Search Results

Search found 32368 results on 1295 pages for 'team project'.

Page 5/1295 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • How to add a new developer to the team

    - by lortabac
    I run a small company composed of only 2 developers. For one of our clients we are building a very big application, whose development has gone on for 1.5 years. Now this client has found an important sponsorship, and they are organizing some events related to this project, so we have a deadline in 2 months and we can't miss it. We are thinking of adding a new developer to the team, and I am wondering what we can do to help his integration. This is the situation: We are approaching the threshhold of Brooks's law, the point when adding new developers will be counter-productive. The application is relatively well designed, but the implementation is chaotic in some points (especially older code). There are unit tests only for more recent code. When this project started, we didn't have the habit of doing tests. Documentation and comments are incomplete. The application is both large and complex. The client has written down almost every detail about his project, in a very clear and "programmer-friendly" way. Is it a good idea to add a person now? If so, what can we do in order to help the new developer integrate into the team?

    Read the article

  • Skeptic in a Scrum Team

    - by Sorantis
    My company has recently switched to an Agile way of working and as a part of it we've started using SCRUM. While I'm very comfortable with it and feel that this way is superior to a traditional one, some of my teammates don't share the same opinion. In fact they are very skeptical about "all that agile stuff", and don't take it seriously. As an example, one of the teammates is always late on the meetings, and doesn't really care about it. The management IMO tries not to notice this (maybe because it's new, and it takes time for the people to get used to it). My question is, how to address this issue while not raising a conflict inside the team?

    Read the article

  • Parsing an MS Project 2007 xml project file.

    - by fred-22
    Has anyone got any idea how to read the XML file saved by MS Project 2007? The standard binary format is .MPP but I'd like to view a project in a different viewer. I've saved the project spec as XML and the viewer I'm using needs the parent task Id for each task. Where can i find that in the rather huge amount of XML data created by ms project?

    Read the article

  • Web Deployment Project builds files that are no longer part of the project

    - by Howard
    This is the error I get: Error 101 Could not load type 'control'. /Test.vbproj/x.ascx 1 1 WebDeployProject This is a left over file that was part of the project last week, but one of the developers deleted it from the project. I have to manually delete the file in order to get the WDP to build. Is there a way to tell the WDP to ignore the files that are not part of the project or to see that these files are not part of the project and delete them?

    Read the article

  • Team Build Errors when there aren't any

    - by Jonesie
    I have a nightly team build that is reporting errors from the test step but zero errors in the summary. This results in a partial success. I cant see any errors in the full build log but maybe it's just the quantity of warnings?? Anyone got any ideas? Thanks

    Read the article

  • More productive alone than in a team?

    - by Furry
    If I work alone, I used to be superproductive, if I want to be. Running prototypes within a day, something that you can deploy and use within a few days. Not perfect, but good enough. I also had this experience a few times when working directly with someone else. Everybody could do the whole thing, but it was more fun not to do it alone and also quicker. The right two people can take an admittedly not too large project onto new levels. Now at work we have a seven person team and I do not feel nearly as productive. Not even nearly. Certain stuff needs to be checked against something else, which then needs to also take care of some new requirement, which just came in three days ago. All sorts of stuff, mostly important, but often just a technical debt from long ago or misconception or different vocabulary for the same thing or sometimes just a not too technically thought out great idea from someone who wants to have their say, and so on. Digging down the rabbit hole, I think to myself, I could do larger portions of this work faster alone (and somewhat better, too), but it's not my responsibility (someone else gets paid for that), so by design I should not care. But I do, because certain things go hand in hand (as you may experience it, when you done sideprojects on your own). I know this is something Fred Brooks has written about, but still, what's your strategy for staying as productive as you know you could be in the cubicle? Or did you quit for some related reason; and if so where did you go?

