Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 610/1407 | < Previous Page | 606 607 608 609 610 611 612 613 614 615 616 617  | Next Page >

  • Join multiple filesystems (on multiple computers) into one big volume

    - by jm666
    Scenario: Have 10 computers, each have 12x2TB HDDs (currently) in raidZ2 (10+2) configuration, so, in the each computer i have one approx. 20TB volume. Now, need those 10 separate computers (separate raid groups) join into one big volume. What is the recommended solution? I'm thinking about the FCoE (10GB ethernet). So, buying into each computer FCoE (10GB ethernet card) and - what need more on the hardware side? (probably another computer, FCoE switch? like Cisco Nexus?) The main question is: what need to install and configure on each computer? Currently they have freebsd/raidz2, but it is possible change it into Linux/Solaris if needed. Any helpful resource what talking about how to build a big volumes from smaller raid-groups (on the software side) is very welcomed. So, what OS, what filesystem, what software - etc. In short: want get one approx. 200TB storage (in one filesystem) from already existing computers/storage. Don't need fast writes, but need good performance on reading data. (as a big fileserver), what will works transparently, so when storing data don't want care about onto what computer the data goes. (e.g. not 10 mountpoints - but one big logical filesystem). Thanks.

    Read the article

  • Resilient Linux Mail Server Setup

    - by Coops
    How would people design a resilient mail server setup with Linux? On an application level what the system needs to provide is both an incoming and outgoing mail service (i.e. SMTP & IMAP), along with filtering and archive storage (the archive part isn't critical yet, so we'll look at this later probably). What is required on top of this is a resilient system, i.e. one which will handle individual server failures without interrupting service. As such I would term this a High Availability mail system. This is in contrast to a High Performance mail setup, as in our case the volume of mail being handled isn't the important factor, it's simply that it stays online. Having not approached this problem before, the first thing I thought of was a clustered file system (gfs/gluster/etc), combined with heartbeat to failover a floating IP to another box in the case of a server failure. Combined with postfix & dovecot does this sound feasible to people?

    Read the article

  • Looking to get a small server – need web, PHP, PostgreSQL.

    - by Javawag
    Hi all! I'm looking to get a cheap (low end) server to serve web pages (xHTML/PHP), but I also need to be able to set up PostGreSQL on the system too. Ideally the server would have low power consumption, run Linux (I prefer Mac OS X but a Mac Mini, although the size I'm looking for, is too much money!) and be around £100 (~$160US). EDIT: Just to make it clearer, I'm looking to purchase the server hardware myself – but I want something about Mac Mini sized. I don't want to pay for hosting! Also, quick question – if it's to serve web pages from my home (standard ISP connection, no static IP!), what do I need in place to get this working. I'm guessing I would sign up with some service like no-ip, and register a domain to point to my no-ip address (then install the no-ip software on the server to update that with the current IP). I know the idea of running a server behind a normal ISP connection isn't very elegant, but I'd prefer to have the server where I can see it then pay over the odds for a hosting service where I have little to no control over what happens. Also, I could write my own server software for apps/etc to connect to as well. Anyways I'm rambling! What do you guys think?! Javawag

    Read the article

  • xcopy Not Surpressing File/Directory Query

    - by Daniel Bingham
    Hey folks, I'm attempting to use xcopy to copy over a file from one machine to another on our network as part of a Java program. I'm calling xcopy like this: xcopy "C:\Program Files\path\to\my\file" "\\othermachine\c$\Documents and Settings\<myUserName>\Desktop\Test\path\in\directory\structure\to\file" /e /y /i Because I'm calling it from with in Java, I need all the prompts to be suppressed. For the most part, \i and \y have done exactly that. However, for this one file /i fails and I get the file or directory prompt. The result is that it hangs the entire program. I've also tried calling it with /s /t /q appended on to the existing options, to no avail. Why isn't /i working to suppress the File or Directory prompt? Is there an order I need to call the options in? Is there something else I need to do? EDIT: I should mention, the file is a text file - single line of text. It does not have an extension. It looks like this: FILE-NAME

