Search Results

Search found 2525 results on 101 pages for 'jared green'.

Page 51/101 | < Previous Page | 47 48 49 50 51 52 53 54 55 56 57 58  | Next Page >

  • How to set checked property in vba (format or control toolbox)

    - by rach-90
    I'm trying to change the value of my checkbox to true based on a another cell's value if range("A1").value = "green" then Checkbox1.value= true end if How to I change the value property to true for multiple checkbox at the same time For some reason the code that i've tried doesn't do anything at all. P.S. I'm using format checkboxes

    Read the article

  • My php script only reads the first row from mysql and doesn't check the rest of the rows for matches

    - by RobertH
    I'm trying to write a script for users to register to a club, and it does all the validation stuff properly and works great until it gets to the part where its supposed to check for duplicates. I'm not sure what is going wrong. HELP PLEASE!!! Thank you in Advance, <?php mysql_connect ("sqlhost", "username", "password") or die(mysql_error()); mysql_select_db ("databasename") or die(mysql_error()); $errormsgdb = ""; $errordb = "Sorry but that "; $error1db = "Name"; $error2db = "email"; $error3db = "mobile number"; $errordbe = " is already registered"; $pass1db = "No Matching Name"; $pass2db = "No Matching Email"; $pass3db = "No Matching Mobile"; $errorcount = 0; $qResult = mysql_query ("SELECT * FROM table"); $nRows = mysql_num_rows($qResult); for ($i=1; $i< $nRows+1; $i++){ $result = mysql_query("SELECT id,fname,lname,dob,email,mobile,agree,code,joindate FROM table WHERE fname = '$ffname"); if ($result > 0) { $errorcount = $errorcount++; $passdb = 0; $errormsgdb = $error1db; echo "<div class=\"box red\">$errordb $errormsgdb } else { $pass = 1; $errormsgdb = $pass1db; echo "<div class=\"box green\">$errormsgdb</div><br />"; } //--------------- Check if DB checks returned errors ------------------------------------> if($errorcount <= 0){ $dobp = $_REQUEST['day'].'/'.$_REQUEST['month'].'/'.$_REQUEST['year']; $dob = $_REQUEST['year'].$_REQUEST['month'].$_REQUEST['day']; //header('Location: thankyou.php?ffname='.$ffname.'&flname='.$flname.'&dob='.$dob.'&femail='.$femail.'&fmobile='.$fmobile.'&agree='.$agree.'&code='.$code.'&dobp='.$dobp); echo "<div class='box green'>Form completed! Error Count = $errorcount</div>"; } else { echo "<div class='box red'>There was an Error! Error Count = $errorcount</div>"; } } ?>

    Read the article

  • Does strokeRect: of NSBezierPath always draw a transparent rect? (Cocoa OSX)

    - by Michael Minerva
    I am trying to make a custom selection box for an image view I created and I am trying to use strokeRect: from NSBezierPath but it always seems to be transparent. Called the method set to set the color the blackColor and then also tried using olorWithDeviceRed:green:blue:alpha: but no matter what I have tried the rectangle created always seems to be transparent. Is there a better method to use to draw an empty rectangle?

    Read the article

  • IE div shorter than 20 px?

    - by aeq
    I can't seem to get my <div> height in IE (7) to be shorter than 20px: <div style="background: green; height: 1px;"> </div> Using the above code (both with and without html and body tags) the height of the div cannot seem to drop below a certain value (I think it is 20px). Any ideas?

    Read the article

  • IF statement within WHILE not working

    - by Ds.109
    I am working on a basic messaging system. This is to get all the messages and to make the row of the table that has an unread message Green. In the table, there is a column called 'msgread'. this is set to '0' by default. Therefore it should make any row with the msgread = 0 - green. this is only working for the first row of the table with the code i have - i verified that it is always getting a 0 value, however it only works the first time through in the while statement .. require('./connect.php'); $getmessages = "SELECT * FROM messages WHERE toperson = '" . $userid . "'"; echo $getmessages; $messages = mysql_query($getmessages); if(mysql_num_rows($messages) != 0) { $table = "<table><tr><th>From</th><th>Subject</th><th>Message</th></tr>"; while($results = mysql_fetch_array($messages)) { if(strlen($results[message]) < 30){ $message = $results[message]; } else { $message = substr($results[message], 0 ,30) . "..."; } if($results[msgread] == 0){ $table .= "<tr style='background:#9CFFB6'>"; $table .= "<td>" . $results[from] . "</td><td>" . $results[subject] . "</td><td><a href='viewmessage.php?id=" . $results[message_id] ."'>" . $message . "</a></td></tr>"; } else { $table .= "<tr>"; $table .= "<td>" . $results[from] . "</td><td>" . $results[subject] . "</td><td><a href='viewmessage.php?id=" . $results[message_id] ."'>" . $message . "</a></td></tr>"; } } echo $table ."</table>"; } else { echo "No Messages Found"; } There's all the code, including grabbing the info from the database. Thanks.

    Read the article

  • Weird Network Behavior of Home Router

    - by Stilgar
    First of all I would like to apologize because what you are going to read will be long and confusing but I am fighting this issue for 3 days now and am out of ideas. At home I have the following setup 50Mbps Internet connects into a home router A 2 desktop computers connect to router A via standard FTP LAN cables including one where the cable is ~20m long. a second router B connects to router A via standard FTP LAN cable X (~20m long). several devices connect to the wireless network of router B and there are a couple of desktop computers connected to it through FTP LAN cables. For some reason computers connected to router B when it is connected via cable X have very slow Internet connection. It is like 5 times slower than what is expected. This is the actual problem I am trying to solve. Interesting facts If a computer is connected to cable X directly instead of through router B the Internet speed is just fine (up to the 50Mbps I get from the ISP). Tested with two computers. I have tried replacing router B with another router C and the problem persists. If I connect router B via another cable to the same ports with the same settings everything seems to work fine and computers connected to router B have quite fast Internet I have tested mainly via Speedtest.net but I have also achieved similar speeds when downloading a file The upload speed is quite higher than the download speed in all cases. Note that my ISP usually has higher upload speed (unless it manages to hit the 50Mbps cap) It seems like the speed when connecting through router B with cable X is reduced 4-5 times no matter what the original speed is. For example via router B I get 10Mbps speed to local servers where I get 50Mbps when connected on router A. If I use a distant server where the ISP is only able to provide 25Mbps I get 4-5Mbps on router B. WiFi is slower than LAN on both routers (which is normal) but the reduced speed is reduced proportionally for WiFi. In addition the upload speed is normally higher from the ISP and it is also reduced proportionally. I have tried two different network configurations. One where I have NAT behind NAT where router B connects to router A via the WAN port and has its own DHCP. Second where router B connects to router A via standard LAN port and has DHCP disabled. In this configuration router B serves as a switch and the Network Gateway for computers connected to router B is the internal IP address of router A. Both configurations work just fine but both manifest the reduced speed issue. pings seem to work just fine As far as I can tell none of the cables is crossed The RJ45 setup for cable X orange orange-white brown brow-white blue blue-white green green-white This is a big problem for me since cable X passes through walls and floors and is very hard to replace. I also may have gotten some of the facts wrong because I am almost going crazy with this issue and testing includes going several floors up and down the staircase. One hypothesis I came up with is that the cable is defective in such a way that the voltage from the router affects its performance. When it is connected to a computer it performs just fine but the router has less power. Related hypothesis includes the cable being affected by electricity cables in the walls when the voltage is low. (I know nothing about electricity) So any ideas what to do, what to test or what the issue may be?

