Search Results

Search found 1754 results on 71 pages for 'meeting overload'.

Page 20/71 | < Previous Page | 16 17 18 19 20 21 22 23 24 25 26 27  | Next Page >

  • [C++] Can all/any struct assignment operator be Overloaded? (and specifically struct tm = sql::Resu

    - by Luke Mcneice
    Hi all, Generally, i was wondering if there was any exceptions of types that cant have thier assignment operator overloaded. Specifically, I'm wanting to overload the assignment operator of a tm struct, (time.h) so i can assign a sql::ResultSet to it. I have already have the conversion logic: sscanf(sqlresult->getString("StoredAt").c_str(),"%d-%d-%d %d:%d:%d",&TempTimeStruct->tm_year,&TempTimeStruct->tm_mon,&TempTimeStruct->tm_mday,&TempTimeStruct->tm_hour,&TempTimeStruct->tm_min,&TempTimeStruct->tm_sec); //populating the struct I tried the overload with this: tm& tm::operator=(sql::ResultSet & results) { //CODE return *this; } however VS08 reports: error C2511: 'tm &tm::operator =(sql::ResultSet &)' : overloaded member function not found in 'tm'

    Read the article

  • Singular method name for single object argument, plural for a list?

    - by nasufara
    I'm having a problem with naming a method for a database application. In my Database instance, I have a method that can remove an Agreement object from the database. However, I want to be able to remove multiple Agreements at once, to be able to use transactions. The problem is that I also have an overload to remove a single Agreement object. Essentially, my structure is like this: public class Database { // ... public void RemoveAgreement(Agreement a) { // ... } public void RemoveAgreement(IEnumerable<Agreement> agreements) { // ... } } But this can be confusing, as the overload with the list of Agreements has a singular name, despite being inherently plural. My question is, how should I structure this? Should I have two overloads with the name RemoveAgreement(), or RemoveAgreements()? Or should I use two separate methods, instead of overloads? Thanks.

    Read the article

  • Constructor Type Coercion in C++

    - by Robert Mason
    Take the following class: class mytype { double num; public: mytype(int a) { num = sqrt(a); } void print() { cout << num; } } Say there is a method which takes a mytype: void foo(mytype a) { a.print(); } Is it legal c++ (or is there a way to implement this) to call foo(4), which would (in theory) output 2? From what I can glean you can overload type casts from a user defined class, but not to. Can constructor do this in a standards-compliant manner (assuming, of course, the constructor is not explicit). Hopefully there is a way to in the end have this legal: int a; cin >> a; foo(a); Note: this is quite obviously not the actual issue, but just an example for posting purposes. I can't just overload the function because of inheritance and other program-specific issues.

    Read the article

  • Fast exchange of data between unmanaged code and managed code

    - by vizcaynot
    Hello: Without using p/invoke, from a C++/CLI I have succeeded in integrating various methods of a DLL library from a third party built in C. One of these methods retrieves information from a database and stores it in different structures. The C++/CLI program I wrote reads those structures and stores them in a List<, which is then returned to the corresponding reading and use of an application programmed completely in C#. I understand that the double handling of data (first, filling in several structures and then, filling all of these structures into a list<) may generate an unnecessary overload, at which point I wish C++/CLI had the keyword "yield". Depending on the above scenario, do you have recommendations to avoid or reduce this overload? Thanks.

    Read the article

  • C++ union assignment, is there a good way to do this?

    - by Sqeaky
    I am working on a project with a library and I must work with unions. Specifically I am working with SDL and the SDL_Event union. I need to make copies of the SDL_Events, and I could find no good information on overloading assignment operators with unions. Provided that I can overload the assignment operator, should I manually sift through the union members and copy the pertinent members or can I simply come some members (this seems dangerous to me), or maybe just use memcpy() (this seems simple and fast, but slightly dangerous)? If I can't overload operators what would my best options be from there? I guess I could make new copies and pass around a bunch of pointers, but in this situation I would prefer not to do that. Any ideas welcome!

    Read the article

  • Implementing default constructors

    - by James
    Implement the default constructor, the constructors with one and two int parameters. The one-parameter constructor should initialize the first member of the pair, the second member of the pair is to be 0. Overload binary operator + to add the pairs as follows: (a, b) + (c, d) = (a + c, b + d); Overload the - analogously. Overload the * on pairs ant int as follows: (a, b) * c = (a * c, b * c). Write a program to test all the member functions and overloaded operators in your class definition. You will also need to write accessor (get) functions for each member. The definition of the class Pairs: class Pairs { public: Pairs(); Pairs(int first, int second); Pairs(int first); // other members and friends friend istream& operator>> (istream&, Pair&); friend ostream& operator<< (ostream&, const Pair&); private: int f; int s; }; Self-Test Exercise #17: istream& operator (istream& ins, Pair& second) { char ch; ins ch; // discard init '(' ins second.f; ins ch; // discard comma ',' ins second.s; ins ch; // discard final '(' return ins; } ostream& operator<< (ostream& outs, const Pair& second) { outs << '('; outs << second.f; outs << ", " ;// I followed the Author's suggestion here. outs << second.s; outs << ")"; return outs; }

    Read the article

  • How does C++ free the memory when a constructor throws an exception and a custom new is used

    - by Joshua
    I see the following constructs: new X will free the memory if X constructor throws. operator new() can be overloaded. The canonical definition of an operator new overload is void *operator new(heap h) and the corrisponding operator delete. The most common operator new overload is pacement new, which is void *operator new(void *p) { return p; } You almost always cannot call delete on the pointer given to placement new. This leads to a single question. How is memory cleaned up when X constructor throws and an overloaded new is used?

    Read the article

  • C++ operator[] syntax.

    - by Lanissum
    Just a quick syntax question. I'm writing a map class (for school). If I define the following operator overload: template<typename Key, typename Val> class Map {... Val* operator[](Key k); What happens when a user writes: Map<int,int> myMap; map[10] = 3; Doing something like that will only overwrite a temporary copy of the [null] pointer at Key k. Is it even possible to do: map[10] = 3; printf("%i\n", map[10]); with the same operator overload?

