  • Customize Team Build 2010 – Part 12: How to debug my custom activities

    In the series the following parts have been published Part 1: Introduction Part 2: Add arguments and variables Part 3: Use more complex arguments Part 4: Create your own activity Part 5: Increase AssemblyVersion Part 6: Use custom type for an argument Part 7: How is the custom assembly found Part 8: Send information to the build log Part 9: Impersonate activities (run under other credentials) Part 10: Include Version Number in the Build Number Part 11: Speed up opening my build process template Part 12: How to debug my custom activities Part 13: Get control over the Build Output Part 14: Execute a PowerShell script Part 15: Fail a build based on the exit code of a console application       Developers are “spoilt” persons who expect to be able to have easy debugging experiences for every technique they work with. So they also expect it when developing custom activities for the build process template. This post describes how you can debug your custom activities without having to develop on the build server itself. Remote debugging prerequisites The prerequisite for these steps are to install the Microsoft Visual Studio Remote Debugging Monitor. You can find information how to install this at http://msdn.microsoft.com/en-us/library/bt727f1t.aspx. I chose for the option to run the remote debugger on the build server from a file share. Debugging symbols prerequisites To be able to start the debugging, you need to have the pdb files on the buildserver together with the assembly. The pdb must have been build with Full Debug Info. Steps In my setup I have a development machine and a build server. To setup the remote debugging, I performed the following steps Locate on your development machine the folder C:\Program Files (x86)\Microsoft Visual Studio 10.0\Common7\IDE\Remote Debugger Create a share for the Remote Debugger folder. Make sure that the share (and the folder) has the correct permissions so the user on the build server has access to the share. On the build server go to the shared “Remote Debugger” folder Start msvsmon.exe which is located in the folder that represents the platform of the build server. This will open a winform application like   Go back to your development machine and open the BuildProcess solution. Start the Attach to process command (Ctrl+Alt+P) Type in the Qualifier the name of the build server. In my case the user account that has started the msvsmon is another user then the user on my development machine. In that case you have to type the qualifier in the format that is shown in the Remote Debugging Monitor (in my case LOCAL\Administrator@TFSLAB) and confirm it by pressing <Enter> Since the build service is running with other credentials, check the option “Show processes from all users”. Now the Attach to process dialog shows the TFSBuildServiceHost process Set the breakpoint in the activity you want to debug and kick of a build. Be aware that when you attach to the TFSBuildServiceHost that you debug every single build that is run by this windows service, so make sure you don’t debug the build server that is in production! You can download the full solution at BuildProcess.zip. It will include the sources of every part and will continue to evolve.