    Read the article

  • FAQ: GridView Calculation with JavaScript - Formatting and Validation

    - by Vincent Maverick Durano
    In my previous post here we've talked about how to calculate the sub-totals and grand total in GridView using JavaScript. In this post I'm going take more step further and will demonstrate how are we going to format the totals into a currency and how to validate the input that would only allow you to enter a whole number in the quantity TextBox. Here are the code blocks below: ASPX Source:   <!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd"> <html xmlns="http://www.w3.org/1999/xhtml" > <head runat="server"> <title></title> <script type="text/javascript"> function CalculateTotals() { var gv = document.getElementById("<%= GridView1.ClientID %>"); var tb = gv.getElementsByTagName("input"); var lb = gv.getElementsByTagName("span"); var sub = 0; var total = 0; var indexQ = 1; var indexP = 0; var price = 0; for (var i = 0; i < tb.length; i++) { if (tb[i].type == "text") { ValidateNumber(tb[i]); price = lb[indexP].innerHTML.replace("$", "").replace(",", ""); sub = parseFloat(price) * parseFloat(tb[i].value); if (isNaN(sub)) { lb[i + indexQ].innerHTML = "0.00"; sub = 0; } else { lb[i + indexQ].innerHTML = FormatToMoney(sub, "$", ",", "."); ; } indexQ++; indexP = indexP + 2; total += parseFloat(sub); } } lb[lb.length - 1].innerHTML = FormatToMoney(total, "$", ",", "."); } function ValidateNumber(o) { if (o.value.length > 0) { o.value = o.value.replace(/[^\d]+/g, ''); //Allow only whole numbers } } function isThousands(position) { if (Math.floor(position / 3) * 3 == position) return true; return false; }; function FormatToMoney(theNumber, theCurrency, theThousands, theDecimal) { var theDecimalDigits = Math.round((theNumber * 100) - (Math.floor(theNumber) * 100)); theDecimalDigits = "" + (theDecimalDigits + "0").substring(0, 2); theNumber = "" + Math.floor(theNumber); var theOutput = theCurrency; for (x = 0; x < theNumber.length; x++) { theOutput += theNumber.substring(x, x + 1); if (isThousands(theNumber.length - x - 1) && (theNumber.length - x - 1 != 0)) { theOutput += theThousands; }; }; theOutput += theDecimal + theDecimalDigits; return theOutput; } </script> </head> <body> <form id="form1" runat="server"> <asp:gridview ID="GridView1" runat="server" ShowFooter="true" AutoGenerateColumns="false"> <Columns> <asp:BoundField DataField="RowNumber" HeaderText="Row Number" /> <asp:BoundField DataField="Description" HeaderText="Item Description" /> <asp:TemplateField HeaderText="Item Price"> <ItemTemplate> <asp:Label ID="LBLPrice" runat="server" Text='<%# Eval("Price","{0:C}") %>'></asp:Label> </ItemTemplate> </asp:TemplateField> <asp:TemplateField HeaderText="Quantity"> <ItemTemplate> <asp:TextBox ID="TXTQty" runat="server" onkeyup="CalculateTotals();"></asp:TextBox> </ItemTemplate> <FooterTemplate> <b>Total Amount:</b> </FooterTemplate> </asp:TemplateField> <asp:TemplateField HeaderText="Sub-Total"> <ItemTemplate> <asp:Label ID="LBLSubTotal" runat="server" ForeColor="Green" Text="0.00"></asp:Label> </ItemTemplate> <FooterTemplate> <asp:Label ID="LBLTotal" runat="server" ForeColor="Green" Font-Bold="true" Text="0.00"></asp:Label> </FooterTemplate> </asp:TemplateField> </Columns> </asp:gridview> </form> </body> </html> Code Behind Source:   public partial class GridCalculation : System.Web.UI.Page { private void BindDummyDataToGrid() { DataTable dt = new DataTable(); DataRow dr = null; dt.Columns.Add(new DataColumn("RowNumber", typeof(string))); dt.Columns.Add(new DataColumn("Description", typeof(string))); dt.Columns.Add(new DataColumn("Price", typeof(decimal))); dr = dt.NewRow(); dr["RowNumber"] = 1; dr["Description"] = "Nike"; dr["Price"] = "1000"; dt.Rows.Add(dr); dr = dt.NewRow(); dr["RowNumber"] = 2; dr["Description"] = "Converse"; dr["Price"] = "800"; dt.Rows.Add(dr); dr = dt.NewRow(); dr["RowNumber"] = 3; dr["Description"] = "Adidas"; dr["Price"] = "500"; dt.Rows.Add(dr); dr = dt.NewRow(); dr["RowNumber"] = 4; dr["Description"] = "Reebok"; dr["Price"] = "750"; dt.Rows.Add(dr); dr = dt.NewRow(); dr["RowNumber"] = 5; dr["Description"] = "Vans"; dr["Price"] = "1100"; dt.Rows.Add(dr); dr = dt.NewRow(); dr["RowNumber"] = 6; dr["Description"] = "Fila"; dr["Price"] = "200"; dt.Rows.Add(dr); //Bind the Gridview GridView1.DataSource = dt; GridView1.DataBind(); } protected void Page_Load(object sender, EventArgs e) { if (!IsPostBack) { BindDummyDataToGrid(); } } } Running the code above will display something like this: On initial load After entering the quantity in the TextBox That's it! I hope someone find this post useful! Technorati Tags: ASP.NET,C#,ADO.NET,JavaScript,GridView