    Read the article

  • Lync Server 2010

    - by ManojDhobale
    Microsoft Lync Server 2010 communications software and its client software, such as Microsoft Lync 2010, enable your users to connect in new ways and to stay connected, regardless of their physical location. Lync 2010 and Lync Server 2010 bring together the different ways that people communicate in a single client interface, are deployed as a unified platform, and are administered through a single management infrastructure. Workload Description IM and presence Instant messaging (IM) and presence help your users find and communicate with one another efficiently and effectively. IM provides an instant messaging platform with conversation history, and supports public IM connectivity with users of public IM networks such as MSN/Windows Live, Yahoo!, and AOL. Presence establishes and displays a user’s personal availability and willingness to communicate through the use of common states such as Available or Busy. This rich presence information enables other users to immediately make effective communication choices. Conferencing Lync Server includes support for IM conferencing, audio conferencing, web conferencing, video conferencing, and application sharing, for both scheduled and impromptu meetings. All these meeting types are supported with a single client. Lync Server also supports dial-in conferencing so that users of public switched telephone network (PSTN) phones can participate in the audio portion of conferences. Conferences can seamlessly change and grow in real time. For example, a single conference can start as just instant messages between a few users, and escalate to an audio conference with desktop sharing and a larger audience instantly, easily, and without interrupting the conversation flow. Enterprise Voice Enterprise Voice is the Voice over Internet Protocol (VoIP) offering in Lync Server 2010. It delivers a voice option to enhance or replace traditional private branch exchange (PBX) systems. In addition to the complete telephony capabilities of an IP PBX, Enterprise Voice is integrated with rich presence, IM, collaboration, and meetings. Features such as call answer, hold, resume, transfer, forward and divert are supported directly, while personalized speed dialing keys are replaced by Contacts lists, and automatic intercom is replaced with IM. Enterprise Voice supports high availability through call admission control (CAC), branch office survivability, and extended options for data resiliency. Support for remote users You can provide full Lync Server functionality for users who are currently outside your organization’s firewalls by deploying servers called Edge Servers to provide a connection for these remote users. These remote users can connect to conferences by using a personal computer with Lync 2010 installed, the phone, or a web interface. Deploying Edge Servers also enables you to federate with partner or vendor organizations. A federated relationship enables your users to put federated users on their Contacts lists, exchange presence information and instant messages with these users, and invite them to audio calls, video calls, and conferences. Integration with other products Lync Server integrates with several other products to provide additional benefits to your users and administrators. Meeting tools are integrated into Outlook 2010 to enable organizers to schedule a meeting or start an impromptu conference with a single click and make it just as easy for attendees to join. Presence information is integrated into Outlook 2010 and SharePoint 2010. Exchange Unified Messaging (UM) provides several integration features. Users can see if they have new voice mail within Lync 2010. They can click a play button in the Outlook message to hear the audio voice mail, or view a transcription of the voice mail in the notification message. Simple deployment To help you plan and deploy your servers and clients, Lync Server provides the Microsoft Lync Server 2010, Planning Tool and the Topology Builder. Lync Server 2010, Planning Tool is a wizard that interactively asks you a series of questions about your organization, the Lync Server features you want to enable, and your capacity planning needs. Then, it creates a recommended deployment topology based on your answers, and produces several forms of output to aid your planning and installation. Topology Builder is an installation component of Lync Server 2010. You use Topology Builder to create, adjust and publish your planned topology. It also validates your topology before you begin server installations. When you install Lync Server on individual servers, the installation program deploys the server as directed in the topology. Simple management After you deploy Lync Server, it offers the following powerful and streamlined management tools: Active Directory for its user information, which eliminates the need for separate user and policy databases. Microsoft Lync Server 2010 Control Panel, a new web-based graphical user interface for administrators. With this web-based UI, Lync Server administrators can manage their systems from anywhere on the corporate network, without needing specialized management software installed on their computers. Lync Server Management Shell command-line management tool, which is based on the Windows PowerShell command-line interface. It provides a rich command set for administration of all aspects of the product, and enables Lync Server administrators to automate repetitive tasks using a familiar tool. While the IM and presence features are automatically installed in every Lync Server deployment, you can choose whether to deploy conferencing, Enterprise Voice, and remote user access, to tailor your deployment to your organization’s needs.

    Read the article

  • What's going on with INETA and the Regional Speakers Bureau?