    Read the article

  • How can i use JIRA for project management with Green Hopper

    - by user22
    I am thinking of using JIRA + GreenHopper for my project management. I have seen that Green Hopper is for making User stories , sprints. I am not able to find how do i need to add tasks , or how to break user stories in to sub stoires. DO i first need to create project in JIRA and then use Green Hopper or i can use use Green Hopper as stand alone for project management. I am thinking of JIRA as issue tracker not project management.

    Read the article

  • Multiple IDE project files

    - by TomWij
    We are currently working in a team where we use both Visual Studio and Code::Blocks, is there a way to replicate changes between those project files? So if one adds a file to the project file it will also get adjusted in the project file of the other IDE? Please note: We want our project to work on multiple IDE's, platforms and compilers. Thus a general solution is welcome too.

    Read the article

  • Version control and project management for freelancing jobs

    - by Groo
    Are there version control and project management tools which "work well" with freelancing jobs, if I want to keep my customer involved in the project at all times? What concerns me is that repository hosting providers have their fees based on the "number of users", which I feel is the number which will constantly increase as I finish one project after another. For each project, for example, I would have to add permissions to my contractor to allow him to pull the source code and collaborate. So how does that work in practice? Do I "remove" the contractor from the project once it's done? This means I basically state that I offer no support and bugfixes anymore. Or do freelances end up paying more and more money for these services? Do you use such online services, or you host them by yourself? Or do you simply send your code to your customer by e-mail in weekly iterations?

    Read the article

  • Project development without experience

    - by Raven13
    I'm a web developer who is part of a three-man team that has been tasked with a rather large and complex development project. Other than some direction and impetus from management, we're pretty much on our own to develop the new website. None of us have any project management experience nor do my two coworkers seem like they would be interested in taking on that role, so I feel like it's up to me to implement some kind of structure to the development process in order to avoid issues down the road. My question is: what can I do as a developer without project managment experience to ensure that our project gets developed successfully and avoid the pitfalls of developing a project without a plan?

    Read the article

  • How can I ensure our project gets developed successfully, without having any project management experience? [migrated]

    - by Raven13
    I'm a web developer who is part of a three-man team that has been tasked with a rather large and complex development project. Other than some direction and impetus from management, we're pretty much on our own to develop the new website. None of us have any project management experience nor do my two coworkers seem like they would be interested in taking on that role, so I feel like it's up to me to implement some kind of structure to the development process in order to avoid issues down the road. What can I do as a developer without project management experience to ensure that our project gets developed successfully and avoid the pitfalls of developing a project without a plan?

    Read the article

  • Quantitfying a cost for a software project

    - by The Elite Gentleman
    Disclaimer: I didn't know exactly where to put this question. If you feel that this question is not suitable for Programmers @ StackExchange, feel free to migrate it. Background: Broadening my last question, there is a request for tender for a software system that's open and I have decided to take it on. I am a software developer & engineer by profession and, in this tender process, I have to put on the pricing for my bid. I have been provided a documentation consisting of functional and non-functional requirements only. I have to put a project manager's cap on and think of all aspects, e.g. cost for implementation for the project, resources needed, etc. My question is: Is there a project framework that I can follow that breaks the project cycle into steps and corresponding cost aspect or how would I go about best calculating/approximating the cost for the project?

    Read the article

  • Project management without experience

    - by Raven13
    I'm a web developer who is part of a three-man team that has been tasked with a rather large and complex development project. Other than some direction and impetus from management, we're pretty much on our own to develop the new website. None of us have any project management experience nor do my two coworkers seem like they would be interested in taking on that role, so I feel like it's up to me to implement some kind of structure to the development process in order to avoid issues down the road. My question is: what can I do as a developer without project managment experience to ensure that our project gets developed successfully and avoid the pitfalls of developing a project without a plan?

