVsThreadedWaitDialog2 dialog = null; if (dialogFactory != null) { dialogFactory.CreateInstance(out dialog); } So if your have the package initialized properly out object dialog will be not null and would contain the instance of IVsThreadedWaitDialog2 interface. Once the instance is got, you call the different methods to manage the dialog. I will cover 3 methods StartWaitDialog, EndWaitDialog and HasCanceled in this blog post. You show the progress dialog as below. if (dialog != null && dialog.StartWaitDialog( "Threaded Wait Dialog", "VS is Busy", "Progress text", null, "Waiting status bar text", 0, false, true) == VSConstants.S_OK) { Thread.Sleep(4000); } As you can see from the method syntax it is very similar to standard windows message box. If you pass true to the 7th parameter to StartWaitDialog method, you will also see a cancel button allowing user to cancel the running task. You can react when user cancels the task as below. bool isCancelled; dialog.HasCanceled(out isCancelled); if (isCancelled) { MessageBox.Show("Cancelled"); } Finally, you can close the dialog when you complete the task running as below. int usercancel; dialog.EndWaitDialog(out usercancel); To help you quickly experience the above code, I have created a sample. It is available for download from GitHub. The sample creates a tool window with two buttons to demo the above explained scenarios. The tool window can be accessed by clicking View –> Other Windows -> ProgressDialogDemo Window

    Read the article

  • tfs 2010 RC Agile Process template update New Task progress report

    Maybe my next post will just be about why I am so excited and impressed with the out of the box templates.  But, for this first blog with my new focus, I thought I would just walk through the process I went through to create a task progress report (to enhance the out of the box Agile template). So, I started with the MSF for Agile Development 5.0 RC template.  After reviewing the template, I came away pretty excited about many of the new reports.  I am especially excited about the reporting services reports.  The big advantage I see here is that these are querying the Warehouse directly instead of the Analysis Services Cube which means that they are much closer to real-time which I find very important for reports like Burndown and task status.  One report that I focused on right away was the User Story Progress Report.  An overview is shown below: This report is very useful, but a lot of our internal managers really prefer to manage at the task level and either dont have stories in TFS or would like to view this type of report for tasks in addition to the User Stories.  So, what did I do? Step 1: Download the Agile Template In VS 2010 RC, open Process Template Manager from Team->Team Project Collection Settings.  Download the MSF for Agile Development template to your local file system.  A project template is a folder of xml files.  There is a ProcessTemplate.xml in the root and then a bunch of directories for things like Work Item Definitions and Queries, Reports, Shared Documents and Source Control Settings.  Step 2: Copy the folder My plan here is to make a new template with all of my modifications.  You can also just enhance update the MSF template.  However, I think it is cleaner when you start making modifications to make your own template.  So, copy the folder and name it with your new template name. Step 3: Change Template Name Open ProcessTemplate.xml and change the <name> of the template. Step 4: Copy the rdl of the Report you want to use a starting point In my case, I copied Stories Progress.rdl and named the file Task Progress Breakdown.rdl.  I reviewed the requirements for the new report with some of the users here and came up with this plan.  Should show tasks and be expandable to show subtasks.  Should add Assigned To and Estimated Finish Date as 2 extra columns. Step 5: Walkthrough the existing report to understand how it works The main thing that I do here is try to get the sql to run in SQL Management Studio.  So, I can walkthrough the process of building up the data for the report. After analyzing this particular report I found a couple of very useful things.  One, this report is already built to display subtasks if I just flip the IncludeTasks flag to 1.  So, if you are using Stories and have tasks assigned to each story.  This might give you everything you want.  For my purposes, I did make that change to the Stories Progress report as I find it to be a more useful report to be able to see the tasks that comprise each story.  But, I still wanted a task only version with the additional fields. Step 6: Update the report definition I tend to work on rdl in visual studio directly as xml.  Especially when I am just altering an existing report, I find it easier than trying to deal with the BI Studio designer.  For my report I made the following changes. Updated Fields Removed Stack Rank and Replaced with Priority since we dont use Stack Rank Added FinishDate and AssignedTo Changed the root deliverable SQL to pull @tasks instead of @deliverablecategory and added a join CurrentWorkItemView for FinishDate and Assigned to SELECT cwi.[System_Id] AS ID FROM [CurrentWorkItemView] cwi             WHERE cwi.[System_WorkItemType] IN (@Task)             AND cwi.[ProjectNodeGUID] = @ProjectGuid SELECT lh.SourceWorkItemID AS ID FROM FactWorkItemLinkHistory lh             INNER JOIN [CurrentWorkItemView] cwi ON lh.TargetWorkItemID = cwi.[System_Id]             WHERE lh.WorkItemLinkTypeSK = @ParentWorkItemLinkTypeSK                 AND lh.RemovedDate = CONVERT(DATETIME, '9999', 126)                 AND lh.TeamProjectCollectionSK = @TeamProjectCollectionSK                 AND cwi.[System_WorkItemType] NOT IN (@DeliverableCategory) Added AssignedTo and FinishDate columns to the @Rollups table Added two columns to the table used for column headers <Tablix Name="ProgressTable">         <TablixBody>           <TablixColumns>             <TablixColumn>               <Width>2.7625in</Width>             </TablixColumn>             <TablixColumn>               <Width>0.5125in</Width>             </TablixColumn>             <TablixColumn>               <Width>3.4625in</Width>             </TablixColumn>             <TablixColumn>               <Width>0.7625in</Width>             </TablixColumn>             <TablixColumn>               <Width>1.25in</Width>             </TablixColumn>             <TablixColumn>               <Width>1.25in</Width>             </TablixColumn>           </TablixColumns> Added Cells for the two new headers Added Cells to the data table to include the two new values (Assigned to & Finish Date) Changed a bunch of widths that would change the format of the report to display landscape and have room for the two additional columns Set the Value of the IncludeTasks Parameter to 1 <ReportParameter Name="IncludeTasks">       <DataType>Integer</DataType>       <DefaultValue>         <Values>           <Value>=1</Value>         </Values>       </DefaultValue>       <Prompt>IncludeTasks</Prompt>       <Hidden>true</Hidden>     </ReportParameter> Change a few descriptions on how the report should be used This is the resulting report I have attached the final rdl. Step 7: Update ReportTasks.xml Last step before the template is ready for use is to update the reportTasks.xml file in the reports folder.  This file defines the reports that are available in the template.           <report name="Task Progress Breakdown" filename="Reports\Task Progress Breakdown.rdl" folder="Project Management" cacheExpiration="30">             <parameters>               <parameter name="ExplicitProject" value="" />             </parameters>             <datasources>               <reference name="/Tfs2010ReportDS" dsname="TfsReportDS" />             </datasources>           </report> Step 8: Upload the template Open the process Template Manager just like Step 1.  And upload the new template. Thats it.  One other note, if you want to add this report to existing team project you will have to go into reportmanager (the reporting services portal) and upload the rdl to that projects directory.Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • Make a WPF circular progress indicator / loading animation