    Read the article

  • Customize Team Build 2010 – Part 13: Get control over the Build Output

    In the series the following parts have been published Part 1: Introduction Part 2: Add arguments and variables Part 3: Use more complex arguments Part 4: Create your own activity Part 5: Increase AssemblyVersion Part 6: Use custom type for an argument Part 7: How is the custom assembly found Part 8: Send information to the build log Part 9: Impersonate activities (run under other credentials) Part 10: Include Version Number in the Build Number Part 11: Speed up opening my build process template Part 12: How to debug my custom activities Part 13: Get control over the Build Output Part 14: Execute a PowerShell script Part 15: Fail a build based on the exit code of a console application     In the part 8, I have explained how you can add informational messages, warnings or errors to the build output. If you want to integrate with other lines of text to the build output, you need to do more. This post will show you how you can add extra steps, additional information and hyperlinks to the build output. Add an hyperlink to the end of the build output Lets start with a simple example of how you can adjust the build output. In this case we are going to add at the end of the build output an hyperlink where a user can click on to for example start the deployment to the test environment. In part 4 you can find information how you can create a custom activity To add information to the build output, you need the BuildDetail. This value is a variable in your xaml and is thus easily transferable to you custom activity. Besides the BuildDetail the user has also to specify the text and the url that has to be added to the end of the build output. The following code segment shows you how you can achieve this.     [BuildActivity(HostEnvironmentOption.All)]    public sealed class AddHyperlinkToBuildOutput : CodeActivity    {        [RequiredArgument]        public InArgument<IBuildDetail> BuildDetail { get; set; }         [RequiredArgument]        public InArgument<string> DisplayText { get; set; }         [RequiredArgument]        public InArgument<string> Url { get; set; }         protected override void Execute(CodeActivityContext context)        {            // Obtain the runtime value of the input arguments                        IBuildDetail buildDetail = context.GetValue(this.BuildDetail);            string displayText = context.GetValue(this.DisplayText);            string url = context.GetValue(this.Url);             // Add the hyperlink            buildDetail.Information.AddExternalLink(displayText, new Uri(url));            buildDetail.Information.Save();        }    } If you add this activity to somewhere in your build process template (within the scope Run on Agent), you will get the following build output Add an line of text to the build output The next challenge is to add this kind of output not only to the end of the build output but at the step that is currently executing. To be able to do this, you need the current node in the build output. The following code shows you how you can achieve this. First you need to get the current activity tracking, which you can get with the following line of code             IActivityTracking currentTracking = context.GetExtension<IBuildLoggingExtension>().GetActivityTracking(context); Then you can create a new node and set its type to Activity Tracking Node (so copy it from the current node) and do nice things with the node.             IBuildInformationNode childNode = currentTracking.Node.Children.CreateNode();            childNode.Type = currentTracking.Node.Type;            childNode.Fields.Add("DisplayText", "This text is displayed."); You can also add a build step to display progress             IBuildStep buildStep = childNode.Children.AddBuildStep("Custom Build Step", "This is my custom build step");            buildStep.FinishTime = DateTime.Now.AddSeconds(10);            buildStep.Status = BuildStepStatus.Succeeded; Or you can add an hyperlink to the node             childNode.Children.AddExternalLink("My link", new Uri(http://www.ewaldhofman.nl)); When you combine this together you get the following result in the build output     You can download the full solution at BuildProcess.zip. It will include the sources of every part and will continue to evolve.

    Read the article

  • Get to Know the ‘Real’ Pyro [Humorous Team Fortress 2 Video]

    - by Asian Angel
    People sometimes wonder just what is going through Pyro’s head when he is spreading mayhem and destruction. If you are one of them, then here is your chance to see things from Pyro’s ‘unique’ point-of-view! Meet the Pyro [via Dorkly] How to Use an Xbox 360 Controller On Your Windows PC Download the Official How-To Geek Trivia App for Windows 8 How to Banish Duplicate Photos with VisiPic

    Read the article

  • Android Studio Could not call IncrementalTask.taskAction() on task ':project:dexDebug'

    - by akenawell85x
    I recently decided to switch from Eclipse to Android Studio. I imported a project I was working on and am now getting this error when I try to run the project. Gradle: Execution failed for task ':project:dexDebug'. > Could not call IncrementalTask.taskAction() on task ':project:dexDebug' I've been cruising this site for 2 days now and trying different suggestions to no avail. I did run gradlew compileDebug --stacktrace and this is what I got: C:\Users\adam\AndroidStudioProjects\projectProject>gradlew compileDebug --stacktrace Relying on packaging to define the extension of the main artifact has been deprecated and is scheduled to be removed in Gradle 2.0 :project:preBuild UP-TO-DATE :project:preDebugBuild UP-TO-DATE :project:preReleaseBuild UP-TO-DATE :project:prepareComAndroidSupportAppcompatV71800Library UP-TO-DATE :project:prepareComGoogleAndroidGmsPlayServices3225Library UP-TO-DATE :project:prepareDebugDependencies :project:compileDebugAidl UP-TO-DATE :project:compileDebugRenderscript UP-TO-DATE :project:generateDebugBuildConfig UP-TO-DATE :project:mergeDebugAssets UP-TO-DATE :project:mergeDebugResources UP-TO-DATE :project:processDebugManifest UP-TO-DATE :project:processDebugResources UP-TO-DATE :project:generateDebugSources UP-TO-DATE :project:compileDebug UP-TO-DATE BUILD SUCCESSFUL Total time: 10.459 secs However I am still getting that error when I try to actually run the project. Here is my build.gradle (i do have a 'libs' folder in my project with all the jars for a google maps/places app): buildscript { repositories { mavenCentral() } dependencies { classpath 'com.android.tools.build:gradle:0.6.+' } } apply plugin: 'android' repositories { mavenCentral() } android { compileSdkVersion 18 buildToolsVersion "18.1.1" defaultConfig { minSdkVersion 8 targetSdkVersion 18 } } dependencies { compile fileTree(dir: 'libs') compile 'com.google.android.gms:play-services:3.2.25' compile 'com.android.support:support-v4:18.0.0' compile 'com.android.support:appcompat-v7:+' } and my settings.gradle: include ':project', ':project:libs:android-support-v4', ':project:libs:google-api-client-1.10.3-beta', ':project:libs:google-api-client-android2-1.10.3-beta', ':project:libs:google-http-client-1.10.3-beta', ':project:libs:google-http-client-android2-1.10.3-beta', ':project:libs:google-oauth-client-1.10.1-beta', ':project:libs:gson-2.1', ':project:libs:guava-11.0.1', ':project:libs:jackson-core-asl-1.9.4', ':project:libs:jsr305-1.3.9', ':project:libs:protobuf-java-2.2.0', ':project:libs:GoogleAdMobAdsSdk-6.4.1' As I said, I've tried pretty much everything I have read on here about this error and am having no luck. Any help would be greatly appreciated.