    Read the article

  • Fixing a SkyDrive Sync Disaster

    - by Rick Strahl
    For a few months I've been using SkyDrive to handle some basic synching tasks for a number of folders of mine. Specifically I've been dumping a few of my development folders into sky drive so I have a live running backup. It had been working just fine until about a week ago when something went awry. Badly! The idea is that the SkyDrive should sync files, but somewhere in its sync relationship it appears that SkyDrive got confused and assumed it needed to sync back older files to my local machine from the SkyDrive server. So rather than syncing my newer files to the server SkyDrive was pushing older files back to me. Because SkyDrive is so slow actually updating data it's not unusual for SkyDrive to be far behind in syncing and apparently some files were out of date by several months. Of course this is insidious because I didn't notice it for quite some time. I'd been happily working away on my files when a few days ago I noted a bunch of files with -RasXps (my machine name) popping up in various folders. At first I thought my Git repository was giving me a fit, but eventually realized that SkyDrive was actually pushing old files into my monitored folders. To be fair SkyDrive did make backups of the existing files, but by the time I caught it there were literally a few thousand files scattered on my machine that were now updated with old files from online. Here's what some of this looks like: If you look at the directory list you see a bunch of files with a -RasXps postfix appended to them. Those are the files that SkyDrive replaced and backed up on my machine. As you can see the backed up files are actually newer than the ones it pulled from the online SkyDrive. Unless I modified the files after they were updated they all were older than the existing local files. Not exactly how I imagined my synching would work. At first I started cleaning up this mess manually. In most cases the obvious solution was to simply delete the original file and replace with the -RasXps file, but not in all files. Some scrutiny was required and besides being a pain in the ass to rename files, quite frequently I had to dig out Beyond Compare to compare a few files where it wasn't quite clear what's wrong. I quickly realized that doing this by hand would be too hard for the large number of files that got hosed. Hacking together a small .NET Utility So, I figured the easiest way to tackle this is to write a small utility app that shows me all the mangled files that have backups, allows me to compare them and then quickly select and update them, removing the -RasXps file after choosing one of the two files. What I ended up with was a quick and dirty WinForms app that allows me to pick a root folder, and then shows all the -MachineName files: I start by picking a base folder and a template to search for - typically the -MachineName. Clicking Go brings up a list of all files in that folder and its subdirectories.  The list also displays the dates for the saved (-MachineName) file and the current file on disk, along with highlighting for the newer of the two. I can right click on any file and get a context menu pop up to open the folder in Explorer, or open Beyond Compare and view the two files to compare differences which I found very helpful for a number of files where I had modified the files after SkyDrive had updated to an old one. Typically these would be the green files (of which there were thankfully few). To 'fix' files I can select any number of files in the list, then use one of the three buttons on the right to apply an operation. I can use the Saved files - that is the backup file that SkyDrive created with the -MachineName extension (-RasXps above). Or I can use the current file, which is the file with the right name on disk right now and delete the -MachineName file. Or on some occasions I can just opt to delete both of them. For some files like binaries it's often easier to just delete and them be rebuild than choosing. For the most part the process involves accepting the pink files, and checking the few green files and see if any modifications were made since the file was updated incorrectly by SkyDrive. For me luckily those are few in number. Anyways, I thought I share this utility in case anybody else runs into this issue. I've included the VS2012 solution and all the source code so you can see how it works and you can tweak it as needed. The .NET 4.5 binaries are also included if you can't compile. Be warned though!  This rough code is provided as is and makes no guarantees or claims about file safety. All three of the action buttons on the form will delete data. It's a very rough utility and there are no safeguards that ask nicely before deleting files. I highly recommend you make a backup before you have at it. This tools is very narrow in focus, but it might also work with other sync issues from other vendors. I seem to remember that I had similar issues with SugarSync at some point and it too created the -MachineName style files on sync conflicts. Hope this helps somebody out so you can avoid wasting the better part of a full work day on this… Resources Download the Source Code and Binaries for SkyDrive Rescue© Rick Strahl, West Wind Technologies, 2005-2013Posted in Windows  .NET   Tweet !function(d,s,id){var js,fjs=d.getElementsByTagName(s)[0];if(!d.getElementById(id)){js=d.createElement(s);js.id=id;js.src="//platform.twitter.com/widgets.js";fjs.parentNode.insertBefore(js,fjs);}}(document,"script","twitter-wjs"); (function() { var po = document.createElement('script'); po.type = 'text/javascript'; po.async = true; po.src = 'https://apis.google.com/js/plusone.js'; var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(po, s); })();

    Read the article

  • The Internet of Things Is Really the Internet of People

    - by HCM-Oracle
    By Mark Hurd - Originally Posted on LinkedIn As I speak with CEOs around the world, our conversations invariably come down to this central question: Can we change our corporate cultures and the ways we train and reward our people as rapidly as new technology is changing the work we do, the products we make and how we engage with customers? It’s a critical consideration given today’s pace of disruption, which already is straining traditional management models and HR strategies. Winning companies will bring innovation and vision to their employees and partners by attracting people who will thrive in this emerging world of relentless data, predictive analytics and unlimited what-if scenarios. So, where are we going to find employees who are as familiar with complex data as I am with orderly financial statements and business plans? I’m not just talking about high-end data scientists who most certainly will sit at or near the top of the new decision-making pyramid. Global organizations will need creative and motivated people who will devote their time to manipulating, reviewing, analyzing, sorting and reshaping data to drive business and delight customers. This might seem evident, but my conversations with business people across the globe indicate that only a small number of companies get it. In the past few years, executives have been busy keeping pace with seismic upheavals, including the rise of social customer engagement, the rapid acceleration of product-development cycles and the relentless move to mobile-first. But all of that, I think, is the start of an uphill climb to the top of a roller-coaster. Today, about 10 billion devices across the globe are connected to the Internet. In a couple of years, that number will probably double, and not because we will have bought 10 billion more computers, smart phones and tablets. This unprecedented explosion of Big Data is being triggered by the Internet of Things, which is another way of saying that the numerous intelligent devices touching our everyday lives are all becoming interconnected. Home appliances, food, industrial equipment, pets, pharmaceutical products, pallets, cars, luggage, packaged goods, athletic equipment, even clothing will be streaming data. Some data will provide important information about how to run our businesses and lead healthier lives. Much of it will be extraneous. How does a CEO cope with this unimaginable volume and velocity of data, much less harness it to excite and delight customers? Here are three things CEOs must do to tackle this challenge: 1) Take care of your employees, take care of your customers. Larry Ellison recently noted that the two most important priorities for any CEO today revolve around people: Taking care of your employees and taking care of your customers. Companies in today’s hypercompetitive business environment simply won’t be able to survive unless they’ve got world-class people at all levels of the organization. CEOs must demonstrate a commitment to employees by becoming champions for HR systems that empower every employee to fully understand his or her job, how it ties into the corporate framework, what’s expected of them, what training is available, and how they can use an embedded social network to communicate, collaborate and excel. Over the next several years, many of the world’s top industrialized economies will see a turnover in the workforce on an unprecedented scale. Across the United States, Europe, China and Japan, the “baby boomer” generation will be retiring and, by 2020, we’ll see turnovers in those regions ranging from 10 to 30 percent. How will companies replace all that brainpower, experience and know-how? How will CEOs perpetuate the best elements of their corporate cultures in the midst of this profound turnover? The challenge will be daunting, but it can be met with world-class HR technology. As companies begin replacing up to 30 percent of their workforce, they will need thousands of new types of data-native workers to exploit the Internet of Things in the service of the Internet of People. The shift in corporate mindset here can’t be overstated. The CEO has to be at the forefront of this new way of recruiting, training, motivating, aligning and developing truly 21-century talent. 2) Start thinking today about the Internet of People. Some forward-looking companies have begun pursuing the “democratization of data.” This allows more people within a company greater access to data that can help them make better decisions, move more quickly and keep pace with the changing interests and demands of their customers. As a result, we’ve seen organizations flatten out, growing numbers of well-informed people authorized to make decisions without corporate approval and a movement of engagement away from headquarters to the point of contact with the customer. These are profound changes, and I’m a huge proponent. As I think about what the next few years will bring as companies become deluged with unprecedented streams of data, I’m convinced that we’ll need dramatically different organizational structures, decision-making models, risk-management profiles and reward systems. For example, if a car company’s marketing department mines incoming data to determine that customers are shifting rapidly toward neon-green models, how many layers of approval, review, analysis and sign-off will be needed before the factory starts cranking out more neon-green cars? Will we continue to have organizations where too many people are empowered to say “No” and too few are allowed to say “Yes”? If so, how will those companies be able to compete in a world in which customers have more choices, instant access to more information and less loyalty than ever before? That’s why I think CEOs need to begin thinking about this problem right now, not in a year or two when competitors are already reshaping their organizations to match the marketplace’s new realities. 3) Partner with universities to help create a new type of highly skilled workers. Several years ago, universities introduced new undergraduate as well as graduate-level programs in analytics and informatics as the business need for deeper insights into the booming world of data began to explode. Today, as the growth rate of data continues to soar, we know that the Internet of Things will only intensify that growth. Moreover, as Big Data fuels insights that can be shaped into products and services that generate revenue, the demand for data scientists and data specialists will go on unabated. Beyond that top-level expertise, companies are going to need data-native thinkers at all levels of the organization. Where will this new type of worker come from? I think it’s incumbent on the business community to collaborate with universities to develop new curricula designed to turn out graduates who can capitalize on the data-driven world that the Internet of Things is surely going to create. These new workers will create opportunities to help their companies in fields as diverse as product design, customer service, marketing, manufacturing and distribution. They will become innovative leaders in fashioning an entirely new type of workforce and organizational structure optimized to fully exploit the Internet of Things so that it becomes a high-value enabler of the Internet of People. Mark Hurd is President of Oracle Corporation and a member of the company's Board of Directors. He joined Oracle in 2010, bringing more than 30 years of technology industry leadership, computer hardware expertise, and executive management experience to his role with the company. As President, Mr. Hurd oversees the corporate direction and strategy for Oracle's global field operations, including marketing, sales, consulting, alliances and channels, and support. He focuses on strategy, leadership, innovation, and customers.