    Read the article

  • Adding Windows 7 32 bit as dual boot option

    - by djerry
    A relative of mine has bought a new laptop this year on which windows 7 (64 bit) is installed. Aside some standard programs he uses on that laptop, he also has some software for his bike that needs to run. The developers of that program still don't support 64-bit systems and therefor I thought about making it dual boot, so he can still use the power of the 64-bit, and just for the bike program, he can initiate the 32-bit version. My questions now are: What are the risks involved in this operation? What steps need to be taken to make this dual boot succesful? Any other ideas besides dual booting? Thanks in advance. Edit I might have forgotten/misphrased something. The software does run on 64-bit, but it cannot find the bike connected to the computer. So I think it's a matter drivers which aren't compatible with the 64-bit system. That's why I wanted to install the 32-bit windows so the drivers would work.

    Read the article

  • Run GUI application via cronjob in Ubuntu?

    - by Christoffer
    Hi, I have a remote server running "Ubuntu 10.04 Desktop". From it I want to run a script that walks through a list of websites and captures screenshots of them. The script is working and thoroughly tested. When I SSH to the server with ssh -X user@ip-adress I can run my script by calling ./myscript.py and everything will work OK. I then modifed my crontab file and added... 59 17 * * * env DISPLAY=:0 /path/to/myscript.py ...as recommended by the Ubuntu WIKI. I can see in the /var/log/syslog that my cron job is started, but it doesn't capture any screenshots. When running env DISPLAY=:0 /path/to/myscript.py from the shell I get No protocol specified myscript.py: cannot connect to X server :0 If I ssh to the server without the -X option I only get the second row of the error: myscript.py: cannot connect to X server :0 What can I try now? More details I have run xhost +local: and checked the output of xhost to see that the option was set correctly. If I run ls /tmp/.X11-unix/ the output is X0 The server only has one screen. Thank you in advance!

    Read the article

  • Terratec Cinergy Hybrid T USB XS is not recognized anymore on Mac OS X

    - by Gabble
    I have used Terratec Cinergy Hybrid T USB XS for years now, alongside with Elgato EyeTV software. I am a happy and completely satisfied user! Since a couple of weeks the USB sitck stopped working on my MacPro1,1 (OS version 10.6.3): EyeTV does not see any device attached, and actually, the green led on the stick stays off. It is not a USB port fault: I have unplugged any other USB/Firewire device and tried with different USB ports, to no avail (any other USB devices work as expected on any port) I have completely uninstalled EyeTV software, including preferences and system daemons/extensions, rebooted and reinstalled the latest EyeTV. No way. Reset the PRAM. Nope. Checked the Apple System Profiler - USB: No device attached, The MacPro does not see it at all. I need to say that: a) The device worked as a charm even with the latest OS 10.6.x (so it's not a OS upgrade cause). b) I have plugged the Terratec Cinergy Hybrid T USB XS to my MacBook5,1 where EyeTV is not installed and was never installed: The green led on the stick turns on, the growl bubble pops up, and the device is perfectly recognized by the system. Apple System Profiler says (sorry, Italian language): Cinergy Hybrid T USB XS (2882): ID prodotto: 0x005e ID fornitore: 0x0ccd Versione: 1.10 Numero di serie: 061102005755 Velocità: Fino a 12 Mb/sec Produttore: TerraTec Electronic GmbH ID posizione: 0x04100000 Corrente disponibile (mA): 500 Corrente necessaria (mA): 500 At this point I am pretty sure the Terratec stick is not damaged and there is something wrong with my MacPro. I kindly ask you: Is there a way to force my MacPro recognize the USB device? What can I check? Is there something that caches USB connection that can be reset? A OS reinstall would be the very last resort for me. Thanks in advance for any help you will offer!