    - by Chris Williams
    For those of you that have been waiting patiently (and not so patiently) I'm happy to say that we're very near completion on some changes/enhancements/improvements that will allow us to finally go live with the INETA Regional Speakers Bureau. I know quite a few of you have already registered, which is great (though some of you may need to come back and update your info) and we've had a few folks submit requests, mostly in a test capacity, but soon we'll be up and live. Here's how it breaks down. Be sure to read this, because things have changed a bit from when we initially announced it. 1. The majority of our speaker/event funding is going into the Regional Speakers Bureau.  The National Bureau still exists, but it's a good bit smaller than it was before, and it's not an "every group" benefit anymore. We'll be using the National Bureau as more of a strategic task force, targeting high impact events and areas that need some community building love from INETA. These will be identified and handled on a case by case basis, and may include more than just user group events. 2. You're going to get more events per group, per year than you did before. Not only are we focusing more resources on this program, but we're also making a lot of efforts to use it more effectively. With the INETA Regional Speakers Bureau, you should be able to get 2-3 INETA speakers per year, on average. Not every geographical area will have exactly the same experience, but we're doing the best we can. 3. It's not a farm team program for the National Bureau. Unsurprisingly, I managed to offend a number of people when I previously made the comment that the Regional Speakers Bureau program was a farm team or stepping stone to the National Bureau. It was a poor choice of words.  Anyone can participate in the Regional Speakers Bureau, and I look forward to working with all of you. 4. There is assistance for your efforts. The exact final details are still being hammered out, but expect it to look something like this: (all distances listed are based on a round trip) Distances < 120 miles = $0 121 miles - 240 miles = $50 (effectively 1 to 2 hours, each way) 241 miles - 360 miles = $100 (effectively 2 to 3 hours, each way) 361 miles - 480 miles = $200 (effectively 3 to 4 hours, each way) For those of you who travel a lot, we're working on a solution to handle group visits when you're away from home. These will (for now) be handled on a case by case basis. 5. We're going to make it as easy as possible to work with the program. In order to do this, we need a few things from you. For speakers, that means your home address. It also means (maybe) filling out a simple 1 line expense report via the INETA website. For user groups, it means making sure your meeting address is up to date as well. 6. Distances will be automatically calculated from your home of record to the user group event and back. We realize that this is not a perfect solution to every instance, but we're not paying you to speak at an event, and you won't be taxed on this money. It's simply some assistance to make your community efforts easier. Our way of saying thanks for everything you do. 7. Sounds good so far, what's the catch? There's always a catch, right? In this case there are two of them: 1) At this time, Microsoft employees are welcome to use the website to line up speaking engagements with user groups, but are not eligible for financial assistance. 2) Anyone can register and use the website to line up speaking engagements with user groups, however you must receive and maintain a net score of 3+ positive ratings (we're implementing a thumbs up / thumbs down system) in order to receive financial assistance. These ratings are provided by the User Group leaders after the meeting has taken place. 8. Involvement by the User Group leaders is a key factor in the success of this program. Your job isn't done once you request a speaker. After you've had your meeting, it's critical that you go back to the website and take a very small survey. Doing this ensures that the speaker gets rated (and compensated if eligible) and also ensures that you can make another request, since you won't be able to make a new request if you have an old one outstanding. 9. What about Canada? We're definitely working on that. Unfortunately nothing new to report on that front, other than to say that we're trying. So... this is where things stand currently. We're working very quickly to get this in place and get speakers and groups together. If you have any questions, please leave a comment below and I'll answer them as quickly as possible. If I've forgotten anything, or if things change, I'll update it here. Thanks, Chris G. Williams INETA Board of Directors

    Read the article

  • SQLAuthority News – #TechEdIn – TechEd India 2012 Memories and Photos

    - by pinaldave
    TechEd India 2012 was held in Bangalore last March 21 to 23, 2012. Just like every year, this event is bigger, grander and inspiring. Pinal Dave at TechEd India 2012 Family Event Every single year, TechEd is a special affair for my entire family.  Four months before the start of TechEd, I usually start to build the mental image of the event. I start to think  about various things. For the most part, what excites me most is presenting a session and meeting friends. Seriously, I start thinking about presenting my session 4 months earlier than the event!  I work on my presentation day and night. I want to make sure that what I present is accurate and that I have experienced it firsthand. My wife and my daughter also contribute to my efforts. For us, TechEd is a family event, and the two of them feel equally responsible as well. They give up their family time so I can bring out the best content for the Community. Pinal, Shaivi and Nupur at TechEd India 2012 Guinea Pigs (My Experiment Victims) I do not rehearse my session, ever. However, I test my demo almost every single day till the last moment that I have to present it already. I sometimes go over the demo more than 2-3 times a day even though the event is more than a month away. I have two “guinea pigs”: 1) Nupur Dave and 2) Vinod Kumar. When I am at home, I present my demos to my wife Nupur. At times I feel that people often backup their demo, but in my case, I have backup demo presenters. In the office during lunch time, I present the demos to Vinod. I am sure he can walk my demos easily with eyes closed. Pinal and Vinod at TechEd India 2012 My Sessions I’ve been determined to present my sessions in a real and practical manner. I prefer to present the subject that I myself would be eager to attend to and sit through if I were an audience. Just keeping that principle in mind, I have created two sessions this year. SQL Server Misconception and Resolution Pinal and Vinod at TechEd India 2012 We believe all kinds of stuff – that the earth is flat, or that the forbidden fruit is apple, or that the big bang theory explains the origin of the universe, and so many other things. Just like these, we have plenty of misconceptions in SQL Server as well. I have had this dream of co-presenting a session with Vinod Kumar for the past 3 years. I have been asking him every year if we could present a session together, but we never got it to work out, until this year came. Fortunately, we got a chance to stand on the same stage and present a single subject.  I believe that Vinod Kumar and I have an excellent synergy when we are working together. We know each other’s strengths and weakness. We know when the other person will speak and when he will keep quiet. The reason behind this synergy is that we have worked on 2 Video Learning Courses (SQL Server Indexes and SQL Server Questions and Answers) and authored 1 book (SQL Server Questions and Answers) together. Crowd Outside Session Hall This session was inspired from the “Laurel and Hardy” show so we performed a role-playing of those famous characters. We had an excellent time at the stage and, for sure, the audience had a wonderful time, too. We had an extremely large audience for this session and had a great time interacting with them. Speed Up! – Parallel Processes and Unparalleled Performance Pinal Dave at TechEd India 2012 I wanted to approach this session at level 400 and I was very determined to do so. The biggest challenge I had was that this was a total of 60 minutes of session and the audience profile was very generic. I had to present at level 100 as well at 400. I worked hard to tune up these demos. I wanted to make sure that my messages would land perfectly to the minds of the attendees, and when they walk out of the session, they could use the knowledge I shared on their servers. After the session, I felt an extreme satisfaction as I received lots of positive feedback at the event. At one point, so many people rushed towards me that I was a bit scared that the stage might break and someone would get injured. Fortunately, nothing like that happened and I was able to shake hands with everybody. Pinal Dave at TechEd India 2012 Crowd rushing to Pinal at TechEd India 2012 Networking This is one of the primary reasons many of us visit the annual TechEd event. I had a fantastic time meeting SQL Server enthusiasts. Well, it was a terrific time meeting old friends, user group members, MVPs and SQL Enthusiasts. I have taken many photographs with lots of people, but I have received a very few back. If you are reading this blog and have a photo of us at the event, would you please send it to me so I could keep it in my memory lane? SQL Track Speaker: Jacob and Pinal at TechEd India 2012 SQL Community: Pinal, Tejas, Nakul, Jacob, Balmukund, Manas, Sudeepta, Sahal at TechEd India 2012 Star Speakers: Amit and Balmukund at TechEd India 2012 TechED Rockstars: Nakul, Tejas and Pinal at TechEd India 2012 I guess TechEd is a mix of family affair and culture for me! Hamara TechEd (Our TechEd) Please tell me which photo you like the most! Reference: Pinal Dave (http://blog.sqlauthority.com) Filed under: PostADay, SQL, SQL Authority, SQL Query, SQL Server, SQL Tips and Tricks, SQLAuthority Author Visit, SQLAuthority News, SQLServer, T SQL, Technology Tagged: TechEd, TechEdIn