    Read the article

  • FAQ: GridView Calculation with JavaScript - Editable Price Field

    - by Vincent Maverick Durano
    Recently I wrote a series of blog posts that demonstrates how to do calculation in GridView using JavaScripts. You can check the series of posts below: FAQ: GridView Calculation with JavaScript FAQ: GridView Calculation with JavaScript - Formatting and Validation FAQ: GridView Calculation with JavaScript - Displaying Quantity Total Recently a user in the forums is asking how to calculate the total quantity, sub-totals and total amout in GridView  when a user enters the price and quantity in the TextBox field. Obviously the series of post  that I wrote will not work in this case because the price field in those examples are Label (read-only) and not TextBox fields. In this post I'm going to demonstrate how to accomplish this using the same method used in my previous examples. Basically I'm just going to modify the GridView declaration and replace the Label price field with a TextBox so that users can type on it. And finally modify the CalculateTotals() javascript function. Here are the code blocks below: <html xmlns="http://www.w3.org/1999/xhtml" > <head runat="server"> <title></title> <script type="text/javascript"> function CalculateTotals() { var gv = document.getElementById("<%= GridView1.ClientID %>"); var tb = gv.getElementsByTagName("input"); var lb = gv.getElementsByTagName("span"); var sub = 0; var total = 0; var indexQ = 1; var indexP = 0; var price = 0; var qty = 0; var totalQty = 0; var tbCount = tb.length / 2; for (var i = 0; i < tbCount; i++) { if (tb[i].type == "text") { ValidateNumber(tb[i + indexQ]); sub = parseFloat(tb[i + indexP].value) * parseFloat(tb[i + indexQ].value); if (isNaN(sub)) { lb[i].innerHTML = "0.00"; sub = 0; } else { lb[i].innerHTML = FormatToMoney(sub, "$", ",", "."); ; } if (isNaN(tb[i + indexQ].value) || tb[i + indexQ].value == "") { qty = 0; } else { qty = tb[i + indexQ].value; } totalQty += parseInt(qty); total += parseFloat(sub); indexQ++; indexP++; } } lb[lb.length - 2].innerHTML = totalQty; lb[lb.length -1].innerHTML = FormatToMoney(total, "$", ",", "."); } function ValidateNumber(o) { if (o.value.length > 0) { o.value = o.value.replace(/[^\d]+/g, ''); //Allow only whole numbers } } function isThousands(position) { if (Math.floor(position / 3) * 3 == position) return true; return false; }; function FormatToMoney(theNumber, theCurrency, theThousands, theDecimal) { var theDecimalDigits = Math.round((theNumber * 100) - (Math.floor(theNumber) * 100)); theDecimalDigits = "" + (theDecimalDigits + "0").substring(0, 2); theNumber = "" + Math.floor(theNumber); var theOutput = theCurrency; for (x = 0; x < theNumber.length; x++) { theOutput += theNumber.substring(x, x + 1); if (isThousands(theNumber.length - x - 1) && (theNumber.length - x - 1 != 0)) { theOutput += theThousands; }; }; theOutput += theDecimal + theDecimalDigits; return theOutput; } </script> </head> <body> <form id="form1" runat="server"> <asp:gridview ID="GridView1" runat="server" ShowFooter="true" AutoGenerateColumns="false"> <Columns> <asp:BoundField DataField="RowNumber" HeaderText="Row Number" /> <asp:BoundField DataField="Description" HeaderText="Item Description" /> <asp:TemplateField HeaderText="Item Price"> <ItemTemplate> <asp:TextBox ID="TXTPrice" runat="server" onkeyup="CalculateTotals();"></asp:TextBox> </ItemTemplate> <FooterTemplate> <b>Total Qty:</b> </FooterTemplate> </asp:TemplateField> <asp:TemplateField HeaderText="Quantity"> <ItemTemplate> <asp:TextBox ID="TXTQty" runat="server" onkeyup="CalculateTotals();"></asp:TextBox> </ItemTemplate> <FooterTemplate> <asp:Label ID="LBLQtyTotal" runat="server" Font-Bold="true" ForeColor="Blue" Text="0" ></asp:Label>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Total Amount:</b> </FooterTemplate> </asp:TemplateField> <asp:TemplateField HeaderText="Sub-Total"> <ItemTemplate> <asp:Label ID="LBLSubTotal" runat="server" ForeColor="Green" Text="0.00"></asp:Label> </ItemTemplate> <FooterTemplate> <asp:Label ID="LBLTotal" runat="server" ForeColor="Green" Font-Bold="true" Text="0.00"></asp:Label> </FooterTemplate> </asp:TemplateField> </Columns> </asp:gridview> </form> </body> </html>   That's it! I hope someone find this post useful! Technorati Tags: ASP.NET,GridView,JavaScript

    Read the article

  • how to do event checks for loops?