    Read the article

  • Customize Team Build 2010 – Part 16: Specify the relative reference path

    In the series the following parts have been published Part 1: Introduction Part 2: Add arguments and variables Part 3: Use more complex arguments Part 4: Create your own activity Part 5: Increase AssemblyVersion Part 6: Use custom type for an argument Part 7: How is the custom assembly found Part 8: Send information to the build log Part 9: Impersonate activities (run under other credentials) Part 10: Include Version Number in the Build Number Part 11: Speed up opening my build process template Part 12: How to debug my custom activities Part 13: Get control over the Build Output Part 14: Execute a PowerShell script Part 15: Fail a build based on the exit code of a console application Part 16: Specify the relative reference path As I have already blogged about, it is not intuitive how to specify the paths where the build server has to look for references that are stored in Source Control. It is a common practice to store 3rd party libraries in Source Control, so they are available to everyone, everyone uses the same version of the libraries and updating a library can be done centrally. In Team Build 2010 these paths are specified as a parameter for MSBuild. What we will do in this post is building the values for this parameter based on the values in an argument. You are now pretty aware how to customize the build template, so let’s do the modifications in another way. Instead of opening the xaml file in the workflow designer, we open it in the XML editor. You can open it in the XML Editor by either selecting the Open with menu (see the context menu), or by choosing the View code option. To add this functionality we need to: Specify a new argument Add the argument to the metadata Build the absolute paths for the references and add these paths to the MSBuild arguments 1. Specify a new argument Locate at the top of the document the Members (which are the arguments) of the XAML and add the following line <x:Property Name="ReferencePaths" Type="InArgument(s:String[])" /> 2. Add the argument to the metadata Then locate the line <mtbw:ProcessParameterMetadataCollection> and paste the following line <mtbw:ProcessParameterMetadata Category="Misc" Description="The list of reference paths, relative to the root path in the Workspace mapping." DisplayName="Reference paths" ParameterName="ReferencePaths" /> 3. Build the absolute paths for the references and add these paths to the MSBuild arguments Now locate the place where the assignments are done to the variables used in the agent. And add the following lines after the last Assign activity         <Sequence DisplayName="Initialize ReferencePath" sap:VirtualizedContainerService.HintSize="464,428">           <Sequence.Variables>             <Variable x:TypeArguments="x:String" Name="ReferencePathsArgument">               <Variable.Default>                 <Literal x:TypeArguments="x:String" Value="" />               </Variable.Default>             </Variable>           </Sequence.Variables>           <sap:WorkflowViewStateService.ViewState>             <scg:Dictionary x:TypeArguments="x:String, x:Object">               <x:Boolean x:Key="IsExpanded">True</x:Boolean>             </scg:Dictionary>           </sap:WorkflowViewStateService.ViewState>           <ForEach x:TypeArguments="x:String" DisplayName="Iterate through the paths" sap:VirtualizedContainerService.HintSize="287,206" mtbwt:BuildTrackingParticipant.Importance="Low" Values="[ReferencePaths]">             <ActivityAction x:TypeArguments="x:String">               <ActivityAction.Argument>                 <DelegateInArgument x:TypeArguments="x:String" Name="path" />               </ActivityAction.Argument>               <Assign x:TypeArguments="x:String" DisplayName="Build ReferencePath argument" sap:VirtualizedContainerService.HintSize="257,100" mtbwt:BuildTrackingParticipant.Importance="Low"  To="[ReferencePathsArgument]" Value="[If(String.IsNullOrEmpty(ReferencePathsArgument), &quot;&quot;, ReferencePathsArgument + &quot;;&quot;) + IO.Path.Combine(SourcesDirectory, path)]" />             </ActivityAction>           </ForEach>           <Assign DisplayName="Append the reference paths to the MSBuild Arguments" sap:VirtualizedContainerService.HintSize="287,58">             <Assign.To>               <OutArgument x:TypeArguments="x:String">[MSBuildArguments]</OutArgument>             </Assign.To>             <Assign.Value>               <InArgument x:TypeArguments="x:String">[String.Format("{0} /p:ReferencePath=""{1}""", MSBuildArguments, ReferencePathsArgument)]</InArgument>             </Assign.Value>           </Assign>         </Sequence> Now you can use the template to specify the paths relative to SourcesDirectory. You can download the full solution at BuildProcess.zip. It will include the sources of every part and will continue to evolve.