    Read the article

  • Howto enable SMPTS (465) postfix CentOS

    - by user197284
    I need help is enabling SMTPS. I use postfix , dovecot with MySQL(virtual domains). I do not know how to enable SMTPS(465). I already added tls related settings and key and certificate in the "/etc/postfix/main.cf" OS: Centos 6.4 64 bit Please my /etc/postfix/master.cf file here # ========================================================================== # service type private unpriv chroot wakeup maxproc command + args # (yes) (yes) (yes) (never) (100) # ========================================================================== smtp inet n - n - - smtpd -o content_filter=smtp-amavis:127.0.0.1:10024 -o receive_override_options=no_address_mappings pickup fifo n - n 60 1 pickup -o content_filter= -o receive_override_options=no_header_body_checks cleanup unix n - n - 0 cleanup qmgr fifo n - n 300 1 qmgr #qmgr fifo n - n 300 1 oqmgr tlsmgr unix - - n 1000? 1 tlsmgr rewrite unix - - n - - trivial-rewrite bounce unix - - n - 0 bounce defer unix - - n - 0 bounce trace unix - - n - 0 bounce verify unix - - n - 1 verify flush unix n - n 1000? 0 flush proxymap unix - - n - - proxymap smtp unix - - n - - smtp # When relaying mail as backup MX, disable fallback_relay to avoid MX loops relay unix - - n - - smtp -o fallback_relay= # -o smtp_helo_timeout=5 -o smtp_connect_timeout=5 showq unix n - n - - showq error unix - - n - - error discard unix - - n - - discard local unix - n n - - local virtual unix - n n - - virtual lmtp unix - - n - - lmtp anvil unix - - n - 1 anvil scache unix - - n - 1 scache # # ==================================================================== # Interfaces to non-Postfix software. Be sure to examine the manual # pages of the non-Postfix software to find out what options it wants. # ==================================================================== maildrop unix - n n - - pipe flags=DRhu user=vmail argv=/usr/local/bin/maildrop -d ${recipient} uucp unix - n n - - pipe flags=Fqhu user=uucp argv=uux -r -n -z -a$sender - $nexthop!rmail ($recipient) ifmail unix - n n - - pipe flags=F user=ftn argv=/usr/lib/ifmail/ifmail -r $nexthop ($recipient) bsmtp unix - n n - - pipe flags=Fq. user=foo argv=/usr/local/sbin/bsmtp -f $sender $nexthop $recipient # # spam/virus section # smtp-amavis unix - - y - 2 smtp -o smtp_data_done_timeout=1200 -o disable_dns_lookups=yes -o smtp_send_xforward_command=yes 127.0.0.1:10025 inet n - y - - smtpd -o content_filter= -o smtpd_helo_restrictions= -o smtpd_sender_restrictions= -o smtpd_recipient_restrictions=permit_mynetworks,reject -o mynetworks=127.0.0.0/8 -o smtpd_error_sleep_time=0 -o smtpd_soft_error_limit=1001 -o smtpd_hard_error_limit=1000 -o receive_override_options=no_header_body_checks -o smtpd_bind_address=127.0.0.1 -o smtpd_helo_required=no -o smtpd_client_restrictions= -o smtpd_restriction_classes= -o disable_vrfy_command=no -o strict_rfc821_envelopes=yes # # Dovecot LDA dovecot unix - n n - - pipe flags=DRhu user=vmail:mail argv=/usr/libexec/dovecot/deliver -d ${recipient} # # Vacation mail vacation unix - n n - - pipe flags=Rq user=vacation argv=/var/spool/vacation/vacation.pl -f ${sender} -- ${recipient} retry unix - - n - - error proxywrite unix - - n - 1 proxymap Please help to enable SMTPS. I have amavis enabled