    Read the article

  • Adventures in Scrum: Lesson 1 &ndash; The failed Sprint

    - by Martin Hinshelwood
    I recently had a conversation with a product owner that wanted to have the Scrum team broken up into smaller units so that less time was wasted on the Scrum Ceremonies! Their complaint was around the need in Scrum to have the entire “Team” (7+-2) involved in the sizing of the work during the “Sprint Planning Meeting”.  The standard flippant answer of all Scrum professionals, “Well that's not Scrum”, does not get you any brownie points in these situations. The response could be “Well we are not doing Scrum then” which in turn leads to “We are doing Scrum…But, we have split the scrum team into units of 2/3 so that they can concentrate on a specific area of work”. While this may work, it is not Scrum and should not be called so… It is just a form of Agile. Don’t get me wrong at this stage, there is nothing wrong with Agile, just don’t call it Scrum. The reason that the Product Owner wants to do this is that, in effect, through a number of miscommunications and failings in our implementation of Scrum, there was NO unit of potentially Shippable software at the end of the first sprint. It does not matter to them that most Scrum teams will fail the first Sprint, even those that are high performing teams. Remember it is the product owners their money! We should NOT break up scrum teams into smaller units for the purpose of having less people tied up in the Scrum Ceremonies. The amount of backlog the Team selects is solely up to the Team… Only the Team can assess what it can accomplish over the upcoming Sprint. - Scrum Guide, Scrum.org The entire team must accept the work and in order to understand what they can accept they must be free to size it as a team. This both encourages common understanding and increases visibility on why team members think a task is of a particular size. This has the benefit of increasing the knowledge of the entire team in the problem domain. A new Team often first realizes that it will either sink or swim as a Team, not individually, in this meeting. The Team realizes that it must rely on itself. As it realizes this, it starts to self-organize to take on the characteristics and behaviour of a real Team. - Scrum Guide, Scrum.org This paragraph goes to the why of having the whole team at the meeting; The goal of Scrum it to produce a unit of potentially shippable software at the end of every Sprint. In order to achieve this we need high performing teams and this is what Scrum as a framework has been optimised to produce. I think that our Product Owner is understandably upset over loosing two weeks work and is losing sight the end goal of Scrum in the failures of the moment. As the man spending the money, I completely understand his perspective and I think that we should not have started Scrum on an internal project, but selected a customer  that is open to the ideas and complications of Scrum. So, what should we have NOT done on our first Scrum project: Should not have had 3 interns as the only on site resource – This lead to bad practices as the experienced guys were not there helping and correcting as they usually would. Should not have had the only experienced guys offsite – With both the experienced technical guys in completely different time zones it was difficult to get time for questions. Helping the guys on site was just plain impossible. Should not have used a part time ScrumMaster – Although the ScrumMaster attended all of the Ceremonies, because they are only in 2 full days of the week it makes it difficult for the team to raise impediments as they go. Should not have used a proxy product owner. – This was probably the worst decision that was made. Mainly because the proxy product owner did not have the same vision as the product owner. While Scrum does not explicitly reject the idea of a Proxy Product Owner, I do not think it works very well in practice. The “single wringable neck” needs to contain both the Money and the Vision as well as attending the required meetings. I will be brining all of these things up at the Sprint Retrospective and we will learn from our mistakes and move on. Do, Inspect then Adapt…   Technorati Tags: Scrum,Sprint Planing,Sprint Retrospective,Scrum.org,Scrum Guide,Scrum Ceremonies,Scrummaster,Product Owner Need Help? Professional Scrum Developer Training SSW has six Professional Scrum Developer Trainers who specialise in training your developers in implementing Scrum with Microsoft's Visual Studio ALM tools.