    Read the article

  • Ideas for my MSc project and Google Summer of Code 2011

    - by Chris Wilson
    I'm currently putting together ideas for my master's project which I'll be working on over the summer, and I would like to be able to use this time to help Ubuntu in some way. I have the freedom to come up with pretty much any project in the field of software development/engineering provided it Is a substantial piece of software (for reference, I will be working on it for five full months) Solves a problem for more people than just myself I was hoping to use this project as an opportunity to get some experience with the underbelly of Linux, so that I can mention on my CV that I have 'experience in developing for *NIX in C++', which I'm noticing more and more companies are looking for these days, probably because stuff's moving to cloud servers and that's where Linux rules the roost. My problem is that, since I don't have the experience to begin with, I'm not sure what to do for such a project, and I was wondering if anyone could help me with this. I've noticed from Daniel Holbach's blog that Ubuntu participated in the Google Summer of Code 2010, and that project ideas for that can be found here. However, I have not been able to find anything related to Ubuntu and GSoC 2011, but I have noticed from the GSoC timeline that the list of mentoring organisations will not be published until March 18th. I have two questions here. Has Ubuntu applied to be a part of Summer of Code 2011, and what is the status of the 2010 project list linked to earlier. Were they all implemented or are there still some that can be picked up now, should I not participate in GSoC? I'd like to do something for Ubuntu, but I'd rather not spend my time reinventing the wheel.

    Read the article

  • Project Manager that wants to lock in time estimate with a signed contract

    - by sunpech
    At a previous employment, a project manager (PM) wasn't satisfied with the delivery time of the code on a project I was on. I was told by my project lead that that the PM was considering having me sign a contract to lock-in my time estimates I gave for tasks and delivery dates. The situation on the project was that we were working with new technologies, codebase, coding standards, and very prone-to-change requirements. I was learning new things and applying them the best I could on requirements that kept on changing. The requirements throughout the iterations grew by 2-3 times, with my estimate-to-complete growing by roughly 5-8 times. The only things that didn't change were the estimates and delivery dates. Yes, I did end up missing most deadlines. And I was working on some very new technologies that no one else on the entire development team could really help out on because they wouldn't be familiar with it. At least not easily. It seemed to me then, that the PM wanted his numbers to add up-- and thus wanted me to sign a contract to "ensure" that I would always deliver working code on time. I suppose with a signed contract the PM could use it against me if I couldn't deliver on time. I believe what happened next was that other project managers and/or project leads defended me, and didn't let this happen. My question is, should this raise a red flag about the manager? Is it common practice for a manager to lock-in time estimates of a software developer with a signed contract? Or in this case, try to. Please note, I was a full time employee, not an independent consultant. Update: I want to add that I did give new estimates weekly, but it seems the original estimates and delivery dates were what the PM was fixated on.

    Read the article

  • Is this project Structure Valid?

    - by rafuru
    I have a dilemma: In the university we learn to create modular software (on java), but this modularity is explained using a single project with packages (a package for business, another one for DAOS and another one for the model, oh and a last package for frontend). But in my work we use the next structure: I will try to explain: First we create a java library project where the model (entities classes) are created in a package. Next we create an EJB named DAOS and using the netbeans wizard we store the DAOS interfaces in the library project in another package , these interfaces are implemented in the DAOS bean. So the next part is the business logic, we create a business EJB for each group of functions , again using the wizard we store the interface in the java library project in another package then is implemented on the business bean. The final part (for the backend) is a bean that I have suggested: a Facade bean who will gather every method of the business beans in a single bean and this has an interface too that is created in our library project and implemented in the bean. So the next part is call the facade module on the web project. But I don't know how valid or viable is this, maybe I'm doing everything wrong and I don't even know! so I want to ask your opinion about this.