    Read the article

  • I'm tasked with leading the documentation effort for an existing, entirely undocumented, software product - what resources are there to help me?

    - by Ben Rose
    I'm a software developer at a technology company. I have been tasked with leading the documentation effort for the product I work on. The goal is to produce documentation internal to developer, and the project spills over into the business side, where it covers requirements documentation. This project is challenging. Specifically, I'm dealing with a product which: - has been around for a long time, at least 6 years. - has no form of documentation other than some small, outdated pieces here and there. - has comments in the code, but they are technical and do not convey any over-arching behavior (even on technical side). - as a consequence of having little to no documentation, is often unnecessarily complex under the covers In addition, we have not been given a lot of time to work on this project. I do not have any formal documentation or writing background, training, or experience. I have displayed some ability in writing/communication around the office, which may be why I was assigned to this project. Please share your advice or recommendation for resources to help me prepare and deal with this project. I'm looking for references to books/website/forums/whatever, to help me come up with the design of a plan with milestones, learn about best practices, task delegation, templates, buy-in, etc. I'm hoping specifically for resources targeting or giving special mention of introducing good documentation to existing, undocumented, projects. I would be very grateful for your responses. Ben

    Read the article

  • Splitting up revenue among development team members on Apple's app store

    - by itaiferber
    A friend and I have started developing an app to put on Apple's app store. Development is going fine, but thinking ahead, we're trying to come up with an easy way to share any revenue coming from our efforts. The app store allows you to deposit your revenue into a single bank account, but there's no easy way to split revenue among several people. How do (small) dev teams split up revenue on their products, on, and off the app store? As far as I can tell, banks don't offer an easy way to automatically split the balance on an account 50-50 (or any other percentage, for that matter), especially on a regular basis. So how do teams deal with this? We're not incorporated, and we don't have an official business set up. We're considering depositing all the money into one of our accounts and manually transferring half the money to the other person, but this isn't sustainable over long periods of time. Is there a low-cost, sustainable, automatic process for handling these finances?

    Read the article

  • Advice: How to convince my newly annointed team lead against writing the code base from scratch

    - by shan23
    I work in a pretty reknowned MNC, and the module that I work in has been assigned to a new "lead". The code base is pretty huge (~130K or more, with inter dependencies on other modules) , but stable - some parts have grown ugly over the years, but its provably in working state. (Our products are running for years on them, even new ones). The problem is, our lead wants to rewrite the code from scratch, to encompass "finer granularity and a proactive design". I know in my guts thats not a very good idea, but how do I convince him/the rest of the team(who are pretty much more senior than me in terms of years of exp), without sounding too pedantic myself (Thou shalt not rewrite , as Joel et al have clear articles prohibiting it)? I have a good working relation with the person concerned, and don't want to ruin it, but neither do I want to be party to a decision which would surely plague us for years to come !! Any suggestions for a milder,yet effective approach ? Even accounts of how you have tackled such a situation to your liking would help me a lot! EDIT: The code base I'm talking about is not a product/GUI, but at kernel level with all the critical functionalities for our product. I hope now you know why i sound so apprehensive !!

    Read the article

  • Advice on Project Management Software?