    - by yao jiang
    I am having some trouble getting the logic down for this. Currently, I have an app that animates the astar pathfinding algorithm. On start of the app, the ui will show the following: User can press "space" to randomly choose start/end coords, then the app will animate it. Or, user can choose the start/end by left-click/right-click. During the animation, the user can also left-click to generate blocks, or right-click to choose a new destiantion. Where I am stuck at is how to handle the events while the app is animating. Right now, I am checking events in the main loop, then when the app is animating, I do event checks again. While it works fine, I feel that I am probably doing it wrong. What is the proper way of setting up the main loop that will handle the events while the app is animating? In main loop, the app start animating once user choose start/end. In my draw function, I am putting another event checker in there. def clear(rows): for r in range(rows): for c in range(rows): if r%3 == 1 and c%3 == 1: color = brown; grid[r][c] = 1; buildCoor.append(r); buildCoor.append(c); else: color = white; grid[r][c] = 0; pick_image(screen, color, width*c, height*r); pygame.display.flip(); os.system('cls'); # draw out the grid def draw(start, end, grid, route_coord): # draw the end coords color = red; pick_image(screen, color, width*end[1],height*end[0]); pygame.display.flip(); # then draw the rest of the route for i in range(len(route_coord)): # pausing because we want animation time.sleep(speed); # get the x/y coords x,y = route_coord[i]; event_on = False; if grid[x][y] == 2: color = green; elif grid[x][y] == 3: color = blue; for event in pygame.event.get(): if event.type == pygame.MOUSEBUTTONDOWN: if event.button == 3: print "destination change detected, rerouting"; # get mouse position, px coords pos = pygame.mouse.get_pos(); # get grid coord c = pos[0] // width; r = pos[1] // height; grid[r][c] = 4; end = [r, c]; elif event.button == 1: print "user generated event"; pos = pygame.mouse.get_pos(); # get grid coord c = pos[0] // width; r = pos[1] // height; # mark it as a block for now grid[r][c] = 1; event_on = True; if check_events([x,y]) or event_on: # there is an event # mark it as a block for now grid[y][x] = 1; pick_image(screen, event_x, width*y, height*x); pygame.display.flip(); # then find a new route new_start = route_coord[i-1]; marked_grid, route_coord = find_route(new_start, end, grid); draw(new_start, end, grid, route_coord); return; # just end draw here so it wont throw the "index out of range" error elif grid[x][y] == 4: color = red; pick_image(screen, color, width*y, height*x); pygame.display.flip(); # clear route coord list, otherwise itll just add more unwanted coords route_coord_list[:] = []; clear(rows); # main loop while not done: # check the events for event in pygame.event.get(): # mouse events if event.type == pygame.MOUSEBUTTONDOWN: # get mouse position, px coords pos = pygame.mouse.get_pos(); # get grid coord c = pos[0] // width; r = pos[1] // height; # find which button pressed, highlight grid accordingly if event.button == 1: # left click, start coords if grid[r][c] == 2: grid[r][c] = 0; color = white; elif grid[r][c] == 0 or grid[r][c] == 4: grid[r][c] = 2; start = [r,c]; color = green; else: grid[r][c] = 1; color = brown; elif event.button == 3: # right click, end coords if grid[r][c] == 4: grid[r][c] = 0; color = white; elif grid[r][c] == 0 or grid[r][c] == 2: grid[r][c] = 4; end = [r,c]; color = red; else: grid[r][c] = 1; color = brown; pick_image(screen, color, width*c, height*r); # keyboard events elif event.type == pygame.KEYDOWN: clear(rows); # one way to quit program if event.key == pygame.K_ESCAPE: print "program will now exit."; done = True; # space key for random start/end elif event.key == pygame.K_SPACE: # first clear the ui clear(rows); # now choose random start/end coords buildLoc = zip(buildCoor,buildCoor[1:])[::2]; #print buildLoc; (start_x, start_y, end_x, end_y) = pick_point(); while (start_x, start_y) in buildLoc or (end_x, end_y) in buildLoc: (start_x, start_y, end_x, end_y) = pick_point(); clear(rows); print "chosen random start/end coords: ", (start_x, start_y, end_x, end_y); if (start_x, start_y) in buildLoc or (end_x, end_y) in buildLoc: print "error"; # draw the route marked_grid, route_coord = find_route([start_x,start_y],[end_x,end_y], grid); draw([start_x, start_y], [end_x, end_y], marked_grid, route_coord); # return key for user defined start/end elif event.key == pygame.K_RETURN: # first clear the ui clear(rows); # get the user defined start/end print "user defined start/end are: ", (start[0], start[1], end[0], end[1]); grid[start[0]][start[1]] = 1; grid[end[0]][end[1]] = 2; # draw the route marked_grid, route_coord = find_route(start, end, grid); draw(start, end, marked_grid, route_coord); # c to clear the screen elif event.key == pygame.K_c: print "clearing screen."; clear(rows); # go fullscreen elif event.key == pygame.K_f: if not full_sc: pygame.display.set_mode([1366, 768], pygame.FULLSCREEN); full_sc = True; rows = 15; clear(rows); else: pygame.display.set_mode(size); full_sc = False; # +/- key to change speed of animation elif event.key == pygame.K_LEFTBRACKET: if speed >= 0.1: print SPEED_UP; speed = speed_up(speed); print speed; else: print FASTEST; print speed; elif event.key == pygame.K_RIGHTBRACKET: if speed < 1.0: print SPEED_DOWN; speed = slow_down(speed); print speed; else: print SLOWEST print speed; # second method to quit program elif event.type == pygame.QUIT: print "program will now exit."; done = True; # limit to 20 fps clock.tick(20); # update the screen pygame.display.flip();