    Read the article

  • The Arab HEUG is now a reality, and other random thoughts

    - by user9147039
    I just returned from Doha, Qatar where the first of its kind HEUG (Higher Education User Group) meeting for institutions in the Middle East and North Africa was held at Qatar University and jointly hosted by Damman University from Saudi Arabia. Over 80 delegates attended including representation from education institutions in Oman, Saudi Arabia, Lebanon, and Qatar. There are many other regional HEUG organizations in place (in Australia/New Zealand, APAC, EMEA, as well as smaller regional HEUG’s in the Netherlands, South Africa, and in regions of the US), but it was truly an accomplishment to see this Middle East/North Africa group organize and launch their chapter with a meeting of this quality. To be known as the Arab HEUG going forward, I am excited about the prospects for sharing between the institutions and for the growth of Oracle solutions in the region. In particular the hosts for the event (Qatar University) did a masterful job with logistics and organization, and the quality of the event was a testament to their capabilities. Among the more interesting and enlightening presentations I attended were one from Dammam University on the lessons learned from their implementation of Campus Solutions and transition off of Banner, as well as the use by Qatar University E-business Suite for grants management (both pre-and post-award). The most notable fact coming from this latter presentation was the fit (89%) of e-Business Suite Grants to the university’s requirements. In a few weeks time we will be convening the 5th meeting of the Oracle Education & Research Industry Strategy Council in Redwood Shores (5th since my advent into my current role). The main topics of discussion will be around our Higher Education Applications Strategy for the future (including cloud approaches to ERP (HCM, Finance, and Student Information Systems), how some cases studies on the benefits of leveraging delivered functionality and extensibility in the software (versus customization). On the second day of the event we will turn our attention to Oracle in Research and also budgeting and planning in higher education. Both of these sessions will include significant participation from council members in the form of panel discussions. Our EVP’s for Systems (John Fowler) and for Global Cloud Services and North America application sales (Joanne Olson) will join us for the discussion. I recently read a couple of articles that were surprising to me. The first was from Inside Higher Ed on October 15 entitled, “As colleges prepare for major software upgrades, Kuali tries to woo them from corporate vendors.” It continues to disappointment that after all this time we are still debating whether it is better to build enterprise software through open or community source initiatives when fully functional, flexible, supported, and widely adopted options exist in the marketplace. Over a decade or more ago when these solutions were relatively immature and there was a great deal of turnover in the market I could appreciate the initiatives like Kuali. But let’s not kid ourselves – the real objective of this movement is to counter a perceived predatory commercial software industry. Again, when commercial solutions are deployed as written without significant customization, and standard business processes are adopted, the cost of these solutions (relative to the value delivered) is quite low, and certain much lower than the massive investment (and risk) in in-house developers to support a bespoke community source system. In this era of cost pressures in education and the need to refocus resources on teaching, learning, and research, I believe it’s bordering on irresponsible to continue to pursue open-source ERP. Many of the adopter’s total costs are staggering and have little to show for their efforts and expended resources. The second article was recently in the Chronicle of Higher Education and was entitled “’Big Data’ Is Bunk, Obama Campaign’s Tech Guru Tells University Leaders.” This one was so outrageous I almost don’t want to legitimize it by referencing it here. In the article the writer relays statements made by Harper Reed, President Obama’s former CTO for his 2012 re-election campaign, that big data solutions in education have no relevance and are akin to snake oil. He goes on to state that while he’s a fan of data-driven decision making in education, most of the necessary analysis can be accomplished in Excel spreadsheets. Yeah… right. This is exactly what ails education (higher education in particular). Dozens of shadow and siloed systems running on spreadsheets with limited-to-no enterprise wide initiatives to harness the data-rich environment that is a higher ed institution and transform the data into useable information. I’ll grant Mr. Reed that “Big Data” is overused and hackneyed, but imperatives like improving student success in higher education are classic big data problems that data-mining and predictive analytics can address. Further, higher ed need to be producing a massive amount more data scientists and analysts than are currently in the pipeline, to further this discipline and application of these tools to many many other problems across multiple industries.

    Read the article

  • Thought Oracle Usability Advisory Board Was Stuffy? Wrong. Justification for Attending OUAB: ROI

    - by ultan o'broin
    Looking for reasons tell your boss why your organization needs to join the Oracle Usability Advisory Board or why you need approval to attend one of its meetings (see the requirements)? Try phrases such as "Continued Return on Investment (ROI)", "Increased Productivity" or "Happy Workers". With OUAB your participation is about realizing and sustaining ROI across the entire applications life-cycle from input to designs to implementation choices and integration, usage and performance and on measuring and improving the onboarding and support experience. If you think this is a boring meeting of middle-aged people sitting around moaning about customizing desktop forms and why the BlackBerry is here to stay, think again! How about this for a rich agenda, all designed to engage the audience in a thought-provoking and feedback-illiciting day of swirling interactions, contextual usage, global delivery, mobility, consumerizationm, gamification and tailoring your implementation to reflect real users doing real work in real environments.  Foldable, rollable ereader devices provide a newspaper-like UK for electronic news. Or a way to wrap silicon chips, perhaps. Explored at the OUAB Europe Meeting (photograph from Terrace Restaurant in TVP. Nom.) At the 7 December 2012 OUAB Europe meeting in Oracle Thames Valley Park, UK, Oracle partners and customers stepped up to the mic and PPT decks with a range of facts and examples to astound any UX conference C-level sceptic. Over the course of the day we covered much ground, but it was all related in a contextual, flexibile, simplication, engagement way aout delivering results for business: that means solving problems. This means being about the user and their tasks and how to make design and technology transforms work into a productive activity that users and bean counters will be excited by. The sessions really gelled for me: 1. Mobile design patterns and the powerful propositions for customers and partners offered by using the design guidance with Oracle ADF Mobile. Customers' and partners' developers existing ADF developers are now productive, efficient ADF Mobile developers applying proven UX guidance using ADF Mobile components and other Oracle Fusion Middleware in the development toolkit. You can find the Mobile UX Design Patterns and Guidance on Building Mobile Apps on OTN. 2. Oracle Voice and Apps. How this medium offers so much potentual in the enterprise and offers a window in Fusion Apps cloud webservices, Oracle RightNow NLP and Nuance technology. Exciting stuff, demoed live on a mobile phone. Stay tuned for more features and modalities and how you can tailor your own apps experience.  3. Oracle RightNow Natural Language Processing (NLP) Virtual Assistant technology (Ella): how contextual intervention and learning from users sessions delivers a great personalized UX for users interacting with Ella, a fifth generation VA to solve problems and seek knowledge. 4. BYOD Keynote: A balanced keynote address contrasting Fujitsu's explaining of the conceprt, challenges, and trends and setting the expectation that BYOD must be embraced in a flexible way,  with the resolute, crafted high security enterprise requirements that nuancing the BYOD concept and proposals with the realities of their world of water tight information and device sharing policies. Fascinating stuff, as well providing anecdotes to make us thing about out own DYOD Deployments. One size does not fit all. 5. Icon Cultural Surveys Results and Insights Arising: Ever wondered about the cultural appropriateness of icons used in software UIs and how these icons assessed for global use? Or considered that social media "Like" icons might be  unacceptable hand gestures in culture or enterprise? Or do the old world icons like Save floppy disk icons still find acceptable? Well the survey results told you. Challenges must be tested, over time, and context of use is critical now, including external factors such as the internet and social media adoption. Indeed the fears about global rejection of the face and hand icons was not borne out, and some of the more anachronistic icons (checkbooks, microphones, real-to-real tape decks, 3.5" floppies for "save") have become accepted metaphors for current actions. More importantly the findings brought into focus the reason for OUAB - engage with and illicit feedback though working groups before we build anything. 6. EReaders and Oracle iBook: What is the uptake and trends of ereaders? And how about a demo of an iBook with enterprise apps content?  Well received by the audience, the session included a live running poll of ereader usage. 7. Gamification Design Jam: Fun, hands on event for teams of Oracle staff, partners and customers, actually building gamified flows, a practice that can be applied right away by customers and partners.  8. UX Direct: A new offering of usability best practices, coming to an external website for you in 2013. FInd a real user, observe their tasks, design and approve, build and measure. Simple stuff to improve apps implications no end. 9. FUSE (an internal term only, basically Fusion Simplified Experience): demo of the new Face of Fusion Applications: inherently mobile, simple to use, social, personalizable and FAST, three great demos from the HCM, CRM and ICT world on how these UX designs can be used in different ways. So, a powerful breadth and depth of UX solutions and opporunities for customers and partners to engage with and explore how they can make their users happy and benefit their business reaping continued ROI from those apps investments. Find out more about the OUAB and how to get involved here ... 