    - by Zenph
    I was wondering, does anybody work as part of a team, or as a project manager who highly recommends a certain project management solution (self-hosted or otherwise) ? Ideally I want something where I can manage the entire project, and also manage the financial side of things too. Should also add a few other things: notifications for team members for individual projects version control integration (like codebase) real time collaboration like chat

    Read the article

  • Improve Engineering & Construction Project Productivity

    - by [email protected]
    Driving successful project delivery and providing greater value and return for all stakeholders are key goals for firms in the engineering and construction industry. However, increasingly complex construction projects, compressed schedules, ineffective collaboration among project stakeholders, and limited interoperability, can get in the way of these goals and lead to reduced productivity. What E&C firms need are solutions that will improve global team collaboration, optimize processes and better communicate electronic project data. Check out the AutoVue for Engineering and Construction Solution Brief and learn how AutoVue enterprise visualization solutions can: - improve global project collaboration and communication - improve data interoperability - support virtual design and construction projects - improve change management and maintain accountability

    Read the article

  • How to deal with project managers who micromanage?

    - by entens
    Perhaps I'm just naive, but when I try to decipher the wall of tasks I'm targeted to do over the course of a week, I just can't help but think whoever builds the project schedule needs to get some remedial training on basic project management. For example, I am assigned 13 tasks today, the shortest lasting .13 days (default time metric in Microsoft Project), and the longest lasting .75 days. I can't help but think that it is blatant micromanagement scheduling projects in sub 10 minute intervals. The effects of management are becoming evident in slipped tasks, resource assignment exceeding capacity by a factor of two at some points in time, and spending more time clearing tasks and figuring out what comes next than actually doing work. How can I convince the project manager to create tasks with larger duration and to see the larger picture?

    Read the article

  • What makes a project big?

    - by Jonny
    Just out of curiosity what's the difference between a small, medium and large size project? Is it measured by lines of code or complexity or what? Im building a bartering system and so far have about 1000 lines of code for login/registration. Even though there's lots of LOC i wouldnt consider it a big project because its not that complex though this is my first project so im not sure. How is it measured?

    Read the article

  • Where to draw the line between front end and back end

    - by Twincascos
    I was recently contracted to develop a smarty theme for an automated SOHO phone answering service. The team who had built the backend wouldn't allow me access to any of the back end nor tell me anything about it, their smarty set up, smarty plugins, data base interface api, server set-up, nothing. Nor could I have access to the server nor a beta domain, basically zero co-operation. So I set up a local server with Smarty and built the template based on what I guessed would be their best practice, commented my code like crazy, wrote all the needed javascript, css, and template files. Then I sent them packaged to the backend team and hoped for the best. With half of a project team failing to cooperate or even communicate I am now concerned that they may reply saying that everything is wrong and they may refuse to implement the new front end. I'm curious to know if others encounter this type of situation and what you may have done to protect yourselves.

    Read the article

  • Failed Project: When to call it?

    - by Dan Ray
    A few months ago my company found itself with its hands around a white-hot emergency of a project, and my entire team of six pulled basically a five week "crunch week". In the 48 hours before go-live, I worked 41 of them, two back to back all-nighters. Deep in the middle of that, I posted what has been my most successful question to date. During all that time there was never any talk of "failure". It was always "get it done, regardless of the pain." Now that the thing is over and we as an organization have had some time to sit back and take stock of what we learned, one question has occurred to me. I can't say I've ever taken part in a project that I'd say had "failed". Plenty that were late or over budget, some disastrously so, but I've always ended up delivering SOMETHING. Yet I hear about "failed IT projects" all the time. I'm wondering about people's experience with that. What were the parameters that defined "failure"? What was the context? In our case, we are a software shop with external clients. Does a project that's internal to a large corporation have more space to "fail"? When do you make that call? What happens when you do? I'm not at all convinced that doing what we did is a smart business move. It wasn't my call (I'm just a code monkey) but I'm wondering if it might have been better to cut our losses, say we're not delivering, and move on. I don't just say that due to the sting of the long hours--the company royally lost its shirt on the project, plus the intangible costs to the company in terms of employee morale and loyalty were large. Factor that against the PR hit of failing to deliver a high profile project like this one was... and I don't know what the right answer is.