    Read the article

  • A star algorithm implementation problems

    - by bryan226
    I’m having some trouble implementing the A* algorithm in a 2D tile based game. The problem is basically that the algorithm gets stuck when something gets in its direct way (e.g. walls) Note that it only allows Horizontal and Vertical movement. Here's a picture as it works fine across the map without something in its direct way: (Green tile = destination, Blue = In closed list, Green = in open list) This is what happens if I try to walk 'around' a wall: I calculate costs with the F = G + H formula: G = 1 Cost per Step H = 10 Cost per Step //Count how many tiles are between current-tile & destination-tile The functions: short c_astar::GuessH(short Startx,short Starty,short Destinationx,short Destinationy) { hgeVector Start, Destination; Start.x = Startx; Start.y = Starty; Destination.x = Destinationx; Destination.y = Destinationy; short a = 0; short b = 0; if(Start.x > Destination.x) a = Start.x - Destination.x; else a = Destination.x - Start.x; if(Start.y > Destination.y) b = Start.y - Destination.y; else b = Destination.y - Start.y; return (a+b)*10; } short c_astar::GuessG(short Startx,short Starty,short Currentx,short Currenty) { hgeVector Start, Destination; Start.x = Startx; Start.y = Starty; Destination.x = Currentx; Destination.y = Currenty; short a = 0; short b = 0; if(Start.x > Destination.x) a = Start.x - Destination.x; else a = Destination.x - Start.x; if(Start.y > Destination.y) b = Start.y - Destination.y; else b = Destination.y - Start.y; return (a+b); } At the end of the loop I check which tile is the cheapest to go according to its F value: Then some quick checks are done for each tile (UP,DOWN,LEFT,RIGHT): //...CX are holding the F value of the TILE specified // Info: C0 = Center (Current) // C1 = UP // C2 = DOWN // C3 = LEFT // C4 = RIGHT //Quick checks if(((C1 < C2) && (C1 < C3) && (C1 < C4))) { Current.y -= 1; bSimilar = false; if(DEBUG) hge->System_Log("C1 < ALL"); } //.. same for C2,C3 & C4 If there are multiple tiles with the same F value: It’s actually a switch for DOWNLEFT,UPRIGHT.. etc. Here’s one of it: case UPRIGHT: { //UP Temporary = Current; Temporary.y -= 1; bTileStatus[0] = IsTileWalkable(Temporary.x,Temporary.y); if(bTileStatus[0]) { //Proceed normal we are OK & walkable Tilex.Tile = map.at(Temporary.y).at(Temporary.x); //Search in lists if(SearchInClosedList(Tilex.Tile.ID,C0)) bFoundInClosedList[0] = true; if(SearchInOpenList(Tilex.Tile.ID,C0)) bFoundInOpenList[0] = true; //RIGHT Temporary = Current; Temporary.x += 1; bTileStatus[1] = IsTileWalkable(Temporary.x,Temporary.y); if(bTileStatus[1]) { //Proceed normal we are OK & walkable Tilex.Tile = map.at(Temporary.y).at(Temporary.x); //Search in lists if(SearchInClosedList(Tilex.Tile.ID,C0)) bFoundInClosedList[1] = true; if(SearchInOpenList(Tilex.Tile.ID,C0)) bFoundInOpenList[1] = true; //************************************************* // Purpose: ClosedList behavior //************************************************* if(bFoundInClosedList[0] && !bFoundInClosedList[1]) { //UP found in ClosedList. Go RIGHT return RIGHT; } if(!bFoundInClosedList[0] && bFoundInClosedList[1]) { //RIGHT found in ClosedList. Go UP return UP; } if(bFoundInClosedList[0] && bFoundInClosedList[1]) { //Both found in ClosedList. Random value switch(hge->Random_Int(8,9)) { case 8: return UP; break; case 9: return RIGHT; break; } } //************************************************* // Purpose: OpenList behavior //************************************************* if(bFoundInOpenList[0] && !bFoundInOpenList[1]) { //UP found in OpenList. Go RIGHT return RIGHT; } if(!bFoundInOpenList[0] && bFoundInOpenList[1]) { //RIGHT found in OpenList. Go UP return UP; } if(bFoundInOpenList[0] && bFoundInOpenList[1]) { //Both found in OpenList. Random value switch(hge->Random_Int(8,9)) { case 8: return UP; break; case 9: return RIGHT; break; } } } else if(!bTileStatus[1]) { //RIGHT is not walkable OR out of range //Choose UP return UP; } } else if(!bTileStatus[0]) { //UP is not walkable OR out of range //Fast check RIGHT Temporary = Current; Temporary.x += 1; bTileStatus[1] = IsTileWalkable(Temporary.x,Temporary.y); if(bTileStatus[1]) { return RIGHT; } else return FAILED; //Failed, no valid path found! } } break; A log for the second picture: (Cut down to ten passes, because it’s just repeating itself) ----------------------------------------------------- PASS: 1 | C1: 211 | C2: 191 | C3: 211 | C4: 191 DOWN + RIGHT SIMILAR Going DOWN ----------------------------------------------------- PASS: 2 | C1: 200 | C2: 182 | C3: 202 | C4: 182 DOWN + RIGHT SIMILAR Going DOWN ----------------------------------------------------- PASS: 3 | C1: 191 | C2: 193 | C3: 193 | C4: 173 C4 < ALL Tile(12.000000,6.000000) not walkable. MAX_F_VALUE set. ----------------------------------------------------- PASS: 4 | C1: 182 | C2: 184 | C3: 182 | C4: 999 UP + LEFT SIMILAR Going UP Tile(12.000000,5.000000) not walkable. MAX_F_VALUE set. ----------------------------------------------------- PASS: 5 | C1: 191 | C2: 173 | C3: 191 | C4: 999 C2 < ALL Tile(12.000000,6.000000) not walkable. MAX_F_VALUE set. ----------------------------------------------------- PASS: 6 | C1: 182 | C2: 184 | C3: 182 | C4: 999 UP + LEFT SIMILAR Going UP Tile(12.000000,5.000000) not walkable. MAX_F_VALUE set. ----------------------------------------------------- PASS: 7 | C1: 191 | C2: 173 | C3: 191 | C4: 999 C2 < ALL Tile(12.000000,6.000000) not walkable. MAX_F_VALUE set. ----------------------------------------------------- PASS: 8 | C1: 182 | C2: 184 | C3: 182 | C4: 999 UP + LEFT SIMILAR Going LEFT ----------------------------------------------------- PASS: 9 | C1: 191 | C2: 193 | C3: 193 | C4: 173 C4 < ALL Tile(12.000000,6.000000) not walkable. MAX_F_VALUE set. ----------------------------------------------------- PASS: 10 | C1: 182 | C2: 184 | C3: 182 | C4: 999 UP + LEFT SIMILAR Going LEFT ----------------------------------------------------- Its always going after the cheapest F value, which seems to be wrong. If someone could point me to the right direction I'd be thankful. Regards, bryan226

    Read the article

  • Testing Workflows &ndash; Test-First

    - by Timothy Klenke
    Originally posted on: http://geekswithblogs.net/TimothyK/archive/2014/05/30/testing-workflows-ndash-test-first.aspxThis is the second of two posts on some common strategies for approaching the job of writing tests.  The previous post covered test-after workflows where as this will focus on test-first.  Each workflow presented is a method of attack for adding tests to a project.  The more tools in your tool belt the better.  So here is a partial list of some test-first methodologies. Ping Pong Ping Pong is a methodology commonly used in pair programing.  One developer will write a new failing test.  Then they hand the keyboard to their partner.  The partner writes the production code to get the test passing.  The partner then writes the next test before passing the keyboard back to the original developer. The reasoning behind this testing methodology is to facilitate pair programming.  That is to say that this testing methodology shares all the benefits of pair programming, including ensuring multiple team members are familiar with the code base (i.e. low bus number). Test Blazer Test Blazing, in some respects, is also a pairing strategy.  The developers don’t work side by side on the same task at the same time.  Instead one developer is dedicated to writing tests at their own desk.  They write failing test after failing test, never touching the production code.  With these tests they are defining the specification for the system.  The developer most familiar with the specifications would be assigned this task. The next day or later in the same day another developer fetches the latest test suite.  Their job is to write the production code to get those tests passing.  Once all the tests pass they fetch from source control the latest version of the test project to get the newer tests. This methodology has some of the benefits of pair programming, namely lowering the bus number.  This can be good way adding an extra developer to a project without slowing it down too much.  The production coder isn’t slowed down writing tests.  The tests are in another project from the production code, so there shouldn’t be any merge conflicts despite two developers working on the same solution. This methodology is also a good test for the tests.  Can another developer figure out what system should do just by reading the tests?  This question will be answered as the production coder works there way through the test blazer’s tests. Test Driven Development (TDD) TDD is a highly disciplined practice that calls for a new test and an new production code to be written every few minutes.  There are strict rules for when you should be writing test or production code.  You start by writing a failing (red) test, then write the simplest production code possible to get the code working (green), then you clean up the code (refactor).  This is known as the red-green-refactor cycle. The goal of TDD isn’t the creation of a suite of tests, however that is an advantageous side effect.  The real goal of TDD is to follow a practice that yields a better design.  The practice is meant to push the design toward small, decoupled, modularized components.  This is generally considered a better design that large, highly coupled ball of mud. TDD accomplishes this through the refactoring cycle.  Refactoring is only possible to do safely when tests are in place.  In order to use TDD developers must be trained in how to look for and repair code smells in the system.  Through repairing these sections of smelly code (i.e. a refactoring) the design of the system emerges. For further information on TDD, I highly recommend the series “Is TDD Dead?”.  It discusses its pros and cons and when it is best used. Acceptance Test Driven Development (ATDD) Whereas TDD focuses on small unit tests that concentrate on a small piece of the system, Acceptance Tests focuses on the larger integrated environment.  Acceptance Tests usually correspond to user stories, which come directly from the customer. The unit tests focus on the inputs and outputs of smaller parts of the system, which are too low level to be of interest to the customer. ATDD generally uses the same tools as TDD.  However, ATDD uses fewer mocks and test doubles than TDD. ATDD often complements TDD; they aren’t competing methods.  A full test suite will usually consist of a large number of unit (created via TDD) tests and a smaller number of acceptance tests. Behaviour Driven Development (BDD) BDD is more about audience than workflow.  BDD pushes the testing realm out towards the client.  Developers, managers and the client all work together to define the tests. Typically different tooling is used for BDD than acceptance and unit testing.  This is done because the audience is not just developers.  Tools using the Gherkin family of languages allow for test scenarios to be described in an English format.  Other tools such as MSpec or FitNesse also strive for highly readable behaviour driven test suites. Because these tests are public facing (viewable by people outside the development team), the terminology usually changes.  You can’t get away with the same technobabble you can with unit tests written in a programming language that only developers understand.  For starters, they usually aren’t called tests.  Usually they’re called “examples”, “behaviours”, “scenarios”, or “specifications”. This may seem like a very subtle difference, but I’ve seen this small terminology change have a huge impact on the acceptance of the process.  Many people have a bias that testing is something that comes at the end of a project.  When you say we need to define the tests at the start of the project many people will immediately give that a lower priority on the project schedule.  But if you say we need to define the specification or behaviour of the system before we can start, you’ll get more cooperation.   Keep these test-first and test-after workflows in your tool belt.  With them you’ll be able to find new opportunities to apply them.