    Read the article

  • Impressions and Reactions from Alliance 2012

    - by user739873
    Alliance 2012 has come to a conclusion.  What strikes me about every Alliance conference is the amazing amount of collaboration and cooperation I see across higher education in the sharing of best practices around the entire Oracle PeopleSoft software suite, not just the student information system (Oracle’s PeopleSoft Campus Solutions).  In addition to the vibrant U.S. organization, it's gratifying to see the growth in the international attendance again this year, with an EMEA HEUG organizing to complement the existing groups in the Netherlands, South Africa, and the U.K.  Their first meeting is planned for London in October, and I suspect they'll be surprised at the amount of interest and attendance. In my discussions with higher education IT and functional leadership at Alliance there were a number of instances where concern was expressed about Oracle's commitment to higher education as an industry, primarily because of a lack of perceived innovation in the applications that Oracle develops for this market. Here I think perception and reality are far apart, and I'd like to explain why I believe this to be true. First let me start with what I think drives this perception. Predominately it's in two areas. The first area is the user interface, both for students and faculty that interact with the system as "customers", and for those employees of the institution (faculty, staff, and sometimes students as well) that use the system in some kind of administrative role. Because the UI hasn't changed all that much from the PeopleSoft days, individuals perceive this as a dead product with little innovation and therefore Oracle isn't investing. The second area is around the integration of the higher education suite of applications (PeopleSoft Campus Solutions) and the rest of the Oracle software assets. Whether grown organically or acquired, there is an impressive array of middleware and other software products that could be leveraged much more significantly by the higher education applications than is currently the case today. This is also perceived as lack of investment. Let me address these two points.  First the UI.  More is being done here than ever before, and the PAG and other groups where this was discussed at Alliance 2012 were more numerous than I've seen in any past meeting. Whether it's Oracle development leveraging web services or some extremely early but very promising work leveraging the recent Endeca acquisition (see some cool examples here) there are a lot of resources aimed at this issue.  There are also some amazing prototypes being developed by our UX (user experience team) that will eventually make their way into the higher education applications realm - they had an impressive setup at Alliance.  Hopefully many of you that attended found this group. If not, the senior leader for that team Jeremy Ashley will be a significant contributor of content to our summer Industry Strategy Council meeting in Washington in June. In the area of integration with other elements of the Oracle stack, this is also an area of focus for the company and my team.  We're making this a priority especially in the areas of identity management and security, leveraging WebCenter more effectively for content, imaging, and mobility, and driving towards the ultimate objective of WebLogic Suite as our platform for SOA, links to learning management systems (SAIP), and content. There is also much work around business intelligence centering on OBI applications. But at the end of the day we get enormous value from the HEUG (higher education user group) and the various subgroups formed as a part of this community that help us align and prioritize our investments, whether it's around better integration with other Oracle products or integration with partner offerings.  It's one of the healthiest, mutually beneficial relationships between customers and an Education IT concern that exists on the globe. And I can't avoid mentioning that this kind of relationship between higher education and the corporate IT community that can truly address the problems of efficiency and effectiveness, institutional excellence (which starts with IT) and student success.  It's not (in my opinion) going to be solved through community source - cost and complexity only increase in that model and in the end higher education doesn't ultimately focus on core competencies: educating, developing, and researching.  While I agree with some of what Michael A. McRobbie wrote in his EDUCAUSE Review article (Information Technology: A View from Both Sides of the President’s Desk), I take strong issue with his assertion that the "the IT marketplace is just the opposite of long-term stability...."  Sure there has been healthy, creative destruction in the past 2-3 decades, but this has had the effect of, in the aggregate, benefiting education with greater efficiency, more innovation and increased stability as larger, more financially secure firms acquire and develop integrated solutions. Cole