    Read the article

  • What is a correct/polite way to inherit from an abandoned open-source project for a new open-source project?

    - by Kabumbus
    My team just tried to contact some guys from an old open source project hosted on code.google.com. We told them that we'd like to join their project and commit to it — at least to some branch of it — but no one responded to us. We tried everyone, owners and committers; no one was in any way active, and no one replied. But we have some code to commit and we really would love to continue work on that project. So we need to create a new project. We came up with a name for it which is close to but not a duplicate of the name of the project we want to inherit from. How should we do our first commit, and what should the commit message be? Should we just copy their code to our repository with a comment like "we inherited this code, we found it here under such and such a license ... now we're upgrading it to this more/less strict license ..."? Or should we just use their code as our first commit, with updates saying "we inherited from ... we made such and such changes ..."?

    Read the article

  • Setting up Clojure Project And Sub Projects

    - by octopusgrabbus
    This is primarily a lein question about setting up a major project and its sub-projects, and is not intended to be a discussion question. Instead, I am interested in either a pointer to documentation or to a Clojure/lein best practices link. I have a municipal property assessments application that splits two master flies into different subset files, depending on whether a billing transfer is taking place or we want to batch update new accounts, rather than making our assessment department enter new accounts once in their system and then again in the tax collection system. My application is going to be large enough, that I can see a common library lein project with support functions, like splitting apart the files, and then individual lein projects that use the common library. Should the lein projects be set up at the same level and support included through the project.clj/core.clj files? Is there an advantage to creating lein new projects underneath a major project? Is there a problem with combing all functions in one project? I can probably make my one core.clj contain all flavors of the program, but coming from a C/C++ and Python background, I would prefer to have a lot of little projects.

    Read the article

  • How to start to gain experience of managing a project

    - by Tim
    There are some job requirements of project management experience for a programmer, such as: the candidate has to have some experience managing a project, not necessarily with subordinates, but rather having worked on a project all the way from design down to test. I was wondering what "subordinates" mean here? if there are some books, webpages or elsewhere with both general guideline and simple practical sample projects to help one get some basics about the whole process of a project. I am particularly interested in projects for both Linux and Windows, in C, C++, Python, Java. I am considering to start by playing on my own, not eager to find a company yet. My major was not CS, so I might lack the basics.

    Read the article

  • VS2008 Setup Project for C# Project

    - by xopht
    I've built app using wmp.dll which is Windows System File in my XP machine. If I tried add outputs of above project to my Setup Project, VS warned that ''wmp.dll' should be excluded because its source file 'C:\WINDOWS\system32\wmp.dll' is under Windows System File Protection'. There're three things under 'Detected Dependencies' folder. Microsoft .NET Framework, Interop.WMPLib.dll and wmp.dll. The app works okay in my machine, of course. But if I install this into Windows Server 2003 machine, the app does not be launched. I think this is because different version of OS use different version of wmp.dll. Anyway, how can I fix this? ps. I've even excluded wmp.dll from the Setup Project.

    Read the article

  • Alternatives to MS project server

    - by Ajaxx
    I manage a small group and I'd keep my work breakdown in project. However, it's difficult to provide my team with an adequate view into the project and ability to report on their progress. I looked at MS Project Server (the sharepoint webpart) but it's an expensive proposition. Has anyone had any experience with any other tool (commercial is fine) that helps team view and report on their work as managed by MS Project? FWIW, I have looked at OpenProj and it appears to be a decent solution for viewing project files on the desktop. Anything web-based, keeping in mind that I'd like people to report on their work not just view their work.

    Read the article

  • Podcast Show Notes: The Fusion Middleware A-Team and the Chronicles of Architecture