    Read the article

  • Calculated Fields - Idiosyncracies

    - by PointsToShare
    © 2011 By: Dov Trietsch. All rights reserved Calculated Fields and some of their Idiosyncrasies Did you try to write a calculate field formula directly into the screen? Good Luck – You’ll need it! Calculated Fields are a sophisticated OOB feature of SharePoint, so you could think that they are best left to the end users – at least to the power users. But they reach their limits before the “Professionals “do, and the tough ones come back to us anyway. Back to business; the simpler the formula, the easier it is. Still, use your favorite editor to write it, then cut it and paste it to the ridiculously small window. What about complex formulae? Write them in steps! Here is a case in point and an idiosyncrasy or two. Our welders need to be certified and recertified every two years. Some of them are certifiable…., but I digress. To be certified you need to pass an eye exam, and two more tests – test A and test B. for each of those you have an expiry date. When renewed, each expiry date is advanced by two years from the date of renewal. My users wanted a visual clue so that when the supervisor looks at the list, she’ll have a KPI symbol telling her if anything expired (Red), is going to expire within the next 90 days (Yellow) or is not to be worried about (green). Not all the dates are filled and any blank date implies a complete lack of certification in the particular requirement. Obviously, I needed to figure the minimal of these 3 dates – a simple enough formula: =MIN([Date_EyeExam], {Date_TestA], [Date_TestB]). Aha! Here is idiosyncrasy #1. When one of the dates is a null, MIN(Date1, Date2) returns the non null date. Null is construed as “Far, far away”. The funny thing is that when you compare it to Today, the null is the lesser one. So a null it is less than today, but not when MIN is calculated. Now, to me the fact that the welder does not have an exam date, is synonymous with his exam being prehistoric, or at least past due. So here is what I did: Solution: Let’s set a blank date to 1/1/1800. How will we do that? Use the IF. IF([Field] rel relValue, TrueValue, FalseValue). rel is any relationship operator <, >, <=, >=, =, <>. If the field is related to the relValue as prescribed, the “IF” returns the TrueValue, otherwise it returns the FalseValue. Thus: =IF([SomeDate]="",1/1/1800,[SomeDate]) will return 1/1/1800 if the date is blank and the date itself if not. So, using this formula, if the welder missed an exam, the returned exam date will be far in the past. It would be nice if we could take such a formula and make it into a reusable function. Alas, here is a calculated field serious shortcoming: You cannot write subs and functions!! Aha, but we can use interim calculated fields! So let’s create 3 calculated fields as follows: 1: c_DateTestA as a calculated field of the date type, with the formula:  IF([Date_TestA]="",1/1/1800,[Date_TestA]) 2: c_DateTestB as a calculated field of the date type, with the formula:  IF([Date_TestB]="",1/1/1800,[Date_TestB]) 3: c_DateEyeExam as a calculated field of the date type, with the formula:  IF([Date_EyeExam]="",1/1/1800,[Date_EyeExam]) And now use these to get c_MinDate. This is again a calculated field of type date with the formula: MIN(c_DateTestA, cDateTestB, c_DateEyeExam) Note that I missed the square parentheses. In “properly named fields – where there are no embedded spaces, we don’t need the square parentheses. I actually strongly recommend using underscores in place of spaces in all the field names in your lists. Among other things, it makes using CAML much simpler. Now, we still need to apply the KPI to this minimal date. I am going to use the available KPI graphics that come with SharePoint and are always available in your 12 hive. "/_layouts/images/kpidefault-2.gif" is the Red KPI "/_layouts/images/kpidefault-1.gif" is the Yellow KPI "/_layouts/images/kpidefault-0.gif" is the Green KPI And here is the nested IF formula that will do the trick: =IF(c_MinDate<=Today,"/_layouts/images/kpidefault-2.gif", IF(cMinDate<Today+90,"/_layouts/images/kpidefault-1.gif","/_layouts/images/kpidefault-0.gif")) Nice! BUT when I tested, it did not work! This is Idiosyncrasy #2: A calculated field based on a calculated field based on a calculated field does not work. You have to stop at two levels! Back to the drawing board: We have to reduce by one level. How? We’ll eliminate the c_DateX items in the formula and replace them with the proper IF formulae. Notice that this needs to be done with precision. You are much better off in doing it in your favorite line editor, than inside the cramped space that SharePoint gives you. So here is the result: MIN(IF([Date_TestA]="",1/1/1800,[ Date_TestA]), IF([Date_TestB]="",1/1/1800,[ Date_TestB]), 1/1/1800), IF([Date_EyeExam]="",1/1/1800,[Date_EyeExam])) Note that I bolded the parentheses and painted them red. They have to match for this formula to work. Now we can leave the KPI formula as is and test again. This time with SUCCESS! Conclusion: build the inner functions first, and then embed them inside the outer formulae. Do this as long as necessary. Use your favorite line editor. Limit yourself to 2 levels. That’s all folks! Almost! As soon as I finished doing all of the above, my users added yet another level of complexity. They added another test, a test that must be passed, but never expires and asked for yet another KPI, this time in Black to denote that any test is not just past due, but altogether missing. I just finished this. Let’s hope it ends here! And OH, the formula  =IF(c_MinDate<=Today,"/_layouts/images/kpidefault-2.gif",IF(cMinDate<Today+90,"/_layouts/images/kpidefault-1.gif","/_layouts/images/kpidefault-0.gif")) Deals with “Today” and this is a subject deserving a discussion of its own!  That’s all folks?! (and this time I mean it)

    Read the article

  • Bouncing off a circular Boundary with multiple balls?

    - by Anarkie
    I am making a game like this : Yellow Smiley has to escape from red smileys, when yellow smiley hits the boundary game is over, when red smileys hit the boundary they should bounce back with the same angle they came, like shown below: Every 10 seconds a new red smiley comes in the big circle, when red smiley hits yellow, game is over, speed and starting angle of red smileys should be random. I control the yellow smiley with arrow keys. The biggest problem I have reflecting the red smileys from the boundary with the angle they came. I don't know how I can give a starting angle to a red smiley and bouncing it with the angle it came. I would be glad for any tips! My js source code : var canvas = document.getElementById("mycanvas"); var ctx = canvas.getContext("2d"); // Object containing some global Smiley properties. var SmileyApp = { radius: 15, xspeed: 0, yspeed: 0, xpos:200, // x-position of smiley ypos: 200 // y-position of smiley }; var SmileyRed = { radius: 15, xspeed: 0, yspeed: 0, xpos:350, // x-position of smiley ypos: 65 // y-position of smiley }; var SmileyReds = new Array(); for (var i=0; i<5; i++){ SmileyReds[i] = { radius: 15, xspeed: 0, yspeed: 0, xpos:350, // x-position of smiley ypos: 67 // y-position of smiley }; SmileyReds[i].xspeed = Math.floor((Math.random()*50)+1); SmileyReds[i].yspeed = Math.floor((Math.random()*50)+1); } function drawBigCircle() { var centerX = canvas.width / 2; var centerY = canvas.height / 2; var radiusBig = 300; ctx.beginPath(); ctx.arc(centerX, centerY, radiusBig, 0, 2 * Math.PI, false); // context.fillStyle = 'green'; // context.fill(); ctx.lineWidth = 5; // context.strokeStyle = '#003300'; // green ctx.stroke(); } function lineDistance( positionx, positiony ) { var xs = 0; var ys = 0; xs = positionx - 350; xs = xs * xs; ys = positiony - 350; ys = ys * ys; return Math.sqrt( xs + ys ); } function drawSmiley(x,y,r) { // outer border ctx.lineWidth = 3; ctx.beginPath(); ctx.arc(x,y,r, 0, 2*Math.PI); //red ctx.fillStyle="rgba(255,0,0, 0.5)"; ctx.fillStyle="rgba(255,255,0, 0.5)"; ctx.fill(); ctx.stroke(); // mouth ctx.beginPath(); ctx.moveTo(x+0.7*r, y); ctx.arc(x,y,0.7*r, 0, Math.PI, false); // eyes var reye = r/10; var f = 0.4; ctx.moveTo(x+f*r, y-f*r); ctx.arc(x+f*r-reye, y-f*r, reye, 0, 2*Math.PI); ctx.moveTo(x-f*r, y-f*r); ctx.arc(x-f*r+reye, y-f*r, reye, -Math.PI, Math.PI); // nose ctx.moveTo(x,y); ctx.lineTo(x, y-r/2); ctx.lineWidth = 1; ctx.stroke(); } function drawSmileyRed(x,y,r) { // outer border ctx.lineWidth = 3; ctx.beginPath(); ctx.arc(x,y,r, 0, 2*Math.PI); //red ctx.fillStyle="rgba(255,0,0, 0.5)"; //yellow ctx.fillStyle="rgba(255,255,0, 0.5)"; ctx.fill(); ctx.stroke(); // mouth ctx.beginPath(); ctx.moveTo(x+0.4*r, y+10); ctx.arc(x,y+10,0.4*r, 0, Math.PI, true); // eyes var reye = r/10; var f = 0.4; ctx.moveTo(x+f*r, y-f*r); ctx.arc(x+f*r-reye, y-f*r, reye, 0, 2*Math.PI); ctx.moveTo(x-f*r, y-f*r); ctx.arc(x-f*r+reye, y-f*r, reye, -Math.PI, Math.PI); // nose ctx.moveTo(x,y); ctx.lineTo(x, y-r/2); ctx.lineWidth = 1; ctx.stroke(); } // --- Animation of smiley moving with constant speed and bounce back at edges of canvas --- var tprev = 0; // this is used to calculate the time step between two successive calls of run function run(t) { requestAnimationFrame(run); if (t === undefined) { t=0; } var h = t - tprev; // time step tprev = t; SmileyApp.xpos += SmileyApp.xspeed * h/1000; // update position according to constant speed SmileyApp.ypos += SmileyApp.yspeed * h/1000; // update position according to constant speed for (var i=0; i<SmileyReds.length; i++){ SmileyReds[i].xpos += SmileyReds[i].xspeed * h/1000; // update position according to constant speed SmileyReds[i].ypos += SmileyReds[i].yspeed * h/1000; // update position according to constant speed } // change speed direction if smiley hits canvas edges if (lineDistance(SmileyApp.xpos, SmileyApp.ypos) + SmileyApp.radius > 300) { alert("Game Over"); } // redraw smiley at new position ctx.clearRect(0,0,canvas.height, canvas.width); drawBigCircle(); drawSmiley(SmileyApp.xpos, SmileyApp.ypos, SmileyApp.radius); for (var i=0; i<SmileyReds.length; i++){ drawSmileyRed(SmileyReds[i].xpos, SmileyReds[i].ypos, SmileyReds[i].radius); } } // uncomment these two lines to get every going // SmileyApp.speed = 100; run(); // --- Control smiley motion with left/right arrow keys function arrowkeyCB(event) { event.preventDefault(); if (event.keyCode === 37) { // left arrow SmileyApp.xspeed = -100; SmileyApp.yspeed = 0; } else if (event.keyCode === 39) { // right arrow SmileyApp.xspeed = 100; SmileyApp.yspeed = 0; } else if (event.keyCode === 38) { // up arrow SmileyApp.yspeed = -100; SmileyApp.xspeed = 0; } else if (event.keyCode === 40) { // right arrow SmileyApp.yspeed = 100; SmileyApp.xspeed = 0; } } document.addEventListener('keydown', arrowkeyCB, true); JSFiddle : http://jsfiddle.net/gj4Q7/

    Read the article

  • Zimbra server status showing red in control panel

    - by Debianuser
    I have been having a weird problem with Zimbra(7.1.4_GA_2555.DEBIAN5) lately: On the (web)control panel the status keep changing to red every few days. When this is happens the output of zmcontrol status still shows running: antispam Running antivirus Running imapproxy Running ldap Running logger Running mailbox Running memcached Running mta Running snmp Running spell Running stats Running zmconfigd Running Every thing runs fine except automated mail forwarding from one account to another(which is critical for us). I have been through Zimbra forums and the following ALWAYS fixes the issue: su - zimbra -c "zmprov mcf zimbraLogHostname mail.mydomain.com" /opt/zimbra/libexec/zmsyslogsetup /etc/init.d/rsyslog restart su - zimbra -c "zmcontrol restart" After I run the above commands, the status on control panel turns green and mail forwarding starts to work again BUT only for a few days. Other than the above, everything works fine including Server statistics. Anyone seen this issue before?

    Read the article

  • HP Loadrunner failed to start .NET Diagnostics probe

    - by Johnbo
    I've got a HP Diagnostics Server (commander mode) installed in the same PC where HP Loadrunner is. I've installed the .NET probe in the web application server. When I navigate localhost:2006/registrar/health I can see the CommandingServer and three instances of the probe, all in green and connected. Then, when in LoadRunner controller I enable Diagnostics, select the probe and start the scenario, I get the next error: Failed to start J2EE/.NET Diagnostics run. (Facade error: Unable to send 'startRun' notification to probe MyAgent.1347615505142149) I've looked at the firewall logs and the rule that lets the server send commands to the probes has been matched three times. What else could it be what doesn't let me start the probe?

    Read the article

< Previous Page | 47 48 49 50 51 52 53 54 55 56 57 58  | Next Page >