    Read the article

  • C#/.NET Little Wonders: The Timeout static class

    - by James Michael Hare
    Once again, in this series of posts I look at the parts of the .NET Framework that may seem trivial, but can help improve your code by making it easier to write and maintain. The index of all my past little wonders posts can be found here. When I started the “Little Wonders” series, I really wanted to pay homage to parts of the .NET Framework that are often small but can help in big ways.  The item I have to discuss today really is a very small item in the .NET BCL, but once again I feel it can help make the intention of code much clearer and thus is worthy of note. The Problem - Magic numbers aren’t very readable or maintainable In my first Little Wonders Post (Five Little Wonders That Make Code Better) I mention the TimeSpan factory methods which, I feel, really help the readability of constructed TimeSpan instances. Just to quickly recap that discussion, ask yourself what the TimeSpan specified in each case below is 1: // Five minutes? Five Seconds? 2: var fiveWhat1 = new TimeSpan(0, 0, 5); 3: var fiveWhat2 = new TimeSpan(0, 0, 5, 0); 4: var fiveWhat3 = new TimeSpan(0, 0, 5, 0, 0); You’d think they’d all be the same unit of time, right?  After all, most overloads tend to tack additional arguments on the end.  But this is not the case with TimeSpan, where the constructor forms are:     TimeSpan(int hours, int minutes, int seconds);     TimeSpan(int days, int hours, int minutes, int seconds);     TimeSpan(int days, int hours, int minutes, int seconds, int milliseconds); Notice how in the 4 and 5 parameter version we suddenly have the parameter days slipping in front of hours?  This can make reading constructors like those above much harder.  Fortunately, there are TimeSpan factory methods to help make your intention crystal clear: 1: // Ah! Much clearer! 2: var fiveSeconds = TimeSpan.FromSeconds(5); These are great because they remove all ambiguity from the reader!  So in short, magic numbers in constructors and methods can be ambiguous, and anything we can do to clean up the intention of the developer will make the code much easier to read and maintain. Timeout – Readable identifiers for infinite timeout values In a similar way to TimeSpan, let’s consider specifying timeouts for some of .NET’s (or our own) many methods that allow you to specify timeout periods. For example, in the TPL Task class, there is a family of Wait() methods that can take TimeSpan or int for timeouts.  Typically, if you want to specify an infinite timeout, you’d just call the version that doesn’t take a timeout parameter at all: 1: myTask.Wait(); // infinite wait But there are versions that take the int or TimeSpan for timeout as well: 1: // Wait for 100 ms 2: myTask.Wait(100); 3:  4: // Wait for 5 seconds 5: myTask.Wait(TimeSpan.FromSeconds(5); Now, if we want to specify an infinite timeout to wait on the Task, we could pass –1 (or a TimeSpan set to –1 ms), which what the .NET BCL methods with timeouts use to represent an infinite timeout: 1: // Also infinite timeouts, but harder to read/maintain 2: myTask.Wait(-1); 3: myTask.Wait(TimeSpan.FromMilliseconds(-1)); However, these are not as readable or maintainable.  If you were writing this code, you might make the mistake of thinking 0 or int.MaxValue was an infinite timeout, and you’d be incorrect.  Also, reading the code above it isn’t as clear that –1 is infinite unless you happen to know that is the specified behavior. To make the code like this easier to read and maintain, there is a static class called Timeout in the System.Threading namespace which contains definition for infinite timeouts specified as both int and TimeSpan forms: Timeout.Infinite An integer constant with a value of –1 Timeout.InfiniteTimeSpan A static readonly TimeSpan which represents –1 ms (only available in .NET 4.5+) This makes our calls to Task.Wait() (or any other calls with timeouts) much more clear: 1: // intention to wait indefinitely is quite clear now 2: myTask.Wait(Timeout.Infinite); 3: myTask.Wait(Timeout.InfiniteTimeSpan); But wait, you may say, why would we care at all?  Why not use the version of Wait() that takes no arguments?  Good question!  When you’re directly calling the method with an infinite timeout that’s what you’d most likely do, but what if you are just passing along a timeout specified by a caller from higher up?  Or perhaps storing a timeout value from a configuration file, and want to default it to infinite? For example, perhaps you are designing a communications module and want to be able to shutdown gracefully, but if you can’t gracefully finish in a specified amount of time you want to force the connection closed.  You could create a Shutdown() method in your class, and take a TimeSpan or an int for the amount of time to wait for a clean shutdown – perhaps waiting for client to acknowledge – before terminating the connection.  So, assume we had a pub/sub system with a class to broadcast messages: 1: // Some class to broadcast messages to connected clients 2: public class Broadcaster 3: { 4: // ... 5:  6: // Shutdown connection to clients, wait for ack back from clients 7: // until all acks received or timeout, whichever happens first 8: public void Shutdown(int timeout) 9: { 10: // Kick off a task here to send shutdown request to clients and wait 11: // for the task to finish below for the specified time... 12:  13: if (!shutdownTask.Wait(timeout)) 14: { 15: // If Wait() returns false, we timed out and task 16: // did not join in time. 17: } 18: } 19: } We could even add an overload to allow us to use TimeSpan instead of int, to give our callers the flexibility to specify timeouts either way: 1: // overload to allow them to specify Timeout in TimeSpan, would 2: // just call the int version passing in the TotalMilliseconds... 3: public void Shutdown(TimeSpan timeout) 4: { 5: Shutdown(timeout.TotalMilliseconds); 6: } Notice in case of this class, we don’t assume the caller wants infinite timeouts, we choose to rely on them to tell us how long to wait.  So now, if they choose an infinite timeout, they could use the –1, which is more cryptic, or use Timeout class to make the intention clear: 1: // shutdown the broadcaster, waiting until all clients ack back 2: // without timing out. 3: myBroadcaster.Shutdown(Timeout.Infinite); We could even add a default argument using the int parameter version so that specifying no arguments to Shutdown() assumes an infinite timeout: 1: // Modified original Shutdown() method to add a default of 2: // Timeout.Infinite, works because Timeout.Infinite is a compile 3: // time constant. 4: public void Shutdown(int timeout = Timeout.Infinite) 5: { 6: // same code as before 7: } Note that you can’t default the ShutDown(TimeSpan) overload with Timeout.InfiniteTimeSpan since it is not a compile-time constant.  The only acceptable default for a TimeSpan parameter would be default(TimeSpan) which is zero milliseconds, which specified no wait, not infinite wait. Summary While Timeout.Infinite and Timeout.InfiniteTimeSpan are not earth-shattering classes in terms of functionality, they do give you very handy and readable constant values that you can use in your programs to help increase readability and maintainability when specifying infinite timeouts for various timeouts in the BCL and your own applications. Technorati Tags: C#,CSharp,.NET,Little Wonders,Timeout,Task

    Read the article

  • Change alpha to a Frame in libgdx

    - by Rudy_TM
    I have this batch.draw(currentFrame, x, y, this.parent.originX, this.parent.originY, this.parent.width, this.parent.height, this.scaleX, this.scaleY,this.rotation); I want to apply the alpha that it gets from the method, but theres is not overload from the SpriteBatch class that takes the alpha value, is there some wey to apply it? (i did it this way, because this are animation, and i wanted to control them) in my static ones i apply sprite.draw(SpriteBatch, alpha) Thanks

    Read the article

  • Are You Drowning in E-mail ?