    - by Bob Rhubart
    If you pay any attention at all to the Oracle blogosphere you’ve probably seen one of several blogs published by members of a group known as the Oracle Fusion Middleware A-Team. A new blog, The Oracle A-Team Chronicles, was recently launched that combines all of those separate A-Team blogs in one. In this program you’ll meet some of the people behind the A-team and the creation of that new blog. The Conversation Listen to Part 1: Background on the A-Team - When was it formed? What is it’s mission? 54) What are some of the most common challenges A-Team architects encounter in the field? Listen to Part 2 (July 3): The panel discusses the trends - big data, mobile, social, etc - that are having the biggest impact in the field. Listen to Part 3 (July 10): The panelists discuss the analysts, journalists, and other resources they rely on to stay ahead of the curve as the technology evolves, and reveal the last article or blog post they shared with other A-team members. The Panelists Jennifer Briscoe: Senior Director, Oracle Fusion Middleware A-Team Clifford Musante: Lead Architect, Application Integration Architecture A-Team, webmaster of the A-Team Chronicles Mikael Ottosson: Vice President, Oracle Fusion Apps and Fusion Middleware A-Team and Cloud Applications Group Pardha Reddy: Senior director of Oracle Identity Management and a member of the Oracle Fusion Middleware A-team Coming Soon Data Warehousing and Oracle Data Integrator: Guest producer and Oracle ACE Director Gurcan Orhan selected the topic and panelists for this program, which also features Uli Bethke, Michael Rainey, and Oracle ACE Cameron Lackpour. Java and Oracle ADF Mobile: An impromptu roundtable discussion featuring QCon New York 2013 session speakers Doug Clarke, Frederic Desbiens, Stephen Chin, and Reza Rahman. Stay tuned:

    Read the article

  • When should I use Areas in TFS instead of Team Projects

    - by Martin Hinshelwood
    Well, it depends…. If you are a small company that creates a finite number of internal projects then you will find it easier to create a single project for each of your products and have TFS do the heavy lifting with reporting, SharePoint sites and Version Control. But what if you are not… Update 9th March 2010 Michael Fourie gave me some feedback which I have integrated. Ed Blankenship via @edblankenship offered encouragement and a nice quote. Ewald Hofman gave me a couple of Cons, and maybe a few more soon. Ewald’s company, Avanade, currently uses Areas, but it looks like the manual management is getting too much and the project is getting cluttered. What if you are likely to have hundreds of projects, possibly with a multitude of internal and external projects? You might have 1 project for a customer or 10. This is the situation that most consultancies find themselves in and thus they need a more sustainable and maintainable option. What I am advocating is that we should have 1 “Team Project” per customer, and use areas to create “sub projects” within that single “Team Project”. "What you describe is what we generally do internally and what we recommend. We make very heavy use of area path to categorize the work within a larger project." - Brian Harry, Microsoft Technical Fellow & Product Unit Manager for Team Foundation Server   "We tend to use areas to segregate multiple projects in the same team project and it works well." - Tiago Pascoal, Visual Studio ALM MVP   "In general, I believe this approach provides consistency [to multi-product engagements] and lowers the administration and maintenance costs. All good." - Michael Fourie, Visual Studio ALM MVP   “@MrHinsh BTW, I'm very much a fan of very large, if not huge, team projects in TFS. Just FYI :) Use Areas & Iterations.” Ed Blankenship, Visual Studio ALM MVP   This would mean that SSW would have a single Team Project called “SSW” that contains all of our internal projects and consequently all of the Areas and Iteration move down one hierarchy to accommodate this. Where we would have had “\SSW\Sprint 1” we now have “\SSW\SqlDeploy\Sprint1” with “SqlDeploy” being our internal project. At the moment SSW has over 70 internal projects and more than 170 total projects in TFS. This method has long term benefits that help to simplify the support model for companies that often have limited internal support time and many projects. But, there are implications as TFS does not provide this model “out-of-the-box”. These implications stretch across Areas, Iterations, Queries, Project Portal and Version Control. Michael made a good comment, he said: I agree with your approach, assuming that in a multi-product engagement with a client, they are happy to adopt the same process template across all products. If they are not, then it’ll either be easy to convince them or there is a valid reason for having a different template - Michael Fourie, Visual Studio ALM MVP   At SSW we have a standard template that we use and this is applied across the board, to all of our projects. We even apply any changes to the core process template to all of our existing projects as well. If you have multiple projects for the same clients on multiple templates and you want to keep it that way, then this approach will not work for you. However, if you want to standardise as we have at SSW then this approach may benefit you as well. Implications around Areas Areas should be used for topological classification/isolation of work items. You can think of this as architecture areas, organisational areas or even the main features of your application. In our scenario there is an additional top level item that represents the Project / Product that we want to chop our Team Project into. Figure: Creating a sub area to represent a product/project is easy. <teamproject> <teamproject>\<Functional Area/module whatever> Becomes: <teamproject> <teamproject>\<ProjectName>\ <teamproject>\<ProjectName>\<Functional Area/module whatever> Implications around Iterations Iterations should be used for chronological classification/isolation of work items. This could include isolated time boxes, milestones or release timelines and really depends on the logical flow of your project or projects. Due to the new level in Area we need to add the same level to Iteration. This is primarily because it is unlikely that the sprints in each of your projects/products will start and end at the same time. This is just a reality of managing multiple projects. Figure: Adding the same Area value to Iteration as the top level item adds flexibility to Iteration. <teamproject>\Sprint 1 Or <teamproject>\Release 1\Sprint 1 Becomes: <teamproject>\<ProjectName>\Sprint 1 Or <teamproject>\<ProjectName>\Release 1\Sprint 1 Implications around Queries Queries are used to filter your work items based on a specified level of granularity. There are a number of queries that are built into a project created using the MSF Agile 5.0 template, but we now have multiple projects and it would be a pain to have to edit all of the work items every time we changed project, and that would only allow one team to work on one project at a time.   Figure: The Queries that are created in a normal MSF Agile 5.0 project do not quite suit our new needs. In order for project contributors to be able to query based on their project we need a couple of things. The first thing I did was to create an “_Area Template” folder that has a copy of the project layout with all the queries setup to filter based on the “_Area Template” Area and the “_Sprint template” you can see in the Area and Iteration views. Figure: The template is currently easily drag and drop, but you then need to edit the queries to point at the right Area and Iteration. This needs a tool. I then created an “Areas” folder to hold all of the area specific queries. So, when you go to create a new TFS Sub-Project you just drag “_Area Template” while holding “Ctrl” and drop it onto “Areas”. There is a little setup here. That said I managed it in around 10 minutes which is not so bad, and I can imagine it being quite easy to build a tool to create these queries Figure: These new queries can be configured in around 10 minutes, which includes setting up the Area and Iteration as well. Version Control What about your source code? Well, that is the easiest of the lot. Just create a sub folder for each of your projects/products.   Figure: Creating sub folders in source control is easy as “Right click | Create new folder”. <teamproject>\DEV\Main\ Becomes: <teamproject>\<ProjectName>\DEV\Main\ Conclusion I think it is up to each company to make a call on how you want to configure your Team Projects and it depends completely on how many projects/products you are going to have for each customer including yourself. If we decide to utilise this route it will require some configuration to get our 170+ projects into this format, and I will probably be writing some tools to help. Pros You only have one project to upgrade when a process template changes – After going through an upgrade of over 170 project prior to the changes in the RC I can tell you that that many projects is no fun. Standardises your Process Template – You will always have the same Process implementation across projects/products without exception You get tighter control over the permissions – Yes, you can do this on a standard Team Project, but it gets a lot easier with practice. You can “move” work items from one “product” to another – Have we not always wanted to do that. You can rename your projects – Wahoo: everyone wants to do this, now you can. One set of Reporting Services reports to manage – You set an area and iteration to run reports anyway, so you may as well set both. Simplified Check-In Policies– There is only one set of check-in policies per client. This simplifies administration of policies. Simplified Alerts – As alerts are applied across multiple projects this simplifies your alert rules as per client. Cons All of these cons could be mitigated by a custom tool that helps automate creation of “Sub-projects” within Team Projects. This custom tool could create areas, Iteration, permissions, SharePoint and queries. It just does not exist yet :) You need to configure the Areas and Iterations You need to configure the permissions You may need to configure sub sites for SharePoint (depends on your requirement) – If you have two projects/products in the same Team Project then you will not see the burn down for each one out-of-the-box, but rather a cumulative for the Team Project. This is not really that much of a problem as you would have to configure your burndown graphs for your current iteration anyway. note: When you create a sub site to a TFS linked portal it will inherit the settings of its parent site :) This is fantastic as it means that you can easily create sub sites and then set the Area and Iteration path in each of the reports to be the correct one. Every team wants their own customization (via Ewald Hofman) - small teams of 2 persons against teams of 30 – or even outsourcing – need their own process, you cannot allow that because everybody gets the same work item types. note: Luckily at SSW this is not a problem as our template is standardised across all projects and customers. Large list of builds (via Ewald Hofman) – As the build list in Team Explorer is just a flat list it can get very cluttered. note: I would mitigate this by removing any build that has not been run in over 30 days. The build template and workflow will still be available in version control, but it will clean the list. Feedback Now that I have explained this method, what do you think? What other pros and cons can you see? What do you think of this approach? Will you be using it? What tools would you like to support you?   Technorati Tags: Visual Studio ALM,TFS Administration,TFS,Team Foundation Server,Project Planning,TFS Customisation