    Read the article

  • Configuring Nagios BGP plugin on Ubuntu

    - by user141610
    I am trying to configure nagios check_bgp_neighbors plug-in on Ubuntu and followed README file of check_bgp_neighbors plug-in. I have made following changes: define command{ command_name check_bgp_all command_line $USER1$/check_bgp_neighbors -H $HOSTADDRESS$ -C $USER3$ -n $ARG1$ -n $ARG2$ } to define command{ command_name check_bgp_all command_line /usr/local/nagios/libexec/check_bgp_neighbors.sh -H xx.xx.xx.49 -C xx.xx.xx.50 And define service{ use server-service hostgroup_name svc-bgp1 service_description BGP Check 1 check_command check_bgp_all!10.0.0.1!172.16.0.2 } to define service{ use generic-service hostgroup_name svc-bgp1 service_description BGP Check 1 check_command check_bgp_all!xx.xx.xx.50 } xx.xx.xx.49 is the IP of the host router and xx.xx.xx.50 is the IP of eBGP neighbour. After that it shows critical status. I know my command is not correct but cannot detect the problem. I learned that in this plug-in user-name and password of the host router are required but don't know how and where to provide it. Nagios log does not show any error message. Status information: Failed: status:0 prefixes:0 sent:0 received:0

    Read the article

  • After installing Windows what should I do first? update or install antivirus?

    - by EApubs
    Normally, after reformating and installing Windows 7, I used to go online and install all the updates, install all the driver updates and then install the anti virus. Because long ago, when I installed the anti virus first, applying windows updates crashed the AV! So, I install it last. Specially 7 sp1 is critical right? But now im having doubts... Going online without an antivirus means I'm vulnerable! (I have a home router which have a small firewall but I'm not sure about it) So, whats the best thing to do? Install the anti virus first or install the updates first?

    Read the article

  • Turn computer into DAS (Direct Attached Storage)

    - by Damon
    Can we build a direct attached storage by taking a computer/server, adding an HBA, and installing some appropriate software? We would use Debian as a host OS for both the DAS and the server. If so, what software do we use? And do we simply need a HBA for the DAS and the Server? Or do we need more hardware? The goal is to use an older server that does not have enough room for drives but does have ECC memory, server processors, redundant power supplies, dual nics, etc. Then find any boxes, server or not, the key being having enough room for 8-12 drives, fans, etc. and turning them into a DAS; build two of these DAS's and have them connected to the server. Eventually we want to have two servers using DRBD and associated services like heartbeat and pace maker to create an HA setup for our server(s) but that will take a long time to configure since I have no experience with anything related to DRBD (yet) and have a learning curve I have to get past, not to mention the additional cost of more hardware (two servers vs one).

    Read the article

  • Setting up and moving a distribution group to a public folder in Exchange 2003

    - by Sevdarkseed
    I'm looking for some advice with something that seems simple but I haven't done before. Currently we use a distribution group called Orders that has an email address that is that forwarded to four people in the company, the same goes for another one, Quotes. The problem is, of course, no one knows what was answered, and all the email gets worked in to the individual user's emails, so I'm thinking that a public folder, only accessible by one department would be the answer. I'm not sure what the best way to set this up would be or how to move/convert the current distribution list over to a public folder. This is a very critical email address in the company, so I'm trying to be sure that there is zero down time at all for it. What would be the best way to go about creating a public folder and converting/forwarding/moving/(whatever) over the current email address to that folder?