    Learn to Reduce Email Overload By 54% E-mail is Making You Stupid! At least, that';s what a headline in the March edition of Entrepreneur Magazine claims. But that';s not all... a survey from the Radi... [Author: Ted Gulas - Computers and Internet - June 07, 2010]

    Read the article

  • How I Built My First Paid Website

    I have been a web master or a website administrator for around a year or so, initially I built two sites which were entirely made using a free domain registrar and a free web host. The free things are always got at the cost of quality. It applied here as well, the main problem I faced with free web host was that their server up time was very low, most of the times the server was down and another problem was server overload, since lots of websites were built on a single server, the load on the server was very...

    Read the article

  • How to Research Keywords - 3 Truths the Gurus Withheld

    Turns out the first valuable lesson I picked up on how to research keywords was the fact that information overload is the fastest way to kill your dreams when it comes to doing anything in your life, especially anything involving your business. Please, please don't make the mistakes that I have! There aren't any science or complex formulas there is simply processes that work if you work the processes.

    Read the article

  • Bing's Latest Assault and the Consequences For Search Marketing

    I think it's about time for a Bing update. It's now a year since Microsoft's 'decision engine' was launched, and the last few months have seen a huge marketing push. The chances are you've seen one of the TV ads, which focus on reducing the information overload users can experience at the hands of other search engines.

    Read the article

  • What is the difference between a PDU and a power strip (both 120V, 15A)?

    - by rob
    I just chatted with an APC rep about upgrading the UPSes at our office. She recommended a single higher-capacity 6-outlet Smart-UPS to replace the four Back-UPS units we currently have. When I asked how she recommended plugging in all the current devices, she recommended using a APC's AP9567 PDU, but said not to use a power strip. At first she said I had to use an APC brand PDU, but after I inquired about using a Tripp-Lite PDU, she said any brand PDU would be fine. The APC PDU previously referenced looks like a standard 120V power strip with overload protection but no surge protection. Other than overload protection (which seems redundant if plugging into the UPS), is there something else I'm missing, or should any power strip (without surge protection) be fine? Edit: I didn't mention it earlier, but we don't have a proper rack--though I did still plan to mount the PDU or power strip to something. I guess I'm wondering if there's any special reason I should pay as much as $180 for the low-end APC PDU (which just looks like a power strip to me) vs. $20-$30 for a workbench power strip.

    Read the article

  • Nginx , Apache , Mysql , Memcache with server 4G ram. How optimize to enought memory?

    - by TomSawyer
    i have 1 dedicated server with Nginx proxy for Apache. Memcache, mysql, 4G Ram. These day, my visitor on my site wasn't increased, but my server get overload always in some specified time. (9AM - 15PM) Ram in use is increased second by second to full. that's moment, my server will get overload. i have to kill all apache , mysql service and reboot it to get free memory. that's the circle. here is my ram in use at the moment 160(nginx) 220(apache) 512(memcache) 924(mysql) here's process number 4(nginx) 14(apache) 5(memcache) 20(mysql) and here's my my.cnf config. someone can help me to optimize it? [mysqld] datadir=/var/lib/mysql socket=/var/lib/mysql/mysql.sock user=mysql skip-locking skip-networking skip-name-resolve # enable log-slow-queries log-slow-queries = /var/log/mysql-slow-queries.log long_query_time=3 max_connections=200 wait_timeout=64 connect_timeout = 10 interactive_timeout = 25 thread_stack = 512K max_allowed_packet=16M table_cache=1500 read_buffer_size=4M join_buffer_size=4M sort_buffer_size=4M read_rnd_buffer_size = 4M max_heap_table_size=256M tmp_table_size=256M thread_cache=256 query_cache_type=1 query_cache_limit=4M query_cache_size=16M thread_concurrency=8 myisam_sort_buffer_size=128M # Disabling symbolic-links is recommended to prevent assorted security risks symbolic-links=0 [mysqldump] quick max_allowed_packet=16M [mysql] no-auto-rehash [isamchk] key_buffer=256M sort_buffer=256M read_buffer=64M write_buffer=64M [myisamchk] key_buffer=256M sort_buffer=256M read_buffer=64M write_buffer=64M [mysqlhotcopy] interactive-timeout [mysql.server] user=mysql basedir=/var/lib [mysqld_safe] log-error=/var/log/mysqld.log pid-file=/var/run/mysqld/mysqld.pid

    Read the article

  • How to parse text fragments located after tag by simplehtmldom?

    - by moogeek
    Hello! I'm using simplehtmldom to parse html and i'm stuck in parsing plaintext that is located outside of any tag (but between two different tags): <div class="text_small"> <b>?dress:</b> 7 Hange Road<br> <b>Phone:</b> 415641587484<br> <b>Contact:</b> Alex<br> <b>Meeting Time:</b> 12:00-13:00<br> </div> Is it possible to get this values of Adress, Phone, Contact, Meeting Time? I wonder if there is a opportunity to pass CSS Selectors into nextSibling/nextSibling functions...

    Read the article

  • Building a subquery with ARel in Rails3

    - by Christopher
    I am trying to build this query in ARel: SELECT FLOOR(AVG(num)) FROM ( SELECT COUNT(attendees.id) AS num, meetings.club_id FROM `meetings` INNER JOIN `attendees` ON `attendees`.`meeting_id` = `meetings`.`id` WHERE (`meetings`.club_id = 1) GROUP BY meetings.id) tmp GROUP BY tmp.club_id It returns the average number of attendees per meeting, per club. (a club has many meetings and a meeting has many attendees) So far I have (declared in class Club < ActiveRecord::Base): num_attendees = meetings.select("COUNT(attendees.id) AS num").joins(:attendees).group('meetings.id') Arel::Table.new('tmp', self.class.arel_engine).from(num_attendees).project('FLOOR(AVG(num))').group('tmp.club_id').to_sql but, I am getting the error: undefined method `visit_ActiveRecord_Relation' for #<Arel::Visitors::MySQL:0x9b42180> The documentation for generating non trivial ARel queries is a bit hard to come by. I have been using http://rdoc.info/github/rails/arel/master/frames Am I approaching this incorrectly? Or am I a few methods away from a solution?

    Read the article

< Previous Page | 16 17 18 19 20 21 22 23 24 25 26 27  | Next Page >