    Read the article

  • What makes for the ideal project? [closed]

    - by Hans Westerbeek
    I try to be careful when accepting assignments, to avoid mutual disappointment. So, I started to come up with a list of things that I consider ingredients for The Ideal Project: (in no particular order) What did I miss? What did I get wrong? Team size < 6 persons to avoid having too many meetings Team members must be dedicated to the project Gut-feeling-estimate (made by developers) of running period does not exceed 4 months. Projects longer than that tend to become open-ended, and are therefore not projects. Has a Product Owner who has mandate and is well-respected at their own company and who has a real interest in the long-term success of the project. Has no technical involvement from people that are not on the team. (yes that's you, Mr Architect That Doesn't Code) All the usual about quiet working conditions Exciting subject matter. Content management is just not as cool as controlling robots :)

    Read the article

  • Beginning with first project on game development [closed]

    - by Tsvetan
    Today is the day I am going to start my first real game project. It will be a Universe simulator. Basically, you can build anything from tiny meteor to quazars and universes. It is going to be my project for an olympiad in IT in my country and I really want to make it perfect(at least a bronze medal). So, I would like to ask some questions about organization and development methodologies. Firstly, my plan is to make a time schedule. In it I would write my plans for the next month or two(because that is the time I have). With this exact plan I hope to make my organisation at its best. Of course, if I am doing sth faster than the schedule I would involve more features for the game and/or continue with the tempo I have. Also, for the organisation I would make a basic pseudocode(maybe) and just rewrite it so it is compilable. Like a basic skeleton of everything. The last is an idea I tought of in the moment, but if it is good I will use it. Secondly, for the development methodologies, obviously, I think of making object-oriented code and make everything perfect(a lot of testing, good code, documentation etc.). Also, I am going to make my own menu system(I read that OpenGL hasn't got very good one). Maybe I would implement it with an xml file, holding the info about position of buttons, text boxes, images and everything. Maybe I would do a specific CSS for it and so on. I think that is very good way of doing the menu system, because it makes the presentation layer separate of the logic. But, if there is a better way, I would do it the better way. For the logic, well, I don't have much to say. OO code, testing, debuging, good and fast algorithms and so on. Also, a good documentation must be written and this is the area I need to make some research in. I think that is for now. I hope I have been enough descriptive. If more questions come on my mind, I will ask them. Edit: I think of blogging every part of the project, or at least writing down everything in a file or something like that. My question is: Is my plan of how to do everything around the project good? And if not, what is necessary to be improved and what other things I can involve for making the project good.

    Read the article

  • How to motivate as a project leader?

    - by Zenzen
    Ok so some of you might think this is not stackoverflow related, but since I got a similar question during an interview (for a J2EE dev position) I think you guys will help me in the end. The situation is simple: you're working on a project in a small group (4-5 people), you're the project leader and the guy who's the most competent (technology wise) is also slacking the most. What do you do to motivate him? The problem is, I'm having the same issue at the university - this semester we have a lot of projects going on (6 to be exact) so we decided to dived the work so everyone will do 1-2 projects in a technology he knows/wants to learn. It's been working well for the most part, the problem is the person whom we thought would finish his project way before us as he's the most experienced among us. How am I supposed to make him do his share properly? Till now he was just half assing his part by doing the bare minimum, with which the professor wasn't really pleased to say the least... Now it's only a university project, but in the future I might have the same problem in a real job and losing a really smart and experienced worker (as firing him is the only solution I can come up with now) would really be a waste. Aren't there any better ways? p.s. now that I think about it, are there any books that would help me in becoming a better project manager?

    Read the article