    Read the article

  • Generic/Text Printer on Windows 7 not prompting for file name

    - by Trevor Tippins
    Hope someone can shed some light on this. I am downloading reports from an AIX-based system by directing them to a TT printer which the terminal emulator (MultiView 2000) intercepts and directs to the default printer on the local system. This local printer is configured as a vanilla Generic/Text printer attached to a FILE port. When I print from AIX, the output is spooled down and the local printer prompts for a file name into which to save the file...but not under Windows 7. This has worked fine for many years, on both Win2K and WinXP. However, on Windows 7 the output gets spooled as a file into spool\PRINTERS (and looks as expected) but the print job then hangs with a status of "Error - Printing" and never prompts for a file name. I have to cancel the job. The Generic/Text printer works as expected with other applications. I have tried setting the printer to print directly rather than spooling but this only serves to hang the terminal session too. I've also tried to run the emulator in Windows 2000 Compatibility Mode and as Administrator in case it was something like that but with no luck. As you might expect, it does work fine in XP Mode (as long as I print to a printer defined therein and not the host's printer) but operationally this isn't going to be an option. Obviously this emulation software is a decade old (at least) and I could just cross/upgrade all the users (at a cost) but, before I do so, has anyone seen this sort of behaviour before and found some sort of fix? Remote OS: AIX 5 Client OS: Windows 7 Pro (32-bit) Printer: Generic/Text on a FILE port TE Software: MultiView 2000 (32-bit) Thanks in advance.

    Read the article

  • Is Ubuntu a viable replacement of Windows XP for small enterprise environments?

    - by Alex. S.
    Hi all, I'm a newbie systems administrator, so any advice would be great. I would like to setup ubuntu 8.04 lts in a small office of consulting in management (around 50 workstations) instead of Windows XP. I would install MS Office 2007 via WINE (*). It would be a fresh installation, so the migration would be less of a pain. The new setup would also include a small server as document repository and a backup server by now. Later, I would install another goodies like a IM server, a document management solution, and whatnot collaborative tool. What do you advice in this scenario? Do you think is viable? Should I try to convince my managers this is a good idea? I consider myself as a fair experienced user in both systems, and I'm the only guy in charge of everything. I need to cut costs down, and I think that antivirus and antimalware software are a waste of money and time. Is this good idea?, or should I resign and try to lock down the Windows systems and install AV software? Is there anything else in this setup I'm not foreseeing? (*) The only catch in my test machine until now had been that Office SmartArt doesn't work properly, the rest of Office 2007 may seem ok.

    Read the article

  • Copying windows home server backup offsite

    - by Simon
    What ways are there to copy a windows home server backup to an offsite location? I'm talking specifically (and only) about the automated backup of my entire machine, and not the shared network folders. I am 90% working away from home on my laptop which has a 640GB drive so the shared folders are essentially useless to me. I backup every night, but if my house burns down or broken into the I'm in serious serious trouble ! I'm really looking for some alternative way to back up my entire machine - which much not interfere with the reliability or speed by which my WHS backs up my laptop every night. Either a way to 'export' a complete machine backup from the server, or recommendations on non-conflicting software I can backup to a 1TB drive at work are what I'm looking for. Note: I believe that WHS uses its own completely proprietary backup and doesn't use things like any 'backup bit' or 'archive bit'. I just dont want to install some other backup software that will conflict. PS I'm now running Windows 7 and just realized that I should probably check out the backup functionality it gives me. I assume that won't conflict right! Edit: Thanks for the hosted solutions. I'd also appreciate ways to backup to an 'offsite' location that I control - like my office vs. my home. The hosted solutions I think will be too slow or expensive for my needs.

    Read the article

  • Best way to build / implement a corporate developer Linux distro with multiple kernels?

    - by Garen
    At work we have Linux users who understandably prefer using Ubuntu. Problem is, we also have developer tools that only work with 'officially' supported Linux distributions that use much older 2.6.18 based kernels. (And even if they worked with newer ones, the vendors could always say they won't "support" the software unless it's on one of their 'officially' supported platforms.) We could of course just tell them to use CentOS or something else 2.6.18-based, and I'm sure their response would be something like: "you can take Ubuntu from our cold, dead hands." :) Which brings to me some questions--is there any good/easy/recommended way to run something like Ubuntu as a host VM and Centos 5.x as a guest OS (with which system--Xen,KVM,VMWare, ...?), and then roll that into our own custom internal distribution that could be easily installed? KVM looks like a good high-performance option just recently included in RHEL 5.4, but if hardware support for virtualization like Intel-VT or AMD-V is necessary, then I'd guess only those folks with fairly new PCs will be able to do it. Would be very interested to hear how anyone else has addressed this kind issue. EDIT: The target audience / users of this kind of system would be developers, each one needs to run locally licensed commercial software, so building out some separate beefy central machines isn't an option unfortunately due to license restrictions. Even if that weren't the case, a couple developers could quickly eat up the resources with parallel builds. :) Ideally, I was hoping there was some step-by-step guide out there to build your own pre-built distribution that had e.g. CentOS 5.x and Ubuntu Desktop as a guest.

    Read the article

  • How do I configure VMware View location-based printing to use Active Directory Groups?

    - by Jason Pearce
    I am attempting to configure VMware View 4.5's Location-Based Printing, which leverages an included OEM version of ThinPrint, to assign printers to active directory groups. The location-based printing feature maps printers that are physically near client systems to VMware View desktops. I am using the Active Directory group policy setting AutoConnect Location-based Printing for VMware View, which is located in the Microsoft Group Policy Object Editor in the Software Settings folder under Computer Configuration. The AutoConnect Location-based Printing for VMware View appearst to be just a name translation table. It permits me to assign a specific printer or printers to an IP Range, Client Name, Mac Address, User, or User Group. I'm attempting to assign printers to active directory user groups. I have created a new active directory group for each printer that I intend to use in VMware View desktop pools. I will then assign active directory users to the active directory groups that represent each network printer. Example: doej is a member of the PTR-FLOOR2-NORTH-ROOM255 active directory group. Using AutoConnect, I assigned the group to receive a network printer by adding PTR-FLOOR2-NORTH-ROOM255 in the User/Group column. Problem: When doej logs in to his VDI session, the printer is not present. However, if I use a wildcard "*" in the User/Group column instead of the specific PTR-FLOOR2-NORTH-ROOM255 active directory group, the printer is present and functions as designed. Alternatives: I have tried assigning printers to active directory groups within AutoConnect in the following ways, all unsuccesfull: PTR-FLOOR2-NORTH-ROOM255 domainexample\PTR-FLOOR2-NORTH-ROOM255 domainexample.local\PTR-FLOOR2-NORTH-ROOM255 Confirmation: The information used to map the printer to the VMware View desktop is stored in a registry entry on the View desktop in HKEY_LOCAL_MACHINE\SOFTWARE\Policies\thinprint\tpautoconnect. For each of these examples, I have reviewed the registry entry and can confirm that the desktop is receiving the information from the AutoConnect translation table. Summary: Can anyone provide an example of how to configure VMware View 4.5's Location-Based Printing so that I may assign network printers to active directory groups via the included AutoConnect tool? I would welcome a clear example of a working configuration. Thank you.

    Read the article

  • Removing a malware that sets up as a system driver

    - by ereOn
    Hello, I recently tried to fix up my mother's computer which has some serious malwares. One of them apparently registered itself as system driver (tjbijkoq.sys if that can help) and after running a malware suppression tool, the computer won't boot anymore, complaining about a "critical driver that is missing". I think deleting the matching entry in the registry would just solve the problem, but obviously I can't boot up the computer (even in safe mode) to fix it. Do you guys have any experience with such an issue and how to solve this ? Thank you very much. The operating system is Windows Vista 32 bits Professional

    Read the article

  • Things to check for an internet-facing email server.

    - by Shtééf
    I'm faced with the task of setting up a public-internet-facing email server, that will be relaying mail for all of our other servers in the network. While the software in itself is set up in few keystrokes, what little experience I have with managing an email server has thought me that there are tons of awkward filtering techniques employed by other email systems. Systems that my own server will inevitably interact with a some point. Hence, my questions: What things should be kept in mind and double checked when setting up an email server? What resources are available for checking if my email server is set-up correctly? I'm specifically NOT looking for instructions for any given mail server, such as Exchange or Postfix. But it's okay to say: “you should have X and Y in your set-up, because when talking to server software Z, it typically tries to weed out open relays by checking for these.” Some things I've discovered myself: Make sure forward and reverse DNS are set up. Mail servers tend to do a reverse lookup for the peer IP-address when receiving. Matching a reverse look up with a follow-up forward lookup is probably employed to weed out open relays run through malware on home networks. Make sure the user in the From-address exists. The From-address is easily spoofed. A receiving mail server may try to contact the mail server in the From-domain, and see if the From-user actually exists.

    Read the article

  • Syncing Google Desktop Scratch Pad

    - by Anders Frey
    I'm a long time user of Google Desktop Scratch Pad and I would like to be able to put the note in the cloud and make it accessible from all my electronic units. I'm working towards changing the filepath Scratch Pad uses to retrieve the .txt to lead to a DropBox folder. As the Desktop Scratch Pad is discontinued I've had no luck in retrieving the API, but what I've got so far is this: The scratch pad data is located at: C:\Users[user]\AppData\Local\Google\Google Desktop\a3d83d5fa2e9\scratchpad.txt The registry keys related to Google Desktop is located at: HKEY_CURRENT_USER\Software\Google\Google Desktop I'm guessing the Scratch Pad app itself is located at: HKEY_CURRENT_USER\Software\Google\Google Desktop\Components I have limited experience with the registry, so I'm not able to translate the binary and hexadecimals, but I'm hoping that the path location is in there somewhere. I've tried using a bunch of other noteapps (including the 'new' scratch pad in chrome) but haven't been able to find one that suits my needs as Desktop Scratch Pad. Hence the effort in this matter. I may be way off and I'm not sure if this is possible to do, but I'm looking forward to hearing your thoughts.

    Read the article

  • There is a commercial tool like Xen + Remus?

    - by SoMoS
    Hello, I have a project where we need a completely redundant system like the one offered by Remus with a Xen virtualization system. I wondered if there is a system like this one built by VMWare or some other company because the project is a very critical one and we do not want to have to wait that a bug is fixed by "the community" and money is not a problem. What Remus does is to build a completely redundant system where you can shutdown one machine and the other continues the work where the other left it maintaining the network connections opened, etc Any hint? Thanks in advance.

    Read the article

  • HTTP cache for my virtual machines

    - by MathematicalOrchid
    I have several Linux virtual machines running on my home PC. One of the quirks of Linux is that every time you run a package manager, it wants to "refresh" the configured software repositories - which basically means it wants to download a file from the Internet. If I revert to an earlier snapshot of the VM, then next time I run the package manager it will re-download the exact same data again [since it no longer exists in the VM]. It seems a shame to waste bandwidth endlessly downloading the same data over and over again, so I was wondering if there's some way I can set up some kind of HTTP proxy server that caches downloaded files. I have no idea how you would do such a thing though. In particular, it needs to be set up so that the VMs don't need to "know" that the cache is there; it needs to be transparent. But I don't know how to do that. Any suggestions on what software I'd need to use? It would be nice if I could run it under the Windows host OS, but running a small VM with a Linux guest is also possible...

    Read the article

  • domain user disabling screensaver

    - by RASG
    I have the following situation: Due to security reasons the screensaver is activated after 10 minutes, and immediately locks the screen. There are GPOs preventing the user from changing the screensaver parameters and the background image. In order to bypass the background policy, some users are using bginfo The problem is that for some reason now the screensaver doesn't work anymore. The settings are still the same (10 minutes; locked to the user) and comparing snapshots of the registry before and after executing bginfo doesn't show any significant modification. Any hints? EDIT 1: Ok, i figured whats going on, but now i have another question. bginfo refreshes the user settings by reading HKEY_CURRENT_USER\Control Panel\Desktop, which has ScreenSaveActive. If the user set it to 0, disables the screensaver. Why isnt HKEY_CURRENT_USER\Software\Policies\Microsoft\Windows\Control Panel\Desktop, which sets ScreenSaveActive to 1, being enforced? or if it is being enforced, where is bginfo storing the value 0, and how can it bypass the policy? EDIT 2: I also discovered that after setting any value to HKEY_CURRENT_USER\Control Panel\Desktop\ScreenSaveActive, it can be deleted and the last value will remain active. For some reason HKEY_CURRENT_USER\Software\Policies\Microsoft\Windows\Control Panel\Desktop\ScreenSaveActive value is not being enforced to the user.

    Read the article

  • ConfigMgr 2012 - How to automatically make updates available to computers without forcing them to be installed?

    - by Massimo
    I'm using System Center Configuration Manager 2012 with the Software Update Point feature; however, in this environment patching has to be strictly manual, because server reboots need to be approved and scheduled by different people; thus, I need to use ConfigMgr's SUP like I would use a plain WSUS server with auto-approval but with manual installation. I created some Automatic Deployment Rules to automatically download and deploy critical updates, and to have an installation dealine of "as soon as possible"; but then, I've also configured those rules to not do anything when the deadline is reached, and to not perform system restarts even if needed (see image). Also, I've configured the device collection to where those rules deploy updates to not have any valid maintencance window. However, I'm experiencing quite the opposite as what I was expecting: as soon as the new updates are processed by the ADRs, they get automatically installed on all systems by the Software Center, and the computers are subsequently restarted. Why is this happening? Am I getting something wrong or is just ConfigMgr 2012 not behaving like it should?

    Read the article

  • configuring apache with mod_mono for .net app

    - by Mystere Man
    I'm having a huge problem getting mod_mono and apache configured to work correctly. I've had this working at one time, but I can't seem to figure out where i'm going wrong. I'm using mono-server4. I'm trying to use a seperate port from the main website. So I have in /etc/apache2/sites-available (with a link from sites-enabled) a vhost configuration that looks like this: <VirtualHost *:9999> ServerName XXX ServerAdmin web-admin@XXX DocumentRoot /var/xxx MonoServerPath XXX "/usr/bin/mod-mono-server4" MonoDebug XXX true MonoSetEnv XXX MONO_IOMAP=all MonoApplications XXX "/:/var/xxx" <Location "/"> Allow from all Order allow,deny MonoSetServerAlias XXX SetHandler mono SetOutputFilter DEFLATE SetEnvIfNoCase Request_URI "\.(?:gif|jpe?g|png)$" no-gzip dont-vary </Location> <IfModule mod_deflate.c> AddOutputFilterByType DEFLATE text/html text/plain text/xml text/javascript </IfModule> </VirtualHost> I used mono-server4-admin to create the application mono-server4-admin --path=/var/xxx --app=/XXX --port=9999 When i start apache, it gives the error: Syntax error on line 13 of /etc/apache2/sites-enabled/xxx: Server alias 'XXX, not found. This corresponds with the MonoSetServerAlias statement. So I commented it out, and when I do that apache starts. However, when I try to access the site, I get a 500 error. The access log indicates that it's trying to access the app on port 80, rather than 9999. I'm not sure what the problem is here. Can anyone help me get figure out where I went wrong? My mono-server4-hosts.conf contains this: # start /etc/mono-server4/conf.d/RMRSite/10_XXX Alias /XXX "/var/xxx" AddMonoApplications default "/XXX:/var/xxx" <Directory /var/xxx> SetHandler mono <IfModule mod_dir.c> DirectoryIndex index.aspx </IfModule> </Directory> # end /etc/mono-server4/conf.d/XXX/10_XXX Also, my /etc/mono-server4/conf.d/XXX/10_XXX contains this: This is the configuration file for the XXX virtualhost path = /var/xxx alias = /XXX vhost = localhost port = 9999

    Read the article

< Previous Page | 606 607 608 609 610 611 612 613 614 615 616 617  | Next Page >