    how to make a WPF circular progress indicator that resembles Silverlights loading animation  read moreBy Michael DetrasDid you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • Messaging indicator does not obey applications-blacklist

    - by user74517
    Since upgrading from 11.10 to 12.04, the microblogging and instant messaging entries have reappeared in the messaging menu. I put symlinks in ~/.config/indicators/messages/applications-blacklist to deactivate empathy evolution gwibber.indicator ubuntuone-control-panel, but this does not seem to have any effect now. How can I remove these entries? I would like to remove the status entries as well, and keep only Thunderbird information.

    Read the article

  • Creating Indicator and Gauge Report in SSRS - SQL Server 2008 R2

    SQL Server Reporting Services allows you to embed indicators and Gauges in your report to analyze the data and its state. Indicators are minimal gauges that convey the state of a single data value at a glance and are mostly used to represent state value of Key Performance Indicator (KPI). New! SQL Monitor 3.0 Red Gate's multi-server performance monitoring and alerting tool gets results from Day One.Simple to install and easy to use – download a free trial today.

    Read the article

  • Hibernation is still missing from menu in 13.10 after enabling via polkit. How to enable?

    - by LiveWireBT
    I know that since 12.04, we need to add a policykit rule to enable hibernation (see question How to enable hibernation? and the Official Documentation). I can successfully bring my laptop into hibernation mode with sudo pm-hibernate or sudo s2disk, so the rule is in place and works, but the hibernation entry is still missing in the menu. I can tell from looking through the source of the indicator-session package (but not understanding the whole code) that there is still a hibernation menu entry in the code and it should be displayed when the system is capable of hibernating. Please calm down if you're enraged by this. This is very unlikely to be a conspiracy, but rather a bug/regression on a deeper level, which can happen when you move code around or replace it. Question: What needs to be done in 13.10 to properly tell indicator-session that the system can hibernate? Possible duplicate: Hibernation still not available - No activity, because saucy was in development at that time, so out of scope for AskUbuntu. Related bug report: https://bugs.launchpad.net/ubuntu/+source/indicator-session/+bug/1232814

    Read the article

  • Custom widgets/controls in application indicators

    - by markitusss
    I want to develop an app for ubuntu, that integrates inside the calendar indicator/menu. It should allow to enter info right from it, and have several controls like input boxes, drop downs, spinners and buttons. Is this possible to integrate/replace the standard date/time indicator? If not, is it possible to create it as a separate indicator that when clicked opens a popup with all the controls and stuff? I want it to look as part of the sys tray and not as a separate desktop app. I'm using Quickly for this. Thanks for your help!

    Read the article

  • how to create a progress bar using php output buffering and jquery?

    - by avien
    how to create a progress bar using php output buffering and jquery? i been searching this for weeks, i am desperate to learn this, this is a very big help for me, is someone the here share some codes? i know the this will need to script. i have tried sereval code for my client side script: var request = new XMLHttpRequest(); request.addEventListener("progress", updateProgress, false); function updateProgress(e) { var percent = (e.loaded / e.total) * 100; /** update the with of the progress bar **/ } and to my server side, i dont know how. but actually i want to use this for a mysql query so that i can see the progress of my query and another thing is i dont know how to use output buffering. somebody help me on this please.

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >