Search Results

Search found 4851 results on 195 pages for 'family calendar'.

Page 25/195 | < Previous Page | 21 22 23 24 25 26 27 28 29 30 31 32  | Next Page >

  • Appointment scheduling web service ?

    - by Tal Galili
    Hi all. I am looking for a web service that can allow me to publish an online calendar in which I offer open time slots - and then clients can fill in when they would like to come. And if a time is taken by one client, another won't be able to take it. What services can offer this? Thanks.

    Read the article

  • iPhone Exchange Calandar Sync Issues

    - by CT
    I am having problems setting up OTA sync of exchange calendars with a users iPhone at work. I set up her exchange account on the iPhone. Have it set to push. Contacts and Email loads up pretty much instantly. No calendar events. Any ideas?

    Read the article

  • Domino 8.5.3 forward room reservation request to external email

    - by Cividan
    I have created a room reservation database on my notes server. Now my problem is that we have 2 company that will use this room and I would like to forward the meeting request sent to this room to external email address so that the other company email server receive the reservation request and update the calendar on their side to see the accurate availability of the room. How can I achive this. Thanks !

    Read the article

  • Can I install a tool like Zimbra or Funambol on a server that is already managed by Syscp?

    - by bensch
    I have a server that is managed by Syscp. The question is, if there are unresolveable dependencies, or services, that are managed by syscp already? For example Zimbra is intended using postfix but syscp is managing that already. I guess, that will not be possible, but maybe without having the full functionality of Zimbra. I only need the calendar and contacts-support with CalDav. (besides: I am using debian sqeeze but this is interesting in general)

    Read the article

  • Changing MS Project to 20-hour or 30-hour week.

    - by Eric
    I'm working on a project in MS Project and the default is a 40-hour week. I'm putting each individual task in based on a number of hours, not days. I'd like to have the whole thing set up and computing at 40-hour weeks, and then change it to 20 hours and have the project recompute. How do I do this? I think it has something to do with changing the "project calendar" but I can't quite figure it out.

    Read the article

  • Embedding multiple Google Calendars in one frame

    - by cyruskazemi
    I have multiple secondary calendars under one account. I would like to be able to embed all of these calendars in the same frame on a web page so that anyone is able to view them. I tried making them all public but have only been able to embed one at a time because each calendar has a different address. Does anyone know if they can all be embedded at the same time?

    Read the article

  • Jquery calendar and tab sliding div clash...

    - by StealthRT
    Hey all, i am trying my best to figure out another way around this problem i seem to have encountered. On my website i have a jquery calendar and also a jquery div tab slider (this: http://www.queness.com/resources/html/tabmenu/jquery-tabbed-menu-queness.html). The problem comes into play with the DIV tag. The calender loads up inside a DIV with a id of 'calender'. The CSS for the tabs have the DIV hidden: CSS: .boxBody div {display:none;} .boxBody div.show {display:block;} .boxBody #category a {display:block;} And because of that, the calender never shows on the page. However, if i comment out that css code above, it shows up but does not cover each section as it should. In other words, everything is shown when it should be hidden until the tabs are clicked on to revel it. code: <script type="text/javascript"> $(document).ready(function() { $('#tabMenu > li').click(function(){ $('#tabMenu > li').removeClass('selected'); $(this).addClass('selected'); $('.boxBody div').slideUp('1500'); $('.boxBody div:eq(' + $('#tabMenu > li').index(this) + ')').slideDown('1500'); }).mouseover(function() { $(this).addClass('mouseover'); $(this).removeClass('mouseout'); }).mouseout(function() { $(this).addClass('mouseout'); $(this).removeClass('mouseover'); }); $('.boxBody #category li').mouseover(function() { $(this).css('backgroundColor','#888'); $(this).children().animate({paddingLeft:"20px"}, {queue:false, duration:300}); }).mouseout(function() { $(this).css('backgroundColor',''); $(this).children().animate({paddingLeft:"0"}, {queue:false, duration:300}); }); $('.boxBody li').click(function(){ window.location = $(this).find("a").attr("href"); }).mouseover(function() { $(this).css('backgroundColor','#888'); }).mouseout(function() { $(this).css('backgroundColor',''); }); }); </script> <div align="center"> <div class="Mainbox"> <ul id="tabMenu"> <div id="theLogo"><[img] src="img/theLogo.png" width="415" height="146" /></div> <li class="stats"><[img] src="img/Stats.png" width="70" height="52" id="tab1" /></li> <li class="cal"><[img] src="img/cal.png" width="70" height="52" id="tab2" /></li> <li class="loyalty"><[img] src="img/Loyalty.png" width="70" height="52" id="tab3" /></li> <li class="Employees"><[img] src="img/Employees.png" width="70" height="52" id="tab4" /></li> <li class="txtemail"><[img] src="img/TxtEmail.png" width="70" height="52" id="tab5" /></li> </ul> <div class="boxTop"></div> <div class="boxBody"> <div id="stats" class="show"> Just a test here.... </div> <div id="cal"> <div id='calendar'></div> </div> <div class="boxBottom"></div> </div> </div> How can i change the tab javascript code so that it does not have to hide the DIV's so that the calendar will work? I've tried to replace all div's with 'span' or 'p' but that does not seem to work at all. Any help would be great as i am stuck on this and can not go any further without it being solved! :) David

    Read the article

  • How do I set TargetNullValue to a date?

    - by Bryan Anderson
    I'm using the WPF toolkit's Calendar control to allow users to select a date. If the date is not yet selected then the property the SelectedDate is bound to is Null. This makes the Calendar default you January 1, 0 AD. I'd like to do something like SelectedDate="{Binding UserPickedDate, TargetNullValue=Today, Mode=TwoWay}" But both "Today" and "Now" throw binding errors. Can I use TargetNullValue to set the default date to Today or Now?

    Read the article

  • Zend GData - seems really big

    - by musoNic80
    I've downloaded the Zend GData package to use the Google Calendar API. When I look through the contents of the package it seems to contain loads and loads of stuff. Do I really need all of it just for using Google Calendar and no other Google APIs? If not, what can i safely get rid of?

    Read the article

  • Synchronize different google calendars on the iPhone

    - by Marta
    With my recent phone it's only possible to synchronize the calendar with my google calendar using gcalsync. An additional program. Here it is not possible to synchronize with different calendars you have in the google account or see your friends calendars on the phone. Is that possible with the iPhone??

    Read the article

  • JQuery DatePicker - pop calendar dialog on 'OnSelect' of another datepicker

    - by sajanyamaha
    I have two JQuery datepickers to select 'StartDate' and 'EndDate'.My requirement is to automatically popup the end date calendar after startDate has been selected. I have tried all the steps in COMMENTED HERE. The code here succesfully triggers the focus of 'EndDate' calendar,but it displays for a second and hides off. $(document).ready(function() { //Runs when tab is loaded var dateFormat = "dd/mm/yy"; var today=new Date(); today.setMonth(today.getMonth()-1); $("#ctl00_ContentPlaceHolder1_datepicker1").datepicker({ minDate: 0, dateFormat:dateFormat, //maxDate: '+12M +31D', onSelect: function(dateText, inst){ var the_date = new Date($.datepicker.parseDate(dateFormat,dateText)); //var end=(the_date.getDate()+1) + '/' + (the_date.getMonth()+1) + '/' + the_date.getFullYear(); $("#ctl00_ContentPlaceHolder1_datepicker2").datepicker('option', 'minDate', the_date); // TRIED ALL THESE //document.getElementById('ui-datepicker-div').style.display = 'block'; //document.getElementById('ui-datepicker-div').style.left = '635.5px'; //$("#ctl00_ContentPlaceHolder1_datepicker2").datepicker("show"); //$("#ctl00_ContentPlaceHolder1_datepicker2").datepicker(); //$("#ctl00_ContentPlaceHolder1_datepicker2").focus(); //$('#foo').slideUp(300).delay(800).fadeIn(400); //$("#ctl00_ContentPlaceHolder1_datepicker2").trigger("focus"); $('#ctl00_ContentPlaceHolder1_datepicker2').focus(); } }); $("#ctl00_ContentPlaceHolder1_datepicker2").datepicker({ //maxDate: '+12M +31D', dateFormat:dateFormat, onSelect: function(dateText, inst){ } }); });

    Read the article

  • HTML Calendar form and input arrays

    - by Christopher Ickes
    Hello. Looking for the best practice here... Have a form that consists of a calendar. Each day of the calendar has 2 text input fields - customer and check-in. What would be the best & most efficient way to send this form to PHP for processing? <form action="post"> <div class="day"> Day 1<br /> <label for="customer['.$current['date'].']">Customer</label> <input type="text" name="customer['.$current['date'].']" value="" size="20" /> <label for="check-in['.$current['date'].']">Check-In</label> <input type="text" name="check-in['.$current['date'].']" value="" size="20" /> <input type="submit" name="submit" value="Update" /> </day> <div class="day"> Day 2<br /> <label for="customer['.$current['date'].']">Customer</label> <input type="text" name="customer['.$current['date'].']" value="" size="20" /> <label for="check-in['.$current['date'].']">Check-In</label> <input type="text" name="check-in['.$current['date'].']" value="" size="20" /> <input type="submit" name="submit" value="Update" /> </day> </form> Is my current setup good? I feel there has to be a better option. My concern involves processing a whole year at once (which can happen) and adding additional text input fields.

    Read the article

  • How to create festival calendar in ASP.net

    - by Atul
    I want to make a festival calendar using asp.net from that I used two ajax calendar and one textbox it is a festival textbox where we enter festival which FromDate and ToDate respectively. I want to do this as following point If I enter in textbox Christmas and Choose Fromdate=25/12/2011 and ToDate=31/12/2011 then it will be valid If I choose fromDate=25/12/2011 and ToDate=24/12/2011 then it will invalid If I choose Fromdate=25/12/2011 and Todate=28/12/2011 then also it is invalid because it coming in between 25/12/2011 and 31/12/2011 If I Choose fromdate=1/1/2011 and ToDate=1/1/2011 then it is valid If I choose fromdate=21/12/2011 and 25/12/2011 then it is invalid because of already Christmas done in 1/1/2011 And all date should show in gridview like 25-dec-2011 format Here is my code: DateTime dt1 = Convert.ToDateTime(txt_fromdate.Text); DateTime dt2 = Convert.ToDateTime(txt_todate.Text); if (dt1 > dt2) { con.Open(); com = new SqlCommand("BTNN_MovieDB_Festival_Details_Insert", con); com.Parameters.Add("@fromdate", SqlDbType.VarChar).Value = dateformat_mmdd(txt_fromdate.Text.ToString().Trim()); com.Parameters.Add("@todate", SqlDbType.VarChar).Value = dateformat_mmdd(txt_todate.Text.ToString().Trim()); com.Parameters.Add("@return", SqlDbType.VarChar).Direction = ParameterDirection.ReturnValue; com.ExecuteNonQuery(); con.Close(); showdata(); } else if (dt1 < dt2) { lblerror.Text = "ToDate should be greater than FromDate"; }

    Read the article

  • Outlook Calendar Error "The attachment size exceeds the allowable limit", even when there is no attachment

    - by Laura Kane-Punyon
    I have an outlook meeting series that occurs weekly. Every week, I open the current occurrence, attach the current week’s meeting materials and send an update to the invites. I have done this for the same meeting series for several years. Recently, I started to run into a problem where every time I try to update or cancel a meeting occurrence I received the error “the attachment size exceeds the allowable limit” regardless of whether or not I have an attachment. I am not even able to cancel the series in order to start fresh. I have 2 questions regarding this issue: Is there any way to send attachments on the occurrence of a meeting invite without running into this issue? Is there any way to remove this meeting series?

    Read the article

  • Your server administrator has limited the number of items you can open simultaneously.

    - by Kez
    I receive the following sync error in Outlook 2007 SP2: Your server administrator has limited the number of items you can open simultaneously. Try closing messages you have opened or removing attachments and images from unsent messages you are composing. It is stopping me updating another user's calendar, which is open within my Outlook. Change are simply not syncing, either way. Is there a fix for this, e.g. increasing the number of permitted connections on the Exchange Server? We are using Exchange Server 2007 on a domain.

    Read the article

  • no volume in kubuntu 10.04

    - by neha
    hello,I am having both gnome and kde on my system.as my gnome is working perfectly but in KDE is there is no sound being generated. output of apley -l and lspci commands is as follows.. neha@neha-laptop:~$ aplay -l **** List of PLAYBACK Hardware Devices **** card 0: Intel [HDA Intel], device 0: STAC92xx Analog [STAC92xx Analog] Subdevices: 1/1 Subdevice #0: subdevice #0 card 0: Intel [HDA Intel], device 3: INTEL HDMI [INTEL HDMI] Subdevices: 1/1 Subdevice #0: subdevice #0 and output of lspci command is: neha@neha-laptop:~$ lspci 00:00.0 Host bridge: Intel Corporation Mobile PM965/GM965/GL960 Memory Controller Hub (rev 0c) 00:02.0 VGA compatible controller: Intel Corporation Mobile GM965/GL960 Integrated Graphics Controller (rev 0c) 00:02.1 Display controller: Intel Corporation Mobile GM965/GL960 Integrated Graphics Controller (rev 0c) 00:1a.0 USB Controller: Intel Corporation 82801H (ICH8 Family) USB UHCI Controller #4 (rev 02) 00:1a.1 USB Controller: Intel Corporation 82801H (ICH8 Family) USB UHCI Controller #5 (rev 02) 00:1a.7 USB Controller: Intel Corporation 82801H (ICH8 Family) USB2 EHCI Controller #2 (rev 02) 00:1b.0 Audio device: Intel Corporation 82801H (ICH8 Family) HD Audio Controller (rev 02) 00:1c.0 PCI bridge: Intel Corporation 82801H (ICH8 Family) PCI Express Port 1 (rev 02) 00:1c.1 PCI bridge: Intel Corporation 82801H (ICH8 Family) PCI Express Port 2 (rev 02) 00:1c.4 PCI bridge: Intel Corporation 82801H (ICH8 Family) PCI Express Port 5 (rev 02) 00:1d.0 USB Controller: Intel Corporation 82801H (ICH8 Family) USB UHCI Controller #1 (rev 02) 00:1d.1 USB Controller: Intel Corporation 82801H (ICH8 Family) USB UHCI Controller #2 (rev 02) 00:1d.2 USB Controller: Intel Corporation 82801H (ICH8 Family) USB UHCI Controller #3 (rev 02) 00:1d.7 USB Controller: Intel Corporation 82801H (ICH8 Family) USB2 EHCI Controller #1 (rev 02) 00:1e.0 PCI bridge: Intel Corporation 82801 Mobile PCI Bridge (rev f2) 00:1f.0 ISA bridge: Intel Corporation 82801HEM (ICH8M) LPC Interface Controller (rev 02) 00:1f.1 IDE interface: Intel Corporation 82801HBM/HEM (ICH8M/ICH8M-E) IDE Controller (rev 02) 00:1f.2 SATA controller: Intel Corporation 82801HBM/HEM (ICH8M/ICH8M-E) SATA AHCI Controller (rev 02) 00:1f.3 SMBus: Intel Corporation 82801H (ICH8 Family) SMBus Controller (rev 02) 02:09.0 FireWire (IEEE 1394): Ricoh Co Ltd R5C832 IEEE 1394 Controller (rev 05) 02:09.1 SD Host controller: Ricoh Co Ltd R5C822 SD/SDIO/MMC/MS/MSPro Host Adapter (rev 22) 02:09.2 System peripheral: Ricoh Co Ltd R5C843 MMC Host Controller (rev 12) 02:09.3 System peripheral: Ricoh Co Ltd R5C592 Memory Stick Bus Host Adapter (rev 12) 02:09.4 System peripheral: Ricoh Co Ltd xD-Picture Card Controller (rev ff) 09:00.0 Ethernet controller: Marvell Technology Group Ltd. 88E8040 PCI-E Fast Ethernet Controller (rev 12) 0b:00.0 Network controller: Broadcom Corporation BCM4312 802.11a/b/g (rev 01) can anyone help me??

    Read the article

  • Ubuntu turns off instead of suspend / sleeping

    - by Marcos
    I'm using Ubuntu 11.10 on my notebook as the main OS. How ever, I've been facing a serious problem: Every time I try to suspend it, or it just stays idle for a while, the computer shuts down, instead of suspending. It actually seems to be suspended, but when I press the button the awake it, it turns on, the open works are all lost. How can i fix this? P.s: On windows 7 the suspend / sleep resumes just fine. Here is a complete list of hardware: 00:00.0 Host bridge [0600]: Intel Corporation 2nd Generation Core Processor Family DRAM Controller [8086:0104] (rev 09) 00:02.0 VGA compatible controller [0300]: Intel Corporation 2nd Generation Core Processor Family Integrated Graphics Controller [8086:0116] (rev 09) 00:16.0 Communication controller [0780]: Intel Corporation 6 Series/C200 Series Chipset Family MEI Controller #1 [8086:1c3a] (rev 04) 00:1a.0 USB Controller [0c03]: Intel Corporation 6 Series/C200 Series Chipset Family USB Enhanced Host Controller #2 [8086:1c2d] (rev 04) 00:1b.0 Audio device [0403]: Intel Corporation 6 Series/C200 Series Chipset Family High Definition Audio Controller [8086:1c20] (rev 04) 00:1c.0 PCI bridge [0604]: Intel Corporation 6 Series/C200 Series Chipset Family PCI Express Root Port 1 [8086:1c10] (rev b4) 00:1c.1 PCI bridge [0604]: Intel Corporation 6 Series/C200 Series Chipset Family PCI Express Root Port 2 [8086:1c12] (rev b4) 00:1c.2 PCI bridge [0604]: Intel Corporation 6 Series/C200 Series Chipset Family PCI Express Root Port 3 [8086:1c14] (rev b4) 00:1d.0 USB Controller [0c03]: Intel Corporation 6 Series/C200 Series Chipset Family USB Enhanced Host Controller #1 [8086:1c26] (rev 04) 00:1f.0 ISA bridge [0601]: Intel Corporation HM65 Express Chipset Family LPC Controller [8086:1c49] (rev 04) 00:1f.2 SATA controller [0106]: Intel Corporation 6 Series/C200 Series Chipset Family 6 port SATA AHCI Controller [8086:1c03] (rev 04) 00:1f.3 SMBus [0c05]: Intel Corporation 6 Series/C200 Series Chipset Family SMBus Controller [8086:1c22] (rev 04) 01:00.0 Network controller [0280]: Realtek Semiconductor Co., Ltd. RTL8188CE 802.11b/g/n WiFi Adapter [10ec:8176] (rev 01) 02:00.0 System peripheral [0880]: JMicron Technology Corp. SD/MMC Host Controller [197b:2382] (rev 80) 02:00.2 SD Host controller [0805]: JMicron Technology Corp. Standard SD Host Controller [197b:2381] (rev 80) 02:00.3 System peripheral [0880]: JMicron Technology Corp. MS Host Controller [197b:2383] (rev 80) 02:00.5 Ethernet controller [0200]: JMicron Technology Corp. JMC250 PCI Express Gigabit Ethernet Controller [197b:0250] (rev 03) I've updated the kernel to 3.2 still and hibernate or suspend is still not working. SWAP is 1/4 of my RAM.

    Read the article

  • Set default reminder pattern to iCal Calendar/Group

    - by elhombre
    Hi all I have in iCal some Calendars/Groups named Birthday, Exams and Holidays. Now I am wondering if I can assign a default reminder pattern to all Exams events, for example: 2 Weeks before, 1 Week before, 2 Days before. The result should be that I don't have to specify each time the reminder pattern of an event in Exams when I create a New one. NOTE: If iCal can't do this, is it maybe possible do that through an automator action etc.?

    Read the article

  • Overlapping appointments in Outlook 2003

    - by iansinke
    I'm using Microsoft Outlook 2003 (Home and Student, if that makes any difference, which I doubt) as my calendar, and I have one minor gripe: it can't really handle appointments that don't begin and end right on the half-hour mark. For instance, if I have a class that ends at 9:22 AM and another class that begins at 9:27 AM, they will appear to overlap in the day view. Not a big deal, but it bugs me nonetheless. Anybody know of a hack or patch that will fix this issue? I've searched the Outlook documentation as well as Google to no avail.

    Read the article

  • Want to be part of the most meaningful Customer Experience conversation today?

    - by Tony Berk
    v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Today's entry is written by Chris Warner, Director, Product Strategy at Oracle. By now you’ve undoubtedly seen the blogs and announcements about Oracle OpenWorld. And perhaps you’ve also seen the news about OpenWorld’s newest sister event: Oracle Customer Experience (CX) Summit @ OpenWorld. Oracle CX Summit was created to be the most meaningful CX event, to be truly unique, to serve as the place to discover what it takes and what it really means to put the customer at the center of your business success. One long-time Oracle customer, when told about the Oracle CX Summit, put it this way: ‘This makes me rethink how I think about Oracle and Customer Experience’. Listen to what she heard and you be the judge. We believe Customer Experience (‘CX’) is a movement, not just the latest ‘IT’ tech trend. CX isn’t something you can simply ‘install’. CX is one of the most strategic initiatives an organization can undertake. Customer Experience is about connecting with an organization’s most important asset, the customer, and the critical role that connection has to an organization’s success. And there’s never been a bigger gathering of the smartest CX minds, most successful CX companies, and innovative CX examples than Oracle CX Summit. Take Subaru, for example. The company fully embraced the CX opportunity and their CX leadership will be on stage at the Oracle CX Summit to share their CX journey. They radically changed the way they interact with their customers, empower their employees, and differentiate their brand. And this is a story with a phenomenal happy ending: in a stagnant market and shrinking economy, they GREW their business and outpaced their competition. Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} At Oracle CX Summit, you will be surrounded by dozens of CX leaders, visionaries and innovators like Subaru. This three-day event brings together the largest collection of thought leaders and practitioners in Customer Experience ever. Notable presenters include: v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Calibri","sans-serif"; mso-bidi-font-family:"Times New Roman";} Seth Godin - World-renowned blogger and one ‘the World’s Top 21 Speakers’, author of 14 best-selling books like “Permission Marketing”, and founder of dozens of startups such as Squidoo.com (ranked one of the top 125 sites in the US). Kerry Bodine - VP Principal Analyst at Forrester for Customer Experience, author of the just-published book “Outside In - The Power of Putting Customers at the Center of Your Business”, and renowned author of “The Customer Experience Ecosystem”. Bruce Temkin - Co-founder and Chair of the Customer Experience Professionals Association, revered blogger of “Customer Experience Matters”, former VP Principal Analyst at Forrester for Customer Experience, Founder and Managing Partner of The Temkin Group, a leading Customer Experience research and consulting firm. George Kembel - Executive Director and Co-founder of the Stanford Design School, an established, recognized thought leader in design thinking and innovation, and a Silicon Valley based-CEO, venture capitalist and educator. Gene Alvarez - VP Research Analyst at Gartner and a recognized authority in the Retail and Consumer Goods industry. Gene has been published, featured and referenced in a variety of trade publications for Customer Experience insights. Senior Executives from innovative Customer Experience brands and agencies like AT&T, Intuit, Southwest Airlines, Marriott, Quiksilver, and Sapient. Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Calibri","sans-serif"; mso-bidi-font-family:"Times New Roman";} But the CX Summit includes much, much more. There are over 30+ role-driven sessions and rountables as well as one-of-a-kind events including: v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Calibri","sans-serif"; mso-bidi-font-family:"Times New Roman";} The Customer Experience Innovation Tent featuring hands-on demonstrations of bleeding-edge customer experiences like the Share Happy Ice Cream Machine A hands-on Customer Journey Mapping Workshop that lets you learn design thinking techniques for innovating differentiated experiences that drive cross-functional alignment Access to the Oracle OpenWorld Exhibition Halls and DEMOgrounds as well as a week-long Live Music Festival and the Oracle Appreciation Event featuring Pearl Jam and Kings of Leon Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Calibri","sans-serif"; mso-bidi-font-family:"Times New Roman";} At Oracle, we are quite proud of our award-winning suite of CX products, a suite of solutions that can help an organization greatly accelerate their CX journey. But Oracle CX Summit isn’t about products. It’s about how an organization can succeed in its CX initiative. There’s never been a bigger gathering of the smartest CX minds, most successful CX companies, and innovative CX examples than Oracle CX Summit. Come join the Customer Experience Revolution. Register for Oracle CX Summit @ OpenWorld here. v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Calibri","sans-serif"; mso-bidi-font-family:"Times New Roman";} --

    Read the article

  • How to stop receiving an error reading iCal invitations on Mac sent from Thunderbird?

    - by Matthew Rankin
    When I open an iCal invitation (Mail Attachment.ics file) in Mac Mail.app sent to me from someone using Thunderbird, I receive the following error: The only solution that I've found to date is to save the Mail Attachment.ics file somewhere like the Desktop, open it in a text editor, and delete the blank lines at the beginning and end of the file. This problem appears to only happen when I'm receiving invitations from people using Thunderbird under Windows. Does anyone know of a better way to solve this problem? Is this a bug in Apple iCal, or is Thunderbird not meeting the iCal spec? Configuration Information OS: Mac OS X 10.6.2 Mail Program: Mac Mail.app ver. 4.2 (1077) Calendar Program: Mac iCal.app ver 4.0.1 (1374)

    Read the article

< Previous Page | 21 22 23 24 25 26 27 28 29 30 31 32  | Next Page >