    Read the article

  • How to move from Programmer to Project Lead

    - by DoctaStooge
    At my job, I'm currently a programmer, but in the next few weeks I'll be taking control my own project. I was wondering if anyone else here has been in the same situation, and if so, what advice you can offer to help me be able to better run my project. Experience in dealing with contractors would be greatly appreciated. A little more info: Project will have 3 people including myself, with extra people coming in when needing testing. The project has been programmed mainly by 2 people I would like to contribute to the programming as I like doing it and think I can add to the program, but am afraid of how the contractors will react. I don't want to create bad feelings which may harm the project. EDIT: Forgot to mention that I'll have to be picking up communications with customers to make sure their needs are met. Any advice on talking to customers cold would be greatly appreciated. EDIT 2: This is not a new project, I'm picking it up around version 6. Sorry that I didn't make it clear before.

    Read the article

  • Project Tasks seem to take longer than entered

    - by Cylindric
    In Microsoft Project 2007, I can't work out why my tasks are scheduled to finish later than I would expect for the Duration I put in. I enter a task with a start date on a Monday and a 1-day duration, and it shows the Finish as Tuesday. Task Name Duration Start Finish Do Something 1 day 12/04/2010 13/04/2010 How can I set this up so a one-day task takes one day, and not one-and-a-bit? I want a one-day task that starts on a Monday to finish on the Monday.

    Read the article

  • VS2010 ultimate DataBase Project + SQL Server 2008: Updating Project from Database

    - by josecortesp
    Hello everyone, this is a quick question: I have this Database Project in a Web app solution with the real database. I want to update the database using SQL server managment studio, and then update the corresponding VS project. This can be done? I know that you can update the scripts in the project, but I'm not the SQL kind of guy, i rather do this changes using Mangment studio... Thanks in advance

    Read the article

  • software that meets all needs in a project

    - by taz
    Hello all, I have a got couple of software projects that I want to run with my friends(max 10 persons) privately(at least for now). But I'm kind of lost between software management systems. I am not even sure about the definitions of my needs. Dear all, what is the definition/name of the system/software that meets my needs listed below? Continuous Integration? And please suggest me a good ALL-IN-ONE instance of it: project roadmap/planning project resource(people) allocation project issue&bug tracking project mailing list project forum project wiki source control server source control client repository change notifier client build system(like scons) nightly build automation IDE integration(VS) Note: I tried Redmine and liked it, but found it kind of slow. All-in-one kind ones will be the most appreciated but if your suggestion includes more than 3 softwares, please suggest me the ones that work together painlessly. thanks in advance..

    Read the article

  • What combination of project-management software will meet my just-started project's needs?

    - by taz
    Hello all, I have a got couple of software projects that I want to run with my friends(max 10 persons) privately(at least for now). But I'm kind of lost between software management systems. I am not even sure about the definitions of my needs. Dear all, what is the definition/name of the system/software that meets my needs listed below? Continuous Integration? And please suggest me a good ALL-IN-ONE instance of it: project roadmap/planning project resource(people) allocation project issue&bug tracking project mailing list project forum project wiki source control server source control client repository change notifier client build system(like scons) nightly build automation IDE integration(VS) Note: I tried Redmine and liked it, but found it kind of slow. All-in-one kind ones will be the most appreciated but if your suggestion includes more than 3 softwares, please suggest me the ones that work together painlessly. thanks in advance..

    Read the article

  • Team Build: The path 'Path' is already mapped in workspace 'workspace' error even after deleting all

    - by Glenn Slaven
    I have this problem when I queue a build. The build dies with the error The path C:\[Path]\Sources is already mapped in workspace [Server Name]. the same as this question. but I've removed all the workspaces on the build agent by running this command: tf workspaces /remove:* and also by deleting the TFS cache folder. I've also restarted the server, but the error keeps happening on each build.

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >